example_id,content,metadata,tagged_sentence,relation_type,type
05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",equal,annotated
45338082-ca66-418b-8fe1-8f2be926f330_9,,,A load-bearing structures of no more than 50 may pass between the stair steps.,less-equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_1,,,Individual flights are: for gradients up to 1:15 not more than 800 millimetres design solar load; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
f034fbd1-7547-425a-8163-513fcac0b66b,The roof structures and joints must be properly inclined and sealed for water drainage.,{'ID': '103_Finnish_Health-Humidity'},The roof structures and joints must be properly inclined and sealed for water drainage.,necessity,annotated
aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",necessity,annotated
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_9,,,"If the total flow rate of a mechanical ventilation systems air duct is designed to be greater than (16.66 8.33 V0.4)/(1000 24), the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_8,,,"If the primary energy factor of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 10 litres per second per person of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic
2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,part-of,annotated
f733b7c9-a406-4f5a-b383-9d3f8b70a559,The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,{'ID': '5_UK_DocA_Structure'},The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,selection,annotated
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_6,,,The energy efficiency must not exceed the individual dwellings high.,less-equal,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_4,,,"The building primary energy rate and domestic hot water circulation heat loss calculated using the measured air permeability must not be higher than the target primary energy rate and patterns, respectively.",less-equal,synthetic
9ebe07e9-8381-451a-9ab8-701912478b30,The air flow rate of all mechanical ventilation fans should be tested.,{'ID': '210_UK_DocF_V1_Ventilation'},The air flow rate of all mechanical ventilation fans should be tested.,necessity,annotated
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",part-of,annotated
c47598f9-df79-4d77-aba9-8f380342372f,extract air of category 4 shall be conducted to the outdoors through individual extract air ducts.,{'ID': '88_Finnish_Health-IndoorClimateAndVentilation'},extract air of category 4 shall be conducted to the outdoors through individual extract air ducts.,necessity,annotated
a235c68f-ae44-4770-b005-4e9d7b659eb7_10,,,All cavity walls should have leaves at least 0.15 headroom and cavities at least 50mm wide.,greater-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_6,,,Skirtings totalling up to 50mm total thickness and shallow projecting Cable routes or casings above 650mm may be discounted when measuring clear width.,greater,synthetic
bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",selection,annotated
99a53f17-48cb-4012-a47b-700761e0983b_8,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 10m of those space must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic
f6ea9be6-644d-4dc6-8954-d115bdd528c8,"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",part-of,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779_2,,,"In large building complexes, such as retail parks and large sports centres, there should be 300 litres wheelchair-accessible unisex seating area capable of including an adult changing table.",equal,synthetic
c416d5e5-cb27-414c-b22e-7ed38be54ed1,There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,{'ID': '232_Finnish_FireSafety'},There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,selection,annotated
8364a5f1-f80e-484c-9f38-bffc6f4c1876_11,,,"Where communal parking is provided to blocks of flats, at least 150m2 standard lifting platform is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic
d8066a73-49c2-4e99-825a-b49b9b2ba67d_4,,,A landing measuring at least 0.06 m2 in fire compartmenting requirement must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic
8bb9aee2-a950-4a65-a715-287035906789,"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",{'ID': '27_Finnish_Accessibility'},"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",necessity,annotated
76bf63bd-30f4-440d-81a0-61ca16170f70_8,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the sections is less than E of the total load.,less,synthetic
2be01bf1-2cd9-4982-8778-ba0afe835580,"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",{'ID': '88_UK_DocF_V1_Ventilation'},"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",necessity,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_10,,,"The free opening of the vertical hatch or window of an emergency exit must be at least m3/(hm2) at 50Pa in product certificate and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
a15ee053-da1e-44cd-bdd9-76cdcb68eaee,"Whenever the building is moved to a new location, in which its intended time of use is less than two years, these calculations can be provided as evidence that the energy efficiency requirements are met.",{'ID': '87_UK_DocM_V2_AccessAndUseOfBuildings'},"Whenever the building is moved to a new location, in which its intended time of use is less than two years, these calculations can be provided as evidence that the energy efficiency requirements are met.",selection,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,none,annotated
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_8,,,The heat loss of the floor surface in the seating area and access route may not exceed E.,less-equal,synthetic
fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,selection,annotated
8fcdc238-3c30-4659-9303-1b126a39b2cd_7,,,"The design solar load should be leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building by at least 300mm.",greater-equal,synthetic
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_1,,,The vicinity of the floor surface in the seating area and access route may not exceed 600kg/m3.,less-equal,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",part-of,annotated
1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",necessity,annotated
b02f9b87-d934-4c2f-8a59-b3b8c0a7be17,"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",{'ID': '124_UK_DocF_V2_Ventilation'},"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",selection,annotated
56517433-cf40-4b88-a9d4-18e61e0e9993_6,,,"In addition, on both sides of the toilet seat there shall be a house of at least 2.",greater-equal,synthetic
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2,The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,{'ID': '19_UK_DocK_ProtectionFromFalling'},The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,none,annotated
8aad11d6-bd81-4a57-bd73-7c1319a76494,"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",{'ID': '331_UK_DocM_V2_AccessAndUseOfBuildings'},"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",part-of,annotated
9c2051ae-9878-4772-9471-bc5b8a28c3ae,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",{'ID': '23_UK_DocF_V2_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",selection,annotated
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_2,,,An upstand built on site should not exceed a value of 1.,less-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_4,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or skylights above four may be discounted when measuring clear width.,greater,synthetic
e21fa967-934e-4a29-a66d-252fdbbf928f_2,,,"If the parasitic energy use is unknown, an total extract air flow of 35 mg/m3 (30 ppm) should be made for any control system.",equal,synthetic
81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",greater-equal,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",none,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_6,,,"If the air flows of fire compartmenting requirement 1 and 1,200 MJ/m2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_2,,,"the minimum clear dimensions of the platform are: 1,000 millimetres layers and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.",equal,synthetic
df122091-ca53-4134-98a3-47779c06f9df,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,{'ID': '198_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,selection,annotated
ef561e39-db90-462c-8dde-15fbeae954e5_4,,,A cube with Ventilation of no more than two may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic
2a256a9c-0b8a-4acf-87e1-86a5857f36a3,"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",{'ID': '17_UK_DocM_V1_AccessAndUseOfBuildings'},"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",selection,annotated
81f14fc1-af5d-45e8-8725-94d2510e4701_9,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a width of at least 30% load in the hallway and kitchen.",greater-equal,synthetic
53bb982d-5260-4a69-a6dd-71e4f074e676_4,,,The travel of standing rows must be at least 10 kN.,greater-equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_8,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for length 1 and 300 litres if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
e15250c0-1279-4d29-a1ec-31560b045007_10,,,trigeneration scheme of basement storeys must not be connected to fire and smoke-proof extension.,not-part-of,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated
c384013b-c40f-4925-acbe-465e1ca5bc13_3,,,0.8 metres pressure gauge per detail should be recorded.,equal,synthetic
382038df-4d45-443d-a52a-8a83e6048d1e,At least 30% of the ties shall be located in the immediate vicinity of the grid lines of the columns and the walls.,{'ID': '175_Finnish_StabilityOfStructures'},At least 30% of the ties shall be located in the immediate vicinity of the grid lines of the columns and the walls.,necessity,annotated
8364a5f1-f80e-484c-9f38-bffc6f4c1876_4,,,"Where communal parking is provided to blocks of flats, at least 50mm standard Cable routes is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74_7,,,"In a tier that is uninterrupted by cross-gangways, and where the sections exceeds 2.4m, use a maximum number of steps of 40.",greater,synthetic
8aad11d6-bd81-4a57-bd73-7c1319a76494,"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",{'ID': '331_UK_DocM_V2_AccessAndUseOfBuildings'},"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",selection,annotated
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_8,,,"The free load capacity from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 1800mm, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic
4094b859-b3b4-4035-94cd-8cf47ccbd801_2,,,The frequency is at least (16.66 8.33 V0.4)/(1000 24).,greater-equal,synthetic
72e7ed0c-9e73-46b2-a919-20f3fea337fd_5,,,"An outdoor air and exhaust air ducts with a potentially flammable or explosive atmosphere must not be located in a eaves where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic
37f01a2c-b944-45a2-a7f4-140d8c03d7ac,"After rebating, frame components should retain at least 32mm of timber.",{'ID': '29_UK_DocQ_Security_Dwellings'},"After rebating, frame components should retain at least 32mm of timber.",necessity,annotated
4a82f789-a98a-4379-9b81-2a20cfba6c87,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",{'ID': '179_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",part-of,annotated
536b172d-ccd1-479a-8136-6ee05db0f264_8,,,"Where pipework is above ground, the performance of the pipe hot water storage vessel should be at least as high as the extends of pipework in the buried part of the system.",greater-equal,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_8,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and two years in instantaneous carbon monoxide concentration; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",selection,annotated
c0abe869-e87e-4e66-a8ca-8578a338b07a,"Where a building automation and control system is installed, its control capabilities should be appropriate for the building, its expected usage and the building services specification.",{'ID': '329_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a building automation and control system is installed, its control capabilities should be appropriate for the building, its expected usage and the building services specification.",necessity,annotated
a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",necessity,annotated
66249fda-33bf-4d93-8bf9-53fb82ad0e95,"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",{'ID': '87_Finnish_SafetyOfUse'},"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",part-of,annotated
33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated
eccd4f77-ef4a-41fd-a22a-620c84fdddd4_10,,,There is a minimum of 01:20:00 of worktop to at least instantaneous carbon monoxide concentration of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic
0fdce0b1-7992-401f-aa84-ad7f2acca23d,Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,{'ID': '184_UK_DocL_V1_ConsrvationOfFuelAndPower'},Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,necessity,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_10,,,"The total useful floor area of a barrier in a dwellings indoor areas may, however, be at least 1.3 seconds if the drop is less than three metres.",greater-equal,synthetic
99a53f17-48cb-4012-a47b-700761e0983b_10,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 50 m2 of those input charge must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic
c384013b-c40f-4925-acbe-465e1ca5bc13_6,,,60 persons staircases per detail should be recorded.,equal,synthetic
ac2db7e5-ea0b-4a14-9623-eba6300272a7,A new dwelling must be built to a minimum standard of total energy performance.,{'ID': '46_UK_DocL_V1_ConsrvationOfFuelAndPower'},A new dwelling must be built to a minimum standard of total energy performance.,necessity,annotated
e3128ebd-be79-48f2-93b5-7806c9a9026a,"Constructions behind surfaces exposed to running water, repetitious splash water or water condensation must be waterproofed.",{'ID': '110_Finnish_Health-Humidity'},"Constructions behind surfaces exposed to running water, repetitious splash water or water condensation must be waterproofed.",selection,annotated
43e26628-8b62-4cc6-91e2-284335df1564_1,,,"In rooms used for sleeping or rest, the heat recovery may not exceed 01:08:00.",less-equal,synthetic
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
84cd76d7-e5d0-4f39-94bc-0236c65d533a_8,,,"in residential buildings of not more than two storeys, one exit of no less than 16/01/2023 00:00 in reference value is permitted.",greater-equal,synthetic
12f51746-1632-4628-9d8a-98dcf58ed9fc,Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,{'ID': '116_UK_DocM_V1_AccessAndUseOfBuildings'},Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,part-of,annotated
f72a98f3-b7d2-4633-b244-0d7242dfb0c9_9,,,Every single bedroom has a minimum temperature of 28 metres and is at least 2.4m wide.,greater-equal,synthetic
f9de28ac-45bb-4400-9d9f-8afee73bd2e3,The number of appliances should not exceed one per 100m2 of dwelling floor area.,{'ID': '273_UK_DocL_V1_ConsrvationOfFuelAndPower'},The number of appliances should not exceed one per 100m2 of dwelling floor area.,none,annotated
2de867fe-80e7-4617-ad18-36225dd45ab1_8,,,Hinged or pivot windows with an cold side of less than 450mm are not suitable for purge ventilation.,less,synthetic
2633c957-07b4-4caa-a9d6-5acbac16b0b0_2,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 55 degrees Celsius thresholds.,equal,synthetic
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_5,,,An upstand built on site should not exceed a total supply air flow of 0.05.,less-equal,synthetic
eeb4239f-3819-475c-ad20-756bed80c4ff_0,,,"In reference heat loss calculations, the value used as the type and quality of the buildings ventilation system shall be 1m2.",equal,synthetic
a9944ed0-7168-4ec7-b761-0641e3e3228b,The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,{'ID': '157_Finnish_Health-WaterAndSewerage'},The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,necessity,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_2,,,"The indoor and outdoor conditions of steps in covered or heated outdoor staircases must be no less than 0.7, and the riser may be no more than 160 millimetres.",greater-equal,synthetic
bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",none,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74_3,,,"In a tier that is uninterrupted by cross-gangways, and where the quality of the installation exceeds 20, use a maximum number of steps of 40.",greater,synthetic
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",none,annotated
703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_0,,,100 millimetres requirements should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_11,,,"If the room temperature of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 0.07 of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic
88e23b46-22d9-4be6-87b7-40541f7995a9_0,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the locations exceeds twice the rise plus the going (2R G); 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic
4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",part-of,annotated
f5a71c7b-e852-40f2-8f88-91cda7902a7e_2,,,"If a new building has a space heating or airconditioning system with an sales counter greater than 270 millimetres, a building automation and control system should be installed.",greater,synthetic
85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",selection,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_11,,,"The wall ties should have a air-tightness of 32mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_10,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or hot water ring duct above 44mm may be discounted when measuring clear width.,greater,synthetic
3cc36bc1-da6a-4ebc-8d2f-2f5b6c4349b1,Supply temperature control should be provided via a variable set point with outdoor temperature compensation.,{'ID': '307_UK_DocM_V2_AccessAndUseOfBuildings'},Supply temperature control should be provided via a variable set point with outdoor temperature compensation.,necessity,annotated
a235c68f-ae44-4770-b005-4e9d7b659eb7,All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,{'ID': '35_UK_DocA_Structure'},All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,part-of,annotated
ca1bbebb-fe4e-48d8-8cdf-eef13cd79ee9,The dwelling emission rate must not exceed the individual dwellings target emission rate.,{'ID': '65_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling emission rate must not exceed the individual dwellings target emission rate.,less-equal,annotated
33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated
76acc6bd-50c0-4f3f-b015-42e171ec6ce7_7,,,eight per cent volume systems must be installed.,equal,synthetic
efd2d371-97de-4d5e-af06-e404ff71f316,The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,{'ID': '91_Finnish_EnergyEfficiency'},The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,necessity,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_2,,,"Where the work concerns a building containing more than 25 decibels controls, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic
fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",none,annotated
23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",necessity,annotated
8efb6108-e49e-4d64-a1e4-22e3f9128b17,"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",{'ID': '136_Finnish_EnergyEfficiency'},"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",part-of,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_11,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the Length may be no more than 1.",less-equal,synthetic
bde1697a-20c9-4f15-a63c-5be323a058c1_10,,,Any connection of 1m3/s or more projects to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic
993e54cc-49c3-43cb-995e-1a951c93c775_9,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an topography equal to 3.3m.",equal,synthetic
77f993c6-dff1-4f9a-8f66-73221d3cbaff_9,,,"If the dwelling only has 0.5 kN/m2 Manual reset, a minimum ventilation rate of 13l/s should be used.",equal,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",necessity,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_11,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the gradient is less than ten millimetres.",less,synthetic
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,part-of,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",none,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_6,,,"If the free gap between facing walls of adjacent glazed balconies or the energy consumption of the wall to the window of an adjacent fire compartment is less than 1,000 millimetres, the wall in question must be class EI 15.",less,synthetic
6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,part-of,annotated
fdd9f39e-e397-4172-b4da-3d213a30f987,On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,{'ID': '335_UK_DocM_V2_AccessAndUseOfBuildings'},On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,selection,annotated
7577d9f7-9f3c-4d3b-b8d9-da31d3e1b201,"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",necessity,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,annotated
6c789809-b1b8-429a-8fe2-8ce16f8a4b54_3,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the shape does not exceed ten millimetres.,less-equal,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890,"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",{'ID': '357_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",less-equal,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_4,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom residential block of flats, where there should be no fewer than 1,500 millimetres.",greater-equal,synthetic
9027959e-efc1-4d32-acbe-e0775d40f001_3,,,"The morticed bolts should have a minimum operation of 180 millimetres, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9_5,,,"Door entry controls, where provided, are mounted 1.3 seconds SEER finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic
70760393-8139-47e8-a329-87da3a477396,Under-floor heating systems intended for intermittent or cyclical operation and/or installed over unheated rooms should be separated from the structural floor by a layer of insulation with a thermal resistance of at least 1.25(m2K)/W.,{'ID': '304_UK_DocL_V1_ConsrvationOfFuelAndPower'},Under-floor heating systems intended for intermittent or cyclical operation and/or installed over unheated rooms should be separated from the structural floor by a layer of insulation with a thermal resistance of at least 1.25(m2K)/W.,necessity,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_5,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 190 kN in travel and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
793cb939-b3d9-46eb-ae65-71a4d5c8031b_6,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be exceptional circumstances to 220 millimetres.,less-equal,synthetic
511c1a7f-08b9-48ec-aea6-9b749fdf31a1_11,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 90mm of appropriately located car park which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic
26f33f06-e967-4d55-9e73-30990f52ac82,"Loft hatches: where the roof is insulated at ceiling level, hatches should be suitably designed and installed to ensure optimum airtightness.",{'ID': '189_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Loft hatches: where the roof is insulated at ceiling level, hatches should be suitably designed and installed to ensure optimum airtightness.",part-of,annotated
f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_9,,,No individual flight has a visual contrast of more than 900 millimetres.,less-equal,synthetic
0667134c-1290-4fe0-99eb-41c0b9e63a27,CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,part-of,annotated
5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",selection,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd_2,,,"An Heating systems with a potentially flammable or explosive atmosphere must not be located in a levels where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_11,,,"If the configuration of a mechanical ventilation systems air duct is designed to be greater than 850-1000mm, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_3,,,"For sizes of cylinder not listed, the principal living area from the cylinder should not exceed 70 kN, where V is the volume in litres.",less-equal,synthetic
458f98c0-ce87-48da-9c61-42a80d5dd672,Intermittent extract fans should be fitted in all wet rooms.,{'ID': '82_UK_DocF_V1_Ventilation'},Intermittent extract fans should be fitted in all wet rooms.,necessity,annotated
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_0,,,"When replacing an existing system, the structure of the new system should be no less than number of wall ties per square metre of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic
835d8fad-7a27-4299-aa38-a5b1771a6779_11,,,"In large building complexes, such as retail parks and large sports centres, there should be 65 degrees Celsius wheelchair-accessible unisex Variable volume control systems capable of including an adult changing table.",equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_1,,,"The wall ties should have a horizontal spacing of 900mm and a protection of 400-600mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",part-of,annotated
26980508-105c-49db-8595-bf001a48d757,"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",{'ID': '103_Finnish_SafetyOfUse'},"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",part-of,annotated
082c7ed9-3579-48c2-a0d2-076f1edd647c_7,,,"Each of the m3/(hm2) at 50Pa heat of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated
ef4ec541-e1a7-47d4-9a83-94715d8900ba_11,,,"Where six metres or more male washrooms are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic
21bf2954-bfa8-44ef-bb2e-4e34367965ba,"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",{'ID': '88_Finnish_FireSafety'},"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",selection,annotated
7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",none,annotated
f420ae57-5656-4558-b1a3-1079e46bf6cc,"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",{'ID': '223_Finnish_FireSafety'},"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",part-of,annotated
e2f06254-ca46-4471-89c7-ebef89a4d93d,"Where used, passive stack ventilation terminals should be located in the ceiling.",{'ID': '50_UK_DocF_V2_Ventilation'},"Where used, passive stack ventilation terminals should be located in the ceiling.",selection,annotated
7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",selection,annotated
596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",necessity,annotated
db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",necessity,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9_1,,,"Door entry controls, where provided, are mounted 01:20:00 fire compartmenting requirement finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic
88e23b46-22d9-4be6-87b7-40541f7995a9_6,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the above exceeds 25; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic
42f29765-356f-4d9c-9a73-bc99e7044e07,"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",{'ID': '47_UK_DocM_V2_AccessAndUseOfBuildings'},"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",selection,annotated
2cb4937d-9ec4-4013-8e9b-318a8adae27a,Account should be taken of outside noise when considering whether openable windows are appropriate for purge ventilation.,{'ID': '24_UK_DocF_V1_Ventilation'},Account should be taken of outside noise when considering whether openable windows are appropriate for purge ventilation.,selection,annotated
a33a8e64-62e5-4a95-b5fb-356b18c8f34f,The crawl space must be accessible for inspections and maintenance of the equipment and systems located there.,{'ID': '84_Finnish_Health-Humidity'},The crawl space must be accessible for inspections and maintenance of the equipment and systems located there.,necessity,annotated
5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",none,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,annotated
cf35d4a4-3170-421b-9be1-b68d928eed1d_0,,,"A roof with a speed greater than 1000m2 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic
43e26628-8b62-4cc6-91e2-284335df1564_4,,,"In rooms used for sleeping or rest, the distance of the uppermost floor level from the entry level may not exceed 2.0 m3/(h m2).",less-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_11,,,"The size of the indoor steps of other spaces intended for everyday use may be no more than 18 dm3/s, and the tread must be no less than 270 millimetres.",less-equal,synthetic
4094b859-b3b4-4035-94cd-8cf47ccbd801_8,,,"The atmosphere is at least 1,000 millimetres.",greater-equal,synthetic
d988e207-c3f9-4314-9a16-f99b334595f4_1,,,The total number of ventilators must be no less than 2.5 ties/m2.,greater-equal,synthetic
94c0e823-a61d-49d6-82b3-4ca96f65dfa4,The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,{'ID': '64_Finnish_SafetyOfUse'},The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,part-of,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779_1,,,"In large building complexes, such as retail parks and large sports centres, there should be 5m wheelchair-accessible unisex high rate controls capable of including an adult changing table.",equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated
9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",part-of,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c_2,,,"The prevailing wind direction for a building's total combined window area is 65mm of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_1,,,The span must not exceed the individual dwellings configuration.,less-equal,synthetic
2a256a9c-0b8a-4acf-87e1-86a5857f36a3,"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",{'ID': '17_UK_DocM_V1_AccessAndUseOfBuildings'},"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",selection,annotated
8102cb27-2e2a-4008-99d6-a53f5045f6e2,Structures with surfaces exposed to moisture must be resistant to the effects of water.,{'ID': '36_Finnish_Health-Humidity'},Structures with surfaces exposed to moisture must be resistant to the effects of water.,necessity,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_0,,,"If the part of a mechanical ventilation systems air duct is designed to be greater than one metre, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_1,,,A building with a intermediate landing exceeding 200 Watts per room must be equipped with anchoring structures for safety lines.,greater,synthetic
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_4,,,"When replacing an existing system, the Unit length of the new system should be no less than primary energy factor of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic
57f7bbad-51b7-4627-8fe9-2d7a50289448,"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",{'ID': '64_UK_DocM_V2_AccessAndUseOfBuildings'},"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",none,annotated
8bb9aee2-a950-4a65-a715-287035906789,"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",{'ID': '27_Finnish_Accessibility'},"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",part-of,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f_5,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 55 of non-fire-compartmented fire compartment that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_11,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 10m in cross-sectional area; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",selection,annotated
1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",none,annotated
99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,part-of,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",selection,annotated
2633c957-07b4-4caa-a9d6-5acbac16b0b0_4,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 2.0 m3/(h m2) building emission rate.,equal,synthetic
922bf8df-3a70-4f45-8c04-200b638d3b3c_3,,,The cold water pipe shall be designed and installed so that the projection in the cold water system may not exceed 270 millimetres.,less-equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_11,,,"In buildings more than 35 mg/m3 (30 ppm) and at most 28 metres in tread, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic
eccd4f77-ef4a-41fd-a22a-620c84fdddd4_2,,,There is a minimum of 160 millimetres of worktop to at least exit of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic
fc129e2c-abfa-48be-9fd6-e85f077ae67b,"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",none,annotated
a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated
8151be81-09ad-4dac-b2d2-f0d757915b6c_4,,,"However, when the snow load can occur, the load EER of the load s should be at least 190 millimetres.",greater-equal,synthetic
1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated
da4d5959-6e64-4e04-a1f3-8b42b6addab0_4,,,The outdoor inner surfaces used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 1 in 40.,greater-equal,synthetic
3ca5cb38-b90b-4449-ba14-4268866df8e1_7,,,The water heater is close to the draw-off points and has a dwelling emission rate no greater than 300 millimetres.,less-equal,synthetic
e40e66a5-25da-494b-b09c-e3241289a1b7,All other bedrooms should be accessible to a wheelchair user.,{'ID': '101_UK_DocM_V1_AccessAndUseOfBuildings'},All other bedrooms should be accessible to a wheelchair user.,necessity,annotated
4b510cad-fefb-44be-a9cb-a26e0c42994c,"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",{'ID': '101_Finnish_EnergyEfficiency'},"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",necessity,annotated
259c1614-77ef-4ae4-a401-83caa603e374,"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '35_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated
"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_4",,,"However, if the allowance is no more than one per 100m2, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic
23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",selection,annotated
56517433-cf40-4b88-a9d4-18e61e0e9993_11,,,"In addition, on both sides of the toilet seat there shall be a leak detectors of at least 75 light source lumens per circuit-watt.",greater-equal,synthetic
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60,The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,{'ID': '16_UK_DocM_V1_AccessAndUseOfBuildings'},The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,part-of,annotated
13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,annotated
9ebe07e9-8381-451a-9ab8-701912478b30,The air flow rate of all mechanical ventilation fans should be tested.,{'ID': '210_UK_DocF_V1_Ventilation'},The air flow rate of all mechanical ventilation fans should be tested.,none,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated
208b093d-361f-4aec-819d-4abca4e72c68,"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",{'ID': '216_Finnish_FireSafety'},"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",selection,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_2,,,Individual flights are: for gradients up to 1:15 not more than EI 15 inaccuracies; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
cc39ab97-8937-45f7-bc1f-bb2ccb95cb56,Drains shall convey foundation drainage water via drainage wells to a collection well.,{'ID': '172_Finnish_Health-WaterAndSewerage'},Drains shall convey foundation drainage water via drainage wells to a collection well.,necessity,annotated
e21fa967-934e-4a29-a66d-252fdbbf928f_11,,,"If the parasitic energy use is unknown, an both sides of four should be made for any control system.",equal,synthetic
f5a71c7b-e852-40f2-8f88-91cda7902a7e_3,,,"If a new building has a space heating or airconditioning system with an spread of fire greater than 30% load, a building automation and control system should be installed.",greater,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_6,,,Individual flights are: for gradients up to 1:15 not more than 0.06 m2 efficiencies; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9_0,,,"Door entry controls, where provided, are mounted between 550mm and 700mm inner surfaces finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic
f2bf62e6-9577-48b5-b15d-9fe4904acf52,"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",{'ID': '268_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",necessity,annotated
9fd15b82-fc32-4364-8724-f1ef14f0c047_10,,,The cooker hood should specification at least the height of the cooker.,greater-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_2,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the impact must be no less than B.",greater-equal,synthetic
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,none,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_2,,,Skirtings totalling up to 50mm total thickness and shallow projecting cooker or casings above 30 may be discounted when measuring clear width.,greater,synthetic
8b054fa5-fa6b-40f8-996a-a6dfea855fc3_5,,,"The CO2 between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 18 dm3/s on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic
4470dde4-6422-4c13-9781-de68c3e075dc_3,,,"The outdoor thick of a dwelling unit, however, shall be designed to be a minimum of 2.0 m3/(h m2).",greater-equal,synthetic
385a4365-40c0-4c07-8854-b07bde292fd2,"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",{'ID': '109_Finnish_EnergyEfficiency'},"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",none,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",necessity,annotated
108b5709-f035-4697-ba25-56edd2ce60fc,"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",{'ID': '126_UK_DocM_V2_AccessAndUseOfBuildings'},"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",necessity,annotated
9618a274-45da-4e3e-87f0-21c2bfae4a8e,"A guardrail must be used at points with a level difference of over 0.7 metres, if these can be accessed by children.",{'ID': '39_Finnish_SafetyOfUse'},"A guardrail must be used at points with a level difference of over 0.7 metres, if these can be accessed by children.",selection,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_11,,,"The condition installed in a dwellings habitable rooms and kitchens should be no fewer than 90, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic
4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",part-of,annotated
76bf63bd-30f4-440d-81a0-61ca16170f70_10,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the headroom is less than 200 Watts per room of the total load.,less,synthetic
d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",greater-equal,annotated
511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",equal,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",selection,annotated
984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",selection,annotated
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_11,,,"Where a new building contains more than two years tier, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,part-of,annotated
f51da5c6-7614-4719-8150-e22851e4aa12,"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",{'ID': '152_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",necessity,annotated
9494f4b9-aae0-4668-aebb-1d8851dd0824,"In refreshment facilities, bars and counters (or sections of them) should be at a level suitable for wheelchair users.",{'ID': '127_UK_DocM_V2_AccessAndUseOfBuildings'},"In refreshment facilities, bars and counters (or sections of them) should be at a level suitable for wheelchair users.",part-of,annotated
64aead92-11dc-49ab-9086-c86f6d1f9c3e,A dynamic calculation tool shall be used for the calculation of the room temperature for the summer season.,{'ID': '162_Finnish_EnergyEfficiency'},A dynamic calculation tool shall be used for the calculation of the room temperature for the summer season.,necessity,annotated
7f696221-52c9-4c52-8f90-74bd93c51299_4,,,"This grippable handrail is 850-1000mm above the pitch line of the flight and effective rated output at least 1,200 millimetres beyond the top and bottom nosings.",greater-equal,synthetic
35cacecf-06dc-4b0f-aadb-db2ee05518c7_4,,,The area of windows and roof windows (but excluding display windows) not reasonable to achieve a step-free approach route to the principal private entrance exceeds three metres of the facade area.,greater,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_2,,,"The dwelling primary energy rate, natural light and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, air-tightness and target fabric energy efficiency rate, respectively.",less-equal,synthetic
f27c9fb4-dc28-494c-a277-a51360cdfdb8,A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,{'ID': '57_Finnish_SafetyOfUse'},A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,necessity,annotated
703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated
e15250c0-1279-4d29-a1ec-31560b045007_8,,,muntins of basement storeys must not be connected to fire and smoke-proof property.,not-part-of,synthetic
0da52584-1b37-48b5-840f-3795ae695275_4,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 0.7W/(m2K) Manual controls are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,less-equal,annotated
d8066a73-49c2-4e99-825a-b49b9b2ba67d_11,,,A landing measuring at least 65mm in facade area must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",selection,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",none,annotated
8e8f4fb5-00b5-404f-89df-a07287984748_2,,,"In buildings with a storage capacity greater than 23C, automatic meter reading and data collection facilities should be installed.",greater,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_7,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the service of that installation exceeds 65mm of the total cost of the major renovation.",greater,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_9,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or control appliance above 9 metres may be discounted when measuring clear width.,greater,synthetic
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",none,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779_9,,,"In large building complexes, such as retail parks and large sports centres, there should be 1 in 40 wheelchair-accessible unisex hermostatic control capable of including an adult changing table.",equal,synthetic
5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,part-of,annotated
12e545d1-64f4-45c9-a520-5b8a003eba0a_2,,,"If the dwelling has more than 850 millimetres exposed oven, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic
528e7551-acfd-4fa6-be24-9c91bd6d7679,The materials and fittings shall be compatible.,{'ID': '149_Finnish_Health-WaterAndSewerage'},The materials and fittings shall be compatible.,necessity,annotated
b5aa20f2-571e-48d8-9943-4102c9f9bd1a,"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",{'ID': '250_Finnish_FireSafety'},"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",selection,annotated
a8b3e54e-902c-4502-99a2-8c41d46f1416_11,,,"If there are more than 9 metres battery storage in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",none,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_6,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the number of people evacuating of these must be at least 0.15 dm3/s per m2.",greater-equal,synthetic
36650de0-ef3c-4fd1-8199-f47c0e576076_3,,,the drop of the platform does not exceed 0.8 metres.,less-equal,synthetic
5211dbd1-d12a-4371-ad62-1dc5616cd2f5,The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,{'ID': '387_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,part-of,annotated
35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",part-of,annotated
72d7716f-7e3e-442c-9e42-14d4b19e18e3_7,,,A area that is being connected to a new building should not have a patterns for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic
c71c68fe-63ac-400f-b9ca-6e8c20cc5b5e,A conservatory or porch must have thermal separation from the existing dwelling.,{'ID': '431_UK_DocL_V1_ConsrvationOfFuelAndPower'},A conservatory or porch must have thermal separation from the existing dwelling.,necessity,annotated
956efc87-87de-4d3c-99fb-dc58eab9353b_3,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a design value of at least EI 30.,greater-equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,selection,annotated
2de867fe-80e7-4617-ad18-36225dd45ab1_6,,,Hinged or pivot windows with an patterns of less than 20 litres per second are not suitable for purge ventilation.,less,synthetic
46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",none,annotated
37239af2-8f49-499f-ab25-73f92d7c9369,Each letter should be 25mm high.,{'ID': '117_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Each letter should be 25mm high.,part-of,annotated
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_5,,,"When replacing an existing system, the energy consumption of the new system should be no less than surface temperature of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic
517253f8-98b1-4821-8901-75124d3237db,"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",none,annotated
287098c1-9e45-4917-ad34-1301db390c17,"Where it is not reasonable to achieve a step-free approach route to the principal private entrance, a step-free approach route should be provided to a suitable alternative private entrance instead.",{'ID': '41_UK_DocM_V1_AccessAndUseOfBuildings'},"Where it is not reasonable to achieve a step-free approach route to the principal private entrance, a step-free approach route should be provided to a suitable alternative private entrance instead.",necessity,annotated
f9de28ac-45bb-4400-9d9f-8afee73bd2e3_9,,,The centre pane U-value should not exceed 50 millimetres of dwelling floor area.,less-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_8,,,the minimum clear dimensions of the platform are: 850-1000mm total capital cost and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,annotated
079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",none,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_1,,,"The dwelling primary energy rate, free gap and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, mechanical ventilation and target fabric energy efficiency rate, respectively.",less-equal,synthetic
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",selection,annotated
b02f9b87-d934-4c2f-8a59-b3b8c0a7be17,"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",{'ID': '124_UK_DocF_V2_Ventilation'},"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",selection,annotated
a0c838b5-5fe2-4b52-abe1-432804c2c8aa_1,,,A intended time of use of 21 C shall be used as the vertical spacing for room temperature during the heating season.,equal,synthetic
f9de28ac-45bb-4400-9d9f-8afee73bd2e3_7,,,The horizontal spacing should not exceed 44mm of dwelling floor area.,less-equal,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73_0,,,The energy consumption of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the intended purpose of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,necessity,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",selection,annotated
2ef73ac0-d424-4e28-9782-3dbaf6e0a046,Attics and uppermost floor voids shall be divided into 400 m2 parts.,{'ID': '107_Finnish_FireSafety'},Attics and uppermost floor voids shall be divided into 400 m2 parts.,selection,annotated
0ea1e862-2434-4fc8-97a2-b076c992ef20_3,,,"The sales counter of an exit must be at least 6m and its free height must be at least 2,100 millimetres.",greater-equal,synthetic
63af9f99-6939-4e8c-a6a9-8b10942e1597,"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",{'ID': '57_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",necessity,annotated
a48aade7-5532-4424-a39e-5b1638516702,The effective g-value should be no worse than 0.3.,{'ID': '350_UK_DocM_V2_AccessAndUseOfBuildings'},The effective g-value should be no worse than 0.3.,necessity,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_3,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 0.055555556 commissioning plan properties, where there should be no fewer than four.",equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_5,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the diameter is not less than 40 degrees Celsius.",greater-equal,synthetic
7602a501-a5b5-429c-99e1-8bc801243494,"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",{'ID': '111_Finnish_Health-Humidity'},"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",necessity,annotated
3ac96918-764f-403d-a588-37b5f4a16f46,"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",{'ID': '284_UK_DocM_V2_AccessAndUseOfBuildings'},"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",selection,annotated
b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",part-of,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50_6,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the Activation of the heat emitters to be installed does not exceed 8.5m2.",less-equal,synthetic
4e8c5c50-44af-48f6-b959-e6f9b31afa1e_11,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical Staircases may be sign.",equal,synthetic
2633c957-07b4-4caa-a9d6-5acbac16b0b0,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,{'ID': '245_UK_DocM_V2_AccessAndUseOfBuildings'},NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,part-of,annotated
05fdde92-d8af-42ad-963b-9019c69a8ab3_2,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same parasitic energy use as the buildings used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic
37f01a2c-b944-45a2-a7f4-140d8c03d7ac,"After rebating, frame components should retain at least 32mm of timber.",{'ID': '29_UK_DocQ_Security_Dwellings'},"After rebating, frame components should retain at least 32mm of timber.",none,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_10,,,"The dwelling primary energy rate, parasitic energy use and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, presence and target fabric energy efficiency rate, respectively.",less-equal,synthetic
74002ed3-548e-4e2f-8835-be76e643c67d_3,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least 300 litres fire resistance time.,greater-equal,synthetic
a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",necessity,annotated
973c9430-2b4a-4ab4-82df-7060c3002f77_5,,,The total capital cost for the community heating primary circuit should be a minimum of 20 millimetres.,greater-equal,synthetic
984c252b-74f4-4d85-9080-1c8ae1851eca_3,,,"If performance requires thicker glass to be used, an equivalent window unit with control capabilities (14 metres) glazing should be shown to meet the required standard.",equal,synthetic
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_3,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than five Grommets.,greater,synthetic
bd1438b0-ce84-4908-8d01-6c0884aa4650,"For roof-lights, U-values should be calculated based on a horizontal position.",{'ID': '111_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roof-lights, U-values should be calculated based on a horizontal position.",part-of,annotated
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",selection,annotated
2ff58135-b89d-40d1-a145-51aad9e5a942_11,,,"The landing in front of the outside door shall be at least 800 millimetres level difference and at least 1,500 millimetres long.",greater-equal,synthetic
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated
72d7716f-7e3e-442c-9e42-14d4b19e18e3,A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,{'ID': '336_UK_DocM_V2_AccessAndUseOfBuildings'},A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,annotated
7dbe5dbf-39fb-4ba4-bc75-d6ac7898e615,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",{'ID': '114_UK_DocL_V1_ConsrvationOfFuelAndPower'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",none,annotated
76bf63bd-30f4-440d-81a0-61ca16170f70_7,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the rated output is less than 56 metres of the total load.,less,synthetic
13a437c0-918c-47f2-85bd-b80dd69eb027_9,,,"There are no patterns on the from the top and bottom corners of the door of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",less,annotated
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_10,,,The floor plate areas must not exceed the individual dwellings total cost.,less-equal,synthetic
b5edf19f-56df-436a-89f0-9ab5bf6963ea,"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '106_Finnish_FireSafety'},"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",necessity,annotated
5925ca4d-801c-42e4-b581-a176dea2519f,"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",{'ID': '76_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",selection,annotated
0a6d6be2-bb25-4a7d-ac98-33351e1a2bb7,"Wheelchair-accessible bedrooms should be sufficiently spacious to enable a wheelchair user to transfer to one side of a bed, with or without assistance.",{'ID': '144_UK_DocM_V2_AccessAndUseOfBuildings'},"Wheelchair-accessible bedrooms should be sufficiently spacious to enable a wheelchair user to transfer to one side of a bed, with or without assistance.",necessity,annotated
41d06a37-5039-4dc0-aae1-0fe3abbd84fc,The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements.,{'ID': '132_UK_DocL_V1_ConsrvationOfFuelAndPower'},The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements.,selection,annotated
dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",none,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_8,,,Skirtings totalling up to 0.05 atmosphere and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic
0fdce0b1-7992-401f-aa84-ad7f2acca23d,Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,{'ID': '184_UK_DocL_V1_ConsrvationOfFuelAndPower'},Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,part-of,annotated
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_3,,,"When replacing an existing system, the Air flow rates of the new system should be no less than total useful floor area of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic
716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,necessity,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_5,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and load 150m2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
29c431ee-ea93-491d-ab13-06418d93c488_9,,,"If rated output is greater than 10m, manual control is acceptable.",greater,synthetic
fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,none,annotated
43e26628-8b62-4cc6-91e2-284335df1564_6,,,"In rooms used for sleeping or rest, the emission rate may not exceed 2.2 metres.",less-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_0,,,Skirtings totalling up to 0.9 metres free gap and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic
a235c68f-ae44-4770-b005-4e9d7b659eb7_7,,,All cavity walls should have leaves at least two years Extract and cavities at least 50mm wide.,greater-equal,synthetic
2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,selection,annotated
86831830-e7f0-4b90-aa27-dc0542b7ba4d_0,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least B automatic flow adjustment.",greater-equal,synthetic
0ea1e862-2434-4fc8-97a2-b076c992ef20_10,,,"The speed of an exit must be at least 10m and its free height must be at least 2,100 millimetres.",greater-equal,synthetic
76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,none,annotated
eeb4239f-3819-475c-ad20-756bed80c4ff_4,,,"In reference heat loss calculations, the value used as the directions of the buildings ventilation system shall be 1.",equal,synthetic
e8340500-38b6-461b-b00d-d3aa44ac1f0b_8,,,The extends of the water available from the hot water system may not exceed 650mm.,less-equal,synthetic
00cded8a-5208-4c1b-bda4-9677d45b9375,The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,{'ID': '105_Finnish_Health-Humidity'},The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,none,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_10,,,"The dwelling primary energy rate, dwelling emission rate and energy savings, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and domestic hot water circulation heat loss, respectively.",less-equal,synthetic
8151be81-09ad-4dac-b2d2-f0d757915b6c,"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",{'ID': '110_Finnish_StabilityOfStructures'},"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",greater-equal,annotated
dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",selection,annotated
0da52584-1b37-48b5-840f-3795ae695275_6,,,"the minimum clear dimensions of the platform are: 1,200 millimetres diameter and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.",equal,synthetic
8207751f-13b8-4fe3-9bfe-4423093d4905_4,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the speed of the staircase and exit route is no more than 850 millimetres.,less-equal,synthetic
3ca5cb38-b90b-4449-ba14-4268866df8e1_1,,,The water heater is close to the draw-off points and has a means no greater than 50 m.,less-equal,synthetic
f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",part-of,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_7,,,"If the free gap between facing walls of adjacent glazed balconies or the Control of the wall to the window of an adjacent fire compartment is less than 50mm, the wall in question must be class EI 15.",less,synthetic
e061791c-7881-43fe-a272-beec4a972b0c,The panel should be securely held in place.,{'ID': '31_UK_DocQ_Security_Dwellings'},The panel should be securely held in place.,necessity,annotated
c47598f9-df79-4d77-aba9-8f380342372f_2,,,extract air of capacity 650mm shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic
9eb5bf01-3810-44e3-802b-7c7eadad1831,"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",{'ID': '21_UK_DocF_V1_Ventilation'},"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",selection,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,none,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,greater,annotated
2a2dbb92-88af-47f5-bd1e-b3ddea4c1ec9,"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",{'ID': '70_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",necessity,annotated
0ab44f38-4588-4f61-ad7e-21a4a25df17d,Calibration should be carried out in accordance with CIBSEs TM23.,{'ID': '342_UK_DocM_V2_AccessAndUseOfBuildings'},Calibration should be carried out in accordance with CIBSEs TM23.,necessity,annotated
34a524ec-6994-426f-86af-78788fd34a80_11,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the heat recovery should be 0.055555556.",equal,synthetic
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_2,,,"Where a new building contains more than 900 millimetres teaching facility, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic
ff3e8f86-1542-4f54-a776-cfdc8482bad7,The seasonal energy efficiency ratio of an air conditioner working in cooling mode should be a minimum of 4.0.,{'ID': '332_UK_DocL_V1_ConsrvationOfFuelAndPower'},The seasonal energy efficiency ratio of an air conditioner working in cooling mode should be a minimum of 4.0.,greater-equal,annotated
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_3,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear construction of 150m2, except in doorways.",equal,synthetic
2032e456-bf80-4342-90dc-0da164e00a9a,A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '7_UK_DocF_V1_Ventilation'},A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,part-of,annotated
1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",selection,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_2,,,"If the agreed level of provision between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 400 millimetres, the wall in question must be class EI 15.",less,synthetic
1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",selection,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_1,,,"If the above of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 1,500 millimetres of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic
51284e52-f2f4-41b5-85e2-3fa96ab8602a,"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",{'ID': '132_UK_DocM_V2_AccessAndUseOfBuildings'},"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",necessity,annotated
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",none,annotated
2ff58135-b89d-40d1-a145-51aad9e5a942_7,,,"The landing in front of the outside door shall be at least 2.2 metres time-lapse and at least 1,500 millimetres long.",greater-equal,synthetic
2ca092ec-4425-4552-a389-fd0dadfbd154_8,,,NOTE: A floor level with a ventilation provision of 40 or steeper should be designed as a ramp.,greater-equal,synthetic
8aad11d6-bd81-4a57-bd73-7c1319a76494,"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",{'ID': '331_UK_DocM_V2_AccessAndUseOfBuildings'},"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",necessity,annotated
11f2902d-29c2-474e-97d0-628a2a97a666_8,,,"fire performance of over 1,200 millimetres must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic
40b40b1b-d1b1-49d8-b9b7-13c5845a169d,The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,{'ID': '71_Finnish_Health-WaterAndSewerage'},The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,less-equal,annotated
208b093d-361f-4aec-819d-4abca4e72c68_2,,,"in an evacuation area where the power input from controls is 270 millimetres, the second exit may be no less than 900 millimetres in width.",equal,synthetic
d7b27bbb-ac51-4036-8073-d094cbe994db,"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",{'ID': '232_UK_DocM_V2_AccessAndUseOfBuildings'},"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",necessity,annotated
a0c838b5-5fe2-4b52-abe1-432804c2c8aa,A temperature of 21 C shall be used as the design value for room temperature during the heating season.,{'ID': '33_Finnish_Health-IndoorClimateAndVentilation'},A temperature of 21 C shall be used as the design value for room temperature during the heating season.,part-of,annotated
6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_11,,,"If parking spaces are provided for a building, an adequate number of Turning circle, but at least 800 millimetres, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic
f9de28ac-45bb-4400-9d9f-8afee73bd2e3_0,,,The axle group load should not exceed 190 kN of dwelling floor area.,less-equal,synthetic
73efbdcb-2751-4f01-9471-ccca44ccc0f3,"If a drainage point is located below the height of backwater, the waste water must be pumped.",{'ID': '133_Finnish_Health-WaterAndSewerage'},"If a drainage point is located below the height of backwater, the waste water must be pumped.",part-of,annotated
f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",necessity,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",none,annotated
c952db0f-b605-4335-8d56-97fc339ad5ba_0,,,All two persons per square metre Insulating materials of the installation and commissioning checklist should be completed.,equal,synthetic
079db365-cfed-474e-9329-25349ac0db4a_4,,,"In connection with the door of an outside space of an individual dwelling the travel distance outside the door may be more than 900-1000mm if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic
ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",selection,annotated
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8,"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",{'ID': '208_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",none,annotated
26980508-105c-49db-8595-bf001a48d757_6,,,"In Ladders with no fixed seats or handrail, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
51f35d58-c411-4d6d-b36e-9ddf10199908,"Whatever lifting device is chosen, internal stairs should always be provided as an alternative means of vertical access, and designed to suit ambulant disabled people and those with impaired sight.",{'ID': '106_UK_DocM_V2_AccessAndUseOfBuildings'},"Whatever lifting device is chosen, internal stairs should always be provided as an alternative means of vertical access, and designed to suit ambulant disabled people and those with impaired sight.",selection,annotated
103f99ad-884b-4bae-9f22-ccb1c5bc3d26_4,,,"In an open garage of no more than 40 sheathing board, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic
2633c957-07b4-4caa-a9d6-5acbac16b0b0_9,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 400-600mm storage capacity.,equal,synthetic
6414854d-01f9-481f-a7f4-c4581e48d8b1_4,,,Special safety features are not necessary if the timber frame is not more than A long.,less-equal,synthetic
9415ae4b-7a74-4c70-a245-e4381c6d71bf_4,,,"At gables and party walls, insulation should extend to the wall; if the cubicles between the wall and joist is less than eight per cent, perimeter insulation may be required.",less,synthetic
c8a048c6-8e7e-4b5a-ada5-02990b983401,"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",{'ID': '91_Finnish_Health-IndoorClimateAndVentilation'},"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",necessity,annotated
b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",necessity,annotated
86350df0-a40e-412b-a301-004524d56736_11,,,"For wet heating systems in new dwellings with a total combined window area of 15 degrees or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic
6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,necessity,annotated
2de867fe-80e7-4617-ad18-36225dd45ab1_9,,,Hinged or pivot windows with an free gap of less than two are not suitable for purge ventilation.,less,synthetic
4d80c4d1-08ee-481a-9f9c-e9151ce1094d_0,,,"The operation of windows, roof windows, rooflights and doors should not exceed between 550mm and 700mm of the total floor area of the dwelling.",less-equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_9,,,"The wall ties should have a horizontal spacing of 900mm and a tie force of 850-1000mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647_10,,,"Parapets in number of occupants A to 90mm and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic
01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",none,annotated
a52847f2-243e-44ed-b4b4-db3e948dd820,The water system shall be designed so as to prevent detrimental cross-flow of water from the hot water pipe to the cold water pipe or vice versa.,{'ID': '63_Finnish_Health-WaterAndSewerage'},The water system shall be designed so as to prevent detrimental cross-flow of water from the hot water pipe to the cold water pipe or vice versa.,necessity,annotated
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_2,,,"In spaces intended for more than 60 persons, the U-value of the access route must be at least 10 kN.",greater-equal,synthetic
53b7d989-c81f-4e01-a5ec-4b2cb30b4bfa,The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,{'ID': '104_Finnish_FireSafety'},The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,part-of,annotated
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated
02648917-f651-4c45-9449-1623cafd6cdc,Public Health Englands Indoor Air Quality Guidelines for Selected Volatile Organic Compounds (VOCs) in the UK should be used.,{'ID': '118_UK_DocF_V2_Ventilation'},Public Health Englands Indoor Air Quality Guidelines for Selected Volatile Organic Compounds (VOCs) in the UK should be used.,selection,annotated
922bf8df-3a70-4f45-8c04-200b638d3b3c_7,,,The cold water pipe shall be designed and installed so that the maximum number of occupants in the cold water system may not exceed 20mm.,less-equal,synthetic
e8340500-38b6-461b-b00d-d3aa44ac1f0b_5,,,The structure of the water available from the hot water system may not exceed 1000m2.,less-equal,synthetic
a235c68f-ae44-4770-b005-4e9d7b659eb7,All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,{'ID': '35_UK_DocA_Structure'},All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,necessity,annotated
4e8c5c50-44af-48f6-b959-e6f9b31afa1e_1,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical Products may be panel parts.",equal,synthetic
e68377dd-acec-4915-a0b4-a5eb8c840bf1,"Where vehicle barriers are necessary, sufficient space (for example 500mm) should be allowed around the future connection location.",{'ID': '121_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where vehicle barriers are necessary, sufficient space (for example 500mm) should be allowed around the future connection location.",selection,annotated
50e89a86-e2be-439d-b230-79274cd7199b_2,,,Modular and portable buildings with a planned Moisture of more than 2.4 metres at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic
29957187-5bca-4da2-b309-4b7ea2fdbf55,Provision shall be made for powered doors and gates to be opened in the event of a power failure.,{'ID': '115_UK_DocK_ProtectionFromFalling'},Provision shall be made for powered doors and gates to be opened in the event of a power failure.,necessity,annotated
9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",necessity,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_7,,,"The output of steps in uncovered or unheated outdoor staircases must be no less than 15 degrees, and the riser may be no more than 130 millimetres.",greater-equal,synthetic
d48274a1-bd70-4db9-8490-14075029cbb7,All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.,{'ID': '109_UK_DocM_V2_AccessAndUseOfBuildings'},All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.,necessity,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_9,,,"Where the work concerns a building containing more than 01:20:00 joints, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic
5e51b653-449e-4d00-be19-0e20ecff5c49,The default condition should be off.,{'ID': '213_UK_DocM_V2_AccessAndUseOfBuildings'},The default condition should be off.,selection,annotated
35cacecf-06dc-4b0f-aadb-db2ee05518c7,The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,{'ID': '495_UK_DocM_V2_AccessAndUseOfBuildings'},The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,selection,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_5,,,The ventilation provision of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the air tightness of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic
99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,annotated
3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_1,,,These fittings should not exceed a means of four.,less-equal,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e_0,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the intended time of use must be no less than 900 millimetres.",greater-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_4,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the maximum number of occupants must be no less than 0.1m2.",greater-equal,synthetic
80221d2c-8ba8-4700-b219-c35fde50f35e,No more than two drainage wells may be connected to a floor drain and they may be located at a maximum distance of three meters from the floor drain.,{'ID': '125_Finnish_Health-WaterAndSewerage'},No more than two drainage wells may be connected to a floor drain and they may be located at a maximum distance of three meters from the floor drain.,necessity,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_7,,,"If the air flows of width 1 and 60 persons are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
8c79efc1-f3e8-4394-ae6a-0bf5432ebcc5,NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a dwelling.,{'ID': '131_UK_DocF_V1_Ventilation'},NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a dwelling.,necessity,annotated
10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",necessity,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8,"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",{'ID': '73_Finnish_Health-IndoorClimateAndVentilation'},"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",none,annotated
f72a98f3-b7d2-4633-b244-0d7242dfb0c9_10,,,Every single bedroom has a minimum sunken area of 0.7W/(m2K) and is at least 2.4m wide.,greater-equal,synthetic
19478a13-7457-4dd3-a394-744f826db7b0_1,,,"The handle to at least 2.4m central heating in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8,"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",{'ID': '208_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",less-equal,annotated
7575211d-616b-42bb-b112-73a949e7ca6a,Any combined facility should be divided into distinct wet and dry areas.,{'ID': '176_UK_DocM_V2_AccessAndUseOfBuildings'},Any combined facility should be divided into distinct wet and dry areas.,necessity,annotated
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_4,,,The resilient layer should be to the full height of the door and 5m inaccuracies of the doorset.,equal,synthetic
a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",selection,annotated
8efb6108-e49e-4d64-a1e4-22e3f9128b17_5,,,"When calculating the reference heat loss of a building, the value of 1,500 millimetres shall be used as the air distribution for the air leakage rate figure for the building envelope.",equal,synthetic
38cd3221-7fc9-4462-be20-78b16a4309d3,The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,{'ID': '490_UK_DocL_V1_ConsrvationOfFuelAndPower'},The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,part-of,annotated
2de867fe-80e7-4617-ad18-36225dd45ab1_11,,,Hinged or pivot windows with an level difference of less than 180kW are not suitable for purge ventilation.,less,synthetic
0667134c-1290-4fe0-99eb-41c0b9e63a27,CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,part-of,annotated
f439dcde-3cf9-4b40-b555-a2107ae5559f,"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '104_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",none,annotated
74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",necessity,annotated
5211dbd1-d12a-4371-ad62-1dc5616cd2f5,The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,{'ID': '387_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,necessity,annotated
956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",selection,annotated
328fb8e7-cae4-4465-b7a7-24f0d066d65a,"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",{'ID': '360_UK_DocM_V2_AccessAndUseOfBuildings'},"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",necessity,annotated
f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_10,,,No individual flight has a category of more than 0.2.,less-equal,synthetic
86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",none,annotated
ff3e8f86-1542-4f54-a776-cfdc8482bad7_4,,,The dwelling emission rate of an air conditioner working in cooling mode should be a minimum of 0.3.,greater-equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_8,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 1,200 MJ/m2 in thresholds, these must be accessible via the interior.",greater,synthetic
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_3,,,"The exposure coefficient of steps in covered or heated outdoor staircases must be no less than 850 millimetres, and the riser may be no more than 160 millimetres.",greater-equal,synthetic
f27c9fb4-dc28-494c-a277-a51360cdfdb8,A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,{'ID': '57_Finnish_SafetyOfUse'},A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,necessity,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,annotated
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4,"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",{'ID': '6_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",necessity,annotated
0da52584-1b37-48b5-840f-3795ae695275_3,,,the minimum clear dimensions of the platform are: 18 dm3/s intended time of use and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection,annotated
eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,none,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_9,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the level difference is not less than 2.4 metres.",greater-equal,synthetic
4d80c4d1-08ee-481a-9f9c-e9151ce1094d_6,,,"The water vapour resistance of windows, roof windows, rooflights and doors should not exceed two persons per square metre of the total floor area of the dwelling.",less-equal,synthetic
10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",part-of,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2,The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,{'ID': '19_UK_DocK_ProtectionFromFalling'},The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,equal,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated
0262f6e5-21bc-4312-9388-8ac93b79416d,The minimum full load EER of the absorption chillers should be no worse than 0.7.,{'ID': '285_UK_DocM_V2_AccessAndUseOfBuildings'},The minimum full load EER of the absorption chillers should be no worse than 0.7.,greater-equal,annotated
f9f11981-2aad-4ef7-82fc-c89470ebe263,A driveway must not intersect a walkway leading to a play area.,{'ID': '88_Finnish_SafetyOfUse'},A driveway must not intersect a walkway leading to a play area.,necessity,annotated
2ff58135-b89d-40d1-a145-51aad9e5a942_8,,,"The landing in front of the outside door shall be at least 130 millimetres load and at least 1,500 millimetres long.",greater-equal,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2_7,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom battery storage, where there should be no fewer than 100 litres.",greater-equal,synthetic
ddd6ec57-ed54-4a8a-abaf-4b1efc287dde,The flushing shall be carried out with household water to remove any dirt and debris from the pipe network.,{'ID': '111_Finnish_Health-WaterAndSewerage'},The flushing shall be carried out with household water to remove any dirt and debris from the pipe network.,selection,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8_7,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the total load of the steps must be no more than 9 metres and the tread must be no less than 300 millimetres.",less-equal,synthetic
d504fd87-d13d-4936-9d7a-71d17954760d,The riser of the steps in an exit may be no more than 180 millimetres.,{'ID': '25_Finnish_SafetyOfUse'},The riser of the steps in an exit may be no more than 180 millimetres.,none,annotated
5aebe4f8-6ca6-4448-94db-5272b5541efb,"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",{'ID': '359_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",none,annotated
18797f16-0b56-41e9-a4e6-d4150db4165d,A new building must be built to a minimum standard of total energy performance.,{'ID': '47_UK_DocM_V2_AccessAndUseOfBuildings'},A new building must be built to a minimum standard of total energy performance.,necessity,annotated
973c9430-2b4a-4ab4-82df-7060c3002f77_0,,,The ventilation provision for the community heating primary circuit should be a minimum of 2.0 m3/(h m2).,greater-equal,synthetic
76bf63bd-30f4-440d-81a0-61ca16170f70_9,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the Length is less than 500kW of the total load.,less,synthetic
d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",none,annotated
339fc78c-a2f2-481c-a410-3aeb41e24b8a_8,,,Solid walls constructed of coursed brickwork or blockwork should be at least as axle group load as 900 millimetres of the storey height.,greater-equal,synthetic
9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",necessity,annotated
710ef992-e187-4b1a-894b-e0e222f54359,"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",{'ID': '199_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",equal,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_5,,,Individual flights are: for total useful floor area up to 0.35W/(m2K) not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
0f32fab3-c03b-400c-949a-cc95828a89d3,The specification of comfort cooling systems should be based on a heat gain calculation for the dwelling.,{'ID': '330_UK_DocL_V1_ConsrvationOfFuelAndPower'},The specification of comfort cooling systems should be based on a heat gain calculation for the dwelling.,necessity,annotated
9b2e2a40-6d63-4ee6-a539-da1d15dd68bd,"Where relevant work is undertaken on a mixed-use building, it should be determined which parking spaces are associated parking spaces for the use of occupants of the dwellings, and which parking spaces are for use by users of the non-residential function of the building.",{'ID': '94_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where relevant work is undertaken on a mixed-use building, it should be determined which parking spaces are associated parking spaces for the use of occupants of the dwellings, and which parking spaces are for use by users of the non-residential function of the building.",selection,annotated
53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,less-equal,annotated
bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",none,annotated
9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",selection,annotated
ee0c8c7c-c65e-4403-92e6-628fd680f3bf,Any panel within the doorset should be at least 15mm thick.,{'ID': '30_UK_DocQ_Security_Dwellings'},Any panel within the doorset should be at least 15mm thick.,none,annotated
f420ae57-5656-4558-b1a3-1079e46bf6cc_11,,,"In the case of the storey-level door of a dwelling, or if the differences through the door exceeds 200 millimetres, doors must open in the direction of the exit.",greater,synthetic
"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_1",,,"However, if the number of storeys is no more than 0.3W/m2, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic
7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",none,annotated
984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",part-of,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_0,,,"The free opening of the vertical hatch or window of an emergency exit must be at least B in shallow projecting and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
bc49524e-4bac-4d16-bc83-5a977019cfaa,Other ventilation systems may be acceptable if they can be shown to meet an equal level of performance.,{'ID': '30_UK_DocF_V1_Ventilation'},Other ventilation systems may be acceptable if they can be shown to meet an equal level of performance.,none,annotated
"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_6",,,"However, if the fire igniting is no more than 0.7W/(m2K), the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",part-of,annotated
2a8898d7-8561-4f67-9979-1bbba8ad42e6,"If insulating material is inserted into a cavity in a cavity wall, reasonable precautions shall be taken to prevent the subsequent permeation of any toxic fumes from that material into any part of the building occupied by people.",{'ID': '3_UK_DocD_ToxicSubstances'},"If insulating material is inserted into a cavity in a cavity wall, reasonable precautions shall be taken to prevent the subsequent permeation of any toxic fumes from that material into any part of the building occupied by people.",necessity,annotated
9415ae4b-7a74-4c70-a245-e4381c6d71bf_0,,,"At gables and party walls, insulation should extend to the wall; if the kitchens between the wall and joist is less than 40 degrees Celsius, perimeter insulation may be required.",less,synthetic
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_1,,,An upstand built on site should not exceed a domestic hot water cylinder heat loss of 15mm.,less-equal,synthetic
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated
baee716c-b8c2-4500-b4de-63fa11f007b1,A minimum of one in five of the remaining parking spaces must have access to cable routes.,{'ID': '83_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},A minimum of one in five of the remaining parking spaces must have access to cable routes.,equal,annotated
7d35f4c4-fa65-4d68-a974-f54386ca8aee_3,,,"However, a horizontal Roofs in a protective part must be no higher than 3.",less-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_0,,,Skirtings totalling up to 50mm total thickness and shallow projecting rain-water or casings above 400 millimetres may be discounted when measuring clear width.,greater,synthetic
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,selection,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74_8,,,"In a tier that is uninterrupted by cross-gangways, and where the projection exceeds 1000m2, use a maximum number of steps of 40.",greater,synthetic
21bf2954-bfa8-44ef-bb2e-4e34367965ba,"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",{'ID': '88_Finnish_FireSafety'},"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",none,annotated
a8b3e54e-902c-4502-99a2-8c41d46f1416,"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",{'ID': '106_Finnish_SafetyOfUse'},"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",selection,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b_3,,,"When an existing building with a total useful heat loss of over 400mm is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic
7134933d-17df-4a8c-b72e-1c09177bad1c,The spread of fire in voids of wall-type building elements must be restricted at least by storey.,{'ID': '130_Finnish_FireSafety'},The spread of fire in voids of wall-type building elements must be restricted at least by storey.,part-of,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_11,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be design solar load four.",equal,synthetic
"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_9",,,"However, if the access is no more than five, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic
7602a501-a5b5-429c-99e1-8bc801243494,"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",{'ID': '111_Finnish_Health-Humidity'},"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",selection,annotated
c490feb8-f09b-4c86-8d5f-12e1a5aec6db,Ventilation intakes should be located away from the direct impact of the sources of local pollution.,{'ID': '124_UK_DocF_V1_Ventilation'},Ventilation intakes should be located away from the direct impact of the sources of local pollution.,necessity,annotated
2695c899-0ada-478c-9b2d-796f79ea4c52,"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",{'ID': '92_UK_DocK_ProtectionFromFalling'},"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",necessity,annotated
83344b26-7cf0-452a-9dac-c0288c46393d,"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '37_UK_DocQ_Security_Dwellings'},"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",necessity,annotated
328fb8e7-cae4-4465-b7a7-24f0d066d65a,"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",{'ID': '360_UK_DocM_V2_AccessAndUseOfBuildings'},"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",selection,annotated
339fc78c-a2f2-481c-a410-3aeb41e24b8a_7,,,Solid walls constructed of coursed brickwork or blockwork should be at least as service as 40 of the storey height.,greater-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_4,,,"The edges of the indoor steps of other spaces intended for everyday use may be no more than 600mm, and the tread must be no less than 270 millimetres.",less-equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c_3,,,The control capabilities of access routes in assembly areas with a maximum capacity of 60 persons must be at least 70 kN.,greater-equal,synthetic
9027959e-efc1-4d32-acbe-e0775d40f001,"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",{'ID': '38_UK_DocQ_Security_Dwellings'},"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",part-of,annotated
c952db0f-b605-4335-8d56-97fc339ad5ba_4,,,All 1400mm water pump of the installation and commissioning checklist should be completed.,equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c,The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,{'ID': '115_Finnish_SafetyOfUse'},The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,part-of,annotated
4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",part-of,annotated
d8066a73-49c2-4e99-825a-b49b9b2ba67d_10,,,A landing measuring at least 300mm in Extract must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic
d48274a1-bd70-4db9-8490-14075029cbb7,All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.,{'ID': '109_UK_DocM_V2_AccessAndUseOfBuildings'},All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.,selection,annotated
868ad193-b0d2-47b9-9fe0-ded5b761d3b0,The integrity of the water system shall be ensured with pressure testing using water.,{'ID': '106_Finnish_Health-WaterAndSewerage'},The integrity of the water system shall be ensured with pressure testing using water.,part-of,annotated
4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",necessity,annotated
b47066e6-d145-4427-91c0-8763c5ea92c5,Remedial work should be carried out to achieve satisfactory performance in retests.,{'ID': '387_UK_DocM_V2_AccessAndUseOfBuildings'},Remedial work should be carried out to achieve satisfactory performance in retests.,necessity,annotated
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_0,,,"There should be a buried part, in the absence of tobacco smoke or other excessive pollutants, of proportion.",equal,synthetic
cf35d4a4-3170-421b-9be1-b68d928eed1d_4,,,"A roof with a temperature greater than 10m must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_11,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 0.05 output.,less-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_8,,,"The gradient of the indoor steps of other spaces intended for everyday use may be no more than 100 litres, and the tread must be no less than 270 millimetres.",less-equal,synthetic
5fa7daca-cb50-4397-a736-617e52d30187_4,,,"If ventilation rate at below 30% are required and unavailable, the number of appliances may be taken as equal to that at 30% load.",equal,synthetic
d988e207-c3f9-4314-9a16-f99b334595f4_9,,,The atmosphere must be no less than EI 30.,greater-equal,synthetic
6bf41e87-d7c1-42a5-bf0d-67c711a21753,"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",{'ID': '105_UK_DocM_V2_AccessAndUseOfBuildings'},"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",selection,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_8,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be net heating energy demand to 60.,less-equal,synthetic
d342429e-d3fc-46e0-a195-527cfef1fd4b_0,,,"When an existing building with a total useful air flow rates of over 50mm is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_7,,,The smaller net heating energy demand of each panel which can be either the width or height of the panel should be 180kW or less.,less-equal,synthetic
a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",necessity,annotated
b0e99ac5-9cbc-4beb-b8ff-85383ae70ea8,"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",{'ID': '40_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",necessity,annotated
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7,The dwelling fabric energy efficiency rate must not exceed the individual dwellings target fabric energy efficiency rate.,{'ID': '66_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling fabric energy efficiency rate must not exceed the individual dwellings target fabric energy efficiency rate.,selection,annotated
26980508-105c-49db-8595-bf001a48d757_2,,,"In cold premises with no fixed gigabit-capable public electronic communications network or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",selection,annotated
12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",none,annotated
5fa7daca-cb50-4397-a736-617e52d30187_3,,,"If vertical spacing at below 30% are required and unavailable, the dimensions may be taken as equal to that at 30% load.",equal,synthetic
53e31e26-a39b-4047-a86e-bdb8021413e8_1,,,Window handles on windows that open outwards are not more than 270 millimetres access when the window is at its maximum openable angle.,less-equal,synthetic
7f72632a-dc0a-4318-afd7-7090b42350fc,Mechanical supply terminals should be located and directed to avoid draughts.,{'ID': '106_UK_DocF_V1_Ventilation'},Mechanical supply terminals should be located and directed to avoid draughts.,necessity,annotated
eccd4f77-ef4a-41fd-a22a-620c84fdddd4_3,,,There is a minimum of 1000m2 of worktop to at least number of people evacuating of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic
8aa4b706-1659-4e30-a4fe-e7f33efe3241,All three parts of the compliance checklist should be completed.,{'ID': '108_UK_DocO_Overheating'},All three parts of the compliance checklist should be completed.,necessity,annotated
745d890e-3b3c-4972-8b75-dfdfd81e764a,"Handrails should be set at heights that are convenient for all users of the building and should extend safely beyond the top and bottom of a flight of steps, or a ramp, to give both stability and warning of the presence of a change in level.",{'ID': '58_UK_DocM_V2_AccessAndUseOfBuildings'},"Handrails should be set at heights that are convenient for all users of the building and should extend safely beyond the top and bottom of a flight of steps, or a ramp, to give both stability and warning of the presence of a change in level.",necessity,annotated
34a524ec-6994-426f-86af-78788fd34a80,"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",{'ID': '36_UK_DocQ_Security_Dwellings'},"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",selection,annotated
fa8a6d84-eb99-490e-8169-3c65353fb553_0,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the water temperature shall be at least 01:20:00.",greater-equal,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647_5,,,"Parapets in open outwards A to E 15 and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic
5fa7daca-cb50-4397-a736-617e52d30187_8,,,"If efficiencies at below 30% are required and unavailable, the control function may be taken as equal to that at 400 millimetres.",equal,synthetic
c2e0629d-350b-45b8-9e9e-d58be1780f12,"If the basement has no bedrooms, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",{'ID': '73_UK_DocF_V1_Ventilation'},"If the basement has no bedrooms, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,annotated
20609d43-016e-4314-9620-256f73f1c6ed,"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",{'ID': '160_UK_DocF_V1_Ventilation'},"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",selection,annotated
ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",part-of,annotated
0071a7ee-a50c-44ab-a562-d99bf06d7918,The text should be displayed over three lines.,{'ID': '118_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The text should be displayed over three lines.,necessity,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_3,,,"Extract air of type and quality two persons per square metre, 3 and 4 shall not be used as recirculation air.",equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_7,,,Modular and portable buildings with a planned energy consumption of more than 200 millimetres but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic
c236bc17-ef9a-4694-a34e-68a9f38ae405,"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",{'ID': '323_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",selection,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f,"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,annotated
38020928-c137-486e-88d7-c8feec038c99,A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,{'ID': '189_Finnish_FireSafety'},A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,none,annotated
164122ed-c7ac-4cf8-8a54-3d56c144f78d_5,,,"In general, the findings indicate that there should be at least the same number of Drawings as open-plan space and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",necessity,annotated
c952db0f-b605-4335-8d56-97fc339ad5ba,All three parts of the installation and commissioning checklist should be completed.,{'ID': '262_UK_DocF_V1_Ventilation'},All three parts of the installation and commissioning checklist should be completed.,necessity,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",part-of,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df,"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",{'ID': '356_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,annotated
64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",necessity,annotated
e874f337-2067-4e77-ad32-c3b857f40e7a_10,,,"If the structure exceeds ten millimetres, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic
37f01a2c-b944-45a2-a7f4-140d8c03d7ac_2,,,"After rebating, frame components should retain at least 100mm of CO2 measurements.",greater-equal,synthetic
6c789809-b1b8-429a-8fe2-8ce16f8a4b54_8,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the vicinity does not exceed 55 degrees Celsius.,less-equal,synthetic
973c9430-2b4a-4ab4-82df-7060c3002f77_8,,,The Air flow rates for the community heating primary circuit should be a minimum of 0.2.,greater-equal,synthetic
511c1a7f-08b9-48ec-aea6-9b749fdf31a1_10,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 1m3/s of appropriately located fixture which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic
72785bd7-d935-4c81-ab5f-ba2095ba62a9,"Manual controls, where provided, should be within reasonable reach of the occupants.",{'ID': '20_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Manual controls, where provided, should be within reasonable reach of the occupants.",selection,annotated
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_0,,,"In spaces intended for more than 60 persons, the open outwards of the access route must be at least 20 degrees Celsius.",greater-equal,synthetic
6a41a473-bd3c-4e38-a093-094b3fdae388_2,,,At least one in every 13l/s remaining air barrier must be provided with cable routes.,equal,synthetic
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated
77f993c6-dff1-4f9a-8f66-73221d3cbaff_2,,,"If the dwelling only has one habitable room, a minimum step of 23C should be used.",greater-equal,synthetic
05fdde92-d8af-42ad-963b-9019c69a8ab3_1,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same power requirements as the hatches used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic
1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",selection,annotated
8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated
fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",selection,annotated
23cff3c3-1251-4c5f-9fd9-8f52d25eb494_2,,,Gasfired boilers and multi-stage oilfired boilers with an that of more than 0.5 kN/m2 should have fully modulating burner controls.,greater,synthetic
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_11,,,"In a thermal energy streams with no openable European Standards, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic
2ff58135-b89d-40d1-a145-51aad9e5a942,"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",{'ID': '16_Finnish_Accessibility'},"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",greater-equal,annotated
26980508-105c-49db-8595-bf001a48d757_7,,,"In heating circuits with no fixed open-plan space or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
4e8c5c50-44af-48f6-b959-e6f9b31afa1e_7,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical frame components may be CO2 readings.",equal,synthetic
23cff3c3-1251-4c5f-9fd9-8f52d25eb494_7,,,Gasfired boilers and multi-stage oilfired boilers with an protective part of more than 1100mm should have fully modulating burner controls.,greater,synthetic
d0ef750b-078c-4e63-a57f-298674c06a5e,Moisture-resistant insulation should be fitted below damp-proof course level and extend to the foundation block/structure.,{'ID': '136_UK_DocL_V1_ConsrvationOfFuelAndPower'},Moisture-resistant insulation should be fitted below damp-proof course level and extend to the foundation block/structure.,necessity,annotated
c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,selection,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_5,,,The normal relationship between the number of appliances of the rise and going is: 200 millimetres equals between 550mm and 700mm.,equal,synthetic
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",necessity,annotated
986f7853-4975-4ecd-8f10-a75d818eb44a,"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",{'ID': '140_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",necessity,annotated
0f67dad7-6df9-444b-8e72-f447668e3fde,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",{'ID': '104_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",greater-equal,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,none,annotated
339fc78c-a2f2-481c-a410-3aeb41e24b8a_6,,,Solid walls constructed of coursed brickwork or blockwork should be at least as energy consumption as 0.15 of the storey height.,greater-equal,synthetic
db611a74-4d57-4f90-989b-23b990d705ae,"Whichever approach is adopted, the agreed level of provision should be clearly recorded.",{'ID': '24_UK_DocM_V2_AccessAndUseOfBuildings'},"Whichever approach is adopted, the agreed level of provision should be clearly recorded.",necessity,annotated
e21fa967-934e-4a29-a66d-252fdbbf928f_1,,,"If the parasitic energy use is unknown, an distance of the uppermost floor level from the entry level of 60 persons should be made for any control system.",equal,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73_7,,,The width of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the domestic hot water cylinder heat loss of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic
ef4ec541-e1a7-47d4-9a83-94715d8900ba_4,,,"Where 56 metres or more rooflights are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic
63af9f99-6939-4e8c-a6a9-8b10942e1597,"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",{'ID': '57_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,annotated
5e51b653-449e-4d00-be19-0e20ecff5c49_9,,,The default value should be 900mm.,equal,synthetic
0262f6e5-21bc-4312-9388-8ac93b79416d,The minimum full load EER of the absorption chillers should be no worse than 0.7.,{'ID': '285_UK_DocM_V2_AccessAndUseOfBuildings'},The minimum full load EER of the absorption chillers should be no worse than 0.7.,part-of,annotated
86365504-9029-4805-a93b-4256849b8e3a,Duct connections should be both mechanically secured and adequately sealed to prevent leaks.,{'ID': '116_UK_DocF_V1_Ventilation'},Duct connections should be both mechanically secured and adequately sealed to prevent leaks.,necessity,annotated
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_0,,,"In a rooflight-and-kerb assemblies with no openable property, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic
0085ecdd-f2f0-45f5-948d-ded697c69866,"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '44_Finnish_Accessibility'},"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",none,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c_4,,,"The Air permeability for a building's total combined window area is 0.7 metres of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic
34a524ec-6994-426f-86af-78788fd34a80_6,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the storage capacity should be 28 metres.",equal,synthetic
afd03eb1-8356-4755-a764-6869d0ac4171,"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",{'ID': '9_UK_DocM_V1_AccessAndUseOfBuildings'},"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",selection,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_2,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for reception up to 6mm not more than 5m long.,less-equal,synthetic
549fd984-e319-47d9-9a86-4ea7f4cbf508,The space between the air barrier and the insulation layer should be filled with solid material.,{'ID': '191_UK_DocL_V1_ConsrvationOfFuelAndPower'},The space between the air barrier and the insulation layer should be filled with solid material.,selection,annotated
23cff3c3-1251-4c5f-9fd9-8f52d25eb494_8,,,Gasfired boilers and multi-stage oilfired boilers with an ending of more than 600kg/m3 should have fully modulating burner controls.,greater,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated
6c789809-b1b8-429a-8fe2-8ce16f8a4b54_9,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the calculation of primary energy and CO2 emissions does not exceed adequate number.,less-equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_7,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under CO2 emissions 10.",equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_7,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the design value from these spaces does not exceed A of the total air flow in the vertical duct.",less-equal,synthetic
9027959e-efc1-4d32-acbe-e0775d40f001_5,,,"The morticed bolts should have a minimum configuration of 1,500 millimetres, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic
f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",necessity,annotated
f64c5a32-2f88-4be6-abf4-8870a4e51fdf,"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",{'ID': '72_Finnish_Health-IndoorClimateAndVentilation'},"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",selection,annotated
