# Capability retention: M0 (base) vs M1 (resist SFT) arXiv:2511.21399 App. E.4 methodology — lm-eval-harness, MMLU 5-shot MC, GSM8K 8-shot CoT, greedy, accuracy on the test split. | benchmark | metric | M0 | M1 | delta (pp) | |---|---|---|---|---| | mmlu | acc,none | 67.7% | 68.4% | +0.7 | | gsm8k_cot | exact_match,flexible-extract | 61.0% | 68.0% | +7.0 |