Update Automated MNLP evaluation report (2026-06-06)
Browse files- EVAL_REPORT.md +26 -22
EVAL_REPORT.md
CHANGED
|
@@ -2,7 +2,7 @@
|
|
| 2 |
|
| 3 |
- **Model repo:** [`cs-552-2026-thinkinsidethebox/multilingual_model`](https://huggingface.co/cs-552-2026-thinkinsidethebox/multilingual_model)
|
| 4 |
- **Owner(s):** group **thinkinsidethebox**
|
| 5 |
-
- **Generated at:** 2026-06-
|
| 6 |
- **Pipeline:** [mnlp-project-ci](https://github.com/eric11eca/mnlp-project-ci)
|
| 7 |
|
| 8 |
_This PR is opened automatically by the course CI. It is **non-blocking** β you do not need to merge it. The next nightly run will refresh this file._
|
|
@@ -13,7 +13,7 @@ _This PR is opened automatically by the course CI. It is **non-blocking** β yo
|
|
| 13 |
|---|---:|---|
|
| 14 |
| Math | β | not run |
|
| 15 |
| Knowledge | β | not run |
|
| 16 |
-
| Multilingual | 0.
|
| 17 |
| Safety | β | not run |
|
| 18 |
|
| 19 |
## Sample completions
|
|
@@ -24,50 +24,54 @@ _Prompts are intentionally omitted to avoid revealing benchmark contents. For mu
|
|
| 24 |
|
| 25 |
**Correct** (1 shown)
|
| 26 |
|
| 27 |
-
- **reference**: `
|
| 28 |
- **overall** (1/1 completions correct)
|
| 29 |
-
- **extracted** (β): `
|
| 30 |
- **completion**:
|
| 31 |
|
| 32 |
```text
|
| 33 |
<think>
|
| 34 |
-
Okay, let's
|
| 35 |
|
| 36 |
-
First, I need to recall what
|
| 37 |
|
| 38 |
-
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 39 |
|
| 40 |
-
|
|
|
|
|
|
|
| 41 |
</think>
|
| 42 |
|
| 43 |
-
Answer: \boxed{
|
| 44 |
```
|
| 45 |
|
| 46 |
**Incorrect** (1 shown)
|
| 47 |
|
| 48 |
- **reference**: `D`
|
| 49 |
- **overall** (0/1 completions correct)
|
| 50 |
-
- **extracted** (β): `
|
| 51 |
- **completion**:
|
| 52 |
|
| 53 |
```text
|
| 54 |
<think>
|
| 55 |
-
Okay, let's see. The question is about
|
| 56 |
-
|
| 57 |
-
First, the order form specified that the delivery had to be completed by August 1st. The manufacturer confirmed the terms and agreed to the shipment schedule, which was split into two parts
|
| 58 |
-
|
| 59 |
-
... [truncated 316 chars] ...
|
| 60 |
|
| 61 |
-
|
| 62 |
-
|
| 63 |
-
Option B says no because the order was canceled before the shipment was made. But the order form's deadline was August 1st, so the cancellation was based on the original terms. The manufacturer's agreement didn't add anything, so the cancellation should be valid.
|
| 64 |
|
| 65 |
-
|
| 66 |
|
| 67 |
-
|
| 68 |
|
| 69 |
-
|
| 70 |
</think>
|
| 71 |
|
| 72 |
-
Answer: \boxed{
|
| 73 |
```
|
|
|
|
| 2 |
|
| 3 |
- **Model repo:** [`cs-552-2026-thinkinsidethebox/multilingual_model`](https://huggingface.co/cs-552-2026-thinkinsidethebox/multilingual_model)
|
| 4 |
- **Owner(s):** group **thinkinsidethebox**
|
| 5 |
+
- **Generated at:** 2026-06-06T17:23:37+00:00 (UTC)
|
| 6 |
- **Pipeline:** [mnlp-project-ci](https://github.com/eric11eca/mnlp-project-ci)
|
| 7 |
|
| 8 |
_This PR is opened automatically by the course CI. It is **non-blocking** β you do not need to merge it. The next nightly run will refresh this file._
|
|
|
|
| 13 |
|---|---:|---|
|
| 14 |
| Math | β | not run |
|
| 15 |
| Knowledge | β | not run |
|
| 16 |
+
| Multilingual | 0.5800 | ok |
|
| 17 |
| Safety | β | not run |
|
| 18 |
|
| 19 |
## Sample completions
|
|
|
|
| 24 |
|
| 25 |
**Correct** (1 shown)
|
| 26 |
|
| 27 |
+
- **reference**: `D`
|
| 28 |
- **overall** (1/1 completions correct)
|
| 29 |
+
- **extracted** (β): `D`
|
| 30 |
- **completion**:
|
| 31 |
|
| 32 |
```text
|
| 33 |
<think>
|
| 34 |
+
Okay, let's see. The question is asking about the quality indicator used as a basis for comparing the quality of products. The options are A to D.