6e5e61dd-039d-4079-9c3f-f52fc12efefb,For continuing horizontal structures the loaded area shall be calculated span by span.,{'ID': '12_Finnish_StabilityOfStructures'},For continuing horizontal structures the loaded area shall be calculated span by span.,selection,annotated
0ea1e862-2434-4fc8-97a2-b076c992ef20_0,,,"The width of an exit must be at least 1,200 millimetres and its free load capacity must be at least 1.3 seconds.",greater-equal,synthetic
984c252b-74f4-4d85-9080-1c8ae1851eca_11,,,"If performance requires thicker glass to be used, an equivalent window unit with impact (0.2) glazing should be shown to meet the required standard.",equal,synthetic
a387fcb8-ead2-4094-9be9-72d783468b33_7,,,"If the Control of windows, roof windows, rooflights and doors exceeds 3.3m of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic
4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",selection,annotated
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_4,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear power requirements of 1, except in doorways.",equal,synthetic
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,less-equal,annotated
7ca3a924-dd3a-450e-af24-4d456d6c1b32,"Wet room waterproofing must form a whole which is impermeable on all waterproofed surfaces as well as on their seams, penetrations and joints.",{'ID': '113_Finnish_Health-Humidity'},"Wet room waterproofing must form a whole which is impermeable on all waterproofed surfaces as well as on their seams, penetrations and joints.",part-of,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_1,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the horizontal spacing of these must be at least EI 30.",greater-equal,synthetic
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",selection,annotated
5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",none,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_11,,,"The sections, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the thresholds, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic
86a39a0b-093f-4920-9879-fe7b3ae6675a,"In principle, suitable sanitary accommodation should be available to everybody, including sanitary accommodation designed for wheelchair users, ambulant disabled people, people of either sex with babies and small children or people encumbered by luggage.",{'ID': '155_UK_DocM_V2_AccessAndUseOfBuildings'},"In principle, suitable sanitary accommodation should be available to everybody, including sanitary accommodation designed for wheelchair users, ambulant disabled people, people of either sex with babies and small children or people encumbered by luggage.",selection,annotated
4a82f789-a98a-4379-9b81-2a20cfba6c87,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",{'ID': '179_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",greater-equal,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_7,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and effective rated output 0.3 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2_0,,,"The internal temperature installed in a dwellings habitable rooms and kitchens should be no fewer than 0.8 metres, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73_11,,,The power input from controls of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the projection of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic
302c413e-fefd-47f1-914f-0dc787e4a761,"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",{'ID': '29_UK_DocM_V2_AccessAndUseOfBuildings'},"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",part-of,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_5,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 270 millimetres primary energy content.,less-equal,synthetic
0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",necessity,annotated
00cded8a-5208-4c1b-bda4-9677d45b9375,The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,{'ID': '105_Finnish_Health-Humidity'},The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,part-of,annotated
6a41a473-bd3c-4e38-a093-094b3fdae388_4,,,At least one in every 600mm remaining Taps must be provided with cable routes.,equal,synthetic
86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",part-of,annotated
2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",none,annotated
745d890e-3b3c-4972-8b75-dfdfd81e764a,"Handrails should be set at heights that are convenient for all users of the building and should extend safely beyond the top and bottom of a flight of steps, or a ramp, to give both stability and warning of the presence of a change in level.",{'ID': '58_UK_DocM_V2_AccessAndUseOfBuildings'},"Handrails should be set at heights that are convenient for all users of the building and should extend safely beyond the top and bottom of a flight of steps, or a ramp, to give both stability and warning of the presence of a change in level.",necessity,annotated
26980508-105c-49db-8595-bf001a48d757_10,,,"In Heat pumps with no fixed seats or pipes, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
f6ea9be6-644d-4dc6-8954-d115bdd528c8,"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",none,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_4,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for glare and reflections up to half not more than 5m long.,less-equal,synthetic
99a53f17-48cb-4012-a47b-700761e0983b_1,,,Where a new building which is not a residential building or a mixed-use building has more than twice the rise plus the going (2R G) onsite electricity generation and storage (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic
e9d02df9-2fcb-4acc-bd08-18a4348cd823,"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",{'ID': '46_UK_DocM_V2_AccessAndUseOfBuildings'},"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",none,annotated
e1460729-0b58-4a44-99ac-dc150f918428,The cleanouts shall be located so that the entire pipeline may be cleansed.,{'ID': '158_Finnish_Health-WaterAndSewerage'},The cleanouts shall be located so that the entire pipeline may be cleansed.,necessity,annotated
a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",none,annotated
bc49524e-4bac-4d16-bc83-5a977019cfaa,Other ventilation systems may be acceptable if they can be shown to meet an equal level of performance.,{'ID': '30_UK_DocF_V1_Ventilation'},Other ventilation systems may be acceptable if they can be shown to meet an equal level of performance.,necessity,annotated
77f993c6-dff1-4f9a-8f66-73221d3cbaff_6,,,"If the dwelling only has one habitable room, a minimum operation of 60 persons should be used.",greater-equal,synthetic
2c12675d-93c9-496a-acf9-b30465dae93d,Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,{'ID': '113_UK_DocF_V1_Ventilation'},Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,selection,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1_2,,,Any connection of E 15 or more flights to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic
d3c5b819-2fd9-461f-b0cc-ac1dd14b45dc,"A sewer installed in the ground shall withstand the load imposed by soil, soil corrosion as well as subsidence of soil.",{'ID': '144_Finnish_Health-WaterAndSewerage'},"A sewer installed in the ground shall withstand the load imposed by soil, soil corrosion as well as subsidence of soil.",necessity,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,selection,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd_11,,,"An building services with a potentially flammable or explosive atmosphere must not be located in a block leaf where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic
b5edf19f-56df-436a-89f0-9ab5bf6963ea,"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '106_Finnish_FireSafety'},"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated
35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",part-of,annotated
cf35d4a4-3170-421b-9be1-b68d928eed1d_2,,,"A roof with a clear width greater than 44mm must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic
ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",selection,annotated
d796dece-45f6-4527-a151-c59b007e9028,"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",{'ID': '132_Finnish_SafetyOfUse'},"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",selection,annotated
f27c9fb4-dc28-494c-a277-a51360cdfdb8,A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,{'ID': '57_Finnish_SafetyOfUse'},A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,necessity,annotated
759d26ff-821f-4949-9096-a7e15c5580f6,Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,{'ID': '137_UK_DocL_V1_ConsrvationOfFuelAndPower'},Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,selection,annotated
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_9,,,The resilient layer should be to the full height of the door and 900-1000mm target primary energy rate of the doorset.,equal,synthetic
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
70760393-8139-47e8-a329-87da3a477396,Under-floor heating systems intended for intermittent or cyclical operation and/or installed over unheated rooms should be separated from the structural floor by a layer of insulation with a thermal resistance of at least 1.25(m2K)/W.,{'ID': '304_UK_DocL_V1_ConsrvationOfFuelAndPower'},Under-floor heating systems intended for intermittent or cyclical operation and/or installed over unheated rooms should be separated from the structural floor by a layer of insulation with a thermal resistance of at least 1.25(m2K)/W.,selection,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_4,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 65 degrees Celsius in travel distance; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
a9c88566-e4e5-4cba-8165-9916820d9cc5,"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",{'ID': '75_Finnish_SafetyOfUse'},"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",none,annotated
ef4f54b6-1099-4404-9fa2-d0c0d5e55543,The dwelling primary energy rate must not exceed the individual dwellings target primary energy rate.,{'ID': '64_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling primary energy rate must not exceed the individual dwellings target primary energy rate.,selection,annotated
164122ed-c7ac-4cf8-8a54-3d56c144f78d_6,,,"In general, the findings indicate that there should be at least the same number of Extinguishing routes as photovoltaic array and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic
23ff7307-c4ae-4bef-97bf-feb9682d91eb,"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",{'ID': '290_UK_DocM_V2_AccessAndUseOfBuildings'},"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",necessity,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb_3,,,"In the absence of relevant harmonised European Standards, products with a energy performance exceeding 10 kN must have a product certificate issued by a Notified Body.",greater,synthetic
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_4,,,The normal relationship between the dimensions of the rise and going is: four equals 1.,equal,synthetic
e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,part-of,annotated
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_3,,,1m3/s terrace of houses should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic
389c960b-525d-4f2e-9a2c-1805eb2dc20d_10,,,The full operation under a stair that forms part of the storage provision should be counted as 0.2.,equal,synthetic
86350df0-a40e-412b-a301-004524d56736_4,,,"For wet heating systems in new dwellings with a cost of 13l/s or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic
ef561e39-db90-462c-8dde-15fbeae954e5_2,,,A cube with dwelling emission rate of no more than 250 millimetres may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1_3,,,A minimum of 1 in 40 in five of the remaining Boards must have access to cable routes.,greater-equal,synthetic
8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",necessity,annotated
23ff7307-c4ae-4bef-97bf-feb9682d91eb,"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",{'ID': '290_UK_DocM_V2_AccessAndUseOfBuildings'},"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",selection,annotated
96b38b2d-e67c-457c-86d4-2a47a1b834b1,"Drawings: all relevant drawings should be provided to clearly identify the position, continuity and extent of the air barrier.",{'ID': '176_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Drawings: all relevant drawings should be provided to clearly identify the position, continuity and extent of the air barrier.",selection,annotated
f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",part-of,annotated
23cff3c3-1251-4c5f-9fd9-8f52d25eb494_10,,,Gasfired boilers and multi-stage oilfired boilers with an area of more than 21 C should have fully modulating burner controls.,greater,synthetic
d8066a73-49c2-4e99-825a-b49b9b2ba67d_2,,,A landing measuring at least 0.7 in heat emission capacity must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic
3931f0fa-433e-4fb8-96bf-a747f3622ee0,"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",{'ID': '97_UK_DocM_V2_AccessAndUseOfBuildings'},"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",selection,annotated
81f14fc1-af5d-45e8-8725-94d2510e4701_8,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a time-lapse of at least 65 degrees Celsius in the hallway and kitchen.",greater-equal,synthetic
f27c9fb4-dc28-494c-a277-a51360cdfdb8,A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,{'ID': '57_Finnish_SafetyOfUse'},A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,necessity,annotated
6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_7,,,"If parking spaces are provided for a building, an adequate number of systems, but at least 2.2 metres, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic
993e54cc-49c3-43cb-995e-1a951c93c775_10,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an supports equal to 200 m2.",equal,synthetic
34a524ec-6994-426f-86af-78788fd34a80_9,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the water vapour resistance should be 500 millimetres.",equal,synthetic
4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",none,annotated
d8066a73-49c2-4e99-825a-b49b9b2ba67d,A landing measuring at least 800 millimetres in length must be reserved in front of and behind a door located in an exit route.,{'ID': '34_Finnish_SafetyOfUse'},A landing measuring at least 800 millimetres in length must be reserved in front of and behind a door located in an exit route.,greater-equal,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",selection,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0_2,,,"For dwellings, for external tapered steps and stairs that are part of the building the rated output of each step should be a minimum of two.",greater-equal,synthetic
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_5,,,"If site constraints necessitate an institutions of 190 kN or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic
40b40b1b-d1b1-49d8-b9b7-13c5845a169d_8,,,The structure of the control appliance of the plumbing fixture shall be such that its time-lapse does not arise above 15.,less-equal,synthetic
8d11b1a7-732a-4153-9564-3f35cc111cb6,A dwelling that is only a basement should be treated as a single-storey dwelling above ground level.,{'ID': '74_UK_DocF_V1_Ventilation'},A dwelling that is only a basement should be treated as a single-storey dwelling above ground level.,none,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_10,,,"The wall ties should have a horizontal spacing of 900mm and a reception of 2,100 millimetres, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_10,,,The normal relationship between the dimensions of the rise and going is: B equals 60.,equal,synthetic
29232335-402c-4ed9-af74-fd093ac22e28_0,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least reference value 400mm.,greater-equal,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",selection,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",part-of,annotated
993e54cc-49c3-43cb-995e-1a951c93c775_0,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an combined dead,imposed and wind loads equal to 16/01/2023 00:00.",equal,synthetic
9953a539-8775-467a-9028-f51fe6d0f9f6,Grommets or flexible collars should be used around incoming services and sealed to the air barrier with air-sealing tape or sealant.,{'ID': '179_UK_DocL_V1_ConsrvationOfFuelAndPower'},Grommets or flexible collars should be used around incoming services and sealed to the air barrier with air-sealing tape or sealant.,necessity,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
f733b7c9-a406-4f5a-b383-9d3f8b70a559,The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,{'ID': '5_UK_DocA_Structure'},The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,selection,annotated
eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,none,annotated
da4d5959-6e64-4e04-a1f3-8b42b6addab0,The outdoor air flow used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 0.15 dm3/s per m2.,{'ID': '67_Finnish_EnergyEfficiency'},The outdoor air flow used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 0.15 dm3/s per m2.,selection,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_10,,,"If the air flows of diameter 1 and 1400mm are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_2,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or fire compartments above 21 C may be discounted when measuring clear width.,greater,synthetic
81f14fc1-af5d-45e8-8725-94d2510e4701_10,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a tread of at least 1m3/s in the hallway and kitchen.",greater-equal,synthetic
e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,none,annotated
05fdde92-d8af-42ad-963b-9019c69a8ab3_10,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same Leakage as the chairs used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic
43e26628-8b62-4cc6-91e2-284335df1564_0,,,"In rooms used for sleeping or rest, the surface may not exceed one metre.",less-equal,synthetic
8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c,"However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",{'ID': '9_Finnish_Accessibility'},"However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",none,annotated
6c789809-b1b8-429a-8fe2-8ce16f8a4b54_11,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the energy efficiency measures does not exceed eight per cent.,less-equal,synthetic
78094ea9-f870-40e9-8174-8dfce8f30a90,The penetrating services should be sealed to the air barrier using proprietary grommets or collars with air-sealing tape or sealant.,{'ID': '181_UK_DocL_V1_ConsrvationOfFuelAndPower'},The penetrating services should be sealed to the air barrier using proprietary grommets or collars with air-sealing tape or sealant.,selection,annotated
9fefb0c6-9530-4277-bfba-162315e8fc37,One electric vehicle charge point must be provided for the building.,{'ID': '67_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},One electric vehicle charge point must be provided for the building.,necessity,annotated
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4,"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",{'ID': '125_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",part-of,annotated
8fcdc238-3c30-4659-9303-1b126a39b2cd,The design solar load should be reduced by at least 20%.,{'ID': '499_UK_DocM_V2_AccessAndUseOfBuildings'},The design solar load should be reduced by at least 20%.,greater-equal,annotated
77f993c6-dff1-4f9a-8f66-73221d3cbaff_11,,,"If the dwelling only has one habitable room, a minimum Manual control of 10 should be used.",greater-equal,synthetic
db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",none,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_5,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 1,200 MJ/m2 onsite electricity generation and storage is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic
f5a71c7b-e852-40f2-8f88-91cda7902a7e_11,,,"If a new building has a space heating or airconditioning system with an gradients greater than four, a building automation and control system should be installed.",greater,synthetic
f6add908-4d45-4b3e-83a6-369f6c36c037_2,,,"Door rails, stiles and muntins should be at least 3.3m full width.",greater-equal,synthetic
29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,greater-equal,annotated
8b054fa5-fa6b-40f8-996a-a6dfea855fc3_11,,,"The output between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 0.7 on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2_3,,,"The prevailing wind direction installed in a dwellings habitable rooms and kitchens should be no fewer than 01:20:00, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic
e5b89c46-e6d5-4fb8-9e13-936c670c37c7,Consideration should be given to installing a chemical sanitary waste disposal unit in wheelchair-accessible WC accommodation.,{'ID': '164_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to installing a chemical sanitary waste disposal unit in wheelchair-accessible WC accommodation.,selection,annotated
12e545d1-64f4-45c9-a520-5b8a003eba0a_9,,,"If the dwelling has more than 20 millimetres exposed system for onsite electricity generation, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic
53e31e26-a39b-4047-a86e-bdb8021413e8_4,,,Window handles on windows that open outwards are not more than E 15 density when the window is at its maximum openable angle.,less-equal,synthetic
656aa2fa-18cb-41ee-ae28-28deb3dffcc3_6,,,The topography of the water in the hot water system shall be at least between 550mm and 700mm and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic
77f993c6-dff1-4f9a-8f66-73221d3cbaff_0,,,"If the dwelling only has 1 floor areas, a minimum ventilation rate of 13l/s should be used.",equal,synthetic
9027959e-efc1-4d32-acbe-e0775d40f001_11,,,"The morticed bolts should have a minimum cross fall of 0.9 metres, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic
793cb939-b3d9-46eb-ae65-71a4d5c8031b_2,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be output to two.,less-equal,synthetic
afd03eb1-8356-4755-a764-6869d0ac4171,"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",{'ID': '9_UK_DocM_V1_AccessAndUseOfBuildings'},"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",selection,annotated
e15250c0-1279-4d29-a1ec-31560b045007_9,,,connection of basement storeys must not be connected to fire and smoke-proof building's.,not-part-of,synthetic
35cacecf-06dc-4b0f-aadb-db2ee05518c7,The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,{'ID': '495_UK_DocM_V2_AccessAndUseOfBuildings'},The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,selection,annotated
"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_3",,,"However, if the target primary energy rate is no more than 9mm, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic
29c431ee-ea93-491d-ab13-06418d93c488_8,,,"If specification is greater than B, manual control is acceptable.",greater,synthetic
389c960b-525d-4f2e-9a2c-1805eb2dc20d_1,,,The full mechanical ventilation under a stair that forms part of the storage provision should be counted as 56 metres.,equal,synthetic
922bf8df-3a70-4f45-8c04-200b638d3b3c_6,,,The cold water pipe shall be designed and installed so that the height in the cold water system may not exceed 20 litres per second.,less-equal,synthetic
bd670961-83e8-410a-85a4-578f2d00c626,"In all cases, roof insulation should be continuous with wall insulation.",{'ID': '168_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In all cases, roof insulation should be continuous with wall insulation.",necessity,annotated
f420ae57-5656-4558-b1a3-1079e46bf6cc_9,,,"In the case of the storey-level door of a dwelling, or if the agreed level of provision through the door exceeds 0.5 kN/m2, doors must open in the direction of the exit.",greater,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",not-part-of,annotated
56517433-cf40-4b88-a9d4-18e61e0e9993_5,,,"In addition, on both sides of the toilet seat there shall be a ramp of at least 200 lux.",greater-equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_9,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 56 metres flight is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic
082c7ed9-3579-48c2-a0d2-076f1edd647c_5,,,"Each of the six metres results of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic
a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,selection,annotated
f162906e-1097-420e-b2a0-dd746d5794c7,"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",{'ID': '265_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",selection,annotated
0ea1e862-2434-4fc8-97a2-b076c992ef20_4,,,"The width of an exit must be at least 1,200 millimetres and its free standard thickness must be at least 0.8 metres.",greater-equal,synthetic
01008f69-874b-443e-bcb2-2f5630280049_8,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the entrance level may be no more than 120 and the tread must be no less than 220 millimetres.",less-equal,synthetic
2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",none,annotated
ec2e84a5-89bc-4c16-9a55-1965efd13981,"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",{'ID': '167_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",necessity,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
8efb6108-e49e-4d64-a1e4-22e3f9128b17_9,,,"When calculating the reference heat loss of a building, the value of 190 kN shall be used as the one side for the air leakage rate figure for the building envelope.",equal,synthetic
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated
b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",part-of,annotated
f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",necessity,annotated
2a2dbb92-88af-47f5-bd1e-b3ddea4c1ec9,"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",{'ID': '70_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",selection,annotated
86831830-e7f0-4b90-aa27-dc0542b7ba4d,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",{'ID': '18_Finnish_SafetyOfUse'},"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",necessity,annotated
c71c68fe-63ac-400f-b9ca-6e8c20cc5b5e,A conservatory or porch must have thermal separation from the existing dwelling.,{'ID': '431_UK_DocL_V1_ConsrvationOfFuelAndPower'},A conservatory or porch must have thermal separation from the existing dwelling.,necessity,annotated
8e8f4fb5-00b5-404f-89df-a07287984748,"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",{'ID': '229_UK_DocM_V2_AccessAndUseOfBuildings'},"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",none,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_4,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding five acentral system is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic
f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",necessity,annotated
efe27c3d-80a8-4999-9310-77160105fe37,"Instead, the building primary energy rate and building emission rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"Instead, the building primary energy rate and building emission rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",none,annotated
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_5,,,The smaller performance standards of each panel which can be either the width or height of the panel should be 0.8 metres or less.,less-equal,synthetic
8151be81-09ad-4dac-b2d2-f0d757915b6c_6,,,"However, when the snow load can occur, the proportion of the cooling load relating to distribution pipework of the load s should be at least 20 millimetres.",greater-equal,synthetic
9691451a-57d5-484f-a346-0f83b59f7ae0,"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",selection,annotated
bb9ec292-062b-43c3-8590-856dd5f6b890_8,,,"The building primary energy rate and surface area calculated using the measured air permeability must not be higher than the target primary energy rate and ventilation, respectively.",less-equal,synthetic
77be05f2-cd8c-4d35-85e4-6637b999d8e7_11,,,"The energy savings of the consequential improvement works should not be less than 1,200 MJ/m2 of the value of the principal works.",greater-equal,synthetic
656aa2fa-18cb-41ee-ae28-28deb3dffcc3_9,,,The pitch of the water in the hot water system shall be at least 2.5 ties/m2 and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_9,,,"The total minimum width of the indoor steps of other spaces intended for everyday use may be no more than (16.66 8.33 V0.4)/(1000 24), and the tread must be no less than 270 millimetres.",less-equal,synthetic
ec2e84a5-89bc-4c16-9a55-1965efd13981,"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",{'ID': '167_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",part-of,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_3,,,"The output of a barrier in a dwellings indoor areas may, however, be at least 800 millimetres if the drop is less than three metres.",greater-equal,synthetic
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",none,annotated
1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",none,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a_0,,,"Modular and portable buildings with a planned service life of more than two years but with an combined dead,imposed and wind loads in a single location of less than 65 degrees Celsius should be shown to comply with the energy efficiency requirements.",less,synthetic
f9de28ac-45bb-4400-9d9f-8afee73bd2e3_5,,,The clear width should not exceed 500kW of dwelling floor area.,less-equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_11,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 0.15 dm3/s per m2 in Signs, these must be accessible via the interior.",greater,synthetic
bf798097-bb99-42d0-a73f-8cebab8fbeb8_0,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the sections of the steps must be no more than 30m2 and the tread must be no less than 300 millimetres.",less-equal,synthetic
11f2902d-29c2-474e-97d0-628a2a97a666_10,,,"installed generation capacity of over 24 degrees Celsius must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic
7602a501-a5b5-429c-99e1-8bc801243494,"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",{'ID': '111_Finnish_Health-Humidity'},"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",necessity,annotated
f5a71c7b-e852-40f2-8f88-91cda7902a7e_6,,,"If a new building has a space heating or airconditioning system with an power input from controls greater than 280mm, a building automation and control system should be installed.",greater,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_0,,,"The dwelling primary energy rate, above and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, gradients and target fabric energy efficiency rate, respectively.",less-equal,synthetic
973c9430-2b4a-4ab4-82df-7060c3002f77_10,,,The cross-sectional area for the community heating primary circuit should be a minimum of 200 Watts per room.,greater-equal,synthetic
fab95d95-4789-4384-8d57-a575190f9e73,The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,{'ID': '297_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,selection,annotated
f034fbd1-7547-425a-8163-513fcac0b66b,The roof structures and joints must be properly inclined and sealed for water drainage.,{'ID': '103_Finnish_Health-Humidity'},The roof structures and joints must be properly inclined and sealed for water drainage.,necessity,annotated
0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_2,,,The SEER of the extension does not exceed adequate number.,less-equal,synthetic
5b4380ba-0066-4735-a362-316d4c8e70b2_4,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 190 kN early childhood education premises after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic
cc72106e-9e7f-47cf-8a95-0173a8305dad,"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",{'ID': '83_Finnish_Health-Humidity'},"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",part-of,annotated
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated
6ab07828-b6aa-4a60-8860-333f061a0fde,"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",{'ID': '71_UK_DocM_V2_AccessAndUseOfBuildings'},"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",none,annotated
34a524ec-6994-426f-86af-78788fd34a80_10,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the U-values should be one per 100m2.",equal,synthetic
a9944ed0-7168-4ec7-b761-0641e3e3228b,The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,{'ID': '157_Finnish_Health-WaterAndSewerage'},The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,selection,annotated
49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",selection,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",none,annotated
9952f64d-e0df-4b03-84af-150782f81387,"For mobility-impaired people, a going of at least 300mm is preferred.",{'ID': '124_UK_DocM_V2_AccessAndUseOfBuildings'},"For mobility-impaired people, a going of at least 300mm is preferred.",greater-equal,annotated
a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,necessity,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9_7,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the average carbon monoxide concentration exceeds 50 millimetres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_6,,,"In buildings more than 9 metres and at most proportion in planned time of use, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic
38cd3221-7fc9-4462-be20-78b16a4309d3,The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,{'ID': '490_UK_DocL_V1_ConsrvationOfFuelAndPower'},The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,selection,annotated
ef4ec541-e1a7-47d4-9a83-94715d8900ba_0,,,"Where 2m or more extract fan are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic
f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",none,annotated
a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",necessity,annotated
06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",none,annotated
b6a045c9-d3a7-4144-a390-8dd21252078d,Drawings should be provided for junctions.,{'ID': '153_UK_DocL_V1_ConsrvationOfFuelAndPower'},Drawings should be provided for junctions.,necessity,annotated
3ca5cb38-b90b-4449-ba14-4268866df8e1_9,,,The water heater is close to the draw-off points and has a vicinity no greater than 3.,less-equal,synthetic
e32bbb47-c826-40c1-8ea4-8c32353d3fd2_4,,,There shall be half a metre of public address provided for people in the building.,equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,less,annotated
716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,part-of,annotated
8421f806-70f2-46a9-a308-90a40da3541d_4,,,"Where the capacity of the approach, whether over its whole length or in part, is 20 millimetres or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic
48133b44-eac2-44e2-b2df-c52243e9f7ea,"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",{'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",none,annotated
f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",selection,annotated
9d172d30-e92f-4151-865c-d204f217705d,The slope of the wet room floor must allow water to flow into the floor drain.,{'ID': '118_Finnish_Health-Humidity'},The slope of the wet room floor must allow water to flow into the floor drain.,part-of,annotated
81f14fc1-af5d-45e8-8725-94d2510e4701_3,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a rise between landings of at least 600 x 600 millimetres in the hallway and kitchen.",greater-equal,synthetic
23cff3c3-1251-4c5f-9fd9-8f52d25eb494_0,,,Gasfired boilers and multi-stage oilfired boilers with an cross-sectional area of more than 50 should have fully modulating burner controls.,greater,synthetic
2de867fe-80e7-4617-ad18-36225dd45ab1,Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,{'ID': '53_UK_DocF_V1_Ventilation'},Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,selection,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_1,,,The number of appliances of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the construction of associated parking spaces.,greater,synthetic
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_8,,,"Where the work concerns a building containing more than 9 metres safety lines, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic
dae0db09-fd4b-4f2c-99c0-cd742b19d17a,"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",{'ID': '68_Finnish_SafetyOfUse'},"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",necessity,annotated
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",none,annotated
3639910c-8ebf-499a-aeec-6f1951b28134,"Additionally, insulated plaster-board should be used in reveals to abut jambs and should be considered within reveal soffits.",{'ID': '166_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Additionally, insulated plaster-board should be used in reveals to abut jambs and should be considered within reveal soffits.",necessity,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_6,,,"The span installed in a dwellings habitable rooms and kitchens should be no fewer than certain proportion, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic
e874f337-2067-4e77-ad32-c3b857f40e7a_0,,,"If the glare and reflections exceeds half a metre, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic
eccd4f77-ef4a-41fd-a22a-620c84fdddd4_8,,,There is a minimum of 0.15 of worktop to at least total capital cost of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f,"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",part-of,annotated
5577528f-8fa0-4ca3-96f6-ea418091cb86_10,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 0.8 metres in maintained is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic
7a6635fc-c464-4d61-8ef1-2fdbf13bb9e7,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U_d values), which is often greater than the area of the roof opening.",{'ID': '140_UK_DocM_V2_AccessAndUseOfBuildings'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U_d values), which is often greater than the area of the roof opening.",part-of,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_11,,,"The dwelling primary energy rate, extract air categories and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, manufacturers declared efficiencies and target fabric energy efficiency rate, respectively.",less-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_3,,,"The pitch of the indoor steps of other spaces intended for everyday use may be no more than E, and the tread must be no less than 270 millimetres.",less-equal,synthetic
e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,part-of,annotated
703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated
26980508-105c-49db-8595-bf001a48d757_11,,,"In Waterproofing with no fixed common access point or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",selection,annotated
0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_3,,,The termination points of the extension does not exceed 2.,less-equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_11,,,Individual flights are: for gradients up to 1:15 not more than adequate means natural light; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
e15250c0-1279-4d29-a1ec-31560b045007_1,,,hearing enhancement of basement storeys must not be connected to fire and smoke-proof shutoff dampers.,not-part-of,synthetic
f5a71c7b-e852-40f2-8f88-91cda7902a7e_7,,,"If a new building has a space heating or airconditioning system with an ending greater than 160 millimetres, a building automation and control system should be installed.",greater,synthetic
6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,necessity,annotated
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_6,,,Storage premises with a constraints exceeding 900 millimetres are not permitted within the building.,greater,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9_10,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 20 points total load from any projecting corner.",greater-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_10,,,the minimum clear dimensions of the platform are: 0.5 kN/m2 time-lapse and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
34a524ec-6994-426f-86af-78788fd34a80_7,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the reverberation time should be 0.1m2.",equal,synthetic
a9cea98b-d439-4930-a991-fc17eee6657c,the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,{'ID': '102_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,necessity,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_8,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the visual contrast from these spaces does not exceed 75 light source lumens per circuit-watt of the total air flow in the vertical duct.",less-equal,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,none,annotated
e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,part-of,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",part-of,annotated
72d7716f-7e3e-442c-9e42-14d4b19e18e3_11,,,A comfort cooling systems that is being connected to a new building should not have a energy efficiency measures for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74_2,,,"In a tier that is uninterrupted by cross-gangways, and where the heat exchanger area exceeds 90, use a maximum number of steps of 40.",greater,synthetic
2ef73ac0-d424-4e28-9782-3dbaf6e0a046,Attics and uppermost floor voids shall be divided into 400 m2 parts.,{'ID': '107_Finnish_FireSafety'},Attics and uppermost floor voids shall be divided into 400 m2 parts.,necessity,annotated
01d924bf-4a69-4eb8-b05e-ce993aee3d45,Perimeter insulation should be continuous and have a minimum thickness of 25mm.,{'ID': '135_UK_DocL_V1_ConsrvationOfFuelAndPower'},Perimeter insulation should be continuous and have a minimum thickness of 25mm.,none,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_6,,,"Extract air of Unit length 2, 3 and 1,500 millimetres shall not be used as recirculation air.",equal,synthetic
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_3,,,"If the free gap between facing walls of adjacent glazed balconies or the mechanical ventilation of the wall to the window of an adjacent fire compartment is less than 220 millimetres, the wall in question must be class EI 15.",less,synthetic
84cd76d7-e5d0-4f39-94bc-0236c65d533a_3,,,"in residential buildings of not more than two storeys, one exit of no less than 1m2 in air tightness is permitted.",greater-equal,synthetic
2633c957-07b4-4caa-a9d6-5acbac16b0b0_6,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and (16.66 8.33 V0.4)/(1000 24) habitable area.,equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_4,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 44mm inner surfaces.,less-equal,synthetic
6d9a1e8e-6fe7-4234-951a-96fdc4598bd7,"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",{'ID': '12_Finnish_Accessibility'},"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",part-of,annotated
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d,An upstand built on site should not exceed a U-value of 0.35W/(m2K).,{'ID': '115_UK_DocL_V1_ConsrvationOfFuelAndPower'},An upstand built on site should not exceed a U-value of 0.35W/(m2K).,selection,annotated
eff9dd2f-007f-4caf-bb2e-3ff65db910b0,A passenger lift is the most suitable means of vertical access and should be provided wherever possible.,{'ID': '103_UK_DocM_V2_AccessAndUseOfBuildings'},A passenger lift is the most suitable means of vertical access and should be provided wherever possible.,selection,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f_4,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 90 of non-fire-compartmented Rooms that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647_0,,,"Parapets in protective part A to 0.15 dm3/s per m2 and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_8,,,Modular and portable buildings with a planned service life of more than two years but with an opening angle in a single location of less than 2.2 metres should be shown to comply with the energy efficiency requirements.,less,synthetic
2f815a08-db3c-48a6-b248-d69aeac870ee_8,,,"the vertical axle group load is: a. not more than 400kg, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic
922bf8df-3a70-4f45-8c04-200b638d3b3c_4,,,The cold water pipe shall be designed and installed so that the anthracite figure in the cold water system may not exceed adequate number.,less-equal,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506,"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",{'ID': '8_UK_DocK_ProtectionFromFalling'},"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,annotated
2be01bf1-2cd9-4982-8778-ba0afe835580,"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",{'ID': '88_UK_DocF_V1_Ventilation'},"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",part-of,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,annotated
1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,none,annotated
f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",selection,annotated
29232335-402c-4ed9-af74-fd093ac22e28_5,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least vicinity 6mm.,greater-equal,synthetic
12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",part-of,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b_5,,,"When an existing building with a total useful flushing of over 2,100 millimetres is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic
f2bf62e6-9577-48b5-b15d-9fe4904acf52,"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",{'ID': '268_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",necessity,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74_0,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a where provided number of steps of 20.",equal,synthetic
a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated
81314489-dcd9-410f-9b15-595b87e7c8f9_11,,,"The resilient layer should be timber sheathing at least 1000m2 protection, expanded metal or a similar resilient material.",greater-equal,synthetic
703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",part-of,annotated
a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated
85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",necessity,annotated
d5cb0429-ffef-43c5-9789-a3611c04446a,"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",{'ID': '89_Finnish_Health-WaterAndSewerage'},"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",part-of,annotated
d5cb0429-ffef-43c5-9789-a3611c04446a,"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",{'ID': '89_Finnish_Health-WaterAndSewerage'},"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",necessity,annotated
1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated
2de867fe-80e7-4617-ad18-36225dd45ab1,Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,{'ID': '53_UK_DocF_V1_Ventilation'},Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,none,annotated
01008f69-874b-443e-bcb2-2f5630280049_10,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the air flow resistance may be no more than 18 dm3/s and the tread must be no less than 220 millimetres.",less-equal,synthetic
aa921550-3c5f-470b-b578-1788f83b49a7,Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,{'ID': '153_UK_DocM_V2_AccessAndUseOfBuildings'},Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,none,annotated
c384013b-c40f-4925-acbe-465e1ca5bc13_9,,,0.9 metres internal stairs per detail should be recorded.,equal,synthetic
4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",none,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b_9,,,"When an existing building with a total useful intended time of use of over EI 30 is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic
11f2902d-29c2-474e-97d0-628a2a97a666_3,,,"energy efficiency measures of over 15 degrees must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic
4e8c5c50-44af-48f6-b959-e6f9b31afa1e_0,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical common access point may be day-care institutions.",equal,synthetic
13a437c0-918c-47f2-85bd-b80dd69eb027_11,,,"There are no minimum value on the gradients of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic
81f14fc1-af5d-45e8-8725-94d2510e4701_5,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a illuminance of at least 90 in the hallway and kitchen.",greater-equal,synthetic
d0f0d416-a728-4d23-965e-10ff6559f2d8,All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting platform.,{'ID': '113_UK_DocM_V2_AccessAndUseOfBuildings'},All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting platform.,selection,annotated
74002ed3-548e-4e2f-8835-be76e643c67d_9,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least 4 termination points.,greater-equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_5,,,"If the heat gain between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than two persons per square metre, the wall in question must be class EI 15.",less,synthetic
3f31e50a-cdcc-412c-a363-2bfdfb507770,"For an electrically operated appliance, an integral remote or thermostatic control should be provided.",{'ID': '277_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For an electrically operated appliance, an integral remote or thermostatic control should be provided.",necessity,annotated
d7b27bbb-ac51-4036-8073-d094cbe994db,"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",{'ID': '232_UK_DocM_V2_AccessAndUseOfBuildings'},"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",none,annotated
7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,part-of,annotated
7a1bc727-1daa-4668-83f6-b44327b96898,"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",{'ID': '133_Finnish_FireSafety'},"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",none,annotated
77f993c6-dff1-4f9a-8f66-73221d3cbaff_8,,,"If the dwelling only has 0.052083333 storeys, a minimum ventilation rate of 13l/s should be used.",equal,synthetic
710ef992-e187-4b1a-894b-e0e222f54359_1,,,"NOTE: For grid-supplied electricity, a going of 25 decibels and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic
f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",necessity,annotated
d988e207-c3f9-4314-9a16-f99b334595f4_11,,,The flushing must be no less than 16/01/2023 00:00.,greater-equal,synthetic
ddcf66e5-33c1-43c6-9c16-52be70d56c54,"If an exhaust air terminal is located on a facade that is exposed to the prevailing wind, measures should be taken to minimise likely wind effects.",{'ID': '100_UK_DocF_V1_Ventilation'},"If an exhaust air terminal is located on a facade that is exposed to the prevailing wind, measures should be taken to minimise likely wind effects.",necessity,annotated
c90714e3-d8f9-47dc-ac9c-2e7ee516a89c,The joint between waterproofing and the floor drain must be tight.,{'ID': '119_Finnish_Health-Humidity'},The joint between waterproofing and the floor drain must be tight.,necessity,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_11,,,The that of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the headroom of associated parking spaces.,greater,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e_4,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the vertical spacing must be no less than 100 millimetres.",greater-equal,synthetic
197b9463-397e-4729-a08d-12739f9db069,"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",{'ID': '283_UK_DocM_V2_AccessAndUseOfBuildings'},"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",selection,annotated
13a437c0-918c-47f2-85bd-b80dd69eb027_0,,,"There are no depth on the heat recovery of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic
0ea1e862-2434-4fc8-97a2-b076c992ef20_9,,,"The domestic hot water circulation heat loss of an exit must be at least 400mm and its free height must be at least 2,100 millimetres.",greater-equal,synthetic
02f5e3fb-7a8b-4a88-a6e5-337cc0835284,"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",{'ID': '90_UK_DocO_Overheating'},"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",none,annotated
5577528f-8fa0-4ca3-96f6-ea418091cb86_3,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than one per 100m2 in category is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic
b6e6ebce-e75f-4fae-b9a2-e35c164b3fb4,"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",{'ID': '342_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",none,annotated
26f33f06-e967-4d55-9e73-30990f52ac82,"Loft hatches: where the roof is insulated at ceiling level, hatches should be suitably designed and installed to ensure optimum airtightness.",{'ID': '189_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Loft hatches: where the roof is insulated at ceiling level, hatches should be suitably designed and installed to ensure optimum airtightness.",necessity,annotated
74002ed3-548e-4e2f-8835-be76e643c67d_1,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least eight per cent standard thickness.,greater-equal,synthetic
7577d9f7-9f3c-4d3b-b8d9-da31d3e1b201,"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",selection,annotated
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",selection,annotated
208b093d-361f-4aec-819d-4abca4e72c68_8,,,"in an evacuation area where the steps is 1.3 seconds, the second exit may be no less than 900 millimetres in width.",equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_4,,,the minimum clear dimensions of the platform are: adequate number frequency and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",none,annotated
ad30824c-74be-4f4f-916a-dfe1e0a89205,"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",part-of,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_7,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for configuration 1 and 0.7W/(m2K) if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
3ca5cb38-b90b-4449-ba14-4268866df8e1_5,,,The water heater is close to the draw-off points and has a fire load no greater than 65mm.,less-equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated
113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",greater-equal,annotated
8efb6108-e49e-4d64-a1e4-22e3f9128b17,"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",{'ID': '136_Finnish_EnergyEfficiency'},"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",equal,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,annotated
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_0,,,Storage premises with a inaccuracies exceeding 90mm are not permitted within the building.,greater,synthetic
20518e80-6f7e-457f-8c5a-59fa4c0eb324_5,,,"When calculating the heat loss for a buildings design solution, the performance shall be used as the value of the Activation for the building envelope.",equal,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e_6,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the depth must be no less than 220 millimetres.",greater-equal,synthetic
5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",none,annotated
2fc22f95-5131-40af-8e97-513ecc970217,What constitutes a substantial proportion should be assessed on a case-by-case basis by the building control body.,{'ID': '18_UK_DocL_V1_ConsrvationOfFuelAndPower'},What constitutes a substantial proportion should be assessed on a case-by-case basis by the building control body.,necessity,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9_10,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the results exceeds 30% load; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic
ef4f54b6-1099-4404-9fa2-d0c0d5e55543_7,,,The Air flow rates must not exceed the individual dwellings Leakage.,less-equal,synthetic
302c413e-fefd-47f1-914f-0dc787e4a761_5,,,"Where level differences on surfaces is greater than 0.15, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic
8e7e4d9a-05b8-4512-91c5-e8dbb9488685,"At night, windows, patio doors and balcony doors should be modelled as closed.",{'ID': '55_UK_DocO_Overheating'},"At night, windows, patio doors and balcony doors should be modelled as closed.",selection,annotated
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_1,,,Storage premises with a control capabilities exceeding One are not permitted within the building.,greater,synthetic
339fc78c-a2f2-481c-a410-3aeb41e24b8a_0,,,Solid walls constructed of coursed brickwork or blockwork should be at least as Air permeability as 1 of the storey height.,greater-equal,synthetic
ba93ede4-473f-4c07-b439-3699580cbcbe,No individual flight has a rise of more than 1800mm between landings.,{'ID': '21_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise of more than 1800mm between landings.,selection,annotated
5ca184fa-e100-4f97-957d-e37ae944786f_6,,,The depth of installing electric vehicle charge points and cable routes is not more than four of the total capital cost of the major renovation.,less-equal,synthetic
86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",none,annotated
56517433-cf40-4b88-a9d4-18e61e0e9993_3,,,"In addition, on both sides of the toilet seat there shall be a terrace of houses of at least 9 metres.",greater-equal,synthetic
06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",none,annotated
eefe1191-2903-4fb8-9138-6471e09fb67d_2,,,The class exceeds 2.0 m3/(h m2) at 11pm.,greater,synthetic
64f259ba-5280-4bf5-bea2-e18cb837a940,A water point shall incorporate a drainage point that is connected to the sewer via a drainage fixture.,{'ID': '124_Finnish_Health-WaterAndSewerage'},A water point shall incorporate a drainage point that is connected to the sewer via a drainage fixture.,none,annotated
3835aa39-14bc-4c7a-a029-a5ce391bad76,The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,{'ID': '73_UK_DocL_V1_ConsrvationOfFuelAndPower'},The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,selection,annotated
5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",part-of,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",none,annotated
03bdab65-fc14-4101-add9-f26c25f41e82,A drainage point shall be equipped with a cleansable water seal.,{'ID': '134_Finnish_Health-WaterAndSewerage'},A drainage point shall be equipped with a cleansable water seal.,selection,annotated
1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",selection,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_4,,,"The intended time of use of a barrier in a dwellings indoor areas may, however, be at least 900-1000mm if the drop is less than three metres.",greater-equal,synthetic
c9983da5-23f1-4211-88ce-68e4753e4ab9,"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",{'ID': '102_UK_DocM_V2_AccessAndUseOfBuildings'},"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",necessity,annotated
51f35d58-c411-4d6d-b36e-9ddf10199908,"Whatever lifting device is chosen, internal stairs should always be provided as an alternative means of vertical access, and designed to suit ambulant disabled people and those with impaired sight.",{'ID': '106_UK_DocM_V2_AccessAndUseOfBuildings'},"Whatever lifting device is chosen, internal stairs should always be provided as an alternative means of vertical access, and designed to suit ambulant disabled people and those with impaired sight.",necessity,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_6,,,"The projection, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the gradient, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic
973c9430-2b4a-4ab4-82df-7060c3002f77_9,,,The U-value for the community heating primary circuit should be a minimum of 1000m2.,greater-equal,synthetic
1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",selection,annotated
b53bb0de-55cd-4505-95a1-cbffd3739047,A commissioning notice must be given to the building control body.,{'ID': '181_UK_DocF_V1_Ventilation'},A commissioning notice must be given to the building control body.,necessity,annotated
38cd3221-7fc9-4462-be20-78b16a4309d3_1,,,The selection of openings in the newly created dwelling should not be more than six metres of the total floor area.,less-equal,synthetic
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4,"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",{'ID': '100_Finnish_Health-IndoorClimateAndVentilation'},"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",none,annotated
a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",necessity,annotated
7d35f4c4-fa65-4d68-a974-f54386ca8aee_7,,,"However, a horizontal those in a protective part must be no higher than 21 C.",less-equal,synthetic
cc72106e-9e7f-47cf-8a95-0173a8305dad_7,,,"In a new building, the crawl space size must be three seconds on average at the minimum.",greater-equal,synthetic
a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated
87c9cfa3-8093-497d-be10-dc054abe7062,"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",{'ID': '164_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",none,annotated
86350df0-a40e-412b-a301-004524d56736_1,,,"For wet heating systems in new dwellings with a supports of 0.06 m2 or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic
2cf150af-bede-4bb6-aa2e-b9f42a109761,The warning should be placed sufficiently in advance of the hazard to allow time to stop and not be so narrow that it might be missed in a single stride.,{'ID': '53_UK_DocM_V2_AccessAndUseOfBuildings'},The warning should be placed sufficiently in advance of the hazard to allow time to stop and not be so narrow that it might be missed in a single stride.,necessity,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c_6,,,"The number of occupants for a building's total combined window area is 0.055555556 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9_10,,,"Door entry controls, where provided, are mounted 220 millimetres class finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic
7a1bc727-1daa-4668-83f6-b44327b96898,"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",{'ID': '133_Finnish_FireSafety'},"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",selection,annotated
74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",part-of,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_5,,,"If the location of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 270 millimetres of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647_4,,,"Parapets in standards A to 200 lux and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic
2a256a9c-0b8a-4acf-87e1-86a5857f36a3,"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",{'ID': '17_UK_DocM_V1_AccessAndUseOfBuildings'},"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",none,annotated
986f7853-4975-4ecd-8f10-a75d818eb44a,"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",{'ID': '140_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",selection,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_9,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for clear width 1 and 100 litres if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
8421f806-70f2-46a9-a308-90a40da3541d_5,,,"Where the locations of the approach, whether over its whole length or in part, is five or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_6,,,"The free air leakage rate figure from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 400-600mm, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic
5925ca4d-801c-42e4-b581-a176dea2519f,"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",{'ID': '76_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",necessity,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779_6,,,"In large building complexes, such as retail parks and large sports centres, there should be 0.7 metres wheelchair-accessible unisex Gangways capable of including an adult changing table.",equal,synthetic
17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",none,annotated
a235c68f-ae44-4770-b005-4e9d7b659eb7_5,,,All cavity walls should have leaves at least 90mm thick and cavities at least 28 metres total cost.,greater-equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_3,,,"If the air flows of air flow rate 1 and 1.3 seconds are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
e5a56966-e0d8-4d9e-9106-9f63913ca6d0,"Photographs should be taken at appropriate construction stages for each detail when completed, but prior to closingup works.",{'ID': '482_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Photographs should be taken at appropriate construction stages for each detail when completed, but prior to closingup works.",necessity,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_2,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for design 1 and 2.2 metres if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
3e9fc57e-bc69-4f17-a056-dd7767afa9bb_0,,,"If the vertical spacing of the building does not exceed 0.8 metres, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic
569c7958-b7d6-4b9c-9dd9-13307e95e59b,"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",{'ID': '385_UK_DocM_V2_AccessAndUseOfBuildings'},"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",part-of,annotated
20609d43-016e-4314-9620-256f73f1c6ed,"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",{'ID': '160_UK_DocF_V1_Ventilation'},"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",part-of,annotated
2ca092ec-4425-4552-a389-fd0dadfbd154_0,,,NOTE: A floor level with a time-lapse of 28 metres or steeper should be designed as a ramp.,greater-equal,synthetic
0f8b3f66-6496-431c-bdc1-75570dde9ee6,"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",{'ID': '111_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",selection,annotated
9fd15b82-fc32-4364-8724-f1ef14f0c047_8,,,The cooker hood should heat emission capacity at least the total thickness of the cooker.,greater-equal,synthetic
a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",part-of,annotated
c2e0629d-350b-45b8-9e9e-d58be1780f12_7,,,"If the kitchen has no boiler interlock, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic
77be05f2-cd8c-4d35-85e4-6637b999d8e7,The value of the consequential improvement works should not be less than 10 of the value of the principal works.,{'ID': '452_UK_DocM_V2_AccessAndUseOfBuildings'},The value of the consequential improvement works should not be less than 10 of the value of the principal works.,none,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_7,,,"Extract air of primary energy content 2, 3 and 450mm shall not be used as recirculation air.",equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_4,,,"If the air flows of maximum number of occupants 1 and 2.4 metres are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
40b40b1b-d1b1-49d8-b9b7-13c5845a169d_10,,,The structure of the control appliance of the plumbing fixture shall be such that its sum total does not arise above 280mm.,less-equal,synthetic
99a53f17-48cb-4012-a47b-700761e0983b_2,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) two persons per square metre of those bathrooms must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic
60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",selection,annotated
b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",part-of,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",selection,annotated
981a0996-c526-4ee7-b679-0f17bd5ecd29,"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",{'ID': '209_UK_DocM_V2_AccessAndUseOfBuildings'},"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",selection,annotated
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_5,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 300 millimetres in limits, these must be accessible via the interior.",greater,synthetic
a9944ed0-7168-4ec7-b761-0641e3e3228b,The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,{'ID': '157_Finnish_Health-WaterAndSewerage'},The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,selection,annotated
45adb0b6-63ee-4f42-b6a3-8fc396221c67_8,,,The total air flow of the insulation plus any required air gap should be at least to the diameter of the rafters.,greater-equal,synthetic
72e7ed0c-9e73-46b2-a919-20f3fea337fd_9,,,"An ducted systems with a potentially flammable or explosive atmosphere must not be located in a thermometers where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic
164122ed-c7ac-4cf8-8a54-3d56c144f78d_2,,,"In general, the findings indicate that there should be at least the same number of recreation areas as induction loop and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_6,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major bathroom, there is no Fixings to install either electric vehicle charge points or cable routes.",not-part-of,synthetic
5e51b653-449e-4d00-be19-0e20ecff5c49_4,,,The default use should be 0.35W/(m2K).,equal,synthetic
8b7e8e7e-81dd-4a76-bdd3-8269ac00f74b,The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,{'ID': '24_UK_DocM_V1_AccessAndUseOfBuildings'},The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,selection,annotated
eccd4f77-ef4a-41fd-a22a-620c84fdddd4_1,,,There is a minimum of 0.3 of worktop to at least dwelling primary energy rate of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",part-of,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_8,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the compensating measures of these must be at least 850-1000mm.",greater-equal,synthetic
01d924bf-4a69-4eb8-b05e-ce993aee3d45_7,,,Perimeter insulation should be continuous and have a minimum layers of 20mm.,greater-equal,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890,"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",{'ID': '357_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",selection,annotated
b810df40-4dd8-44c4-80c4-b33bb873a5e9,"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '103_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",necessity,annotated
746c2a1e-aa29-4913-b431-c415290a9f4b,controls should be inspected to ensure that the following have been achieved.,{'ID': '220_UK_DocF_V1_Ventilation'},controls should be inspected to ensure that the following have been achieved.,necessity,annotated
f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",none,annotated
d3c5b819-2fd9-461f-b0cc-ac1dd14b45dc,"A sewer installed in the ground shall withstand the load imposed by soil, soil corrosion as well as subsidence of soil.",{'ID': '144_Finnish_Health-WaterAndSewerage'},"A sewer installed in the ground shall withstand the load imposed by soil, soil corrosion as well as subsidence of soil.",selection,annotated
05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",selection,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_9,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and intermediate landing 16/01/2023 00:00 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated
c384013b-c40f-4925-acbe-465e1ca5bc13_8,,,20 litres per second sunken per detail should be recorded.,equal,synthetic
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9,"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",{'ID': '116_Finnish_SafetyOfUse'},"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",part-of,annotated
525aa713-65e1-4368-a6f4-38f628be7fed,"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",necessity,annotated
5e51b653-449e-4d00-be19-0e20ecff5c49_5,,,The default Level differences should be 15.,equal,synthetic
12e545d1-64f4-45c9-a520-5b8a003eba0a_10,,,"If the dwelling has more than 1,500 millimetres exposed cavity closers, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic
4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",selection,annotated
164122ed-c7ac-4cf8-8a54-3d56c144f78d_11,,,"In general, the findings indicate that there should be at least the same number of Their as fittings and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic
cf35d4a4-3170-421b-9be1-b68d928eed1d,"A roof with a pitch greater than 1:8 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",{'ID': '125_Finnish_SafetyOfUse'},"A roof with a pitch greater than 1:8 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",necessity,annotated
45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,part-of,annotated
45b99da0-5bce-49b7-9ce2-04810c7e5a19,"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",{'ID': '151_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",part-of,annotated
94c0e823-a61d-49d6-82b3-4ca96f65dfa4,The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,{'ID': '64_Finnish_SafetyOfUse'},The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,part-of,annotated
8151be81-09ad-4dac-b2d2-f0d757915b6c,"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",{'ID': '110_Finnish_StabilityOfStructures'},"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",part-of,annotated
67657794-a272-4ab2-9b19-df29e9d24844,Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,{'ID': '160_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,part-of,annotated
d5cb0429-ffef-43c5-9789-a3611c04446a,"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",{'ID': '89_Finnish_Health-WaterAndSewerage'},"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",necessity,annotated
ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",none,annotated
aec934d9-6175-4624-9e8d-1ee6f71fb49d,Sufficient information about the overheating mitigation strategy and its maintenance requirements must be given to owners so that it can be used effectively.,{'ID': '92_UK_DocO_Overheating'},Sufficient information about the overheating mitigation strategy and its maintenance requirements must be given to owners so that it can be used effectively.,necessity,annotated
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",part-of,annotated
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_10,,,six metres lifting platform should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_9,,,Skirtings totalling up to 50mm total thickness and shallow projecting shower or casings above 1m2 may be discounted when measuring clear width.,greater,synthetic
53bb982d-5260-4a69-a6dd-71e4f074e676_0,,,The boiler type of standing rows must be at least EI 30.,greater-equal,synthetic
bd033057-ac6c-45bb-92c7-ca58bf22dab1,The lobby should be large enough and of a shape to allow a wheelchair user or a person pushing a pram to move clear of one door before opening the second door.,{'ID': '80_UK_DocM_V2_AccessAndUseOfBuildings'},The lobby should be large enough and of a shape to allow a wheelchair user or a person pushing a pram to move clear of one door before opening the second door.,part-of,annotated
d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",none,annotated
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88,The resilient layer should be to the full height of the door and 600mm either side of the doorset.,{'ID': '15_UK_DocQ_Security_Dwellings'},The resilient layer should be to the full height of the door and 600mm either side of the doorset.,necessity,annotated
bb9ec292-062b-43c3-8590-856dd5f6b890_9,,,"The annual percentage of heat and building emission rate calculated using the measured air permeability must not be higher than the total thickness and target emission rate, respectively.",less-equal,synthetic
01008f69-874b-443e-bcb2-2f5630280049_2,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the parasitic energy use may be no more than 500kW and the tread must be no less than 220 millimetres.",less-equal,synthetic
e15250c0-1279-4d29-a1ec-31560b045007_2,,,ventilation equipment of basement storeys must not be connected to fire and smoke-proof bath.,not-part-of,synthetic
23cff3c3-1251-4c5f-9fd9-8f52d25eb494_9,,,Gasfired boilers and multi-stage oilfired boilers with an Moisture of more than 600 millimetres should have fully modulating burner controls.,greater,synthetic
a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",none,annotated
fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",part-of,annotated
2c725d50-13d5-4e77-bacf-9f174530e27c,The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,{'ID': '17_UK_DocM_V2_AccessAndUseOfBuildings'},The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,part-of,annotated
511c1a7f-08b9-48ec-aea6-9b749fdf31a1_3,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 4 of appropriately located future connection which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic
e4fb8d18-8dbc-4351-a2df-d87f880f476a,The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,{'ID': '90_Finnish_FireSafety'},The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,part-of,annotated
08efb7a8-1f9e-491b-8a6f-7043ec96ea3b,The methodology for determining costs should be consistent between all elements of the calculation to allow a fair comparison between the cost of the major renovation and the cost of electric vehicle charge point infrastructure.,{'ID': '54_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The methodology for determining costs should be consistent between all elements of the calculation to allow a fair comparison between the cost of the major renovation and the cost of electric vehicle charge point infrastructure.,necessity,annotated
4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",selection,annotated
c9983da5-23f1-4211-88ce-68e4753e4ab9,"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",{'ID': '102_UK_DocM_V2_AccessAndUseOfBuildings'},"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",none,annotated
f398541a-81df-4380-a408-d7b1beaa7c92,"People should be able to see other people approaching from the opposite direction, thereby allowing sufficient reaction time for both parties to avoid a collision.",{'ID': '68_UK_DocM_V2_AccessAndUseOfBuildings'},"People should be able to see other people approaching from the opposite direction, thereby allowing sufficient reaction time for both parties to avoid a collision.",necessity,annotated
f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",necessity,annotated
c8a048c6-8e7e-4b5a-ada5-02990b983401,"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",{'ID': '91_Finnish_Health-IndoorClimateAndVentilation'},"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",selection,annotated
23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",none,annotated
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_10,,,"Generally, a thermal element once upgraded should not have a Ventilation greater than 2.2 metres.",less-equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c,The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,{'ID': '115_Finnish_SafetyOfUse'},The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,equal,annotated
a0c838b5-5fe2-4b52-abe1-432804c2c8aa_8,,,A construction of 21 C shall be used as the emission rate for room temperature during the heating season.,equal,synthetic
3ac96918-764f-403d-a588-37b5f4a16f46,"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",{'ID': '284_UK_DocM_V2_AccessAndUseOfBuildings'},"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",necessity,annotated
baee716c-b8c2-4500-b4de-63fa11f007b1_8,,,A minimum of one in 300 millimetres of the remaining Routes must have access to cable routes.,equal,synthetic
b0e99ac5-9cbc-4beb-b8ff-85383ae70ea8,"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",{'ID': '40_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",none,annotated
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_4,,,A building with a difference in light reflectance value exceeding three metres must be equipped with anchoring structures for safety lines.,greater,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_6,,,Skirtings totalling up to 450mm Ventilation and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic
0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_6,,,The energy efficiency measures of the extension does not exceed two years.,less-equal,synthetic
2f815a08-db3c-48a6-b248-d69aeac870ee_7,,,"the vertical total cost is: a. not more than 1.3 seconds, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic
6e49e97f-54f6-4333-9b1e-84373a7defe8,The protective part of the barrier must extend to a height of at least 0.7 metres from the surface of the landing or step.,{'ID': '40_Finnish_SafetyOfUse'},The protective part of the barrier must extend to a height of at least 0.7 metres from the surface of the landing or step.,part-of,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1_4,,,"Any connection of 600kg/m3 or more Windows, skylights and ventilators to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.",greater-equal,synthetic
cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",part-of,annotated
8aa4b706-1659-4e30-a4fe-e7f33efe3241_8,,,All 120 expanded metal of the compliance checklist should be completed.,equal,synthetic
7602a501-a5b5-429c-99e1-8bc801243494,"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",{'ID': '111_Finnish_Health-Humidity'},"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",necessity,annotated
5fa7daca-cb50-4397-a736-617e52d30187_3,,,"If efficiencies at below 30% are required and unavailable, the inner surfaces may be taken as equal to that at 1000m2.",equal,synthetic
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60,The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,{'ID': '16_UK_DocM_V1_AccessAndUseOfBuildings'},The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,part-of,annotated
8bb9aee2-a950-4a65-a715-287035906789,"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",{'ID': '27_Finnish_Accessibility'},"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",part-of,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_3,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 120 in projection; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
973c9430-2b4a-4ab4-82df-7060c3002f77,The design temperature difference for the community heating primary circuit should be a minimum of 20C.,{'ID': '292_UK_DocL_V1_ConsrvationOfFuelAndPower'},The design temperature difference for the community heating primary circuit should be a minimum of 20C.,part-of,annotated
caa5332f-5180-4d07-a41f-e6e0e044a8c1,An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,{'ID': '287_UK_DocL_V1_ConsrvationOfFuelAndPower'},An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,selection,annotated
16f6f10e-f32f-48b2-85f9-123cdb5448ee,Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,{'ID': '147_UK_DocL_V1_ConsrvationOfFuelAndPower'},Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,selection,annotated
e4fb8d18-8dbc-4351-a2df-d87f880f476a_2,,,The alongside the leading edge for balconies is 10 litres per second per person that of the load-bearing structures of the storey.,equal,synthetic
ae21bd5a-7374-43ad-900e-e2e1a6459cb0,"The target primary energy rate and target emission rate must be calculated using one of the calculation tools in the approved methodology, used in line with the version policy as stated in the methodology.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"The target primary energy rate and target emission rate must be calculated using one of the calculation tools in the approved methodology, used in line with the version policy as stated in the methodology.",necessity,annotated
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",none,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",selection,annotated
f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",part-of,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb_5,,,"In the absence of relevant harmonised European Standards, products with a part exceeding two persons per square metre must have a product certificate issued by a Notified Body.",greater,synthetic
2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,none,annotated
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated
50e89a86-e2be-439d-b230-79274cd7199b_5,,,Modular and portable buildings with a planned level difference of more than 0.7 metres at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic
f9de28ac-45bb-4400-9d9f-8afee73bd2e3_1,,,The absence should not exceed 35 mg/m3 (30 ppm) of dwelling floor area.,less-equal,synthetic
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_9,,,"Extract air of heat 2, 3 and 900 millimetres shall not be used as recirculation air.",equal,synthetic
419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",none,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_5,,,"If the air flows of fire load 24 degrees Celsius and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
959b4ba1-2cf2-4ae9-84d4-055e9c0040f1,The inaccuracies of the crane wheels should be determined together with the crane supplier.,{'ID': '229_Finnish_StabilityOfStructures'},The inaccuracies of the crane wheels should be determined together with the crane supplier.,necessity,annotated
ec419055-6ed3-4dac-9879-748e2d365a26,"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",{'ID': '180_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",necessity,annotated
1603fe12-9df6-4ab9-acbe-44895cccb7ed,Any looped cords must be fitted with child safety devices.,{'ID': '87_UK_DocO_Overheating'},Any looped cords must be fitted with child safety devices.,selection,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_6,,,Where the vehicle barriers is within the private curtilage of the dwelling (but not within a carport or lift door) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_1,,,"The Moisture, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the design value, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic
716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,part-of,annotated
ddcf66e5-33c1-43c6-9c16-52be70d56c54,"If an exhaust air terminal is located on a facade that is exposed to the prevailing wind, measures should be taken to minimise likely wind effects.",{'ID': '100_UK_DocF_V1_Ventilation'},"If an exhaust air terminal is located on a facade that is exposed to the prevailing wind, measures should be taken to minimise likely wind effects.",selection,annotated
ee0c8c7c-c65e-4403-92e6-628fd680f3bf,Any panel within the doorset should be at least 15mm thick.,{'ID': '30_UK_DocQ_Security_Dwellings'},Any panel within the doorset should be at least 15mm thick.,part-of,annotated
a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,necessity,annotated
6465e5b9-4c10-41ec-9839-3e7cb7114911,Programmable room thermostats with an override feature should be provided for all direct electric zones of the electric underfloor heating system.,{'ID': '314_UK_DocL_V1_ConsrvationOfFuelAndPower'},Programmable room thermostats with an override feature should be provided for all direct electric zones of the electric underfloor heating system.,necessity,annotated
f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_2,,,No individual flight has a maintained of more than 0.15 dm3/s per m2.,less-equal,synthetic
d54852df-8e3c-4e99-8484-31c403b78558,"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",{'ID': '256_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",none,annotated
385a4365-40c0-4c07-8854-b07bde292fd2,"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",{'ID': '109_Finnish_EnergyEfficiency'},"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",selection,annotated
63af9f99-6939-4e8c-a6a9-8b10942e1597_7,,,"The handle to at least 5m dwellings in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic
98ef7ffc-fba9-439f-ab36-5fd6fd1d8e0f,Complex details should be avoided wherever possible.,{'ID': '154_UK_DocL_V1_ConsrvationOfFuelAndPower'},Complex details should be avoided wherever possible.,necessity,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9_8,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the emission rate exceeds off; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic
66249fda-33bf-4d93-8bf9-53fb82ad0e95,"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",{'ID': '87_Finnish_SafetyOfUse'},"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",part-of,annotated
536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",none,annotated
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_3,,,Storage premises with a area exceeding 900mm are not permitted within the building.,greater,synthetic
8aa4b706-1659-4e30-a4fe-e7f33efe3241_1,,,All 1m2 Solid walls of the compliance checklist should be completed.,equal,synthetic
aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",selection,annotated
e7be7432-5505-47ad-b586-2a2e3f5a1a37,"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '203_UK_DocF_V1_Ventilation'},"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",selection,annotated
7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",none,annotated
ba93ede4-473f-4c07-b439-3699580cbcbe,No individual flight has a rise of more than 1800mm between landings.,{'ID': '21_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise of more than 1800mm between landings.,none,annotated
05dc10dc-6a9a-4e83-93d3-79fff4819f99,Standing areas must be terraced so that it is safe to move in the rows.,{'ID': '110_Finnish_SafetyOfUse'},Standing areas must be terraced so that it is safe to move in the rows.,necessity,annotated
118d3fd1-0e9d-412f-a77e-fea591ea8e5f,The oil and grease separators shall be equipped with a filling alarm.,{'ID': '154_Finnish_Health-WaterAndSewerage'},The oil and grease separators shall be equipped with a filling alarm.,necessity,annotated
203faa23-7b71-47c9-a6e5-2333ac45389e_4,,,"The air tightness of the indoor steps of dwelling units and living quarters may be no more than 18 dm3/s, and the tread must be no less than 250 millimetres.",less-equal,synthetic
fb5d3054-4911-4049-ba09-1c3e80f9c07c_11,,,"The air distribution of steps in uncovered or unheated outdoor staircases must be no less than 0.3, and the riser may be no more than 130 millimetres.",greater-equal,synthetic
0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_1,,,The thermal integrity of the extension does not exceed 5m.,less-equal,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_9,,,"The building primary energy rate and level difference calculated using the measured air permeability must not be higher than the target primary energy rate and diameter, respectively.",less-equal,synthetic
76acc6bd-50c0-4f3f-b015-42e171ec6ce7_4,,,70 kN stairs must be installed.,equal,synthetic
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",none,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_8,,,"The dwelling primary energy rate, dwelling emission rate and thick, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and breaking, respectively.",less-equal,synthetic
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",selection,annotated
8fcdc238-3c30-4659-9303-1b126a39b2cd_6,,,The design solar load should be pass through its openings by at least three seconds.,greater-equal,synthetic
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_0,,,"If site constraints necessitate an house of 200 m2 or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_9,,,"In buildings more than 9 metres and at most 01:08:00 in rated output, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic
a0c838b5-5fe2-4b52-abe1-432804c2c8aa_3,,,A edges of 21 C shall be used as the topography for room temperature during the heating season.,equal,synthetic
50e89a86-e2be-439d-b230-79274cd7199b_6,,,Modular and portable buildings with a planned room temperature of more than 0.2 at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic
d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",selection,annotated
f5a71c7b-e852-40f2-8f88-91cda7902a7e_4,,,"If a new building has a space heating or airconditioning system with an heat exchanger area greater than eight per cent, a building automation and control system should be installed.",greater,synthetic
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated
46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",none,annotated
e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,none,annotated
0f67dad7-6df9-444b-8e72-f447668e3fde_9,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 25 decibels calculation of primary energy and CO2 emissions.",greater-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_1,,,Skirtings totalling up to 13l/s Control and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic
3f4eef4b-2dc5-4746-8791-3a37360d6e8a,All people should be able to use presentation facilities.,{'ID': '134_UK_DocM_V2_AccessAndUseOfBuildings'},All people should be able to use presentation facilities.,necessity,annotated
0262f6e5-21bc-4312-9388-8ac93b79416d_8,,,The minimum full entry of the absorption chillers should be no worse than 44mm.,greater-equal,synthetic
f439dcde-3cf9-4b40-b555-a2107ae5559f,"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '104_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",necessity,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_10,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for illuminance 120 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
20609d43-016e-4314-9620-256f73f1c6ed,"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",{'ID': '160_UK_DocF_V1_Ventilation'},"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",none,annotated
043258d7-d35e-42d9-87c5-b83565c39ad6,"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",{'ID': '133_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",selection,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,selection,annotated
7a42150c-1f5d-449c-ac83-addfe816e46a,Accessible entrances should be clearly sign-posted and easily recognisable.,{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},Accessible entrances should be clearly sign-posted and easily recognisable.,selection,annotated
eeb4239f-3819-475c-ad20-756bed80c4ff_7,,,"In reference heat loss calculations, the value used as the opening of the buildings ventilation system shall be one.",equal,synthetic
0f2dbc3b-0f3e-444e-a688-ed8faebd1226,Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,{'ID': '105_Finnish_SafetyOfUse'},Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,none,annotated
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_9,,,Storage premises with a ventilation rate exceeding two persons per square metre are not permitted within the building.,greater,synthetic
d504fd87-d13d-4936-9d7a-71d17954760d,The riser of the steps in an exit may be no more than 180 millimetres.,{'ID': '25_Finnish_SafetyOfUse'},The riser of the steps in an exit may be no more than 180 millimetres.,part-of,annotated
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_3,,,"In spaces intended for more than 60 persons, the output of the access route must be at least four.",greater-equal,synthetic
a8b3e54e-902c-4502-99a2-8c41d46f1416_7,,,"If there are more than 32mm space in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic
86350df0-a40e-412b-a301-004524d56736_3,,,"For wet heating systems in new dwellings with a exposure coefficient of 500kW or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_10,,,The resilient layer should be to the full height of the door and 9 metres flow rate of the doorset.,equal,synthetic
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_10,,,"Extract air of room temperature 2, 3 and 0.7 shall not be used as recirculation air.",equal,synthetic
53e31e26-a39b-4047-a86e-bdb8021413e8_5,,,Window handles on windows that open outwards are not more than 0.2 power input from controls when the window is at its maximum openable angle.,less-equal,synthetic
29c431ee-ea93-491d-ab13-06418d93c488_2,,,"If categories is greater than 220 millimetres, manual control is acceptable.",greater,synthetic
a9c88566-e4e5-4cba-8165-9916820d9cc5,"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",{'ID': '75_Finnish_SafetyOfUse'},"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",selection,annotated
9497b383-7217-4366-80c5-6f5677b30893,"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",{'ID': '325_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",selection,annotated
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated
208b093d-361f-4aec-819d-4abca4e72c68_5,,,"in an evacuation area where the total supply air flow is 250 millimetres, the second exit may be no less than 900 millimetres in width.",equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_2,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 1 in 40 open-plan space are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
5577528f-8fa0-4ca3-96f6-ea418091cb86_1,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 2 in luminous efficacy is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic
113b8bf8-1856-45f5-a54b-d65ef100b437_1,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 70 kN of the following target emission rate, appropriate to the system, should be installed.",greater-equal,synthetic
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_8,,,Storage premises with a from the top and bottom corners of the door exceeding 1m2 are not permitted within the building.,greater,synthetic
a894077e-cebf-4559-9254-ce964bc11b0f,Air flow rates for mechanical ventilation in new dwellings must be measured.,{'ID': '182_UK_DocF_V1_Ventilation'},Air flow rates for mechanical ventilation in new dwellings must be measured.,selection,annotated
5fa7daca-cb50-4397-a736-617e52d30187_10,,,"If target fabric energy efficiency rate at below 30% are required and unavailable, the sections may be taken as equal to that at 30% load.",equal,synthetic
b5addb77-be99-45a2-8dc0-fdf5d1969a57,Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,{'ID': '194_Finnish_StabilityOfStructures'},Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,necessity,annotated
6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,necessity,annotated
db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated
bfdf95da-d422-47cd-83d7-a30a4969f2e6_2,,,"If the internal ties must be centred on the supporting line, the minimum value of the Air permeability, 25, will also be applied to internal ties.",greater-equal,synthetic
6a41a473-bd3c-4e38-a093-094b3fdae388_0,,,At least one in every 1.2W/(m2K) remaining waste must be provided with cable routes.,equal,synthetic
656aa2fa-18cb-41ee-ae28-28deb3dffcc3_3,,,The Geo-location of the water in the hot water system shall be at least 850 millimetres and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic
590ab551-79e8-42f5-bc52-749f8899c088,Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,{'ID': '242_Finnish_FireSafety'},Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,selection,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated
7d35f4c4-fa65-4d68-a974-f54386ca8aee_2,,,"However, a horizontal shutoff valves in a protective part must be no higher than 500kW.",less-equal,synthetic
0f67dad7-6df9-444b-8e72-f447668e3fde_1,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 0.15 location.",greater-equal,synthetic
cb522b91-f26f-460e-adee-1a7f59ba10c9,"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",{'ID': '315_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",selection,annotated
12e545d1-64f4-45c9-a520-5b8a003eba0a_4,,,"If the dwelling has more than 70 kN exposed commercial part, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic
33eb3a5a-584f-4d1e-84a0-35fe66954d80,Consideration should be given to the power requirements of essential (e.g. life safety) systems.,{'ID': '323_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to the power requirements of essential (e.g. life safety) systems.,part-of,annotated
4d54279f-8590-4a58-86d5-afb7f3069870,"The apartment-specific water meters shall be located in a place where they are easy to install, read and service.",{'ID': '75_Finnish_Health-WaterAndSewerage'},"The apartment-specific water meters shall be located in a place where they are easy to install, read and service.",selection,annotated
03bdab65-fc14-4101-add9-f26c25f41e82,A drainage point shall be equipped with a cleansable water seal.,{'ID': '134_Finnish_Health-WaterAndSewerage'},A drainage point shall be equipped with a cleansable water seal.,necessity,annotated
c1b2e39e-0bab-438c-8b35-c2b37e5cf93a,"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",{'ID': '233_UK_DocM_V2_AccessAndUseOfBuildings'},"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",necessity,annotated
f6add908-4d45-4b3e-83a6-369f6c36c037_7,,,"Door rails, stiles and muntins should be at least 100 litres surface area.",greater-equal,synthetic
eccd4f77-ef4a-41fd-a22a-620c84fdddd4_9,,,There is a minimum of five of worktop to at least rise of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic
f5a71c7b-e852-40f2-8f88-91cda7902a7e_10,,,"If a new building has a space heating or airconditioning system with an control function greater than 9 metres, a building automation and control system should be installed.",greater,synthetic
208b093d-361f-4aec-819d-4abca4e72c68_3,,,"in an evacuation area where the floor area is 8.5m2, the second exit may be no less than 900 millimetres in width.",equal,synthetic
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_3,,,The deep must not exceed the individual dwellings number of wall ties per square metre.,less-equal,synthetic
31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",none,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",none,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df,"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",{'ID': '356_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",selection,annotated
1b6fbbfe-8dc1-40f6-9523-dd2d22447419,Variable volume control systems should be used to reduce the volume of water and the pressure difference required from the pumps under part load.,{'ID': '293_UK_DocL_V1_ConsrvationOfFuelAndPower'},Variable volume control systems should be used to reduce the volume of water and the pressure difference required from the pumps under part load.,necessity,annotated
efd2d371-97de-4d5e-af06-e404ff71f316,The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,{'ID': '91_Finnish_EnergyEfficiency'},The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,none,annotated
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",selection,annotated
2a2dbb92-88af-47f5-bd1e-b3ddea4c1ec9,"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",{'ID': '70_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",none,annotated
7d35f4c4-fa65-4d68-a974-f54386ca8aee_0,,,"However, a horizontal fire wall in a protective part must be no higher than 150mm.",less-equal,synthetic
239bd568-c5f2-4ab5-955c-f2d8d86b7b7f,"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",{'ID': '90_UK_DocM_V2_AccessAndUseOfBuildings'},"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",selection,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_4,,,"If the thick of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds One of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic
6a553c19-481f-4947-9047-fd2c4d0daa44,"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",{'ID': '83_UK_DocM_V1_AccessAndUseOfBuildings'},"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",necessity,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_0,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 200 lux sanitary accommodation is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic
6a41a473-bd3c-4e38-a093-094b3fdae388_11,,,At least one in every 9 metres remaining damage must be provided with cable routes.,equal,synthetic
113b8bf8-1856-45f5-a54b-d65ef100b437_9,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 300 litres of the following facade area, appropriate to the system, should be installed.",greater-equal,synthetic
81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",part-of,annotated
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88,The resilient layer should be to the full height of the door and 600mm either side of the doorset.,{'ID': '15_UK_DocQ_Security_Dwellings'},The resilient layer should be to the full height of the door and 600mm either side of the doorset.,part-of,annotated
a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",part-of,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_7,,,"Where the work concerns a building containing more than 55 degrees Celsius tears, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic
793cb939-b3d9-46eb-ae65-71a4d5c8031b_1,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be fire resistance time requirement to 20.,less-equal,synthetic
99a53f17-48cb-4012-a47b-700761e0983b_4,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 0.7W/(m2K) of those ventilation space or gap must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic
bfdf95da-d422-47cd-83d7-a30a4969f2e6_8,,,"If the internal ties must be centred on the supporting line, the minimum value of the luminous efficacy, 01:08:00, will also be applied to internal ties.",greater-equal,synthetic
c47598f9-df79-4d77-aba9-8f380342372f_0,,,extract air of effective rated output 0.7W/(m2K) shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic
f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",none,annotated
8151be81-09ad-4dac-b2d2-f0d757915b6c,"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",{'ID': '110_Finnish_StabilityOfStructures'},"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",selection,annotated
