Commit History

2 days ago

  1. Link the playground

    Verified signature
    bd328ad

3 days ago

  1. Retry on failed extrusions; failures no longer count toward the run budget

    Verified signature
    51f180c
  2. Show the failure risk as a ramp wall in the campaign figure

    Verified signature
    c603dcf
  3. Update results text for the template-row scan

    Verified signature
    793161e
  4. One-factor baseline: equal RPM steps (150, 300, 450), then change B.T.

    Verified signature
    2cc5f61
  5. Template-row scan for the one-factor baseline; surrogate and uncertainty strips

    Verified signature
    e7bed7b
  6. Probabilistic failure model, success-weighted selection, 10-seed benchmark

    Verified signature
    2f15905
  7. Add GP model, code, figures and card

    Verified signature
    97d671c
  8. initial commit

    Verified signature
    abdfde6