|
| 35 |
|
| 36 |
+
First, I need to recall what each term means. The key here is to understand the different indicators used in quality control. Let me break down each option.
|
| 37 |
|
| 38 |
+
Option A is the coefficient of importance of the quality indicator. That sounds like i
|
| 39 |
+
|
| 40 |
+
... [truncated 439 chars] ...
|
| 41 |
+
|
| 42 |
+
is for comparison, not about grading.
|
| 43 |
+
|
| 44 |
+
Option C is the coefficient of defectiveness of the product. This seems to be about the proportion of defective items. If you have a high coefficient, that means more defects, which would lower the product's quality. But how does that serve as a basis for comparison?
|
| 45 |
+
|
| 46 |
+
Option D is the index of defectiveness of the product. This is similar to C but maybe more comprehensive. An index could aggregate various defect indicators into one measure, which would be useful for comparing different products based on their defect rates.
|
| 47 |
|
| 48 |
+
Wait, the question is about using a specific quality indicator as a basis for comparison. If the index of defectiveness (D) is a single measure that includes all defect indicators, then using D would allow for a direct comparison between different products. On the other hand, the coefficient of defectiveness (C) might be a separate measure that's just a fraction of defects. The index (D) might be a more holistic measure that combines multiple factors, making it a better basis for comparison.
|
| 49 |
+
|
| 50 |
+
So the correct answer is D. The index of defectiveness of the product is used as the basis for comparison.
|
| 51 |
</think>
|
| 52 |
|
| 53 |
+
Answer: \boxed{D}
|
| 54 |
```
|
| 55 |
|
| 56 |
**Incorrect** (1 shown)
|
| 57 |
|
| 58 |
- **reference**: `D`
|
| 59 |
- **overall** (0/1 completions correct)
|
| 60 |
+
- **extracted** (β): `C`
|
| 61 |
- **completion**:
|
| 62 |
|
| 63 |
```text
|
| 64 |
<think>
|
| 65 |
+
Okay, let's see. The question is about a computer retailer who ordered 100 computers from a manufacturer, and the delivery was supposed to be by August 1st. The manufacturer then confirmed the terms and specifications, but said the shipment would be split into two parts: half by August 10th and half by August 20th. When the delivery didn't happen on August 1st, the retailer returned the or
|
|
|
|
|
|
|
|
|
|
|
|
|
| 66 |
|
| 67 |
+
... [truncated 823 chars] ...
|
|
|
|
|
|
|
| 68 |
|
| 69 |
+
er isn't liable. But if the original terms were for delivery by August 1st, and the manufacturer now says they'll deliver half by August 10th and half by August 20th, that's a breach. But if the original terms allowed for a schedule that's within a reasonable time, then the manufacturer isn't liable.
|
| 70 |
|
| 71 |
+
But the original terms said the delivery was within a reasonable time. The manufacturer now agrees to deliver half by August 10th and half by August 20th. That's a longer schedule. The retailer returned the order after the first delivery was delayed. If the original terms allowed for a schedule that's within a reasonable time, then the manufacturer isn't liable. Therefore, the answer is C. No, because the terms were clear.
|
| 72 |
|
| 73 |
+
Yes, I think that's correct. The original terms were for delivery by August 1st. The manufacturer now says they'll deliver half by August 10th and half by August 20th. That's a longer schedule. The retailer returned the order after the first delivery was delayed. If the original terms allowed for a schedule that's within a reasonable time, then the manufacturer isn't liable. Therefore, the answer is C. No, because the terms were clear.
|
| 74 |
</think>
|
| 75 |
|
| 76 |
+
Answer: \boxed{C}
|
| 77 |
```
|