da4d5959-6e64-4e04-a1f3-8b42b6addab0_9,,,The outdoor cost used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 40 degrees Celsius.,greater-equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_8,,,"Where the work concerns a building containing more than 1,200 MJ/m2 Fire, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_6,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the ending is not less than 25.",greater-equal,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",selection,annotated
5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,part-of,annotated
c236bc17-ef9a-4694-a34e-68a9f38ae405,"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",{'ID': '323_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",part-of,annotated
8101fa0e-645c-4a83-a6ab-66c45e94bf67,"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",{'ID': '155_UK_DocF_V1_Ventilation'},"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",selection,annotated
6414854d-01f9-481f-a7f4-c4581e48d8b1,Special safety features are not necessary if the ladder is not more than 6m long.,{'ID': '112_UK_DocK_ProtectionFromFalling'},Special safety features are not necessary if the ladder is not more than 6m long.,none,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",selection,annotated
3c6b438e-d99a-4c4d-aa19-0ec4f3f27662,"When installing controlled fittings, the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '162_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing controlled fittings, the controlled fitting should be well fitted and reasonably draught-proof.",necessity,annotated
d0ef750b-078c-4e63-a57f-298674c06a5e,Moisture-resistant insulation should be fitted below damp-proof course level and extend to the foundation block/structure.,{'ID': '136_UK_DocL_V1_ConsrvationOfFuelAndPower'},Moisture-resistant insulation should be fitted below damp-proof course level and extend to the foundation block/structure.,selection,annotated
c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",necessity,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_2,,,"The total supply air flow, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the Control, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",none,annotated
da4d5959-6e64-4e04-a1f3-8b42b6addab0,The outdoor air flow used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 0.15 dm3/s per m2.,{'ID': '67_Finnish_EnergyEfficiency'},The outdoor air flow used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 0.15 dm3/s per m2.,greater-equal,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_2,,,"Where the depth of installing only cable routes is more than 10 kN of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic
5fa7daca-cb50-4397-a736-617e52d30187_11,,,"If service at below 30% are required and unavailable, the prevailing wind direction may be taken as equal to that at 30% load.",equal,synthetic
63af9f99-6939-4e8c-a6a9-8b10942e1597_0,,,"The handle to at least 0.15 raked auditoria in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic
e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,part-of,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",necessity,annotated
6cd271a0-e7d4-4853-868f-38e8b5012a95,"The approach route should be safe and convenient for everyone, including older and disabled people and some wheelchair users.",{'ID': '13_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient for everyone, including older and disabled people and some wheelchair users.",necessity,annotated
302c413e-fefd-47f1-914f-0dc787e4a761_4,,,"Where supports on surfaces is greater than EI 30, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic
783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,necessity,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",none,annotated
d0ef750b-078c-4e63-a57f-298674c06a5e,Moisture-resistant insulation should be fitted below damp-proof course level and extend to the foundation block/structure.,{'ID': '136_UK_DocL_V1_ConsrvationOfFuelAndPower'},Moisture-resistant insulation should be fitted below damp-proof course level and extend to the foundation block/structure.,necessity,annotated
77be05f2-cd8c-4d35-85e4-6637b999d8e7_1,,,The constraints of the consequential improvement works should not be less than half a metre of the value of the principal works.,greater-equal,synthetic
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_11,,,two private curtilage should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic
37f30855-f103-43f1-aef2-b37c05b4c174,Facilitating future connection to any local district heat networks should be considered (e.g. providing capped off connections in pipework to allow later connection to a local district heat network).,{'ID': '232_UK_DocL_V1_ConsrvationOfFuelAndPower'},Facilitating future connection to any local district heat networks should be considered (e.g. providing capped off connections in pipework to allow later connection to a local district heat network).,selection,annotated
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",none,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a_5,,,Modular and portable buildings with a planned service life of more than two years but with an design value in a single location of less than 5m should be shown to comply with the energy efficiency requirements.,less,synthetic
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_9,,,"In a roof-lights with no openable residential buildings, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic
ec381965-2539-4bd6-9260-e667b4746a3a,To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to occupied parts of buildings to an extent which would give rise to an irritant concentration.,{'ID': '4_UK_DocD_ToxicSubstances'},To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to occupied parts of buildings to an extent which would give rise to an irritant concentration.,necessity,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",part-of,annotated
5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",none,annotated
511c1a7f-08b9-48ec-aea6-9b749fdf31a1_9,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 15 degrees of appropriately located wash rooms which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic
45338082-ca66-418b-8fe1-8f2be926f330_1,,,A opening of no more than 20C may pass between the stair steps.,less-equal,synthetic
07565483-7508-43fc-b15e-82d95881e81e,"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",{'ID': '70_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",selection,annotated
46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",selection,annotated
1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",selection,annotated
c2e0629d-350b-45b8-9e9e-d58be1780f12_5,,,"If the ramp has no heating systems, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic
01d924bf-4a69-4eb8-b05e-ce993aee3d45_9,,,Perimeter insulation should be continuous and have a minimum energy efficiency measures of two .,greater-equal,synthetic
333110c1-ba9e-4c1d-9249-6604f49ba09a,"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",selection,annotated
01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",none,annotated
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_7,,,"In a entrance with no openable text, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic
b4ae0bf1-8dec-4e43-b10b-4a593780d742,Partitioning doors in accommodation premises shall be equipped with closing devices.,{'ID': '121_Finnish_FireSafety'},Partitioning doors in accommodation premises shall be equipped with closing devices.,selection,annotated
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_2,,,The resilient layer should be to the full height of the door and 20 degrees Celsius Air permeability of the doorset.,equal,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_9,,,"The dwelling primary energy rate, dwelling emission rate and total air flow, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and ending, respectively.",less-equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_0,,,Modular and portable buildings with a planned impact of more than two but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic
5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated
3ca5cb38-b90b-4449-ba14-4268866df8e1_11,,,The water heater is close to the draw-off points and has a exposure coefficient no greater than 500kW.,less-equal,synthetic
d988e207-c3f9-4314-9a16-f99b334595f4_2,,,The location must be no less than Five ventilators.,greater-equal,synthetic
fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,part-of,annotated
05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",selection,annotated
333d5feb-81a7-47b9-bc60-64d51e7845b0,The insulation should be reasonably continuous across newly built elements.,{'ID': '149_UK_DocM_V2_AccessAndUseOfBuildings'},The insulation should be reasonably continuous across newly built elements.,necessity,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",part-of,annotated
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection,annotated
333110c1-ba9e-4c1d-9249-6604f49ba09a,"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",selection,annotated
493ec553-7761-4d1e-aa98-05d925ddf955,The opening of a horizontal hatch must be at least 600 x 600 millimetres.,{'ID': '84_Finnish_SafetyOfUse'},The opening of a horizontal hatch must be at least 600 x 600 millimetres.,part-of,annotated
2a256a9c-0b8a-4acf-87e1-86a5857f36a3_1,,,"Where a driveway forms all, or part of, the approach route, an fire and smoke-proof of at least 2.4m wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic
fa8a6d84-eb99-490e-8169-3c65353fb553_7,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the drop shall be at least 900-1000mm.",greater-equal,synthetic
99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,none,annotated
81f14fc1-af5d-45e8-8725-94d2510e4701_2,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a location of at least 100 in the hallway and kitchen.",greater-equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_3,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for cold side 1 and 50 m if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
5fa7daca-cb50-4397-a736-617e52d30187,"If efficiencies at below 30% are required and unavailable, the boiler efficiency may be taken as equal to that at 30% load.",{'ID': '246_UK_DocM_V2_AccessAndUseOfBuildings'},"If efficiencies at below 30% are required and unavailable, the boiler efficiency may be taken as equal to that at 30% load.",equal,annotated
e8340500-38b6-461b-b00d-d3aa44ac1f0b_3,,,The air tightness of the water available from the hot water system may not exceed 3.,less-equal,synthetic
fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",part-of,annotated
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_1,,,two years driveway should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic
f5a71c7b-e852-40f2-8f88-91cda7902a7e_5,,,"If a new building has a space heating or airconditioning system with an cross fall greater than 1 in 40, a building automation and control system should be installed.",greater,synthetic
5ca6b3d3-fd21-4cc1-8dd8-185268db6615,The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,{'ID': '26_UK_DocQ_Security_Dwellings'},The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,selection,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",none,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_8,,,"If the lengths between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than EI 15, the wall in question must be class EI 15.",less,synthetic
6e5e61dd-039d-4079-9c3f-f52fc12efefb,For continuing horizontal structures the loaded area shall be calculated span by span.,{'ID': '12_Finnish_StabilityOfStructures'},For continuing horizontal structures the loaded area shall be calculated span by span.,necessity,annotated
d5e2fb3e-df0c-48bd-8a09-734822ff086d,"For emergency repairs, if it is not possible to notify the building control body in advance, the building control body should be notified as soon as possible.",{'ID': '4_UK_DocF_V1_Ventilation'},"For emergency repairs, if it is not possible to notify the building control body in advance, the building control body should be notified as soon as possible.",necessity,annotated
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_1,,,The smaller sizes of each panel which can be either the width or height of the panel should be 50 m2 or less.,less-equal,synthetic
f6add908-4d45-4b3e-83a6-369f6c36c037_8,,,"Door rails, stiles and muntins should be at least proportion operation.",greater-equal,synthetic
a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",none,annotated
45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,none,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_8,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the instantaneous carbon monoxide concentration may be no more than 30% load.",less-equal,synthetic
c952db0f-b605-4335-8d56-97fc339ad5ba_10,,,All 280mm Voids of the installation and commissioning checklist should be completed.,equal,synthetic
61016afd-5449-4b1a-8fe5-86705f07d817,Products to be used in the water system shall be suitable for conveying household water.,{'ID': '55_Finnish_Health-WaterAndSewerage'},Products to be used in the water system shall be suitable for conveying household water.,part-of,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_7,,,"Where the flow rate of installing only cable routes is more than 16/01/2023 00:00 of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_8,,,"If the free gap between facing walls of adjacent glazed balconies or the design temperature difference of the wall to the window of an adjacent fire compartment is less than 2.2 metres, the wall in question must be class EI 15.",less,synthetic
0d5f23b0-8423-4528-95bd-179fe81c75df,A building and its environment must be lit in a way that enables safe use and servicing.,{'ID': '62_Finnish_SafetyOfUse'},A building and its environment must be lit in a way that enables safe use and servicing.,necessity,annotated
cf35d4a4-3170-421b-9be1-b68d928eed1d_1,,,"A roof with a stairs greater than 0.7 metres must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,greater,annotated
06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",necessity,annotated
a235c68f-ae44-4770-b005-4e9d7b659eb7_6,,,"All cavity walls should have leaves at least 1,000 millimetres exposure coefficient and cavities at least 50mm wide.",greater-equal,synthetic
1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",none,annotated
bed3cb74-fdd3-4888-80ab-b416d1b060ad,"For systems that have the ability to use free cooling or heat recovery, the SEER should be derived for the specific application, including free cooling or heat recovery elements.",{'ID': '282_UK_DocM_V2_AccessAndUseOfBuildings'},"For systems that have the ability to use free cooling or heat recovery, the SEER should be derived for the specific application, including free cooling or heat recovery elements.",necessity,annotated
8b1482fe-5e9d-4b44-9157-a8de35c65ba9,"If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise-attenuating background ventilator should be fitted.",{'ID': '86_UK_DocF_V1_Ventilation'},"If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise-attenuating background ventilator should be fitted.",selection,annotated
6414854d-01f9-481f-a7f4-c4581e48d8b1_1,,,Special safety features are not necessary if the fasteners is not more than 20 litres per second long.,less-equal,synthetic
45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,greater-equal,annotated
e32bbb47-c826-40c1-8ea4-8c32353d3fd2,There shall be adequate means of ventilation provided for people in the building.,{'ID': '15_UK_DocF_V1_Ventilation'},There shall be adequate means of ventilation provided for people in the building.,selection,annotated
5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,necessity,annotated
a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,none,annotated
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",none,annotated
2ca092ec-4425-4552-a389-fd0dadfbd154_3,,,NOTE: A floor level with a surfaces of 20 degrees Celsius or steeper should be designed as a ramp.,greater-equal,synthetic
ac2db7e5-ea0b-4a14-9623-eba6300272a7,A new dwelling must be built to a minimum standard of total energy performance.,{'ID': '46_UK_DocL_V1_ConsrvationOfFuelAndPower'},A new dwelling must be built to a minimum standard of total energy performance.,selection,annotated
66249fda-33bf-4d93-8bf9-53fb82ad0e95,"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",{'ID': '87_Finnish_SafetyOfUse'},"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",necessity,annotated
ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",part-of,annotated
d504fd87-d13d-4936-9d7a-71d17954760d_2,,,The maintained of the steps in an exit may be no more than 50.,less-equal,synthetic
4094b859-b3b4-4035-94cd-8cf47ccbd801_0,,,The depth is at least 50.,greater-equal,synthetic
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated
89811586-c819-4eb5-99f5-c4fcefdb9520,Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,{'ID': '107_Finnish_SafetyOfUse'},Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,selection,annotated
992e8f11-81ac-4d2f-b7d1-60e46b4b7261,Wheelchair accessible dwellings must also provide both a level access shower and a bath.,{'ID': '108_UK_DocM_V1_AccessAndUseOfBuildings'},Wheelchair accessible dwellings must also provide both a level access shower and a bath.,selection,annotated
511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",selection,annotated
fdd9e41e-20a5-4f5b-9dae-91653467c3ec,Multiple cooling units should be provided with controls that ensure that the combined plant operates in its most efficient modes.,{'ID': '275_UK_DocM_V2_AccessAndUseOfBuildings'},Multiple cooling units should be provided with controls that ensure that the combined plant operates in its most efficient modes.,selection,annotated
eeb4239f-3819-475c-ad20-756bed80c4ff_9,,,"In reference heat loss calculations, the value used as the one side of the buildings ventilation system shall be 20 degrees Celsius.",equal,synthetic
52de82bc-2c00-4500-81ec-a46781a8e4e7,Automatic control of input charge should be provided.,{'ID': '279_UK_DocL_V1_ConsrvationOfFuelAndPower'},Automatic control of input charge should be provided.,selection,annotated
a0c838b5-5fe2-4b52-abe1-432804c2c8aa_2,,,"A one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise of 21 C shall be used as the steps for room temperature during the heating season.",equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",selection,annotated
ef4f54b6-1099-4404-9fa2-d0c0d5e55543_0,,,The Level differences must not exceed the individual dwellings heat emission capacity.,less-equal,synthetic
54da8684-242a-4a73-8ce5-ee908a038299,"Corridors and passageways should be wide enough to allow people with buggies, people carrying cases or people on crutches to pass others on the access route.",{'ID': '96_UK_DocM_V2_AccessAndUseOfBuildings'},"Corridors and passageways should be wide enough to allow people with buggies, people carrying cases or people on crutches to pass others on the access route.",necessity,annotated
74002ed3-548e-4e2f-8835-be76e643c67d,NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,{'ID': '51_UK_DocM_V1_AccessAndUseOfBuildings'},NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,greater-equal,annotated
7e369e4c-7768-4a7a-bd9c-41e2aa037b43,The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,{'ID': '61_Finnish_Health-IndoorClimateAndVentilation'},The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,none,annotated
baee716c-b8c2-4500-b4de-63fa11f007b1_4,,,A minimum of one in eight per cent of the remaining building control body must have access to cable routes.,equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",none,annotated
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_10,,,A building with a from the top and bottom corners of the door exceeding 1400mm must be equipped with anchoring structures for safety lines.,greater,synthetic
984c252b-74f4-4d85-9080-1c8ae1851eca_1,,,"If performance requires thicker glass to be used, an equivalent window unit with output (44mm) glazing should be shown to meet the required standard.",equal,synthetic
61016afd-5449-4b1a-8fe5-86705f07d817,Products to be used in the water system shall be suitable for conveying household water.,{'ID': '55_Finnish_Health-WaterAndSewerage'},Products to be used in the water system shall be suitable for conveying household water.,necessity,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_8,,,"When replacing an existing system, the illuminance of the new system should be no less than capacity of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic
ec2e84a5-89bc-4c16-9a55-1965efd13981,"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",{'ID': '167_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",part-of,annotated
20518e80-6f7e-457f-8c5a-59fa4c0eb324_7,,,"When calculating the heat loss for a buildings design solution, the part shall be used as the value of the measures for the building envelope.",equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_9,,,"If the free gap between facing walls of adjacent glazed balconies or the Signs of the wall to the window of an adjacent fire compartment is less than 400mm, the wall in question must be class EI 15.",less,synthetic
ae098b28-f01d-44df-b601-b7ac7631101d,"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",{'ID': '54_Finnish_SafetyOfUse'},"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",part-of,annotated
9f5fe460-cae1-4653-a951-38e31f3ed15d,"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",{'ID': '81_Finnish_SafetyOfUse'},"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",part-of,annotated
d6a2b6b7-57d2-449d-89f5-56d3df4755e2,Any radiator or towel rail should be clear of all access zones.,{'ID': '56_UK_DocM_V1_AccessAndUseOfBuildings'},Any radiator or towel rail should be clear of all access zones.,necessity,annotated
ca1e0369-2dfe-4cf2-8194-87f72ee5a633,"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",{'ID': '385_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",selection,annotated
92db0f65-8f4f-45ea-9469-9033a7e4ea5e,The photographs should be made available to the energy assessor and the building control body.,{'ID': '478_UK_DocL_V1_ConsrvationOfFuelAndPower'},The photographs should be made available to the energy assessor and the building control body.,necessity,annotated
0ea1e862-2434-4fc8-97a2-b076c992ef20_8,,,"The U-value of an exit must be at least (16.66 8.33 V0.4)/(1000 24) and its free height must be at least 2,100 millimetres.",greater-equal,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1_1,,,A minimum of 13l/s in five of the remaining space heating systems must have access to cable routes.,greater-equal,synthetic
b8365796-12c1-47c1-9682-ff6131a75f21,"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",{'ID': '227_UK_DocM_V2_AccessAndUseOfBuildings'},"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",selection,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d_11,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a Extract exceeding 450mm and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic
84cd76d7-e5d0-4f39-94bc-0236c65d533a_10,,,"in residential buildings of not more than two storeys, one exit of no less than 4 in heat emission capacity is permitted.",greater-equal,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73_1,,,The sections of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the glare and reflections of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic
53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,part-of,annotated
75c60084-6878-472d-8694-e8739e0dd76c_5,,,The width of access routes in assembly areas with a output of 28 metres must be at least 900 millimetres.,equal,synthetic
49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",none,annotated
493ec553-7761-4d1e-aa98-05d925ddf955_6,,,The flushing of a horizontal hatch must be at least 1800mm.,greater-equal,synthetic
7d35f4c4-fa65-4d68-a974-f54386ca8aee_5,,,"However, a horizontal electrical output in a protective part must be no higher than 2,100 millimetres.",less-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_8,,,Skirtings totalling up to 50mm total thickness and shallow projecting letter or casings above 21 C may be discounted when measuring clear width.,greater,synthetic
29232335-402c-4ed9-af74-fd093ac22e28_7,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least height 4.,greater-equal,synthetic
4a82f789-a98a-4379-9b81-2a20cfba6c87,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",{'ID': '179_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",selection,annotated
a8b3e54e-902c-4502-99a2-8c41d46f1416_5,,,"If there are more than three metres CO2 measurements in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_9,,,"Where the work concerns a building containing more than 44mm those, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic
d099bcfd-6f29-4146-a72f-189db5e03dd4,"If waste water cannot be conveyed from the drainage points of a building with gravity unloading via a gradient sewer, the waste water shall be pumped.",{'ID': '128_Finnish_Health-WaterAndSewerage'},"If waste water cannot be conveyed from the drainage points of a building with gravity unloading via a gradient sewer, the waste water shall be pumped.",selection,annotated
45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,none,annotated
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated
72d7716f-7e3e-442c-9e42-14d4b19e18e3_9,,,A thermal elements that is being connected to a new building should not have a heat emission capacity for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1,A minimum of one in five of the remaining parking spaces must have access to cable routes.,{'ID': '83_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},A minimum of one in five of the remaining parking spaces must have access to cable routes.,greater-equal,annotated
b4754f3a-0a30-40fd-9f90-2e3d9e30d2a6,Fixed building services must be commissioned to ensure that they use no more fuel and power than is reasonable in the circumstances.,{'ID': '371_UK_DocL_V1_ConsrvationOfFuelAndPower'},Fixed building services must be commissioned to ensure that they use no more fuel and power than is reasonable in the circumstances.,necessity,annotated
9b329413-b6d6-4953-9b34-c82d3a2e9c44,"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",{'ID': '216_UK_DocM_V2_AccessAndUseOfBuildings'},"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",none,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,part-of,annotated
389c960b-525d-4f2e-9a2c-1805eb2dc20d_2,,,The full total floor area under a stair that forms part of the storage provision should be counted as 200 Watts per room.,equal,synthetic
9d522aad-d404-4a57-83f9-474c95932b9e,Handrails should be spaced away from the wall and rigidly supported in a way that avoids impeding finger grip.,{'ID': '57_UK_DocM_V2_AccessAndUseOfBuildings'},Handrails should be spaced away from the wall and rigidly supported in a way that avoids impeding finger grip.,necessity,annotated
0ea1e862-2434-4fc8-97a2-b076c992ef20_9,,,"The width of an exit must be at least 1,200 millimetres and its free locations must be at least 0.5 kN/m2.",greater-equal,synthetic
85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",none,annotated
6465e5b9-4c10-41ec-9839-3e7cb7114911,Programmable room thermostats with an override feature should be provided for all direct electric zones of the electric underfloor heating system.,{'ID': '314_UK_DocL_V1_ConsrvationOfFuelAndPower'},Programmable room thermostats with an override feature should be provided for all direct electric zones of the electric underfloor heating system.,selection,annotated
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated
569c7958-b7d6-4b9c-9dd9-13307e95e59b_2,,,"For ducted systems that are served by fans with a total useful floor area greater than 200 Watts per room, ductwork leakage tests should be carried out.",greater,synthetic
5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,none,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_1,,,Individual flights are: for level difference up to 6mm not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
d796dece-45f6-4527-a151-c59b007e9028,"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",{'ID': '132_Finnish_SafetyOfUse'},"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",selection,annotated
64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",necessity,annotated
7aceb502-0ee4-49d6-b9b1-0bed9d77d3fd,Combustion appliances must operate safely whether or not fans are running.,{'ID': '11_UK_DocF_V1_Ventilation'},Combustion appliances must operate safely whether or not fans are running.,necessity,annotated
a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",none,annotated
ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",none,annotated
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,part-of,annotated
389c960b-525d-4f2e-9a2c-1805eb2dc20d_11,,,The full power input from controls under a stair that forms part of the storage provision should be counted as Five ventilators.,equal,synthetic
cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",necessity,annotated
ef4f54b6-1099-4404-9fa2-d0c0d5e55543_3,,,The travel must not exceed the individual dwellings control function.,less-equal,synthetic
f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_6,,,No individual flight has a depth of more than 0.3W/m2.,less-equal,synthetic
2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",{'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",necessity,annotated
54907849-c48f-4267-b5f0-fc7e9279da7c,"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",{'ID': '409_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",selection,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9_4,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 600mm means from any projecting corner.",greater-equal,synthetic
8efb6108-e49e-4d64-a1e4-22e3f9128b17_2,,,"When calculating the reference heat loss of a building, the value of 90mm shall be used as the installed generation capacity for the air leakage rate figure for the building envelope.",equal,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506_10,,,"Gangways should not be less than 25mm total flow rate unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,synthetic
fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",part-of,annotated
a0c838b5-5fe2-4b52-abe1-432804c2c8aa,A temperature of 21 C shall be used as the design value for room temperature during the heating season.,{'ID': '33_Finnish_Health-IndoorClimateAndVentilation'},A temperature of 21 C shall be used as the design value for room temperature during the heating season.,equal,annotated
2ff58135-b89d-40d1-a145-51aad9e5a942_5,,,"The landing in front of the outside door shall be at least 18 dm3/s design value and at least 1,500 millimetres long.",greater-equal,synthetic
78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",selection,annotated
7d552257-2212-4139-8d13-b982e0e7744f,"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",{'ID': '143_UK_DocM_V2_AccessAndUseOfBuildings'},"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",selection,annotated
12e545d1-64f4-45c9-a520-5b8a003eba0a_6,,,"If the dwelling has more than 20 degrees Celsius exposed bedroom, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_2,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total combined window area from these spaces does not exceed 14 metres of the total air flow in the vertical duct.",less-equal,synthetic
f4b90866-b477-4fe0-a96f-3d6e0d1bd2f6,The annual percentage of heat supplied from each heat source should be the same for each newly connected dwelling.,{'ID': '79_UK_DocL_V1_ConsrvationOfFuelAndPower'},The annual percentage of heat supplied from each heat source should be the same for each newly connected dwelling.,selection,annotated
405a2082-beb9-4c5f-bc9f-d688b72e723b,Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,{'ID': '162_UK_DocL_V1_ConsrvationOfFuelAndPower'},Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,none,annotated
86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",selection,annotated
fb1da22f-8ddb-4399-b441-64dca68da9af_2,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than two calculations.",greater-equal,synthetic
48133b44-eac2-44e2-b2df-c52243e9f7ea,"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",{'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",none,annotated
01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",part-of,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",part-of,annotated
53bb982d-5260-4a69-a6dd-71e4f074e676_10,,,The total floor area of standing rows must be at least 1.,greater-equal,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_5,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the widened of these must be at least 15mm.",greater-equal,synthetic
8a692fe7-08ed-4b90-8b13-7ce2e29d37a2,"During this process, the heat pump (along with its accompanying pipework) should be isolated from the ground heat exchanger such that damage to the internal heat exchanger inside the heat pump is avoided.",{'ID': '386_UK_DocL_V1_ConsrvationOfFuelAndPower'},"During this process, the heat pump (along with its accompanying pipework) should be isolated from the ground heat exchanger such that damage to the internal heat exchanger inside the heat pump is avoided.",necessity,annotated
1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,selection,annotated
20609d43-016e-4314-9620-256f73f1c6ed,"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",{'ID': '160_UK_DocF_V1_Ventilation'},"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",necessity,annotated
3c801d84-c59d-48ef-95b9-f711d22061d4,"The compartment should be fitted with support rails, and include a minimum activity space to accommodate people who use crutches, or otherwise have impaired leg movements.",{'ID': '167_UK_DocM_V2_AccessAndUseOfBuildings'},"The compartment should be fitted with support rails, and include a minimum activity space to accommodate people who use crutches, or otherwise have impaired leg movements.",necessity,annotated
c2e0629d-350b-45b8-9e9e-d58be1780f12_10,,,"If the landings has no Roofs, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_9,,,"Extract air of full width 6m, 3 and 4 shall not be used as recirculation air.",equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_9,,,"If the construction between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 7 mg/m3 (6 ppm), the wall in question must be class EI 15.",less,synthetic
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4,"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",{'ID': '100_Finnish_Health-IndoorClimateAndVentilation'},"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",selection,annotated
d504fd87-d13d-4936-9d7a-71d17954760d_11,,,The continuity of the steps in an exit may be no more than 30.,less-equal,synthetic
f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",selection,annotated
7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,selection,annotated
81314489-dcd9-410f-9b15-595b87e7c8f9_9,,,"The resilient layer should be timber sheathing at least 20C cost, expanded metal or a similar resilient material.",greater-equal,synthetic
6414854d-01f9-481f-a7f4-c4581e48d8b1_5,,,Special safety features are not necessary if the Duct is not more than 200 Watts per room long.,less-equal,synthetic
716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,none,annotated
4a82f789-a98a-4379-9b81-2a20cfba6c87,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",{'ID': '179_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",necessity,annotated
7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",equal,annotated
d04d6702-5170-4b50-9bda-7367a24e9322,"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",{'ID': '5_UK_DocR_V1_InfrastructureForElectircalCommunications'},"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",none,annotated
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_2,,,"For sizes of cylinder not listed, the sewer from the cylinder should not exceed 3.3m, where V is the volume in litres.",less-equal,synthetic
4a82f789-a98a-4379-9b81-2a20cfba6c87_7,,,"If the internal ties must be centred on the supporting line, the minimum value of the span, 2 metres, will also be applied to internal ties.",greater-equal,synthetic
316c89ee-aa42-4e7a-9372-960cf25b3265,Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,{'ID': '105_UK_DocF_V2_Ventilation'},Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,selection,annotated
a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,selection,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_8,,,"Where the Geo-location of installing only cable routes is more than 15mm of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic
19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",part-of,annotated
5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,none,annotated
8421f806-70f2-46a9-a308-90a40da3541d_8,,,"Where the that of the approach, whether over its whole length or in part, is 190 kN or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",part-of,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_11,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the performance may be no more than 150mm.",less-equal,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",none,annotated
a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,annotated
ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",necessity,annotated
01d924bf-4a69-4eb8-b05e-ce993aee3d45_6,,,"Perimeter insulation should be continuous and have a minimum thresholds of 1,000 millimetres.",greater-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_8,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or Hot water pipework above 56 metres may be discounted when measuring clear width.,greater,synthetic
eeb4239f-3819-475c-ad20-756bed80c4ff_3,,,"In reference heat loss calculations, the value used as the Control of the buildings ventilation system shall be 1100mm.",equal,synthetic
20518e80-6f7e-457f-8c5a-59fa4c0eb324_6,,,"When calculating the heat loss for a buildings design solution, the sum total shall be used as the value of the atmosphere for the building envelope.",equal,synthetic
ff3e8f86-1542-4f54-a776-cfdc8482bad7_7,,,The number of appliances of an air conditioner working in cooling mode should be a minimum of 50mm.,greater-equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_4,,,Modular and portable buildings with a planned service life of more than two years but with an air leakage rate figure in a single location of less than 600kg/m3 should be shown to comply with the energy efficiency requirements.,less,synthetic
d0b6759e-deec-451d-bd7a-ec65b96048be_6,,,"extract air of atmosphere 300mm shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic
dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",none,annotated
92f99822-6896-4ade-abbe-7598f8225b9e,"The information should be provided in a clear manner, for a non-technical audience.",{'ID': '93_UK_DocO_Overheating'},"The information should be provided in a clear manner, for a non-technical audience.",selection,annotated
86831830-e7f0-4b90-aa27-dc0542b7ba4d_8,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least two intended time of use.",greater-equal,synthetic
f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",selection,annotated
d0b6759e-deec-451d-bd7a-ec65b96048be_8,,,"extract air of standards 55 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated
549fd984-e319-47d9-9a86-4ea7f4cbf508,The space between the air barrier and the insulation layer should be filled with solid material.,{'ID': '191_UK_DocL_V1_ConsrvationOfFuelAndPower'},The space between the air barrier and the insulation layer should be filled with solid material.,necessity,annotated
26980508-105c-49db-8595-bf001a48d757_8,,,"In tiered terraces with no fixed Stairs or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
6075de3c-d339-4ba4-9945-990480975615_1,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 50mm balcony of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic
a387fcb8-ead2-4094-9be9-72d783468b33_0,,,"If the combined dead,imposed and wind loads of windows, roof windows, rooflights and doors exceeds 600mm of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic
9f5fe460-cae1-4653-a951-38e31f3ed15d,"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",{'ID': '81_Finnish_SafetyOfUse'},"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",none,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_1,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extends 200 m2 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
cb522b91-f26f-460e-adee-1a7f59ba10c9,"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",{'ID': '315_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",none,annotated
67657794-a272-4ab2-9b19-df29e9d24844,Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,{'ID': '160_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,selection,annotated
6a41a473-bd3c-4e38-a093-094b3fdae388,At least one in every five remaining parking spaces must be provided with cable routes.,{'ID': '68_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},At least one in every five remaining parking spaces must be provided with cable routes.,equal,annotated
d5cb0429-ffef-43c5-9789-a3611c04446a,"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",{'ID': '89_Finnish_Health-WaterAndSewerage'},"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",part-of,annotated
569c7958-b7d6-4b9c-9dd9-13307e95e59b_1,,,"For ducted systems that are served by fans with a energy efficiency greater than 25mm, ductwork leakage tests should be carried out.",greater,synthetic
8e8f4fb5-00b5-404f-89df-a07287984748_0,,,"In buildings with a building primary energy rate greater than 300 millimetres, automatic meter reading and data collection facilities should be installed.",greater,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_10,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for floor plate areas 1 and 280mm if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
5ebe90af-93ee-4d92-96fd-44b674d5e1a5,Systems should be designed so that they can be commissioned to suitable ventilation rates so that spaces are not significantly over-ventilated.,{'ID': '335_UK_DocL_V1_ConsrvationOfFuelAndPower'},Systems should be designed so that they can be commissioned to suitable ventilation rates so that spaces are not significantly over-ventilated.,selection,annotated
fa8a6d84-eb99-490e-8169-3c65353fb553_8,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the internal temperature shall be at least 190 kN.",greater-equal,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e_10,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the inner surfaces must be no less than 500kW.",greater-equal,synthetic
31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",none,annotated
01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",part-of,annotated
77f993c6-dff1-4f9a-8f66-73221d3cbaff_5,,,"If the dwelling only has one habitable room, a minimum vicinity of 15mm should be used.",greater-equal,synthetic
d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",necessity,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74_10,,,"In a tier that is uninterrupted by cross-gangways, and where the widened exceeds 500kW, use a maximum number of steps of 40.",greater,synthetic
43e26628-8b62-4cc6-91e2-284335df1564_5,,,"In rooms used for sleeping or rest, the feasibility of installing high-efficiency alternative systems may not exceed 40 degrees Celsius.",less-equal,synthetic
4e8c5c50-44af-48f6-b959-e6f9b31afa1e_9,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical electric vehicle charge point may be boiler.",equal,synthetic
89811586-c819-4eb5-99f5-c4fcefdb9520,Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,{'ID': '107_Finnish_SafetyOfUse'},Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,necessity,annotated
993e54cc-49c3-43cb-995e-1a951c93c775,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",{'ID': '25_Finnish_StabilityOfStructures'},"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",necessity,annotated
fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",necessity,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_8,,,"The opening angle installed in a dwellings habitable rooms and kitchens should be no fewer than 100mm, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_2,,,Individual flights are: for free gap up to 40 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_5,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom Drains, where there should be no fewer than E 15.",greater-equal,synthetic
37f01a2c-b944-45a2-a7f4-140d8c03d7ac_9,,,"After rebating, frame components should retain at least 0.055555556 of volume systems.",greater-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_3,,,Skirtings totalling up to 1800mm total cost and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",part-of,annotated
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_11,,,The smaller presence of each panel which can be either the width or height of the panel should be B or less.,less-equal,synthetic
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated
a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",necessity,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_9,,,The normal relationship between the dimension of the rise and going is: five equals between 550mm and 700mm.,equal,synthetic
a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,selection,annotated
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_4,,,"Where a new building contains more than 900-1000mm supply terminals, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic
a387fcb8-ead2-4094-9be9-72d783468b33_2,,,"If the quality of the installation of windows, roof windows, rooflights and doors exceeds 1,200 MJ/m2 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic
76acc6bd-50c0-4f3f-b015-42e171ec6ce7_11,,,16/01/2023 00:00 cases must be installed.,equal,synthetic
8101fa0e-645c-4a83-a6ab-66c45e94bf67,"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",{'ID': '155_UK_DocF_V1_Ventilation'},"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",none,annotated
19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",none,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",none,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,selection,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated
302c413e-fefd-47f1-914f-0dc787e4a761_8,,,"Where reverberation time on surfaces is greater than 4, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic
7d877df3-9aa7-4dff-a64d-5356a66c944d_2,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a protection exceeding 40 degrees Celsius and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic
45adb0b6-63ee-4f42-b6a3-8fc396221c67_1,,,The rated output of the insulation plus any required air gap should be at least to the luminous efficacy of the rafters.,greater-equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c_10,,,The access of access routes in assembly areas with a maximum capacity of 60 persons must be at least 3.3m.,greater-equal,synthetic
2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",selection,annotated
3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",less-equal,annotated
e874f337-2067-4e77-ad32-c3b857f40e7a_5,,,"If the extends exceeds 1m3/s, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic
12e1a42b-38ed-42c8-ac32-86091fcb85b1,The frequency of measurements should be sufficient to ensure that changes in the use of the room or space throughout the day are represented in the readings.,{'ID': '125_UK_DocF_V2_Ventilation'},The frequency of measurements should be sufficient to ensure that changes in the use of the room or space throughout the day are represented in the readings.,necessity,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_4,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the mechanical ventilation of these must be at least 270 millimetres.",greater-equal,synthetic
23cff3c3-1251-4c5f-9fd9-8f52d25eb494,Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,{'ID': '252_UK_DocM_V2_AccessAndUseOfBuildings'},Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,necessity,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_4,,,The ventilation rate of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the energy efficiency measures of associated parking spaces.,greater,synthetic
86831830-e7f0-4b90-aa27-dc0542b7ba4d_2,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 90 number of storeys.",greater-equal,synthetic
70cd7164-bc50-4b16-95b0-432188db4ea5,Buildings located near to significant local pollution sources should be designed to minimise the intake of external air pollutants.,{'ID': '80_UK_DocO_Overheating'},Buildings located near to significant local pollution sources should be designed to minimise the intake of external air pollutants.,selection,annotated
493ec553-7761-4d1e-aa98-05d925ddf955_5,,,The maximum number of occupants of a horizontal hatch must be at least 190 kN.,greater-equal,synthetic
5fa7daca-cb50-4397-a736-617e52d30187,"If efficiencies at below 30% are required and unavailable, the boiler efficiency may be taken as equal to that at 30% load.",{'ID': '246_UK_DocM_V2_AccessAndUseOfBuildings'},"If efficiencies at below 30% are required and unavailable, the boiler efficiency may be taken as equal to that at 30% load.",equal,annotated
29ad081e-90f4-4eb0-9cea-a4f49beea768,Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,{'ID': '298_UK_DocM_V2_AccessAndUseOfBuildings'},Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,selection,annotated
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3,"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",{'ID': '73_Finnish_FireSafety'},"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",greater,annotated
1603fe12-9df6-4ab9-acbe-44895cccb7ed,Any looped cords must be fitted with child safety devices.,{'ID': '87_UK_DocO_Overheating'},Any looped cords must be fitted with child safety devices.,necessity,annotated
3c6b438e-d99a-4c4d-aa19-0ec4f3f27662,"When installing controlled fittings, the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '162_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing controlled fittings, the controlled fitting should be well fitted and reasonably draught-proof.",necessity,annotated
86350df0-a40e-412b-a301-004524d56736_7,,,"For wet heating systems in new dwellings with a specification of One or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_3,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under shape 1100mm.",equal,synthetic
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_1,,,"The total cost of steps in covered or heated outdoor staircases must be no less than 200 lux, and the riser may be no more than 160 millimetres.",greater-equal,synthetic
d5e04f9c-3e74-4ade-8a8c-07b77efd3fd1,"For windows and roof windows, U-values should be calculated based on a vertical position.",{'ID': '110_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For windows and roof windows, U-values should be calculated based on a vertical position.",part-of,annotated
da4d5959-6e64-4e04-a1f3-8b42b6addab0_8,,,The outdoor steps used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least six metres.,greater-equal,synthetic
061c3b6a-49ed-4803-9436-e6349fae98e0,Entrance doors should be capable of being held closed when not in use.,{'ID': '65_UK_DocM_V2_AccessAndUseOfBuildings'},Entrance doors should be capable of being held closed when not in use.,necessity,annotated
c1b2e39e-0bab-438c-8b35-c2b37e5cf93a,"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",{'ID': '233_UK_DocM_V2_AccessAndUseOfBuildings'},"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",necessity,annotated
a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",none,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",less-equal,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_5,,,"Extract air of limits 50mm, 3 and 4 shall not be used as recirculation air.",equal,synthetic
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated
8b9e1d32-efa8-409b-873b-22e2eae5b537,External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,{'ID': '95_Finnish_Health-Humidity'},External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,necessity,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_0,,,"If the air flows of capacity 25 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",none,annotated
bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",selection,annotated
45adb0b6-63ee-4f42-b6a3-8fc396221c67_9,,,The maximum number of occupants of the insulation plus any required air gap should be at least to the service of the rafters.,greater-equal,synthetic
3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_7,,,These fittings should not exceed a tie force of (16.66 8.33 V0.4)/(1000 24).,less-equal,synthetic
05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",none,annotated
5fa7daca-cb50-4397-a736-617e52d30187_5,,,"If efficiencies at below 30% are required and unavailable, the density may be taken as equal to that at 400mm.",equal,synthetic
f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",necessity,annotated
beeec1b2-c382-40cc-aec2-6eda86f5782e,"Each residential unit, shared communal room and common space should be categorised separately.",{'ID': '25_UK_DocO_Overheating'},"Each residential unit, shared communal room and common space should be categorised separately.",necessity,annotated
35cacecf-06dc-4b0f-aadb-db2ee05518c7_11,,,"The area of windows and roof windows (but excluding display windows) located in a place where it is easy to install, read and service and where it cannot freeze exceeds 55 of the facade area.",greater,synthetic
53bb982d-5260-4a69-a6dd-71e4f074e676_9,,,The illuminance of standing rows must be at least 50 millimetres.,greater-equal,synthetic
4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",selection,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_11,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or organic substances above 25 decibels may be discounted when measuring clear width.,greater,synthetic
56b3f993-37b5-4cb1-9540-432972f8056e,"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",{'ID': '99_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",necessity,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_1,,,"If the air flows of sizes 230mm and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
9618a274-45da-4e3e-87f0-21c2bfae4a8e_8,,,"A guardrail must be used at points with a going of over 300 litres, if these can be accessed by children.",greater,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506_7,,,"Gangways should not be less than 1400mm annual percentage of heat unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,synthetic
0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated
e4fb8d18-8dbc-4351-a2df-d87f880f476a_3,,,The value for balconies is half a metre that of the load-bearing structures of the storey.,equal,synthetic
13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",part-of,annotated
f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",none,annotated
6a553c19-481f-4947-9047-fd2c4d0daa44,"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",{'ID': '83_UK_DocM_V1_AccessAndUseOfBuildings'},"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",necessity,annotated
9952f64d-e0df-4b03-84af-150782f81387_7,,,"For mobility-impaired people, a washing facilities of at least 2m is preferred.",greater-equal,synthetic
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c,One bedroom should be close to an accessible bathroom suitable for a wheelchair user.,{'ID': '100_UK_DocM_V1_AccessAndUseOfBuildings'},One bedroom should be close to an accessible bathroom suitable for a wheelchair user.,necessity,annotated
2f815a08-db3c-48a6-b248-d69aeac870ee_6,,,"the vertical calculations is: a. not more than 2, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_3,,,"Extract air of flushing 2, 3 and 25mm shall not be used as recirculation air.",equal,synthetic
81314489-dcd9-410f-9b15-595b87e7c8f9_7,,,"The resilient layer should be timber sheathing at least 7 mg/m3 (6 ppm) level differences, expanded metal or a similar resilient material.",greater-equal,synthetic
72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",selection,annotated
99a53f17-48cb-4012-a47b-700761e0983b_2,,,Where a new building which is not a residential building or a mixed-use building has more than 0.07 tier (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic
5e51b653-449e-4d00-be19-0e20ecff5c49_6,,,The default presence should be 9mm.,equal,synthetic
6d190990-05e3-4496-8945-320d5937c7b8,Controls should be provided for ventilators so that the ventilation in each room can be adjusted.,{'ID': '58_UK_DocF_V2_Ventilation'},Controls should be provided for ventilators so that the ventilation in each room can be adjusted.,selection,annotated
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",necessity,annotated
500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,selection,annotated
2ca092ec-4425-4552-a389-fd0dadfbd154_7,,,NOTE: A floor level with a sections of 1400mm or steeper should be designed as a ramp.,greater-equal,synthetic
5e51b653-449e-4d00-be19-0e20ecff5c49_0,,,The default storage capacity should be 0.15m/s.,equal,synthetic
94c0e823-a61d-49d6-82b3-4ca96f65dfa4,The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,{'ID': '64_Finnish_SafetyOfUse'},The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,necessity,annotated
c384013b-c40f-4925-acbe-465e1ca5bc13_1,,,ten millimetres public service facility per detail should be recorded.,equal,synthetic
57f7bbad-51b7-4627-8fe9-2d7a50289448,"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",{'ID': '64_UK_DocM_V2_AccessAndUseOfBuildings'},"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",selection,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_8,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major escape routes, there is no Voids to install either electric vehicle charge points or cable routes.",not-part-of,synthetic
2c725d50-13d5-4e77-bacf-9f174530e27c,The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,{'ID': '17_UK_DocM_V2_AccessAndUseOfBuildings'},The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,necessity,annotated
5577528f-8fa0-4ca3-96f6-ea418091cb86_8,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 190 kN in Air permeability is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic
5b4380ba-0066-4735-a362-316d4c8e70b2_10,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 1.501kWhPE/kWh renovation after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic
45338082-ca66-418b-8fe1-8f2be926f330_7,,,A Door entry controls of no more than two years may pass between the stair steps.,less-equal,synthetic
7f3f59a4-fc7e-4b14-8074-384f6cacf548_2,,,"The design temperature difference of a barrier in a dwellings indoor areas may, however, be at least one metre if the drop is less than three metres.",greater-equal,synthetic
984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",equal,annotated
81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",part-of,annotated
e26e2280-635f-44b5-967c-6cf0b56e15de,Water pipes that are located in cold premises shall be thermally insulated.,{'ID': '86_Finnish_Health-WaterAndSewerage'},Water pipes that are located in cold premises shall be thermally insulated.,necessity,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_6,,,"Where the work concerns a building containing more than 0.5 kN/m2 heating system, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic
d3fc8c9b-c23a-4188-8723-369caa90453c_8,,,"The presence for a building's total combined window area is 0.15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic
0d5f23b0-8423-4528-95bd-179fe81c75df,A building and its environment must be lit in a way that enables safe use and servicing.,{'ID': '62_Finnish_SafetyOfUse'},A building and its environment must be lit in a way that enables safe use and servicing.,necessity,annotated
dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",none,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_0,,,"The CO2 of steps in covered or heated outdoor staircases must be no less than 0.1m2, and the riser may be no more than 160 millimetres.",greater-equal,synthetic
40b40b1b-d1b1-49d8-b9b7-13c5845a169d_9,,,The structure of the control appliance of the plumbing fixture shall be such that its Unit length does not arise above 2.4 metres.,less-equal,synthetic
f420ae57-5656-4558-b1a3-1079e46bf6cc_0,,,"In the case of the storey-level door of a dwelling, or if the lengths through the door exceeds 30, doors must open in the direction of the exit.",greater,synthetic
4d80c4d1-08ee-481a-9f9c-e9151ce1094d_9,,,"The from the top and bottom corners of the door of windows, roof windows, rooflights and doors should not exceed 10 litres per second per person of the total floor area of the dwelling.",less-equal,synthetic
f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",selection,annotated
73efbdcb-2751-4f01-9471-ccca44ccc0f3,"If a drainage point is located below the height of backwater, the waste water must be pumped.",{'ID': '133_Finnish_Health-WaterAndSewerage'},"If a drainage point is located below the height of backwater, the waste water must be pumped.",necessity,annotated
6414854d-01f9-481f-a7f4-c4581e48d8b1_8,,,Special safety features are not necessary if the changing rooms is not more than 2.2 metres long.,less-equal,synthetic
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_5,,,"For sizes of cylinder not listed, the air gap from the cylinder should not exceed one metre, where V is the volume in litres.",less-equal,synthetic
113b8bf8-1856-45f5-a54b-d65ef100b437_3,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 40 degrees Celsius of the following spread of fire, appropriate to the system, should be installed.",greater-equal,synthetic
d3fc8c9b-c23a-4188-8723-369caa90453c_9,,,"The air leakage rate figure for a building's total combined window area is 400mm of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic
a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",none,annotated
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",selection,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",part-of,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",part-of,annotated
0f67dad7-6df9-444b-8e72-f447668e3fde,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",{'ID': '104_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",part-of,annotated
26980508-105c-49db-8595-bf001a48d757_5,,,"In building fabric with no fixed grippable handrail or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
4a82f789-a98a-4379-9b81-2a20cfba6c87_11,,,"If the internal ties must be centred on the supporting line, the minimum value of the inaccuracies, 2.5 ties/m2, will also be applied to internal ties.",greater-equal,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506_1,,,"Gangways should not be less than 1100mm value unless used by not more than 50 persons, in which case gangways should be a minimum of 3.",greater-equal,synthetic
eeb4239f-3819-475c-ad20-756bed80c4ff,"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",{'ID': '151_Finnish_EnergyEfficiency'},"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",part-of,annotated
a0c838b5-5fe2-4b52-abe1-432804c2c8aa,A temperature of 21 C shall be used as the design value for room temperature during the heating season.,{'ID': '33_Finnish_Health-IndoorClimateAndVentilation'},A temperature of 21 C shall be used as the design value for room temperature during the heating season.,selection,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",none,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,selection,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_3,,,The normal relationship between the dimensions of the rise and going is: 3.3m equals 3m.,equal,synthetic
5b4380ba-0066-4735-a362-316d4c8e70b2_11,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 1000m2 heat distribution room after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic
db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_5,,,"If the free gap between facing walls of adjacent glazed balconies or the breaking of the wall to the window of an adjacent fire compartment is less than 23C, the wall in question must be class EI 15.",less,synthetic
703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated
50e89a86-e2be-439d-b230-79274cd7199b_8,,,Modular and portable buildings with a planned domestic hot water circulation heat loss of more than 3.3m at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic
51550284-0701-41b2-9a76-a0061d16938a,"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",{'ID': '188_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",part-of,annotated
8364a5f1-f80e-484c-9f38-bffc6f4c1876_8,,,"Where communal parking is provided to blocks of flats, at least 190 millimetres standard load-bearing element is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic
5fa7daca-cb50-4397-a736-617e52d30187_4,,,"If efficiencies at below 30% are required and unavailable, the facade area may be taken as equal to that at 25mm.",equal,synthetic
0aaf71f0-a482-4a72-a407-0d6db79c7f6f_1,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 20 points of non-fire-compartmented fixings that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_11,,,"When replacing an existing system, the limits of the new system should be no less than number of storeys of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",part-of,annotated
4470dde4-6422-4c13-9781-de68c3e075dc_8,,,"The outdoor heat gain of a dwelling unit, however, shall be designed to be a minimum of adequate number.",greater-equal,synthetic
536b172d-ccd1-479a-8136-6ee05db0f264_5,,,"Where pipework is above ground, the performance of the pipe parts should be at least as high as the target fabric energy efficiency rate of pipework in the buried part of the system.",greater-equal,synthetic
f51da5c6-7614-4719-8150-e22851e4aa12,"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",{'ID': '152_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",selection,annotated
2633c957-07b4-4caa-a9d6-5acbac16b0b0,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,{'ID': '245_UK_DocM_V2_AccessAndUseOfBuildings'},NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,necessity,annotated
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4,"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",{'ID': '6_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",selection,annotated
6075de3c-d339-4ba4-9945-990480975615,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",{'ID': '94_UK_DocF_V1_Ventilation'},"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",none,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",part-of,annotated
45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,part-of,annotated
dcc583b1-8c4c-42cf-a1ed-e8907de56254_0,,,"The steps of the indoor steps of other spaces intended for everyday use may be no more than 150mm, and the tread must be no less than 270 millimetres.",less-equal,synthetic
835d8fad-7a27-4299-aa38-a5b1771a6779_0,,,"In large building complexes, such as retail parks and large sports centres, there should be EI 15 wheelchair-accessible unisex thermal bridging capable of including an adult changing table.",equal,synthetic
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",necessity,annotated
2633c957-07b4-4caa-a9d6-5acbac16b0b0_1,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 200 Watts per room step.,equal,synthetic
984c252b-74f4-4d85-9080-1c8ae1851eca_5,,,"If performance requires thicker glass to be used, an equivalent window unit with dwelling emission rate (650mm) glazing should be shown to meet the required standard.",equal,synthetic
d82c4149-8daa-48b2-8f46-c959a5f9ebe3,"Artificial lighting should be designed to give good colour rendering of all surfaces, without creating glare or pools of bright light and strong shadows.",{'ID': '152_UK_DocM_V2_AccessAndUseOfBuildings'},"Artificial lighting should be designed to give good colour rendering of all surfaces, without creating glare or pools of bright light and strong shadows.",selection,annotated
fc129e2c-abfa-48be-9fd6-e85f077ae67b,"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",necessity,annotated
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",none,annotated
12e545d1-64f4-45c9-a520-5b8a003eba0a_11,,,"If the dwelling has more than 0.15m/s exposed panel, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_6,,,"The building primary energy rate and cross-sectional area calculated using the measured air permeability must not be higher than the target primary energy rate and gradient, respectively.",less-equal,synthetic
63af9f99-6939-4e8c-a6a9-8b10942e1597_5,,,"The handle to at least 190 millimetres accompanied wheelchair users in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic
c47598f9-df79-4d77-aba9-8f380342372f_3,,,extract air of net heating energy demand three shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic
45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,part-of,annotated
70292367-f940-4ca6-b35f-b47bd4e66cd3,Cable routes must still be provided for a minimum of one in five parking spaces.,{'ID': '71_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Cable routes must still be provided for a minimum of one in five parking spaces.,none,annotated
6e49e97f-54f6-4333-9b1e-84373a7defe8,The protective part of the barrier must extend to a height of at least 0.7 metres from the surface of the landing or step.,{'ID': '40_Finnish_SafetyOfUse'},The protective part of the barrier must extend to a height of at least 0.7 metres from the surface of the landing or step.,necessity,annotated
6414854d-01f9-481f-a7f4-c4581e48d8b1_6,,,Special safety features are not necessary if the water pipe is not more than 01:08:00 long.,less-equal,synthetic
6414854d-01f9-481f-a7f4-c4581e48d8b1_0,,,Special safety features are not necessary if the built on site is not more than 1m2 long.,less-equal,synthetic
eeb4239f-3819-475c-ad20-756bed80c4ff,"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",{'ID': '151_Finnish_EnergyEfficiency'},"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",equal,annotated
8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2,"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",{'ID': '111_Finnish_EnergyEfficiency'},"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",part-of,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb_8,,,"In the absence of relevant harmonised European Standards, products with a value exceeding 150mm must have a product certificate issued by a Notified Body.",greater,synthetic
26980508-105c-49db-8595-bf001a48d757_4,,,"In gained via an interconnecting doorset from the garage with no fixed ventilation equipment or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_10,,,"If the dwelling fabric energy efficiency rate of a mechanical ventilation systems air duct is designed to be greater than 25 decibels, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_5,,,Skirtings totalling up to six metres average carbon monoxide concentration and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic
ee0c8c7c-c65e-4403-92e6-628fd680f3bf_1,,,"Any panel within the doorset should be at least 1,200 MJ/m2 sales counter.",greater-equal,synthetic
f6e7c818-f661-400b-8272-8062c5a7de68,"Where a lift is provided, it should be suitable for a wheelchair user.",{'ID': '22_UK_DocM_V1_AccessAndUseOfBuildings'},"Where a lift is provided, it should be suitable for a wheelchair user.",necessity,annotated
3931f0fa-433e-4fb8-96bf-a747f3622ee0,"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",{'ID': '97_UK_DocM_V2_AccessAndUseOfBuildings'},"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",selection,annotated
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,selection,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_5,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for equivalent area up to 70 kN not more than 5m long.,less-equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_1,,,"The wall ties should have a constraints of 190 kN and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",none,annotated
fb1da22f-8ddb-4399-b441-64dca68da9af_5,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 4 maximum capacity.",greater-equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated
29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,part-of,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_7,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be rated speed two.",equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated
75c60084-6878-472d-8694-e8739e0dd76c_6,,,The rated speed of access routes in assembly areas with a maximum capacity of 60 persons must be at least 55 degrees Celsius.,greater-equal,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_11,,,"The dwelling primary energy rate, dwelling emission rate and diameter, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and control capabilities, respectively.",less-equal,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",part-of,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f_9,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 1,500 millimetres of non-fire-compartmented Provision that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic
a28272ea-f4a9-4e36-93b6-2fe9c692ba0d,"The building control body should be notified that the analysis of high-efficiency alternative systems has been undertaken, that it is documented and is available to be verified.",{'ID': '115_UK_DocM_V2_AccessAndUseOfBuildings'},"The building control body should be notified that the analysis of high-efficiency alternative systems has been undertaken, that it is documented and is available to be verified.",necessity,annotated
99a53f17-48cb-4012-a47b-700761e0983b_5,,,Where a new building which is not a residential building or a mixed-use building has more than 20 water heater (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic
1913381b-a2cc-496e-9168-82ccf2a01d50_7,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the supports of the heat emitters to be installed does not exceed 180 millimetres.",less-equal,synthetic
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,selection,annotated
cc72106e-9e7f-47cf-8a95-0173a8305dad_9,,,"In a new building, the crawl space long must be 16/01/2023 00:00 on average at the minimum.",greater-equal,synthetic
e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none,annotated
e874f337-2067-4e77-ad32-c3b857f40e7a_11,,,"If the travel distance exceeds 20 litres per second, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic
a235c68f-ae44-4770-b005-4e9d7b659eb7_3,,,All cavity walls should have leaves at least 90mm thick and cavities at least 25mm total flow rate.,greater-equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_6,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than ten millimetres in automatic flow adjustment, these must be accessible via the interior.",greater,synthetic
0da52584-1b37-48b5-840f-3795ae695275_9,,,the minimum clear dimensions of the platform are: 0.7W/(m2K) maximum capacity and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
7e369e4c-7768-4a7a-bd9c-41e2aa037b43,The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,{'ID': '61_Finnish_Health-IndoorClimateAndVentilation'},The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,necessity,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a_7,,,Modular and portable buildings with a planned service life of more than two years but with an reception in a single location of less than Five ventilators should be shown to comply with the energy efficiency requirements.,less,synthetic
8db97194-2e07-415d-a4e0-1f32790d1d8a,"U-values should be assessed for the whole thermal element (e.g. in the caseof a window, the combined performance of the glazing and the frame).",{'ID': '123_UK_DocM_V2_AccessAndUseOfBuildings'},"U-values should be assessed for the whole thermal element (e.g. in the caseof a window, the combined performance of the glazing and the frame).",necessity,annotated
8364a5f1-f80e-484c-9f38-bffc6f4c1876_7,,,"Where communal parking is provided to blocks of flats, at least 200 millimetres standard passenger lift is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated
a064e2ec-0793-4312-a45a-1eea61b17583,A system for purge ventilation should be provided in each habitable room.,{'ID': '46_UK_DocF_V1_Ventilation'},A system for purge ventilation should be provided in each habitable room.,necessity,annotated
0ea1e862-2434-4fc8-97a2-b076c992ef20_2,,,"The energy savings of an exit must be at least 2.5 ties/m2 and its free height must be at least 2,100 millimetres.",greater-equal,synthetic
96b38b2d-e67c-457c-86d4-2a47a1b834b1,"Drawings: all relevant drawings should be provided to clearly identify the position, continuity and extent of the air barrier.",{'ID': '176_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Drawings: all relevant drawings should be provided to clearly identify the position, continuity and extent of the air barrier.",necessity,annotated
a8b3e54e-902c-4502-99a2-8c41d46f1416,"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",{'ID': '106_Finnish_SafetyOfUse'},"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,annotated
5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,selection,annotated
a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",part-of,annotated
5577528f-8fa0-4ca3-96f6-ea418091cb86_7,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 9mm in design temperature difference is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic
86831830-e7f0-4b90-aa27-dc0542b7ba4d_1,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 20 litres per second thresholds.",greater-equal,synthetic
1d10aa43-7650-46b1-83c3-867f212ab9c3,Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,{'ID': '58_UK_DocF_V1_Ventilation'},Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,part-of,annotated
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",part-of,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",none,annotated
b0e99ac5-9cbc-4beb-b8ff-85383ae70ea8,"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",{'ID': '40_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",necessity,annotated
86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",none,annotated
c384013b-c40f-4925-acbe-465e1ca5bc13_5,,,certain proportion air barriers per detail should be recorded.,equal,synthetic
f0c72b35-5a0a-4554-8713-96f6f73a67f1_0,,,A cube with entrance level of no more than 0.2 may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic
4e8c5c50-44af-48f6-b959-e6f9b31afa1e,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",{'ID': '89_UK_DocM_V2_AccessAndUseOfBuildings'},"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",equal,annotated
38020928-c137-486e-88d7-c8feec038c99,A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,{'ID': '189_Finnish_FireSafety'},A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,selection,annotated
8101fa0e-645c-4a83-a6ab-66c45e94bf67,"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",{'ID': '155_UK_DocF_V1_Ventilation'},"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",necessity,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,none,annotated
750a4f32-2581-4040-ac8b-8e4ad59abd56,Extract ventilators in sanitary accommodation should be capable of continuous operation if required.,{'ID': '48_UK_DocF_V2_Ventilation'},Extract ventilators in sanitary accommodation should be capable of continuous operation if required.,part-of,annotated
e21fa967-934e-4a29-a66d-252fdbbf928f_0,,,"If the parasitic energy use is unknown, an Leakage of 270 millimetres should be made for any control system.",equal,synthetic
83ff563b-077a-4849-b526-382fbb012647,The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,{'ID': '67_Finnish_SafetyOfUse'},The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,part-of,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_0,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the Ventilation of these must be at least 10 kN.",greater-equal,synthetic
eeb4239f-3819-475c-ad20-756bed80c4ff_5,,,"In reference heat loss calculations, the value used as the category of the buildings ventilation system shall be 4.",equal,synthetic
009e12eb-db83-485c-9ffc-e1f462251109_10,,,"Each air terminal should have a storm water sewers of at least 1,200 MJ/m2 of the free area of its associated duct.",greater-equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_5,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the service may be no more than 1 in 40.",less-equal,synthetic
a4fccc69-c508-4405-92aa-2cfe36bfca39,Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,{'ID': '209_Finnish_FireSafety'},Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,necessity,annotated
43e26628-8b62-4cc6-91e2-284335df1564_11,,,"In rooms used for sleeping or rest, the pitch may not exceed 10.",less-equal,synthetic
e7cc3da8-211a-4244-b711-210a912ca2ac,Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,{'ID': '302_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,necessity,annotated
d34c0f60-8df0-4310-b5af-428c63225a6f,"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",{'ID': '60_Finnish_Health-WaterAndSewerage'},"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",none,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8_3,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the natural light of the steps must be no more than 600 millimetres and the tread must be no less than 300 millimetres.",less-equal,synthetic
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_7,,,The approach route is a minimum of 900mm wide with a maximum lengths of 0.7 metres.,less-equal,synthetic
05fdde92-d8af-42ad-963b-9019c69a8ab3_8,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same calculation of primary energy and CO2 emissions as the Air handling units used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic
3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_10,,,These fittings should not exceed a either side of two .,less-equal,synthetic
12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",part-of,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",none,annotated
5fa7daca-cb50-4397-a736-617e52d30187_6,,,"If efficiencies at below 30% are required and unavailable, the deep may be taken as equal to that at 5m.",equal,synthetic
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,necessity,annotated
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_8,,,The smaller heat exchanger area of each panel which can be either the width or height of the panel should be 120 or less.,less-equal,synthetic
9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",selection,annotated
9415ae4b-7a74-4c70-a245-e4381c6d71bf_5,,,"At gables and party walls, insulation should extend to the wall; if the Cavity walls between the wall and joist is less than 850-1000mm, perimeter insulation may be required.",less,synthetic
079db365-cfed-474e-9329-25349ac0db4a_1,,,"In connection with the door of an outside space of an individual dwelling the surfaces outside the door may be more than 0.052083333 if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic
0aaf71f0-a482-4a72-a407-0d6db79c7f6f_0,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 20 degrees Celsius of non-fire-compartmented energy savings that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic
a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",none,annotated
fa8a6d84-eb99-490e-8169-3c65353fb553_3,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the from the inside face of the wall shall be at least 900mm.",greater-equal,synthetic
517253f8-98b1-4821-8901-75124d3237db,"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",selection,annotated
1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,selection,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated
333110c1-ba9e-4c1d-9249-6604f49ba09a,"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",part-of,annotated
7f696221-52c9-4c52-8f90-74bd93c51299_11,,,This grippable handrail is 850-1000mm above the pitch line of the flight and limits at least 13l/s beyond the top and bottom nosings.,greater-equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74_5,,,"In a tier that is uninterrupted by cross-gangways, and where the value exceeds 390 millimetres, use a maximum number of steps of 40.",greater,synthetic
45338082-ca66-418b-8fe1-8f2be926f330,A cube of no more than 100 millimetres may pass between the stair steps.,{'ID': '52_Finnish_SafetyOfUse'},A cube of no more than 100 millimetres may pass between the stair steps.,none,annotated
f162906e-1097-420e-b2a0-dd746d5794c7,"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",{'ID': '265_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",selection,annotated
7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",selection,annotated
7e369e4c-7768-4a7a-bd9c-41e2aa037b43,The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,{'ID': '61_Finnish_Health-IndoorClimateAndVentilation'},The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,selection,annotated
54f4e30f-d171-4156-ae87-7aed3541dd18,Insulated cavity closers should be used for all construction types.,{'ID': '165_UK_DocL_V1_ConsrvationOfFuelAndPower'},Insulated cavity closers should be used for all construction types.,necessity,annotated
32f91d86-2cbf-4d57-ab93-5a28fd804df8,Signs indicating the location of a lifting device accessible by mobility-impaired people should be clearly visible from the building entrance.,{'ID': '104_UK_DocM_V2_AccessAndUseOfBuildings'},Signs indicating the location of a lifting device accessible by mobility-impaired people should be clearly visible from the building entrance.,necessity,annotated
263dec16-c53e-4169-91d3-b6961fcda501,The water system shall be leakproof.,{'ID': '84_Finnish_Health-WaterAndSewerage'},The water system shall be leakproof.,necessity,annotated
e6fcc89d-b55e-4536-9a24-c3c5f4015a0d,"All technically, functionally and economically feasible measures to improve the fabric of the building served by the service should be implemented.",{'ID': '455_UK_DocM_V2_AccessAndUseOfBuildings'},"All technically, functionally and economically feasible measures to improve the fabric of the building served by the service should be implemented.",selection,annotated
f9de28ac-45bb-4400-9d9f-8afee73bd2e3,The number of appliances should not exceed one per 100m2 of dwelling floor area.,{'ID': '273_UK_DocL_V1_ConsrvationOfFuelAndPower'},The number of appliances should not exceed one per 100m2 of dwelling floor area.,less-equal,annotated
a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",none,annotated
675c4d48-3eef-463a-8516-edd71ee983e3,Adequate space should be available for access to maintain ventilation equipment.,{'ID': '110_UK_DocF_V1_Ventilation'},Adequate space should be available for access to maintain ventilation equipment.,necessity,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_5,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the sum total may be no more than 900 millimetres.",less-equal,synthetic
19478a13-7457-4dd3-a394-744f826db7b0_5,,,"The handle to at least 200 lux enduse categories in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic
e4fb8d18-8dbc-4351-a2df-d87f880f476a,The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,{'ID': '90_Finnish_FireSafety'},The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,part-of,annotated
710ef992-e187-4b1a-894b-e0e222f54359_5,,,"NOTE: For grid-supplied electricity, a number of 0.2 and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic
06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",necessity,annotated
6a553c19-481f-4947-9047-fd2c4d0daa44,"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",{'ID': '83_UK_DocM_V1_AccessAndUseOfBuildings'},"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",selection,annotated
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_5,,,The elevation difference must not exceed the individual dwellings diameter.,less-equal,synthetic
53e31e26-a39b-4047-a86e-bdb8021413e8_7,,,Window handles on windows that open outwards are not more than 16/01/2023 00:00 surfaces when the window is at its maximum openable angle.,less-equal,synthetic
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6,The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,{'ID': '119_Finnish_SafetyOfUse'},The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,part-of,annotated
9618a274-45da-4e3e-87f0-21c2bfae4a8e_1,,,"A guardrail must be used at points with a extends of over two , if these can be accessed by children.",greater,synthetic
6c789809-b1b8-429a-8fe2-8ce16f8a4b54_4,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the layers does not exceed 850-1000mm.,less-equal,synthetic
0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",none,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_2,,,"In buildings more than 9 metres and at most adequate number in projection, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic
6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_8,,,"If parking spaces are provided for a building, an adequate number of district cooling schemes, but at least 50 m2, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_0,,,"the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 2,100 millimetres Window handles are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.",equal,synthetic
99a53f17-48cb-4012-a47b-700761e0983b_5,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 15 of those front doorset must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic
703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",necessity,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_0,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under insulating performance 1.3 seconds.",equal,synthetic
d8a06af7-3a6b-4d68-8bba-342aac6d3ac0,Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,{'ID': '146_Finnish_Health-WaterAndSewerage'},Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,none,annotated
99a53f17-48cb-4012-a47b-700761e0983b_9,,,Where a new building which is not a residential building or a mixed-use building has more than 0.15 dm3/s per m2 Ramps (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic
65b5e58d-ead5-43fb-831e-3a42487fa227,"People with hearing impairments should be able to participate fully in conferences, committee meetings and study groups.",{'ID': '133_UK_DocM_V2_AccessAndUseOfBuildings'},"People with hearing impairments should be able to participate fully in conferences, committee meetings and study groups.",selection,annotated
ff3e8f86-1542-4f54-a776-cfdc8482bad7_11,,,The room temperature of an air conditioner working in cooling mode should be a minimum of 75 light source lumens per circuit-watt.,greater-equal,synthetic
f27c9fb4-dc28-494c-a277-a51360cdfdb8,A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,{'ID': '57_Finnish_SafetyOfUse'},A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,part-of,annotated
9618a274-45da-4e3e-87f0-21c2bfae4a8e_9,,,"A guardrail must be used at points with a slope of over 0.2, if these can be accessed by children.",greater,synthetic
81314489-dcd9-410f-9b15-595b87e7c8f9_1,,,"The resilient layer should be timber sheathing at least 0.2 design temperature difference, expanded metal or a similar resilient material.",greater-equal,synthetic
ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",none,annotated
76acc6bd-50c0-4f3f-b015-42e171ec6ce7_10,,,650mm pressure sewer must be installed.,equal,synthetic
6efbae9b-e306-4005-8881-aed97c54e405,Leakage from a pressure sewer located in a groundwater zone shall be detectable.,{'ID': '145_Finnish_Health-WaterAndSewerage'},Leakage from a pressure sewer located in a groundwater zone shall be detectable.,necessity,annotated
2ca092ec-4425-4552-a389-fd0dadfbd154_11,,,NOTE: A floor level with a distance of the basement storey floor from the entry level of 3 or steeper should be designed as a ramp.,greater-equal,synthetic
956efc87-87de-4d3c-99fb-dc58eab9353b_7,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a sizes of at least 0.05.,greater-equal,synthetic
d687ab7a-74e0-4d2e-8aad-27e009651634,Joints between vertical and horizontal structures shall always be designed without a reduction factor.,{'ID': '13_Finnish_StabilityOfStructures'},Joints between vertical and horizontal structures shall always be designed without a reduction factor.,selection,annotated
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,none,annotated
d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,none,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,greater,annotated
7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",none,annotated
a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",part-of,annotated
6543949e-dd47-4365-b5a9-d952bf233cd7,"Any manual high rate controls should be provided locally to the spaces being served, e.g. bathrooms and kitchens.",{'ID': '66_UK_DocF_V1_Ventilation'},"Any manual high rate controls should be provided locally to the spaces being served, e.g. bathrooms and kitchens.",selection,annotated
36650de0-ef3c-4fd1-8199-f47c0e576076_0,,,the length of the platform does not exceed 4.,less-equal,synthetic
64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",part-of,annotated
f02161e2-1942-4ddf-9627-e3343df63909,"System controls should be wired so that when there is no demand for space heating, the heating appliance and pump are switched off.",{'ID': '214_UK_DocM_V2_AccessAndUseOfBuildings'},"System controls should be wired so that when there is no demand for space heating, the heating appliance and pump are switched off.",necessity,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",part-of,annotated
8aa4b706-1659-4e30-a4fe-e7f33efe3241,All three parts of the compliance checklist should be completed.,{'ID': '108_UK_DocO_Overheating'},All three parts of the compliance checklist should be completed.,equal,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_10,,,"If the stairs between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 20, the wall in question must be class EI 15.",less,synthetic
26980508-105c-49db-8595-bf001a48d757,"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",{'ID': '103_Finnish_SafetyOfUse'},"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,annotated
dcc583b1-8c4c-42cf-a1ed-e8907de56254_6,,,"The target fabric energy efficiency rate of the indoor steps of other spaces intended for everyday use may be no more than 180kW, and the tread must be no less than 270 millimetres.",less-equal,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",selection,annotated
cf35d4a4-3170-421b-9be1-b68d928eed1d_11,,,"A roof with a one side greater than 230mm must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic
569c7958-b7d6-4b9c-9dd9-13307e95e59b_3,,,"For ducted systems that are served by fans with a elevation difference greater than 3, ductwork leakage tests should be carried out.",greater,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1_11,,,A minimum of one in 4 of the remaining toileting facilities must have access to cable routes.,equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_4,,,"In buildings more than 220 millimetres and at most 28 metres in location, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic
d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",none,annotated
d8066a73-49c2-4e99-825a-b49b9b2ba67d_3,,,A landing measuring at least 0.35W/(m2K) in visual contrast must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e_9,,,"The intended purpose of the indoor steps of dwelling units and living quarters may be no more than 800 millimetres, and the tread must be no less than 250 millimetres.",less-equal,synthetic
b5d2186d-338d-40b6-b3b4-7fadf3cfd4e0,"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",{'ID': '286_UK_DocM_V2_AccessAndUseOfBuildings'},"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",part-of,annotated
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_11,,,"There should be a common space, in the absence of tobacco smoke or other excessive pollutants, of 1800mm.",equal,synthetic
1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",none,annotated
977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",none,annotated
81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",none,annotated
23cff3c3-1251-4c5f-9fd9-8f52d25eb494,Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,{'ID': '252_UK_DocM_V2_AccessAndUseOfBuildings'},Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,selection,annotated
2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",none,annotated
f420ae57-5656-4558-b1a3-1079e46bf6cc,"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",{'ID': '223_Finnish_FireSafety'},"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",selection,annotated
19478a13-7457-4dd3-a394-744f826db7b0_10,,,"The handle to at least between 550mm and 700mm sanitary accommodation in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic
a8b3e54e-902c-4502-99a2-8c41d46f1416,"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",{'ID': '106_Finnish_SafetyOfUse'},"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",necessity,annotated
d6a2b6b7-57d2-449d-89f5-56d3df4755e2,Any radiator or towel rail should be clear of all access zones.,{'ID': '56_UK_DocM_V1_AccessAndUseOfBuildings'},Any radiator or towel rail should be clear of all access zones.,necessity,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_3,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the dwelling fabric energy efficiency rate from these spaces does not exceed 180kW of the total air flow in the vertical duct.",less-equal,synthetic
12907c6f-e734-436d-a7de-c8a1626fbe92,"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",{'ID': '496_UK_DocM_V2_AccessAndUseOfBuildings'},"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",part-of,annotated
1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",part-of,annotated
d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",none,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_9,,,"Where a new building contains more than 300 litres audit, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic
103f99ad-884b-4bae-9f22-ccb1c5bc3d26_6,,,"In an open garage of no more than 0.7W/(m2K) fans (including cooker hoods, where they extract to the outside), the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic
e15250c0-1279-4d29-a1ec-31560b045007_7,,,structural elements of basement storeys must not be connected to fire and smoke-proof Water.,not-part-of,synthetic
f420ae57-5656-4558-b1a3-1079e46bf6cc,"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",{'ID': '223_Finnish_FireSafety'},"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",none,annotated
2a256a9c-0b8a-4acf-87e1-86a5857f36a3_4,,,"Where a driveway forms all, or part of, the approach route, an all of at least 18 dm3/s wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic
2633c957-07b4-4caa-a9d6-5acbac16b0b0_0,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 20C inaccuracies.,equal,synthetic
4470dde4-6422-4c13-9781-de68c3e075dc_4,,,"The outdoor thermal integrity of a dwelling unit, however, shall be designed to be a minimum of 13l/s.",greater-equal,synthetic
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_4,,,"The free energy performance from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 1 in 40, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic
f439dcde-3cf9-4b40-b555-a2107ae5559f,"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '104_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",selection,annotated
eccc60e7-3d76-46c0-a9d9-e398bf3e475a,The part of the dwelling above ground level should be considered separately.,{'ID': '71_UK_DocF_V1_Ventilation'},The part of the dwelling above ground level should be considered separately.,necessity,annotated
aa774d9d-2414-4e6f-9c4e-9b7c5abde23b,The outputs of any renewable systems should be separately monitored.,{'ID': '228_UK_DocM_V2_AccessAndUseOfBuildings'},The outputs of any renewable systems should be separately monitored.,necessity,annotated
74002ed3-548e-4e2f-8835-be76e643c67d,NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,{'ID': '51_UK_DocM_V1_AccessAndUseOfBuildings'},NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,part-of,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_7,,,"The thickness of steps in covered or heated outdoor staircases must be no less than 65mm, and the riser may be no more than 160 millimetres.",greater-equal,synthetic
164122ed-c7ac-4cf8-8a54-3d56c144f78d_4,,,"In general, the findings indicate that there should be at least the same number of exterior wall as manifolds and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic
36650de0-ef3c-4fd1-8199-f47c0e576076_6,,,the indoor and outdoor conditions of the platform does not exceed 200 m2.,less-equal,synthetic
7ca3a924-dd3a-450e-af24-4d456d6c1b32,"Wet room waterproofing must form a whole which is impermeable on all waterproofed surfaces as well as on their seams, penetrations and joints.",{'ID': '113_Finnish_Health-Humidity'},"Wet room waterproofing must form a whole which is impermeable on all waterproofed surfaces as well as on their seams, penetrations and joints.",none,annotated
2ca092ec-4425-4552-a389-fd0dadfbd154,NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,{'ID': '54_UK_DocK_ProtectionFromFalling'},NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,necessity,annotated
fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",none,annotated
82bb35f1-0a27-4c94-bad3-246e6cc4f02a,"Wheelchair users should be able to manoeuvre around and use the facilities in the room, and operate switches and controls.",{'ID': '145_UK_DocM_V2_AccessAndUseOfBuildings'},"Wheelchair users should be able to manoeuvre around and use the facilities in the room, and operate switches and controls.",necessity,annotated
20216261-f56d-4f79-8a46-c781abe19f04,"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",{'ID': '98_UK_DocF_V2_Ventilation'},"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",selection,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_0,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be layers 190 kN.",equal,synthetic
9952f64d-e0df-4b03-84af-150782f81387_5,,,"For mobility-impaired people, a heat of at least E is preferred.",greater-equal,synthetic
07565483-7508-43fc-b15e-82d95881e81e,"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",{'ID': '70_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",necessity,annotated
40b40b1b-d1b1-49d8-b9b7-13c5845a169d_4,,,The structure of the control appliance of the plumbing fixture shall be such that its cold side does not arise above 20C.,less-equal,synthetic
2a2dbb92-88af-47f5-bd1e-b3ddea4c1ec9,"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",{'ID': '70_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",necessity,annotated
588857f5-9281-4c32-8d83-c98230d5b934,The use of boards with lapped or tongue and groove edges should be considered.,{'ID': '146_UK_DocL_V1_ConsrvationOfFuelAndPower'},The use of boards with lapped or tongue and groove edges should be considered.,selection,annotated
302c413e-fefd-47f1-914f-0dc787e4a761_10,,,"Where energy performance on surfaces is greater than 25 decibels, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic
a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",none,annotated
5ca6b3d3-fd21-4cc1-8dd8-185268db6615,The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,{'ID': '26_UK_DocQ_Security_Dwellings'},The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,necessity,annotated
4d80c4d1-08ee-481a-9f9c-e9151ce1094d_11,,,"The capacity of windows, roof windows, rooflights and doors should not exceed proportion of the total floor area of the dwelling.",less-equal,synthetic
eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,selection,annotated
fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,none,annotated
01bd7c41-594c-4440-8058-c34f1c4bad09,"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",{'ID': '82_UK_DocO_Overheating'},"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",part-of,annotated
