File size: 5,951 Bytes
2a5c21d
 
f317f35
2a5c21d
55603a7
2a5c21d
 
 
157758d
a436531
157758d
a436531
a9804a2
321dc32
a9804a2
2a5c21d
ab4fdc1
2a5c21d
157758d
7746322
55603a7
2a5c21d
bbb8ed2
2a5c21d
7746322
 
 
 
 
 
f317f35
 
 
 
 
028d89a
 
7746322
c0b6656
 
9a893b3
 
 
 
510cdc7
9007fb0
9a893b3
 
 
9007fb0
4e0b8f3
 
 
9007fb0
4e0b8f3
f317f35
df1b2b5
55603a7
6c9c630
 
9a893b3
2a5c21d
 
 
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
# Study progress

Updated 2026-11-26T12:35:20+00:00.

60 training/control records and 24 final evaluations are complete. This is 70.0% of 120 planned model milestones.

## Current record

Recorded activity · Experiments paused by request. The remaining runs have no scheduled start date.

First run on resumption · Research abstracts · Third derivative · confirm seed 5 (1%). [Status of every planned run](planned-runs.md#current-evidence-and-remaining-runs)

**stories** has 36 completed runs. The next milestone is determined by the run matrix.

Pilot rates project 0.00 remaining confirmation GPU-hours, excluding validation, exports and uploads.

Statistical status: inconclusive. The registered two-comparison superiority criterion was unmet.

**abstracts** has 24 completed runs. Current records: abstracts-confirm-s05-third-r01-fp64 (paused, 458,752 targets).

Pilot rates project 4.77 remaining confirmation GPU-hours, excluding validation, exports and uploads.

Statistical status: incomplete. All checkpoints must reach 524,288 target tokens.

## One-week feasibility

At the pre-test check on 2026-11-25T10:33:28+00:00, pilot timings projected 22.50 hours for all confirmatory training and scoring, with 141.73 hours of the week available for secondary pilots, setup, publication and interruptions. [Timing and GPU memory by method](../results/feasibility/one-week.json)

## TinyStories hybrid follow-up

23 of 48 full runs and 5 of 8 shared checkpoints complete. awaiting eight paired width measurements. Adaptive was narrower than the fixed ramp in 4 bracket-resolved pairs. Even the most favorable completion of the eight planned pairs gives raw p ≥ 0.63671875. The registered joint width-superiority criterion is unreachable. [Per-seed widths and development scores](hybrid/results.md)

## Scientific audit

The post-hoc copy check found exact passages of at least 50 tokens in 26 of 21,990 test stories. At the registered training horizon, the sampled windows contained such passages from 3–11 test stories per seed. The archived test losses cover the whole split. Their sensitivity to removing these stories is unknown. [Hypothesis decisions, numerical qualifications and provenance](reviews/independent-scientific-audit.md)

The first measured set of hybrid arms projects 33.68 further hours from that checkpoint, including the eight replays. With the original confirmations and final scoring, the projected remaining work at the check was 56.18 hours with 159.49 hours left in the week. [Wall-time assumptions, measured memory and inputs](../results/feasibility/hybrid-week.json)

The first seed included 4.11 hours between the last pre-restart update and the first resumed update. Excluding repetitions of that gap projects 4.91 hours of remaining hybrid work and 27.40 hours with the original confirmations and scoring. Both forecasts use actual observed wall time and apply from the first-seed checkpoint. [Restart-adjusted timing](../results/feasibility/hybrid-uptime.json)

## Flatness coverage

| Stage | Weight geometry | Shared score geometry | Median pilot cycle | Longest pilot cycle |
| --- | --- | --- | --- | --- |
| stories | 63/91 | 64/92 | 34 s | 37 s |
| abstracts | 24/36 | 25/37 | 193 s | 311 s |

Weight geometry covers every neural checkpoint. Score geometry also covers the two unigram references. [All arms and their measurements](flatness.md#every-variant-and-baseline)

Giving each predictor still missing a measurement one complete native pilot cycle projects 0.91 additional hours at each stage’s median or 1.32 hours at its longest observed cycle. These scenarios include the observed reporting and upload time. Existing hybrid widths can be reused. The shared score calculation, archive growth and future interruptions can change the total. [Timestamped pilot measurements](../results/feasibility/flatness-pilot-wall-time.json) · [Archived timing log](https://huggingface.co/BurnyCoder/thirdloss-study/blob/main/logs/checkpoint-flatness-20261125T163331Z.log)

## Overall completion and remaining time

Across training, references, final tests, hybrid runs and flatness evaluations, **201/305 milestones are complete (65.9%)** and 104 remain. Each milestone has equal weight in this count. Data preparation, software and publications are recorded separately.

Projected remaining machine time is **18.82–19.42 hours**, including model publication and geometry. There are 138.20 hours left in the original week. These are two timing scenarios. They use the recorded pilot rates, whole remaining hybrid seed blocks, the longest primary pilot as a proxy for each remaining secondary pilot, and median or slower diagnostic and release cycles. Machine or network interruptions can extend them. [Cost by task](../results/feasibility/remaining-work.json) · [Observed release times](../results/feasibility/checkpoint-publication-time.json)

The registered adapter schedules require 518 host derivative calls across unfinished runs. Scaling the pilot by token count alone gives 320. Pricing the scheduled calls at each method’s measured mean changes the forecast by +2.18 hours. The original pre-test feasibility record retains its initial estimate. [Per-arm counts and observed costs](../results/feasibility/remaining-work.json) · [Training gate](../src/thirdloss/windows.py)

The final seed-sensitivity analysis is pending. The queue completes both stages’ single-seed comparisons and original frozen test evaluations before the remaining hybrid replications. All checkpoint measurements precede the final across-seed analysis. [Queue amendment](amendments/seed-sensitivity-last.md) · [Final report](seed-sensitivity.md)

## Monitoring

Inspect runs lasting over 10, 30 and 60 minutes at 5, 15 and 30 minute intervals respectively. The live dashboard refreshes between those checks. [Study design](plan.md) · [Run matrix](planned-runs.md) · [Experiment ledger](experiments/experiments.md)