Commit History

3 days ago

  1. Retry on failed extrusions; failures no longer count toward the run budget

    Verified signature
    51f180c
  2. Show the failure risk as a ramp wall in the campaign figure

    Verified signature
    c603dcf
  3. One-factor baseline: equal RPM steps (150, 300, 450), then change B.T.

    Verified signature
    2cc5f61
  4. Template-row scan for the one-factor baseline; surrogate and uncertainty strips

    Verified signature
    e7bed7b
  5. Probabilistic failure model, success-weighted selection, 10-seed benchmark

    Verified signature
    2f15905
  6. Add GP model, code, figures and card

    Verified signature
    97d671c