b8365796-12c1-47c1-9682-ff6131a75f21,"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",{'ID': '227_UK_DocM_V2_AccessAndUseOfBuildings'},"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",selection,annotated
e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0_7,,,"For dwellings, for external tapered steps and stairs that are part of the building the fire performance of each step should be a minimum of half.",greater-equal,synthetic
10b37d1a-a0b5-4dfb-8bcc-39317d144580,"On variable volume systems, variable speed glandless circulators should be used.",{'ID': '289_UK_DocM_V2_AccessAndUseOfBuildings'},"On variable volume systems, variable speed glandless circulators should be used.",necessity,annotated
517253f8-98b1-4821-8901-75124d3237db,"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",part-of,annotated
b5d2186d-338d-40b6-b3b4-7fadf3cfd4e0,"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",{'ID': '286_UK_DocM_V2_AccessAndUseOfBuildings'},"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",selection,annotated
5163f2fb-022f-4589-889f-2ade7a9d49c6,The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,{'ID': '109_UK_DocO_Overheating'},The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,none,annotated
c2e0629d-350b-45b8-9e9e-d58be1780f12_4,,,"If the heating has no retaining rail, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic
fb5d3054-4911-4049-ba09-1c3e80f9c07c_0,,,"The proportion of the cooling load relating to distribution pipework of steps in uncovered or unheated outdoor staircases must be no less than 8 per cent (1:12.5), and the riser may be no more than 130 millimetres.",greater-equal,synthetic
103f99ad-884b-4bae-9f22-ccb1c5bc3d26_9,,,"In an open garage of no more than two crawl space, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic
2633c957-07b4-4caa-a9d6-5acbac16b0b0_8,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 200 m2 either side.,equal,synthetic
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,annotated
596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",none,annotated
12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",none,annotated
9952f64d-e0df-4b03-84af-150782f81387_0,,,"For mobility-impaired people, a circulation piping of at least 2.0 m3/(h m2) is preferred.",greater-equal,synthetic
20609d43-016e-4314-9620-256f73f1c6ed,"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",{'ID': '160_UK_DocF_V1_Ventilation'},"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",part-of,annotated
75c60084-6878-472d-8694-e8739e0dd76c_4,,,The directions of access routes in assembly areas with a maximum capacity of 60 persons must be at least 2.5 ties/m2.,greater-equal,synthetic
81314489-dcd9-410f-9b15-595b87e7c8f9_4,,,"The resilient layer should be timber sheathing at least 0.07 primary energy content, expanded metal or a similar resilient material.",greater-equal,synthetic
ad792658-a7d2-4d6e-9a21-c531bb02b521,To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to the occupied parts of buildings to an extent which would give rise to an irritant concentration.,{'ID': '12_UK_DocD_ToxicSubstances'},To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to the occupied parts of buildings to an extent which would give rise to an irritant concentration.,selection,annotated
ad30824c-74be-4f4f-916a-dfe1e0a89205,"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",selection,annotated
ee0c8c7c-c65e-4403-92e6-628fd680f3bf_3,,,Any panel within the doorset should be at least 3 centre pane U-value.,greater-equal,synthetic
2be01bf1-2cd9-4982-8778-ba0afe835580,"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",{'ID': '88_UK_DocF_V1_Ventilation'},"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",part-of,annotated
596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",part-of,annotated
e15250c0-1279-4d29-a1ec-31560b045007_11,,,lighting of basement storeys must not be connected to fire and smoke-proof wall covering.,not-part-of,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_1,,,"Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than three combined dead,imposed and wind loads.",less-equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated
3f31e50a-cdcc-412c-a363-2bfdfb507770,"For an electrically operated appliance, an integral remote or thermostatic control should be provided.",{'ID': '277_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For an electrically operated appliance, an integral remote or thermostatic control should be provided.",necessity,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_9,,,"The floor area installed in a dwellings habitable rooms and kitchens should be no fewer than between 550mm and 700mm, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic
a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",part-of,annotated
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_7,,,"Storage premises with a gradients exceeding 1,500 millimetres are not permitted within the building.",greater,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f,"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",necessity,annotated
c2e0629d-350b-45b8-9e9e-d58be1780f12,"If the basement has no bedrooms, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",{'ID': '73_UK_DocF_V1_Ventilation'},"If the basement has no bedrooms, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",selection,annotated
2de867fe-80e7-4617-ad18-36225dd45ab1_5,,,Hinged or pivot windows with an Geo-location of less than 4 are not suitable for purge ventilation.,less,synthetic
5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",none,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_5,,,Individual flights are: for gradients up to 1:15 not more than 5m energy efficiency; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
54907849-c48f-4267-b5f0-fc7e9279da7c,"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",{'ID': '409_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",selection,annotated
63af9f99-6939-4e8c-a6a9-8b10942e1597_9,,,"The handle to at least three seconds timber sheathing in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic
6dd4c02d-ab0f-414d-b784-654bd72f9cd7,Monitors should therefore be positioned at least 500mm away from room occupants.,{'ID': '123_UK_DocF_V2_Ventilation'},Monitors should therefore be positioned at least 500mm away from room occupants.,necessity,annotated
a9c88566-e4e5-4cba-8165-9916820d9cc5,"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",{'ID': '75_Finnish_SafetyOfUse'},"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",necessity,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_4,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the heat may be no more than 2.",less-equal,synthetic
082c7ed9-3579-48c2-a0d2-076f1edd647c,"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",{'ID': '112_UK_DocO_Overheating'},"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",selection,annotated
23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",none,annotated
2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",necessity,annotated
f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",selection,annotated
7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",less,annotated
a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",necessity,annotated
5afbc8c9-4c2e-4cb8-8945-24e184d161e1,The fan should be set at a speed that will approximately achieve the desired continuous flow rate.,{'ID': '201_UK_DocF_V1_Ventilation'},The fan should be set at a speed that will approximately achieve the desired continuous flow rate.,none,annotated
6075de3c-d339-4ba4-9945-990480975615_2,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 25 water heater of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic
fab95d95-4789-4384-8d57-a575190f9e73,The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,{'ID': '297_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,selection,annotated
710ef992-e187-4b1a-894b-e0e222f54359_9,,,"NOTE: For grid-supplied electricity, a span of 850-1000mm and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic
1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",selection,annotated
e8340500-38b6-461b-b00d-d3aa44ac1f0b_11,,,The area of the water available from the hot water system may not exceed B.,less-equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_8,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 3 auxiliary units is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb,"There should be a supply rate, in the absence of tobacco smoke or other excessive pollutants, of 10 litres per second per person.",{'ID': '114_UK_DocF_V2_Ventilation'},"There should be a supply rate, in the absence of tobacco smoke or other excessive pollutants, of 10 litres per second per person.",equal,annotated
40b40b1b-d1b1-49d8-b9b7-13c5845a169d_1,,,The structure of the control appliance of the plumbing fixture shall be such that its Geo-location does not arise above 5m.,less-equal,synthetic
86365504-9029-4805-a93b-4256849b8e3a,Duct connections should be both mechanically secured and adequately sealed to prevent leaks.,{'ID': '116_UK_DocF_V1_Ventilation'},Duct connections should be both mechanically secured and adequately sealed to prevent leaks.,part-of,annotated
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_6,,,"In a firefighting and rescue operations with no openable exterior wall, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic
21bf2954-bfa8-44ef-bb2e-4e34367965ba,"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",{'ID': '88_Finnish_FireSafety'},"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",none,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",necessity,annotated
4e119abd-0cf7-4c60-9c7b-1083f9b46280,"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",{'ID': '85_UK_DocF_V2_Ventilation'},"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",selection,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,selection,annotated
419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",selection,annotated
d7737a4f-9594-475c-891f-a27d66fb7067,Insulating materials which give off formaldehyde fumes (either when used or later in normal use) may be used to insulate the cavity in a cavity wall where there is a continuous barrier which will minimise as far as practicable the passage of fumes to the occupiable parts.,{'ID': '14_UK_DocD_ToxicSubstances'},Insulating materials which give off formaldehyde fumes (either when used or later in normal use) may be used to insulate the cavity in a cavity wall where there is a continuous barrier which will minimise as far as practicable the passage of fumes to the occupiable parts.,selection,annotated
a0c838b5-5fe2-4b52-abe1-432804c2c8aa_11,,,A tread of 21 C shall be used as the primary energy factor for room temperature during the heating season.,equal,synthetic
8cfa23d5-d9d3-4d72-a761-6595f876d577,NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a building.,{'ID': '79_UK_DocF_V2_Ventilation'},NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a building.,necessity,annotated
db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated
eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,part-of,annotated
1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",necessity,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",none,annotated
c954c2a4-3d5c-4e63-8228-9704b463aa8e,"The input charge for electric storage heaters should be adjusted automatically, based on the internal air temperature.",{'ID': '260_UK_DocM_V2_AccessAndUseOfBuildings'},"The input charge for electric storage heaters should be adjusted automatically, based on the internal air temperature.",necessity,annotated
45adb0b6-63ee-4f42-b6a3-8fc396221c67_7,,,The level differences of the insulation plus any required air gap should be at least to the proportion of the cooling load relating to distribution pipework of the rafters.,greater-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_2,,,the minimum clear dimensions of the platform are: 1100mm wide and 8 per cent (1:12.5) air extract rate where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
a1f91cfd-21f8-49a4-8468-746f49f4848e_2,,,"For a building that contains more than 600 x 600 millimetres compressible tape for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic
993e54cc-49c3-43cb-995e-1a951c93c775_4,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an either side equal to 1 in 40.",equal,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9_9,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 01:08:00 topography from any projecting corner.",greater-equal,synthetic
36650de0-ef3c-4fd1-8199-f47c0e576076_2,,,the breaking of the platform does not exceed 20 points.,less-equal,synthetic
0f8b3f66-6496-431c-bdc1-75570dde9ee6,"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",{'ID': '111_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",necessity,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_5,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for clear width 600kg/m3 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
c06bb553-d8f1-47f5-ab33-cfdebb6bca52,"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",none,annotated
2f815a08-db3c-48a6-b248-d69aeac870ee,"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",{'ID': '173_UK_DocM_V2_AccessAndUseOfBuildings'},"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",none,annotated
5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",selection,annotated
fc8ee55c-408d-48a9-ae4c-a6961b5745ce,Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,part-of,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b_1,,,"When an existing building with a total useful high of over 220 millimetres is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic
db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",none,annotated
baee716c-b8c2-4500-b4de-63fa11f007b1_6,,,A minimum of one in 10 of the remaining Consideration must have access to cable routes.,equal,synthetic
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,part-of,annotated
6414854d-01f9-481f-a7f4-c4581e48d8b1,Special safety features are not necessary if the ladder is not more than 6m long.,{'ID': '112_UK_DocK_ProtectionFromFalling'},Special safety features are not necessary if the ladder is not more than 6m long.,part-of,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated
b5d2186d-338d-40b6-b3b4-7fadf3cfd4e0,"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",{'ID': '286_UK_DocM_V2_AccessAndUseOfBuildings'},"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",necessity,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",selection,annotated
ee0c8c7c-c65e-4403-92e6-628fd680f3bf_0,,,Any panel within the doorset should be at least 1m3/s heat loss.,greater-equal,synthetic
3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",necessity,annotated
7f696221-52c9-4c52-8f90-74bd93c51299,This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,{'ID': '73_UK_DocM_V1_AccessAndUseOfBuildings'},This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,part-of,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905_10,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the from the inside face of the wall of the staircase and exit route is no more than 16/01/2023 00:00.,less-equal,synthetic
20518e80-6f7e-457f-8c5a-59fa4c0eb324_4,,,"When calculating the heat loss for a buildings design solution, the power input from controls shall be used as the value of the manufacturers declared efficiencies for the building envelope.",equal,synthetic
b850a570-c0bd-4cf0-8b46-338ff5d8aa78,NOTE: A system for purge ventilation should be provided in each habitable room to demonstrate compliance with Part F of the Building Regulations.,{'ID': '67_UK_DocO_Overheating'},NOTE: A system for purge ventilation should be provided in each habitable room to demonstrate compliance with Part F of the Building Regulations.,necessity,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c_11,,,"The number of appliances for a building's total combined window area is 0.052083333 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic
7dbe5dbf-39fb-4ba4-bc75-d6ac7898e615,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",{'ID': '114_UK_DocL_V1_ConsrvationOfFuelAndPower'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",part-of,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,none,annotated
a538fc03-db66-4b31-b40f-e41754522010,The three-part form should be completed for each installation address.,{'ID': '264_UK_DocF_V1_Ventilation'},The three-part form should be completed for each installation address.,necessity,annotated
d9b8f957-49e3-45d0-83ca-c0419a50361a,"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",{'ID': '48_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",selection,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",none,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_6,,,The total minimum width of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the depth of associated parking spaces.,greater,synthetic
2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",part-of,annotated
37f01a2c-b944-45a2-a7f4-140d8c03d7ac_1,,,"After rebating, frame components should retain at least 1800mm of storey.",greater-equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_3,,,"The wall ties should have a operation of 600 millimetres and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
5577528f-8fa0-4ca3-96f6-ea418091cb86_0,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 20 litres per second in air flow resistance is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic
c2e0629d-350b-45b8-9e9e-d58be1780f12_0,,,"If the Ventilation systems has no connector pipe, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic
3121fe90-27db-405e-a42a-df3cd22ee176_1,,,"Where necessary, 1 in 40pipes, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic
53e31e26-a39b-4047-a86e-bdb8021413e8_6,,,Window handles on windows that open outwards are not more than 6mm flushing when the window is at its maximum openable angle.,less-equal,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9_2,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least (16.66 8.33 V0.4)/(1000 24) part from any projecting corner.",greater-equal,synthetic
ef561e39-db90-462c-8dde-15fbeae954e5_11,,,A cube with construction of no more than 100mm may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic
7d552257-2212-4139-8d13-b982e0e7744f,"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",{'ID': '143_UK_DocM_V2_AccessAndUseOfBuildings'},"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",none,annotated
3c0a8ccb-d813-40fb-b69b-88250d3bc4ec,These fittings should not exceed a centre pane U-value of 1.2W/(m2K).,{'ID': '118_UK_DocL_V1_ConsrvationOfFuelAndPower'},These fittings should not exceed a centre pane U-value of 1.2W/(m2K).,less-equal,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,selection,annotated
e4fb8d18-8dbc-4351-a2df-d87f880f476a_1,,,The building emission rate for balconies is 15 that of the load-bearing structures of the storey.,equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_10,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the travel of these must be at least half.",greater-equal,synthetic
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",selection,annotated
0fdce0b1-7992-401f-aa84-ad7f2acca23d,Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,{'ID': '184_UK_DocL_V1_ConsrvationOfFuelAndPower'},Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,necessity,annotated
99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,none,annotated
47e50ddf-6174-436d-851b-7ddf46c10ccf,A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,{'ID': '380_UK_DocL_V1_ConsrvationOfFuelAndPower'},A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,necessity,annotated
d988e207-c3f9-4314-9a16-f99b334595f4_0,,,The access must be no less than 600kg/m3.,greater-equal,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_2,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the number of storeys of these must be at least (16.66 8.33 V0.4)/(1000 24).",greater-equal,synthetic
72d7716f-7e3e-442c-9e42-14d4b19e18e3_6,,,A appliance that is being connected to a new building should not have a U-values for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic
8207751f-13b8-4fe3-9bfe-4423093d4905_0,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the sum total of the staircase and exit route is no more than 160 millimetres.,less-equal,synthetic
0f8b3f66-6496-431c-bdc1-75570dde9ee6,"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",{'ID': '111_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",selection,annotated
993e54cc-49c3-43cb-995e-1a951c93c775_1,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an open outwards equal to three seconds.",equal,synthetic
a0c838b5-5fe2-4b52-abe1-432804c2c8aa_9,,,A presence of 21 C shall be used as the CO2 emissions for room temperature during the heating season.,equal,synthetic
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1_11,,,Any connection of 0.7 metres or more handle to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic
5925ca4d-801c-42e4-b581-a176dea2519f,"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",{'ID': '76_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",part-of,annotated
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_9,,,"There should be a data collection facilities, in the absence of tobacco smoke or other excessive pollutants, of 0.15 dm3/s per m2.",equal,synthetic
1834463c-7e45-4148-8315-f750b5f047cb,"When the lift serves more than three storeys, it provides visual and audible indicators to identify the floor reached.",{'ID': '25_UK_DocM_V1_AccessAndUseOfBuildings'},"When the lift serves more than three storeys, it provides visual and audible indicators to identify the floor reached.",selection,annotated
01bd7c41-594c-4440-8058-c34f1c4bad09,"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",{'ID': '82_UK_DocO_Overheating'},"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",none,annotated
eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,selection,annotated
26980508-105c-49db-8595-bf001a48d757_2,,,"In Door furniture with no fixed seats or energy declaration, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_4,,,These fittings should not exceed a specification of 270 millimetres.,less-equal,synthetic
cc72106e-9e7f-47cf-8a95-0173a8305dad,"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",{'ID': '83_Finnish_Health-Humidity'},"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",part-of,annotated
511c1a7f-08b9-48ec-aea6-9b749fdf31a1_7,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 70 kN of appropriately located cavity which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic
77f993c6-dff1-4f9a-8f66-73221d3cbaff_7,,,"If the dwelling only has 20 millimetres lifting device, a minimum ventilation rate of 13l/s should be used.",equal,synthetic
2a256a9c-0b8a-4acf-87e1-86a5857f36a3_8,,,"Where a driveway forms all, or part of, the approach route, an located in an easily accessible place of at least 1800mm wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic
77f993c6-dff1-4f9a-8f66-73221d3cbaff_4,,,"If the dwelling only has 4 hot water system, a minimum ventilation rate of 13l/s should be used.",equal,synthetic
b88c2c2a-5c6f-4347-888d-0224c8971d7b,Non-condensing boilers should be fitted with a flue condensing kit where feasible and where the boiler is likely to be able to operate in condensing mode (e.g. variable temperature circuits).,{'ID': '235_UK_DocM_V2_AccessAndUseOfBuildings'},Non-condensing boilers should be fitted with a flue condensing kit where feasible and where the boiler is likely to be able to operate in condensing mode (e.g. variable temperature circuits).,selection,annotated
fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",selection,annotated
ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",selection,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",none,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_1,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the ventilation rate is less than 400 millimetres.",less,synthetic
b6b19c38-b160-475d-b01d-e3880ca00ab2,"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",{'ID': '31_UK_DocF_V2_Ventilation'},"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",necessity,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",equal,annotated
2abae1a0-074b-4b23-ac5d-82c98cf4211d,"Lift door systems should be designed to allow adequate time for people, and any assistance dogs, to enter or leave the lift without coming into contact with closing doors.",{'ID': '111_UK_DocM_V2_AccessAndUseOfBuildings'},"Lift door systems should be designed to allow adequate time for people, and any assistance dogs, to enter or leave the lift without coming into contact with closing doors.",necessity,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_3,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be density 4.",equal,synthetic
569c7958-b7d6-4b9c-9dd9-13307e95e59b,"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",{'ID': '385_UK_DocM_V2_AccessAndUseOfBuildings'},"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",none,annotated
8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",none,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",part-of,annotated
43e26628-8b62-4cc6-91e2-284335df1564,"In rooms used for sleeping or rest, the one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise may not exceed 25 decibels.",{'ID': '17_Finnish_AcousticEnvironment'},"In rooms used for sleeping or rest, the one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise may not exceed 25 decibels.",less-equal,annotated
1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",necessity,annotated
dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",none,annotated
da4d5959-6e64-4e04-a1f3-8b42b6addab0_11,,,The outdoor patterns used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least three metres.,greater-equal,synthetic
590ab551-79e8-42f5-bc52-749f8899c088,Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,{'ID': '242_Finnish_FireSafety'},Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,selection,annotated
e15250c0-1279-4d29-a1ec-31560b045007,Extinguishing routes of basement storeys must not be connected to fire and smoke-proof exits.,{'ID': '244_Finnish_FireSafety'},Extinguishing routes of basement storeys must not be connected to fire and smoke-proof exits.,part-of,annotated
f3bd99b4-7ea5-4968-af10-3c133c0b5aa0,No individual flight has a rise between landings of more than 1800mm.,{'ID': '42_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise between landings of more than 1800mm.,less-equal,annotated
2ca092ec-4425-4552-a389-fd0dadfbd154,NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,{'ID': '54_UK_DocK_ProtectionFromFalling'},NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,greater-equal,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated
7db23e3b-7063-47a3-b65e-5d02ad78c922,"In a natural ventilation system, the ventilation valves shall be easy to close.",{'ID': '49_Finnish_Health-IndoorClimateAndVentilation'},"In a natural ventilation system, the ventilation valves shall be easy to close.",necessity,annotated
5b4380ba-0066-4735-a362-316d4c8e70b2_1,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 9mm emergency exits after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic
9027959e-efc1-4d32-acbe-e0775d40f001_7,,,"The morticed bolts should have a minimum Unit length of 900mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic
9b594ead-759a-420d-8d1c-52f007daaca4,"Each office should have the means to provide purge ventilation, to reduce pollutants before the office space is occupied or after activities such as painting.",{'ID': '56_UK_DocF_V2_Ventilation'},"Each office should have the means to provide purge ventilation, to reduce pollutants before the office space is occupied or after activities such as painting.",selection,annotated
bfdf95da-d422-47cd-83d7-a30a4969f2e6_4,,,"If the internal ties must be centred on the supporting line, the minimum value of the visual contrast, 0.35W/(m2K), will also be applied to internal ties.",greater-equal,synthetic
76bf63bd-30f4-440d-81a0-61ca16170f70_6,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the extract air categories is less than One of the total load.,less,synthetic
38cd3221-7fc9-4462-be20-78b16a4309d3,The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,{'ID': '490_UK_DocL_V1_ConsrvationOfFuelAndPower'},The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,less-equal,annotated
41d06a37-5039-4dc0-aae1-0fe3abbd84fc,The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements.,{'ID': '132_UK_DocL_V1_ConsrvationOfFuelAndPower'},The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements.,selection,annotated
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated
561480d1-56e5-41be-a56d-f2f2222bcb17,"Any damage, such as tears, should be repaired before boarding.",{'ID': '185_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any damage, such as tears, should be repaired before boarding.",necessity,annotated
c236bc17-ef9a-4694-a34e-68a9f38ae405,"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",{'ID': '323_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",selection,annotated
e728e1af-4952-4010-a0bf-3723d54bc450,"Ventilation shall provide healthy, safe and comfortable indoor air quality in occupiable spaces.",{'ID': '45_Finnish_Health-IndoorClimateAndVentilation'},"Ventilation shall provide healthy, safe and comfortable indoor air quality in occupiable spaces.",necessity,annotated
6a41a473-bd3c-4e38-a093-094b3fdae388_9,,,"At least one in every 1,200 MJ/m2 remaining thermal element must be provided with cable routes.",equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_8,,,"The wall ties should have a relationship of 900-1000mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2,The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,{'ID': '19_UK_DocK_ProtectionFromFalling'},The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,equal,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_8,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the travel distance is not less than 100mm.",greater-equal,synthetic
8e8f4fb5-00b5-404f-89df-a07287984748_5,,,"In buildings with a going greater than 18 dm3/s, automatic meter reading and data collection facilities should be installed.",greater,synthetic
45adb0b6-63ee-4f42-b6a3-8fc396221c67_6,,,The dimension of the insulation plus any required air gap should be at least to the specification of the rafters.,greater-equal,synthetic
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated
992e8f11-81ac-4d2f-b7d1-60e46b4b7261,Wheelchair accessible dwellings must also provide both a level access shower and a bath.,{'ID': '108_UK_DocM_V1_AccessAndUseOfBuildings'},Wheelchair accessible dwellings must also provide both a level access shower and a bath.,selection,annotated
cc72106e-9e7f-47cf-8a95-0173a8305dad_10,,,"In a new building, the crawl space luminous efficacy must be 25 on average at the minimum.",greater-equal,synthetic
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",part-of,annotated
0ea1e862-2434-4fc8-97a2-b076c992ef20_5,,,"The number of wall ties per square metre of an exit must be at least twice the rise plus the going (2R G) and its free height must be at least 2,100 millimetres.",greater-equal,synthetic
11f2902d-29c2-474e-97d0-628a2a97a666_4,,,"topography of over 150m2 must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f_2,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than ten millimetres of non-fire-compartmented Skirtings that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e_5,,,"The minimum value of the indoor steps of dwelling units and living quarters may be no more than EI 15, and the tread must be no less than 250 millimetres.",less-equal,synthetic
7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",none,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_1,,,"Where the work concerns a building containing more than 400mm public areas, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_9,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the difference in light reflectance value from these spaces does not exceed three of the total air flow in the vertical duct.",less-equal,synthetic
1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",none,annotated
2695c899-0ada-478c-9b2d-796f79ea4c52,"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",{'ID': '92_UK_DocK_ProtectionFromFalling'},"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",none,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_4,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the supports may be no more than 01:20:00.",less-equal,synthetic
5ebe90af-93ee-4d92-96fd-44b674d5e1a5,Systems should be designed so that they can be commissioned to suitable ventilation rates so that spaces are not significantly over-ventilated.,{'ID': '335_UK_DocL_V1_ConsrvationOfFuelAndPower'},Systems should be designed so that they can be commissioned to suitable ventilation rates so that spaces are not significantly over-ventilated.,necessity,annotated
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",selection,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_3,,,"In buildings more than 1100mm and at most 28 metres in opening, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic
00cded8a-5208-4c1b-bda4-9677d45b9375,The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,{'ID': '105_Finnish_Health-Humidity'},The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,part-of,annotated
d504fd87-d13d-4936-9d7a-71d17954760d_4,,,The performance of the steps in an exit may be no more than six metres.,less-equal,synthetic
77be05f2-cd8c-4d35-85e4-6637b999d8e7_7,,,The automatic flow adjustment of the consequential improvement works should not be less than 9 metres of the value of the principal works.,greater-equal,synthetic
9691451a-57d5-484f-a346-0f83b59f7ae0,"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",necessity,annotated
596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",none,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",greater-equal,annotated
ddc0bba6-2df8-43e1-9398-37514366fb06,"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",{'ID': '208_UK_DocF_V1_Ventilation'},"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",none,annotated
b0e99ac5-9cbc-4beb-b8ff-85383ae70ea8,"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",{'ID': '40_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",necessity,annotated
d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,necessity,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",none,annotated
37f01a2c-b944-45a2-a7f4-140d8c03d7ac_6,,,"After rebating, frame components should retain at least 130 millimetres of Floors.",greater-equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",equal,annotated
569c7958-b7d6-4b9c-9dd9-13307e95e59b_5,,,"For ducted systems that are served by fans with a Capacities greater than 01:08:00, ductwork leakage tests should be carried out.",greater,synthetic
0d8c2f7d-5234-4bec-bbbe-961e499ebbbc,"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",{'ID': '129_UK_DocM_V2_AccessAndUseOfBuildings'},"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",part-of,annotated
df122091-ca53-4134-98a3-47779c06f9df,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,{'ID': '198_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,necessity,annotated
f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",none,annotated
81314489-dcd9-410f-9b15-595b87e7c8f9_8,,,"The resilient layer should be timber sheathing at least 1m3/s water temperature, expanded metal or a similar resilient material.",greater-equal,synthetic
77f993c6-dff1-4f9a-8f66-73221d3cbaff,"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",{'ID': '43_UK_DocF_V1_Ventilation'},"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",part-of,annotated
0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_9,,,The continuity of the extension does not exceed 10.,less-equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_0,,,"Where the work concerns a building containing more than 9mm method, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic
50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,none,annotated
8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2,"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",{'ID': '111_Finnish_EnergyEfficiency'},"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",necessity,annotated
"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_0",,,"However, if the habitable area is no more than 1.2W/(m2K), the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic
103f99ad-884b-4bae-9f22-ccb1c5bc3d26_5,,,"In an open garage of no more than two walls, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic
0667134c-1290-4fe0-99eb-41c0b9e63a27,CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,necessity,annotated
64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",selection,annotated
e32bbb47-c826-40c1-8ea4-8c32353d3fd2_8,,,There shall be 75 light source lumens per circuit-watt of Ground floors provided for people in the building.,equal,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_4,,,"The floor area, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the energy efficiency measures, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1_8,,,A minimum of eight per cent in five of the remaining air pressure test must have access to cable routes.,greater-equal,synthetic
9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",none,annotated
922bf8df-3a70-4f45-8c04-200b638d3b3c,The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,{'ID': '59_Finnish_Health-WaterAndSewerage'},The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,less-equal,annotated
a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",selection,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",none,annotated
01d924bf-4a69-4eb8-b05e-ce993aee3d45_1,,,Perimeter insulation should be continuous and have a minimum measures of 300 litres.,greater-equal,synthetic
77f993c6-dff1-4f9a-8f66-73221d3cbaff_8,,,"If the dwelling only has one habitable room, a minimum control function of 1,200 millimetres should be used.",greater-equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
29c431ee-ea93-491d-ab13-06418d93c488,"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",{'ID': '338_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",selection,annotated
23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",none,annotated
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",none,annotated
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,part-of,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_11,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for air extract rate up to ten millimetres not more than 5m long.,less-equal,synthetic
239bd568-c5f2-4ab5-955c-f2d8d86b7b7f,"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",{'ID': '90_UK_DocM_V2_AccessAndUseOfBuildings'},"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",selection,annotated
656aa2fa-18cb-41ee-ae28-28deb3dffcc3_8,,,The termination points of the water in the hot water system shall be at least 90mm and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated
8cfa23d5-d9d3-4d72-a761-6595f876d577,NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a building.,{'ID': '79_UK_DocF_V2_Ventilation'},NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a building.,selection,annotated
29c431ee-ea93-491d-ab13-06418d93c488_3,,,"If domestic hot water circulation heat loss is greater than 0.055555556, manual control is acceptable.",greater,synthetic
9952f64d-e0df-4b03-84af-150782f81387_8,,,"For mobility-impaired people, a conference facility of at least 180 millimetres is preferred.",greater-equal,synthetic
f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",selection,annotated
bfdf95da-d422-47cd-83d7-a30a4969f2e6_9,,,"If the internal ties must be centred on the supporting line, the minimum value of the proportion, 0.8 metres, will also be applied to internal ties.",greater-equal,synthetic
2f75848b-a39a-41d3-a6bf-25ef1154bcff,"Where appropriate, these should be automated (with manual override) so that energy savings are maximised.",{'ID': '322_UK_DocM_V2_AccessAndUseOfBuildings'},"Where appropriate, these should be automated (with manual override) so that energy savings are maximised.",necessity,annotated
4b510cad-fefb-44be-a9cb-a26e0c42994c,"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",{'ID': '101_Finnish_EnergyEfficiency'},"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",part-of,annotated
38020928-c137-486e-88d7-c8feec038c99,A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,{'ID': '189_Finnish_FireSafety'},A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,none,annotated
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_0,,,The smaller differences of each panel which can be either the width or height of the panel should be 15 degrees or less.,less-equal,synthetic
3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",none,annotated
8151be81-09ad-4dac-b2d2-f0d757915b6c_3,,,"However, when the snow load can occur, the fastening points of the load s should be at least 50mm.",greater-equal,synthetic
bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",necessity,annotated
01008f69-874b-443e-bcb2-2f5630280049_5,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the open outwards may be no more than 250 millimetres and the tread must be no less than 220 millimetres.",less-equal,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,selection,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",greater,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_0,,,"The dwelling primary energy rate, dwelling emission rate and Signs, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and that, respectively.",less-equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_6,,,"If the load capacity between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 18 dm3/s, the wall in question must be class EI 15.",less,synthetic
f5a71c7b-e852-40f2-8f88-91cda7902a7e_8,,,"If a new building has a space heating or airconditioning system with an energy efficiency measures greater than 250 millimetres, a building automation and control system should be installed.",greater,synthetic
f3c5d35c-ad38-46d6-8a75-1a331555b89e,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,{'ID': '206_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,part-of,annotated
"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}","However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",{'ID': '9_Finnish_Accessibility'},"However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",less-equal,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",part-of,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8_6,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the rated output must be no less than 25mm.",greater-equal,synthetic
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_6,,,An upstand built on site should not exceed a building primary energy rate of 400-600mm.,less-equal,synthetic
9abdce80-0a4a-400a-8725-205bb3b887e4,"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",{'ID': '218_UK_DocM_V2_AccessAndUseOfBuildings'},"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",selection,annotated
2ca092ec-4425-4552-a389-fd0dadfbd154_4,,,NOTE: A floor level with a number of storeys of certain proportion or steeper should be designed as a ramp.,greater-equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_1,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 25W/m2 in atmosphere, these must be accessible via the interior.",greater,synthetic
caa5332f-5180-4d07-a41f-e6e0e044a8c1,An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,{'ID': '287_UK_DocL_V1_ConsrvationOfFuelAndPower'},An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,necessity,annotated
66249fda-33bf-4d93-8bf9-53fb82ad0e95,"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",{'ID': '87_Finnish_SafetyOfUse'},"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",necessity,annotated
8bb9aee2-a950-4a65-a715-287035906789,"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",{'ID': '27_Finnish_Accessibility'},"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",necessity,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_4,,,"The wall ties should have a configuration of 20mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_8,,,"If the air flows of energy consumption 1 and 2,100 millimetres are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1_2,,,A minimum of one in 30% load of the remaining Fixings must have access to cable routes.,equal,synthetic
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_5,,,"The free total cost from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 0.8 metres, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic
d8a06af7-3a6b-4d68-8bba-342aac6d3ac0,Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,{'ID': '146_Finnish_Health-WaterAndSewerage'},Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,selection,annotated
17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",selection,annotated
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_2,,,"If the primary energy factor of a mechanical ventilation systems air duct is designed to be greater than 40, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",part-of,annotated
23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",necessity,annotated
99a53f17-48cb-4012-a47b-700761e0983b_7,,,Where a new building which is not a residential building or a mixed-use building has more than 20 litres per second driveway (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic
0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated
0fdce0b1-7992-401f-aa84-ad7f2acca23d,Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,{'ID': '184_UK_DocL_V1_ConsrvationOfFuelAndPower'},Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,none,annotated
992e8f11-81ac-4d2f-b7d1-60e46b4b7261,Wheelchair accessible dwellings must also provide both a level access shower and a bath.,{'ID': '108_UK_DocM_V1_AccessAndUseOfBuildings'},Wheelchair accessible dwellings must also provide both a level access shower and a bath.,necessity,annotated
a9cea98b-d439-4930-a991-fc17eee6657c,the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,{'ID': '102_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,part-of,annotated
d56a51f7-6ec0-457b-a9ed-263fffe3a3e2,"Once open, all doors to accessible entrances should be wide enough to allow unrestricted passage for a variety of users, including wheelchair users, people carrying luggage, people with assistance dogs, and parents with pushchairs and small children.",{'ID': '66_UK_DocM_V2_AccessAndUseOfBuildings'},"Once open, all doors to accessible entrances should be wide enough to allow unrestricted passage for a variety of users, including wheelchair users, people carrying luggage, people with assistance dogs, and parents with pushchairs and small children.",selection,annotated
75c60084-6878-472d-8694-e8739e0dd76c_9,,,The number of storeys of access routes in assembly areas with a maximum capacity of 60 persons must be at least 50 millimetres.,greater-equal,synthetic
54907849-c48f-4267-b5f0-fc7e9279da7c,"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",{'ID': '409_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",none,annotated
99a53f17-48cb-4012-a47b-700761e0983b_6,,,Where a new building which is not a residential building or a mixed-use building has more than half insulating material (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic
6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,none,annotated
c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,none,annotated
8a692fe7-08ed-4b90-8b13-7ce2e29d37a2,"During this process, the heat pump (along with its accompanying pipework) should be isolated from the ground heat exchanger such that damage to the internal heat exchanger inside the heat pump is avoided.",{'ID': '386_UK_DocL_V1_ConsrvationOfFuelAndPower'},"During this process, the heat pump (along with its accompanying pipework) should be isolated from the ground heat exchanger such that damage to the internal heat exchanger inside the heat pump is avoided.",necessity,annotated
ef561e39-db90-462c-8dde-15fbeae954e5_8,,,A cube with vertical spacing of no more than 56 metres may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic
a894077e-cebf-4559-9254-ce964bc11b0f,Air flow rates for mechanical ventilation in new dwellings must be measured.,{'ID': '182_UK_DocF_V1_Ventilation'},Air flow rates for mechanical ventilation in new dwellings must be measured.,selection,annotated
81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",none,annotated
89811586-c819-4eb5-99f5-c4fcefdb9520,Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,{'ID': '107_Finnish_SafetyOfUse'},Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,necessity,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_3,,,"The installation of steps in uncovered or unheated outdoor staircases must be no less than two years, and the riser may be no more than 130 millimetres.",greater-equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
d0b6759e-deec-451d-bd7a-ec65b96048be_5,,,"extract air of habitable area 40 degrees Celsius shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic
0a53e4af-84a7-46aa-b28a-cb1d873c8cae,"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",{'ID': '151_UK_DocM_V2_AccessAndUseOfBuildings'},"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",selection,annotated
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7,The dwelling fabric energy efficiency rate must not exceed the individual dwellings target fabric energy efficiency rate.,{'ID': '66_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling fabric energy efficiency rate must not exceed the individual dwellings target fabric energy efficiency rate.,part-of,annotated
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3,"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",{'ID': '73_Finnish_FireSafety'},"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",none,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_11,,,"In buildings more than 9 metres and at most 20 millimetres in safety features, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic
0ea1e862-2434-4fc8-97a2-b076c992ef20_6,,,"The heat loss of an exit must be at least four and its free height must be at least 2,100 millimetres.",greater-equal,synthetic
11f2902d-29c2-474e-97d0-628a2a97a666_5,,,"standards of over 0.052083333 must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic
fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",part-of,annotated
f6add908-4d45-4b3e-83a6-369f6c36c037_0,,,"Door rails, stiles and muntins should be at least 800 millimetres fire resistance time.",greater-equal,synthetic
74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",selection,annotated
c47598f9-df79-4d77-aba9-8f380342372f_5,,,extract air of fire resistance time requirement 01:08:00 shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic
389c960b-525d-4f2e-9a2c-1805eb2dc20d,The full area under a stair that forms part of the storage provision should be counted as 1m2.,{'ID': '79_UK_DocM_V1_AccessAndUseOfBuildings'},The full area under a stair that forms part of the storage provision should be counted as 1m2.,equal,annotated
a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",part-of,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",none,annotated
2238d6ef-421b-4f84-b24d-d46c6ba2afc5,"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",{'ID': '92_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",necessity,annotated
783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,necessity,annotated
9d172d30-e92f-4151-865c-d204f217705d,The slope of the wet room floor must allow water to flow into the floor drain.,{'ID': '118_Finnish_Health-Humidity'},The slope of the wet room floor must allow water to flow into the floor drain.,part-of,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_11,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for free gap 1 and half a metre if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",necessity,annotated
bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",necessity,annotated
f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_0,,,No individual flight has a away of more than 900mm.,less-equal,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_4,,,"The dwelling primary energy rate, reference value and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, domestic hot water circulation heat loss and target fabric energy efficiency rate, respectively.",less-equal,synthetic
7db23e3b-7063-47a3-b65e-5d02ad78c922,"In a natural ventilation system, the ventilation valves shall be easy to close.",{'ID': '49_Finnish_Health-IndoorClimateAndVentilation'},"In a natural ventilation system, the ventilation valves shall be easy to close.",part-of,annotated
b0e99ac5-9cbc-4beb-b8ff-85383ae70ea8,"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",{'ID': '40_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",none,annotated
34a524ec-6994-426f-86af-78788fd34a80_3,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the frequency should be 2.0 m3/(h m2).",equal,synthetic
81f14fc1-af5d-45e8-8725-94d2510e4701_6,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a breaking of at least 23C in the hallway and kitchen.",greater-equal,synthetic
fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,necessity,annotated
7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,part-of,annotated
76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,less,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9_11,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 180kW headroom from any projecting corner.",greater-equal,synthetic
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_2,,,"If site constraints necessitate an lifting device of 100 litres or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic
8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2,"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",{'ID': '111_Finnish_EnergyEfficiency'},"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",necessity,annotated
23ff7307-c4ae-4bef-97bf-feb9682d91eb,"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",{'ID': '290_UK_DocM_V2_AccessAndUseOfBuildings'},"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",part-of,annotated
f162906e-1097-420e-b2a0-dd746d5794c7,"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",{'ID': '265_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",none,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,selection,annotated
05fdde92-d8af-42ad-963b-9019c69a8ab3_0,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same condition as the gap used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic
0edb92b7-a2e1-480f-b708-e7e6c9951a79,The foundation drainage water shall flow away from the property in such a way that it does not cause problems to the waste water and storm water systems.,{'ID': '173_Finnish_Health-WaterAndSewerage'},The foundation drainage water shall flow away from the property in such a way that it does not cause problems to the waste water and storm water systems.,necessity,annotated
493ec553-7761-4d1e-aa98-05d925ddf955_4,,,The floor plate areas of a horizontal hatch must be at least 2 metres.,greater-equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_9,,,"The wall ties should have a total load of 0.3 and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
8151be81-09ad-4dac-b2d2-f0d757915b6c_0,,,"However, when the snow load can occur, the reverberation time of the load s should be at least 180kW.",greater-equal,synthetic
cd904a0f-c120-4c67-bcff-6fcc77abca62,Any future connection locations should be clearly identified and labelled.,{'ID': '116_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Any future connection locations should be clearly identified and labelled.,necessity,annotated
0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_8,,,The spread of fire of the extension does not exceed 25 decibels.,less-equal,synthetic
103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",selection,annotated
108b5709-f035-4697-ba25-56edd2ce60fc,"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",{'ID': '126_UK_DocM_V2_AccessAndUseOfBuildings'},"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",selection,annotated
3835aa39-14bc-4c7a-a029-a5ce391bad76,The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,{'ID': '73_UK_DocL_V1_ConsrvationOfFuelAndPower'},The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,selection,annotated
5afbc8c9-4c2e-4cb8-8945-24e184d161e1,The fan should be set at a speed that will approximately achieve the desired continuous flow rate.,{'ID': '201_UK_DocF_V1_Ventilation'},The fan should be set at a speed that will approximately achieve the desired continuous flow rate.,necessity,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",greater-equal,annotated
2319724e-2fd4-463b-bb59-0972073dc55a,"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",{'ID': '44_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",selection,annotated
536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",part-of,annotated
1fc9255c-929e-4052-aaec-e3ffede5a62e,"For large or complex projects, a commissioning manager should be appointed.",{'ID': '374_UK_DocM_V2_AccessAndUseOfBuildings'},"For large or complex projects, a commissioning manager should be appointed.",selection,annotated
55d84237-8fad-4bd7-b67d-0745b9cc1e31,"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",{'ID': '222_Finnish_FireSafety'},"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",none,annotated
f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",none,annotated
302c413e-fefd-47f1-914f-0dc787e4a761_11,,,"Where air distribution on surfaces is greater than 25W/m2, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic
c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated
536b172d-ccd1-479a-8136-6ee05db0f264_1,,,"Where pipework is above ground, the performance of the pipe lifting device should be at least as high as the high of pipework in the buried part of the system.",greater-equal,synthetic
082c7ed9-3579-48c2-a0d2-076f1edd647c,"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",{'ID': '112_UK_DocO_Overheating'},"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,annotated
40b40b1b-d1b1-49d8-b9b7-13c5845a169d_5,,,The structure of the control appliance of the plumbing fixture shall be such that its insulating performance does not arise above adequate means.,less-equal,synthetic
6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,selection,annotated
76bf63bd-30f4-440d-81a0-61ca16170f70_11,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the ventilation provision is less than two years of the total load.,less,synthetic
4a82f789-a98a-4379-9b81-2a20cfba6c87_6,,,"If the internal ties must be centred on the supporting line, the minimum value of the axle group load, 10m, will also be applied to internal ties.",greater-equal,synthetic
e4fb8d18-8dbc-4351-a2df-d87f880f476a_8,,,The step for balconies is 0.7 metres that of the load-bearing structures of the storey.,equal,synthetic
ef4f54b6-1099-4404-9fa2-d0c0d5e55543_4,,,The indoor units must not exceed the individual dwellings differences.,less-equal,synthetic
9027959e-efc1-4d32-acbe-e0775d40f001_10,,,"The morticed bolts should have a minimum water temperature of 0.15, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic
d504fd87-d13d-4936-9d7a-71d17954760d_5,,,The average carbon monoxide concentration of the steps in an exit may be no more than 600 millimetres.,less-equal,synthetic
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_2,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the supports may be no more than certain proportion.",less-equal,synthetic
78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",selection,annotated
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_4,,,ten millimetres Grommets should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic
86365504-9029-4805-a93b-4256849b8e3a,Duct connections should be both mechanically secured and adequately sealed to prevent leaks.,{'ID': '116_UK_DocF_V1_Ventilation'},Duct connections should be both mechanically secured and adequately sealed to prevent leaks.,necessity,annotated
86350df0-a40e-412b-a301-004524d56736_2,,,"For wet heating systems in new dwellings with a part of half a metre or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic
8efb6108-e49e-4d64-a1e4-22e3f9128b17_4,,,"When calculating the reference heat loss of a building, the value of 10m shall be used as the number for the air leakage rate figure for the building envelope.",equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_5,,,"Where the work concerns a building containing more than 900 millimetres controls, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic
9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",necessity,annotated
bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",part-of,annotated
a86b58e8-046f-44b7-8e1b-00c876c8c647_3,,,"Parapets in energy efficiency measures A to 300mm and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_2,,,"The travel distance of the indoor steps of other spaces intended for everyday use may be no more than 4, and the tread must be no less than 270 millimetres.",less-equal,synthetic
31e6f85a-97ea-4224-9144-bc3d1daad96d,Consideration should be given to providing a low level urinal for children in male washrooms.,{'ID': '174_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to providing a low level urinal for children in male washrooms.,selection,annotated
0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_5,,,The room temperature of the extension does not exceed off.,less-equal,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e_3,,,"The U-value of the indoor steps of dwelling units and living quarters may be no more than 220 millimetres, and the tread must be no less than 250 millimetres.",less-equal,synthetic
81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",none,annotated
8e8f4fb5-00b5-404f-89df-a07287984748,"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",{'ID': '229_UK_DocM_V2_AccessAndUseOfBuildings'},"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",greater,annotated
6c789809-b1b8-429a-8fe2-8ce16f8a4b54_7,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the minimum value does not exceed 4.,less-equal,synthetic
2de867fe-80e7-4617-ad18-36225dd45ab1,Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,{'ID': '53_UK_DocF_V1_Ventilation'},Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,part-of,annotated
baee716c-b8c2-4500-b4de-63fa11f007b1_2,,,A minimum of 30% load in five of the remaining Sewers must have access to cable routes.,greater-equal,synthetic
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_5,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 55 Door.,greater,synthetic
20518e80-6f7e-457f-8c5a-59fa4c0eb324_9,,,"When calculating the heat loss for a buildings design solution, the slope shall be used as the value of the feasibility of installing high-efficiency alternative systems for the building envelope.",equal,synthetic
6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,selection,annotated
f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",part-of,annotated
a235c68f-ae44-4770-b005-4e9d7b659eb7_1,,,All cavity walls should have leaves at least 4 steps and cavities at least 50mm wide.,greater-equal,synthetic
8fcdc238-3c30-4659-9303-1b126a39b2cd_2,,,The design solar load should be danger of collision by at least three metres.,greater-equal,synthetic
2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,none,annotated
415aa97a-1b29-4d68-b1f1-e7d29a5ed7d6,Rigid connectors and jubilee clips should be used for flexible ducting to ensure a good seal.,{'ID': '117_UK_DocF_V1_Ventilation'},Rigid connectors and jubilee clips should be used for flexible ducting to ensure a good seal.,necessity,annotated
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_7,,,"Where a new building contains more than 10m vapour barriers, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_6,,,The normal relationship between the dimensions of the rise and going is: 100 equals three.,equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_5,,,Skirtings totalling up to 50mm total thickness and shallow projecting toilets or casings above EI 15 may be discounted when measuring clear width.,greater,synthetic
77be05f2-cd8c-4d35-85e4-6637b999d8e7_2,,,The number of storeys of the consequential improvement works should not be less than 3m of the value of the principal works.,greater-equal,synthetic
eefe1191-2903-4fb8-9138-6471e09fb67d_5,,,The CO2 exceeds 850 millimetres at 11pm.,greater,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",part-of,annotated
83344b26-7cf0-452a-9dac-c0288c46393d,"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '37_UK_DocQ_Security_Dwellings'},"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated
ddd6ec57-ed54-4a8a-abaf-4b1efc287dde,The flushing shall be carried out with household water to remove any dirt and debris from the pipe network.,{'ID': '111_Finnish_Health-WaterAndSewerage'},The flushing shall be carried out with household water to remove any dirt and debris from the pipe network.,none,annotated
0da52584-1b37-48b5-840f-3795ae695275_0,,,the minimum clear dimensions of the platform are: 1100mm wide and 0.052083333 thick where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
6d5428cc-90c2-477e-b20e-978a6d1cd403,Edge columns and walls shall be tied to every floor and roof.,{'ID': '186_Finnish_StabilityOfStructures'},Edge columns and walls shall be tied to every floor and roof.,necessity,annotated
203faa23-7b71-47c9-a6e5-2333ac45389e_8,,,"The heat of the indoor steps of dwelling units and living quarters may be no more than 10 kN, and the tread must be no less than 250 millimetres.",less-equal,synthetic
c2e0629d-350b-45b8-9e9e-d58be1780f12_8,,,"If the heating and cooling systems has no Water pipes, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic
0ea1e862-2434-4fc8-97a2-b076c992ef20_11,,,"The reference value of an exit must be at least 0.9 metres and its free height must be at least 2,100 millimetres.",greater-equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_1,,,Modular and portable buildings with a planned equivalent area of more than 90mm but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic
e32bbb47-c826-40c1-8ea4-8c32353d3fd2_7,,,There shall be 150m2 of separator or treatment device provided for people in the building.,equal,synthetic
4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",necessity,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",selection,annotated
4a82f789-a98a-4379-9b81-2a20cfba6c87,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",{'ID': '179_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",none,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",selection,annotated
8e8f4fb5-00b5-404f-89df-a07287984748_1,,,"In buildings with a habitable area greater than 20 degrees Celsius, automatic meter reading and data collection facilities should be installed.",greater,synthetic
81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",part-of,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74_9,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a remains fully open number of steps of 390 millimetres.",equal,synthetic
cc72106e-9e7f-47cf-8a95-0173a8305dad,"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",{'ID': '83_Finnish_Health-Humidity'},"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",selection,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",none,annotated
34a524ec-6994-426f-86af-78788fd34a80,"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",{'ID': '36_UK_DocQ_Security_Dwellings'},"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",equal,annotated
43e26628-8b62-4cc6-91e2-284335df1564,"In rooms used for sleeping or rest, the one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise may not exceed 25 decibels.",{'ID': '17_Finnish_AcousticEnvironment'},"In rooms used for sleeping or rest, the one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise may not exceed 25 decibels.",part-of,annotated
39a37d5e-3361-43b9-a209-e5cd45918abc,"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",{'ID': '95_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",part-of,annotated
fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",none,annotated
389c960b-525d-4f2e-9a2c-1805eb2dc20d_5,,,The full indoor units under a stair that forms part of the storage provision should be counted as 25W/m2.,equal,synthetic
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_9,,,"If site constraints necessitate an casings of 0.2 or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_1,,,"If the air flows of primary energy content 1 and 0.3 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
9fd15b82-fc32-4364-8724-f1ef14f0c047,The cooker hood should span at least the full width of the cooker.,{'ID': '36_UK_DocF_V1_Ventilation'},The cooker hood should span at least the full width of the cooker.,part-of,annotated
e874f337-2067-4e77-ad32-c3b857f40e7a_7,,,"If the service exceeds eight per cent, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic
fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",none,annotated
11f2902d-29c2-474e-97d0-628a2a97a666_2,,,"total extract air flow of over eight per cent must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none,annotated
5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,necessity,annotated
302c413e-fefd-47f1-914f-0dc787e4a761_3,,,"Where load on surfaces is greater than 230mm, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic
986f7853-4975-4ecd-8f10-a75d818eb44a,"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",{'ID': '140_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",none,annotated
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_1,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 1400mm circulation piping.,greater,synthetic
8efb6108-e49e-4d64-a1e4-22e3f9128b17_10,,,"When calculating the reference heat loss of a building, the value of (16.66 8.33 V0.4)/(1000 24) shall be used as the performance standards for the air leakage rate figure for the building envelope.",equal,synthetic
6a41a473-bd3c-4e38-a093-094b3fdae388_1,,,At least one in every 30m2 remaining hotels must be provided with cable routes.,equal,synthetic
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",none,annotated
2de867fe-80e7-4617-ad18-36225dd45ab1_1,,,Hinged or pivot windows with an height of less than 8 per cent (1:12.5) are not suitable for purge ventilation.,less,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_11,,,Skirtings totalling up to 15 degrees shallow projecting and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_7,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than EI 15 in intended time of use, these must be accessible via the interior.",greater,synthetic
d796dece-45f6-4527-a151-c59b007e9028,"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",{'ID': '132_Finnish_SafetyOfUse'},"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",selection,annotated
e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,selection,annotated
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d,An upstand built on site should not exceed a U-value of 0.35W/(m2K).,{'ID': '115_UK_DocL_V1_ConsrvationOfFuelAndPower'},An upstand built on site should not exceed a U-value of 0.35W/(m2K).,part-of,annotated
3153d771-404e-4a54-ac05-ed1b75e37506_8,,,"Gangways should not be less than 1100mm total capital cost unless used by not more than 50 persons, in which case gangways should be a minimum of 1000m2.",greater-equal,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_11,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 220 millimetres in sum total and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
2a256a9c-0b8a-4acf-87e1-86a5857f36a3,"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",{'ID': '17_UK_DocM_V1_AccessAndUseOfBuildings'},"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",part-of,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_6,,,The cross fall of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the air leakage rate figure of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic
2de867fe-80e7-4617-ad18-36225dd45ab1,Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,{'ID': '53_UK_DocF_V1_Ventilation'},Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,necessity,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_7,,,Skirtings totalling up to 50mm total thickness and shallow projecting Ramps or casings above (16.66 8.33 V0.4)/(1000 24) may be discounted when measuring clear width.,greater,synthetic
239bd568-c5f2-4ab5-955c-f2d8d86b7b7f,"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",{'ID': '90_UK_DocM_V2_AccessAndUseOfBuildings'},"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",none,annotated
d3e7a947-536e-4a49-9823-e27fc0f68b27_6,,,surfaces of landings to be at least equal to the total useful floor area of the ramp.,greater-equal,synthetic
f420ae57-5656-4558-b1a3-1079e46bf6cc_4,,,"In the case of the storey-level door of a dwelling, or if the performance standards through the door exceeds 7 mg/m3 (6 ppm), doors must open in the direction of the exit.",greater,synthetic
83ff563b-077a-4849-b526-382fbb012647,The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,{'ID': '67_Finnish_SafetyOfUse'},The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,part-of,annotated
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_11,,,A building with a fittings exceeding 32mm must be equipped with anchoring structures for safety lines.,greater,synthetic
891e9eee-4a4b-4d7c-8051-3aee8302cd6b,"Walls: insulation should be fitted without any air gaps and tight to the structure, cavity closers, lintels and cavity trays.",{'ID': '141_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Walls: insulation should be fitted without any air gaps and tight to the structure, cavity closers, lintels and cavity trays.",part-of,annotated
3835aa39-14bc-4c7a-a029-a5ce391bad76,The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,{'ID': '73_UK_DocL_V1_ConsrvationOfFuelAndPower'},The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,necessity,annotated
0f67dad7-6df9-444b-8e72-f447668e3fde_4,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 100 millimetres total supply air flow.",greater-equal,synthetic
079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",part-of,annotated
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_3,,,The approach route is a minimum of 900mm wide with a maximum stairs of two.,less-equal,synthetic
2a256a9c-0b8a-4acf-87e1-86a5857f36a3,"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",{'ID': '17_UK_DocM_V1_AccessAndUseOfBuildings'},"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",part-of,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_4,,,"The class of steps in covered or heated outdoor staircases must be no less than 15 degrees, and the riser may be no more than 160 millimetres.",greater-equal,synthetic
8151be81-09ad-4dac-b2d2-f0d757915b6c_1,,,"However, when the snow load can occur, the elevation difference of the load s should be at least One.",greater-equal,synthetic
bd670961-83e8-410a-85a4-578f2d00c626,"In all cases, roof insulation should be continuous with wall insulation.",{'ID': '168_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In all cases, roof insulation should be continuous with wall insulation.",part-of,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",necessity,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_4,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for output 1,000 millimetres and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
4a82f789-a98a-4379-9b81-2a20cfba6c87_4,,,"If the internal ties must be centred on the supporting line, the minimum value of the going, adequate means, will also be applied to internal ties.",greater-equal,synthetic
31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",selection,annotated
5fa7daca-cb50-4397-a736-617e52d30187_9,,,"If total combined window area at below 30% are required and unavailable, the target emission rate may be taken as equal to that at 30% load.",equal,synthetic
2a2dbb92-88af-47f5-bd1e-b3ddea4c1ec9,"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",{'ID': '70_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",necessity,annotated
b6e6ebce-e75f-4fae-b9a2-e35c164b3fb4,"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",{'ID': '342_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",selection,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_9,,,"The dwelling primary energy rate, reverberation time and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, opening angle and target fabric energy efficiency rate, respectively.",less-equal,synthetic
793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,part-of,annotated
b5aa20f2-571e-48d8-9943-4102c9f9bd1a,"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",{'ID': '250_Finnish_FireSafety'},"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",selection,annotated
259c1614-77ef-4ae4-a401-83caa603e374,"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '35_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",necessity,annotated
a0c838b5-5fe2-4b52-abe1-432804c2c8aa_6,,,A rise of 21 C shall be used as the reception for room temperature during the heating season.,equal,synthetic
ee0c8c7c-c65e-4403-92e6-628fd680f3bf_4,,,"Any panel within the doorset should be at least 2,100 millimetres CO2.",greater-equal,synthetic
eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,part-of,annotated
984c252b-74f4-4d85-9080-1c8ae1851eca_2,,,"If performance requires thicker glass to be used, an equivalent window unit with exit (0.136kgCO2/kWh) glazing should be shown to meet the required standard.",equal,synthetic
103f99ad-884b-4bae-9f22-ccb1c5bc3d26_11,,,"In an open garage of no more than 20C controls, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic
b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",necessity,annotated
956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",part-of,annotated
4e8c5c50-44af-48f6-b959-e6f9b31afa1e_3,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical requirements may be outdoor air and exhaust air ducts.",equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_9,,,"In buildings more than 0.3W/m2 and at most 28 metres in U-value, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic
a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",none,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_6,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 1,000 millimetres district heat networks is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic
8b054fa5-fa6b-40f8-996a-a6dfea855fc3_8,,,"The dimensions between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 150mm on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic
511c1a7f-08b9-48ec-aea6-9b749fdf31a1_1,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 01:20:00 of appropriately located construction layers which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic
0d8c2f7d-5234-4bec-bbbe-961e499ebbbc,"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",{'ID': '129_UK_DocM_V2_AccessAndUseOfBuildings'},"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",part-of,annotated
56166e36-b14b-4632-9767-70b71d335d9c,"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_3,,,Individual flights are: for width up to 400mm not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_5,,,"The water temperature of the indoor steps of other spaces intended for everyday use may be no more than 6m, and the tread must be no less than 270 millimetres.",less-equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_0,,,"The wall ties should have a seasonal energy efficiency ratio of 0.35W/(m2K) and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
26980508-105c-49db-8595-bf001a48d757,"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",{'ID': '103_Finnish_SafetyOfUse'},"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",selection,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8_2,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the alongside the leading edge must be no less than three metres.",greater-equal,synthetic
0f8b3f66-6496-431c-bdc1-75570dde9ee6,"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",{'ID': '111_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",selection,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_1,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the design solar load may be no more than between 550mm and 700mm.",less-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_7,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 0.35W/(m2K) residential unit are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
0d8c2f7d-5234-4bec-bbbe-961e499ebbbc,"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",{'ID': '129_UK_DocM_V2_AccessAndUseOfBuildings'},"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",none,annotated
fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,none,annotated
7a1bc727-1daa-4668-83f6-b44327b96898,"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",{'ID': '133_Finnish_FireSafety'},"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",selection,annotated
2ff58135-b89d-40d1-a145-51aad9e5a942,"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",{'ID': '16_Finnish_Accessibility'},"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",part-of,annotated
48133b44-eac2-44e2-b2df-c52243e9f7ea,"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",{'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",none,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,part-of,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_11,,,"Extract air of opening 2, 3 and 70 kN shall not be used as recirculation air.",equal,synthetic
8c7cf3d7-3ab9-4cb4-99bf-016cbbd4914d,Mechanical ventilation systems must be commissioned to provide adequate ventilation.,{'ID': '180_UK_DocF_V1_Ventilation'},Mechanical ventilation systems must be commissioned to provide adequate ventilation.,none,annotated
a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",selection,annotated
8c7cf3d7-3ab9-4cb4-99bf-016cbbd4914d,Mechanical ventilation systems must be commissioned to provide adequate ventilation.,{'ID': '180_UK_DocF_V1_Ventilation'},Mechanical ventilation systems must be commissioned to provide adequate ventilation.,necessity,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_8,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the total extract air flow is less than 23C.",less,synthetic
beeec1b2-c382-40cc-aec2-6eda86f5782e,"Each residential unit, shared communal room and common space should be categorised separately.",{'ID': '25_UK_DocO_Overheating'},"Each residential unit, shared communal room and common space should be categorised separately.",selection,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0_6,,,"For dwellings, for external tapered steps and stairs that are part of the building the number of people evacuating of each step should be a minimum of proportion.",greater-equal,synthetic
eefe1191-2903-4fb8-9138-6471e09fb67d_11,,,The going exceeds five at 11pm.,greater,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",part-of,annotated
8421f806-70f2-46a9-a308-90a40da3541d_0,,,"Where the continuity of the approach, whether over its whole length or in part, is 20C or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_4,,,"If the Air flow rates between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 0.136kgCO2/kWh, the wall in question must be class EI 15.",less,synthetic
7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",greater-equal,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_3,,,"If the absence between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 50mm, the wall in question must be class EI 15.",less,synthetic
d8066a73-49c2-4e99-825a-b49b9b2ba67d_5,,,A landing measuring at least one in height must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic
cf35d4a4-3170-421b-9be1-b68d928eed1d_8,,,"A roof with a construction greater than 65mm must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic
4e1bda84-398f-4bae-a335-2c7f24501b09,The water heater is situated centrally with a distribution system to supply water to the drawoff points and has a capacity greater than 300 litres.,{'ID': '456_UK_DocM_V2_AccessAndUseOfBuildings'},The water heater is situated centrally with a distribution system to supply water to the drawoff points and has a capacity greater than 300 litres.,necessity,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9_7,,,"Door entry controls, where provided, are mounted 850-1000mm entrance level finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic
8421f806-70f2-46a9-a308-90a40da3541d_10,,,"Where the building primary energy rate of the approach, whether over its whole length or in part, is 28 metres or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",greater-equal,annotated
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,selection,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_11,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under sum 100.",equal,synthetic
117864c0-5065-4c55-b390-c17b60c8d9dd,"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",{'ID': '48_Finnish_SafetyOfUse'},"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",none,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",necessity,annotated
2de867fe-80e7-4617-ad18-36225dd45ab1_7,,,Hinged or pivot windows with an pitch of less than 16/01/2023 00:00 are not suitable for purge ventilation.,less,synthetic
ffc11c58-ff7e-45f4-a5c7-da59404e5659,"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",{'ID': '1_UK_DocP_ElectricalSafety'},"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",part-of,annotated
86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",none,annotated
e874f337-2067-4e77-ad32-c3b857f40e7a_4,,,"If the atmosphere exceeds 190 kN, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic
d988e207-c3f9-4314-9a16-f99b334595f4_5,,,The travel distance must be no less than 20mm.,greater-equal,synthetic
6b2f3ca5-8cea-4616-8679-438446bc6233,"Since doors are potential barriers, their use should be avoided whenever appropriate.",{'ID': '88_UK_DocM_V2_AccessAndUseOfBuildings'},"Since doors are potential barriers, their use should be avoided whenever appropriate.",necessity,annotated
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a,"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",{'ID': '99_Finnish_SafetyOfUse'},"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",selection,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9_11,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the Extract exceeds between 550mm and 700mm; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic
525aa713-65e1-4368-a6f4-38f628be7fed,"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",necessity,annotated
783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,selection,annotated
eff9dd2f-007f-4caf-bb2e-3ff65db910b0,A passenger lift is the most suitable means of vertical access and should be provided wherever possible.,{'ID': '103_UK_DocM_V2_AccessAndUseOfBuildings'},A passenger lift is the most suitable means of vertical access and should be provided wherever possible.,necessity,annotated
9027959e-efc1-4d32-acbe-e0775d40f001,"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",{'ID': '38_UK_DocQ_Security_Dwellings'},"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_6,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the indoor units is less than 35 mg/m3 (30 ppm).",less,synthetic
750a4f32-2581-4040-ac8b-8e4ad59abd56,Extract ventilators in sanitary accommodation should be capable of continuous operation if required.,{'ID': '48_UK_DocF_V2_Ventilation'},Extract ventilators in sanitary accommodation should be capable of continuous operation if required.,necessity,annotated
678e5476-66e6-40c2-a409-a8248dc6cef7,The sign should be sited where a person installing an electric vehicle charge point in future will see it.,{'ID': '120_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The sign should be sited where a person installing an electric vehicle charge point in future will see it.,necessity,annotated
d941229d-4de4-4873-9704-c207a9b673c8,An exit enclosure has doors that open separately into each adjoining fire compartment without a need to open the doors at the same time.,{'ID': '26_Finnish_FireSafety'},An exit enclosure has doors that open separately into each adjoining fire compartment without a need to open the doors at the same time.,selection,annotated
a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f_11,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 65mm of non-fire-compartmented rooms that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,none,annotated
23cff3c3-1251-4c5f-9fd9-8f52d25eb494,Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,{'ID': '252_UK_DocM_V2_AccessAndUseOfBuildings'},Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,greater,annotated
ef9dc94d-b79c-4fba-897a-eed2b90084b2,"Thermal bridging, including at the party wall, should be reasonably limited.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"Thermal bridging, including at the party wall, should be reasonably limited.",selection,annotated
993e54cc-49c3-43cb-995e-1a951c93c775,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",{'ID': '25_Finnish_StabilityOfStructures'},"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",part-of,annotated
117864c0-5065-4c55-b390-c17b60c8d9dd,"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",{'ID': '48_Finnish_SafetyOfUse'},"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",part-of,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_4,,,Where the ladder is within the private curtilage of the dwelling (but not within a carport or fire compartment) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic
2de867fe-80e7-4617-ad18-36225dd45ab1_0,,,Hinged or pivot windows with an ending of less than two years are not suitable for purge ventilation.,less,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_2,,,"The building primary energy rate and sizes calculated using the measured air permeability must not be higher than the target primary energy rate and fittings, respectively.",less-equal,synthetic
8aa4b706-1659-4e30-a4fe-e7f33efe3241_3,,,All 40 degrees Celsius building envelope of the compliance checklist should be completed.,equal,synthetic
716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,necessity,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",selection,annotated
76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,necessity,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated
86831830-e7f0-4b90-aa27-dc0542b7ba4d,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",{'ID': '18_Finnish_SafetyOfUse'},"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",none,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",none,annotated
c384013b-c40f-4925-acbe-465e1ca5bc13_7,,,600 millimetres building control body per detail should be recorded.,equal,synthetic
81314489-dcd9-410f-9b15-595b87e7c8f9_6,,,"The resilient layer should be timber sheathing at least 1,200 millimetres travel distance, expanded metal or a similar resilient material.",greater-equal,synthetic
06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",necessity,annotated
c384013b-c40f-4925-acbe-465e1ca5bc13_11,,,20 heat per detail should be recorded.,equal,synthetic
5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",selection,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_8,,,"The water temperature, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the Manual control, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic
6c789809-b1b8-429a-8fe2-8ce16f8a4b54_6,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the cross fall does not exceed 0.8 metres.,less-equal,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",none,annotated
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_6,,,"There should be a swimming pools, in the absence of tobacco smoke or other excessive pollutants, of 0.136kgCO2/kWh.",equal,synthetic
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated
511c1a7f-08b9-48ec-aea6-9b749fdf31a1_6,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 20 millimetres of appropriately located standing auditorium which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73_10,,,The dwelling emission rate of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the quality of the installation of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e_6,,,"The internal temperature of the indoor steps of dwelling units and living quarters may be no more than 600 x 600 millimetres, and the tread must be no less than 250 millimetres.",less-equal,synthetic
f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",selection,annotated
20518e80-6f7e-457f-8c5a-59fa4c0eb324,"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",{'ID': '137_Finnish_EnergyEfficiency'},"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",none,annotated
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",necessity,annotated
8e8f4fb5-00b5-404f-89df-a07287984748,"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",{'ID': '229_UK_DocM_V2_AccessAndUseOfBuildings'},"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",part-of,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_2,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major open-plan space, there is no elevator shafts to install either electric vehicle charge points or cable routes.",not-part-of,synthetic
c145afb4-469c-49a7-a14f-167094cf055e,People should be able to appreciate easily where to place their feet by highlighting nosings and avoiding open rises.,{'ID': '54_UK_DocM_V2_AccessAndUseOfBuildings'},People should be able to appreciate easily where to place their feet by highlighting nosings and avoiding open rises.,necessity,annotated
6414854d-01f9-481f-a7f4-c4581e48d8b1,Special safety features are not necessary if the ladder is not more than 6m long.,{'ID': '112_UK_DocK_ProtectionFromFalling'},Special safety features are not necessary if the ladder is not more than 6m long.,less-equal,annotated
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_11,,,"The free type and quality from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 90, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_4,,,"Where the work concerns a building containing more than E 15 centralised system, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic
0a53e4af-84a7-46aa-b28a-cb1d873c8cae,"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",{'ID': '151_UK_DocM_V2_AccessAndUseOfBuildings'},"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",selection,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",selection,annotated
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_0,,,The water temperature of the floor surface in the seating area and access route may not exceed 25mm.,less-equal,synthetic
316c89ee-aa42-4e7a-9372-960cf25b3265,Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,{'ID': '105_UK_DocF_V2_Ventilation'},Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,selection,annotated
bb309bf3-9e86-43d9-8b6e-ebff176d1c88,The sink is not more than 150mm deep with insulation to the underside to prevent scalding of a wheelchair users legs.,{'ID': '96_UK_DocM_V1_AccessAndUseOfBuildings'},The sink is not more than 150mm deep with insulation to the underside to prevent scalding of a wheelchair users legs.,necessity,annotated
72d7716f-7e3e-442c-9e42-14d4b19e18e3_3,,,A electric vehicle charge points that is being connected to a new building should not have a length for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic
0aaf71f0-a482-4a72-a407-0d6db79c7f6f_7,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 2.0 m3/(h m2) of non-fire-compartmented basement storeys that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic
569c7958-b7d6-4b9c-9dd9-13307e95e59b,"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",{'ID': '385_UK_DocM_V2_AccessAndUseOfBuildings'},"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",greater,annotated
f19c6d4a-f6e8-4f2e-b676-537852f3c38f,"The heat loss from the floor should be calculated using the sum of the thermal resistance of the floor finish and the underlying heated layer, multiplied by 10.",{'ID': '303_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The heat loss from the floor should be calculated using the sum of the thermal resistance of the floor finish and the underlying heated layer, multiplied by 10.",necessity,annotated
d3e7a947-536e-4a49-9823-e27fc0f68b27_10,,,design value of landings to be at least equal to the type and quality of the ramp.,greater-equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_2,,,"In buildings more than B and at most 28 metres in equivalent area, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_11,,,"The wall ties should have a horizontal spacing of 900mm and a Capacities of 0.055555556, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_7,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear total floor area of 500kW, except in doorways.",equal,synthetic
5ca184fa-e100-4f97-957d-e37ae944786f_3,,,The Geo-location of installing electric vehicle charge points and cable routes is not more than twice the rise plus the going (2R G) of the total capital cost of the major renovation.,less-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_11,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 100 non-domestic building are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
fc129e2c-abfa-48be-9fd6-e85f077ae67b,"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",part-of,annotated
37f01a2c-b944-45a2-a7f4-140d8c03d7ac_4,,,"After rebating, frame components should retain at least 230mm of Ladders.",greater-equal,synthetic
f9de28ac-45bb-4400-9d9f-8afee73bd2e3_11,,,The type and quality should not exceed 50mm of dwelling floor area.,less-equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c_4,,,The width of access routes in assembly areas with a air extract rate of 20 millimetres must be at least 900 millimetres.,equal,synthetic
8207751f-13b8-4fe3-9bfe-4423093d4905_3,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the sales counter of the staircase and exit route is no more than 100 litres.,less-equal,synthetic
cf35d4a4-3170-421b-9be1-b68d928eed1d_5,,,"A roof with a integrity greater than 2 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic
8b054fa5-fa6b-40f8-996a-a6dfea855fc3,"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",{'ID': '33_Finnish_SafetyOfUse'},"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",none,annotated
61bc1c7a-62f8-43c1-9c71-6e3073695cbe,"Roofs: insulation should be installed tight to the structure, without air gaps, and should extend to the wall insulation.",{'ID': '143_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Roofs: insulation should be installed tight to the structure, without air gaps, and should extend to the wall insulation.",part-of,annotated
fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",part-of,annotated
4d80c4d1-08ee-481a-9f9c-e9151ce1094d_5,,,"The elevation difference of windows, roof windows, rooflights and doors should not exceed 21 C of the total floor area of the dwelling.",less-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_11,,,Skirtings totalling up to 50mm total thickness and shallow projecting exhaust air terminal or casings above 0.05 may be discounted when measuring clear width.,greater,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_6,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the headroom from these spaces does not exceed 8.5m2 of the total air flow in the vertical duct.",less-equal,synthetic
835d8fad-7a27-4299-aa38-a5b1771a6779_8,,,"In large building complexes, such as retail parks and large sports centres, there should be 25W/m2 wheelchair-accessible unisex cooker capable of including an adult changing table.",equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74_2,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a to enhance number of steps of 1,000 millimetres.",equal,synthetic
87c9c5f5-18dc-4107-b4af-b44dfb2b9627,The effective rated output should be assessed based on the final installed capacity of the heating or air-conditioning system.,{'ID': '326_UK_DocM_V2_AccessAndUseOfBuildings'},The effective rated output should be assessed based on the final installed capacity of the heating or air-conditioning system.,selection,annotated
2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,none,annotated
8b1482fe-5e9d-4b44-9157-a8de35c65ba9,"If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise-attenuating background ventilator should be fitted.",{'ID': '86_UK_DocF_V1_Ventilation'},"If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise-attenuating background ventilator should be fitted.",necessity,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",none,annotated
26980508-105c-49db-8595-bf001a48d757_10,,,"In sign with no fixed adjoining rooms or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_6,,,"The wall ties should have a Leakage of 400kg and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
8c79efc1-f3e8-4394-ae6a-0bf5432ebcc5,NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a dwelling.,{'ID': '131_UK_DocF_V1_Ventilation'},NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a dwelling.,part-of,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_10,,,"Where the net absorber area of installing only cable routes is more than 25mm of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic
05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",none,annotated
26980508-105c-49db-8595-bf001a48d757_3,,,"In ventilation space or gap with no fixed Drawings or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
3121fe90-27db-405e-a42a-df3cd22ee176_2,,,"Where necessary, 400mmHandrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic
e4fb8d18-8dbc-4351-a2df-d87f880f476a_5,,,The locations for balconies is 100 that of the load-bearing structures of the storey.,equal,synthetic
fc129e2c-abfa-48be-9fd6-e85f077ae67b,"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",selection,annotated
29232335-402c-4ed9-af74-fd093ac22e28_4,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least dwelling fabric energy efficiency rate 01:20:00.,greater-equal,synthetic
ded852b5-c826-4649-8ce5-dece0eba6061,"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",{'ID': '32_Finnish_Health-IndoorClimateAndVentilation'},"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",part-of,annotated
4ee66fa0-9dcc-4332-b001-f1aec49d9af9,It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,{'ID': '154_UK_DocM_V2_AccessAndUseOfBuildings'},It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,part-of,annotated
3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_11,,,These fittings should not exceed a agreed level of provision of adequate means.,less-equal,synthetic
533762d6-e592-494d-a08b-a0817b5b4f9f,"If there are associated parking spaces where there is not a requirement to install electric vehicle charge points, cable routes must be installed in all remaining associated parking spaces.",{'ID': '50_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are associated parking spaces where there is not a requirement to install electric vehicle charge points, cable routes must be installed in all remaining associated parking spaces.",selection,annotated
f72a98f3-b7d2-4633-b244-0d7242dfb0c9,Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,{'ID': '102_UK_DocM_V1_AccessAndUseOfBuildings'},Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,none,annotated
56b3f993-37b5-4cb1-9540-432972f8056e,"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",{'ID': '99_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",none,annotated
dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",selection,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",equal,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9_8,,,"Door entry controls, where provided, are mounted 600kg/m3 deep finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic
05fdde92-d8af-42ad-963b-9019c69a8ab3_4,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same U-values as the emergency repairs used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic
8beb3f9d-f806-4385-b876-2b3d29d7852a,Independent temperature control of the hot water circuit should be implemented with a cylinder thermostat and a timing device.,{'ID': '269_UK_DocL_V1_ConsrvationOfFuelAndPower'},Independent temperature control of the hot water circuit should be implemented with a cylinder thermostat and a timing device.,necessity,annotated
77f993c6-dff1-4f9a-8f66-73221d3cbaff_6,,,"If the dwelling only has off service building, a minimum ventilation rate of 13l/s should be used.",equal,synthetic
536b172d-ccd1-479a-8136-6ee05db0f264_11,,,"Where pipework is above ground, the performance of the pipe measurements should be at least as high as the intended purpose of pipework in the buried part of the system.",greater-equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_5,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be load EER 0.5 kN/m2.",equal,synthetic
f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",part-of,annotated
77f993c6-dff1-4f9a-8f66-73221d3cbaff_4,,,"If the dwelling only has one habitable room, a minimum lengths of 0.15m/s should be used.",greater-equal,synthetic
1913381b-a2cc-496e-9168-82ccf2a01d50_5,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the extract air categories of the heat emitters to be installed does not exceed 15 degrees.",less-equal,synthetic
e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",part-of,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_8,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under ventilation provision 270 millimetres.",equal,synthetic
fb5d3054-4911-4049-ba09-1c3e80f9c07c_4,,,"The lengths of steps in uncovered or unheated outdoor staircases must be no less than 0.7 metres, and the riser may be no more than 130 millimetres.",greater-equal,synthetic
703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",none,annotated
3e9fc57e-bc69-4f17-a056-dd7767afa9bb_3,,,"If the locations of the building does not exceed 270 millimetres, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_3,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be planned time of use eight per cent.",equal,synthetic
d3e7a947-536e-4a49-9823-e27fc0f68b27_1,,,headroom of landings to be at least equal to the results of the ramp.,greater-equal,synthetic
37f01a2c-b944-45a2-a7f4-140d8c03d7ac_11,,,"After rebating, frame components should retain at least 6mm of rooflight-and-kerb assemblies.",greater-equal,synthetic
7a6635fc-c464-4d61-8ef1-2fdbf13bb9e7,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U_d values), which is often greater than the area of the roof opening.",{'ID': '140_UK_DocM_V2_AccessAndUseOfBuildings'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U_d values), which is often greater than the area of the roof opening.",part-of,annotated
710ef992-e187-4b1a-894b-e0e222f54359_3,,,"NOTE: For grid-supplied electricity, a parasitic energy use of 44mm and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic
986f7853-4975-4ecd-8f10-a75d818eb44a,"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",{'ID': '140_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",necessity,annotated
fb3922fb-8844-40e2-98f5-86e8cccabc72,Cable routes should be provided from a metered electricity supply point to the future connection location.,{'ID': '107_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Cable routes should be provided from a metered electricity supply point to the future connection location.,necessity,annotated
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_10,,,"Where a new building contains more than 44mm sand, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic
8d11b1a7-732a-4153-9564-3f35cc111cb6,A dwelling that is only a basement should be treated as a single-storey dwelling above ground level.,{'ID': '74_UK_DocF_V1_Ventilation'},A dwelling that is only a basement should be treated as a single-storey dwelling above ground level.,necessity,annotated
cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",selection,annotated
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4,"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",{'ID': '125_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",selection,annotated
b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",selection,annotated
23cff3c3-1251-4c5f-9fd9-8f52d25eb494_5,,,Gasfired boilers and multi-stage oilfired boilers with an steps of more than 300 litres should have fully modulating burner controls.,greater,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated
511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",part-of,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b_2,,,"When an existing building with a total useful air distribution of over 190 kN is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic
4ee66fa0-9dcc-4332-b001-f1aec49d9af9,It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,{'ID': '154_UK_DocM_V2_AccessAndUseOfBuildings'},It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,selection,annotated
d8066a73-49c2-4e99-825a-b49b9b2ba67d_6,,,A landing measuring at least 2.0 m3/(h m2) in from the inside face of the wall must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic
8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,part-of,annotated
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_1,,,"There should be a Their, in the absence of tobacco smoke or other excessive pollutants, of 2.4 metres.",equal,synthetic
9618a274-45da-4e3e-87f0-21c2bfae4a8e,"A guardrail must be used at points with a level difference of over 0.7 metres, if these can be accessed by children.",{'ID': '39_Finnish_SafetyOfUse'},"A guardrail must be used at points with a level difference of over 0.7 metres, if these can be accessed by children.",greater,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_3,,,The total combined window area of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the speed of associated parking spaces.,greater,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2_5,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one metre places properties, where there should be no fewer than four.",equal,synthetic
38745b5e-4dea-43fe-9378-5befa5a2399d,A copy of the completed commissioning sheet should be given to the owner of the building.,{'ID': '99_UK_DocF_V2_Ventilation'},A copy of the completed commissioning sheet should be given to the owner of the building.,none,annotated
9abdce80-0a4a-400a-8725-205bb3b887e4,"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",{'ID': '218_UK_DocM_V2_AccessAndUseOfBuildings'},"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",none,annotated
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,selection,annotated
61bc1c7a-62f8-43c1-9c71-6e3073695cbe,"Roofs: insulation should be installed tight to the structure, without air gaps, and should extend to the wall insulation.",{'ID': '143_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Roofs: insulation should be installed tight to the structure, without air gaps, and should extend to the wall insulation.",necessity,annotated
419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",none,annotated
c47598f9-df79-4d77-aba9-8f380342372f_11,,,extract air of dimension 15 shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_7,,,The entrance level of the floor surface in the seating area and access route may not exceed 10.,less-equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_7,,,"If the installation between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 4, the wall in question must be class EI 15.",less,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_4,,,"If the free gap between facing walls of adjacent glazed balconies or the high of the wall to the window of an adjacent fire compartment is less than 2.4m, the wall in question must be class EI 15.",less,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_2,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 25mm exit.,less-equal,synthetic
835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",none,annotated
73b4b305-8971-489a-a290-f996e1f63e19,"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",{'ID': '19_Finnish_Accessibility'},"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",selection,annotated
17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",selection,annotated
079db365-cfed-474e-9329-25349ac0db4a_6,,,"In connection with the door of an outside space of an individual dwelling the air extract rate outside the door may be more than 5m if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic
99a53f17-48cb-4012-a47b-700761e0983b_10,,,Where a new building which is not a residential building or a mixed-use building has more than 0.052083333 window and door units (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic
"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_7",,,"However, if the protective part is no more than 0.15 dm3/s per m2, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic
51517a5d-dd11-41b9-b44b-36d87b959127,The presence of the door should be apparent not only when it is shut but also when it is open.,{'ID': '77_UK_DocM_V2_AccessAndUseOfBuildings'},The presence of the door should be apparent not only when it is shut but also when it is open.,none,annotated
0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",none,annotated
3e9fc57e-bc69-4f17-a056-dd7767afa9bb_6,,,"If the dwelling fabric energy efficiency rate of the building does not exceed 150m2, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_0,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the both sides from these spaces does not exceed twice the rise plus the going (2R G) of the total air flow in the vertical duct.",less-equal,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_9,,,"Where the performance of installing only cable routes is more than three of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_4,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 150m2 in visual contrast and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
aac9b625-4f6b-42e6-b657-2accd6054607,Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,{'ID': '299_UK_DocL_V1_ConsrvationOfFuelAndPower'},Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,part-of,annotated
46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",selection,annotated
a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated
64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",necessity,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",none,annotated
7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",necessity,annotated
1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated
caf32693-fa0e-43ba-aa9f-526bcba734fa,Single glazing should be supplemented with low-emissivity secondary glazing.,{'ID': '119_UK_DocL_V1_ConsrvationOfFuelAndPower'},Single glazing should be supplemented with low-emissivity secondary glazing.,selection,annotated
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_8,,,"There should be a lift, in the absence of tobacco smoke or other excessive pollutants, of 1,500 millimetres.",equal,synthetic
3ec0e36a-0227-4b76-9fd5-7a2f77877d99,A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '23_UK_DocM_V2_AccessAndUseOfBuildings'},A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,selection,annotated
c47598f9-df79-4d77-aba9-8f380342372f_6,,,extract air of net absorber area three seconds shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic
35cacecf-06dc-4b0f-aadb-db2ee05518c7_0,,,The area of windows and roof windows (but excluding display windows) located on the roof of the building exceeds between 550mm and 700mm of the facade area.,greater,synthetic
99a53f17-48cb-4012-a47b-700761e0983b_9,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 400-600mm of those bedroom must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c_0,,,The part of access routes in assembly areas with a maximum capacity of 60 persons must be at least 1400mm.,greater-equal,synthetic
b6b19c38-b160-475d-b01d-e3880ca00ab2,"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",{'ID': '31_UK_DocF_V2_Ventilation'},"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",selection,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_10,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be number of wall ties per square metre 120.",equal,synthetic
2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,selection,annotated
c384013b-c40f-4925-acbe-465e1ca5bc13_2,,,four Account per detail should be recorded.,equal,synthetic
8efb6108-e49e-4d64-a1e4-22e3f9128b17_6,,,"When calculating the reference heat loss of a building, the value of 0.3W/m2 shall be used as the total load for the air leakage rate figure for the building envelope.",equal,synthetic
ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",none,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,annotated
569c7958-b7d6-4b9c-9dd9-13307e95e59b_6,,,"For ducted systems that are served by fans with a entry greater than 2, ductwork leakage tests should be carried out.",greater,synthetic
72e7ed0c-9e73-46b2-a919-20f3fea337fd_1,,,"An Grommets with a potentially flammable or explosive atmosphere must not be located in a Lifting devices where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic
8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2,"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",{'ID': '111_Finnish_EnergyEfficiency'},"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",selection,annotated
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",selection,annotated
f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",selection,annotated
4e8c5c50-44af-48f6-b959-e6f9b31afa1e_5,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical these may be roofs.",equal,synthetic
977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",none,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a_1,,,Modular and portable buildings with a planned service life of more than two years but with an difference in light reflectance value in a single location of less than 400kg should be shown to comply with the energy efficiency requirements.,less,synthetic
85cf77b8-70aa-4453-8d95-00f55a63c4ca,The provision made must be sufficient to (a) allow simple adaptation of the dwelling to meet the needs of occupants who use wheelchairs; or (b) meet the needs of occupants who use wheelchairs.,{'ID': '65_UK_DocM_V1_AccessAndUseOfBuildings'},The provision made must be sufficient to (a) allow simple adaptation of the dwelling to meet the needs of occupants who use wheelchairs; or (b) meet the needs of occupants who use wheelchairs.,necessity,annotated
ae21bd5a-7374-43ad-900e-e2e1a6459cb0,"The target primary energy rate and target emission rate must be calculated using one of the calculation tools in the approved methodology, used in line with the version policy as stated in the methodology.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"The target primary energy rate and target emission rate must be calculated using one of the calculation tools in the approved methodology, used in line with the version policy as stated in the methodology.",necessity,annotated
2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,necessity,annotated
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",selection,annotated
bb9ec292-062b-43c3-8590-856dd5f6b890_8,,,"The air flow rate and building emission rate calculated using the measured air permeability must not be higher than the equivalent area and target emission rate, respectively.",less-equal,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_6,,,"The dwelling primary energy rate, sales counter and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, seasonal energy efficiency ratio and target fabric energy efficiency rate, respectively.",less-equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_10,,,"Where the work concerns a building containing more than 2,100 millimetres Duct, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic
48133b44-eac2-44e2-b2df-c52243e9f7ea,"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",{'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",selection,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",necessity,annotated
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_9,,,A building with a energy consumption exceeding three must be equipped with anchoring structures for safety lines.,greater,synthetic
5577528f-8fa0-4ca3-96f6-ea418091cb86_2,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 m2 in means is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic
19478a13-7457-4dd3-a394-744f826db7b0_4,,,"The handle to at least 1,500 millimetres airleakage gaps in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic
23cff3c3-1251-4c5f-9fd9-8f52d25eb494_1,,,Gasfired boilers and multi-stage oilfired boilers with an parasitic energy use of more than 13l/s should have fully modulating burner controls.,greater,synthetic
f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",selection,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_4,,,The normal relationship between the edges of the rise and going is: 8 per cent (1:12.5) equals between 550mm and 700mm.,equal,synthetic
4fc3b5b1-a838-4429-b385-d8e80e6633eb_4,,,"In the absence of relevant harmonised European Standards, products with a distance of the basement storey floor from the entry level exceeding 190 kN must have a product certificate issued by a Notified Body.",greater,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1_7,,,A minimum of one in 14 metres of the remaining watertight connection must have access to cable routes.,equal,synthetic
536b172d-ccd1-479a-8136-6ee05db0f264_3,,,"Where pipework is above ground, the performance of the pipe device should be at least as high as the number of persons of pipework in the buried part of the system.",greater-equal,synthetic
984c252b-74f4-4d85-9080-1c8ae1851eca_0,,,"If performance requires thicker glass to be used, an equivalent window unit with exposure coefficient (450mm) glazing should be shown to meet the required standard.",equal,synthetic
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_5,,,A building with a CO2 emissions exceeding 50mm must be equipped with anchoring structures for safety lines.,greater,synthetic
20518e80-6f7e-457f-8c5a-59fa4c0eb324_0,,,"When calculating the heat loss for a buildings design solution, the Level differences shall be used as the value of the target primary energy rate for the building envelope.",equal,synthetic
28433761-e537-456b-9ff8-00e786b43143,Consumer units should be mounted so that the switches are between 1350mm and 1450mm above floor level.,{'ID': '126_UK_DocM_V1_AccessAndUseOfBuildings'},Consumer units should be mounted so that the switches are between 1350mm and 1450mm above floor level.,necessity,annotated
c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",none,annotated
d0b6759e-deec-451d-bd7a-ec65b96048be_1,,,"extract air of construction 2.5 ties/m2 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic
e505b13c-7b62-4857-aa2d-544dc986e9c0_11,,,"For dwellings, for external tapered steps and stairs that are part of the building the primary energy of each step should be a minimum of 230mm.",greater-equal,synthetic
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated
208b093d-361f-4aec-819d-4abca4e72c68_4,,,"in an evacuation area where the step is 400mm, the second exit may be no less than 900 millimetres in width.",equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_3,,,Skirtings totalling up to 50mm total thickness and shallow projecting Controls or casings above 0.052083333 may be discounted when measuring clear width.,greater,synthetic
835d8fad-7a27-4299-aa38-a5b1771a6779_10,,,"In large building complexes, such as retail parks and large sports centres, there should be 15 wheelchair-accessible unisex ventilation equipment capable of including an adult changing table.",equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_4,,,"In buildings more than 9 metres and at most four in maximum capacity, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic
710ef992-e187-4b1a-894b-e0e222f54359_7,,,"NOTE: For grid-supplied electricity, a annual percentage of heat of 25mm and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic
61630012-3ff7-44cb-af91-7845be0b6f79,"How the measurements can help you take action CO2 measurements should be used as a broad guide to ventilation within a space, rather than treated as safe thresholds.",{'ID': '126_UK_DocF_V2_Ventilation'},"How the measurements can help you take action CO2 measurements should be used as a broad guide to ventilation within a space, rather than treated as safe thresholds.",necessity,annotated
8e8f4fb5-00b5-404f-89df-a07287984748_3,,,"In buildings with a categories greater than E, automatic meter reading and data collection facilities should be installed.",greater,synthetic
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,part-of,annotated
3931f0fa-433e-4fb8-96bf-a747f3622ee0,"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",{'ID': '97_UK_DocM_V2_AccessAndUseOfBuildings'},"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",necessity,annotated
34a524ec-6994-426f-86af-78788fd34a80_0,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the drop should be 100 litres.",equal,synthetic
17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",none,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated
3ca5cb38-b90b-4449-ba14-4268866df8e1,The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,{'ID': '463_UK_DocM_V2_AccessAndUseOfBuildings'},The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,none,annotated
956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",none,annotated
5b4380ba-0066-4735-a362-316d4c8e70b2_2,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 800 millimetres Waterproofing after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic
a8b3e54e-902c-4502-99a2-8c41d46f1416_1,,,"If there are more than 200 m2 foundations in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic
922bf8df-3a70-4f45-8c04-200b638d3b3c,The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,{'ID': '59_Finnish_Health-WaterAndSewerage'},The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,selection,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_10,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under water vapour resistance 200 Watts per room.",equal,synthetic
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78,"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",{'ID': '83_UK_DocF_V1_Ventilation'},"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",necessity,annotated
4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",none,annotated
f9de28ac-45bb-4400-9d9f-8afee73bd2e3_6,,,"The emission rate should not exceed 1,000 millimetres of dwelling floor area.",less-equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74_6,,,"In a tier that is uninterrupted by cross-gangways, and where the heat emission capacity exceeds 0.9 metres, use a maximum number of steps of 40.",greater,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",selection,annotated
5e226793-2805-41b0-bcb6-49319afaefc7,"If the building has a floor area greater than 150m2, heating should be split into different heating zones and each zone should have separate controls for timing and temperature demand.",{'ID': '258_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building has a floor area greater than 150m2, heating should be split into different heating zones and each zone should have separate controls for timing and temperature demand.",necessity,annotated
99a53f17-48cb-4012-a47b-700761e0983b_6,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 0.05 of those vapour barriers must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic
2702a3b3-b2a8-4457-86e8-3e7de2498dc3,landing call buttons are located between 900mm and 1100mm from the floor of the landing and at least 500mm from any return wall.,{'ID': '185_UK_DocM_V2_AccessAndUseOfBuildings'},landing call buttons are located between 900mm and 1100mm from the floor of the landing and at least 500mm from any return wall.,necessity,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_10,,,"Extract air of fire compartmenting requirement 1,200 MJ/m2, 3 and 4 shall not be used as recirculation air.",equal,synthetic
193be0e3-dfbb-4e04-ba58-1ae1ed44729b,Consideration should be given to providing an area next to certain seats for an assistance dog to rest.,{'ID': '131_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to providing an area next to certain seats for an assistance dog to rest.,necessity,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_0,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 0.8 metres anthracite figure.,less-equal,synthetic
4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",less-equal,annotated
c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",none,annotated
8bb9aee2-a950-4a65-a715-287035906789,"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",{'ID': '27_Finnish_Accessibility'},"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",part-of,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74_4,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a glued in position number of steps of E.",equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_2,,,"If the free gap between facing walls of adjacent glazed balconies or the internal temperature of the wall to the window of an adjacent fire compartment is less than 1.501kWhPE/kWh, the wall in question must be class EI 15.",less,synthetic
3ec0e36a-0227-4b76-9fd5-7a2f77877d99,A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '23_UK_DocM_V2_AccessAndUseOfBuildings'},A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,part-of,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,part-of,annotated
53e31e26-a39b-4047-a86e-bdb8021413e8_8,,,Window handles on windows that open outwards are not more than 800 millimetres both sides when the window is at its maximum openable angle.,less-equal,synthetic
01008f69-874b-443e-bcb2-2f5630280049_1,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the U-value may be no more than 90 and the tread must be no less than 220 millimetres.",less-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_7,,,"The seasonal energy efficiency ratio of the indoor steps of other spaces intended for everyday use may be no more than 2,100 millimetres, and the tread must be no less than 270 millimetres.",less-equal,synthetic
ae098b28-f01d-44df-b601-b7ac7631101d,"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",{'ID': '54_Finnish_SafetyOfUse'},"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",part-of,annotated
ae098b28-f01d-44df-b601-b7ac7631101d,"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",{'ID': '54_Finnish_SafetyOfUse'},"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",part-of,annotated
48133b44-eac2-44e2-b2df-c52243e9f7ea,"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",{'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",part-of,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_2,,,"If the air flows of height 3 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
f0c72b35-5a0a-4554-8713-96f6f73a67f1_9,,,A cube with Extract of no more than 0.06 m2 may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic
87c9cfa3-8093-497d-be10-dc054abe7062,"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",{'ID': '164_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",selection,annotated
164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",none,annotated
76acc6bd-50c0-4f3f-b015-42e171ec6ce7_6,,,"1,500 millimetres ventilation unit room must be installed.",equal,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",{'ID': '22_Finnish_SafetyOfUse'},"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",part-of,annotated
ffbc85cb-4301-4bcb-9a56-7487c95cf16d,Only the proportion of openings which can be opened with a very low risk of occupants falling from height should be considered to form part of the overheating mitigation strategy.,{'ID': '83_UK_DocO_Overheating'},Only the proportion of openings which can be opened with a very low risk of occupants falling from height should be considered to form part of the overheating mitigation strategy.,part-of,annotated
103f99ad-884b-4bae-9f22-ccb1c5bc3d26_1,,,"In an open garage of no more than 0.136kgCO2/kWh door or gate, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic
81314489-dcd9-410f-9b15-595b87e7c8f9_5,,,"The resilient layer should be timber sheathing at least 600kg/m3 design value, expanded metal or a similar resilient material.",greater-equal,synthetic
6d9a1e8e-6fe7-4234-951a-96fdc4598bd7,"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",{'ID': '12_Finnish_Accessibility'},"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,annotated
29c431ee-ea93-491d-ab13-06418d93c488_0,,,"If distance of the uppermost floor level from the entry level is greater than 23C, manual control is acceptable.",greater,synthetic
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_10,,,An upstand built on site should not exceed a Level differences of 0.055555556.,less-equal,synthetic
13a437c0-918c-47f2-85bd-b80dd69eb027_1,,,"There are no building primary energy rate on the drop of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic
8421f806-70f2-46a9-a308-90a40da3541d_2,,,"Where the total supply air flow of the approach, whether over its whole length or in part, is 2 metres or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic
b0e99ac5-9cbc-4beb-b8ff-85383ae70ea8,"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",{'ID': '40_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",selection,annotated
0da52584-1b37-48b5-840f-3795ae695275_1,,,the minimum clear dimensions of the platform are: 50mm fire load and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",selection,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
922bf8df-3a70-4f45-8c04-200b638d3b3c_5,,,The cold water pipe shall be designed and installed so that the total air flow in the cold water system may not exceed 9mm.,less-equal,synthetic
74002ed3-548e-4e2f-8835-be76e643c67d_6,,,"NOTE 2: Double doors effectively provide nibs where each leaf is at least 1,500 millimetres side.",greater-equal,synthetic
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated
ff3e8f86-1542-4f54-a776-cfdc8482bad7,The seasonal energy efficiency ratio of an air conditioner working in cooling mode should be a minimum of 4.0.,{'ID': '332_UK_DocL_V1_ConsrvationOfFuelAndPower'},The seasonal energy efficiency ratio of an air conditioner working in cooling mode should be a minimum of 4.0.,selection,annotated
3121fe90-27db-405e-a42a-df3cd22ee176_0,,,"Where necessary, 1,500 millimetresliving accommodation, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic
5fe7997a-7e99-485c-89b3-7912d7c8d44d,"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",{'ID': '199_UK_DocF_V1_Ventilation'},"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",none,annotated
baee716c-b8c2-4500-b4de-63fa11f007b1_9,,,A minimum of 01:08:00 in five of the remaining text must have access to cable routes.,greater-equal,synthetic
9691451a-57d5-484f-a346-0f83b59f7ae0,"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",selection,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_9,,,The topography of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the building emission rate of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic
c2c49207-78b3-42b0-8b61-ad506f5a80e2,"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce lime-scale accumulation.",{'ID': '381_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce lime-scale accumulation.",selection,annotated
99a53f17-48cb-4012-a47b-700761e0983b_11,,,Where a new building which is not a residential building or a mixed-use building has more than 180 millimetres cooker (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic
9fd15b82-fc32-4364-8724-f1ef14f0c047_2,,,The cooker hood should surface at least the distance of the basement storey floor from the entry level of the cooker.,greater-equal,synthetic
a235c68f-ae44-4770-b005-4e9d7b659eb7_5,,,All cavity walls should have leaves at least 5m wide and cavities at least 50mm wide.,greater-equal,synthetic
31e6f85a-97ea-4224-9144-bc3d1daad96d,Consideration should be given to providing a low level urinal for children in male washrooms.,{'ID': '174_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to providing a low level urinal for children in male washrooms.,none,annotated
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c,A building with a height exceeding 9 metres must be equipped with anchoring structures for safety lines.,{'ID': '127_Finnish_SafetyOfUse'},A building with a height exceeding 9 metres must be equipped with anchoring structures for safety lines.,part-of,annotated
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9,"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",none,annotated
2ff58135-b89d-40d1-a145-51aad9e5a942_2,,,"The landing in front of the outside door shall be at least 180 millimetres that and at least 1,500 millimetres long.",greater-equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_2,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the maximum capacity is not less than 25mm.",greater-equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_1,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 01:08:00 access routes is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic
371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",selection,annotated
76acc6bd-50c0-4f3f-b015-42e171ec6ce7_5,,,50 m2 temperature control must be installed.,equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_10,,,"If the efficiency of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 300mm of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic
d04d6702-5170-4b50-9bda-7367a24e9322,"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",{'ID': '5_UK_DocR_V1_InfrastructureForElectircalCommunications'},"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",necessity,annotated
f420ae57-5656-4558-b1a3-1079e46bf6cc_6,,,"In the case of the storey-level door of a dwelling, or if the layers through the door exceeds 25mm, doors must open in the direction of the exit.",greater,synthetic
84cd76d7-e5d0-4f39-94bc-0236c65d533a_1,,,"in residential buildings of not more than two storeys, one exit of no less than two years in total cost is permitted.",greater-equal,synthetic
1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",selection,annotated
517253f8-98b1-4821-8901-75124d3237db,"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",necessity,annotated
baee716c-b8c2-4500-b4de-63fa11f007b1_5,,,A minimum of 400 millimetres in five of the remaining Solid walls must have access to cable routes.,greater-equal,synthetic
0ea1e862-2434-4fc8-97a2-b076c992ef20,"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",{'ID': '214_Finnish_FireSafety'},"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",part-of,annotated
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",part-of,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8,"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",{'ID': '73_Finnish_Health-IndoorClimateAndVentilation'},"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",equal,annotated
8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",none,annotated
72d7716f-7e3e-442c-9e42-14d4b19e18e3_8,,,A Consideration that is being connected to a new building should not have a energy consumption for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic
f6add908-4d45-4b3e-83a6-369f6c36c037_10,,,"Door rails, stiles and muntins should be at least 55 calculations.",greater-equal,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647_9,,,"Parapets in integrity A to 230mm and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic
a2bf4b81-52eb-48c0-b753-ed5e939612bf,Waterproofing or water pressure barrier must be located on the outer surface of the exterior wall structure against the ground or inside the exterior thermal insulation facing the ground.,{'ID': '87_Finnish_Health-Humidity'},Waterproofing or water pressure barrier must be located on the outer surface of the exterior wall structure against the ground or inside the exterior thermal insulation facing the ground.,necessity,annotated
84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",none,annotated
5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,none,annotated
38cd3221-7fc9-4462-be20-78b16a4309d3_6,,,The reference value of openings in the newly created dwelling should not be more than 1400mm of the total floor area.,less-equal,synthetic
26f33f06-e967-4d55-9e73-30990f52ac82,"Loft hatches: where the roof is insulated at ceiling level, hatches should be suitably designed and installed to ensure optimum airtightness.",{'ID': '189_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Loft hatches: where the roof is insulated at ceiling level, hatches should be suitably designed and installed to ensure optimum airtightness.",selection,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_11,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 50 m renewable technology is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic
3cbfb816-4071-496e-aec2-87d424df047f,Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,{'ID': '181_UK_DocM_V2_AccessAndUseOfBuildings'},Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,selection,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,part-of,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_11,,,"If the air flows of performance 28 metres and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",selection,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",selection,annotated
7ca3a924-dd3a-450e-af24-4d456d6c1b32,"Wet room waterproofing must form a whole which is impermeable on all waterproofed surfaces as well as on their seams, penetrations and joints.",{'ID': '113_Finnish_Health-Humidity'},"Wet room waterproofing must form a whole which is impermeable on all waterproofed surfaces as well as on their seams, penetrations and joints.",necessity,annotated
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_10,,,Storage premises with a net heating energy demand exceeding 10 litres per second per person are not permitted within the building.,greater,synthetic
1913381b-a2cc-496e-9168-82ccf2a01d50_1,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the cold side of the heat emitters to be installed does not exceed 24 metres.",less-equal,synthetic
cc72106e-9e7f-47cf-8a95-0173a8305dad_4,,,"In a new building, the crawl space exposure coefficient must be 100 on average at the minimum.",greater-equal,synthetic
992e8f11-81ac-4d2f-b7d1-60e46b4b7261,Wheelchair accessible dwellings must also provide both a level access shower and a bath.,{'ID': '108_UK_DocM_V1_AccessAndUseOfBuildings'},Wheelchair accessible dwellings must also provide both a level access shower and a bath.,none,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_7,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for Unit length two and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
7d877df3-9aa7-4dff-a64d-5356a66c944d_5,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a indoor and outdoor conditions exceeding 5m and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic
2319724e-2fd4-463b-bb59-0972073dc55a,"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",{'ID': '44_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",none,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_6,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the differences may be no more than 8.5m2.",less-equal,synthetic
6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,less-equal,annotated
01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",less-equal,annotated
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,none,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_0,,,"Extract air of design solar load 1.501kWhPE/kWh, 3 and 4 shall not be used as recirculation air.",equal,synthetic
38cd3221-7fc9-4462-be20-78b16a4309d3_8,,,The total minimum width of openings in the newly created dwelling should not be more than 0.2 of the total floor area.,less-equal,synthetic
15c28729-22a9-4992-b43a-bdcf457c0526,"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",{'ID': '45_UK_DocM_V2_AccessAndUseOfBuildings'},"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",selection,annotated
0085ecdd-f2f0-45f5-948d-ded697c69866,"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '44_Finnish_Accessibility'},"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",none,annotated
2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",selection,annotated
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_9,,,The approach route is a minimum of 900mm wide with a maximum projection of 60.,less-equal,synthetic
35cacecf-06dc-4b0f-aadb-db2ee05518c7_2,,,The area of windows and roof windows (but excluding display windows) lockable in both horizontal and vertical sewers exceeds five of the facade area.,greater,synthetic
38745b5e-4dea-43fe-9378-5befa5a2399d,A copy of the completed commissioning sheet should be given to the owner of the building.,{'ID': '99_UK_DocF_V2_Ventilation'},A copy of the completed commissioning sheet should be given to the owner of the building.,necessity,annotated
043258d7-d35e-42d9-87c5-b83565c39ad6,"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",{'ID': '133_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",none,annotated
9618a274-45da-4e3e-87f0-21c2bfae4a8e_7,,,"A guardrail must be used at points with a shape of over 0.3, if these can be accessed by children.",greater,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_7,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be insulating performance 100.",equal,synthetic
9618a274-45da-4e3e-87f0-21c2bfae4a8e_3,,,"A guardrail must be used at points with a cross fall of over 50, if these can be accessed by children.",greater,synthetic
e8e5b04a-e794-4933-b846-aefb5457f60b,The toilet seat shall be placed between 200 and 300 millimetres from the rear wall.,{'ID': '57_Finnish_Accessibility'},The toilet seat shall be placed between 200 and 300 millimetres from the rear wall.,necessity,annotated
922bf8df-3a70-4f45-8c04-200b638d3b3c,The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,{'ID': '59_Finnish_Health-WaterAndSewerage'},The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,none,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,part-of,annotated
536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",part-of,annotated
33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",part-of,annotated
82330d3d-6139-4050-9ca0-946bc982fbb0,The sign should be suitably weatherproof for its location.,{'ID': '119_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The sign should be suitably weatherproof for its location.,necessity,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_9,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for number of wall ties per square metre 500kW and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
a2bf4b81-52eb-48c0-b753-ed5e939612bf,Waterproofing or water pressure barrier must be located on the outer surface of the exterior wall structure against the ground or inside the exterior thermal insulation facing the ground.,{'ID': '87_Finnish_Health-Humidity'},Waterproofing or water pressure barrier must be located on the outer surface of the exterior wall structure against the ground or inside the exterior thermal insulation facing the ground.,necessity,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_10,,,"The wall ties should have a distance of the basement storey floor from the entry level of 7 mg/m3 (6 ppm) and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
197b9463-397e-4729-a08d-12739f9db069,"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",{'ID': '283_UK_DocM_V2_AccessAndUseOfBuildings'},"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",necessity,annotated
0da52584-1b37-48b5-840f-3795ae695275_8,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 56 metres basement area are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
f9de28ac-45bb-4400-9d9f-8afee73bd2e3_4,,,The gradients should not exceed 220 millimetres of dwelling floor area.,less-equal,synthetic
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_4,,,The smaller number of each panel which can be either the width or height of the panel should be 4 or less.,less-equal,synthetic
e505b13c-7b62-4857-aa2d-544dc986e9c0_10,,,"For dwellings, for external tapered steps and stairs that are part of the building the continuity of each step should be a minimum of three metres.",greater-equal,synthetic
e4fb8d18-8dbc-4351-a2df-d87f880f476a,The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,{'ID': '90_Finnish_FireSafety'},The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,part-of,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_11,,,Individual flights are: for service up to 0.8 metres not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
d178dd92-6cf3-4f68-a9ba-44b97d74204a,"Staircases must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '13_Finnish_SafetyOfUse'},"Staircases must be safe, sufficiently spacious and suitable for their purpose.",necessity,annotated
9952f64d-e0df-4b03-84af-150782f81387_1,,,"For mobility-impaired people, a heating and cooling systems of at least off is preferred.",greater-equal,synthetic
528e7551-acfd-4fa6-be24-9c91bd6d7679,The materials and fittings shall be compatible.,{'ID': '149_Finnish_Health-WaterAndSewerage'},The materials and fittings shall be compatible.,necessity,annotated
419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",none,annotated
fb1da22f-8ddb-4399-b441-64dca68da9af_9,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 20C from the top and bottom corners of the door.",greater-equal,synthetic
5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_7,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for elevation difference up to 500kW not more than 5m long.,less-equal,synthetic
7d35f4c4-fa65-4d68-a974-f54386ca8aee_6,,,"However, a horizontal Snow in a protective part must be no higher than 13l/s.",less-equal,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506_10,,,"Gangways should not be less than 1100mm heating plant emission rate unless used by not more than 50 persons, in which case gangways should be a minimum of 600kg/m3.",greater-equal,synthetic
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated
8102cb27-2e2a-4008-99d6-a53f5045f6e2,Structures with surfaces exposed to moisture must be resistant to the effects of water.,{'ID': '36_Finnish_Health-Humidity'},Structures with surfaces exposed to moisture must be resistant to the effects of water.,selection,annotated
26980508-105c-49db-8595-bf001a48d757_5,,,"In g-value with no fixed seats or showers, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
56166e36-b14b-4632-9767-70b71d335d9c,"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",none,annotated
a235c68f-ae44-4770-b005-4e9d7b659eb7_6,,,All cavity walls should have leaves at least 90mm thick and cavities at least 230mm energy consumption.,greater-equal,synthetic
20216261-f56d-4f79-8a46-c781abe19f04,"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",{'ID': '98_UK_DocF_V2_Ventilation'},"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",selection,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_0,,,The normal relationship between the net heating energy demand of the rise and going is: 0.3 equals between 550mm and 700mm.,equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",part-of,annotated
4d80c4d1-08ee-481a-9f9c-e9151ce1094d_10,,,"The Air flow rates of windows, roof windows, rooflights and doors should not exceed 50 of the total floor area of the dwelling.",less-equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_1,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the sections of that installation exceeds 18 dm3/s of the total cost of the major renovation.",greater,synthetic
4094b859-b3b4-4035-94cd-8cf47ccbd801_9,,,The intended purpose is at least 190 millimetres.,greater-equal,synthetic
1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",less-equal,annotated
8fcdc238-3c30-4659-9303-1b126a39b2cd_5,,,The design solar load should be final by at least 600 x 600 millimetres.,greater-equal,synthetic
316c89ee-aa42-4e7a-9372-960cf25b3265,Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,{'ID': '105_UK_DocF_V2_Ventilation'},Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,selection,annotated
29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,selection,annotated
2f815a08-db3c-48a6-b248-d69aeac870ee_10,,,"the vertical integrity is: a. not more than 60, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic
2c224c59-366d-447f-9ecc-87c119c2db07,"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",{'ID': '374_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",selection,annotated
7e369e4c-7768-4a7a-bd9c-41e2aa037b43,The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,{'ID': '61_Finnish_Health-IndoorClimateAndVentilation'},The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,selection,annotated
7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",selection,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_4,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the side edges is less than 1.2W/(m2K).",less,synthetic
d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,selection,annotated
164122ed-c7ac-4cf8-8a54-3d56c144f78d_8,,,"In general, the findings indicate that there should be at least the same number of Calibration as space and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_5,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 0.05 fire door are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_9,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the service life must be no less than three.",greater-equal,synthetic
493ec553-7761-4d1e-aa98-05d925ddf955_11,,,The room temperature of a horizontal hatch must be at least 1100mm.,greater-equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated
984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",necessity,annotated
f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",necessity,annotated
8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",none,annotated
6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_6,,,"If parking spaces are provided for a building, an adequate number of System controls, but at least 55 degrees Celsius, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic
569c7958-b7d6-4b9c-9dd9-13307e95e59b_11,,,"For ducted systems that are served by fans with a Unit length greater than 600 millimetres, ductwork leakage tests should be carried out.",greater,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_5,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under that 50 millimetres.",equal,synthetic
500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,part-of,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_11,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the feasibility of installing high-efficiency alternative systems of these must be at least 20C.",greater-equal,synthetic
103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",necessity,annotated
37f01a2c-b944-45a2-a7f4-140d8c03d7ac_3,,,"After rebating, frame components should retain at least 1.3 seconds of rain-water.",greater-equal,synthetic
ec419055-6ed3-4dac-9879-748e2d365a26,"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",{'ID': '180_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",necessity,annotated
5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,selection,annotated
5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated
e21fa967-934e-4a29-a66d-252fdbbf928f_5,,,"If the parasitic energy use is unknown, an extract air categories of 1 should be made for any control system.",equal,synthetic
bfe386ee-8c0b-41d4-9967-6e873edf7229,"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",{'ID': '148_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",necessity,annotated
ef561e39-db90-462c-8dde-15fbeae954e5_10,,,A cube with total minimum width of no more than 900-1000mm may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic
bf798097-bb99-42d0-a73f-8cebab8fbeb8_4,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the extract air categories of the steps must be no more than E 15 and the tread must be no less than 300 millimetres.",less-equal,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1,A minimum of one in five of the remaining parking spaces must have access to cable routes.,{'ID': '83_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},A minimum of one in five of the remaining parking spaces must have access to cable routes.,necessity,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_5,,,"The dwelling primary energy rate, flushing and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, total floor area and target fabric energy efficiency rate, respectively.",less-equal,synthetic
53e31e26-a39b-4047-a86e-bdb8021413e8_9,,,Window handles on windows that open outwards are not more than 900 millimetres indoor units when the window is at its maximum openable angle.,less-equal,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2_1,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 10 kN Lifting devices properties, where there should be no fewer than four.",equal,synthetic
588857f5-9281-4c32-8d83-c98230d5b934,The use of boards with lapped or tongue and groove edges should be considered.,{'ID': '146_UK_DocL_V1_ConsrvationOfFuelAndPower'},The use of boards with lapped or tongue and groove edges should be considered.,selection,annotated
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_6,,,"In spaces intended for more than 60 persons, the allowance of the access route must be at least adequate means.",greater-equal,synthetic
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_10,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the heat recovery may be no more than 30% load.",less-equal,synthetic
2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,none,annotated
0a53e4af-84a7-46aa-b28a-cb1d873c8cae,"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",{'ID': '151_UK_DocM_V2_AccessAndUseOfBuildings'},"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",necessity,annotated
fa8a6d84-eb99-490e-8169-3c65353fb553_5,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the inaccuracies shall be at least 15.",greater-equal,synthetic
76bf63bd-30f4-440d-81a0-61ca16170f70_2,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the gradient is less than 190 kN of the total load.,less,synthetic
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",none,annotated
8b054fa5-fa6b-40f8-996a-a6dfea855fc3,"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",{'ID': '33_Finnish_SafetyOfUse'},"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_9,,,"The total number of a barrier in a dwellings indoor areas may, however, be at least 2.2 metres if the drop is less than three metres.",greater-equal,synthetic
ec419055-6ed3-4dac-9879-748e2d365a26,"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",{'ID': '180_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",part-of,annotated
56b3f993-37b5-4cb1-9540-432972f8056e,"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",{'ID': '99_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",part-of,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_2,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than twice the rise plus the going (2R G) in total flow rate, these must be accessible via the interior.",greater,synthetic
a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",part-of,annotated
c2e0629d-350b-45b8-9e9e-d58be1780f12_9,,,"If the Rigid ducts has no multipoint locking system, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic
e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",part-of,annotated
2f815a08-db3c-48a6-b248-d69aeac870ee,"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",{'ID': '173_UK_DocM_V2_AccessAndUseOfBuildings'},"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",selection,annotated
e32bbb47-c826-40c1-8ea4-8c32353d3fd2_11,,,There shall be three seconds of stack vent provided for people in the building.,equal,synthetic
302c413e-fefd-47f1-914f-0dc787e4a761,"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",{'ID': '29_UK_DocM_V2_AccessAndUseOfBuildings'},"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",greater,annotated
9d522aad-d404-4a57-83f9-474c95932b9e,Handrails should be spaced away from the wall and rigidly supported in a way that avoids impeding finger grip.,{'ID': '57_UK_DocM_V2_AccessAndUseOfBuildings'},Handrails should be spaced away from the wall and rigidly supported in a way that avoids impeding finger grip.,necessity,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_4,,,"Extract air of total floor area 0.9 metres, 3 and 4 shall not be used as recirculation air.",equal,synthetic
c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated
8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",none,annotated
339fc78c-a2f2-481c-a410-3aeb41e24b8a_11,,,Solid walls constructed of coursed brickwork or blockwork should be at least as locations as 8 per cent (1:12.5) of the storey height.,greater-equal,synthetic
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated
5925ca4d-801c-42e4-b581-a176dea2519f,"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",{'ID': '76_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",necessity,annotated
203faa23-7b71-47c9-a6e5-2333ac45389e_3,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the ventilation rate must be no less than A.",greater-equal,synthetic
517253f8-98b1-4821-8901-75124d3237db,"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",selection,annotated
f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",necessity,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_1,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 25mm in load EER and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,necessity,annotated
783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,none,annotated
0da52584-1b37-48b5-840f-3795ae695275_8,,,the minimum clear dimensions of the platform are: 1100mm wide and 0.7 exceptional circumstances where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
1913381b-a2cc-496e-9168-82ccf2a01d50_0,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the vicinity of the heat emitters to be installed does not exceed 850 millimetres.",less-equal,synthetic
3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_9,,,These fittings should not exceed a distance of 8 per cent (1:12.5).,less-equal,synthetic
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",selection,annotated
d12808b8-b64d-4742-8026-ba93fe86246d,The pumping station shall be located in a place where it can be easily inspected and serviced.,{'ID': '132_Finnish_Health-WaterAndSewerage'},The pumping station shall be located in a place where it can be easily inspected and serviced.,necessity,annotated
24729e93-fd1e-4e91-bbd6-ef8e73c582fb,"A unit that contains both living accommodation and space for commercial purposes (e.g. as aworkshop or office) should be treated as a residential building, as long as the commercial part canrevert to residential use.",{'ID': '3_UK_DocO_Overheating'},"A unit that contains both living accommodation and space for commercial purposes (e.g. as aworkshop or office) should be treated as a residential building, as long as the commercial part canrevert to residential use.",necessity,annotated
922bf8df-3a70-4f45-8c04-200b638d3b3c_2,,,The cold water pipe shall be designed and installed so that the thermal integrity in the cold water system may not exceed one metre.,less-equal,synthetic
dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",selection,annotated
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",none,annotated
302c413e-fefd-47f1-914f-0dc787e4a761_0,,,"Where fire compartmenting requirement on surfaces is greater than 300 litres, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic
2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",{'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",selection,annotated
38cd3221-7fc9-4462-be20-78b16a4309d3,The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,{'ID': '490_UK_DocL_V1_ConsrvationOfFuelAndPower'},The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,none,annotated
d3e7a947-536e-4a49-9823-e27fc0f68b27_0,,,heat of landings to be at least equal to the product certificate of the ramp.,greater-equal,synthetic
fc8ee55c-408d-48a9-ae4c-a6961b5745ce,Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,part-of,annotated
7577d9f7-9f3c-4d3b-b8d9-da31d3e1b201,"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",selection,annotated
569c7958-b7d6-4b9c-9dd9-13307e95e59b_9,,,"For ducted systems that are served by fans with a annual percentage of heat greater than 0.136kgCO2/kWh, ductwork leakage tests should be carried out.",greater,synthetic
a1f91cfd-21f8-49a4-8468-746f49f4848e_0,,,"For a building that contains more than 24 metres exterior wall for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",none,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,annotated
20518e80-6f7e-457f-8c5a-59fa4c0eb324_1,,,"When calculating the heat loss for a buildings design solution, the either side shall be used as the value of the cross-sectional area for the building envelope.",equal,synthetic
0262f6e5-21bc-4312-9388-8ac93b79416d_4,,,The minimum full sunken area of the absorption chillers should be no worse than 0.35W/(m2K).,greater-equal,synthetic
e32bbb47-c826-40c1-8ea4-8c32353d3fd2_9,,,There shall be 1m2 of structure provided for people in the building.,equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_11,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be going 0.3.",equal,synthetic
45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,selection,annotated
73b4b305-8971-489a-a290-f996e1f63e19,"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",{'ID': '19_Finnish_Accessibility'},"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",selection,annotated
13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",none,annotated
87c9cfa3-8093-497d-be10-dc054abe7062,"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",{'ID': '164_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",part-of,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb_7,,,"In the absence of relevant harmonised European Standards, products with a structure exceeding 190 millimetres must have a product certificate issued by a Notified Body.",greater,synthetic
bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",greater-equal,annotated
86350df0-a40e-412b-a301-004524d56736_8,,,"For wet heating systems in new dwellings with a water vapour resistance of 450mm or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",necessity,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd_8,,,"An Roofs with a potentially flammable or explosive atmosphere must not be located in a water meter where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73_8,,,The energy performance of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the effective rated output of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic
f0c72b35-5a0a-4554-8713-96f6f73a67f1_2,,,A cube with widened of no more than three may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic
f6a682fb-f427-41d0-9219-3a45d2134be6,"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane - either horizontal or vertical.",{'ID': '109_UK_DocL_V1_ConsrvationOfFuelAndPower'},"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane - either horizontal or vertical.",necessity,annotated
16f6f10e-f32f-48b2-85f9-123cdb5448ee,Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,{'ID': '147_UK_DocL_V1_ConsrvationOfFuelAndPower'},Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,selection,annotated
ddc0bba6-2df8-43e1-9398-37514366fb06,"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",{'ID': '208_UK_DocF_V1_Ventilation'},"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",part-of,annotated
8c4a09c5-1eb2-4a41-86d9-b69c031b4592,Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,{'ID': '384_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,part-of,annotated
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_11,,,"An upstand built on site should not exceed a instantaneous carbon monoxide concentration of 1,200 MJ/m2.",less-equal,synthetic
c8a048c6-8e7e-4b5a-ada5-02990b983401,"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",{'ID': '91_Finnish_Health-IndoorClimateAndVentilation'},"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",selection,annotated
aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",necessity,annotated
86a39a0b-093f-4920-9879-fe7b3ae6675a,"In principle, suitable sanitary accommodation should be available to everybody, including sanitary accommodation designed for wheelchair users, ambulant disabled people, people of either sex with babies and small children or people encumbered by luggage.",{'ID': '155_UK_DocM_V2_AccessAndUseOfBuildings'},"In principle, suitable sanitary accommodation should be available to everybody, including sanitary accommodation designed for wheelchair users, ambulant disabled people, people of either sex with babies and small children or people encumbered by luggage.",necessity,annotated
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_9,,,2m Double doors should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic
fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",none,annotated
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",part-of,annotated
113b8bf8-1856-45f5-a54b-d65ef100b437_6,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 1,500 millimetres of the following both sides, appropriate to the system, should be installed.",greater-equal,synthetic
20216261-f56d-4f79-8a46-c781abe19f04,"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",{'ID': '98_UK_DocF_V2_Ventilation'},"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",none,annotated
596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",selection,annotated
cc72106e-9e7f-47cf-8a95-0173a8305dad_5,,,"In a new building, the crawl space indoor units must be 10m on average at the minimum.",greater-equal,synthetic
76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,necessity,annotated
eccd4f77-ef4a-41fd-a22a-620c84fdddd4_7,,,There is a minimum of 100 millimetres of worktop to at least value of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic
01008f69-874b-443e-bcb2-2f5630280049_3,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the indoor and outdoor conditions may be no more than 35 mg/m3 (30 ppm) and the tread must be no less than 220 millimetres.",less-equal,synthetic
e874f337-2067-4e77-ad32-c3b857f40e7a,"If the number of occupants exceeds 120, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",{'ID': '219_Finnish_FireSafety'},"If the number of occupants exceeds 120, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,annotated
4c83069b-8c22-43ad-92a0-354ecd0e40a1,"Sufficient information should be provided to ensure that people can operate, maintain or alter an electrical installation with reasonable safety.",{'ID': '7_UK_DocP_ElectricalSafety'},"Sufficient information should be provided to ensure that people can operate, maintain or alter an electrical installation with reasonable safety.",necessity,annotated
302c413e-fefd-47f1-914f-0dc787e4a761_6,,,"Where wide on surfaces is greater than 0.055555556, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic
50e89a86-e2be-439d-b230-79274cd7199b_3,,,Modular and portable buildings with a planned standard thickness of more than E 15 at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_10,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the visual contrast is not less than 500kW.",greater-equal,synthetic
99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,annotated
eefe1191-2903-4fb8-9138-6471e09fb67d_7,,,The design value exceeds 2m at 11pm.,greater,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",equal,annotated
f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_7,,,No individual flight has a either side of more than 2.,less-equal,synthetic
3ca5cb38-b90b-4449-ba14-4268866df8e1_0,,,The water heater is close to the draw-off points and has a integrity no greater than 3.3m.,less-equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f,"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,annotated
45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,none,annotated
99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,none,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_3,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the energy efficiency may be no more than two years.",less-equal,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_5,,,"Where the energy efficiency measures of installing only cable routes is more than five of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic
82aa0792-8ea3-414a-9952-933b4959b782,"NOTE: All boilers should be used in the calculation, including any that are identical.",{'ID': '249_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: All boilers should be used in the calculation, including any that are identical.",none,annotated
f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",necessity,annotated
3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",none,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",part-of,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_2,,,"If the configuration of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 0.2 of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic
5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,part-of,annotated
1e0aa8d6-4291-4a33-883c-b88453c83287,"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane either horizontal or vertical.",{'ID': '128_UK_DocM_V2_AccessAndUseOfBuildings'},"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane either horizontal or vertical.",necessity,annotated
aa921550-3c5f-470b-b578-1788f83b49a7,Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,{'ID': '153_UK_DocM_V2_AccessAndUseOfBuildings'},Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,selection,annotated
ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",selection,annotated
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_11,,,"If site constraints necessitate an their of 0.3 or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic
e8340500-38b6-461b-b00d-d3aa44ac1f0b_1,,,The maximum number of occupants of the water available from the hot water system may not exceed 6mm.,less-equal,synthetic
511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",none,annotated
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,part-of,annotated
5fe7997a-7e99-485c-89b3-7912d7c8d44d,"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",{'ID': '199_UK_DocF_V1_Ventilation'},"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",part-of,annotated
079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,annotated
78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",none,annotated
aaca648c-5f60-4300-a30f-887da252ebd0,The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,{'ID': '116_UK_DocM_V2_AccessAndUseOfBuildings'},The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,necessity,annotated
dcc583b1-8c4c-42cf-a1ed-e8907de56254_1,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the surfaces must be no less than 25W/m2.",greater-equal,synthetic
993e54cc-49c3-43cb-995e-1a951c93c775_11,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an exposure coefficient equal to adequate means.",equal,synthetic
164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",none,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_7,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the operation of these must be at least 90mm.",greater-equal,synthetic
76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,part-of,annotated
c952db0f-b605-4335-8d56-97fc339ad5ba_8,,,All 0.07 requirement of the installation and commissioning checklist should be completed.,equal,synthetic
a8b3e54e-902c-4502-99a2-8c41d46f1416_4,,,"If there are more than 1.2W/(m2K) facade in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic
a8b3e54e-902c-4502-99a2-8c41d46f1416_0,,,"If there are more than four structures in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_6,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for performance standards 1 and E 15 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,selection,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated
bb9ec292-062b-43c3-8590-856dd5f6b890_1,,,"The categories and building emission rate calculated using the measured air permeability must not be higher than the category and target emission rate, respectively.",less-equal,synthetic
259c1614-77ef-4ae4-a401-83caa603e374,"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '35_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,part-of,annotated
b850a570-c0bd-4cf0-8b46-338ff5d8aa78,NOTE: A system for purge ventilation should be provided in each habitable room to demonstrate compliance with Part F of the Building Regulations.,{'ID': '67_UK_DocO_Overheating'},NOTE: A system for purge ventilation should be provided in each habitable room to demonstrate compliance with Part F of the Building Regulations.,selection,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1_8,,,Any connection of 900-1000mm or more heating systems to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_4,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the Ventilation from these spaces does not exceed 0.07 of the total air flow in the vertical duct.",less-equal,synthetic
2c12675d-93c9-496a-acf9-b30465dae93d,Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,{'ID': '113_UK_DocF_V1_Ventilation'},Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,selection,annotated
1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated
cc72106e-9e7f-47cf-8a95-0173a8305dad,"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",{'ID': '83_Finnish_Health-Humidity'},"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",greater-equal,annotated
a235c68f-ae44-4770-b005-4e9d7b659eb7_0,,,All cavity walls should have leaves at least 90mm thick and cavities at least 100 litres number of appliances.,greater-equal,synthetic
56517433-cf40-4b88-a9d4-18e61e0e9993_2,,,"In addition, on both sides of the toilet seat there shall be a load-bearing element of at least One.",greater-equal,synthetic
76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,none,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_11,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major extension, there is no load-bearing element to install either electric vehicle charge points or cable routes.",not-part-of,synthetic
9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",less,annotated
99a53f17-48cb-4012-a47b-700761e0983b_4,,,Where a new building which is not a residential building or a mixed-use building has more than 90mm toilet and washing facility (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic
1085a40e-a3d6-48e2-85ac-8247a26f04f2,Mechanical ventilation systems must be commissioned in accordance with an approved procedure.,{'ID': '35_UK_DocF_V2_Ventilation'},Mechanical ventilation systems must be commissioned in accordance with an approved procedure.,necessity,annotated
74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",selection,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",necessity,annotated
a8b3e54e-902c-4502-99a2-8c41d46f1416_6,,,"If there are more than 1m2 Insulating materials in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic
17d9350b-ba07-405f-bbe3-3b728eab4dee,The facilities suitable for persons with mobility and functional impairment shall be marked with the International Symbol of Access.,{'ID': '62_Finnish_Accessibility'},The facilities suitable for persons with mobility and functional impairment shall be marked with the International Symbol of Access.,selection,annotated
a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,selection,annotated
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",none,annotated
259c1614-77ef-4ae4-a401-83caa603e374,"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '35_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",part-of,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_7,,,"The parasitic energy use installed in a dwellings habitable rooms and kitchens should be no fewer than 2.4m, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic
86a39a0b-093f-4920-9879-fe7b3ae6675a,"In principle, suitable sanitary accommodation should be available to everybody, including sanitary accommodation designed for wheelchair users, ambulant disabled people, people of either sex with babies and small children or people encumbered by luggage.",{'ID': '155_UK_DocM_V2_AccessAndUseOfBuildings'},"In principle, suitable sanitary accommodation should be available to everybody, including sanitary accommodation designed for wheelchair users, ambulant disabled people, people of either sex with babies and small children or people encumbered by luggage.",necessity,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_1,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under energy efficiency 500 millimetres.",equal,synthetic
c2e0629d-350b-45b8-9e9e-d58be1780f12_11,,,"If the community heating primary circuit has no structures, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic
7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",selection,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_0,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for load capacity 1 and E if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,necessity,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9_6,,,"Door entry controls, where provided, are mounted 300 litres automatic flow adjustment finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic
6075de3c-d339-4ba4-9945-990480975615_4,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than two years photovoltaic array of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic
113b8bf8-1856-45f5-a54b-d65ef100b437_10,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 2m of the following supports, appropriate to the system, should be installed.",greater-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated
56517433-cf40-4b88-a9d4-18e61e0e9993_9,,,"In addition, on both sides of the toilet seat there shall be a water pressure barrier of at least 65mm.",greater-equal,synthetic
f733b7c9-a406-4f5a-b383-9d3f8b70a559,The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,{'ID': '5_UK_DocA_Structure'},The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,part-of,annotated
f0c72b35-5a0a-4554-8713-96f6f73a67f1_5,,,A cube with number of wall ties per square metre of no more than 1 may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic
113b8bf8-1856-45f5-a54b-d65ef100b437_4,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least certain proportion of the following Unit length, appropriate to the system, should be installed.",greater-equal,synthetic
2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,part-of,annotated
ec0cd536-6082-48ba-b9e7-8678c02d65a4,Waste water shall be conveyed to the sewer of the water supply plant or for purification property-specifically or to a cesspit.,{'ID': '122_Finnish_Health-WaterAndSewerage'},Waste water shall be conveyed to the sewer of the water supply plant or for purification property-specifically or to a cesspit.,necessity,annotated
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8,"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",{'ID': '208_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",part-of,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_3,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for air flow rate 50 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
8595e26e-db5c-4d09-9fcf-02b530b61e23,There must be access to each fire compartment of an attic for firefighting operations.,{'ID': '240_Finnish_FireSafety'},There must be access to each fire compartment of an attic for firefighting operations.,selection,annotated
fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,selection,annotated
e21fa967-934e-4a29-a66d-252fdbbf928f,"If the parasitic energy use is unknown, an allowance of 0.3W/m2 should be made for any control system.",{'ID': '473_UK_DocM_V2_AccessAndUseOfBuildings'},"If the parasitic energy use is unknown, an allowance of 0.3W/m2 should be made for any control system.",equal,annotated
3ca5cb38-b90b-4449-ba14-4268866df8e1_2,,,The water heater is close to the draw-off points and has a results no greater than 24 degrees Celsius.,less-equal,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_5,,,"The dwelling primary energy rate, dwelling emission rate and step, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and vicinity, respectively.",less-equal,synthetic
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_9,,,"The free energy efficiency measures from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 01:20:00, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic
16f6f10e-f32f-48b2-85f9-123cdb5448ee,Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,{'ID': '147_UK_DocL_V1_ConsrvationOfFuelAndPower'},Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,selection,annotated
0da52584-1b37-48b5-840f-3795ae695275_9,,,the minimum clear dimensions of the platform are: 1100mm wide and 0.05 reception where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
9eb5bf01-3810-44e3-802b-7c7eadad1831,"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",{'ID': '21_UK_DocF_V1_Ventilation'},"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",necessity,annotated
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_3,,,"Where a new building contains more than EI 15 free area, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic
26980508-105c-49db-8595-bf001a48d757_4,,,"In baby changing facilities with no fixed seats or justification, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
54f4e30f-d171-4156-ae87-7aed3541dd18,Insulated cavity closers should be used for all construction types.,{'ID': '165_UK_DocL_V1_ConsrvationOfFuelAndPower'},Insulated cavity closers should be used for all construction types.,selection,annotated
4094b859-b3b4-4035-94cd-8cf47ccbd801_4,,,The primary energy is at least 25mm.,greater-equal,synthetic
bde1697a-20c9-4f15-a63c-5be323a058c1_1,,,Any connection of 0.15 or more Extract air to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_8,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 14 metres in dwelling emission rate and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
56166e36-b14b-4632-9767-70b71d335d9c,"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",necessity,annotated
a0c838b5-5fe2-4b52-abe1-432804c2c8aa_0,,,A measures of 21 C shall be used as the Air flow rates for room temperature during the heating season.,equal,synthetic
72e7ed0c-9e73-46b2-a919-20f3fea337fd_6,,,"An attic with a potentially flammable or explosive atmosphere must not be located in a loading docks where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic
8aa4b706-1659-4e30-a4fe-e7f33efe3241_9,,,All 600kg/m3 Ventilation systems of the compliance checklist should be completed.,equal,synthetic
77be05f2-cd8c-4d35-85e4-6637b999d8e7_10,,,The Air permeability of the consequential improvement works should not be less than 40 of the value of the principal works.,greater-equal,synthetic
4e8c5c50-44af-48f6-b959-e6f9b31afa1e_4,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical handrail may be speed glandless circulators.",equal,synthetic
56166e36-b14b-4632-9767-70b71d335d9c,"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_4,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be presence 9 metres.",equal,synthetic
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60,The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,{'ID': '16_UK_DocM_V1_AccessAndUseOfBuildings'},The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,less-equal,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_7,,,Individual flights are: for energy efficiency up to 90 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
079db365-cfed-474e-9329-25349ac0db4a_0,,,"In connection with the door of an outside space of an individual dwelling the manufacturers declared efficiencies outside the door may be more than 50 if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic
e32bbb47-c826-40c1-8ea4-8c32353d3fd2_5,,,There shall be 500 millimetres of rain-water provided for people in the building.,equal,synthetic
08efb7a8-1f9e-491b-8a6f-7043ec96ea3b,The methodology for determining costs should be consistent between all elements of the calculation to allow a fair comparison between the cost of the major renovation and the cost of electric vehicle charge point infrastructure.,{'ID': '54_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The methodology for determining costs should be consistent between all elements of the calculation to allow a fair comparison between the cost of the major renovation and the cost of electric vehicle charge point infrastructure.,selection,annotated
75c60084-6878-472d-8694-e8739e0dd76c_1,,,The annual percentage of heat of access routes in assembly areas with a maximum capacity of 60 persons must be at least two years.,greater-equal,synthetic
dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",none,annotated
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection,annotated
0fdce0b1-7992-401f-aa84-ad7f2acca23d,Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,{'ID': '184_UK_DocL_V1_ConsrvationOfFuelAndPower'},Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,none,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
43a7a088-718f-4a11-a392-88e71559466e,"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",{'ID': '107_UK_DocM_V2_AccessAndUseOfBuildings'},"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",none,annotated
28c47652-47a0-4fa4-8343-beee0af2691c,"Large roof surfaces must be divided into parts of no more than 2,400 square metres.",{'ID': '181_Finnish_FireSafety'},"Large roof surfaces must be divided into parts of no more than 2,400 square metres.",necessity,annotated
1c511111-ab71-4b68-9421-f588bc4b9180,"People with visual impairment should be in no doubt as to the location of glass doors, especially when they are within a glazed screen.",{'ID': '76_UK_DocM_V2_AccessAndUseOfBuildings'},"People with visual impairment should be in no doubt as to the location of glass doors, especially when they are within a glazed screen.",necessity,annotated
61bc1c7a-62f8-43c1-9c71-6e3073695cbe,"Roofs: insulation should be installed tight to the structure, without air gaps, and should extend to the wall insulation.",{'ID': '143_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Roofs: insulation should be installed tight to the structure, without air gaps, and should extend to the wall insulation.",necessity,annotated
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",part-of,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",part-of,annotated
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_6,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 4 battery storage.,greater,synthetic
43e26628-8b62-4cc6-91e2-284335df1564_2,,,"In rooms used for sleeping or rest, the shallow projecting may not exceed half a metre.",less-equal,synthetic
239bd568-c5f2-4ab5-955c-f2d8d86b7b7f,"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",{'ID': '90_UK_DocM_V2_AccessAndUseOfBuildings'},"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",selection,annotated
13a437c0-918c-47f2-85bd-b80dd69eb027_2,,,"There are no air tightness on the diameter of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic
c766f874-d4aa-45b8-89f7-20b08db787c6,The total height of the barrier must be one metre if the drop is no more than six metres.,{'ID': '43_Finnish_SafetyOfUse'},The total height of the barrier must be one metre if the drop is no more than six metres.,part-of,annotated
f5a71c7b-e852-40f2-8f88-91cda7902a7e_9,,,"If a new building has a space heating or airconditioning system with an proportion greater than 15, a building automation and control system should be installed.",greater,synthetic
fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",part-of,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c_7,,,"The steps for a building's total combined window area is 30% load of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_10,,,Skirtings totalling up to 50mm total thickness and shallow projecting floor level or casings above 900 millimetres may be discounted when measuring clear width.,greater,synthetic
0262f6e5-21bc-4312-9388-8ac93b79416d_7,,,The minimum full energy efficiency of the absorption chillers should be no worse than 0.055555556.,greater-equal,synthetic
339fc78c-a2f2-481c-a410-3aeb41e24b8a,Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,{'ID': '32_UK_DocA_Structure'},Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,part-of,annotated
17d9350b-ba07-405f-bbe3-3b728eab4dee,The facilities suitable for persons with mobility and functional impairment shall be marked with the International Symbol of Access.,{'ID': '62_Finnish_Accessibility'},The facilities suitable for persons with mobility and functional impairment shall be marked with the International Symbol of Access.,necessity,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb_11,,,"In the absence of relevant harmonised European Standards, products with a facade area exceeding 20 must have a product certificate issued by a Notified Body.",greater,synthetic
ec2e84a5-89bc-4c16-9a55-1965efd13981,"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",{'ID': '167_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",selection,annotated
536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",greater-equal,annotated
d0b6759e-deec-451d-bd7a-ec65b96048be_11,,,"extract air of speed 20 degrees Celsius shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic
86350df0-a40e-412b-a301-004524d56736_0,,,"For wet heating systems in new dwellings with a design value of E 15 or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic
d04d6702-5170-4b50-9bda-7367a24e9322,"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",{'ID': '5_UK_DocR_V1_InfrastructureForElectircalCommunications'},"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",necessity,annotated
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_5,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear total cost of 90mm, except in doorways.",equal,synthetic
33d3a432-5793-4102-ba93-da485c334abd,The termination points of cable duct should be sited where access to maintain in future is unrestricted.,{'ID': '113_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The termination points of cable duct should be sited where access to maintain in future is unrestricted.,necessity,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b_11,,,"When an existing building with a total useful access of over 1.2W/(m2K) is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic
8aa4b706-1659-4e30-a4fe-e7f33efe3241_2,,,All five commercial part of the compliance checklist should be completed.,equal,synthetic
ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",selection,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_7,,,"Where the work concerns a building containing more than eight per cent Controls, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic
eefe1191-2903-4fb8-9138-6471e09fb67d_4,,,The Level differences exceeds 10 at 11pm.,greater,synthetic
1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",selection,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",part-of,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",selection,annotated
2f815a08-db3c-48a6-b248-d69aeac870ee_1,,,"the vertical steps is: a. not more than EI 30, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic
b5d2186d-338d-40b6-b3b4-7fadf3cfd4e0,"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",{'ID': '286_UK_DocM_V2_AccessAndUseOfBuildings'},"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",part-of,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_0,,,"If the side edges of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds EI 15 of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2_4,,,"The that installed in a dwellings habitable rooms and kitchens should be no fewer than 44mm, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic
ec381965-2539-4bd6-9260-e667b4746a3a,To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to occupied parts of buildings to an extent which would give rise to an irritant concentration.,{'ID': '4_UK_DocD_ToxicSubstances'},To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to occupied parts of buildings to an extent which would give rise to an irritant concentration.,selection,annotated
5fa7daca-cb50-4397-a736-617e52d30187_6,,,"If breaking at below 30% are required and unavailable, the heat exchanger area may be taken as equal to that at 30% load.",equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",part-of,annotated
06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",necessity,annotated
20518e80-6f7e-457f-8c5a-59fa4c0eb324,"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",{'ID': '137_Finnish_EnergyEfficiency'},"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",equal,annotated
868ad193-b0d2-47b9-9fe0-ded5b761d3b0,The integrity of the water system shall be ensured with pressure testing using water.,{'ID': '106_Finnish_Health-WaterAndSewerage'},The integrity of the water system shall be ensured with pressure testing using water.,necessity,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_3,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be side to 200 millimetres.,less-equal,synthetic
4ee66fa0-9dcc-4332-b001-f1aec49d9af9,It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,{'ID': '154_UK_DocM_V2_AccessAndUseOfBuildings'},It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,none,annotated
bfdf95da-d422-47cd-83d7-a30a4969f2e6_1,,,"If the internal ties must be centred on the supporting line, the minimum value of the service, 10m, will also be applied to internal ties.",greater-equal,synthetic
70292367-f940-4ca6-b35f-b47bd4e66cd3,Cable routes must still be provided for a minimum of one in five parking spaces.,{'ID': '71_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Cable routes must still be provided for a minimum of one in five parking spaces.,selection,annotated
8805ec9f-3f5f-44fc-9078-3ae62439c973,"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",{'ID': '108_UK_DocL_V1_ConsrvationOfFuelAndPower'},"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",none,annotated
21d5baaf-1c54-43ac-ac3e-992c5fa20f10,Units should be draught-proofed.,{'ID': '418_UK_DocL_V1_ConsrvationOfFuelAndPower'},Units should be draught-proofed.,necessity,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_1,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the primary energy content may be no more than 0.15m/s.",less-equal,synthetic
525aa713-65e1-4368-a6f4-38f628be7fed,"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",part-of,annotated
cf35d4a4-3170-421b-9be1-b68d928eed1d_6,,,"A roof with a directions greater than 0.5 kN/m2 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic
339fc78c-a2f2-481c-a410-3aeb41e24b8a_2,,,Solid walls constructed of coursed brickwork or blockwork should be at least as steps as 300mm of the storey height.,greater-equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_6,,,"If the air flows of both sides three and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_5,,,the minimum clear dimensions of the platform are: 50 m shape and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",selection,annotated
cc72106e-9e7f-47cf-8a95-0173a8305dad_2,,,"In a new building, the crawl space differences must be 2.4m on average at the minimum.",greater-equal,synthetic
569c7958-b7d6-4b9c-9dd9-13307e95e59b_4,,,"For ducted systems that are served by fans with a continuity greater than 21 C, ductwork leakage tests should be carried out.",greater,synthetic
563cd5fb-adc9-4bde-8b34-4accc93ac84b,"Systems should not be significantly oversized in most circumstances, the cooling appliance should not be sized for more than 120 of the design cooling load.",{'ID': '331_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Systems should not be significantly oversized in most circumstances, the cooling appliance should not be sized for more than 120 of the design cooling load.",part-of,annotated
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9,"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",{'ID': '116_Finnish_SafetyOfUse'},"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",none,annotated
316c89ee-aa42-4e7a-9372-960cf25b3265,Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,{'ID': '105_UK_DocF_V2_Ventilation'},Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,necessity,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",none,annotated
8efb6108-e49e-4d64-a1e4-22e3f9128b17_3,,,"When calculating the reference heat loss of a building, the value of 0.7W/(m2K) shall be used as the tie force for the air leakage rate figure for the building envelope.",equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",necessity,annotated
fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",necessity,annotated
39a37d5e-3361-43b9-a209-e5cd45918abc,"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",{'ID': '95_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",necessity,annotated
53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,selection,annotated
8fec1c4a-527e-49b6-9267-89ff700a9291,"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",{'ID': '182_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",selection,annotated
d504fd87-d13d-4936-9d7a-71d17954760d_8,,,The rated speed of the steps in an exit may be no more than 1.2W/(m2K).,less-equal,synthetic
aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",selection,annotated
2c725d50-13d5-4e77-bacf-9f174530e27c,The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,{'ID': '17_UK_DocM_V2_AccessAndUseOfBuildings'},The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,selection,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",part-of,annotated
2f815a08-db3c-48a6-b248-d69aeac870ee_2,,,"the vertical gradients is: a. not more than four, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic
c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated
8b7e8e7e-81dd-4a76-bdd3-8269ac00f74b,The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,{'ID': '24_UK_DocM_V1_AccessAndUseOfBuildings'},The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,necessity,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_5,,,"The maintained of steps in uncovered or unheated outdoor staircases must be no less than adequate means, and the riser may be no more than 130 millimetres.",greater-equal,synthetic
993e54cc-49c3-43cb-995e-1a951c93c775_8,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an service equal to 1.",equal,synthetic
fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",none,annotated
10b37d1a-a0b5-4dfb-8bcc-39317d144580,"On variable volume systems, variable speed glandless circulators should be used.",{'ID': '289_UK_DocM_V2_AccessAndUseOfBuildings'},"On variable volume systems, variable speed glandless circulators should be used.",selection,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_10,,,"Skirtings totalling up to 2,100 millimetres vertical spacing and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.",less-equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74_0,,,"In a tier that is uninterrupted by cross-gangways, and where the structure exceeds 1,200 MJ/m2, use a maximum number of steps of 40.",greater,synthetic
5925ca4d-801c-42e4-b581-a176dea2519f,"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",{'ID': '76_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",selection,annotated
339fc78c-a2f2-481c-a410-3aeb41e24b8a,Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,{'ID': '32_UK_DocA_Structure'},Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,greater-equal,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9_5,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 0.15m/s flushing from any projecting corner.",greater-equal,synthetic
8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2,"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",{'ID': '111_Finnish_EnergyEfficiency'},"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",none,annotated
eeb4239f-3819-475c-ad20-756bed80c4ff_6,,,"In reference heat loss calculations, the value used as the number of wall ties per square metre of the buildings ventilation system shall be E.",equal,synthetic
d796dece-45f6-4527-a151-c59b007e9028,"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",{'ID': '132_Finnish_SafetyOfUse'},"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",selection,annotated
e8340500-38b6-461b-b00d-d3aa44ac1f0b_9,,,The flow rate of the water available from the hot water system may not exceed 20 millimetres.,less-equal,synthetic
a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",part-of,annotated
a0c838b5-5fe2-4b52-abe1-432804c2c8aa_5,,,A water temperature of 21 C shall be used as the extends for room temperature during the heating season.,equal,synthetic
536b172d-ccd1-479a-8136-6ee05db0f264_9,,,"Where pipework is above ground, the performance of the pipe flight should be at least as high as the air extract rate of pipework in the buried part of the system.",greater-equal,synthetic
5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,necessity,annotated
34a524ec-6994-426f-86af-78788fd34a80_1,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the Leakage should be 120.",equal,synthetic
bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",none,annotated
85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",necessity,annotated
4a82f789-a98a-4379-9b81-2a20cfba6c87_9,,,"If the internal ties must be centred on the supporting line, the minimum value of the standard thickness, 0.136kgCO2/kWh, will also be applied to internal ties.",greater-equal,synthetic
a9cea98b-d439-4930-a991-fc17eee6657c,the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,{'ID': '102_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,necessity,annotated
1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated
6414854d-01f9-481f-a7f4-c4581e48d8b1_11,,,Special safety features are not necessary if the induction loop is not more than one long.,less-equal,synthetic
7f696221-52c9-4c52-8f90-74bd93c51299_5,,,This grippable handrail is 850-1000mm above the pitch line of the flight and emission rate at least 900mm beyond the top and bottom nosings.,greater-equal,synthetic
23cff3c3-1251-4c5f-9fd9-8f52d25eb494_11,,,Gasfired boilers and multi-stage oilfired boilers with an locations of more than 5m should have fully modulating burner controls.,greater,synthetic
922bf8df-3a70-4f45-8c04-200b638d3b3c_8,,,The cold water pipe shall be designed and installed so that the safety features in the cold water system may not exceed 40.,less-equal,synthetic
6c789809-b1b8-429a-8fe2-8ce16f8a4b54_1,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the standards does not exceed 3.,less-equal,synthetic
302c413e-fefd-47f1-914f-0dc787e4a761_9,,,"Where heat emission capacity on surfaces is greater than 24 metres, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic
8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",selection,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",selection,annotated
500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,none,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",greater-equal,annotated
05fdde92-d8af-42ad-963b-9019c69a8ab3_11,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same number of occupants as the structural elements used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic
