File size: 4,472 Bytes
2a5c21d
 
a957111
2a5c21d
6f22cd8
2a5c21d
 
 
08f3a5f
321dc32
 
2a5c21d
 
 
6f22cd8
7746322
 
2a5c21d
 
 
7746322
 
 
 
 
 
1e4b9c5
028d89a
 
7746322
c0b6656
 
9a893b3
 
 
 
166cd39
a957111
9a893b3
 
 
a957111
4e0b8f3
 
 
a957111
4e0b8f3
a957111
6c9c630
 
9a893b3
2a5c21d
 
 
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
# Study progress

Updated 2026-11-25T19:29:39+00:00.

23 training/control records and 0 final evaluations are complete. This is 19.2% of 120 planned model milestones.

## Current record

**stories** has 12 completed runs. The next milestone is determined by the run matrix.

Pilot rates project 1.69 remaining confirmation GPU-hours, excluding validation, exports and uploads.

Statistical status: pending. Awaiting confirmatory runs.

**abstracts** has 11 completed runs. The next milestone is determined by the run matrix.

Pilot rates project 9.54 remaining confirmation GPU-hours, excluding validation, exports and uploads.

Statistical status: pending. Awaiting confirmatory runs.

## One-week feasibility

At the pre-test check on 2026-11-25T10:33:28+00:00, pilot timings projected 22.50 hours for all confirmatory training and scoring, with 141.73 hours of the week available for secondary pilots, setup, publication and interruptions. [Timing and GPU memory by method](../results/feasibility/one-week.json)

## TinyStories hybrid follow-up

23 of 48 full runs and 5 of 8 shared checkpoints complete. awaiting eight paired width measurements. [Per-seed widths and development scores](hybrid/results.md)

The first measured set of hybrid arms projects 33.68 further hours from that checkpoint, including the eight replays. With the original confirmations and final scoring, the projected remaining work at the check was 56.18 hours with 159.49 hours left in the week. [Wall-time assumptions, measured memory and inputs](../results/feasibility/hybrid-week.json)

The first seed included 4.11 hours between the last pre-restart update and the first resumed update. Excluding repetitions of that gap projects 4.91 hours of remaining hybrid work and 27.40 hours with the original confirmations and scoring. Both forecasts use actual observed wall time and apply from the first-seed checkpoint. [Restart-adjusted timing](../results/feasibility/hybrid-uptime.json)

## Flatness coverage

| Stage | Weight geometry | Shared score geometry | Median pilot cycle | Longest pilot cycle |
| --- | --- | --- | --- | --- |
| stories | 39/91 | 40/92 | 34 s | 37 s |
| abstracts | 11/36 | 12/37 | 193 s | 311 s |

Weight geometry covers every neural checkpoint. Score geometry also covers the two unigram references. [All arms and their measurements](flatness.md#every-variant-and-baseline)

Giving each predictor still missing a measurement one complete native pilot cycle projects 1.83 additional hours at each stage’s median or 2.69 hours at its longest observed cycle. These scenarios include the observed reporting and upload time. Existing hybrid widths can be reused. The shared score calculation, archive growth and future interruptions can change the total. [Timestamped pilot measurements](../results/feasibility/flatness-pilot-wall-time.json) · [Archived timing log](https://huggingface.co/BurnyCoder/thirdloss-study/blob/main/logs/checkpoint-flatness-20261125T163331Z.log)

## Overall completion and remaining time

Across training, references, final tests, hybrid runs and flatness evaluations, **103/305 milestones are complete (33.8%)** and 202 remain. Each milestone has equal weight in this count. Data preparation, software and publications are recorded separately.

Projected remaining machine time is **28.91–30.27 hours**, including model publication and geometry. There are 155.29 hours left in the original week. These are two timing scenarios. They use the recorded pilot rates, whole remaining hybrid seed blocks, the longest primary pilot as a proxy for each remaining secondary pilot, and median or slower diagnostic and release cycles. Machine or network interruptions can extend them. [Cost by task](../results/feasibility/remaining-work.json) · [Observed release times](../results/feasibility/checkpoint-publication-time.json)

The final seed-sensitivity analysis is pending. The queue completes both stages’ single-seed comparisons and original frozen test evaluations before the remaining hybrid replications. All checkpoint measurements precede the final across-seed analysis. [Queue amendment](amendments/seed-sensitivity-last.md) · [Final report](seed-sensitivity.md)

## Monitoring

Inspect runs lasting over 10, 30 and 60 minutes at 5, 15 and 30 minute intervals respectively. The live dashboard refreshes between those checks. [Study design](plan.md) · [Run matrix](planned-runs.md) · [Experiment ledger](experiments/experiments.md)