Commit History

Yesterday

  1. Card fixes 2026-11-02: full card audit — benchmark notes and MMLU method, BF16 shares, requirements, GGUF/diffusion details

    Verified signature
    2f9dd4c
  2. Card update 2026-11-02: FP8 vision-tower config fix note, hybrid KV-cache and FP32 precision wording, benchmark shot wording

    Verified signature
    c314e22

2 days ago

  1. Add measured benchmark results (lm-evaluation-harness)

    Verified signature
    6895fc7
  2. Card update 2026-11-01: rewrite Korean summary, known-issue notice where applicable

    Verified signature
    9273422
  3. Card fixes 2026-11-01: verified corrections, requirements

    Verified signature
    2b299ea

3 days ago

  1. Card fixes 2026-11-01: verified corrections, requirements

    Verified signature
    a44a5c2
  2. Card fixes 2026-11-01: verified corrections, requirements

    Verified signature
    84f7103
  3. Card: detailed run/usage instructions

    Verified signature
    3901ea7
  4. Add files using upload-large-folder tool

    Verified signature
    1081a96
  5. Add files using upload-large-folder tool

    Verified signature
    fb9cdf4
  6. initial commit

    Verified signature
    4e6cc9e