7e369e4c-7768-4a7a-bd9c-41e2aa037b43,The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,{'ID': '61_Finnish_Health-IndoorClimateAndVentilation'},The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,part-of,annotated
5fa7daca-cb50-4397-a736-617e52d30187_2,,,"If efficiencies at below 30% are required and unavailable, the total minimum width may be taken as equal to that at 400-600mm.",equal,synthetic
6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_2,,,"If parking spaces are provided for a building, an adequate number of building, but at least 90, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic
15c28729-22a9-4992-b43a-bdcf457c0526,"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",{'ID': '45_UK_DocM_V2_AccessAndUseOfBuildings'},"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",selection,annotated
19478a13-7457-4dd3-a394-744f826db7b0_8,,,"The handle to at least A Areas in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic
37239af2-8f49-499f-ab25-73f92d7c9369,Each letter should be 25mm high.,{'ID': '117_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Each letter should be 25mm high.,selection,annotated
28c47652-47a0-4fa4-8343-beee0af2691c,"Large roof surfaces must be divided into parts of no more than 2,400 square metres.",{'ID': '181_Finnish_FireSafety'},"Large roof surfaces must be divided into parts of no more than 2,400 square metres.",part-of,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_4,,,"If the air flows of measures 30% load and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_11,,,"Where the air flow resistance of installing only cable routes is more than 0.3W/m2 of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic
a235c68f-ae44-4770-b005-4e9d7b659eb7_2,,,All cavity walls should have leaves at least 180kW constraints and cavities at least 50mm wide.,greater-equal,synthetic
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_9,,,The smaller U-values of each panel which can be either the width or height of the panel should be 650mm or less.,less-equal,synthetic
c384013b-c40f-4925-acbe-465e1ca5bc13,One photograph per detail should be recorded.,{'ID': '480_UK_DocL_V1_ConsrvationOfFuelAndPower'},One photograph per detail should be recorded.,equal,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",none,annotated
76bf63bd-30f4-440d-81a0-61ca16170f70_3,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the results is less than 20 millimetres of the total load.,less,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506_0,,,"Gangways should not be less than 1100mm floor area unless used by not more than 50 persons, in which case gangways should be a minimum of 50mm.",greater-equal,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_3,,,"The building primary energy rate and termination points calculated using the measured air permeability must not be higher than the target primary energy rate and level with entry, respectively.",less-equal,synthetic
df09194e-2fe6-4007-b6c1-1a7383f1baba,"Generally, gradients within the approach should be as gentle as possible.",{'ID': '40_UK_DocM_V2_AccessAndUseOfBuildings'},"Generally, gradients within the approach should be as gentle as possible.",selection,annotated
f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",selection,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0_4,,,"For dwellings, for external tapered steps and stairs that are part of the building the thermal integrity of each step should be a minimum of 14 metres.",greater-equal,synthetic
b5aa20f2-571e-48d8-9943-4102c9f9bd1a,"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",{'ID': '250_Finnish_FireSafety'},"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",necessity,annotated
984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",none,annotated
d0f0d416-a728-4d23-965e-10ff6559f2d8,All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting platform.,{'ID': '113_UK_DocM_V2_AccessAndUseOfBuildings'},All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting platform.,part-of,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_0,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 90mm in patterns, these must be accessible via the interior.",greater,synthetic
9b594ead-759a-420d-8d1c-52f007daaca4,"Each office should have the means to provide purge ventilation, to reduce pollutants before the office space is occupied or after activities such as painting.",{'ID': '56_UK_DocF_V2_Ventilation'},"Each office should have the means to provide purge ventilation, to reduce pollutants before the office space is occupied or after activities such as painting.",necessity,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",selection,annotated
ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",part-of,annotated
ff3e8f86-1542-4f54-a776-cfdc8482bad7_3,,,The level differences of an air conditioner working in cooling mode should be a minimum of 55.,greater-equal,synthetic
f9de28ac-45bb-4400-9d9f-8afee73bd2e3_8,,,The design solar load should not exceed two of dwelling floor area.,less-equal,synthetic
d178dd92-6cf3-4f68-a9ba-44b97d74204a,"Staircases must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '13_Finnish_SafetyOfUse'},"Staircases must be safe, sufficiently spacious and suitable for their purpose.",necessity,annotated
8aa4b706-1659-4e30-a4fe-e7f33efe3241_6,,,All A restrictors of the compliance checklist should be completed.,equal,synthetic
34a524ec-6994-426f-86af-78788fd34a80_4,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the size should be 230mm.",equal,synthetic
13a437c0-918c-47f2-85bd-b80dd69eb027_6,,,"There are no air extract rate on the Extract of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic
0638f810-16d0-4670-8870-4e7c78c5371f,Insulated cavity closers should be installed where appropriate.,{'ID': '419_UK_DocL_V1_ConsrvationOfFuelAndPower'},Insulated cavity closers should be installed where appropriate.,selection,annotated
e874f337-2067-4e77-ad32-c3b857f40e7a,"If the number of occupants exceeds 120, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",{'ID': '219_Finnish_FireSafety'},"If the number of occupants exceeds 120, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",necessity,annotated
d713514a-9398-45a2-9584-efecff6ebcc5,Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,{'ID': '4_UK_DocQ_Security_Dwellings'},Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,necessity,annotated
079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",selection,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_9,,,Individual flights are: for gradients up to 1:15 not more than 6mm standard thickness; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
20518e80-6f7e-457f-8c5a-59fa4c0eb324_3,,,"When calculating the heat loss for a buildings design solution, the deep shall be used as the value of the clear width for the building envelope.",equal,synthetic
f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",greater,annotated
a387fcb8-ead2-4094-9be9-72d783468b33_10,,,"If the open outwards of windows, roof windows, rooflights and doors exceeds 200 m2 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic
74002ed3-548e-4e2f-8835-be76e643c67d_11,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least 20 millimetres locations.,greater-equal,synthetic
50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,none,annotated
656aa2fa-18cb-41ee-ae28-28deb3dffcc3,The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,{'ID': '61_Finnish_Health-WaterAndSewerage'},The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,greater-equal,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_4,,,Skirtings totalling up to 65mm inner surfaces and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",part-of,annotated
113b8bf8-1856-45f5-a54b-d65ef100b437_2,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 7 mg/m3 (6 ppm) of the following manufacturers declared efficiencies, appropriate to the system, should be installed.",greater-equal,synthetic
aec8a3e1-5ba0-4288-ab0a-e47b0310ff6a,Capacities should be derived from the combined total of a buildings publicly accessible facilities.,{'ID': '162_UK_DocM_V2_AccessAndUseOfBuildings'},Capacities should be derived from the combined total of a buildings publicly accessible facilities.,necessity,annotated
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,annotated
ec2e84a5-89bc-4c16-9a55-1965efd13981,"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",{'ID': '167_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",necessity,annotated
5fa7daca-cb50-4397-a736-617e52d30187_5,,,"If feasibility of installing high-efficiency alternative systems at below 30% are required and unavailable, the air leakage rate figure may be taken as equal to that at 30% load.",equal,synthetic
5fa7daca-cb50-4397-a736-617e52d30187_1,,,"If outputs at below 30% are required and unavailable, the that may be taken as equal to that at 30% load.",equal,synthetic
b810df40-4dd8-44c4-80c4-b33bb873a5e9,"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '103_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",selection,annotated
19478a13-7457-4dd3-a394-744f826db7b0_2,,,"The handle to at least 1.501kWhPE/kWh building owner in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic
7f3f59a4-fc7e-4b14-8074-384f6cacf548_0,,,"The storage capacity of a barrier in a dwellings indoor areas may, however, be at least 20C if the drop is less than three metres.",greater-equal,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",part-of,annotated
3121fe90-27db-405e-a42a-df3cd22ee176_11,,,"Where necessary, 60cube, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic
aaca648c-5f60-4300-a30f-887da252ebd0,The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,{'ID': '116_UK_DocM_V2_AccessAndUseOfBuildings'},The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,selection,annotated
984c252b-74f4-4d85-9080-1c8ae1851eca_8,,,"If performance requires thicker glass to be used, an equivalent window unit with domestic hot water cylinder heat loss (half a metre) glazing should be shown to meet the required standard.",equal,synthetic
5fa7daca-cb50-4397-a736-617e52d30187_0,,,"If efficiencies at below 30% are required and unavailable, the heat loss may be taken as equal to that at 15.",equal,synthetic
f72a98f3-b7d2-4633-b244-0d7242dfb0c9_7,,,Every single bedroom has a minimum axle group load of 220 millimetres and is at least 2.4m wide.,greater-equal,synthetic
4470dde4-6422-4c13-9781-de68c3e075dc_7,,,"The outdoor rate of heat release of a dwelling unit, however, shall be designed to be a minimum of 55 degrees Celsius.",greater-equal,synthetic
f0c72b35-5a0a-4554-8713-96f6f73a67f1_7,,,A cube with relationship of no more than 01:08:00 may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic
05fdde92-d8af-42ad-963b-9019c69a8ab3_6,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same exit as the Refreshment facilities used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic
26980508-105c-49db-8595-bf001a48d757_1,,,"In fan with no fixed seats or sign, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a,"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",{'ID': '99_Finnish_SafetyOfUse'},"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",greater-equal,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_6,,,"The number of appliances of steps in uncovered or unheated outdoor staircases must be no less than 500 millimetres, and the riser may be no more than 130 millimetres.",greater-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_0,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the size must be no less than 65 degrees Celsius.",greater-equal,synthetic
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_7,,,The resilient layer should be to the full height of the door and 200 m2 Activation of the doorset.,equal,synthetic
755b768a-b9d0-4175-8b69-398c399aeac7,It should be possible for information about the building to be easily obtained from a reception point or gathered from notice boards and signs.,{'ID': '86_UK_DocM_V2_AccessAndUseOfBuildings'},It should be possible for information about the building to be easily obtained from a reception point or gathered from notice boards and signs.,selection,annotated
7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",selection,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_2,,,The normal relationship between the number of storeys of the rise and going is: 9mm equals between 550mm and 700mm.,equal,synthetic
d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",selection,annotated
710ef992-e187-4b1a-894b-e0e222f54359_4,,,"NOTE: For grid-supplied electricity, a surface temperature of 20 and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic
43e26628-8b62-4cc6-91e2-284335df1564_10,,,"In rooms used for sleeping or rest, the fire igniting may not exceed 20.",less-equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c_2,,,The width of access routes in assembly areas with a travel of 3 must be at least 900 millimetres.,equal,synthetic
4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",selection,annotated
33eb3a5a-584f-4d1e-84a0-35fe66954d80,Consideration should be given to the power requirements of essential (e.g. life safety) systems.,{'ID': '323_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to the power requirements of essential (e.g. life safety) systems.,necessity,annotated
d3e7a947-536e-4a49-9823-e27fc0f68b27,Length of landings to be at least equal to the width of the ramp.,{'ID': '66_UK_DocK_ProtectionFromFalling'},Length of landings to be at least equal to the width of the ramp.,part-of,annotated
db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_2,,,"Generally, a thermal element once upgraded should not have a locations greater than 0.15m/s.",less-equal,synthetic
642e2c46-45a8-440f-af0b-1b53f41d8d8f,Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,{'ID': '156_UK_DocM_V2_AccessAndUseOfBuildings'},Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,necessity,annotated
113b8bf8-1856-45f5-a54b-d65ef100b437_0,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least two years of the following prevailing wind direction, appropriate to the system, should be installed.",greater-equal,synthetic
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,necessity,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_3,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the automatic flow adjustment of these must be at least 3.3m.",greater-equal,synthetic
76acc6bd-50c0-4f3f-b015-42e171ec6ce7_1,,,390 millimetres baby changing facilities must be installed.,equal,synthetic
a1f91cfd-21f8-49a4-8468-746f49f4848e_8,,,"For a building that contains more than 60 playgrounds for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic
33206aa7-1092-4ab9-9534-8e8e16e72d1b,The storm water system shall be cleansable via manholes and fittings.,{'ID': '165_Finnish_Health-WaterAndSewerage'},The storm water system shall be cleansable via manholes and fittings.,necessity,annotated
9027959e-efc1-4d32-acbe-e0775d40f001,"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",{'ID': '38_UK_DocQ_Security_Dwellings'},"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",necessity,annotated
10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",selection,annotated
a68b404d-d10a-4e48-b25b-907261271e75,Voids between insulation at the top of the external wall and the cavity wall/timber frame insulation should be fully filled with insulation.,{'ID': '171_UK_DocL_V1_ConsrvationOfFuelAndPower'},Voids between insulation at the top of the external wall and the cavity wall/timber frame insulation should be fully filled with insulation.,selection,annotated
33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",part-of,annotated
8364a5f1-f80e-484c-9f38-bffc6f4c1876_3,,,"Where communal parking is provided to blocks of flats, at least 0.3 standard sign is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic
aca1acce-65c1-4677-a979-ce2920457a55,The surface of stairs the must not be slippery.,{'ID': '14_Finnish_SafetyOfUse'},The surface of stairs the must not be slippery.,part-of,annotated
c2e0629d-350b-45b8-9e9e-d58be1780f12_3,,,"If the bath has no they, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic
99a53f17-48cb-4012-a47b-700761e0983b_7,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 1.2W/(m2K) of those Glazing must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df,"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",{'ID': '356_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,annotated
df24d65a-425f-4ddd-b3aa-0ae34be4b0c1,Beading should be mechanically fixed and glued in position.,{'ID': '32_UK_DocQ_Security_Dwellings'},Beading should be mechanically fixed and glued in position.,necessity,annotated
bdfc74e0-24b2-41e2-be4e-6cab13de421f,The test data should be certified by a notified body.,{'ID': '222_UK_DocL_V1_ConsrvationOfFuelAndPower'},The test data should be certified by a notified body.,necessity,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b_7,,,"When an existing building with a total useful target fabric energy efficiency rate of over 400 millimetres is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic
fc54cd23-e216-4f59-b1b6-35ec47a83a4a,Test data must be from a minimum of five in-situ measurements of the same module types and link details as used in the actual building.,{'ID': '351_UK_DocM_V2_AccessAndUseOfBuildings'},Test data must be from a minimum of five in-situ measurements of the same module types and link details as used in the actual building.,necessity,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
ef561e39-db90-462c-8dde-15fbeae954e5_6,,,A cube with U-values of no more than 2.4m may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic
1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",none,annotated
d0b6759e-deec-451d-bd7a-ec65b96048be,"extract air of category 3 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",{'ID': '130_Finnish_Health-IndoorClimateAndVentilation'},"extract air of category 3 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",necessity,annotated
5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",none,annotated
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",necessity,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_2,,,"The wall ties should have a horizontal spacing of 900mm and a level differences of 5m, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated
26980508-105c-49db-8595-bf001a48d757_3,,,"In cable duct with no fixed seats or schools, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_10,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and impact 0.055555556 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
d7b27bbb-ac51-4036-8073-d094cbe994db,"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",{'ID': '232_UK_DocM_V2_AccessAndUseOfBuildings'},"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",selection,annotated
6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,none,annotated
dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",greater-equal,annotated
c0abe869-e87e-4e66-a8ca-8578a338b07a,"Where a building automation and control system is installed, its control capabilities should be appropriate for the building, its expected usage and the building services specification.",{'ID': '329_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a building automation and control system is installed, its control capabilities should be appropriate for the building, its expected usage and the building services specification.",selection,annotated
c06bb553-d8f1-47f5-ab33-cfdebb6bca52,"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated
536b172d-ccd1-479a-8136-6ee05db0f264_10,,,"Where pipework is above ground, the performance of the pipe fasteners should be at least as high as the allowance of pipework in the buried part of the system.",greater-equal,synthetic
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_7,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the intended purpose may be no more than 15 degrees.",less-equal,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_9,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 50 m2 in sum and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
2f75848b-a39a-41d3-a6bf-25ef1154bcff,"Where appropriate, these should be automated (with manual override) so that energy savings are maximised.",{'ID': '322_UK_DocM_V2_AccessAndUseOfBuildings'},"Where appropriate, these should be automated (with manual override) so that energy savings are maximised.",selection,annotated
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_9,,,The total combined window area of the floor surface in the seating area and access route may not exceed 15mm.,less-equal,synthetic
d34c0f60-8df0-4310-b5af-428c63225a6f,"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",{'ID': '60_Finnish_Health-WaterAndSewerage'},"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",part-of,annotated
9f5fe460-cae1-4653-a951-38e31f3ed15d,"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",{'ID': '81_Finnish_SafetyOfUse'},"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",selection,annotated
fc29901a-8b5e-48a5-a569-bed57699cf72,Moisture from the foundation wall and the base floors concrete slab must not transfer harmfully to the wooden sole plates or upper wall and floor structures.,{'ID': '89_Finnish_Health-Humidity'},Moisture from the foundation wall and the base floors concrete slab must not transfer harmfully to the wooden sole plates or upper wall and floor structures.,necessity,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_0,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be heat loss ten millimetres.",equal,synthetic
cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",part-of,annotated
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated
5ed671ca-0cd0-47e2-ad68-1d910e5ddbdf,The access route in the seating area or standing auditorium must be directly accessible from the end of each row.,{'ID': '114_Finnish_SafetyOfUse'},The access route in the seating area or standing auditorium must be directly accessible from the end of each row.,part-of,annotated
563cd5fb-adc9-4bde-8b34-4accc93ac84b,"Systems should not be significantly oversized in most circumstances, the cooling appliance should not be sized for more than 120 of the design cooling load.",{'ID': '331_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Systems should not be significantly oversized in most circumstances, the cooling appliance should not be sized for more than 120 of the design cooling load.",necessity,annotated
63af9f99-6939-4e8c-a6a9-8b10942e1597_10,,,"The handle to at least 2 metres commissioning plan in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic
ef561e39-db90-462c-8dde-15fbeae954e5_5,,,A cube with steps of no more than 180kW may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic
2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",none,annotated
6b2f3ca5-8cea-4616-8679-438446bc6233,"Since doors are potential barriers, their use should be avoided whenever appropriate.",{'ID': '88_UK_DocM_V2_AccessAndUseOfBuildings'},"Since doors are potential barriers, their use should be avoided whenever appropriate.",part-of,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8_4,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the Extract must be no less than two persons per square metre.",greater-equal,synthetic
ee0c8c7c-c65e-4403-92e6-628fd680f3bf_8,,,Any panel within the doorset should be at least 1 size.,greater-equal,synthetic
b5aa20f2-571e-48d8-9943-4102c9f9bd1a,"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",{'ID': '250_Finnish_FireSafety'},"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",necessity,annotated
2032e456-bf80-4342-90dc-0da164e00a9a,A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '7_UK_DocF_V1_Ventilation'},A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,selection,annotated
b02f9b87-d934-4c2f-8a59-b3b8c0a7be17,"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",{'ID': '124_UK_DocF_V2_Ventilation'},"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",necessity,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_3,,,"If the air flows of SEER 220 millimetres and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
88e23b46-22d9-4be6-87b7-40541f7995a9_9,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the surface exceeds 0.35W/(m2K); 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,part-of,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,annotated
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",greater,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_11,,,Where the design solar load is within the private curtilage of the dwelling (but not within a carport or insulated plane) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",part-of,annotated
a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",none,annotated
642e2c46-45a8-440f-af0b-1b53f41d8d8f,Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,{'ID': '156_UK_DocM_V2_AccessAndUseOfBuildings'},Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,part-of,annotated
81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",necessity,annotated
993e54cc-49c3-43cb-995e-1a951c93c775,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",{'ID': '25_Finnish_StabilityOfStructures'},"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",equal,annotated
511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",selection,annotated
103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",none,annotated
0f2dbc3b-0f3e-444e-a688-ed8faebd1226,Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,{'ID': '105_Finnish_SafetyOfUse'},Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,selection,annotated
0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_7,,,"The one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise of the extension does not exceed 0.3.",less-equal,synthetic
6414854d-01f9-481f-a7f4-c4581e48d8b1,Special safety features are not necessary if the ladder is not more than 6m long.,{'ID': '112_UK_DocK_ProtectionFromFalling'},Special safety features are not necessary if the ladder is not more than 6m long.,selection,annotated
2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,selection,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_9,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 55 load.,less-equal,synthetic
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_7,,,"The wall ties should have a horizontal spacing of 900mm and a heat recovery of 15mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",part-of,annotated
01bd7c41-594c-4440-8058-c34f1c4bad09,"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",{'ID': '82_UK_DocO_Overheating'},"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",necessity,annotated
74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",necessity,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_3,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major thermal bridging, there is no control appliance to install either electric vehicle charge points or cable routes.",not-part-of,synthetic
c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",none,annotated
596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",necessity,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3,"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",{'ID': '73_Finnish_FireSafety'},"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",necessity,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",necessity,annotated
a15ee053-da1e-44cd-bdd9-76cdcb68eaee,"Whenever the building is moved to a new location, in which its intended time of use is less than two years, these calculations can be provided as evidence that the energy efficiency requirements are met.",{'ID': '87_UK_DocM_V2_AccessAndUseOfBuildings'},"Whenever the building is moved to a new location, in which its intended time of use is less than two years, these calculations can be provided as evidence that the energy efficiency requirements are met.",necessity,annotated
c384013b-c40f-4925-acbe-465e1ca5bc13,One photograph per detail should be recorded.,{'ID': '480_UK_DocL_V1_ConsrvationOfFuelAndPower'},One photograph per detail should be recorded.,necessity,annotated
3e9fc57e-bc69-4f17-a056-dd7767afa9bb_10,,,"If the CO2 emission factor of the building does not exceed 1,500 millimetres, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_2,,,Modular and portable buildings with a planned service life of more than two years but with an ventilation provision in a single location of less than 400 millimetres should be shown to comply with the energy efficiency requirements.,less,synthetic
63af9f99-6939-4e8c-a6a9-8b10942e1597_2,,,"The handle to at least 0.15 dm3/s per m2 energy savings in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic
3ec9d4e7-3526-411c-8b30-0c7671660ed1,"The relationship between the kitchen, dining and living areas should be convenient and step-free.",{'ID': '91_UK_DocM_V1_AccessAndUseOfBuildings'},"The relationship between the kitchen, dining and living areas should be convenient and step-free.",selection,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,part-of,annotated
8e8f4fb5-00b5-404f-89df-a07287984748_7,,,"In buildings with a maintained greater than 2,100 millimetres, automatic meter reading and data collection facilities should be installed.",greater,synthetic
a8b3e54e-902c-4502-99a2-8c41d46f1416_2,,,"If there are more than 15mm ventilation system in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic
e4fb8d18-8dbc-4351-a2df-d87f880f476a_0,,,The air flow rates for balconies is 200 lux that of the load-bearing structures of the storey.,equal,synthetic
35cacecf-06dc-4b0f-aadb-db2ee05518c7_7,,,The area of windows and roof windows (but excluding display windows) same exceeds 75 light source lumens per circuit-watt of the facade area.,greater,synthetic
8e8f4fb5-00b5-404f-89df-a07287984748_11,,,"In buildings with a total extract air flow greater than 600kg/m3, automatic meter reading and data collection facilities should be installed.",greater,synthetic
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_1,,,"In a compliance checklist with no openable surfaces, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic
ff3e8f86-1542-4f54-a776-cfdc8482bad7_5,,,"The one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise of an air conditioner working in cooling mode should be a minimum of 30.",greater-equal,synthetic
50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,greater,annotated
9eb5bf01-3810-44e3-802b-7c7eadad1831,"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",{'ID': '21_UK_DocF_V1_Ventilation'},"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",selection,annotated
01d924bf-4a69-4eb8-b05e-ce993aee3d45_2,,,Perimeter insulation should be continuous and have a minimum heat gain of 1.3 seconds.,greater-equal,synthetic
34a524ec-6994-426f-86af-78788fd34a80,"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",{'ID': '36_UK_DocQ_Security_Dwellings'},"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",part-of,annotated
164122ed-c7ac-4cf8-8a54-3d56c144f78d_3,,,"In general, the findings indicate that there should be at least the same number of day-care institutions as boiler interlock and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated
6075de3c-d339-4ba4-9945-990480975615_6,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 6mm Part 2 and 3 of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic
8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,none,annotated
74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",none,annotated
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9,"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",{'ID': '116_Finnish_SafetyOfUse'},"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",greater-equal,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_3,,,"In buildings more than 9 metres and at most two persons per square metre in intermediate landing, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_5,,,"Extract air of design solar load 2, 3 and 24 degrees Celsius shall not be used as recirculation air.",equal,synthetic
ef4ec541-e1a7-47d4-9a83-94715d8900ba_5,,,"Where 60 persons or more extension are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74_9,,,"In a tier that is uninterrupted by cross-gangways, and where the installation exceeds 0.1m2, use a maximum number of steps of 40.",greater,synthetic
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_3,,,The smaller manufacturers declared efficiencies of each panel which can be either the width or height of the panel should be 900 millimetres or less.,less-equal,synthetic
389c960b-525d-4f2e-9a2c-1805eb2dc20d_6,,,The full installation under a stair that forms part of the storage provision should be counted as 5m.,equal,synthetic
56517433-cf40-4b88-a9d4-18e61e0e9993_1,,,"In addition, on both sides of the toilet seat there shall be a roof windows of at least twice the rise plus the going (2R G).",greater-equal,synthetic
7f065688-203b-42d0-acb9-8fde5ff37821,Main distribution routes should be through vertical risers to minimise heat gains into common spaces.,{'ID': '44_UK_DocO_Overheating'},Main distribution routes should be through vertical risers to minimise heat gains into common spaces.,selection,annotated
a4fccc69-c508-4405-92aa-2cfe36bfca39,Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,{'ID': '209_Finnish_FireSafety'},Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,part-of,annotated
973c9430-2b4a-4ab4-82df-7060c3002f77_2,,,The slope for the community heating primary circuit should be a minimum of 2.4 metres.,greater-equal,synthetic
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_0,,,"For sizes of cylinder not listed, the commissioning notice from the cylinder should not exceed 13l/s, where V is the volume in litres.",less-equal,synthetic
113b8bf8-1856-45f5-a54b-d65ef100b437_7,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 1,200 millimetres of the following axle group load, appropriate to the system, should be installed.",greater-equal,synthetic
c47598f9-df79-4d77-aba9-8f380342372f_7,,,extract air of Capacities four shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic
40b40b1b-d1b1-49d8-b9b7-13c5845a169d,The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,{'ID': '71_Finnish_Health-WaterAndSewerage'},The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,none,annotated
9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",part-of,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,part-of,annotated
4d80c4d1-08ee-481a-9f9c-e9151ce1094d_8,,,"The surface of windows, roof windows, rooflights and doors should not exceed 01:08:00 of the total floor area of the dwelling.",less-equal,synthetic
01d924bf-4a69-4eb8-b05e-ce993aee3d45_4,,,Perimeter insulation should be continuous and have a minimum gradient of 20.,greater-equal,synthetic
56166e36-b14b-4632-9767-70b71d335d9c,"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated
53bb982d-5260-4a69-a6dd-71e4f074e676,The depth of standing rows must be at least half a metre.,{'ID': '111_Finnish_SafetyOfUse'},The depth of standing rows must be at least half a metre.,greater-equal,annotated
d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",none,annotated
9027959e-efc1-4d32-acbe-e0775d40f001_6,,,"The morticed bolts should have a minimum length of 200 Watts per room, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic
c9983da5-23f1-4211-88ce-68e4753e4ab9,"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",{'ID': '102_UK_DocM_V2_AccessAndUseOfBuildings'},"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",necessity,annotated
99a53f17-48cb-4012-a47b-700761e0983b_0,,,Where a new building which is not a residential building or a mixed-use building has more than 01:20:00 residential block of flats (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic
cf35d4a4-3170-421b-9be1-b68d928eed1d_7,,,"A roof with a luminous efficacy greater than 60 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic
009e12eb-db83-485c-9ffc-e1f462251109,Each air terminal should have a free area of at least 90 of the free area of its associated duct.,{'ID': '115_UK_DocF_V1_Ventilation'},Each air terminal should have a free area of at least 90 of the free area of its associated duct.,greater-equal,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",greater-equal,annotated
9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",none,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,part-of,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_3,,,Individual flights are: for gradients up to 1:15 not more than 200 m2 frequency; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
c8a048c6-8e7e-4b5a-ada5-02990b983401,"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",{'ID': '91_Finnish_Health-IndoorClimateAndVentilation'},"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",necessity,annotated
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_9,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 20 millimetres System controls.,greater,synthetic
f162906e-1097-420e-b2a0-dd746d5794c7,"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",{'ID': '265_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",none,annotated
55d84237-8fad-4bd7-b67d-0745b9cc1e31,"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",{'ID': '222_Finnish_FireSafety'},"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",necessity,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_8,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be dimension 100 litres.",equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_5,,,"In buildings more than eight per cent and at most 28 metres in structure, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic
39a37d5e-3361-43b9-a209-e5cd45918abc,"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",{'ID': '95_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",selection,annotated
8364a5f1-f80e-484c-9f38-bffc6f4c1876_6,,,"Where communal parking is provided to blocks of flats, at least 120 standard Extract air is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic
590ab551-79e8-42f5-bc52-749f8899c088,Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,{'ID': '242_Finnish_FireSafety'},Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,necessity,annotated
a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,selection,annotated
d504fd87-d13d-4936-9d7a-71d17954760d_10,,,The free gap of the steps in an exit may be no more than 1 in 40.,less-equal,synthetic
60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",part-of,annotated
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_1,,,"If the internal temperature of a mechanical ventilation systems air duct is designed to be greater than 500kW, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic
13a437c0-918c-47f2-85bd-b80dd69eb027_10,,,"There are no cold side on the visual contrast of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic
8efb6108-e49e-4d64-a1e4-22e3f9128b17,"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",{'ID': '136_Finnish_EnergyEfficiency'},"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",part-of,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a_10,,,Modular and portable buildings with a planned service life of more than two years but with an luminous efficacy in a single location of less than 1m2 should be shown to comply with the energy efficiency requirements.,less,synthetic
2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",{'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",necessity,annotated
81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",selection,annotated
20216261-f56d-4f79-8a46-c781abe19f04,"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",{'ID': '98_UK_DocF_V2_Ventilation'},"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",none,annotated
81314489-dcd9-410f-9b15-595b87e7c8f9_0,,,"The resilient layer should be timber sheathing at least 21 C boiler type, expanded metal or a similar resilient material.",greater-equal,synthetic
7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,part-of,annotated
f1b9829d-7ac3-4bc5-918a-5bbb8d663a35,"For space heating systems, temperature control should be installed for the heating appliance.",{'ID': '248_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For space heating systems, temperature control should be installed for the heating appliance.",part-of,annotated
d713514a-9398-45a2-9584-efecff6ebcc5,Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,{'ID': '4_UK_DocQ_Security_Dwellings'},Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,none,annotated
eefe1191-2903-4fb8-9138-6471e09fb67d_0,,,The domestic hot water circulation heat loss exceeds 390 millimetres at 11pm.,greater,synthetic
d342429e-d3fc-46e0-a195-527cfef1fd4b_6,,,"When an existing building with a total useful number of storeys of over 0.5 kN/m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none,annotated
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_3,,,A building with a location exceeding 01:20:00 must be equipped with anchoring structures for safety lines.,greater,synthetic
5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",necessity,annotated
977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",none,annotated
c47598f9-df79-4d77-aba9-8f380342372f_9,,,extract air of mechanical ventilation 25 decibels shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic
8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",none,annotated
77be05f2-cd8c-4d35-85e4-6637b999d8e7_6,,,The selection of the consequential improvement works should not be less than 1100mm of the value of the principal works.,greater-equal,synthetic
efd2d371-97de-4d5e-af06-e404ff71f316,The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,{'ID': '91_Finnish_EnergyEfficiency'},The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,none,annotated
6594919a-cde6-4dd8-be04-eb61e30f99bb,"Snow or rain-water shall not be allowed to ingress the ventilation system via externally mounted air transfer devices in quantities causing damage to the system, lowering air quality or impairing the functioning of the system.",{'ID': '67_Finnish_Health-IndoorClimateAndVentilation'},"Snow or rain-water shall not be allowed to ingress the ventilation system via externally mounted air transfer devices in quantities causing damage to the system, lowering air quality or impairing the functioning of the system.",necessity,annotated
113b8bf8-1856-45f5-a54b-d65ef100b437_8,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 0.9 metres of the following target primary energy rate, appropriate to the system, should be installed.",greater-equal,synthetic
f6add908-4d45-4b3e-83a6-369f6c36c037_4,,,"Door rails, stiles and muntins should be at least 35 mg/m3 (30 ppm) height.",greater-equal,synthetic
20518e80-6f7e-457f-8c5a-59fa4c0eb324,"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",{'ID': '137_Finnish_EnergyEfficiency'},"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",part-of,annotated
0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",necessity,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_8,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and constraints 9mm air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
c5a6cac6-a314-47b1-aabd-13f2d1b7ad56,A step-free approach route should be provided to all private entrances.,{'ID': '71_UK_DocM_V1_AccessAndUseOfBuildings'},A step-free approach route should be provided to all private entrances.,none,annotated
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_1,,,"When replacing an existing system, the time-lapse of the new system should be no less than total floor area of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,annotated
ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",selection,annotated
6d9a1e8e-6fe7-4234-951a-96fdc4598bd7,"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",{'ID': '12_Finnish_Accessibility'},"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",none,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_4,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be patterns to 40.,less-equal,synthetic
082c7ed9-3579-48c2-a0d2-076f1edd647c,"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",{'ID': '112_UK_DocO_Overheating'},"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",part-of,annotated
5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",necessity,annotated
5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",none,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",none,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",none,annotated
29232335-402c-4ed9-af74-fd093ac22e28_2,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least total load 300 litres.,greater-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,necessity,annotated
f51da5c6-7614-4719-8150-e22851e4aa12,"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",{'ID': '152_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",selection,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_5,,,"The combined dead,imposed and wind loads, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the load EER, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic
493ec553-7761-4d1e-aa98-05d925ddf955_10,,,The primary energy content of a horizontal hatch must be at least 200 millimetres.,greater-equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_3,,,"Where the work concerns a building containing more than 60 persons damage, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic
b4ae0bf1-8dec-4e43-b10b-4a593780d742,Partitioning doors in accommodation premises shall be equipped with closing devices.,{'ID': '121_Finnish_FireSafety'},Partitioning doors in accommodation premises shall be equipped with closing devices.,necessity,annotated
371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",none,annotated
9b329413-b6d6-4953-9b34-c82d3a2e9c44,"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",{'ID': '216_UK_DocM_V2_AccessAndUseOfBuildings'},"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",necessity,annotated
f6add908-4d45-4b3e-83a6-369f6c36c037,"Door rails, stiles and muntins should be at least 44mm thick.",{'ID': '28_UK_DocQ_Security_Dwellings'},"Door rails, stiles and muntins should be at least 44mm thick.",part-of,annotated
4e119abd-0cf7-4c60-9c7b-1083f9b46280,"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",{'ID': '85_UK_DocF_V2_Ventilation'},"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",selection,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_4,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major going, there is no sunken to install either electric vehicle charge points or cable routes.",not-part-of,synthetic
45adb0b6-63ee-4f42-b6a3-8fc396221c67_10,,,The standards of the insulation plus any required air gap should be at least to the relationship of the rafters.,greater-equal,synthetic
e8340500-38b6-461b-b00d-d3aa44ac1f0b_2,,,The tie force of the water available from the hot water system may not exceed 8 per cent (1:12.5).,less-equal,synthetic
bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",necessity,annotated
f3c5d35c-ad38-46d6-8a75-1a331555b89e,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,{'ID': '206_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,selection,annotated
0da52584-1b37-48b5-840f-3795ae695275_0,,,the minimum clear dimensions of the platform are: 50 m2 size and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
3639910c-8ebf-499a-aeec-6f1951b28134,"Additionally, insulated plaster-board should be used in reveals to abut jambs and should be considered within reveal soffits.",{'ID': '166_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Additionally, insulated plaster-board should be used in reveals to abut jambs and should be considered within reveal soffits.",selection,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_8,,,The fire igniting of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the extends of associated parking spaces.,greater,synthetic
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_4,,,"Extract air of above 2, 3 and 40 degrees Celsius shall not be used as recirculation air.",equal,synthetic
4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",part-of,annotated
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_5,,,The minimum value of the floor surface in the seating area and access route may not exceed 0.8 metres.,less-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_6,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or shower room above 400-600mm may be discounted when measuring clear width.,greater,synthetic
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_10,,,"If site constraints necessitate an foundations of 2.4 metres or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic
c7137e3d-e3f2-4a19-87bc-ccb194d42c74,"Incoming services: ducts, and cables wherever possible, should be grouped to minimise how often the air barrier is penetrated, while ensuring sufficient space to allow adequate screed flow between ducts.",{'ID': '178_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Incoming services: ducts, and cables wherever possible, should be grouped to minimise how often the air barrier is penetrated, while ensuring sufficient space to allow adequate screed flow between ducts.",necessity,annotated
d54852df-8e3c-4e99-8484-31c403b78558,"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",{'ID': '256_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",necessity,annotated
3121fe90-27db-405e-a42a-df3cd22ee176,"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",{'ID': '55_Finnish_SafetyOfUse'},"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",none,annotated
"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_11",,,"However, if the air flow rates is no more than 600kg/m3, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic
43e26628-8b62-4cc6-91e2-284335df1564_3,,,"In rooms used for sleeping or rest, the domestic hot water circulation heat loss may not exceed 200 Watts per room.",less-equal,synthetic
7f3f59a4-fc7e-4b14-8074-384f6cacf548_7,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the horizontal spacing is less than 2m.",less,synthetic
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_3,,,The resilient layer should be to the full height of the door and ten millimetres drop of the doorset.,equal,synthetic
bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",less-equal,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df,"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",{'ID': '356_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",selection,annotated
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_1,,,"If site constraints necessitate an Voids of adequate number or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_7,,,Individual flights are: for gradients up to 1:15 not more than 35 mg/m3 (30 ppm) exceptional circumstances; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
082c7ed9-3579-48c2-a0d2-076f1edd647c_6,,,"Each of the 50 m minimum value of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_3,,,Modular and portable buildings with a planned minimum value of more than 800 millimetres but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic
33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated
19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",part-of,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",none,annotated
bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",necessity,annotated
389c960b-525d-4f2e-9a2c-1805eb2dc20d_8,,,"The full annual percentage of heat under a stair that forms part of the storage provision should be counted as 1,200 millimetres.",equal,synthetic
29c431ee-ea93-491d-ab13-06418d93c488_6,,,"If total capital cost is greater than 0.9 metres, manual control is acceptable.",greater,synthetic
d0b6759e-deec-451d-bd7a-ec65b96048be_10,,,"extract air of sizes B shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic
4470dde4-6422-4c13-9781-de68c3e075dc_9,,,"The outdoor sunken area of a dwelling unit, however, shall be designed to be a minimum of 24 metres.",greater-equal,synthetic
6075de3c-d339-4ba4-9945-990480975615_7,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 20mm Standing areas of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic
1c511111-ab71-4b68-9421-f588bc4b9180,"People with visual impairment should be in no doubt as to the location of glass doors, especially when they are within a glazed screen.",{'ID': '76_UK_DocM_V2_AccessAndUseOfBuildings'},"People with visual impairment should be in no doubt as to the location of glass doors, especially when they are within a glazed screen.",none,annotated
13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",part-of,annotated
aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",none,annotated
23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",selection,annotated
9618a274-45da-4e3e-87f0-21c2bfae4a8e_10,,,"A guardrail must be used at points with a number of appliances of over 100 litres, if these can be accessed by children.",greater,synthetic
5fa7daca-cb50-4397-a736-617e52d30187_10,,,"If efficiencies at below 30% are required and unavailable, the surface temperature may be taken as equal to that at 20.",equal,synthetic
0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_2,,,The smaller fire load of each panel which can be either the width or height of the panel should be 2 metres or less.,less-equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_9,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the sales counter of that installation exceeds 2.5 ties/m2 of the total cost of the major renovation.",greater,synthetic
009e12eb-db83-485c-9ffc-e1f462251109_4,,,Each air terminal should have a environment of at least 0.35W/(m2K) of the free area of its associated duct.,greater-equal,synthetic
db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated
86350df0-a40e-412b-a301-004524d56736_6,,,"For wet heating systems in new dwellings with a centre pane U-value of 130 millimetres or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic
10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",none,annotated
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",part-of,annotated
4b510cad-fefb-44be-a9cb-a26e0c42994c,"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",{'ID': '101_Finnish_EnergyEfficiency'},"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",part-of,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_3,,,"The dwelling primary energy rate, dwelling emission rate and span, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target emission rate, respectively.",less-equal,synthetic
2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,selection,annotated
f6a682fb-f427-41d0-9219-3a45d2134be6,"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane - either horizontal or vertical.",{'ID': '109_UK_DocL_V1_ConsrvationOfFuelAndPower'},"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane - either horizontal or vertical.",selection,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_0,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the entry is less than 2.2 metres.",less,synthetic
99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,necessity,annotated
f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",selection,annotated
3d0bbf85-327f-4f92-a468-201f81080779,The roof insulation should be installed when the eaves are still accessible.,{'ID': '169_UK_DocL_V1_ConsrvationOfFuelAndPower'},The roof insulation should be installed when the eaves are still accessible.,part-of,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_3,,,"The dwelling primary energy rate, Manual control and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, standards and target fabric energy efficiency rate, respectively.",less-equal,synthetic
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",necessity,annotated
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_0,,,"Where a new building contains more than One internal stairs, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic
77be05f2-cd8c-4d35-85e4-6637b999d8e7,The value of the consequential improvement works should not be less than 10 of the value of the principal works.,{'ID': '452_UK_DocM_V2_AccessAndUseOfBuildings'},The value of the consequential improvement works should not be less than 10 of the value of the principal works.,greater-equal,annotated
ff3e8f86-1542-4f54-a776-cfdc8482bad7,The seasonal energy efficiency ratio of an air conditioner working in cooling mode should be a minimum of 4.0.,{'ID': '332_UK_DocL_V1_ConsrvationOfFuelAndPower'},The seasonal energy efficiency ratio of an air conditioner working in cooling mode should be a minimum of 4.0.,part-of,annotated
ddc0bba6-2df8-43e1-9398-37514366fb06,"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",{'ID': '208_UK_DocF_V1_Ventilation'},"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",necessity,annotated
29c431ee-ea93-491d-ab13-06418d93c488_4,,,"If service is greater than 55, manual control is acceptable.",greater,synthetic
0da52584-1b37-48b5-840f-3795ae695275_11,,,the minimum clear dimensions of the platform are: 1100mm wide and twice the rise plus the going (2R G) condition where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",selection,annotated
a4fccc69-c508-4405-92aa-2cfe36bfca39,Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,{'ID': '209_Finnish_FireSafety'},Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,none,annotated
973c9430-2b4a-4ab4-82df-7060c3002f77_3,,,The riser for the community heating primary circuit should be a minimum of 400kg.,greater-equal,synthetic
f6add908-4d45-4b3e-83a6-369f6c36c037_9,,,"Door rails, stiles and muntins should be at least 8 per cent (1:12.5) total cost.",greater-equal,synthetic
4e119abd-0cf7-4c60-9c7b-1083f9b46280,"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",{'ID': '85_UK_DocF_V2_Ventilation'},"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",necessity,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779_7,,,"In large building complexes, such as retail parks and large sports centres, there should be twice the rise plus the going (2R G) wheelchair-accessible unisex cooling appliance capable of including an adult changing table.",equal,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506_11,,,"Gangways should not be less than 1100mm shallow projecting unless used by not more than 50 persons, in which case gangways should be a minimum of three.",greater-equal,synthetic
2be01bf1-2cd9-4982-8778-ba0afe835580,"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",{'ID': '88_UK_DocF_V1_Ventilation'},"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",none,annotated
f2bf62e6-9577-48b5-b15d-9fe4904acf52,"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",{'ID': '268_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",selection,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d_0,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a design value exceeding 650mm and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic
7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",selection,annotated
536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",none,annotated
75c60084-6878-472d-8694-e8739e0dd76c_8,,,The width of access routes in assembly areas with a product certificate of 100 litres must be at least 900 millimetres.,equal,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_7,,,"The natural light and building emission rate calculated using the measured air permeability must not be higher than the efficiencies and target emission rate, respectively.",less-equal,synthetic
d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",part-of,annotated
2f815a08-db3c-48a6-b248-d69aeac870ee_0,,,"the vertical constraints is: a. not more than 1800mm, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic
7d35f4c4-fa65-4d68-a974-f54386ca8aee_8,,,"However, a horizontal strategy in a protective part must be no higher than 50mm.",less-equal,synthetic
4470dde4-6422-4c13-9781-de68c3e075dc,"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",{'ID': '54_Finnish_Health-IndoorClimateAndVentilation'},"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",greater-equal,annotated
3ec9d4e7-3526-411c-8b30-0c7671660ed1,"The relationship between the kitchen, dining and living areas should be convenient and step-free.",{'ID': '91_UK_DocM_V1_AccessAndUseOfBuildings'},"The relationship between the kitchen, dining and living areas should be convenient and step-free.",necessity,annotated
19478a13-7457-4dd3-a394-744f826db7b0_7,,,"The handle to at least 30 driveways in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic
eeb4239f-3819-475c-ad20-756bed80c4ff_1,,,"In reference heat loss calculations, the value used as the dimension of the buildings ventilation system shall be 190 kN.",equal,synthetic
0f67dad7-6df9-444b-8e72-f447668e3fde_0,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of two reception.",greater-equal,synthetic
511c1a7f-08b9-48ec-aea6-9b749fdf31a1_4,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 300mm of appropriately located living quarters which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic
bfc84a1d-db59-4f4a-bd93-3d5f1043d11e,A notice of the measured air flow rates must be given to the building control body.,{'ID': '183_UK_DocF_V1_Ventilation'},A notice of the measured air flow rates must be given to the building control body.,necessity,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",none,annotated
eeb4239f-3819-475c-ad20-756bed80c4ff_10,,,"In reference heat loss calculations, the value used as the presence of the buildings ventilation system shall be 300 litres.",equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",none,annotated
bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",none,annotated
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",selection,annotated
56517433-cf40-4b88-a9d4-18e61e0e9993_7,,,"In addition, on both sides of the toilet seat there shall be a terminals of at least 0.7.",greater-equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74_11,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a commissioned in accordance with an approved procedure number of steps of 900 millimetres.",equal,synthetic
05fdde92-d8af-42ad-963b-9019c69a8ab3_3,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same fire resistance time requirement as the Frames used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic
a235c68f-ae44-4770-b005-4e9d7b659eb7_7,,,All cavity walls should have leaves at least 90mm thick and cavities at least 0.3W/m2 power input from controls.,greater-equal,synthetic
72b3e031-a732-4749-af3e-ffd5c635e830,Boards should be fitted to the structure to avoid any gaps between board edges and between the board facings.,{'ID': '145_UK_DocL_V1_ConsrvationOfFuelAndPower'},Boards should be fitted to the structure to avoid any gaps between board edges and between the board facings.,necessity,annotated
259c1614-77ef-4ae4-a401-83caa603e374,"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '35_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated
5fe7997a-7e99-485c-89b3-7912d7c8d44d,"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",{'ID': '199_UK_DocF_V1_Ventilation'},"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",necessity,annotated
07336e23-ffc0-4625-9dca-73c1eb5808c7,Purge ventilation should be capable of extracting at least four air changes per hour per room directly to the outside.,{'ID': '47_UK_DocF_V1_Ventilation'},Purge ventilation should be capable of extracting at least four air changes per hour per room directly to the outside.,necessity,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_7,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the opening may be no more than 270 millimetres.",less-equal,synthetic
36650de0-ef3c-4fd1-8199-f47c0e576076_10,,,the results of the platform does not exceed E.,less-equal,synthetic
ee0c8c7c-c65e-4403-92e6-628fd680f3bf_9,,,Any panel within the doorset should be at least 15 protection.,greater-equal,synthetic
4470dde4-6422-4c13-9781-de68c3e075dc_6,,,"The outdoor agreed level of provision of a dwelling unit, however, shall be designed to be a minimum of 6m.",greater-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated
5fa7daca-cb50-4397-a736-617e52d30187_8,,,"If operation at below 30% are required and unavailable, the away may be taken as equal to that at 30% load.",equal,synthetic
f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",none,annotated
ef561e39-db90-462c-8dde-15fbeae954e5_3,,,A cube with entry of no more than 1000m2 may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_3,,,"Generally, a thermal element once upgraded should not have a Control greater than 25 decibels.",less-equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",part-of,annotated
9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",none,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated
45b99da0-5bce-49b7-9ce2-04810c7e5a19,"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",{'ID': '151_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",selection,annotated
ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",part-of,annotated
74002ed3-548e-4e2f-8835-be76e643c67d,NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,{'ID': '51_UK_DocM_V1_AccessAndUseOfBuildings'},NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,part-of,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_10,,,The normal relationship between the spread of fire of the rise and going is: 0.136kgCO2/kWh equals between 550mm and 700mm.,equal,synthetic
0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",none,annotated
203faa23-7b71-47c9-a6e5-2333ac45389e_2,,,"The control capabilities of the indoor steps of dwelling units and living quarters may be no more than 0.7W/(m2K), and the tread must be no less than 250 millimetres.",less-equal,synthetic
a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,annotated
8e8f4fb5-00b5-404f-89df-a07287984748_8,,,"In buildings with a reference value greater than 1800mm, automatic meter reading and data collection facilities should be installed.",greater,synthetic
84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",none,annotated
7f72632a-dc0a-4318-afd7-7090b42350fc,Mechanical supply terminals should be located and directed to avoid draughts.,{'ID': '106_UK_DocF_V1_Ventilation'},Mechanical supply terminals should be located and directed to avoid draughts.,selection,annotated
405a2082-beb9-4c5f-bc9f-d688b72e723b,Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,{'ID': '162_UK_DocL_V1_ConsrvationOfFuelAndPower'},Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,none,annotated
208b093d-361f-4aec-819d-4abca4e72c68_10,,,"in an evacuation area where the fire resistance time requirement is 01:08:00, the second exit may be no less than 900 millimetres in width.",equal,synthetic
54da8684-242a-4a73-8ce5-ee908a038299,"Corridors and passageways should be wide enough to allow people with buggies, people carrying cases or people on crutches to pass others on the access route.",{'ID': '96_UK_DocM_V2_AccessAndUseOfBuildings'},"Corridors and passageways should be wide enough to allow people with buggies, people carrying cases or people on crutches to pass others on the access route.",necessity,annotated
6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_4,,,"If parking spaces are provided for a building, an adequate number of cabinet, but at least 18 dm3/s, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic
eefe1191-2903-4fb8-9138-6471e09fb67d_6,,,The automatic flow adjustment exceeds half at 11pm.,greater,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73_7,,,The air-tightness of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the widened of associated parking spaces.,greater,synthetic
9415ae4b-7a74-4c70-a245-e4381c6d71bf_11,,,"At gables and party walls, insulation should extend to the wall; if the bars between the wall and joist is less than 2m, perimeter insulation may be required.",less,synthetic
ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",none,annotated
99a53f17-48cb-4012-a47b-700761e0983b_3,,,Where a new building which is not a residential building or a mixed-use building has more than 600 millimetres fittings (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1_5,,,A minimum of one in 0.2 of the remaining floor must have access to cable routes.,equal,synthetic
5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",necessity,annotated
e40e66a5-25da-494b-b09c-e3241289a1b7,All other bedrooms should be accessible to a wheelchair user.,{'ID': '101_UK_DocM_V1_AccessAndUseOfBuildings'},All other bedrooms should be accessible to a wheelchair user.,selection,annotated
fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,necessity,annotated
783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated
53e31e26-a39b-4047-a86e-bdb8021413e8_2,,,Window handles on windows that open outwards are not more than 100 litres target fabric energy efficiency rate when the window is at its maximum openable angle.,less-equal,synthetic
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated
5163f2fb-022f-4589-889f-2ade7a9d49c6,The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,{'ID': '109_UK_DocO_Overheating'},The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,selection,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_11,,,"The cross fall of steps in covered or heated outdoor staircases must be no less than 5m, and the riser may be no more than 160 millimetres.",greater-equal,synthetic
8151be81-09ad-4dac-b2d2-f0d757915b6c_7,,,"However, when the snow load can occur, the maximum number of occupants of the load s should be at least 8.5m2.",greater-equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f,"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",none,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_1,,,"Extract air of flow rate 2, 3 and half a metre shall not be used as recirculation air.",equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",part-of,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",selection,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c_0,,,"The going for a building's total combined window area is 1m2 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic
4e8c5c50-44af-48f6-b959-e6f9b31afa1e_6,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical Supply temperature control may be casings.",equal,synthetic
f420ae57-5656-4558-b1a3-1079e46bf6cc_8,,,"In the case of the storey-level door of a dwelling, or if the floor area through the door exceeds 120, doors must open in the direction of the exit.",greater,synthetic
45adb0b6-63ee-4f42-b6a3-8fc396221c67_5,,,The air leakage rate figure of the insulation plus any required air gap should be at least to the ventilation of the rafters.,greater-equal,synthetic
a0c838b5-5fe2-4b52-abe1-432804c2c8aa_4,,,A service life of 21 C shall be used as the air flow rate for room temperature during the heating season.,equal,synthetic
2ff58135-b89d-40d1-a145-51aad9e5a942_4,,,"The landing in front of the outside door shall be at least One air extract rate and at least 1,500 millimetres long.",greater-equal,synthetic
01008f69-874b-443e-bcb2-2f5630280049_7,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the standards may be no more than between 550mm and 700mm and the tread must be no less than 220 millimetres.",less-equal,synthetic
8479a43c-e64a-4180-af62-7f4124c460b8,"An entrance door should be included, which should be shut all the time.",{'ID': '56_UK_DocO_Overheating'},"An entrance door should be included, which should be shut all the time.",necessity,annotated
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_11,,,"Generally, a thermal element once upgraded should not have a vertical spacing greater than 0.5 kN/m2.",less-equal,synthetic
5577528f-8fa0-4ca3-96f6-ea418091cb86_6,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than B in illuminance is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic
8101fa0e-645c-4a83-a6ab-66c45e94bf67,"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",{'ID': '155_UK_DocF_V1_Ventilation'},"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",part-of,annotated
a9c88566-e4e5-4cba-8165-9916820d9cc5,"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",{'ID': '75_Finnish_SafetyOfUse'},"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",necessity,annotated
50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,selection,annotated
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",selection,annotated
4ec7b2ef-59e8-4ab1-9243-16587296b466,Fire must not spread in a roof or in its underlay in a way that causes a hazard.,{'ID': '179_Finnish_FireSafety'},Fire must not spread in a roof or in its underlay in a way that causes a hazard.,selection,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_5,,,"The outputs of a barrier in a dwellings indoor areas may, however, be at least 2.4 metres if the drop is less than three metres.",greater-equal,synthetic
977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",part-of,annotated
c25a4595-d20d-40ed-bada-495abcfef307,"Background ventilators should be at least 1700mm above floor level, to reduce cold draughts, but still be easy for the occupant to reach.",{'ID': '64_UK_DocF_V1_Ventilation'},"Background ventilators should be at least 1700mm above floor level, to reduce cold draughts, but still be easy for the occupant to reach.",necessity,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",none,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_5,,,"Where the work concerns a building containing more than 0.05 fire and service rescue equipment, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic
5ca6b3d3-fd21-4cc1-8dd8-185268db6615,The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,{'ID': '26_UK_DocQ_Security_Dwellings'},The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,part-of,annotated
39a37d5e-3361-43b9-a209-e5cd45918abc,"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",{'ID': '95_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",selection,annotated
015b966c-962b-4505-b742-21eaabe0240a,"Where there is a prevailing wind direction, exhaust outlets should be downwind of intakes.",{'ID': '130_UK_DocF_V1_Ventilation'},"Where there is a prevailing wind direction, exhaust outlets should be downwind of intakes.",necessity,annotated
f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",none,annotated
3121fe90-27db-405e-a42a-df3cd22ee176_10,,,"Where necessary, 0.35W/(m2K)flights, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic
fb1da22f-8ddb-4399-b441-64dca68da9af_0,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than three seconds room temperature.",greater-equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_11,,,"If the free gap between facing walls of adjacent glazed balconies or the depth of the wall to the window of an adjacent fire compartment is less than 0.136kgCO2/kWh, the wall in question must be class EI 15.",less,synthetic
c952db0f-b605-4335-8d56-97fc339ad5ba,All three parts of the installation and commissioning checklist should be completed.,{'ID': '262_UK_DocF_V1_Ventilation'},All three parts of the installation and commissioning checklist should be completed.,equal,annotated
c06bb553-d8f1-47f5-ab33-cfdebb6bca52,"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated
6e5e61dd-039d-4079-9c3f-f52fc12efefb,For continuing horizontal structures the loaded area shall be calculated span by span.,{'ID': '12_Finnish_StabilityOfStructures'},For continuing horizontal structures the loaded area shall be calculated span by span.,none,annotated
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9,"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",greater-equal,annotated
511c1a7f-08b9-48ec-aea6-9b749fdf31a1_0,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an m3/(hm2) at 50Pa of appropriately located Structures which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic
8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",part-of,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f_10,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 15mm of non-fire-compartmented data collection facilities that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic
8c4a09c5-1eb2-4a41-86d9-b69c031b4592,Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,{'ID': '384_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,necessity,annotated
2ca092ec-4425-4552-a389-fd0dadfbd154_5,,,NOTE: A floor level with a Signs of 0.9 metres or steeper should be designed as a ramp.,greater-equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_4,,,"The wall ties should have a horizontal spacing of 900mm and a span of 800 millimetres, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
c47598f9-df79-4d77-aba9-8f380342372f_1,,,"extract air of combined dead,imposed and wind loads 40 degrees Celsius shall be conducted to the outdoors through individual extract air ducts.",equal,synthetic
d9b8f957-49e3-45d0-83ca-c0419a50361a,"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",{'ID': '48_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",selection,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated
cb522b91-f26f-460e-adee-1a7f59ba10c9,"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",{'ID': '315_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",none,annotated
01d924bf-4a69-4eb8-b05e-ce993aee3d45_0,,,Perimeter insulation should be continuous and have a minimum entry of 500 millimetres.,greater-equal,synthetic
b6e6ebce-e75f-4fae-b9a2-e35c164b3fb4,"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",{'ID': '342_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",selection,annotated
f0c72b35-5a0a-4554-8713-96f6f73a67f1,A cube with edges of no more than 50 millimetres may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,{'ID': '51_Finnish_SafetyOfUse'},A cube with edges of no more than 50 millimetres may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,necessity,annotated
53bb982d-5260-4a69-a6dd-71e4f074e676_7,,,The horizontal spacing of standing rows must be at least 20 degrees Celsius.,greater-equal,synthetic
ee0c8c7c-c65e-4403-92e6-628fd680f3bf,Any panel within the doorset should be at least 15mm thick.,{'ID': '30_UK_DocQ_Security_Dwellings'},Any panel within the doorset should be at least 15mm thick.,part-of,annotated
b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",none,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74_1,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a acoustically reflective number of steps of 0.2.",equal,synthetic
4a82f789-a98a-4379-9b81-2a20cfba6c87_8,,,"If the internal ties must be centred on the supporting line, the minimum value of the width, 200 m2, will also be applied to internal ties.",greater-equal,synthetic
4470dde4-6422-4c13-9781-de68c3e075dc_2,,,"The outdoor inaccuracies of a dwelling unit, however, shall be designed to be a minimum of two years.",greater-equal,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647_7,,,"Parapets in primary energy content A to 400kg and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic
13a437c0-918c-47f2-85bd-b80dd69eb027_3,,,"There are no planned time of use on the load EER of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic
c5c5365f-273f-4c29-8491-4f50aabc3b78,"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",{'ID': '74_UK_DocM_V2_AccessAndUseOfBuildings'},"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",selection,annotated
fa8a6d84-eb99-490e-8169-3c65353fb553_10,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the structure shall be at least adequate number.",greater-equal,synthetic
8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated
e1460729-0b58-4a44-99ac-dc150f918428,The cleanouts shall be located so that the entire pipeline may be cleansed.,{'ID': '158_Finnish_Health-WaterAndSewerage'},The cleanouts shall be located so that the entire pipeline may be cleansed.,selection,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_9,,,"If the limits of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds A of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic
aaca648c-5f60-4300-a30f-887da252ebd0,The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,{'ID': '116_UK_DocM_V2_AccessAndUseOfBuildings'},The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,selection,annotated
5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",part-of,annotated
9fd15b82-fc32-4364-8724-f1ef14f0c047_6,,,The cooker hood should side at least the use of the cooker.,greater-equal,synthetic
aaca648c-5f60-4300-a30f-887da252ebd0,The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,{'ID': '116_UK_DocM_V2_AccessAndUseOfBuildings'},The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,selection,annotated
12f51746-1632-4628-9d8a-98dcf58ed9fc,Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,{'ID': '116_UK_DocM_V1_AccessAndUseOfBuildings'},Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,selection,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",part-of,annotated
316c89ee-aa42-4e7a-9372-960cf25b3265,Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,{'ID': '105_UK_DocF_V2_Ventilation'},Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,selection,annotated
02f5e3fb-7a8b-4a88-a6e5-337cc0835284,"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",{'ID': '90_UK_DocO_Overheating'},"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",none,annotated
ced8e4bc-84ed-467a-b41f-d933cff5bb0d,All evacuation areas must be designed in such a way that it is possible to transport an immobile individual on a stretcher via the exit route.,{'ID': '15_Finnish_SafetyOfUse'},All evacuation areas must be designed in such a way that it is possible to transport an immobile individual on a stretcher via the exit route.,selection,annotated
57f7bbad-51b7-4627-8fe9-2d7a50289448,"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",{'ID': '64_UK_DocM_V2_AccessAndUseOfBuildings'},"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",necessity,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated
3153d771-404e-4a54-ac05-ed1b75e37506,"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",{'ID': '8_UK_DocK_ProtectionFromFalling'},"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",necessity,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a_9,,,Modular and portable buildings with a planned target fabric energy efficiency rate of more than 8 per cent (1:12.5) but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic
50e89a86-e2be-439d-b230-79274cd7199b_1,,,Modular and portable buildings with a planned CO2 emission factor of more than 1.3 seconds at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic
6075de3c-d339-4ba4-9945-990480975615_8,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 28 metres network distribution point of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,necessity,annotated
ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
8e7e4d9a-05b8-4512-91c5-e8dbb9488685,"At night, windows, patio doors and balcony doors should be modelled as closed.",{'ID': '55_UK_DocO_Overheating'},"At night, windows, patio doors and balcony doors should be modelled as closed.",selection,annotated
29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,selection,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_7,,,The normal relationship between the total capital cost of the rise and going is: 270 millimetres equals between 550mm and 700mm.,equal,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",equal,annotated
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated
c384013b-c40f-4925-acbe-465e1ca5bc13_10,,,14 metres warning sign per detail should be recorded.,equal,synthetic
8b054fa5-fa6b-40f8-996a-a6dfea855fc3_10,,,"The free gap between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than B on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic
984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",none,annotated
5ca184fa-e100-4f97-957d-e37ae944786f_11,,,The side edges of installing electric vehicle charge points and cable routes is not more than 18 dm3/s of the total capital cost of the major renovation.,less-equal,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2_10,,,"The natural light installed in a dwellings habitable rooms and kitchens should be no fewer than 10m, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic
c1b2e39e-0bab-438c-8b35-c2b37e5cf93a,"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",{'ID': '233_UK_DocM_V2_AccessAndUseOfBuildings'},"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",none,annotated
3c801d84-c59d-48ef-95b9-f711d22061d4,"The compartment should be fitted with support rails, and include a minimum activity space to accommodate people who use crutches, or otherwise have impaired leg movements.",{'ID': '167_UK_DocM_V2_AccessAndUseOfBuildings'},"The compartment should be fitted with support rails, and include a minimum activity space to accommodate people who use crutches, or otherwise have impaired leg movements.",necessity,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9_9,,,"Door entry controls, where provided, are mounted 28 metres ventilation provision finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic
793cb939-b3d9-46eb-ae65-71a4d5c8031b_0,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be clear width to 4.,less-equal,synthetic
e21fa967-934e-4a29-a66d-252fdbbf928f_6,,,"If the parasitic energy use is unknown, an absence of 0.052083333 should be made for any control system.",equal,synthetic
10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",necessity,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a_6,,,Modular and portable buildings with a planned thickness of more than 190 millimetres but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic
c952db0f-b605-4335-8d56-97fc339ad5ba_2,,,All 1800mm dwelling of the installation and commissioning checklist should be completed.,equal,synthetic
7f3f59a4-fc7e-4b14-8074-384f6cacf548_6,,,"The dimensions of a barrier in a dwellings indoor areas may, however, be at least 1 if the drop is less than three metres.",greater-equal,synthetic
fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",none,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated
ccc405a0-c6d6-4ace-ad70-e0cfe07cd1e3,"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",{'ID': '14_UK_DocK_ProtectionFromFalling'},"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",necessity,annotated
50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,selection,annotated
84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",none,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_6,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under glare and reflections 1,200 millimetres.",equal,synthetic
a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",selection,annotated
81f14fc1-af5d-45e8-8725-94d2510e4701_1,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a either side of at least 390 millimetres in the hallway and kitchen.",greater-equal,synthetic
5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated
c06bb553-d8f1-47f5-ab33-cfdebb6bca52,"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated
a1f91cfd-21f8-49a4-8468-746f49f4848e_1,,,"For a building that contains more than 0.8 metres water system for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic
74002ed3-548e-4e2f-8835-be76e643c67d_7,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least one per 100m2 distance of the basement storey floor from the entry level.,greater-equal,synthetic
1d10aa43-7650-46b1-83c3-867f212ab9c3,Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,{'ID': '58_UK_DocF_V1_Ventilation'},Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,part-of,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb_1,,,"In the absence of relevant harmonised European Standards, products with a dwelling emission rate exceeding two years must have a product certificate issued by a Notified Body.",greater,synthetic
fb5d3054-4911-4049-ba09-1c3e80f9c07c_10,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the number of occupants may be no more than 21 C.",less-equal,synthetic
d34c0f60-8df0-4310-b5af-428c63225a6f,"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",{'ID': '60_Finnish_Health-WaterAndSewerage'},"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",selection,annotated
bfe386ee-8c0b-41d4-9967-6e873edf7229,"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",{'ID': '148_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",none,annotated
01d924bf-4a69-4eb8-b05e-ce993aee3d45_8,,,Perimeter insulation should be continuous and have a minimum anthracite figure of 0.9 metres.,greater-equal,synthetic
c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",selection,annotated
8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated
6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,selection,annotated
6e5e61dd-039d-4079-9c3f-f52fc12efefb,For continuing horizontal structures the loaded area shall be calculated span by span.,{'ID': '12_Finnish_StabilityOfStructures'},For continuing horizontal structures the loaded area shall be calculated span by span.,selection,annotated
e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,none,annotated
328fb8e7-cae4-4465-b7a7-24f0d066d65a,"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",{'ID': '360_UK_DocM_V2_AccessAndUseOfBuildings'},"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",part-of,annotated
31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",none,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_8,,,"In buildings more than 30 and at most 28 metres in heating plant emission rate, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic
850d22c2-6ff0-4ab6-89e1-75368bad5aa6,Barriers on loading docks must not impede loading and unloading.,{'ID': '136_Finnish_SafetyOfUse'},Barriers on loading docks must not impede loading and unloading.,necessity,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,part-of,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",selection,annotated
ef561e39-db90-462c-8dde-15fbeae954e5_9,,,A cube with standards of no more than 0.055555556 may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic
b4754f3a-0a30-40fd-9f90-2e3d9e30d2a6,Fixed building services must be commissioned to ensure that they use no more fuel and power than is reasonable in the circumstances.,{'ID': '371_UK_DocL_V1_ConsrvationOfFuelAndPower'},Fixed building services must be commissioned to ensure that they use no more fuel and power than is reasonable in the circumstances.,none,annotated
710ef992-e187-4b1a-894b-e0e222f54359_0,,,"NOTE: For grid-supplied electricity, a number of people evacuating of 90mm and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic
eeb4239f-3819-475c-ad20-756bed80c4ff,"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",{'ID': '151_Finnish_EnergyEfficiency'},"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",part-of,annotated
8364a5f1-f80e-484c-9f38-bffc6f4c1876_2,,,"Where communal parking is provided to blocks of flats, at least 50 standard pipework is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic
64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",none,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",necessity,annotated
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_8,,,"Where a new building contains more than adequate means ceilings, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic
a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",none,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_8,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in adequate means foundations properties, where there should be no fewer than four.",equal,synthetic
ad792658-a7d2-4d6e-9a21-c531bb02b521,To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to the occupied parts of buildings to an extent which would give rise to an irritant concentration.,{'ID': '12_UK_DocD_ToxicSubstances'},To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to the occupied parts of buildings to an extent which would give rise to an irritant concentration.,selection,annotated
2ff58135-b89d-40d1-a145-51aad9e5a942_6,,,"The landing in front of the outside door shall be at least one number of storeys and at least 1,500 millimetres long.",greater-equal,synthetic
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_2,,,A building with a fire load exceeding 280mm must be equipped with anchoring structures for safety lines.,greater,synthetic
86831830-e7f0-4b90-aa27-dc0542b7ba4d_6,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 1800mm step.",greater-equal,synthetic
5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,part-of,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_3,,,The CO2 of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the cold side of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic
2319724e-2fd4-463b-bb59-0972073dc55a,"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",{'ID': '44_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",selection,annotated
db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated
ba93ede4-473f-4c07-b439-3699580cbcbe,No individual flight has a rise of more than 1800mm between landings.,{'ID': '21_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise of more than 1800mm between landings.,selection,annotated
0da52584-1b37-48b5-840f-3795ae695275_4,,,the minimum clear dimensions of the platform are: 1100mm wide and 70 kN constraints where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
c5c5365f-273f-4c29-8491-4f50aabc3b78,"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",{'ID': '74_UK_DocM_V2_AccessAndUseOfBuildings'},"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",none,annotated
164122ed-c7ac-4cf8-8a54-3d56c144f78d_1,,,"In general, the findings indicate that there should be at least the same number of wall-to-floor junctions as perimeter insulation and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic
e8340500-38b6-461b-b00d-d3aa44ac1f0b_7,,,The sections of the water available from the hot water system may not exceed 65mm.,less-equal,synthetic
8fcdc238-3c30-4659-9303-1b126a39b2cd_11,,,The design solar load should be for dua-lfuel appliances by at least 0.055555556.,greater-equal,synthetic
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6,The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,{'ID': '119_Finnish_SafetyOfUse'},The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,part-of,annotated
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,annotated
8b054fa5-fa6b-40f8-996a-a6dfea855fc3_3,,,"The drop between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 100mm on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic
f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",selection,annotated
c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated
65b5e58d-ead5-43fb-831e-3a42487fa227,"People with hearing impairments should be able to participate fully in conferences, committee meetings and study groups.",{'ID': '133_UK_DocM_V2_AccessAndUseOfBuildings'},"People with hearing impairments should be able to participate fully in conferences, committee meetings and study groups.",necessity,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_3,,,"The wall ties should have a horizontal spacing of 900mm and a domestic hot water circulation heat loss of 24 degrees Celsius, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",selection,annotated
12e545d1-64f4-45c9-a520-5b8a003eba0a_8,,,"If the dwelling has more than 15 exposed building's, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic
a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",none,annotated
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_4,,,"In a CO2 readings with no openable submission, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic
00cded8a-5208-4c1b-bda4-9677d45b9375,The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,{'ID': '105_Finnish_Health-Humidity'},The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,necessity,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a_2,,,Modular and portable buildings with a planned Capacities of more than 0.3 but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_6,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be heat gain 0.07.",equal,synthetic
2032e456-bf80-4342-90dc-0da164e00a9a,A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '7_UK_DocF_V1_Ventilation'},A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,none,annotated
8421f806-70f2-46a9-a308-90a40da3541d,"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",{'ID': '41_UK_DocM_V2_AccessAndUseOfBuildings'},"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",necessity,annotated
2a256a9c-0b8a-4acf-87e1-86a5857f36a3_5,,,"Where a driveway forms all, or part of, the approach route, an linked to one another in at least four groups of at least 2,100 millimetres wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic
3ac96918-764f-403d-a588-37b5f4a16f46,"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",{'ID': '284_UK_DocM_V2_AccessAndUseOfBuildings'},"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",part-of,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",part-of,annotated
c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated
8b1482fe-5e9d-4b44-9157-a8de35c65ba9,"If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise-attenuating background ventilator should be fitted.",{'ID': '86_UK_DocF_V1_Ventilation'},"If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise-attenuating background ventilator should be fitted.",selection,annotated
7f696221-52c9-4c52-8f90-74bd93c51299,This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,{'ID': '73_UK_DocM_V1_AccessAndUseOfBuildings'},This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,selection,annotated
b8365796-12c1-47c1-9682-ff6131a75f21,"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",{'ID': '227_UK_DocM_V2_AccessAndUseOfBuildings'},"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",selection,annotated
3e9fc57e-bc69-4f17-a056-dd7767afa9bb_1,,,"If the standard thickness of the building does not exceed 180 millimetres, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic
83344b26-7cf0-452a-9dac-c0288c46393d,"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '37_UK_DocQ_Security_Dwellings'},"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated
f19c920a-bd5a-49ac-a111-69fb944271b4,The net heating energy demand for ventilation shall be calculated on the basis of the heating of air after heat recovery to supply air temperature and any heating before heat recovery.,{'ID': '86_Finnish_EnergyEfficiency'},The net heating energy demand for ventilation shall be calculated on the basis of the heating of air after heat recovery to supply air temperature and any heating before heat recovery.,necessity,annotated
c2e0629d-350b-45b8-9e9e-d58be1780f12_1,,,"If the street areas has no Ventilation ductwork, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic
51550284-0701-41b2-9a76-a0061d16938a,"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",{'ID': '188_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",none,annotated
239bd568-c5f2-4ab5-955c-f2d8d86b7b7f,"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",{'ID': '90_UK_DocM_V2_AccessAndUseOfBuildings'},"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",necessity,annotated
8f2f0722-46e5-4c3a-937d-51edde58141a,Routes intended for vehicle traffic must be located in a way that does not restrict pedestrian routes or the space required for opening doors and gates.,{'ID': '90_Finnish_SafetyOfUse'},Routes intended for vehicle traffic must be located in a way that does not restrict pedestrian routes or the space required for opening doors and gates.,selection,annotated
5fe7997a-7e99-485c-89b3-7912d7c8d44d,"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",{'ID': '199_UK_DocF_V1_Ventilation'},"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",selection,annotated
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4,"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",{'ID': '6_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",part-of,annotated
419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",none,annotated
12e1a42b-38ed-42c8-ac32-86091fcb85b1,The frequency of measurements should be sufficient to ensure that changes in the use of the room or space throughout the day are represented in the readings.,{'ID': '125_UK_DocF_V2_Ventilation'},The frequency of measurements should be sufficient to ensure that changes in the use of the room or space throughout the day are represented in the readings.,part-of,annotated
b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",none,annotated
bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",selection,annotated
c236bc17-ef9a-4694-a34e-68a9f38ae405,"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",{'ID': '323_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",necessity,annotated
da4d5959-6e64-4e04-a1f3-8b42b6addab0_10,,,The outdoor tread used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 5m.,greater-equal,synthetic
4d80c4d1-08ee-481a-9f9c-e9151ce1094d_7,,,"The open outwards of windows, roof windows, rooflights and doors should not exceed 400 millimetres of the total floor area of the dwelling.",less-equal,synthetic
aa921550-3c5f-470b-b578-1788f83b49a7,Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,{'ID': '153_UK_DocM_V2_AccessAndUseOfBuildings'},Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,none,annotated
a387fcb8-ead2-4094-9be9-72d783468b33_3,,,"If the effective rated output of windows, roof windows, rooflights and doors exceeds 3m of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated
973c9430-2b4a-4ab4-82df-7060c3002f77,The design temperature difference for the community heating primary circuit should be a minimum of 20C.,{'ID': '292_UK_DocL_V1_ConsrvationOfFuelAndPower'},The design temperature difference for the community heating primary circuit should be a minimum of 20C.,greater-equal,annotated
0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3,The floor area of the extension does not exceed 30m2.,{'ID': '13_UK_DocL_V1_ConsrvationOfFuelAndPower'},The floor area of the extension does not exceed 30m2.,less-equal,annotated
1181f374-2034-44c4-8823-26f80bd0ec02,The barrier must not feature horizontal structures or patterns that make it possible to climb.,{'ID': '41_Finnish_SafetyOfUse'},The barrier must not feature horizontal structures or patterns that make it possible to climb.,necessity,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a_4,,,Modular and portable buildings with a planned Ventilation of more than 3.3m but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic
13a437c0-918c-47f2-85bd-b80dd69eb027_8,,,"There are no deep on the boiler type of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic
0262f6e5-21bc-4312-9388-8ac93b79416d,The minimum full load EER of the absorption chillers should be no worse than 0.7.,{'ID': '285_UK_DocM_V2_AccessAndUseOfBuildings'},The minimum full load EER of the absorption chillers should be no worse than 0.7.,selection,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",selection,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_5,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be slope 2.4m.",equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_2,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under feasibility of installing high-efficiency alternative systems 0.1m2.",equal,synthetic
6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,none,annotated
37f01a2c-b944-45a2-a7f4-140d8c03d7ac_8,,,"After rebating, frame components should retain at least 450mm of light well.",greater-equal,synthetic
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_6,,,The smaller rate of heat release of each panel which can be either the width or height of the panel should be 300 millimetres or less.,less-equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_0,,,"Where the work concerns a building containing more than 0.15 dm3/s per m2 system and its electrical output, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic
89811586-c819-4eb5-99f5-c4fcefdb9520,Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,{'ID': '107_Finnish_SafetyOfUse'},Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,selection,annotated
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection,annotated
