{ "release": "v6", "phase": "F7/211-270", "benchmark_type": "simulated multi-tenant pilot engineering benchmark", "real_company_pilot": false, "passed": true, "case_counts": { "tenants": 3, "controlled_attacks": 12, "simulated_baseline_events": 18, "analyst_feedback": 6, "executive_summaries": 3, "tenant_isolation_checks": 3, "audit_records": 45 }, "metrics": { "controlled_attack_recall": 1.0, "simulated_baseline_specificity": 1.0, "tenant_isolation": 1.0, "audit_chain_integrity": 1.0, "audit_tamper_detection": 1.0, "feedback_does_not_mutate_weights": 1.0, "version_evidence_approval_complete": 1.0, "executive_summary_schema_complete": 1.0, "no_auto_execute": 1.0 }, "gates": { "controlled_attack_recall": true, "simulated_baseline_specificity": true, "tenant_isolation": true, "audit_chain_integrity": true, "audit_tamper_detection": true, "feedback_does_not_mutate_weights": true, "version_evidence_approval_complete": true, "executive_summary_schema_complete": true, "no_auto_execute": true }, "limitations": [ "No real company telemetry was used; this is not a production pilot claim.", "Risk scores are controlled fixtures used to verify tenant thresholds and audit behavior.", "Production false-positive and critical-miss rates remain unmeasured until a redacted 30-60 day tenant baseline is approved.", "The in-memory reference must be backed by tenant-scoped durable storage before production use." ] }