53e31e26-a39b-4047-a86e-bdb8021413e8_11,,,Window handles on windows that open outwards are not more than 300 litres primary energy content when the window is at its maximum openable angle.,less-equal,synthetic
70cd7164-bc50-4b16-95b0-432188db4ea5,Buildings located near to significant local pollution sources should be designed to minimise the intake of external air pollutants.,{'ID': '80_UK_DocO_Overheating'},Buildings located near to significant local pollution sources should be designed to minimise the intake of external air pollutants.,necessity,annotated
a86b58e8-046f-44b7-8e1b-00c876c8c647_8,,,"Parapets in heat gain A to 650mm and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic
8207751f-13b8-4fe3-9bfe-4423093d4905_8,,,"A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the control capabilities of the staircase and exit route is no more than 2,100 millimetres.",less-equal,synthetic
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_7,,,"If the Manual control of a mechanical ventilation systems air duct is designed to be greater than 3m, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic
5e51b653-449e-4d00-be19-0e20ecff5c49,The default condition should be off.,{'ID': '213_UK_DocM_V2_AccessAndUseOfBuildings'},The default condition should be off.,equal,annotated
3ca5cb38-b90b-4449-ba14-4268866df8e1_6,,,"The water heater is close to the draw-off points and has a power requirements no greater than 1,500 millimetres.",less-equal,synthetic
956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",part-of,annotated
5ca184fa-e100-4f97-957d-e37ae944786f_2,,,The energy consumption of installing electric vehicle charge points and cable routes is not more than off of the total capital cost of the major renovation.,less-equal,synthetic
c47598f9-df79-4d77-aba9-8f380342372f_4,,,extract air of flushing 0.7 shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic
208b093d-361f-4aec-819d-4abca4e72c68_9,,,"in an evacuation area where the tie force is 6mm, the second exit may be no less than 900 millimetres in width.",equal,synthetic
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_6,,,The normal relationship between the ending of the rise and going is: 0.35W/(m2K) equals between 550mm and 700mm.,equal,synthetic
f4b90866-b477-4fe0-a96f-3d6e0d1bd2f6,The annual percentage of heat supplied from each heat source should be the same for each newly connected dwelling.,{'ID': '79_UK_DocL_V1_ConsrvationOfFuelAndPower'},The annual percentage of heat supplied from each heat source should be the same for each newly connected dwelling.,necessity,annotated
922bf8df-3a70-4f45-8c04-200b638d3b3c,The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,{'ID': '59_Finnish_Health-WaterAndSewerage'},The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,necessity,annotated
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,necessity,annotated
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_10,,,"There should be a space heating or airconditioning system, in the absence of tobacco smoke or other excessive pollutants, of 35 mg/m3 (30 ppm).",equal,synthetic
339fc78c-a2f2-481c-a410-3aeb41e24b8a_9,,,Solid walls constructed of coursed brickwork or blockwork should be at least as reception as 100 litres of the storey height.,greater-equal,synthetic
d0b6759e-deec-451d-bd7a-ec65b96048be,"extract air of category 3 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",{'ID': '130_Finnish_Health-IndoorClimateAndVentilation'},"extract air of category 3 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",part-of,annotated
da4d5959-6e64-4e04-a1f3-8b42b6addab0_7,,,The outdoor side edges used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 20 degrees Celsius.,greater-equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_11,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for air flow rates 15 degrees and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
b4ae0bf1-8dec-4e43-b10b-4a593780d742,Partitioning doors in accommodation premises shall be equipped with closing devices.,{'ID': '121_Finnish_FireSafety'},Partitioning doors in accommodation premises shall be equipped with closing devices.,part-of,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",none,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_0,,,Individual flights are: for intended time of use up to half not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_3,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and thermal integrity eight per cent air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,none,annotated
e4fb8d18-8dbc-4351-a2df-d87f880f476a_9,,,The allowance for balconies is 100 litres that of the load-bearing structures of the storey.,equal,synthetic
3322ab9c-4c2b-49af-9bf5-74e0efec08d1,The water system shall withstand internal excess pressure of at least 1 000 kilopascals.,{'ID': '65_Finnish_Health-WaterAndSewerage'},The water system shall withstand internal excess pressure of at least 1 000 kilopascals.,necessity,annotated
973c9430-2b4a-4ab4-82df-7060c3002f77_4,,,The number of occupants for the community heating primary circuit should be a minimum of 30m2.,greater-equal,synthetic
26980508-105c-49db-8595-bf001a48d757_9,,,"In cooker hood with no fixed Door furniture or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
eefe1191-2903-4fb8-9138-6471e09fb67d,The internal temperature exceeds 23C at 11pm.,{'ID': '53_UK_DocO_Overheating'},The internal temperature exceeds 23C at 11pm.,greater,annotated
43a7a088-718f-4a11-a392-88e71559466e,"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",{'ID': '107_UK_DocM_V2_AccessAndUseOfBuildings'},"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",selection,annotated
082c7ed9-3579-48c2-a0d2-076f1edd647c_2,,,"Each of the 2.4m entry of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74_1,,,"In a tier that is uninterrupted by cross-gangways, and where the cross fall exceeds 1 in 40, use a maximum number of steps of 40.",greater,synthetic
35cacecf-06dc-4b0f-aadb-db2ee05518c7_9,,,The area of windows and roof windows (but excluding display windows) Insulated exceeds two of the facade area.,greater,synthetic
d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",less-equal,annotated
40b40b1b-d1b1-49d8-b9b7-13c5845a169d,The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,{'ID': '71_Finnish_Health-WaterAndSewerage'},The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,part-of,annotated
2f815a08-db3c-48a6-b248-d69aeac870ee_11,,,"the vertical anthracite figure is: a. not more than 0.3, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic
d342429e-d3fc-46e0-a195-527cfef1fd4b_4,,,"When an existing building with a total useful load capacity of over 90 is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic
bfc6b7af-2aa8-4c6c-8d4d-1b86f8a67eb5,The total supply air flow should be distributed proportionately to the volume of each habitable room.,{'ID': '105_UK_DocF_V1_Ventilation'},The total supply air flow should be distributed proportionately to the volume of each habitable room.,necessity,annotated
8bb9aee2-a950-4a65-a715-287035906789,"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",{'ID': '27_Finnish_Accessibility'},"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",part-of,annotated
cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",selection,annotated
43e26628-8b62-4cc6-91e2-284335df1564_8,,,"In rooms used for sleeping or rest, the input charge may not exceed 130 millimetres.",less-equal,synthetic
6594919a-cde6-4dd8-be04-eb61e30f99bb,"Snow or rain-water shall not be allowed to ingress the ventilation system via externally mounted air transfer devices in quantities causing damage to the system, lowering air quality or impairing the functioning of the system.",{'ID': '67_Finnish_Health-IndoorClimateAndVentilation'},"Snow or rain-water shall not be allowed to ingress the ventilation system via externally mounted air transfer devices in quantities causing damage to the system, lowering air quality or impairing the functioning of the system.",none,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a,"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",{'ID': '99_Finnish_SafetyOfUse'},"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",selection,annotated
9027959e-efc1-4d32-acbe-e0775d40f001_2,,,"The morticed bolts should have a minimum results of 2m, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic
64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",selection,annotated
5b4380ba-0066-4735-a362-316d4c8e70b2_5,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 1800mm heat pump after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic
8e8f4fb5-00b5-404f-89df-a07287984748,"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",{'ID': '229_UK_DocM_V2_AccessAndUseOfBuildings'},"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",necessity,annotated
b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",part-of,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated
11f2902d-29c2-474e-97d0-628a2a97a666,"Level differences of over 500 millimetres must be equipped with an appropriate safety barrier, railing or handrail.",{'ID': '109_Finnish_SafetyOfUse'},"Level differences of over 500 millimetres must be equipped with an appropriate safety barrier, railing or handrail.",necessity,annotated
bb9ec292-062b-43c3-8590-856dd5f6b890_10,,,"The total flow rate and building emission rate calculated using the measured air permeability must not be higher than the seasonal energy efficiency ratio and target emission rate, respectively.",less-equal,synthetic
64aead92-11dc-49ab-9086-c86f6d1f9c3e,A dynamic calculation tool shall be used for the calculation of the room temperature for the summer season.,{'ID': '162_Finnish_EnergyEfficiency'},A dynamic calculation tool shall be used for the calculation of the room temperature for the summer season.,selection,annotated
7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",selection,annotated
75c60084-6878-472d-8694-e8739e0dd76c_3,,,The width of access routes in assembly areas with a Leakage of one must be at least 900 millimetres.,equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c_5,,,The density of access routes in assembly areas with a maximum capacity of 60 persons must be at least 600kg/m3.,greater-equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_3,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the Air permeability of that installation exceeds 0.055555556 of the total cost of the major renovation.",greater,synthetic
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",necessity,annotated
203faa23-7b71-47c9-a6e5-2333ac45389e_0,,,"The dimensions of the indoor steps of dwelling units and living quarters may be no more than 0.5 kN/m2, and the tread must be no less than 250 millimetres.",less-equal,synthetic
2ca092ec-4425-4552-a389-fd0dadfbd154,NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,{'ID': '54_UK_DocK_ProtectionFromFalling'},NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,selection,annotated
d504fd87-d13d-4936-9d7a-71d17954760d_1,,,The design of the steps in an exit may be no more than eight per cent.,less-equal,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_0,,,"The capacity, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the opening, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic
f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",selection,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50_3,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the maximum number of occupants of the heat emitters to be installed does not exceed EI 30.",less-equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
d5e04f9c-3e74-4ade-8a8c-07b77efd3fd1,"For windows and roof windows, U-values should be calculated based on a vertical position.",{'ID': '110_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For windows and roof windows, U-values should be calculated based on a vertical position.",necessity,annotated
922bf8df-3a70-4f45-8c04-200b638d3b3c_10,,,The cold water pipe shall be designed and installed so that the CO2 emissions in the cold water system may not exceed one per 100m2.,less-equal,synthetic
23cff3c3-1251-4c5f-9fd9-8f52d25eb494_3,,,Gasfired boilers and multi-stage oilfired boilers with an use of more than six metres should have fully modulating burner controls.,greater,synthetic
d504fd87-d13d-4936-9d7a-71d17954760d_9,,,The air distribution of the steps in an exit may be no more than certain proportion.,less-equal,synthetic
9618a274-45da-4e3e-87f0-21c2bfae4a8e_5,,,"A guardrail must be used at points with a minimum value of over 100 millimetres, if these can be accessed by children.",greater,synthetic
41d06a37-5039-4dc0-aae1-0fe3abbd84fc,The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements.,{'ID': '132_UK_DocL_V1_ConsrvationOfFuelAndPower'},The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements.,necessity,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,annotated
9618a274-45da-4e3e-87f0-21c2bfae4a8e_11,,,"A guardrail must be used at points with a rate of heat release of over 3, if these can be accessed by children.",greater,synthetic
2ff58135-b89d-40d1-a145-51aad9e5a942_3,,,"The landing in front of the outside door shall be at least 15mm heat emission capacity and at least 1,500 millimetres long.",greater-equal,synthetic
eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,none,annotated
d988e207-c3f9-4314-9a16-f99b334595f4_8,,,The Manual control must be no less than twice the rise plus the going (2R G).,greater-equal,synthetic
23cff3c3-1251-4c5f-9fd9-8f52d25eb494_4,,,Gasfired boilers and multi-stage oilfired boilers with an sum of more than 0.3 should have fully modulating burner controls.,greater,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_1,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the riser is not less than 3.3m.",greater-equal,synthetic
4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",selection,annotated
83344b26-7cf0-452a-9dac-c0288c46393d,"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '37_UK_DocQ_Security_Dwellings'},"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated
86831830-e7f0-4b90-aa27-dc0542b7ba4d_10,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 1,200 millimetres span.",greater-equal,synthetic
a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",none,annotated
f2516477-0c54-4192-9a7a-7bf8755f57e9,"The water meter of a property shall be located in a place where it is easy to install, read and service and where it cannot freeze.",{'ID': '73_Finnish_Health-WaterAndSewerage'},"The water meter of a property shall be located in a place where it is easy to install, read and service and where it cannot freeze.",necessity,annotated
f5a71c7b-e852-40f2-8f88-91cda7902a7e_0,,,"If a new building has a space heating or airconditioning system with an shallow projecting greater than 1m2, a building automation and control system should be installed.",greater,synthetic
75c60084-6878-472d-8694-e8739e0dd76c_1,,,The width of access routes in assembly areas with a quality of the installation of 8 per cent (1:12.5) must be at least 900 millimetres.,equal,synthetic
8e8f4fb5-00b5-404f-89df-a07287984748_4,,,"In buildings with a level differences greater than 100, automatic meter reading and data collection facilities should be installed.",greater,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e_10,,,"The stairs of the indoor steps of dwelling units and living quarters may be no more than 32mm, and the tread must be no less than 250 millimetres.",less-equal,synthetic
51517a5d-dd11-41b9-b44b-36d87b959127,The presence of the door should be apparent not only when it is shut but also when it is open.,{'ID': '77_UK_DocM_V2_AccessAndUseOfBuildings'},The presence of the door should be apparent not only when it is shut but also when it is open.,none,annotated
86831830-e7f0-4b90-aa27-dc0542b7ba4d_11,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 900 millimetres operation.",greater-equal,synthetic
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated
77f993c6-dff1-4f9a-8f66-73221d3cbaff_11,,,"If the dwelling only has 20mm sanitary accommodation, a minimum ventilation rate of 13l/s should be used.",equal,synthetic
76bf63bd-30f4-440d-81a0-61ca16170f70_5,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the thick is less than 8.5m2 of the total load.,less,synthetic
f72a98f3-b7d2-4633-b244-0d7242dfb0c9_11,,,Every single bedroom has a minimum room temperature of 100 millimetres and is at least 2.4m wide.,greater-equal,synthetic
e8340500-38b6-461b-b00d-d3aa44ac1f0b_4,,,The alongside the leading edge of the water available from the hot water system may not exceed adequate means.,less-equal,synthetic
77f993c6-dff1-4f9a-8f66-73221d3cbaff_1,,,"If the dwelling only has 120 lead boiler, a minimum ventilation rate of 13l/s should be used.",equal,synthetic
19478a13-7457-4dd3-a394-744f826db7b0_3,,,"The handle to at least 650mm gaps in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic
710ef992-e187-4b1a-894b-e0e222f54359_6,,,"NOTE: For grid-supplied electricity, a total number of 8.5m2 and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic
fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",necessity,annotated
45b99da0-5bce-49b7-9ce2-04810c7e5a19,"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",{'ID': '151_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",necessity,annotated
94c0e823-a61d-49d6-82b3-4ca96f65dfa4,The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,{'ID': '64_Finnish_SafetyOfUse'},The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,necessity,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d_10,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a design temperature difference exceeding 0.15 and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic
88e23b46-22d9-4be6-87b7-40541f7995a9_5,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the calculation of primary energy and CO2 emissions exceeds 100 litres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic
2ff58135-b89d-40d1-a145-51aad9e5a942_1,,,"The landing in front of the outside door shall be at least 7 mg/m3 (6 ppm) protection and at least 1,500 millimetres long.",greater-equal,synthetic
20518e80-6f7e-457f-8c5a-59fa4c0eb324,"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",{'ID': '137_Finnish_EnergyEfficiency'},"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",none,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",part-of,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_5,,,"The wall ties should have a frequency of 55 degrees Celsius and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
f0c72b35-5a0a-4554-8713-96f6f73a67f1_6,,,A cube with primary energy factor of no more than 18 dm3/s may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic
77be05f2-cd8c-4d35-85e4-6637b999d8e7,The value of the consequential improvement works should not be less than 10 of the value of the principal works.,{'ID': '452_UK_DocM_V2_AccessAndUseOfBuildings'},The value of the consequential improvement works should not be less than 10 of the value of the principal works.,selection,annotated
ef4f54b6-1099-4404-9fa2-d0c0d5e55543_9,,,The location must not exceed the individual dwellings selection.,less-equal,synthetic
11f2902d-29c2-474e-97d0-628a2a97a666,"Level differences of over 500 millimetres must be equipped with an appropriate safety barrier, railing or handrail.",{'ID': '109_Finnish_SafetyOfUse'},"Level differences of over 500 millimetres must be equipped with an appropriate safety barrier, railing or handrail.",greater,annotated
079db365-cfed-474e-9329-25349ac0db4a_2,,,"In connection with the door of an outside space of an individual dwelling the boiler type outside the door may be more than 100 litres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",greater-equal,annotated
5ca184fa-e100-4f97-957d-e37ae944786f_5,,,The domestic hot water cylinder heat loss of installing electric vehicle charge points and cable routes is not more than 0.7W/(m2K) of the total capital cost of the major renovation.,less-equal,synthetic
74002ed3-548e-4e2f-8835-be76e643c67d_2,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least 400 millimetres configuration.,greater-equal,synthetic
bde1697a-20c9-4f15-a63c-5be323a058c1_7,,,"Any connection of 1,000 millimetres or more sinks to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.",greater-equal,synthetic
339fc78c-a2f2-481c-a410-3aeb41e24b8a_1,,,Solid walls constructed of coursed brickwork or blockwork should be at least as feasibility of installing high-efficiency alternative systems as 1.501kWhPE/kWh of the storey height.,greater-equal,synthetic
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_5,,,The normal relationship between the dimensions of the rise and going is: proportion equals three metres.,equal,synthetic
5e51b653-449e-4d00-be19-0e20ecff5c49_1,,,The default that should be 50 millimetres.,equal,synthetic
74002ed3-548e-4e2f-8835-be76e643c67d_0,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least half a metre energy efficiency.,greater-equal,synthetic
2032e456-bf80-4342-90dc-0da164e00a9a,A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '7_UK_DocF_V1_Ventilation'},A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,none,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_7,,,"The dwelling primary energy rate, rated speed and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, total number of ventilators and target fabric energy efficiency rate, respectively.",less-equal,synthetic
3e9fc57e-bc69-4f17-a056-dd7767afa9bb_11,,,"If the limits of the building does not exceed 0.3, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_10,,,the minimum clear dimensions of the platform are: 1100mm wide and 90 control function where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_0,,,A building with a lengths exceeding 18 dm3/s must be equipped with anchoring structures for safety lines.,greater,synthetic
f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",selection,annotated
8719164e-370a-42f2-9240-0a1b8db1a2c7,Extensive voids must be partitioned in order to restrict the spread of fire.,{'ID': '129_Finnish_FireSafety'},Extensive voids must be partitioned in order to restrict the spread of fire.,necessity,annotated
bfdf95da-d422-47cd-83d7-a30a4969f2e6_10,,,"If the internal ties must be centred on the supporting line, the minimum value of the patterns, 1,000 millimetres, will also be applied to internal ties.",greater-equal,synthetic
5b4380ba-0066-4735-a362-316d4c8e70b2_3,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 180kW shower rooms after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1_0,,,A minimum of certain proportion in five of the remaining residential block of flats must have access to cable routes.,greater-equal,synthetic
20216261-f56d-4f79-8a46-c781abe19f04,"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",{'ID': '98_UK_DocF_V2_Ventilation'},"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",selection,annotated
984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",none,annotated
f733b7c9-a406-4f5a-b383-9d3f8b70a559,The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,{'ID': '5_UK_DocA_Structure'},The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,none,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd_4,,,"An WC accommodation with a potentially flammable or explosive atmosphere must not be located in a doors where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic
6a41a473-bd3c-4e38-a093-094b3fdae388_6,,,At least one in every 230mm remaining heating appliance must be provided with cable routes.,equal,synthetic
596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",selection,annotated
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated
8b054fa5-fa6b-40f8-996a-a6dfea855fc3_4,,,"The axle group load between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 220 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic
42f29765-356f-4d9c-9a73-bc99e7044e07,"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",{'ID': '47_UK_DocM_V2_AccessAndUseOfBuildings'},"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",necessity,annotated
c0abe869-e87e-4e66-a8ca-8578a338b07a,"Where a building automation and control system is installed, its control capabilities should be appropriate for the building, its expected usage and the building services specification.",{'ID': '329_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a building automation and control system is installed, its control capabilities should be appropriate for the building, its expected usage and the building services specification.",selection,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_4,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in B extract fan properties, where there should be no fewer than four.",equal,synthetic
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_8,,,"The edges of steps in covered or heated outdoor staircases must be no less than 20 degrees Celsius, and the riser may be no more than 160 millimetres.",greater-equal,synthetic
d30364dd-539e-4351-9d53-89ad358a4b44,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the outer developed surface area, which is often greater than the area of the roof opening.",{'ID': '122_UK_DocL_V1_ConsrvationOfFuelAndPower'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the outer developed surface area, which is often greater than the area of the roof opening.",part-of,annotated
710ef992-e187-4b1a-894b-e0e222f54359_8,,,"NOTE: For grid-supplied electricity, a total useful floor area of 300 litres and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic
37f30855-f103-43f1-aef2-b37c05b4c174,Facilitating future connection to any local district heat networks should be considered (e.g. providing capped off connections in pipework to allow later connection to a local district heat network).,{'ID': '232_UK_DocL_V1_ConsrvationOfFuelAndPower'},Facilitating future connection to any local district heat networks should be considered (e.g. providing capped off connections in pipework to allow later connection to a local district heat network).,selection,annotated
703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",none,annotated
fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",none,annotated
05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",part-of,annotated
17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",selection,annotated
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_3,,,The efficiency of the floor surface in the seating area and access route may not exceed 32mm.,less-equal,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506_9,,,"Gangways should not be less than 1100mm travel distance unless used by not more than 50 persons, in which case gangways should be a minimum of 2,100 millimetres.",greater-equal,synthetic
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_6,,,A building with a impact exceeding 0.8 metres must be equipped with anchoring structures for safety lines.,greater,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_6,,,"The anthracite figure and building emission rate calculated using the measured air permeability must not be higher than the Air permeability and target emission rate, respectively.",less-equal,synthetic
8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,annotated
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_11,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 20 litres per second Linear interpolation.,greater,synthetic
e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,selection,annotated
360bc9ab-1ae1-44f0-a6a3-c1110edac6a9,The annual energy savings should be estimated using the National Calculation Methodology Modelling Guide.,{'ID': '465_UK_DocM_V2_AccessAndUseOfBuildings'},The annual energy savings should be estimated using the National Calculation Methodology Modelling Guide.,necessity,annotated
4470dde4-6422-4c13-9781-de68c3e075dc,"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",{'ID': '54_Finnish_Health-IndoorClimateAndVentilation'},"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",none,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",part-of,annotated
ef4f54b6-1099-4404-9fa2-d0c0d5e55543_10,,,The thresholds must not exceed the individual dwellings gradient.,less-equal,synthetic
01008f69-874b-443e-bcb2-2f5630280049_6,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the air tightness may be no more than 1,200 MJ/m2 and the tread must be no less than 220 millimetres.",less-equal,synthetic
5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",none,annotated
526d7a82-6362-4fce-8d58-1ab0b0005235,The structures of the wet rooms must be rigid enough that the thermal and moisture movements do no damage the wet room waterproofing or surface structures.,{'ID': '115_Finnish_Health-Humidity'},The structures of the wet rooms must be rigid enough that the thermal and moisture movements do no damage the wet room waterproofing or surface structures.,part-of,annotated
3121fe90-27db-405e-a42a-df3cd22ee176_5,,,"Where necessary, 0.15Window handles, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74_3,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a installed over unheated rooms number of steps of 01:08:00.",equal,synthetic
7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",none,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_0,,,"Where the U-values of installing only cable routes is more than two of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic
1e0aa8d6-4291-4a33-883c-b88453c83287,"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane either horizontal or vertical.",{'ID': '128_UK_DocM_V2_AccessAndUseOfBuildings'},"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane either horizontal or vertical.",selection,annotated
5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,greater,annotated
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,part-of,annotated
f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",necessity,annotated
4094b859-b3b4-4035-94cd-8cf47ccbd801,The load capacity is at least 400kg.,{'ID': '23_UK_DocM_V1_AccessAndUseOfBuildings'},The load capacity is at least 400kg.,greater-equal,annotated
ee0c8c7c-c65e-4403-92e6-628fd680f3bf_2,,,Any panel within the doorset should be at least 390 millimetres condition.,greater-equal,synthetic
c33e482e-252a-4e99-a905-7861a480d024,"Geo-location should be enabled to confirm the location, date and time of each image.",{'ID': '484_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Geo-location should be enabled to confirm the location, date and time of each image.",necessity,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8_5,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the opening must be no less than three seconds.",greater-equal,synthetic
ca1e0369-2dfe-4cf2-8194-87f72ee5a633,"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",{'ID': '385_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",necessity,annotated
2de867fe-80e7-4617-ad18-36225dd45ab1_2,,,Hinged or pivot windows with an energy performance of less than 2.4m are not suitable for purge ventilation.,less,synthetic
12e545d1-64f4-45c9-a520-5b8a003eba0a_0,,,"If the dwelling has more than E 15 exposed bathroom, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",selection,annotated
aac9b625-4f6b-42e6-b657-2accd6054607,Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,{'ID': '299_UK_DocL_V1_ConsrvationOfFuelAndPower'},Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,necessity,annotated
ef4f54b6-1099-4404-9fa2-d0c0d5e55543_11,,,The U-values must not exceed the individual dwellings prevailing wind direction.,less-equal,synthetic
86831830-e7f0-4b90-aa27-dc0542b7ba4d,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",{'ID': '18_Finnish_SafetyOfUse'},"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",greater-equal,annotated
16f6f10e-f32f-48b2-85f9-123cdb5448ee,Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,{'ID': '147_UK_DocL_V1_ConsrvationOfFuelAndPower'},Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,none,annotated
dae0db09-fd4b-4f2c-99c0-cd742b19d17a,"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",{'ID': '68_Finnish_SafetyOfUse'},"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",necessity,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",none,annotated
26980508-105c-49db-8595-bf001a48d757,"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",{'ID': '103_Finnish_SafetyOfUse'},"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",selection,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,none,annotated
6e61f4b0-ddc1-44cb-9966-0e146933d032,"Where a separate-sex toilet washroom can be accessed by wheelchair users, it should be possible for them to use both a urinal, where appropriate, and a washbasin at a lower height than is provided for other users.",{'ID': '171_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a separate-sex toilet washroom can be accessed by wheelchair users, it should be possible for them to use both a urinal, where appropriate, and a washbasin at a lower height than is provided for other users.",selection,annotated
09e6b265-5610-4917-ac32-6b2c8f144fd6,"Windows, skylights and ventilators which can be opened by people in or about the building shall be so constructed or equipped that they may be opened, closed or adjusted safely.",{'ID': '107_UK_DocK_ProtectionFromFalling'},"Windows, skylights and ventilators which can be opened by people in or about the building shall be so constructed or equipped that they may be opened, closed or adjusted safely.",necessity,annotated
c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,necessity,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_10,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for ending up to 0.07 not more than 5m long.,less-equal,synthetic
c47598f9-df79-4d77-aba9-8f380342372f,extract air of category 4 shall be conducted to the outdoors through individual extract air ducts.,{'ID': '88_Finnish_Health-IndoorClimateAndVentilation'},extract air of category 4 shall be conducted to the outdoors through individual extract air ducts.,part-of,annotated
ef561e39-db90-462c-8dde-15fbeae954e5_1,,,A cube with rise of no more than two may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic
079db365-cfed-474e-9329-25349ac0db4a_11,,,"In connection with the door of an outside space of an individual dwelling the maximum number of occupants outside the door may be more than 0.2 if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_11,,,"The size and building emission rate calculated using the measured air permeability must not be higher than the efficiency and target emission rate, respectively.",less-equal,synthetic
76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,part-of,annotated
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",none,annotated
32dec356-9315-4ea6-9213-86ad0a72802b,Drawings should be reviewed by the designer and installer and should include specifications for key materials.,{'ID': '177_UK_DocL_V1_ConsrvationOfFuelAndPower'},Drawings should be reviewed by the designer and installer and should include specifications for key materials.,necessity,annotated
8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated
5211dbd1-d12a-4371-ad62-1dc5616cd2f5,The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,{'ID': '387_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,necessity,annotated
7d35f4c4-fa65-4d68-a974-f54386ca8aee_9,,,"However, a horizontal fasteners in a protective part must be no higher than 300 millimetres.",less-equal,synthetic
9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",none,annotated
99a53f17-48cb-4012-a47b-700761e0983b_3,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 8.5m2 of those precipices must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic
389c960b-525d-4f2e-9a2c-1805eb2dc20d_7,,,The full illuminance under a stair that forms part of the storage provision should be counted as 10 litres per second per person.,equal,synthetic
bde1697a-20c9-4f15-a63c-5be323a058c1_6,,,Any connection of 20mm or more parking to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic
a9944ed0-7168-4ec7-b761-0641e3e3228b,The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,{'ID': '157_Finnish_Health-WaterAndSewerage'},The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,none,annotated
47e50ddf-6174-436d-851b-7ddf46c10ccf,A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,{'ID': '380_UK_DocL_V1_ConsrvationOfFuelAndPower'},A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,selection,annotated
500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,selection,annotated
2a256a9c-0b8a-4acf-87e1-86a5857f36a3_6,,,"Where a driveway forms all, or part of, the approach route, an uppermost of at least 5m wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",none,annotated
8151be81-09ad-4dac-b2d2-f0d757915b6c,"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",{'ID': '110_Finnish_StabilityOfStructures'},"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",none,annotated
40b40b1b-d1b1-49d8-b9b7-13c5845a169d_6,,,The structure of the control appliance of the plumbing fixture shall be such that its headroom does not arise above 150mm.,less-equal,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",necessity,annotated
01d924bf-4a69-4eb8-b05e-ce993aee3d45_11,,,Perimeter insulation should be continuous and have a minimum parasitic energy use of half a metre.,greater-equal,synthetic
e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",selection,annotated
76acc6bd-50c0-4f3f-b015-42e171ec6ce7,One electric vehicle charge point must be installed.,{'ID': '82_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},One electric vehicle charge point must be installed.,equal,annotated
1d10aa43-7650-46b1-83c3-867f212ab9c3,Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,{'ID': '58_UK_DocF_V1_Ventilation'},Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,selection,annotated
7f696221-52c9-4c52-8f90-74bd93c51299,This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,{'ID': '73_UK_DocM_V1_AccessAndUseOfBuildings'},This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,part-of,annotated
13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",necessity,annotated
6075de3c-d339-4ba4-9945-990480975615_0,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 70 kN design solar load of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic
7f696221-52c9-4c52-8f90-74bd93c51299_1,,,This grippable handrail is 850-1000mm above the pitch line of the flight and tie force at least 270 millimetres beyond the top and bottom nosings.,greater-equal,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_3,,,"The use and building emission rate calculated using the measured air permeability must not be higher than the away and target emission rate, respectively.",less-equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_11,,,"Where the work concerns a building containing more than 400-600mm systems, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic
aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",none,annotated
8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated
d8066a73-49c2-4e99-825a-b49b9b2ba67d_8,,,A landing measuring at least 0.15 in full width must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74_8,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a average number of steps of 75 light source lumens per circuit-watt.",equal,synthetic
ff3e8f86-1542-4f54-a776-cfdc8482bad7_9,,,The horizontal spacing of an air conditioner working in cooling mode should be a minimum of 390 millimetres.,greater-equal,synthetic
4e8c5c50-44af-48f6-b959-e6f9b31afa1e_8,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical Standing areas may be thermal element.",equal,synthetic
bc5a76fa-f0ec-47d5-b8e3-0e9458f3f140,"Foundations: wherever possible, blocks below the damp-proof course should be the same as those specified in the design for the above-ground main wall element (in masonry construction).",{'ID': '159_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Foundations: wherever possible, blocks below the damp-proof course should be the same as those specified in the design for the above-ground main wall element (in masonry construction).",necessity,annotated
2032e456-bf80-4342-90dc-0da164e00a9a,A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '7_UK_DocF_V1_Ventilation'},A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,part-of,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,none,annotated
b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",necessity,annotated
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,part-of,annotated
38cd3221-7fc9-4462-be20-78b16a4309d3_5,,,The open outwards of openings in the newly created dwelling should not be more than 2m of the total floor area.,less-equal,synthetic
8f2f0722-46e5-4c3a-937d-51edde58141a,Routes intended for vehicle traffic must be located in a way that does not restrict pedestrian routes or the space required for opening doors and gates.,{'ID': '90_Finnish_SafetyOfUse'},Routes intended for vehicle traffic must be located in a way that does not restrict pedestrian routes or the space required for opening doors and gates.,necessity,annotated
6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,selection,annotated
9b908e68-0f92-4883-9fd2-7fe013848b15,"Where a gas combination boiler is used, the boiler type should be selected to modulate down to the typical heating load of the dwelling.",{'ID': '237_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a gas combination boiler is used, the boiler type should be selected to modulate down to the typical heating load of the dwelling.",selection,annotated
517253f8-98b1-4821-8901-75124d3237db,"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",selection,annotated
a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",part-of,annotated
8beb3f9d-f806-4385-b876-2b3d29d7852a,Independent temperature control of the hot water circuit should be implemented with a cylinder thermostat and a timing device.,{'ID': '269_UK_DocL_V1_ConsrvationOfFuelAndPower'},Independent temperature control of the hot water circuit should be implemented with a cylinder thermostat and a timing device.,part-of,annotated
d713514a-9398-45a2-9584-efecff6ebcc5,Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,{'ID': '4_UK_DocQ_Security_Dwellings'},Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,necessity,annotated
8fec1c4a-527e-49b6-9267-89ff700a9291,"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",{'ID': '182_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",selection,annotated
12e545d1-64f4-45c9-a520-5b8a003eba0a_3,,,"If the dwelling has more than 220 millimetres exposed ramp, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic
759d26ff-821f-4949-9096-a7e15c5580f6,Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,{'ID': '137_UK_DocL_V1_ConsrvationOfFuelAndPower'},Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,selection,annotated
d941229d-4de4-4873-9704-c207a9b673c8,An exit enclosure has doors that open separately into each adjoining fire compartment without a need to open the doors at the same time.,{'ID': '26_Finnish_FireSafety'},An exit enclosure has doors that open separately into each adjoining fire compartment without a need to open the doors at the same time.,part-of,annotated
6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,selection,annotated
c952db0f-b605-4335-8d56-97fc339ad5ba_9,,,All 15mm bathrooms of the installation and commissioning checklist should be completed.,equal,synthetic
3e9fc57e-bc69-4f17-a056-dd7767afa9bb_4,,,"If the energy consumption of the building does not exceed two, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,necessity,annotated
339fc78c-a2f2-481c-a410-3aeb41e24b8a_4,,,Solid walls constructed of coursed brickwork or blockwork should be at least as total load as 6m of the storey height.,greater-equal,synthetic
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_7,,,"The normal relationship between the dimensions of the rise and going is: 1,200 MJ/m2 equals 40 degrees Celsius.",equal,synthetic
78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",none,annotated
3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_3,,,These fittings should not exceed a from the top and bottom corners of the door of 0.2.,less-equal,synthetic
82330d3d-6139-4050-9ca0-946bc982fbb0,The sign should be suitably weatherproof for its location.,{'ID': '119_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The sign should be suitably weatherproof for its location.,selection,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd_3,,,"An electric resistance heating with a potentially flammable or explosive atmosphere must not be located in a installation and commissioning checklist where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic
4c83069b-8c22-43ad-92a0-354ecd0e40a1,"Sufficient information should be provided to ensure that people can operate, maintain or alter an electrical installation with reasonable safety.",{'ID': '7_UK_DocP_ElectricalSafety'},"Sufficient information should be provided to ensure that people can operate, maintain or alter an electrical installation with reasonable safety.",selection,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50_11,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the going of the heat emitters to be installed does not exceed 24 degrees Celsius.",less-equal,synthetic
f6add908-4d45-4b3e-83a6-369f6c36c037_6,,,"Door rails, stiles and muntins should be at least 1800mm measures.",greater-equal,synthetic
e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",greater-equal,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_0,,,"In buildings more than 1 and at most 28 metres in clear width, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic
a235c68f-ae44-4770-b005-4e9d7b659eb7,All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,{'ID': '35_UK_DocA_Structure'},All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,greater-equal,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",none,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905_11,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the rated speed of the staircase and exit route is no more than 900mm.,less-equal,synthetic
aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",none,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_1,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the Activation from these spaces does not exceed adequate number of the total air flow in the vertical duct.",less-equal,synthetic
302c413e-fefd-47f1-914f-0dc787e4a761_1,,,"Where cross-sectional area on surfaces is greater than 01:08:00, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_1,,,"In spaces intended for more than 60 persons, the power requirements of the access route must be at least Five ventilators.",greater-equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_3,,,"Modular and portable buildings with a planned service life of more than two years but with an clear width in a single location of less than 1,500 millimetres should be shown to comply with the energy efficiency requirements.",less,synthetic
7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",selection,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_0,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the topography of that installation exceeds 35 mg/m3 (30 ppm) of the total cost of the major renovation.",greater,synthetic
642e2c46-45a8-440f-af0b-1b53f41d8d8f,Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,{'ID': '156_UK_DocM_V2_AccessAndUseOfBuildings'},Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,necessity,annotated
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb,"There should be a supply rate, in the absence of tobacco smoke or other excessive pollutants, of 10 litres per second per person.",{'ID': '114_UK_DocF_V2_Ventilation'},"There should be a supply rate, in the absence of tobacco smoke or other excessive pollutants, of 10 litres per second per person.",necessity,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_6,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the sum of that installation exceeds 120 of the total cost of the major renovation.",greater,synthetic
77f993c6-dff1-4f9a-8f66-73221d3cbaff_10,,,"If the dwelling only has one habitable room, a minimum protective part of 100 should be used.",greater-equal,synthetic
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_8,,,"For sizes of cylinder not listed, the Linear interpolation from the cylinder should not exceed 2, where V is the volume in litres.",less-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_3,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the number of occupants must be no less than 5m.",greater-equal,synthetic
35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",part-of,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",necessity,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_11,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be total number to 0.7W/(m2K).,less-equal,synthetic
082c7ed9-3579-48c2-a0d2-076f1edd647c_9,,,"Each of the 30 air tightness of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic
e15250c0-1279-4d29-a1ec-31560b045007_4,,,cords of basement storeys must not be connected to fire and smoke-proof Door entry controls.,not-part-of,synthetic
36650de0-ef3c-4fd1-8199-f47c0e576076_11,,,"the patterns of the platform does not exceed 1,500 millimetres.",less-equal,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890,"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",{'ID': '357_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",less-equal,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",part-of,annotated
a7d2ac72-8a5b-4432-8449-001439d3ab93,Guarding should be sized to prevent the passage of a 100mm sphere.,{'ID': '85_UK_DocO_Overheating'},Guarding should be sized to prevent the passage of a 100mm sphere.,necessity,annotated
0f67dad7-6df9-444b-8e72-f447668e3fde_11,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 0.9 metres instantaneous carbon monoxide concentration.",greater-equal,synthetic
d5a90fc3-6477-476f-91f0-083444f3b68b,Ventilation should be controllable.,{'ID': '63_UK_DocF_V1_Ventilation'},Ventilation should be controllable.,necessity,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74_10,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a replaced number of steps of 1.501kWhPE/kWh.",equal,synthetic
78a7dc3d-5e1e-4858-8913-b319e30f2ff1,The air extract rate should be 20 litres per second per machine during use.,{'ID': '46_UK_DocF_V2_Ventilation'},The air extract rate should be 20 litres per second per machine during use.,part-of,annotated
81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",part-of,annotated
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_11,,,The location of the floor surface in the seating area and access route may not exceed (16.66 8.33 V0.4)/(1000 24).,less-equal,synthetic
73b4b305-8971-489a-a290-f996e1f63e19,"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",{'ID': '19_Finnish_Accessibility'},"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",none,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_1,,,The normal relationship between the load capacity of the rise and going is: 21 C equals between 550mm and 700mm.,equal,synthetic
dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",selection,annotated
54907849-c48f-4267-b5f0-fc7e9279da7c,"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",{'ID': '409_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",none,annotated
f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",part-of,annotated
dcc583b1-8c4c-42cf-a1ed-e8907de56254_6,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the atmosphere must be no less than 180kW.",greater-equal,synthetic
6075de3c-d339-4ba4-9945-990480975615_3,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 2m speed glandless circulators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic
7a1bc727-1daa-4668-83f6-b44327b96898,"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",{'ID': '133_Finnish_FireSafety'},"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",none,annotated
3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",part-of,annotated
01bd7c41-594c-4440-8058-c34f1c4bad09,"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",{'ID': '82_UK_DocO_Overheating'},"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",selection,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_2,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be maximum number of occupants 0.15.",equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_9,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under visual contrast 25W/m2.",equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_9,,,Modular and portable buildings with a planned service life of more than two years but with an product certificate in a single location of less than 6mm should be shown to comply with the energy efficiency requirements.,less,synthetic
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_2,,,"There should be a Test data, in the absence of tobacco smoke or other excessive pollutants, of 30m2.",equal,synthetic
103f99ad-884b-4bae-9f22-ccb1c5bc3d26_7,,,"In an open garage of no more than 600 x 600 millimetres free area, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic
a235c68f-ae44-4770-b005-4e9d7b659eb7_8,,,All cavity walls should have leaves at least 90mm thick and cavities at least 7 mg/m3 (6 ppm) both sides.,greater-equal,synthetic
29232335-402c-4ed9-af74-fd093ac22e28_10,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least target fabric energy efficiency rate 30% load.,greater-equal,synthetic
bf798097-bb99-42d0-a73f-8cebab8fbeb8_9,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the service of the steps must be no more than 500 millimetres and the tread must be no less than 300 millimetres.",less-equal,synthetic
389c960b-525d-4f2e-9a2c-1805eb2dc20d_4,,,The full continuity under a stair that forms part of the storage provision should be counted as 600kg/m3.,equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_3,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 30m2 in design temperature difference, these must be accessible via the interior.",greater,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,greater,annotated
6e5e61dd-039d-4079-9c3f-f52fc12efefb,For continuing horizontal structures the loaded area shall be calculated span by span.,{'ID': '12_Finnish_StabilityOfStructures'},For continuing horizontal structures the loaded area shall be calculated span by span.,part-of,annotated
7f72632a-dc0a-4318-afd7-7090b42350fc,Mechanical supply terminals should be located and directed to avoid draughts.,{'ID': '106_UK_DocF_V1_Ventilation'},Mechanical supply terminals should be located and directed to avoid draughts.,selection,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779_4,,,"In large building complexes, such as retail parks and large sports centres, there should be 28 metres wheelchair-accessible unisex accommodation capable of including an adult changing table.",equal,synthetic
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_7,,,"If site constraints necessitate an non-domestic building of one or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_2,,,Skirtings totalling up to 180kW target primary energy rate and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_6,,,"If the Control of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 5m of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic
d3e7a947-536e-4a49-9823-e27fc0f68b27_11,,,air flow rate of landings to be at least equal to the rise of the ramp.,greater-equal,synthetic
4a0355cd-8b2f-4be1-b0d1-3fc90981b3d3,"In addition, the entrance must be protected against snow loads with a covering.",{'ID': '97_Finnish_SafetyOfUse'},"In addition, the entrance must be protected against snow loads with a covering.",necessity,annotated
15f74476-8f8e-48a3-8906-752c29fdebac,The results should be recorded and given to the building owner.,{'ID': '399_UK_DocM_V2_AccessAndUseOfBuildings'},The results should be recorded and given to the building owner.,necessity,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb_2,,,"In the absence of relevant harmonised European Standards, products with a dimensions exceeding 2.2 metres must have a product certificate issued by a Notified Body.",greater,synthetic
aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",none,annotated
8fcdc238-3c30-4659-9303-1b126a39b2cd_3,,,The design solar load should be long-term by at least 100 litres.,greater-equal,synthetic
bde1697a-20c9-4f15-a63c-5be323a058c1_3,,,Any connection of 8.5m2 or more copy to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic
e68377dd-acec-4915-a0b4-a5eb8c840bf1,"Where vehicle barriers are necessary, sufficient space (for example 500mm) should be allowed around the future connection location.",{'ID': '121_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where vehicle barriers are necessary, sufficient space (for example 500mm) should be allowed around the future connection location.",selection,annotated
d54852df-8e3c-4e99-8484-31c403b78558,"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",{'ID': '256_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",part-of,annotated
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_11,,,The approach route is a minimum of 900mm wide with a maximum thick of proportion.,less-equal,synthetic
9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",selection,annotated
3cbfb816-4071-496e-aec2-87d424df047f,Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,{'ID': '181_UK_DocM_V2_AccessAndUseOfBuildings'},Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,selection,annotated
8e7e4d9a-05b8-4512-91c5-e8dbb9488685,"At night, windows, patio doors and balcony doors should be modelled as closed.",{'ID': '55_UK_DocO_Overheating'},"At night, windows, patio doors and balcony doors should be modelled as closed.",selection,annotated
5afbc8c9-4c2e-4cb8-8945-24e184d161e1,The fan should be set at a speed that will approximately achieve the desired continuous flow rate.,{'ID': '201_UK_DocF_V1_Ventilation'},The fan should be set at a speed that will approximately achieve the desired continuous flow rate.,selection,annotated
f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",necessity,annotated
8aa4b706-1659-4e30-a4fe-e7f33efe3241_7,,,All 2m lighting of the compliance checklist should be completed.,equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_3,,,"If the Air permeability of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 2 metres of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic
d7b27bbb-ac51-4036-8073-d094cbe994db,"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",{'ID': '232_UK_DocM_V2_AccessAndUseOfBuildings'},"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",selection,annotated
45338082-ca66-418b-8fe1-8f2be926f330_11,,,A plaster-board of no more than 800 millimetres may pass between the stair steps.,less-equal,synthetic
e4fb8d18-8dbc-4351-a2df-d87f880f476a_4,,,The distance of the basement storey floor from the entry level for balconies is 7 mg/m3 (6 ppm) that of the load-bearing structures of the storey.,equal,synthetic
e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none,annotated
c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d_4,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a total capital cost exceeding 6mm and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic
082a011b-2d6a-4569-b58d-f8cab00f5d81,The quality of the installation of the ventilator product should be checked to ensure it is correctly mounted within the wall or window aperture.,{'ID': '191_UK_DocF_V1_Ventilation'},The quality of the installation of the ventilator product should be checked to ensure it is correctly mounted within the wall or window aperture.,part-of,annotated
203faa23-7b71-47c9-a6e5-2333ac45389e_2,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the heat must be no less than 400kg.",greater-equal,synthetic
3e9fc57e-bc69-4f17-a056-dd7767afa9bb_9,,,"If the layers of the building does not exceed (16.66 8.33 V0.4)/(1000 24), access to the attic fire compartments from the outside shall be required.",less-equal,synthetic
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_5,,,The resilient layer should be to the full height of the door and 15 degrees elevation difference of the doorset.,equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_2,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 1.501kWhPE/kWh extract air is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic
9eb5bf01-3810-44e3-802b-7c7eadad1831,"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",{'ID': '21_UK_DocF_V1_Ventilation'},"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",selection,annotated
55d84237-8fad-4bd7-b67d-0745b9cc1e31,"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",{'ID': '222_Finnish_FireSafety'},"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",part-of,annotated
c5c5365f-273f-4c29-8491-4f50aabc3b78,"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",{'ID': '74_UK_DocM_V2_AccessAndUseOfBuildings'},"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",necessity,annotated
7dbe5dbf-39fb-4ba4-bc75-d6ac7898e615,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",{'ID': '114_UK_DocL_V1_ConsrvationOfFuelAndPower'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",necessity,annotated
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_10,,,"In spaces intended for more than 60 persons, the rise of the access route must be at least 280mm.",greater-equal,synthetic
efe70fd9-5cdd-4586-9ebc-73c2960b1e00,"If a fire door is kept open in normal use, it shall be equipped with devices that will close the door in the event of fire.",{'ID': '120_Finnish_FireSafety'},"If a fire door is kept open in normal use, it shall be equipped with devices that will close the door in the event of fire.",selection,annotated
50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,necessity,annotated
113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",none,annotated
ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",none,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,annotated
35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",selection,annotated
f162906e-1097-420e-b2a0-dd746d5794c7,"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",{'ID': '265_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",necessity,annotated
38322c6e-7509-4638-9a8d-74d5cfb777b2,A new district heat network should be taken as meaning any other district heat network.,{'ID': '83_UK_DocL_V1_ConsrvationOfFuelAndPower'},A new district heat network should be taken as meaning any other district heat network.,selection,annotated
29c431ee-ea93-491d-ab13-06418d93c488,"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",{'ID': '338_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",greater,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779_3,,,"In large building complexes, such as retail parks and large sports centres, there should be 0.7 wheelchair-accessible unisex substantial proportion capable of including an adult changing table.",equal,synthetic
37f01a2c-b944-45a2-a7f4-140d8c03d7ac_5,,,"After rebating, frame components should retain at least half a metre of Waterproofing.",greater-equal,synthetic
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_7,,,"Extract air of size 30m2, 3 and 4 shall not be used as recirculation air.",equal,synthetic
5163f2fb-022f-4589-889f-2ade7a9d49c6,The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,{'ID': '109_UK_DocO_Overheating'},The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,necessity,annotated
f9de28ac-45bb-4400-9d9f-8afee73bd2e3_10,,,The step should not exceed half of dwelling floor area.,less-equal,synthetic
50e89a86-e2be-439d-b230-79274cd7199b_11,,,Modular and portable buildings with a planned domestic hot water cylinder heat loss of more than 8 per cent (1:12.5) at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic
0da52584-1b37-48b5-840f-3795ae695275_3,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 70 kN ventilation fans are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
f6add908-4d45-4b3e-83a6-369f6c36c037,"Door rails, stiles and muntins should be at least 44mm thick.",{'ID': '28_UK_DocQ_Security_Dwellings'},"Door rails, stiles and muntins should be at least 44mm thick.",part-of,annotated
df122091-ca53-4134-98a3-47779c06f9df,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,{'ID': '198_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,none,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_2,,,The Capacities of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the energy consumption of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic
783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,part-of,annotated
40b40b1b-d1b1-49d8-b9b7-13c5845a169d_3,,,"The structure of the control appliance of the plumbing fixture shall be such that its target emission rate does not arise above 1,200 millimetres.",less-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",none,annotated
3ca5cb38-b90b-4449-ba14-4268866df8e1,The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,{'ID': '463_UK_DocM_V2_AccessAndUseOfBuildings'},The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,part-of,annotated
8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",selection,annotated
986f7853-4975-4ecd-8f10-a75d818eb44a,"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",{'ID': '140_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",none,annotated
451e7c91-d39f-4401-a0e3-5ab455ab0442,"The approach route should be level, gently sloping, or, where necessary, ramped.",{'ID': '15_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be level, gently sloping, or, where necessary, ramped.",necessity,annotated
f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",none,annotated
20518e80-6f7e-457f-8c5a-59fa4c0eb324_8,,,"When calculating the heat loss for a buildings design solution, the results shall be used as the value of the location for the building envelope.",equal,synthetic
009e12eb-db83-485c-9ffc-e1f462251109_11,,,Each air terminal should have a filling alarm of at least 850-1000mm of the free area of its associated duct.,greater-equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated
2633c957-07b4-4caa-a9d6-5acbac16b0b0_10,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 500 millimetres diameter.,equal,synthetic
569c7958-b7d6-4b9c-9dd9-13307e95e59b_8,,,"For ducted systems that are served by fans with a heating plant emission rate greater than 850 millimetres, ductwork leakage tests should be carried out.",greater,synthetic
76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,selection,annotated
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_2,,,"The free both sides from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 850-1000mm, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic
72b3e031-a732-4749-af3e-ffd5c635e830,Boards should be fitted to the structure to avoid any gaps between board edges and between the board facings.,{'ID': '145_UK_DocL_V1_ConsrvationOfFuelAndPower'},Boards should be fitted to the structure to avoid any gaps between board edges and between the board facings.,selection,annotated
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_8,,,"If site constraints necessitate an fridge of 600 millimetres or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic
01008f69-874b-443e-bcb2-2f5630280049_0,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the from the top and bottom corners of the door may be no more than 1,500 millimetres and the tread must be no less than 220 millimetres.",less-equal,synthetic
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_7,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than certain proportion areas.,greater,synthetic
6465e5b9-4c10-41ec-9839-3e7cb7114911,Programmable room thermostats with an override feature should be provided for all direct electric zones of the electric underfloor heating system.,{'ID': '314_UK_DocL_V1_ConsrvationOfFuelAndPower'},Programmable room thermostats with an override feature should be provided for all direct electric zones of the electric underfloor heating system.,selection,annotated
78094ea9-f870-40e9-8174-8dfce8f30a90,The penetrating services should be sealed to the air barrier using proprietary grommets or collars with air-sealing tape or sealant.,{'ID': '181_UK_DocL_V1_ConsrvationOfFuelAndPower'},The penetrating services should be sealed to the air barrier using proprietary grommets or collars with air-sealing tape or sealant.,necessity,annotated
77be05f2-cd8c-4d35-85e4-6637b999d8e7,The value of the consequential improvement works should not be less than 10 of the value of the principal works.,{'ID': '452_UK_DocM_V2_AccessAndUseOfBuildings'},The value of the consequential improvement works should not be less than 10 of the value of the principal works.,part-of,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d_1,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a differences exceeding 9 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic
891e9eee-4a4b-4d7c-8051-3aee8302cd6b,"Walls: insulation should be fitted without any air gaps and tight to the structure, cavity closers, lintels and cavity trays.",{'ID': '141_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Walls: insulation should be fitted without any air gaps and tight to the structure, cavity closers, lintels and cavity trays.",necessity,annotated
642e2c46-45a8-440f-af0b-1b53f41d8d8f,Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,{'ID': '156_UK_DocM_V2_AccessAndUseOfBuildings'},Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,necessity,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8_3,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the storage capacity must be no less than 100 litres.",greater-equal,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_1,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear efficiency of 850-1000mm, except in doorways.",equal,synthetic
17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",selection,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_4,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be number of people evacuating 1,200 MJ/m2.",equal,synthetic
f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",part-of,annotated
7577d9f7-9f3c-4d3b-b8d9-da31d3e1b201,"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",part-of,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",less-equal,annotated
f72a98f3-b7d2-4633-b244-0d7242dfb0c9,Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,{'ID': '102_UK_DocM_V1_AccessAndUseOfBuildings'},Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,greater-equal,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_1,,,"In buildings more than 0.3 and at most 28 metres in sum total, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_0,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or Sewers above E may be discounted when measuring clear width.,greater,synthetic
f6add908-4d45-4b3e-83a6-369f6c36c037,"Door rails, stiles and muntins should be at least 44mm thick.",{'ID': '28_UK_DocQ_Security_Dwellings'},"Door rails, stiles and muntins should be at least 44mm thick.",greater-equal,annotated
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated
23867bb3-e845-48ca-9ee8-72010a55aa42,WC doors must be capable of opening outwards.,{'ID': '124_UK_DocM_V1_AccessAndUseOfBuildings'},WC doors must be capable of opening outwards.,necessity,annotated
ccc405a0-c6d6-4ace-ad70-e0cfe07cd1e3,"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",{'ID': '14_UK_DocK_ProtectionFromFalling'},"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",necessity,annotated
ef4f54b6-1099-4404-9fa2-d0c0d5e55543_5,,,The distance of the basement storey floor from the entry level must not exceed the individual dwellings value.,less-equal,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,annotated
389c960b-525d-4f2e-9a2c-1805eb2dc20d_0,,,The full span under a stair that forms part of the storage provision should be counted as 220 millimetres.,equal,synthetic
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none,annotated
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8,"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",{'ID': '208_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",selection,annotated
38745b5e-4dea-43fe-9378-5befa5a2399d,A copy of the completed commissioning sheet should be given to the owner of the building.,{'ID': '99_UK_DocF_V2_Ventilation'},A copy of the completed commissioning sheet should be given to the owner of the building.,part-of,annotated
fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,none,annotated
19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",selection,annotated
333110c1-ba9e-4c1d-9249-6604f49ba09a,"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",none,annotated
2be01bf1-2cd9-4982-8778-ba0afe835580,"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",{'ID': '88_UK_DocF_V1_Ventilation'},"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",selection,annotated
35cacecf-06dc-4b0f-aadb-db2ee05518c7_8,,,"The area of windows and roof windows (but excluding display windows) protect persons operating, maintaining or altering the installations from fire or injury exceeds 100 litres of the facade area.",greater,synthetic
75c60084-6878-472d-8694-e8739e0dd76c_11,,,The surface area of access routes in assembly areas with a maximum capacity of 60 persons must be at least 600 millimetres.,greater-equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_5,,,"In buildings more than 9 metres and at most 60 in continuity, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic
793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,less-equal,annotated
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7,The dwelling fabric energy efficiency rate must not exceed the individual dwellings target fabric energy efficiency rate.,{'ID': '66_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling fabric energy efficiency rate must not exceed the individual dwellings target fabric energy efficiency rate.,less-equal,annotated
50e89a86-e2be-439d-b230-79274cd7199b_4,,,Modular and portable buildings with a planned going of more than 90 at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_2,,,certain proportion acoustic design should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic
d9b8f957-49e3-45d0-83ca-c0419a50361a,"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",{'ID': '48_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",necessity,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_4,,,"The dwelling primary energy rate, dwelling emission rate and facade area, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and SEER, respectively.",less-equal,synthetic
6c789809-b1b8-429a-8fe2-8ce16f8a4b54_0,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the maximum number of occupants does not exceed 18 dm3/s.,less-equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated
c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,selection,annotated
4c83069b-8c22-43ad-92a0-354ecd0e40a1,"Sufficient information should be provided to ensure that people can operate, maintain or alter an electrical installation with reasonable safety.",{'ID': '7_UK_DocP_ElectricalSafety'},"Sufficient information should be provided to ensure that people can operate, maintain or alter an electrical installation with reasonable safety.",none,annotated
2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",selection,annotated
75c60084-6878-472d-8694-e8739e0dd76c,The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,{'ID': '115_Finnish_SafetyOfUse'},The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,greater-equal,annotated
a86b58e8-046f-44b7-8e1b-00c876c8c647_1,,,"Parapets in either side A to 65 degrees Celsius and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic
d504fd87-d13d-4936-9d7a-71d17954760d_0,,,The away of the steps in an exit may be no more than 35 mg/m3 (30 ppm).,less-equal,synthetic
4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",selection,annotated
12907c6f-e734-436d-a7de-c8a1626fbe92,"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",{'ID': '496_UK_DocM_V2_AccessAndUseOfBuildings'},"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",part-of,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
e26e2280-635f-44b5-967c-6cf0b56e15de,Water pipes that are located in cold premises shall be thermally insulated.,{'ID': '86_Finnish_Health-WaterAndSewerage'},Water pipes that are located in cold premises shall be thermally insulated.,selection,annotated
2f815a08-db3c-48a6-b248-d69aeac870ee,"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",{'ID': '173_UK_DocM_V2_AccessAndUseOfBuildings'},"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",none,annotated
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated
328fb8e7-cae4-4465-b7a7-24f0d066d65a,"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",{'ID': '360_UK_DocM_V2_AccessAndUseOfBuildings'},"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",none,annotated
6543949e-dd47-4365-b5a9-d952bf233cd7,"Any manual high rate controls should be provided locally to the spaces being served, e.g. bathrooms and kitchens.",{'ID': '66_UK_DocF_V1_Ventilation'},"Any manual high rate controls should be provided locally to the spaces being served, e.g. bathrooms and kitchens.",necessity,annotated
c8a048c6-8e7e-4b5a-ada5-02990b983401,"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",{'ID': '91_Finnish_Health-IndoorClimateAndVentilation'},"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",none,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",part-of,annotated
33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",selection,annotated
e4fb8d18-8dbc-4351-a2df-d87f880f476a_10,,,The facade area for balconies is 50 that of the load-bearing structures of the storey.,equal,synthetic
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,none,annotated
ffc11c58-ff7e-45f4-a5c7-da59404e5659,"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",{'ID': '1_UK_DocP_ElectricalSafety'},"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",part-of,annotated
c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",selection,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_5,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be frequency to 10.,less-equal,synthetic
eeb4239f-3819-475c-ad20-756bed80c4ff_8,,,"In reference heat loss calculations, the value used as the travel of the buildings ventilation system shall be 5m.",equal,synthetic
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",necessity,annotated
e874f337-2067-4e77-ad32-c3b857f40e7a_3,,,"If the opening exceeds 2m, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e_11,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the annual efficiency of heat recovery from ventilation extract air must be no less than 10 kN.",greater-equal,synthetic
a8b3e54e-902c-4502-99a2-8c41d46f1416_8,,,"If there are more than six metres properties in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic
108b5709-f035-4697-ba25-56edd2ce60fc,"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",{'ID': '126_UK_DocM_V2_AccessAndUseOfBuildings'},"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",none,annotated
a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",none,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated
50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,part-of,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_8,,,The normal relationship between the air flow of the rise and going is: 15mm equals between 550mm and 700mm.,equal,synthetic
8efb6108-e49e-4d64-a1e4-22e3f9128b17_0,,,"When calculating the reference heat loss of a building, the value of 3.3m shall be used as the habitable area for the air leakage rate figure for the building envelope.",equal,synthetic
35cacecf-06dc-4b0f-aadb-db2ee05518c7,The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,{'ID': '495_UK_DocM_V2_AccessAndUseOfBuildings'},The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,necessity,annotated
d0b6759e-deec-451d-bd7a-ec65b96048be_7,,,"extract air of fire resistance time 8.5m2 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic
d178dd92-6cf3-4f68-a9ba-44b97d74204a,"Staircases must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '13_Finnish_SafetyOfUse'},"Staircases must be safe, sufficiently spacious and suitable for their purpose.",necessity,annotated
d3e7a947-536e-4a49-9823-e27fc0f68b27,Length of landings to be at least equal to the width of the ramp.,{'ID': '66_UK_DocK_ProtectionFromFalling'},Length of landings to be at least equal to the width of the ramp.,greater-equal,annotated
6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,part-of,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_7,,,Where the garage doorset is within the private curtilage of the dwelling (but not within a carport or compliance checklist) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic
bfdf95da-d422-47cd-83d7-a30a4969f2e6_5,,,"If the internal ties must be centred on the supporting line, the minimum value of the fire performance, 50mm, will also be applied to internal ties.",greater-equal,synthetic
5ca184fa-e100-4f97-957d-e37ae944786f_1,,,The insulating performance of installing electric vehicle charge points and cable routes is not more than 60 persons of the total capital cost of the major renovation.,less-equal,synthetic
aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",selection,annotated
868ad193-b0d2-47b9-9fe0-ded5b761d3b0,The integrity of the water system shall be ensured with pressure testing using water.,{'ID': '106_Finnish_Health-WaterAndSewerage'},The integrity of the water system shall be ensured with pressure testing using water.,none,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
cc72106e-9e7f-47cf-8a95-0173a8305dad_11,,,"In a new building, the crawl space dwelling emission rate must be 55 on average at the minimum.",greater-equal,synthetic
77f993c6-dff1-4f9a-8f66-73221d3cbaff,"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",{'ID': '43_UK_DocF_V1_Ventilation'},"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",equal,annotated
bfb006bb-c7f5-4586-adc3-89c758d4d99d,The system should be specified and installed according to the manufacturers instructions to ensure the overall performance of the system meets a reasonable standard.,{'ID': '332_UK_DocM_V2_AccessAndUseOfBuildings'},The system should be specified and installed according to the manufacturers instructions to ensure the overall performance of the system meets a reasonable standard.,necessity,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",part-of,annotated
4d80c4d1-08ee-481a-9f9c-e9151ce1094d_1,,,"The height of windows, roof windows, rooflights and doors should not exceed 1 of the total floor area of the dwelling.",less-equal,synthetic
47b51cfa-bda8-4971-83c1-5aa198c59297,The loading area must be safe and appropriate.,{'ID': '135_Finnish_SafetyOfUse'},The loading area must be safe and appropriate.,necessity,annotated
371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",selection,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_2,,,"The wall ties should have a height of 400-600mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
2f815a08-db3c-48a6-b248-d69aeac870ee_9,,,"the vertical internal temperature is: a. not more than 60 persons, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic
4e8c5c50-44af-48f6-b959-e6f9b31afa1e,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",{'ID': '89_UK_DocM_V2_AccessAndUseOfBuildings'},"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",selection,annotated
f420ae57-5656-4558-b1a3-1079e46bf6cc,"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",{'ID': '223_Finnish_FireSafety'},"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",part-of,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_8,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be horizontal spacing 65mm.",equal,synthetic
1c511111-ab71-4b68-9421-f588bc4b9180,"People with visual impairment should be in no doubt as to the location of glass doors, especially when they are within a glazed screen.",{'ID': '76_UK_DocM_V2_AccessAndUseOfBuildings'},"People with visual impairment should be in no doubt as to the location of glass doors, especially when they are within a glazed screen.",necessity,annotated
56517433-cf40-4b88-a9d4-18e61e0e9993_10,,,"In addition, on both sides of the toilet seat there shall be a flights of at least 180 millimetres.",greater-equal,synthetic
c5a6cac6-a314-47b1-aabd-13f2d1b7ad56,A step-free approach route should be provided to all private entrances.,{'ID': '71_UK_DocM_V1_AccessAndUseOfBuildings'},A step-free approach route should be provided to all private entrances.,necessity,annotated
e15250c0-1279-4d29-a1ec-31560b045007_6,,,chambers of basement storeys must not be connected to fire and smoke-proof water meters.,not-part-of,synthetic
009e12eb-db83-485c-9ffc-e1f462251109,Each air terminal should have a free area of at least 90 of the free area of its associated duct.,{'ID': '115_UK_DocF_V1_Ventilation'},Each air terminal should have a free area of at least 90 of the free area of its associated duct.,necessity,annotated
536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",part-of,annotated
984c252b-74f4-4d85-9080-1c8ae1851eca_7,,,"If performance requires thicker glass to be used, an equivalent window unit with reception (400kg) glazing should be shown to meet the required standard.",equal,synthetic
2cb4937d-9ec4-4013-8e9b-318a8adae27a,Account should be taken of outside noise when considering whether openable windows are appropriate for purge ventilation.,{'ID': '24_UK_DocF_V1_Ventilation'},Account should be taken of outside noise when considering whether openable windows are appropriate for purge ventilation.,necessity,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_0,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major boxings, there is no mortice lock to install either electric vehicle charge points or cable routes.",not-part-of,synthetic
e7cc3da8-211a-4244-b711-210a912ca2ac,Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,{'ID': '302_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,necessity,annotated
bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",necessity,annotated
e874f337-2067-4e77-ad32-c3b857f40e7a_9,,,"If the annual percentage of heat exceeds 50mm, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,selection,annotated
8b9e1d32-efa8-409b-873b-22e2eae5b537,External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,{'ID': '95_Finnish_Health-Humidity'},External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,selection,annotated
203faa23-7b71-47c9-a6e5-2333ac45389e_5,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the sizes must be no less than 0.3.",greater-equal,synthetic
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",selection,annotated
96ad745d-47e4-44d5-91ee-a0482881dd8f,"Consideration should be given to installing a fold-down table, e.g. for baby changing.",{'ID': '168_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to installing a fold-down table, e.g. for baby changing.",necessity,annotated
64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",part-of,annotated
2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,necessity,annotated
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",part-of,annotated
4e441774-859a-4a85-94ec-5fda3b2a6531,"A copy should be submitted to the building control body as evidence that the system has been correctly installed, inspected and commissioned.",{'ID': '265_UK_DocF_V1_Ventilation'},"A copy should be submitted to the building control body as evidence that the system has been correctly installed, inspected and commissioned.",necessity,annotated
db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",selection,annotated
0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated
5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,part-of,annotated
33eb3a5a-584f-4d1e-84a0-35fe66954d80,Consideration should be given to the power requirements of essential (e.g. life safety) systems.,{'ID': '323_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to the power requirements of essential (e.g. life safety) systems.,selection,annotated
64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",none,annotated
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_9,,,"For sizes of cylinder not listed, the dwellings from the cylinder should not exceed 600kg/m3, where V is the volume in litres.",less-equal,synthetic
ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",none,annotated
7af206e3-3c30-4fd8-8d95-bf9b95861206,Systems should be commissioned to optimise the use of energy for pumping.,{'ID': '393_UK_DocL_V1_ConsrvationOfFuelAndPower'},Systems should be commissioned to optimise the use of energy for pumping.,necessity,annotated
569c7958-b7d6-4b9c-9dd9-13307e95e59b_7,,,"For ducted systems that are served by fans with a service greater than One, ductwork leakage tests should be carried out.",greater,synthetic
2633c957-07b4-4caa-a9d6-5acbac16b0b0_5,,,"NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 2,100 millimetres design flow rate.",equal,synthetic
009e12eb-db83-485c-9ffc-e1f462251109_3,,,Each air terminal should have a building services of at least 1400mm of the free area of its associated duct.,greater-equal,synthetic
72d7716f-7e3e-442c-9e42-14d4b19e18e3,A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,{'ID': '336_UK_DocM_V2_AccessAndUseOfBuildings'},A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,selection,annotated
d988e207-c3f9-4314-9a16-f99b334595f4,The tread must be no less than 270 millimetres.,{'ID': '26_Finnish_SafetyOfUse'},The tread must be no less than 270 millimetres.,greater-equal,annotated
8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",none,annotated
2c224c59-366d-447f-9ecc-87c119c2db07,"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",{'ID': '374_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",part-of,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",part-of,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_8,,,"The level with entry of a barrier in a dwellings indoor areas may, however, be at least 25mm if the drop is less than three metres.",greater-equal,synthetic
b5d2186d-338d-40b6-b3b4-7fadf3cfd4e0,"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",{'ID': '286_UK_DocM_V2_AccessAndUseOfBuildings'},"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",none,annotated
f3c5d35c-ad38-46d6-8a75-1a331555b89e,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,{'ID': '206_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,necessity,annotated
493ec553-7761-4d1e-aa98-05d925ddf955_0,,,The tie force of a horizontal hatch must be at least 400kg.,greater-equal,synthetic
9494f4b9-aae0-4668-aebb-1d8851dd0824,"In refreshment facilities, bars and counters (or sections of them) should be at a level suitable for wheelchair users.",{'ID': '127_UK_DocM_V2_AccessAndUseOfBuildings'},"In refreshment facilities, bars and counters (or sections of them) should be at a level suitable for wheelchair users.",part-of,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",none,annotated
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",selection,annotated
11f2902d-29c2-474e-97d0-628a2a97a666_7,,,"glare and reflections of over 01:08:00 must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic
d504fd87-d13d-4936-9d7a-71d17954760d_7,,,"The sizes of the steps in an exit may be no more than 1,500 millimetres.",less-equal,synthetic
0fdce0b1-7992-401f-aa84-ad7f2acca23d,Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,{'ID': '184_UK_DocL_V1_ConsrvationOfFuelAndPower'},Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,selection,annotated
6075de3c-d339-4ba4-9945-990480975615,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",{'ID': '94_UK_DocF_V1_Ventilation'},"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",selection,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_1,,,Skirtings totalling up to 50mm total thickness and shallow projecting assembly areas or casings above 20 millimetres may be discounted when measuring clear width.,greater,synthetic
45338082-ca66-418b-8fe1-8f2be926f330_3,,,A roof-lights of no more than A may pass between the stair steps.,less-equal,synthetic
656aa2fa-18cb-41ee-ae28-28deb3dffcc3,The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,{'ID': '61_Finnish_Health-WaterAndSewerage'},The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,part-of,annotated
103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",part-of,annotated
aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",necessity,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,annotated
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",part-of,annotated
203faa23-7b71-47c9-a6e5-2333ac45389e_1,,,"The primary energy factor of the indoor steps of dwelling units and living quarters may be no more than 0.3, and the tread must be no less than 250 millimetres.",less-equal,synthetic
19c404de-7fd5-4e44-8a8f-b4219883f0ce,That background ventilators allow fresh air into the building and should be left open.,{'ID': '102_UK_DocF_V2_Ventilation'},That background ventilators allow fresh air into the building and should be left open.,necessity,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_4,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and energy consumption 8.5m2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
4094b859-b3b4-4035-94cd-8cf47ccbd801_3,,,"The air flow resistance is at least 1,500 millimetres.",greater-equal,synthetic
1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,none,annotated
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",selection,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_5,,,Where the sewers is within the private curtilage of the dwelling (but not within a carport or evacuation areas) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic
85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",necessity,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9_1,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the total capital cost exceeds 25 decibels; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_1,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for thermal integrity 1 and 0.5 kN/m2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
5b4380ba-0066-4735-a362-316d4c8e70b2_9,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 0.2 timber frame after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_3,,,An upstand built on site should not exceed a total extract air flow of 25 decibels.,less-equal,synthetic
a0c838b5-5fe2-4b52-abe1-432804c2c8aa_10,,,A illuminance of 21 C shall be used as the Signs for room temperature during the heating season.,equal,synthetic
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_6,,,The resilient layer should be to the full height of the door and 0.15m/s input charge of the doorset.,equal,synthetic
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_7,,,"The wall ties should have a temperature of 4 and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
d3fc8c9b-c23a-4188-8723-369caa90453c_5,,,"The total extract air flow for a building's total combined window area is 50 millimetres of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_6,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear vicinity of 2, except in doorways.",equal,synthetic
8151be81-09ad-4dac-b2d2-f0d757915b6c_5,,,"However, when the snow load can occur, the breaking of the load s should be at least 0.15m/s.",greater-equal,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_2,,,"The dwelling primary energy rate, dwelling emission rate and travel, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and size, respectively.",less-equal,synthetic
76acc6bd-50c0-4f3f-b015-42e171ec6ce7_2,,,400mm thermometers must be installed.,equal,synthetic
b4582e8e-9bf5-4d2e-8eb3-975e45511aa2,"The building should be designed, within the overall constraints of space, so that the difference in level between the entrance storey and the site entry point is minimised.",{'ID': '37_UK_DocM_V2_AccessAndUseOfBuildings'},"The building should be designed, within the overall constraints of space, so that the difference in level between the entrance storey and the site entry point is minimised.",selection,annotated
87c9cfa3-8093-497d-be10-dc054abe7062,"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",{'ID': '164_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",necessity,annotated
f0c72b35-5a0a-4554-8713-96f6f73a67f1,A cube with edges of no more than 50 millimetres may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,{'ID': '51_Finnish_SafetyOfUse'},A cube with edges of no more than 50 millimetres may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,part-of,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,none,annotated
2de867fe-80e7-4617-ad18-36225dd45ab1,Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,{'ID': '53_UK_DocF_V1_Ventilation'},Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,less,annotated
46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",none,annotated
b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",selection,annotated
302c413e-fefd-47f1-914f-0dc787e4a761,"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",{'ID': '29_UK_DocM_V2_AccessAndUseOfBuildings'},"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",none,annotated
a8b3e54e-902c-4502-99a2-8c41d46f1416_3,,,"If there are more than EI 30 dwellings in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic
3d0bbf85-327f-4f92-a468-201f81080779,The roof insulation should be installed when the eaves are still accessible.,{'ID': '169_UK_DocL_V1_ConsrvationOfFuelAndPower'},The roof insulation should be installed when the eaves are still accessible.,necessity,annotated
0262f6e5-21bc-4312-9388-8ac93b79416d_2,,,The minimum full output of the absorption chillers should be no worse than 100 millimetres.,greater-equal,synthetic
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated
40b40b1b-d1b1-49d8-b9b7-13c5845a169d_11,,,The structure of the control appliance of the plumbing fixture shall be such that its load capacity does not arise above 200 Watts per room.,less-equal,synthetic
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_9,,,"Generally, a thermal element once upgraded should not have a calculations greater than 0.8 metres.",less-equal,synthetic
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_4,,,"For sizes of cylinder not listed, the water heater from the cylinder should not exceed 28 metres, where V is the volume in litres.",less-equal,synthetic
079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",none,annotated
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",selection,annotated
5b4380ba-0066-4735-a362-316d4c8e70b2_7,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 20C facility after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic
835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",none,annotated
76acc6bd-50c0-4f3f-b015-42e171ec6ce7_0,,,15 balcony must be installed.,equal,synthetic
88e23b46-22d9-4be6-87b7-40541f7995a9_4,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the air leakage rate figure exceeds 60; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic
bd033057-ac6c-45bb-92c7-ca58bf22dab1,The lobby should be large enough and of a shape to allow a wheelchair user or a person pushing a pram to move clear of one door before opening the second door.,{'ID': '80_UK_DocM_V2_AccessAndUseOfBuildings'},The lobby should be large enough and of a shape to allow a wheelchair user or a person pushing a pram to move clear of one door before opening the second door.,necessity,annotated
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,none,annotated
9fd15b82-fc32-4364-8724-f1ef14f0c047_5,,,The cooker hood should surface area at least the intended time of use of the cooker.,greater-equal,synthetic
72d7716f-7e3e-442c-9e42-14d4b19e18e3_2,,,A pipes that is being connected to a new building should not have a air distribution for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic
8b054fa5-fa6b-40f8-996a-a6dfea855fc3,"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",{'ID': '33_Finnish_SafetyOfUse'},"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",selection,annotated
38cd3221-7fc9-4462-be20-78b16a4309d3,The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,{'ID': '490_UK_DocL_V1_ConsrvationOfFuelAndPower'},The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,part-of,annotated
05fdde92-d8af-42ad-963b-9019c69a8ab3_9,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same fittings as the gigabit-ready physical infrastructure used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated
9fd15b82-fc32-4364-8724-f1ef14f0c047_7,,,The cooker hood should location at least the surfaces of the cooker.,greater-equal,synthetic
5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated
82aa0792-8ea3-414a-9952-933b4959b782,"NOTE: All boilers should be used in the calculation, including any that are identical.",{'ID': '249_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: All boilers should be used in the calculation, including any that are identical.",none,annotated
c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,part-of,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4,"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",{'ID': '100_Finnish_Health-IndoorClimateAndVentilation'},"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",part-of,annotated
2ca092ec-4425-4552-a389-fd0dadfbd154_10,,,NOTE: A floor level with a differences of 180 millimetres or steeper should be designed as a ramp.,greater-equal,synthetic
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4,"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",{'ID': '100_Finnish_Health-IndoorClimateAndVentilation'},"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_9,,,"The flushing, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the distance of the basement storey floor from the entry level, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic
c9983da5-23f1-4211-88ce-68e4753e4ab9,"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",{'ID': '102_UK_DocM_V2_AccessAndUseOfBuildings'},"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",necessity,annotated
8b9e1d32-efa8-409b-873b-22e2eae5b537,External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,{'ID': '95_Finnish_Health-Humidity'},External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,necessity,annotated
2238d6ef-421b-4f84-b24d-d46c6ba2afc5,"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",{'ID': '92_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",none,annotated
1afa330a-2d10-44bd-bdce-b9f2667a1b21,"Where it can be held open, steps should be taken to avoid people being harmed by walking into the door.",{'ID': '78_UK_DocM_V2_AccessAndUseOfBuildings'},"Where it can be held open, steps should be taken to avoid people being harmed by walking into the door.",selection,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df,"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",{'ID': '356_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",selection,annotated
ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",selection,annotated
c5a6cac6-a314-47b1-aabd-13f2d1b7ad56,A step-free approach route should be provided to all private entrances.,{'ID': '71_UK_DocM_V1_AccessAndUseOfBuildings'},A step-free approach route should be provided to all private entrances.,selection,annotated
86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",part-of,annotated
ef561e39-db90-462c-8dde-15fbeae954e5,A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,{'ID': '50_Finnish_SafetyOfUse'},A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,less-equal,annotated
f6add908-4d45-4b3e-83a6-369f6c36c037_11,,,"Door rails, stiles and muntins should be at least 14 metres sections.",greater-equal,synthetic
26980508-105c-49db-8595-bf001a48d757_6,,,"In strategy with no fixed terrace of houses or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2_10,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 20 panel parts properties, where there should be no fewer than four.",equal,synthetic
a372d2c4-f734-479d-bc8d-d3a8aa15362d,"A wide range of people, including accompanied wheelchair users, should be able to access and use the lift.",{'ID': '49_UK_DocM_V1_AccessAndUseOfBuildings'},"A wide range of people, including accompanied wheelchair users, should be able to access and use the lift.",selection,annotated
108b5709-f035-4697-ba25-56edd2ce60fc,"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",{'ID': '126_UK_DocM_V2_AccessAndUseOfBuildings'},"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",selection,annotated
d0f0d416-a728-4d23-965e-10ff6559f2d8,All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting platform.,{'ID': '113_UK_DocM_V2_AccessAndUseOfBuildings'},All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting platform.,necessity,annotated
26980508-105c-49db-8595-bf001a48d757_1,,,"In connector pipe with no fixed space heating system or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_2,,,The total number of ventilators must not exceed the individual dwellings alongside the leading edge.,less-equal,synthetic
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_4,,,"The Length of the floor surface in the seating area and access route may not exceed 1,200 millimetres.",less-equal,synthetic
e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,none,annotated
cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",none,annotated
f0c72b35-5a0a-4554-8713-96f6f73a67f1_10,,,A cube with wide of no more than 23C may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_2,,,Storage premises with a performance standards exceeding 01:20:00 are not permitted within the building.,greater,synthetic
aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",selection,annotated
7d35f4c4-fa65-4d68-a974-f54386ca8aee_4,,,"However, a horizontal hot water ring duct in a protective part must be no higher than (16.66 8.33 V0.4)/(1000 24).",less-equal,synthetic
9952f64d-e0df-4b03-84af-150782f81387,"For mobility-impaired people, a going of at least 300mm is preferred.",{'ID': '124_UK_DocM_V2_AccessAndUseOfBuildings'},"For mobility-impaired people, a going of at least 300mm is preferred.",necessity,annotated
7d552257-2212-4139-8d13-b982e0e7744f,"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",{'ID': '143_UK_DocM_V2_AccessAndUseOfBuildings'},"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",part-of,annotated
3121fe90-27db-405e-a42a-df3cd22ee176_3,,,"Where necessary, 1,200 MJ/m2requirement, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic
9497b383-7217-4366-80c5-6f5677b30893,"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",{'ID': '325_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",selection,annotated
20518e80-6f7e-457f-8c5a-59fa4c0eb324_11,,,"When calculating the heat loss for a buildings design solution, the entrance level shall be used as the value of the allowance for the building envelope.",equal,synthetic
e4fb8d18-8dbc-4351-a2df-d87f880f476a,The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,{'ID': '90_Finnish_FireSafety'},The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,none,annotated
e21fa967-934e-4a29-a66d-252fdbbf928f_10,,,"If the parasitic energy use is unknown, an design flow rate of 250 millimetres should be made for any control system.",equal,synthetic
f420ae57-5656-4558-b1a3-1079e46bf6cc,"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",{'ID': '223_Finnish_FireSafety'},"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",greater,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_5,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the air flow resistance of that installation exceeds EI 15 of the total cost of the major renovation.",greater,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2_2,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 400-600mm Ramps properties, where there should be no fewer than four.",equal,synthetic
d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",part-of,annotated
c25a4595-d20d-40ed-bada-495abcfef307,"Background ventilators should be at least 1700mm above floor level, to reduce cold draughts, but still be easy for the occupant to reach.",{'ID': '64_UK_DocF_V1_Ventilation'},"Background ventilators should be at least 1700mm above floor level, to reduce cold draughts, but still be easy for the occupant to reach.",necessity,annotated
cf35d4a4-3170-421b-9be1-b68d928eed1d_3,,,"A roof with a alongside the leading edge greater than eight per cent must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506,"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",{'ID': '8_UK_DocK_ProtectionFromFalling'},"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,annotated
9497b383-7217-4366-80c5-6f5677b30893,"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",{'ID': '325_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",none,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",necessity,annotated
78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",necessity,annotated
1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,none,annotated
5fa7daca-cb50-4397-a736-617e52d30187_9,,,"If efficiencies at below 30% are required and unavailable, the dimensions may be taken as equal to that at 1m3/s.",equal,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647_11,,,"Parapets in headroom A to 90 and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",less,annotated
6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,none,annotated
a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",none,annotated
74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",selection,annotated
4d80c4d1-08ee-481a-9f9c-e9151ce1094d_4,,,"The building primary energy rate of windows, roof windows, rooflights and doors should not exceed 2 of the total floor area of the dwelling.",less-equal,synthetic
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4,"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",{'ID': '6_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",part-of,annotated
0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",necessity,annotated
d8a06af7-3a6b-4d68-8bba-342aac6d3ac0,Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,{'ID': '146_Finnish_Health-WaterAndSewerage'},Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,selection,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",none,annotated
d504fd87-d13d-4936-9d7a-71d17954760d,The riser of the steps in an exit may be no more than 180 millimetres.,{'ID': '25_Finnish_SafetyOfUse'},The riser of the steps in an exit may be no more than 180 millimetres.,less-equal,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9_1,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 1,200 millimetres structure from any projecting corner.",greater-equal,synthetic
29232335-402c-4ed9-af74-fd093ac22e28_9,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least presence 50mm.,greater-equal,synthetic
13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",none,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c_3,,,"The air-tightness for a building's total combined window area is 75 light source lumens per circuit-watt of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic
cb522b91-f26f-460e-adee-1a7f59ba10c9,"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",{'ID': '315_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",necessity,annotated
7d35f4c4-fa65-4d68-a974-f54386ca8aee_1,,,"However, a horizontal seating in a protective part must be no higher than E.",less-equal,synthetic
f0c72b35-5a0a-4554-8713-96f6f73a67f1_1,,,A cube with specification of no more than 2.0 m3/(h m2) may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_8,,,The normal relationship between the dimensions of the rise and going is: 200 lux equals 400 millimetres.,equal,synthetic
c8a048c6-8e7e-4b5a-ada5-02990b983401,"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",{'ID': '91_Finnish_Health-IndoorClimateAndVentilation'},"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",selection,annotated
c384013b-c40f-4925-acbe-465e1ca5bc13_0,,,50 m2 buildings per detail should be recorded.,equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_9,,,The normal relationship between the dimensions of the rise and going is: 3 equals 20 points.,equal,synthetic
6075de3c-d339-4ba4-9945-990480975615,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",{'ID': '94_UK_DocF_V1_Ventilation'},"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",necessity,annotated
36650de0-ef3c-4fd1-8199-f47c0e576076_1,,,"the depth of the platform does not exceed 1,200 millimetres.",less-equal,synthetic
e21fa967-934e-4a29-a66d-252fdbbf928f_9,,,"If the parasitic energy use is unknown, an heat recovery of two should be made for any control system.",equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",necessity,annotated
2633c957-07b4-4caa-a9d6-5acbac16b0b0_7,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and four fire igniting.,equal,synthetic
4b510cad-fefb-44be-a9cb-a26e0c42994c,"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",{'ID': '101_Finnish_EnergyEfficiency'},"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",selection,annotated
60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",necessity,annotated
8b054fa5-fa6b-40f8-996a-a6dfea855fc3_0,,,"The total floor area between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 900mm on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic
84cd76d7-e5d0-4f39-94bc-0236c65d533a_2,,,"in residential buildings of not more than two storeys, one exit of no less than 55 in drop is permitted.",greater-equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_8,,,"In buildings more than 9 metres and at most 8 per cent (1:12.5) in breaking, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_10,,,"Where the work concerns a building containing more than 35 mg/m3 (30 ppm) skylights, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic
bf798097-bb99-42d0-a73f-8cebab8fbeb8_1,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the installed generation capacity of the steps must be no more than 75 light source lumens per circuit-watt and the tread must be no less than 300 millimetres.",less-equal,synthetic
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",none,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",selection,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_1,,,The normal relationship between the dimensions of the rise and going is: 800 millimetres equals 16/01/2023 00:00.,equal,synthetic
1afa330a-2d10-44bd-bdce-b9f2667a1b21,"Where it can be held open, steps should be taken to avoid people being harmed by walking into the door.",{'ID': '78_UK_DocM_V2_AccessAndUseOfBuildings'},"Where it can be held open, steps should be taken to avoid people being harmed by walking into the door.",necessity,annotated
511c1a7f-08b9-48ec-aea6-9b749fdf31a1_8,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 0.136kgCO2/kWh of appropriately located heating circuits which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic
84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",part-of,annotated
746e7940-e063-42d5-a5c7-af12bb243924,"All floor areas, even when located at different levels, should be accessible.",{'ID': '128_UK_DocM_V2_AccessAndUseOfBuildings'},"All floor areas, even when located at different levels, should be accessible.",selection,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",selection,annotated
9953a539-8775-467a-9028-f51fe6d0f9f6,Grommets or flexible collars should be used around incoming services and sealed to the air barrier with air-sealing tape or sealant.,{'ID': '179_UK_DocL_V1_ConsrvationOfFuelAndPower'},Grommets or flexible collars should be used around incoming services and sealed to the air barrier with air-sealing tape or sealant.,necessity,annotated
8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",none,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_6,,,"The wall ties should have a horizontal spacing of 900mm and a travel of 90mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
35cacecf-06dc-4b0f-aadb-db2ee05518c7,The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,{'ID': '495_UK_DocM_V2_AccessAndUseOfBuildings'},The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,none,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_4,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for frequency 1 and 56 metres if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",greater-equal,annotated
05fdde92-d8af-42ad-963b-9019c69a8ab3_5,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same cost as the garage doorset used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",none,annotated
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_5,,,Storage premises with a primary energy content exceeding B are not permitted within the building.,greater,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_1,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be water vapour resistance 1,500 millimetres.",equal,synthetic
83344b26-7cf0-452a-9dac-c0288c46393d,"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '37_UK_DocQ_Security_Dwellings'},"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated
aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",part-of,annotated
0f2dbc3b-0f3e-444e-a688-ed8faebd1226,Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,{'ID': '105_Finnish_SafetyOfUse'},Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,selection,annotated
83ff563b-077a-4849-b526-382fbb012647,The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,{'ID': '67_Finnish_SafetyOfUse'},The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,part-of,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_1,,,"Where the work concerns a building containing more than 400-600mm roof structures, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic
5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",none,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b_8,,,"When an existing building with a total useful Extract of over 1m3/s is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_2,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and shape EI 30 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
4e119abd-0cf7-4c60-9c7b-1083f9b46280,"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",{'ID': '85_UK_DocF_V2_Ventilation'},"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",selection,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",none,annotated
aa921550-3c5f-470b-b578-1788f83b49a7,Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,{'ID': '153_UK_DocM_V2_AccessAndUseOfBuildings'},Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,necessity,annotated
2cf150af-bede-4bb6-aa2e-b9f42a109761,The warning should be placed sufficiently in advance of the hazard to allow time to stop and not be so narrow that it might be missed in a single stride.,{'ID': '53_UK_DocM_V2_AccessAndUseOfBuildings'},The warning should be placed sufficiently in advance of the hazard to allow time to stop and not be so narrow that it might be missed in a single stride.,necessity,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905_5,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the thick of the staircase and exit route is no more than 1000m2.,less-equal,synthetic
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none,annotated
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_9,,,The Unit length must not exceed the individual dwellings primary energy content.,less-equal,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_0,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear installation of 200 m2, except in doorways.",equal,synthetic
4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",none,annotated
72d7716f-7e3e-442c-9e42-14d4b19e18e3_5,,,A Provision that is being connected to a new building should not have a anthracite figure for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6,The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,{'ID': '119_Finnish_SafetyOfUse'},The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,part-of,annotated
a894077e-cebf-4559-9254-ce964bc11b0f,Air flow rates for mechanical ventilation in new dwellings must be measured.,{'ID': '182_UK_DocF_V1_Ventilation'},Air flow rates for mechanical ventilation in new dwellings must be measured.,necessity,annotated
5e51b653-449e-4d00-be19-0e20ecff5c49_2,,,The default flushing should be eight per cent.,equal,synthetic
9952f64d-e0df-4b03-84af-150782f81387,"For mobility-impaired people, a going of at least 300mm is preferred.",{'ID': '124_UK_DocM_V2_AccessAndUseOfBuildings'},"For mobility-impaired people, a going of at least 300mm is preferred.",none,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_4,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 500kW in maintained, these must be accessible via the interior.",greater,synthetic
bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",none,annotated
3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_2,,,These fittings should not exceed a heat loss of 60 persons.,less-equal,synthetic
b6e6ebce-e75f-4fae-b9a2-e35c164b3fb4,"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",{'ID': '342_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",none,annotated
75c60084-6878-472d-8694-e8739e0dd76c_0,,,The width of access routes in assembly areas with a service life of 50 m2 must be at least 900 millimetres.,equal,synthetic
802f724b-cd37-4e78-9cbc-42ccec62237f,"System controls should be wired so that when there is no demand for space heating or hot water, the heating appliance, if appropriate, and pump are switched off.",{'ID': '306_UK_DocM_V2_AccessAndUseOfBuildings'},"System controls should be wired so that when there is no demand for space heating or hot water, the heating appliance, if appropriate, and pump are switched off.",necessity,annotated
333110c1-ba9e-4c1d-9249-6604f49ba09a,"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",none,annotated
c47598f9-df79-4d77-aba9-8f380342372f,extract air of category 4 shall be conducted to the outdoors through individual extract air ducts.,{'ID': '88_Finnish_Health-IndoorClimateAndVentilation'},extract air of category 4 shall be conducted to the outdoors through individual extract air ducts.,equal,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_9,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be constraints 50mm.",equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_5,,,"The wall ties should have a horizontal spacing of 900mm and a relationship of 0.3, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated
76bf63bd-30f4-440d-81a0-61ca16170f70_1,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the performance is less than 900mm of the total load.,less,synthetic
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_4,,,The approach route is a minimum of 900mm wide with a maximum instantaneous carbon monoxide concentration of 6m.,less-equal,synthetic
8207751f-13b8-4fe3-9bfe-4423093d4905_6,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the product certificate of the staircase and exit route is no more than 56 metres.,less-equal,synthetic
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_11,,,The topography must not exceed the individual dwellings dwelling emission rate.,less-equal,synthetic
3639910c-8ebf-499a-aeec-6f1951b28134,"Additionally, insulated plaster-board should be used in reveals to abut jambs and should be considered within reveal soffits.",{'ID': '166_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Additionally, insulated plaster-board should be used in reveals to abut jambs and should be considered within reveal soffits.",necessity,annotated
50e89a86-e2be-439d-b230-79274cd7199b_10,,,Modular and portable buildings with a planned total flow rate of more than 44mm at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic
e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none,annotated
5ca184fa-e100-4f97-957d-e37ae944786f_8,,,The target primary energy rate of installing electric vehicle charge points and cable routes is not more than 0.2 of the total capital cost of the major renovation.,less-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_6,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 0.1m2 window unit are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",selection,annotated
36650de0-ef3c-4fd1-8199-f47c0e576076_8,,,the total extract air flow of the platform does not exceed 2m.,less-equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_1,,,"If the free gap between facing walls of adjacent glazed balconies or the absence of the wall to the window of an adjacent fire compartment is less than 50 millimetres, the wall in question must be class EI 15.",less,synthetic
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_8,,,"In a Dwellings with no openable door systems, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic
fb5d3054-4911-4049-ba09-1c3e80f9c07c_10,,,"The breaking of steps in uncovered or unheated outdoor staircases must be no less than 25mm, and the riser may be no more than 130 millimetres.",greater-equal,synthetic
cd904a0f-c120-4c67-bcff-6fcc77abca62,Any future connection locations should be clearly identified and labelled.,{'ID': '116_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Any future connection locations should be clearly identified and labelled.,necessity,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8_5,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the performance standards of the steps must be no more than 100 litres and the tread must be no less than 300 millimetres.",less-equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_5,,,Modular and portable buildings with a planned type and quality of more than 500 millimetres but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic
164122ed-c7ac-4cf8-8a54-3d56c144f78d_9,,,"In general, the findings indicate that there should be at least the same number of heating technology as fire-extinguishing system and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic
371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",none,annotated
83ff563b-077a-4849-b526-382fbb012647,The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,{'ID': '67_Finnish_SafetyOfUse'},The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,part-of,annotated
a1f91cfd-21f8-49a4-8468-746f49f4848e_4,,,"For a building that contains more than 7 mg/m3 (6 ppm) circulation piping for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic
76acc6bd-50c0-4f3f-b015-42e171ec6ce7_9,,,20 degrees Celsius toilet washroom must be installed.,equal,synthetic
45338082-ca66-418b-8fe1-8f2be926f330_6,,,A ventilators of no more than 65mm may pass between the stair steps.,less-equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c,The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,{'ID': '115_Finnish_SafetyOfUse'},The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,part-of,annotated
45adb0b6-63ee-4f42-b6a3-8fc396221c67_11,,,The air flow resistance of the insulation plus any required air gap should be at least to the power requirements of the rafters.,greater-equal,synthetic
51550284-0701-41b2-9a76-a0061d16938a,"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",{'ID': '188_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",necessity,annotated
7e369e4c-7768-4a7a-bd9c-41e2aa037b43,The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,{'ID': '61_Finnish_Health-IndoorClimateAndVentilation'},The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,selection,annotated
8595e26e-db5c-4d09-9fcf-02b530b61e23,There must be access to each fire compartment of an attic for firefighting operations.,{'ID': '240_Finnish_FireSafety'},There must be access to each fire compartment of an attic for firefighting operations.,necessity,annotated
569c7958-b7d6-4b9c-9dd9-13307e95e59b_0,,,"For ducted systems that are served by fans with a prevailing wind direction greater than 40, ductwork leakage tests should be carried out.",greater,synthetic
84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",none,annotated
12907c6f-e734-436d-a7de-c8a1626fbe92,"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",{'ID': '496_UK_DocM_V2_AccessAndUseOfBuildings'},"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",none,annotated
1d10aa43-7650-46b1-83c3-867f212ab9c3,Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,{'ID': '58_UK_DocF_V1_Ventilation'},Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,selection,annotated
d56a51f7-6ec0-457b-a9ed-263fffe3a3e2,"Once open, all doors to accessible entrances should be wide enough to allow unrestricted passage for a variety of users, including wheelchair users, people carrying luggage, people with assistance dogs, and parents with pushchairs and small children.",{'ID': '66_UK_DocM_V2_AccessAndUseOfBuildings'},"Once open, all doors to accessible entrances should be wide enough to allow unrestricted passage for a variety of users, including wheelchair users, people carrying luggage, people with assistance dogs, and parents with pushchairs and small children.",necessity,annotated
389c960b-525d-4f2e-9a2c-1805eb2dc20d_9,,,The full air extract rate under a stair that forms part of the storage provision should be counted as ten millimetres.,equal,synthetic
4a82f789-a98a-4379-9b81-2a20cfba6c87,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",{'ID': '179_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",none,annotated
23cff3c3-1251-4c5f-9fd9-8f52d25eb494,Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,{'ID': '252_UK_DocM_V2_AccessAndUseOfBuildings'},Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,none,annotated
b6b19c38-b160-475d-b01d-e3880ca00ab2,"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",{'ID': '31_UK_DocF_V2_Ventilation'},"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",part-of,annotated
84033aa1-c68d-457c-b7d8-893e879cd196,The pumping station shall be equipped with a malfunction detector.,{'ID': '131_Finnish_Health-WaterAndSewerage'},The pumping station shall be equipped with a malfunction detector.,necessity,annotated
44b436fd-26ab-4b00-82e9-9565e73bb87e,NOTE: Any method to reduce overheating risk in residential buildings must comply with all other parts of the Building Regulations.,{'ID': '65_UK_DocO_Overheating'},NOTE: Any method to reduce overheating risk in residential buildings must comply with all other parts of the Building Regulations.,necessity,annotated
5ca184fa-e100-4f97-957d-e37ae944786f_9,,,The wide of installing electric vehicle charge points and cable routes is not more than 1 of the total capital cost of the major renovation.,less-equal,synthetic
07565483-7508-43fc-b15e-82d95881e81e,"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",{'ID': '70_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",necessity,annotated
3121fe90-27db-405e-a42a-df3cd22ee176,"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",{'ID': '55_Finnish_SafetyOfUse'},"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",necessity,annotated
a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",selection,annotated
451e7c91-d39f-4401-a0e3-5ab455ab0442,"The approach route should be level, gently sloping, or, where necessary, ramped.",{'ID': '15_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be level, gently sloping, or, where necessary, ramped.",necessity,annotated
99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,part-of,annotated
8e7e4d9a-05b8-4512-91c5-e8dbb9488685,"At night, windows, patio doors and balcony doors should be modelled as closed.",{'ID': '55_UK_DocO_Overheating'},"At night, windows, patio doors and balcony doors should be modelled as closed.",necessity,annotated
f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",selection,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",none,annotated
7134933d-17df-4a8c-b72e-1c09177bad1c,The spread of fire in voids of wall-type building elements must be restricted at least by storey.,{'ID': '130_Finnish_FireSafety'},The spread of fire in voids of wall-type building elements must be restricted at least by storey.,none,annotated
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",necessity,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_6,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom basins, where there should be no fewer than 25mm.",greater-equal,synthetic
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_11,,,The resilient layer should be to the full height of the door and 15mm category of the doorset.,equal,synthetic
9027959e-efc1-4d32-acbe-e0775d40f001_8,,,"The morticed bolts should have a minimum vicinity of 50mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_11,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the design from these spaces does not exceed 65 degrees Celsius of the total air flow in the vertical duct.",less-equal,synthetic
d3e7a947-536e-4a49-9823-e27fc0f68b27_8,,,measures of landings to be at least equal to the domestic hot water circulation heat loss of the ramp.,greater-equal,synthetic
d04d6702-5170-4b50-9bda-7367a24e9322,"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",{'ID': '5_UK_DocR_V1_InfrastructureForElectircalCommunications'},"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",selection,annotated
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_9,,,Skirtings totalling up to 8 per cent (1:12.5) differences and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c_7,,,The width of access routes in assembly areas with a step of 65 degrees Celsius must be at least 900 millimetres.,equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_7,,,"If the air flows of elevation difference 50 m2 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,necessity,annotated
a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",none,annotated
0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",part-of,annotated
5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,selection,annotated
536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",part-of,annotated
922bf8df-3a70-4f45-8c04-200b638d3b3c_1,,,The cold water pipe shall be designed and installed so that the tie force in the cold water system may not exceed 500 millimetres.,less-equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
08075a86-82be-487e-915b-2c8423f95cb8,The equivalent area of the opening should meet or exceed the free area of the opening.,{'ID': '39_UK_DocO_Overheating'},The equivalent area of the opening should meet or exceed the free area of the opening.,part-of,annotated
34a524ec-6994-426f-86af-78788fd34a80,"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",{'ID': '36_UK_DocQ_Security_Dwellings'},"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",part-of,annotated
2238d6ef-421b-4f84-b24d-d46c6ba2afc5,"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",{'ID': '92_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",selection,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",none,annotated
f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",selection,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9_2,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the category exceeds 2.5 ties/m2; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,selection,annotated
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,necessity,annotated
5fa7daca-cb50-4397-a736-617e52d30187_11,,,"If efficiencies at below 30% are required and unavailable, the above may be taken as equal to that at 0.15.",equal,synthetic
7d877df3-9aa7-4dff-a64d-5356a66c944d_3,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a atmosphere exceeding 0.9 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic
656aa2fa-18cb-41ee-ae28-28deb3dffcc3_1,,,The insulating performance of the water in the hot water system shall be at least 4 and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic
956efc87-87de-4d3c-99fb-dc58eab9353b_4,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a that of at least 23C.,greater-equal,synthetic
6a41a473-bd3c-4e38-a093-094b3fdae388_5,,,At least one in every 0.15 dm3/s per m2 remaining low expansion foam must be provided with cable routes.,equal,synthetic
6414854d-01f9-481f-a7f4-c4581e48d8b1_7,,,Special safety features are not necessary if the sleeping accommodation is not more than 25 decibels long.,less-equal,synthetic
ae098b28-f01d-44df-b601-b7ac7631101d,"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",{'ID': '54_Finnish_SafetyOfUse'},"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",necessity,annotated
c5a6cac6-a314-47b1-aabd-13f2d1b7ad56,A step-free approach route should be provided to all private entrances.,{'ID': '71_UK_DocM_V1_AccessAndUseOfBuildings'},A step-free approach route should be provided to all private entrances.,selection,annotated
103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,annotated
a538fc03-db66-4b31-b40f-e41754522010,The three-part form should be completed for each installation address.,{'ID': '264_UK_DocF_V1_Ventilation'},The three-part form should be completed for each installation address.,selection,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",none,annotated
53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,part-of,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905_1,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the level with entry of the staircase and exit route is no more than adequate means.,less-equal,synthetic
e32bbb47-c826-40c1-8ea4-8c32353d3fd2_6,,,There shall be 0.7 of electric storage heaters provided for people in the building.,equal,synthetic
7f3f59a4-fc7e-4b14-8074-384f6cacf548_9,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the value is less than three.",less,synthetic
a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",none,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d_7,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a capacity exceeding 90mm and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic
8b054fa5-fa6b-40f8-996a-a6dfea855fc3_7,,,"The thresholds between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 65mm on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic
fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",selection,annotated
92f99822-6896-4ade-abbe-7598f8225b9e,"The information should be provided in a clear manner, for a non-technical audience.",{'ID': '93_UK_DocO_Overheating'},"The information should be provided in a clear manner, for a non-technical audience.",necessity,annotated
536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",selection,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",none,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_9,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be design to 56 metres.,less-equal,synthetic
85cf77b8-70aa-4453-8d95-00f55a63c4ca,The provision made must be sufficient to (a) allow simple adaptation of the dwelling to meet the needs of occupants who use wheelchairs; or (b) meet the needs of occupants who use wheelchairs.,{'ID': '65_UK_DocM_V1_AccessAndUseOfBuildings'},The provision made must be sufficient to (a) allow simple adaptation of the dwelling to meet the needs of occupants who use wheelchairs; or (b) meet the needs of occupants who use wheelchairs.,necessity,annotated
45338082-ca66-418b-8fe1-8f2be926f330_10,,,A Heat pumps of no more than 0.9 metres may pass between the stair steps.,less-equal,synthetic
f64c5a32-2f88-4be6-abf4-8870a4e51fdf,"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",{'ID': '72_Finnish_Health-IndoorClimateAndVentilation'},"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",selection,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_7,,,"In buildings more than 20 millimetres and at most 28 metres in water vapour resistance, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic
2c725d50-13d5-4e77-bacf-9f174530e27c,The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,{'ID': '17_UK_DocM_V2_AccessAndUseOfBuildings'},The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,selection,annotated
f72a98f3-b7d2-4633-b244-0d7242dfb0c9_3,,,Every single bedroom has a minimum free gap of 1.501kWhPE/kWh and is at least 2.4m wide.,greater-equal,synthetic
e8340500-38b6-461b-b00d-d3aa44ac1f0b_10,,,The Length of the water available from the hot water system may not exceed 9 metres.,less-equal,synthetic
28433761-e537-456b-9ff8-00e786b43143,Consumer units should be mounted so that the switches are between 1350mm and 1450mm above floor level.,{'ID': '126_UK_DocM_V1_AccessAndUseOfBuildings'},Consumer units should be mounted so that the switches are between 1350mm and 1450mm above floor level.,selection,annotated
0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_10,,,The exceptional circumstances of the extension does not exceed 01:08:00.,less-equal,synthetic
"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_2",,,"However, if the boiler efficiency is no more than 50 millimetres, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_4,,,"In spaces intended for more than 60 persons, the total flow rate of the access route must be at least 0.7 metres.",greater-equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_7,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 0.136kgCO2/kWh facility for festive occasions is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic
a1f91cfd-21f8-49a4-8468-746f49f4848e_5,,,"For a building that contains more than 30m2 organic substances for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic
35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",selection,annotated
35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",none,annotated
2a256a9c-0b8a-4acf-87e1-86a5857f36a3_2,,,"Where a driveway forms all, or part of, the approach route, an demonstrate compliance with Part F of the Building Regulations of at least 20 litres per second wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic
6efbae9b-e306-4005-8881-aed97c54e405,Leakage from a pressure sewer located in a groundwater zone shall be detectable.,{'ID': '145_Finnish_Health-WaterAndSewerage'},Leakage from a pressure sewer located in a groundwater zone shall be detectable.,part-of,annotated
1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,part-of,annotated
8c7cf3d7-3ab9-4cb4-99bf-016cbbd4914d,Mechanical ventilation systems must be commissioned to provide adequate ventilation.,{'ID': '180_UK_DocF_V1_Ventilation'},Mechanical ventilation systems must be commissioned to provide adequate ventilation.,selection,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0_0,,,"For dwellings, for external tapered steps and stairs that are part of the building the protective part of each step should be a minimum of 0.8 metres.",greater-equal,synthetic
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",part-of,annotated
244aeb26-ba33-498c-8a28-989b5aa879a8,The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,{'ID': '129_Finnish_Health-WaterAndSewerage'},The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,necessity,annotated
c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,necessity,annotated
9618a274-45da-4e3e-87f0-21c2bfae4a8e_6,,,"A guardrail must be used at points with a Unit length of over certain proportion, if these can be accessed by children.",greater,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_10,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding half air conditioner is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic
fa8a6d84-eb99-490e-8169-3c65353fb553_9,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the energy savings shall be at least 14 metres.",greater-equal,synthetic
e8340500-38b6-461b-b00d-d3aa44ac1f0b_0,,,The Ventilation of the water available from the hot water system may not exceed 250 millimetres.,less-equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",part-of,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0_3,,,"For dwellings, for external tapered steps and stairs that are part of the building the category of each step should be a minimum of 2 metres.",greater-equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_11,,,Modular and portable buildings with a planned spread of fire of more than 300 litres but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic
50e89a86-e2be-439d-b230-79274cd7199b_9,,,Modular and portable buildings with a planned fittings of more than 24 degrees Celsius at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic
9fd15b82-fc32-4364-8724-f1ef14f0c047,The cooker hood should span at least the full width of the cooker.,{'ID': '36_UK_DocF_V1_Ventilation'},The cooker hood should span at least the full width of the cooker.,part-of,annotated
d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",part-of,annotated
f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_8,,,"No individual flight has a access of more than 1,200 MJ/m2.",less-equal,synthetic
9c9a27b6-b4be-4946-854a-c46ee812140c,"In general, accessible bedrooms should be no less advantageously situated than other bedrooms.",{'ID': '142_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, accessible bedrooms should be no less advantageously situated than other bedrooms.",necessity,annotated
8efb6108-e49e-4d64-a1e4-22e3f9128b17_8,,,"When calculating the reference heat loss of a building, the value of 1 shall be used as the dwelling primary energy rate for the air leakage rate figure for the building envelope.",equal,synthetic
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_4,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 180kW duct.,greater,synthetic
4fc3b5b1-a838-4429-b385-d8e80e6633eb_0,,,"In the absence of relevant harmonised European Standards, products with a cross fall exceeding 650mm must have a product certificate issued by a Notified Body.",greater,synthetic
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_2,,,The clear width of the floor surface in the seating area and access route may not exceed 190 kN.,less-equal,synthetic
26980508-105c-49db-8595-bf001a48d757_9,,,"In copy with no fixed seats or waste, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_7,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 150m2 in flow rate; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",none,annotated
e32bbb47-c826-40c1-8ea4-8c32353d3fd2_0,,,There shall be 0.1m2 of technical utility room provided for people in the building.,equal,synthetic
5e51b653-449e-4d00-be19-0e20ecff5c49_11,,,The default design solar load should be 800 millimetres.,equal,synthetic
5ca6b3d3-fd21-4cc1-8dd8-185268db6615,The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,{'ID': '26_UK_DocQ_Security_Dwellings'},The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,none,annotated
72d7716f-7e3e-442c-9e42-14d4b19e18e3_1,,,A detailing that is being connected to a new building should not have a difference in light reflectance value for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic
ddc0bba6-2df8-43e1-9398-37514366fb06,"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",{'ID': '208_UK_DocF_V1_Ventilation'},"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",part-of,annotated
74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",none,annotated
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88,The resilient layer should be to the full height of the door and 600mm either side of the doorset.,{'ID': '15_UK_DocQ_Security_Dwellings'},The resilient layer should be to the full height of the door and 600mm either side of the doorset.,equal,annotated
ad30824c-74be-4f4f-916a-dfe1e0a89205,"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",selection,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",part-of,annotated
9415ae4b-7a74-4c70-a245-e4381c6d71bf_2,,,"At gables and party walls, insulation should extend to the wall; if the air flow between the wall and joist is less than four, perimeter insulation may be required.",less,synthetic
bf798097-bb99-42d0-a73f-8cebab8fbeb8_10,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the horizontal spacing of the steps must be no more than 300mm and the tread must be no less than 300 millimetres.",less-equal,synthetic
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_11,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and water temperature one air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c,The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,{'ID': '115_Finnish_SafetyOfUse'},The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,part-of,annotated
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a,"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",{'ID': '99_Finnish_SafetyOfUse'},"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",selection,annotated
0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",none,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_8,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the efficiency may be no more than 0.3W/m2.",less-equal,synthetic
90b450dc-e913-48b3-bd17-dbac5b6fb057,The separator devices shall be located so that they can be serviced and emptied easily and without causing problems.,{'ID': '153_Finnish_Health-WaterAndSewerage'},The separator devices shall be located so that they can be serviced and emptied easily and without causing problems.,necessity,annotated
009e12eb-db83-485c-9ffc-e1f462251109_9,,,Each air terminal should have a premises of at least twice the rise plus the going (2R G) of the free area of its associated duct.,greater-equal,synthetic
536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",none,annotated
5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated
e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none,annotated
a4fccc69-c508-4405-92aa-2cfe36bfca39,Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,{'ID': '209_Finnish_FireSafety'},Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,selection,annotated
5b4380ba-0066-4735-a362-316d4c8e70b2_6,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 2m plot after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic
9415ae4b-7a74-4c70-a245-e4381c6d71bf_7,,,"At gables and party walls, insulation should extend to the wall; if the Wall between the wall and joist is less than 2.0 m3/(h m2), perimeter insulation may be required.",less,synthetic
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_3,,,"In a requirement with no openable Intermittent extract fans, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic
a0c838b5-5fe2-4b52-abe1-432804c2c8aa_7,,,A energy savings of 21 C shall be used as the total useful floor area for room temperature during the heating season.,equal,synthetic
f1898d1c-5d14-4f9b-8c31-e0ac7623a61c,The building control body should be provided with a report that demonstrates that the residential building passes CIBSEs TM59 assessment of overheating.,{'ID': '47_UK_DocO_Overheating'},The building control body should be provided with a report that demonstrates that the residential building passes CIBSEs TM59 assessment of overheating.,necessity,annotated
197b9463-397e-4729-a08d-12739f9db069,"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",{'ID': '283_UK_DocM_V2_AccessAndUseOfBuildings'},"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",necessity,annotated
354c849e-8e02-47ec-992c-e5431a62cb3f,Ventilation systems that provide supply and extract ventilation should be fitted with a heat recovery system where technically feasible.,{'ID': '309_UK_DocM_V2_AccessAndUseOfBuildings'},Ventilation systems that provide supply and extract ventilation should be fitted with a heat recovery system where technically feasible.,none,annotated
3ca5cb38-b90b-4449-ba14-4268866df8e1_4,,,The water heater is close to the draw-off points and has a Manual control no greater than 2.2 metres.,less-equal,synthetic
4ee66fa0-9dcc-4332-b001-f1aec49d9af9,It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,{'ID': '154_UK_DocM_V2_AccessAndUseOfBuildings'},It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,selection,annotated
9691451a-57d5-484f-a346-0f83b59f7ae0,"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",selection,annotated
ef561e39-db90-462c-8dde-15fbeae954e5,A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,{'ID': '50_Finnish_SafetyOfUse'},A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,none,annotated
9618a274-45da-4e3e-87f0-21c2bfae4a8e_0,,,"A guardrail must be used at points with a dwelling primary energy rate of over 280mm, if these can be accessed by children.",greater,synthetic
113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",selection,annotated
35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",necessity,annotated
d0b6759e-deec-451d-bd7a-ec65b96048be_2,,,"extract air of above 850 millimetres shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",none,annotated
f72a98f3-b7d2-4633-b244-0d7242dfb0c9_0,,,Every single bedroom has a minimum emission rate of 0.052083333 and is at least 2.4m wide.,greater-equal,synthetic
76acc6bd-50c0-4f3f-b015-42e171ec6ce7_3,,,(16.66 8.33 V0.4)/(1000 24) living area must be installed.,equal,synthetic
f050b9bc-ce9e-4e51-8291-bbabda986732,all dimensions are minimum except where noted.,{'ID': '88_UK_DocM_V1_AccessAndUseOfBuildings'},all dimensions are minimum except where noted.,necessity,annotated
7d552257-2212-4139-8d13-b982e0e7744f,"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",{'ID': '143_UK_DocM_V2_AccessAndUseOfBuildings'},"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",selection,annotated
f1b9829d-7ac3-4bc5-918a-5bbb8d663a35,"For space heating systems, temperature control should be installed for the heating appliance.",{'ID': '248_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For space heating systems, temperature control should be installed for the heating appliance.",necessity,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,selection,annotated
9dd51871-3235-4bbe-abdc-ab8d6dd3b1e6,"For example, the shutters should be used in the day and the windows opened only when it is cooler outside.",{'ID': '96_UK_DocO_Overheating'},"For example, the shutters should be used in the day and the windows opened only when it is cooler outside.",necessity,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_8,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 400kg intended purpose.,less-equal,synthetic
53e31e26-a39b-4047-a86e-bdb8021413e8_0,,,Window handles on windows that open outwards are not more than twice the rise plus the going (2R G) standard thickness when the window is at its maximum openable angle.,less-equal,synthetic
113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",selection,annotated
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_10,,,The flow rate of the floor surface in the seating area and access route may not exceed EI 30.,less-equal,synthetic
63af9f99-6939-4e8c-a6a9-8b10942e1597_3,,,"The handle to at least 4 gangways in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9,"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",part-of,annotated
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated
26980508-105c-49db-8595-bf001a48d757,"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",{'ID': '103_Finnish_SafetyOfUse'},"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_5,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the proportion of the cooling load relating to distribution pipework is less than 10m.",less,synthetic
87c9cfa3-8093-497d-be10-dc054abe7062,"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",{'ID': '164_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",necessity,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_9,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be area 220 millimetres.",equal,synthetic
53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,none,annotated
4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",none,annotated
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,selection,annotated
956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",necessity,annotated
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_6,,,"The gradients of the floor surface in the seating area and access route may not exceed 1,500 millimetres.",less-equal,synthetic
53bb982d-5260-4a69-a6dd-71e4f074e676_5,,,The intended purpose of standing rows must be at least 450mm.,greater-equal,synthetic
51550284-0701-41b2-9a76-a0061d16938a,"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",{'ID': '188_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",none,annotated
adc0ce58-8e7e-42fa-a823-ab45f266f77f,Sewers shall be connected to a stack vent that extends above the roofing of a building.,{'ID': '135_Finnish_Health-WaterAndSewerage'},Sewers shall be connected to a stack vent that extends above the roofing of a building.,selection,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_11,,,"If the axle group load between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 30% load, the wall in question must be class EI 15.",less,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_4,,,"Where the sum of installing only cable routes is more than 0.35W/(m2K) of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic
536b172d-ccd1-479a-8136-6ee05db0f264_0,,,"Where pipework is above ground, the performance of the pipe properties should be at least as high as the effective rated output of pipework in the buried part of the system.",greater-equal,synthetic
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9,"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",{'ID': '116_Finnish_SafetyOfUse'},"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",part-of,annotated
01008f69-874b-443e-bcb2-2f5630280049_4,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the thick may be no more than 15 degrees and the tread must be no less than 220 millimetres.",less-equal,synthetic
793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,none,annotated
f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_3,,,No individual flight has a Leakage of more than 200 lux.,less-equal,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_11,,,"The building primary energy rate and illuminance calculated using the measured air permeability must not be higher than the target primary energy rate and total flow rate, respectively.",less-equal,synthetic
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4,"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",{'ID': '6_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,annotated
a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,none,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905_2,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the service life of the staircase and exit route is no more than 2 metres.,less-equal,synthetic
8efb6108-e49e-4d64-a1e4-22e3f9128b17_11,,,"When calculating the reference heat loss of a building, the value of 13l/s shall be used as the load for the air leakage rate figure for the building envelope.",equal,synthetic
35cacecf-06dc-4b0f-aadb-db2ee05518c7_3,,,The area of windows and roof windows (but excluding display windows) suitable for their purpose exceeds 10m of the facade area.,greater,synthetic
d0b6759e-deec-451d-bd7a-ec65b96048be_0,,,"extract air of proportion 0.06 m2 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2_7,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 10m Staircases properties, where there should be no fewer than four.",equal,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506_3,,,"Gangways should not be less than 1100mm net absorber area unless used by not more than 50 persons, in which case gangways should be a minimum of 200 m2.",greater-equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated
103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",part-of,annotated
0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",selection,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_8,,,Individual flights are: for Capacities up to 23C not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
dae0db09-fd4b-4f2c-99c0-cd742b19d17a,"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",{'ID': '68_Finnish_SafetyOfUse'},"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",part-of,annotated
2ff58135-b89d-40d1-a145-51aad9e5a942,"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",{'ID': '16_Finnish_Accessibility'},"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",part-of,annotated
8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated
1085a40e-a3d6-48e2-85ac-8247a26f04f2,Mechanical ventilation systems must be commissioned in accordance with an approved procedure.,{'ID': '35_UK_DocF_V2_Ventilation'},Mechanical ventilation systems must be commissioned in accordance with an approved procedure.,selection,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_0,,,Individual flights are: for gradients up to 1:15 not more than half widened; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_9,,,"If the air flows of maintained 1 and 10 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
bde1697a-20c9-4f15-a63c-5be323a058c1_5,,,Any connection of 10 litres per second per person or more entrance door to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic
0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated
2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",none,annotated
371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",selection,annotated
fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",none,annotated
63af9f99-6939-4e8c-a6a9-8b10942e1597,"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",{'ID': '57_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",part-of,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50_9,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the manufacturers declared efficiencies of the heat emitters to be installed does not exceed 1.501kWhPE/kWh.",less-equal,synthetic
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_8,,,An upstand built on site should not exceed a energy efficiency of 0.3.,less-equal,synthetic
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_0,,,The approach route is a minimum of 900mm wide with a maximum outputs of 2 metres.,less-equal,synthetic
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_1,,,The approach route is a minimum of 900mm wide with a maximum maximum number of occupants of 180 millimetres.,less-equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",selection,annotated
9fd15b82-fc32-4364-8724-f1ef14f0c047_4,,,The cooker hood should total useful floor area at least the absence of the cooker.,greater-equal,synthetic
bc5a76fa-f0ec-47d5-b8e3-0e9458f3f140,"Foundations: wherever possible, blocks below the damp-proof course should be the same as those specified in the design for the above-ground main wall element (in masonry construction).",{'ID': '159_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Foundations: wherever possible, blocks below the damp-proof course should be the same as those specified in the design for the above-ground main wall element (in masonry construction).",selection,annotated
c90714e3-d8f9-47dc-ac9c-2e7ee516a89c,The joint between waterproofing and the floor drain must be tight.,{'ID': '119_Finnish_Health-Humidity'},The joint between waterproofing and the floor drain must be tight.,selection,annotated
29c431ee-ea93-491d-ab13-06418d93c488_7,,,"If dimension is greater than 0.2, manual control is acceptable.",greater,synthetic
d713514a-9398-45a2-9584-efecff6ebcc5,Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,{'ID': '4_UK_DocQ_Security_Dwellings'},Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,part-of,annotated
37f01a2c-b944-45a2-a7f4-140d8c03d7ac,"After rebating, frame components should retain at least 32mm of timber.",{'ID': '29_UK_DocQ_Security_Dwellings'},"After rebating, frame components should retain at least 32mm of timber.",greater-equal,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated
9494f4b9-aae0-4668-aebb-1d8851dd0824,"In refreshment facilities, bars and counters (or sections of them) should be at a level suitable for wheelchair users.",{'ID': '127_UK_DocM_V2_AccessAndUseOfBuildings'},"In refreshment facilities, bars and counters (or sections of them) should be at a level suitable for wheelchair users.",necessity,annotated
fab95d95-4789-4384-8d57-a575190f9e73,The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,{'ID': '297_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,part-of,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",part-of,annotated
da4d5959-6e64-4e04-a1f3-8b42b6addab0_1,,,The outdoor number of wall ties per square metre used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 14 metres.,greater-equal,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506_6,,,"Gangways should not be less than 20 points exceptional circumstances unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,synthetic
36650de0-ef3c-4fd1-8199-f47c0e576076,the rated speed of the platform does not exceed 0.15m/s.,{'ID': '183_UK_DocM_V2_AccessAndUseOfBuildings'},the rated speed of the platform does not exceed 0.15m/s.,less-equal,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_6,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for U-value 25 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
8421f806-70f2-46a9-a308-90a40da3541d,"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",{'ID': '41_UK_DocM_V2_AccessAndUseOfBuildings'},"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",selection,annotated
cf35d4a4-3170-421b-9be1-b68d928eed1d_9,,,"A roof with a thermal integrity greater than 21 C must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic
9415ae4b-7a74-4c70-a245-e4381c6d71bf_9,,,"At gables and party walls, insulation should extend to the wall; if the Floors between the wall and joist is less than 0.136kgCO2/kWh, perimeter insulation may be required.",less,synthetic
ee0c8c7c-c65e-4403-92e6-628fd680f3bf,Any panel within the doorset should be at least 15mm thick.,{'ID': '30_UK_DocQ_Security_Dwellings'},Any panel within the doorset should be at least 15mm thick.,greater-equal,annotated
fb1da22f-8ddb-4399-b441-64dca68da9af_10,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 25mm patterns.",greater-equal,synthetic
13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",selection,annotated
34a524ec-6994-426f-86af-78788fd34a80,"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",{'ID': '36_UK_DocQ_Security_Dwellings'},"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",selection,annotated
2ff58135-b89d-40d1-a145-51aad9e5a942_10,,,"The landing in front of the outside door shall be at least between 550mm and 700mm floor plate areas and at least 1,500 millimetres long.",greater-equal,synthetic
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_6,,,"Extract air of installed generation capacity 500kW, 3 and 4 shall not be used as recirculation air.",equal,synthetic
4fc3b5b1-a838-4429-b385-d8e80e6633eb_10,,,"In the absence of relevant harmonised European Standards, products with a domestic hot water cylinder heat loss exceeding 0.1m2 must have a product certificate issued by a Notified Body.",greater,synthetic
3ec0e36a-0227-4b76-9fd5-7a2f77877d99,A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '23_UK_DocM_V2_AccessAndUseOfBuildings'},A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,part-of,annotated
51f35d58-c411-4d6d-b36e-9ddf10199908,"Whatever lifting device is chosen, internal stairs should always be provided as an alternative means of vertical access, and designed to suit ambulant disabled people and those with impaired sight.",{'ID': '106_UK_DocM_V2_AccessAndUseOfBuildings'},"Whatever lifting device is chosen, internal stairs should always be provided as an alternative means of vertical access, and designed to suit ambulant disabled people and those with impaired sight.",necessity,annotated
51517a5d-dd11-41b9-b44b-36d87b959127,The presence of the door should be apparent not only when it is shut but also when it is open.,{'ID': '77_UK_DocM_V2_AccessAndUseOfBuildings'},The presence of the door should be apparent not only when it is shut but also when it is open.,necessity,annotated
fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",greater-equal,annotated
079db365-cfed-474e-9329-25349ac0db4a_7,,,"In connection with the door of an outside space of an individual dwelling the air distribution outside the door may be more than 230mm if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,annotated
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated
33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",selection,annotated
2d31da64-b8e0-40aa-a8f6-6ae601e5c0da,lifting platform controls are located between 800mm and 1100mm from the floor of the lifting platform and at least 400mm from any return wall.,{'ID': '184_UK_DocM_V2_AccessAndUseOfBuildings'},lifting platform controls are located between 800mm and 1100mm from the floor of the lifting platform and at least 400mm from any return wall.,necessity,annotated
208b093d-361f-4aec-819d-4abca4e72c68_6,,,"in an evacuation area where the number of occupants is two, the second exit may be no less than 900 millimetres in width.",equal,synthetic
c06bb553-d8f1-47f5-ab33-cfdebb6bca52,"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",necessity,annotated
7a1bc727-1daa-4668-83f6-b44327b96898,"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",{'ID': '133_Finnish_FireSafety'},"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",necessity,annotated
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_8,,,The approach route is a minimum of 900mm wide with a maximum load EER of 16/01/2023 00:00.,less-equal,synthetic
302c413e-fefd-47f1-914f-0dc787e4a761_2,,,"Where height on surfaces is greater than EI 15, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic
079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",selection,annotated
85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",part-of,annotated
3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",none,annotated
993e54cc-49c3-43cb-995e-1a951c93c775_7,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an total air flow equal to 100.",equal,synthetic
99a53f17-48cb-4012-a47b-700761e0983b_0,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) half a metre of those rooms must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated
9618a274-45da-4e3e-87f0-21c2bfae4a8e_2,,,"A guardrail must be used at points with a air flow rates of over m3/(hm2) at 50Pa, if these can be accessed by children.",greater,synthetic
f9de28ac-45bb-4400-9d9f-8afee73bd2e3,The number of appliances should not exceed one per 100m2 of dwelling floor area.,{'ID': '273_UK_DocL_V1_ConsrvationOfFuelAndPower'},The number of appliances should not exceed one per 100m2 of dwelling floor area.,part-of,annotated
746e7940-e063-42d5-a5c7-af12bb243924,"All floor areas, even when located at different levels, should be accessible.",{'ID': '128_UK_DocM_V2_AccessAndUseOfBuildings'},"All floor areas, even when located at different levels, should be accessible.",necessity,annotated
208b093d-361f-4aec-819d-4abca4e72c68_0,,,"in an evacuation area where the constraints is four, the second exit may be no less than 900 millimetres in width.",equal,synthetic
99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,selection,annotated
aa774d9d-2414-4e6f-9c4e-9b7c5abde23b,The outputs of any renewable systems should be separately monitored.,{'ID': '228_UK_DocM_V2_AccessAndUseOfBuildings'},The outputs of any renewable systems should be separately monitored.,selection,annotated
f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",necessity,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_10,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be dwelling fabric energy efficiency rate to 32mm.,less-equal,synthetic
31e6f85a-97ea-4224-9144-bc3d1daad96d,Consideration should be given to providing a low level urinal for children in male washrooms.,{'ID': '174_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to providing a low level urinal for children in male washrooms.,selection,annotated
a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",none,annotated
55d84237-8fad-4bd7-b67d-0745b9cc1e31,"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",{'ID': '222_Finnish_FireSafety'},"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",selection,annotated
a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",selection,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_5,,,"If the air flows of equivalent area 1 and between 550mm and 700mm are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
981a0996-c526-4ee7-b679-0f17bd5ecd29,"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",{'ID': '209_UK_DocM_V2_AccessAndUseOfBuildings'},"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",necessity,annotated
81f14fc1-af5d-45e8-8725-94d2510e4701_4,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a high of at least (16.66 8.33 V0.4)/(1000 24) in the hallway and kitchen.",greater-equal,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_10,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear location of 20 millimetres, except in doorways.",equal,synthetic
3e9fc57e-bc69-4f17-a056-dd7767afa9bb_5,,,"If the maintained of the building does not exceed 30m2, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated
ff3e8f86-1542-4f54-a776-cfdc8482bad7_8,,,The net absorber area of an air conditioner working in cooling mode should be a minimum of 4.,greater-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,part-of,annotated
009e12eb-db83-485c-9ffc-e1f462251109,Each air terminal should have a free area of at least 90 of the free area of its associated duct.,{'ID': '115_UK_DocF_V1_Ventilation'},Each air terminal should have a free area of at least 90 of the free area of its associated duct.,none,annotated
77f993c6-dff1-4f9a-8f66-73221d3cbaff_2,,,"If the dwelling only has 0.7 metres control system, a minimum ventilation rate of 13l/s should be used.",equal,synthetic
164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,annotated
0da52584-1b37-48b5-840f-3795ae695275_1,,,the minimum clear dimensions of the platform are: 1100mm wide and 120 ventilation provision where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
6efbae9b-e306-4005-8881-aed97c54e405,Leakage from a pressure sewer located in a groundwater zone shall be detectable.,{'ID': '145_Finnish_Health-WaterAndSewerage'},Leakage from a pressure sewer located in a groundwater zone shall be detectable.,part-of,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_0,,,"If the air flows of distance of the uppermost floor level from the entry level 1 and ten millimetres are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,none,annotated
eefe1191-2903-4fb8-9138-6471e09fb67d_3,,,The presence exceeds certain proportion at 11pm.,greater,synthetic
9415ae4b-7a74-4c70-a245-e4381c6d71bf_3,,,"At gables and party walls, insulation should extend to the wall; if the access route between the wall and joist is less than 50 m2, perimeter insulation may be required.",less,synthetic
26980508-105c-49db-8595-bf001a48d757,"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",{'ID': '103_Finnish_SafetyOfUse'},"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",none,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb_9,,,"In the absence of relevant harmonised European Standards, products with a side edges exceeding 10 litres per second per person must have a product certificate issued by a Notified Body.",greater,synthetic
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_6,,,"Generally, a thermal element once upgraded should not have a sum greater than 50 m2.",less-equal,synthetic
9027959e-efc1-4d32-acbe-e0775d40f001_4,,,"The morticed bolts should have a minimum location of 10, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_5,,,"Where a new building contains more than 120 seats, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic
8364a5f1-f80e-484c-9f38-bffc6f4c1876_1,,,"Where communal parking is provided to blocks of flats, at least four standard ventilation valves is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic
e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,none,annotated
353ebb10-20b6-4100-acfa-1afed0784b33,Designs should clearly indicate means to limit disruption to the insulation.,{'ID': '150_UK_DocL_V1_ConsrvationOfFuelAndPower'},Designs should clearly indicate means to limit disruption to the insulation.,necessity,annotated
a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",selection,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_9,,,The habitable area of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the Signs of associated parking spaces.,greater,synthetic
26980508-105c-49db-8595-bf001a48d757_0,,,"In Rigid ducts with no fixed Mortar snots or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
8805ec9f-3f5f-44fc-9078-3ae62439c973,"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",{'ID': '108_UK_DocL_V1_ConsrvationOfFuelAndPower'},"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",none,annotated
6a41a473-bd3c-4e38-a093-094b3fdae388,At least one in every five remaining parking spaces must be provided with cable routes.,{'ID': '68_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},At least one in every five remaining parking spaces must be provided with cable routes.,none,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,selection,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_6,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 0.7 metres water vapour resistance.,less-equal,synthetic
2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",selection,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",selection,annotated
bb9ec292-062b-43c3-8590-856dd5f6b890_0,,,"The thickness and building emission rate calculated using the measured air permeability must not be higher than the full width and target emission rate, respectively.",less-equal,synthetic
fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",part-of,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,part-of,annotated
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",selection,annotated
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",selection,annotated
e15250c0-1279-4d29-a1ec-31560b045007_3,,,oil and grease separators of basement storeys must not be connected to fire and smoke-proof building envelope.,not-part-of,synthetic
082c7ed9-3579-48c2-a0d2-076f1edd647c_8,,,"Each of the E 15 steps of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic
6ab07828-b6aa-4a60-8860-333f061a0fde,"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",{'ID': '71_UK_DocM_V2_AccessAndUseOfBuildings'},"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",necessity,annotated
5fa7daca-cb50-4397-a736-617e52d30187_0,,,"If indoor and outdoor conditions at below 30% are required and unavailable, the fire resistance time may be taken as equal to that at 30% load.",equal,synthetic
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_11,,,"Extract air of SEER 1m2, 3 and 4 shall not be used as recirculation air.",equal,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,part-of,annotated
7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",selection,annotated
339fc78c-a2f2-481c-a410-3aeb41e24b8a_10,,,Solid walls constructed of coursed brickwork or blockwork should be at least as planned time of use as 30 of the storey height.,greater-equal,synthetic
aac9b625-4f6b-42e6-b657-2accd6054607,Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,{'ID': '299_UK_DocL_V1_ConsrvationOfFuelAndPower'},Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,part-of,annotated
d1512435-3f66-4a07-90fd-fd3e3d2bea1a,The stairs between floor levels must be covered.,{'ID': '17_Finnish_SafetyOfUse'},The stairs between floor levels must be covered.,selection,annotated
8e8f4fb5-00b5-404f-89df-a07287984748_6,,,"In buildings with a insulating performance greater than 44mm, automatic meter reading and data collection facilities should be installed.",greater,synthetic
0667134c-1290-4fe0-99eb-41c0b9e63a27,CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,none,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",none,annotated
60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",part-of,annotated
9c2051ae-9878-4772-9471-bc5b8a28c3ae,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",{'ID': '23_UK_DocF_V2_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",selection,annotated
05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,none,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_6,,,"Where the work concerns a building containing more than 100 water system, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic
49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",none,annotated
77f993c6-dff1-4f9a-8f66-73221d3cbaff_5,,,"If the dwelling only has 900-1000mm duct, a minimum ventilation rate of 13l/s should be used.",equal,synthetic
35cacecf-06dc-4b0f-aadb-db2ee05518c7_5,,,The area of windows and roof windows (but excluding display windows) at its maximum openable angle exceeds 4 of the facade area.,greater,synthetic
84cd76d7-e5d0-4f39-94bc-0236c65d533a_0,,,"in residential buildings of not more than two storeys, one exit of no less than 500kW in going is permitted.",greater-equal,synthetic
7a1bc727-1daa-4668-83f6-b44327b96898,"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",{'ID': '133_Finnish_FireSafety'},"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",part-of,annotated
656aa2fa-18cb-41ee-ae28-28deb3dffcc3_7,,,The ventilation rate of the water in the hot water system shall be at least 0.7W/(m2K) and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic
e7cc3da8-211a-4244-b711-210a912ca2ac,Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,{'ID': '302_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,none,annotated
05698d4d-c140-4bce-94b3-386ce02baa6b,The storm water sewers within the building shall be equipped with condensation insulation.,{'ID': '169_Finnish_Health-WaterAndSewerage'},The storm water sewers within the building shall be equipped with condensation insulation.,part-of,annotated
3ac96918-764f-403d-a588-37b5f4a16f46,"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",{'ID': '284_UK_DocM_V2_AccessAndUseOfBuildings'},"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",necessity,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_7,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be cross-sectional area to 24 degrees Celsius.,less-equal,synthetic
56b3f993-37b5-4cb1-9540-432972f8056e,"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",{'ID': '99_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",selection,annotated
43e26628-8b62-4cc6-91e2-284335df1564_7,,,"In rooms used for sleeping or rest, the visual contrast may not exceed one.",less-equal,synthetic
78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",necessity,annotated
3e9fc57e-bc69-4f17-a056-dd7767afa9bb_8,,,"If the travel distance of the building does not exceed E, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic
993e54cc-49c3-43cb-995e-1a951c93c775_2,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an value equal to 2m.",equal,synthetic
5ddf9b8d-87fb-4fc4-9b38-4ff91008cfdf,The annual energy savings should be estimated using the Standard Assessment Procedure.,{'ID': '464_UK_DocL_V1_ConsrvationOfFuelAndPower'},The annual energy savings should be estimated using the Standard Assessment Procedure.,necessity,annotated
7f696221-52c9-4c52-8f90-74bd93c51299_7,,,This grippable handrail is 850-1000mm above the pitch line of the flight and heat gain at least 2.0 m3/(h m2) beyond the top and bottom nosings.,greater-equal,synthetic
54907849-c48f-4267-b5f0-fc7e9279da7c,"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",{'ID': '409_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",part-of,annotated
50e89a86-e2be-439d-b230-79274cd7199b_7,,,Modular and portable buildings with a planned shape of more than 280mm at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic
d3e7a947-536e-4a49-9823-e27fc0f68b27_5,,,illuminance of landings to be at least equal to the opening angle of the ramp.,greater-equal,synthetic
b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",none,annotated
b4582e8e-9bf5-4d2e-8eb3-975e45511aa2,"The building should be designed, within the overall constraints of space, so that the difference in level between the entrance storey and the site entry point is minimised.",{'ID': '37_UK_DocM_V2_AccessAndUseOfBuildings'},"The building should be designed, within the overall constraints of space, so that the difference in level between the entrance storey and the site entry point is minimised.",necessity,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_8,,,"If the air flows of storage capacity 600 x 600 millimetres and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
e15250c0-1279-4d29-a1ec-31560b045007_0,,,joint of basement storeys must not be connected to fire and smoke-proof toilet seat.,not-part-of,synthetic
d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",none,annotated
56517433-cf40-4b88-a9d4-18e61e0e9993,"In addition, on both sides of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '55_Finnish_Accessibility'},"In addition, on both sides of the toilet seat there shall be a free space of at least 800 millimetres.",necessity,annotated
ffc11c58-ff7e-45f4-a5c7-da59404e5659,"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",{'ID': '1_UK_DocP_ElectricalSafety'},"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",necessity,annotated
a387fcb8-ead2-4094-9be9-72d783468b33_9,,,"If the energy performance of windows, roof windows, rooflights and doors exceeds 270 millimetres of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic
dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",none,annotated
29c431ee-ea93-491d-ab13-06418d93c488_5,,,"If equivalent area is greater than 90, manual control is acceptable.",greater,synthetic
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,none,annotated
4a82f789-a98a-4379-9b81-2a20cfba6c87_0,,,"If the internal ties must be centred on the supporting line, the minimum value of the either side, 9mm, will also be applied to internal ties.",greater-equal,synthetic
fb5d3054-4911-4049-ba09-1c3e80f9c07c_2,,,"The prevailing wind direction of steps in uncovered or unheated outdoor staircases must be no less than 0.055555556, and the riser may be no more than 130 millimetres.",greater-equal,synthetic
d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",none,annotated
72d7716f-7e3e-442c-9e42-14d4b19e18e3_10,,,A Frames that is being connected to a new building should not have a entrance level for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic
fc54cd23-e216-4f59-b1b6-35ec47a83a4a,Test data must be from a minimum of five in-situ measurements of the same module types and link details as used in the actual building.,{'ID': '351_UK_DocM_V2_AccessAndUseOfBuildings'},Test data must be from a minimum of five in-situ measurements of the same module types and link details as used in the actual building.,necessity,annotated
a8b3e54e-902c-4502-99a2-8c41d46f1416,"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",{'ID': '106_Finnish_SafetyOfUse'},"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",none,annotated
ddc0bba6-2df8-43e1-9398-37514366fb06,"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",{'ID': '208_UK_DocF_V1_Ventilation'},"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",selection,annotated
1cf2f287-457b-4f89-8c43-135ffda5029a,"The provision made must be sufficient to (a) meet the needs of occupants with differing needs, including some older or disabled people; and (b) to allow adaptation of the dwelling to meet the changing needs of occupants over time.",{'ID': '36_UK_DocM_V1_AccessAndUseOfBuildings'},"The provision made must be sufficient to (a) meet the needs of occupants with differing needs, including some older or disabled people; and (b) to allow adaptation of the dwelling to meet the changing needs of occupants over time.",necessity,annotated
2695c899-0ada-478c-9b2d-796f79ea4c52,"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",{'ID': '92_UK_DocK_ProtectionFromFalling'},"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",selection,annotated
f420ae57-5656-4558-b1a3-1079e46bf6cc_3,,,"In the case of the storey-level door of a dwelling, or if the distance of the uppermost floor level from the entry level through the door exceeds 900mm, doors must open in the direction of the exit.",greater,synthetic
72785bd7-d935-4c81-ab5f-ba2095ba62a9,"Manual controls, where provided, should be within reasonable reach of the occupants.",{'ID': '20_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Manual controls, where provided, should be within reasonable reach of the occupants.",selection,annotated
d3e7a947-536e-4a49-9823-e27fc0f68b27_7,,,water temperature of landings to be at least equal to the load EER of the ramp.,greater-equal,synthetic
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_0,,,"Extract air of compensating measures 2, 3 and 35 mg/m3 (30 ppm) shall not be used as recirculation air.",equal,synthetic
88e23b46-22d9-4be6-87b7-40541f7995a9_3,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the visual contrast exceeds 2.0 m3/(h m2); 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic
9415ae4b-7a74-4c70-a245-e4381c6d71bf_6,,,"At gables and party walls, insulation should extend to the wall; if the load-bearing structures between the wall and joist is less than 0.35W/(m2K), perimeter insulation may be required.",less,synthetic
eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,selection,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",part-of,annotated
d8a06af7-3a6b-4d68-8bba-342aac6d3ac0,Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,{'ID': '146_Finnish_Health-WaterAndSewerage'},Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,necessity,annotated
cc72106e-9e7f-47cf-8a95-0173a8305dad_6,,,"In a new building, the crawl space access must be 1100mm on average at the minimum.",greater-equal,synthetic
2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",{'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",necessity,annotated
23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",none,annotated
f733b7c9-a406-4f5a-b383-9d3f8b70a559,The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,{'ID': '5_UK_DocA_Structure'},The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,necessity,annotated
aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",selection,annotated
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_6,,,"If site constraints necessitate an free space of 18 dm3/s or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,part-of,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0_9,,,"For dwellings, for external tapered steps and stairs that are part of the building the calculations of each step should be a minimum of 28 metres.",greater-equal,synthetic
d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",none,annotated
40b40b1b-d1b1-49d8-b9b7-13c5845a169d_0,,,The structure of the control appliance of the plumbing fixture shall be such that its feasibility of installing high-efficiency alternative systems does not arise above m3/(hm2) at 50Pa.,less-equal,synthetic
ba93ede4-473f-4c07-b439-3699580cbcbe,No individual flight has a rise of more than 1800mm between landings.,{'ID': '21_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise of more than 1800mm between landings.,part-of,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,none,annotated
53e31e26-a39b-4047-a86e-bdb8021413e8_3,,,Window handles on windows that open outwards are not more than 90mm temperature when the window is at its maximum openable angle.,less-equal,synthetic
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_3,,,"If the from the inside face of the wall of a mechanical ventilation systems air duct is designed to be greater than EI 15, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic
5ca184fa-e100-4f97-957d-e37ae944786f_10,,,"The combined dead,imposed and wind loads of installing electric vehicle charge points and cable routes is not more than 5m of the total capital cost of the major renovation.",less-equal,synthetic
b8365796-12c1-47c1-9682-ff6131a75f21,"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",{'ID': '227_UK_DocM_V2_AccessAndUseOfBuildings'},"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",necessity,annotated
710ef992-e187-4b1a-894b-e0e222f54359_2,,,"NOTE: For grid-supplied electricity, a proportion of three seconds and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",none,annotated
a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",none,annotated
117864c0-5065-4c55-b390-c17b60c8d9dd,"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",{'ID': '48_Finnish_SafetyOfUse'},"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",part-of,annotated
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_5,,,"If the equivalent area of a mechanical ventilation systems air duct is designed to be greater than ten millimetres, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic
710ef992-e187-4b1a-894b-e0e222f54359,"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",{'ID': '199_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",none,annotated
86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",none,annotated
64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",selection,annotated
5e51b653-449e-4d00-be19-0e20ecff5c49_10,,,The default number of appliances should be proportion.,equal,synthetic
0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",selection,annotated
385a4365-40c0-4c07-8854-b07bde292fd2,"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",{'ID': '109_Finnish_EnergyEfficiency'},"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",necessity,annotated
5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",selection,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_0,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and above 2.5 ties/m2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
4470dde4-6422-4c13-9781-de68c3e075dc_0,,,"The outdoor operation of a dwelling unit, however, shall be designed to be a minimum of 65 degrees Celsius.",greater-equal,synthetic
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4,"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",{'ID': '6_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",part-of,annotated
2633c957-07b4-4caa-a9d6-5acbac16b0b0_11,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 150m2 open outwards.,equal,synthetic
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_4,,,"Generally, a thermal element once upgraded should not have a parasitic energy use greater than 01:08:00.",less-equal,synthetic
103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",none,annotated
525aa713-65e1-4368-a6f4-38f628be7fed,"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",selection,annotated
ca1bbebb-fe4e-48d8-8cdf-eef13cd79ee9,The dwelling emission rate must not exceed the individual dwellings target emission rate.,{'ID': '65_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling emission rate must not exceed the individual dwellings target emission rate.,part-of,annotated
d0b6759e-deec-451d-bd7a-ec65b96048be_4,,,"extract air of U-values 900mm shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_7,,,"Generally, a thermal element once upgraded should not have a entrance level greater than 15 degrees.",less-equal,synthetic
4094b859-b3b4-4035-94cd-8cf47ccbd801_6,,,The fire performance is at least B.,greater-equal,synthetic
ef4ec541-e1a7-47d4-9a83-94715d8900ba_10,,,"Where 35 mg/m3 (30 ppm) or more bathroom are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
e3128ebd-be79-48f2-93b5-7806c9a9026a,"Constructions behind surfaces exposed to running water, repetitious splash water or water condensation must be waterproofed.",{'ID': '110_Finnish_Health-Humidity'},"Constructions behind surfaces exposed to running water, repetitious splash water or water condensation must be waterproofed.",necessity,annotated
ca1e0369-2dfe-4cf2-8194-87f72ee5a633,"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",{'ID': '385_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",selection,annotated
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_11,,,"In spaces intended for more than 60 persons, the above of the access route must be at least 400mm.",greater-equal,synthetic
"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_5",,,"However, if the cold side is no more than 10 kN, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",none,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",part-of,annotated
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_4,,,"If the air leakage rate figure of a mechanical ventilation systems air duct is designed to be greater than 6m, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic
0f67dad7-6df9-444b-8e72-f447668e3fde_5,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 0.7 metres pitch.",greater-equal,synthetic
bf798097-bb99-42d0-a73f-8cebab8fbeb8_6,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the alongside the leading edge of the steps must be no more than 1,500 millimetres and the tread must be no less than 300 millimetres.",less-equal,synthetic
7d35f4c4-fa65-4d68-a974-f54386ca8aee,"However, a horizontal gap in a protective part must be no higher than ten millimetres.",{'ID': '49_Finnish_SafetyOfUse'},"However, a horizontal gap in a protective part must be no higher than ten millimetres.",part-of,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50_2,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the installed generation capacity of the heat emitters to be installed does not exceed 1,200 MJ/m2.",less-equal,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_10,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 55 in relationship; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
11f2902d-29c2-474e-97d0-628a2a97a666_0,,,"CO2 of over 250 millimetres must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_4,,,An upstand built on site should not exceed a pressures of 100.,less-equal,synthetic
9d172d30-e92f-4151-865c-d204f217705d,The slope of the wet room floor must allow water to flow into the floor drain.,{'ID': '118_Finnish_Health-Humidity'},The slope of the wet room floor must allow water to flow into the floor drain.,necessity,annotated
33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated
0638f810-16d0-4670-8870-4e7c78c5371f,Insulated cavity closers should be installed where appropriate.,{'ID': '419_UK_DocL_V1_ConsrvationOfFuelAndPower'},Insulated cavity closers should be installed where appropriate.,necessity,annotated
164122ed-c7ac-4cf8-8a54-3d56c144f78d_0,,,"In general, the findings indicate that there should be at least the same number of ventilation systems as Spaces and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",necessity,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9_11,,,"Door entry controls, where provided, are mounted 4 Air permeability finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",part-of,annotated
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78,"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",{'ID': '83_UK_DocF_V1_Ventilation'},"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,annotated
6414854d-01f9-481f-a7f4-c4581e48d8b1_10,,,Special safety features are not necessary if the Photographs is not more than 16/01/2023 00:00 long.,less-equal,synthetic
0262f6e5-21bc-4312-9388-8ac93b79416d,The minimum full load EER of the absorption chillers should be no worse than 0.7.,{'ID': '285_UK_DocM_V2_AccessAndUseOfBuildings'},The minimum full load EER of the absorption chillers should be no worse than 0.7.,selection,annotated
d5e2fb3e-df0c-48bd-8a09-734822ff086d,"For emergency repairs, if it is not possible to notify the building control body in advance, the building control body should be notified as soon as possible.",{'ID': '4_UK_DocF_V1_Ventilation'},"For emergency repairs, if it is not possible to notify the building control body in advance, the building control body should be notified as soon as possible.",selection,annotated
a235c68f-ae44-4770-b005-4e9d7b659eb7_4,,,All cavity walls should have leaves at least one number of persons and cavities at least 50mm wide.,greater-equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",part-of,annotated
b5aa20f2-571e-48d8-9943-4102c9f9bd1a,"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",{'ID': '250_Finnish_FireSafety'},"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",selection,annotated
984c252b-74f4-4d85-9080-1c8ae1851eca_10,,,"If performance requires thicker glass to be used, an equivalent window unit with pitch (850 millimetres) glazing should be shown to meet the required standard.",equal,synthetic
8805ec9f-3f5f-44fc-9078-3ae62439c973,"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",{'ID': '108_UK_DocL_V1_ConsrvationOfFuelAndPower'},"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",selection,annotated
e874f337-2067-4e77-ad32-c3b857f40e7a_1,,,"If the location exceeds 15mm, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic
dae0db09-fd4b-4f2c-99c0-cd742b19d17a,"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",{'ID': '68_Finnish_SafetyOfUse'},"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",selection,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated
0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",none,annotated
81f14fc1-af5d-45e8-8725-94d2510e4701_7,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a floor plate areas of at least 0.136kgCO2/kWh in the hallway and kitchen.",greater-equal,synthetic
5b4380ba-0066-4735-a362-316d4c8e70b2_8,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 400-600mm Air pressure tests after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic
922bf8df-3a70-4f45-8c04-200b638d3b3c_0,,,The cold water pipe shall be designed and installed so that the axle group load in the cold water system may not exceed 3.,less-equal,synthetic
36650de0-ef3c-4fd1-8199-f47c0e576076_5,,,the number of occupants of the platform does not exceed 35 mg/m3 (30 ppm).,less-equal,synthetic
86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",selection,annotated
26980508-105c-49db-8595-bf001a48d757_11,,,"In connections with no fixed seats or air handling units, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
9618a274-45da-4e3e-87f0-21c2bfae4a8e_4,,,"A guardrail must be used at points with a primary energy factor of over 50 millimetres, if these can be accessed by children.",greater,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506,"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",{'ID': '8_UK_DocK_ProtectionFromFalling'},"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",selection,annotated
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_6,,,"Where a new building contains more than 65mm WC compartment doors, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic
6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_3,,,"If parking spaces are provided for a building, an adequate number of public address, but at least 0.9 metres, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic
2c224c59-366d-447f-9ecc-87c119c2db07,"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",{'ID': '374_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",necessity,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_11,,,The normal relationship between the cost of the rise and going is: 90 equals between 550mm and 700mm.,equal,synthetic
993e54cc-49c3-43cb-995e-1a951c93c775_6,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an above equal to 1100mm.",equal,synthetic
fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,none,annotated
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",necessity,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",none,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",selection,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated
5e51b653-449e-4d00-be19-0e20ecff5c49_7,,,The default annual percentage of heat should be 21 C.,equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_0,,,"If the free gap between facing walls of adjacent glazed balconies or the Air permeability of the wall to the window of an adjacent fire compartment is less than 1m2, the wall in question must be class EI 15.",less,synthetic
a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",selection,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_4,,,Individual flights are: for gradients up to 1:15 not more than Five ventilators primary energy; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",none,annotated
a387fcb8-ead2-4094-9be9-72d783468b33_11,,,"If the distance of the basement storey floor from the entry level of windows, roof windows, rooflights and doors exceeds 50 m2 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_3,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for category up to 2 metres not more than 5m long.,less-equal,synthetic
5ed671ca-0cd0-47e2-ad68-1d910e5ddbdf,The access route in the seating area or standing auditorium must be directly accessible from the end of each row.,{'ID': '114_Finnish_SafetyOfUse'},The access route in the seating area or standing auditorium must be directly accessible from the end of each row.,part-of,annotated
86831830-e7f0-4b90-aa27-dc0542b7ba4d_7,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 15 degrees from the inside face of the wall.",greater-equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_6,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for rated output up to 150mm not more than 5m long.,less-equal,synthetic
60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",part-of,annotated
8151be81-09ad-4dac-b2d2-f0d757915b6c_10,,,"However, when the snow load can occur, the manufacturers declared efficiencies of the load s should be at least 20 litres per second.",greater-equal,synthetic
77f993c6-dff1-4f9a-8f66-73221d3cbaff_9,,,"If the dwelling only has one habitable room, a minimum capacity of One should be used.",greater-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_10,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where off water removal system are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9,"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",necessity,annotated
7f696221-52c9-4c52-8f90-74bd93c51299,This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,{'ID': '73_UK_DocM_V1_AccessAndUseOfBuildings'},This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,greater-equal,annotated
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_0,,,An upstand built on site should not exceed a power requirements of 130 millimetres.,less-equal,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",equal,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_0,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the away may be no more than 65mm.",less-equal,synthetic
2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",none,annotated
5ddf9b8d-87fb-4fc4-9b38-4ff91008cfdf,The annual energy savings should be estimated using the Standard Assessment Procedure.,{'ID': '464_UK_DocL_V1_ConsrvationOfFuelAndPower'},The annual energy savings should be estimated using the Standard Assessment Procedure.,selection,annotated
74002ed3-548e-4e2f-8835-be76e643c67d,NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,{'ID': '51_UK_DocM_V1_AccessAndUseOfBuildings'},NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,part-of,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_2,,,"Extract air of impact three, 3 and 4 shall not be used as recirculation air.",equal,synthetic
8151be81-09ad-4dac-b2d2-f0d757915b6c_2,,,"However, when the snow load can occur, the tread of the load s should be at least 15mm.",greater-equal,synthetic
a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated
fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",selection,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",part-of,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_10,,,"The boiler type, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the maintained, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic
13a437c0-918c-47f2-85bd-b80dd69eb027_5,,,"There are no mechanical ventilation on the reverberation time of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic
e874f337-2067-4e77-ad32-c3b857f40e7a_2,,,"If the horizontal spacing exceeds 600kg/m3, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic
113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",selection,annotated
eccc60e7-3d76-46c0-a9d9-e398bf3e475a,The part of the dwelling above ground level should be considered separately.,{'ID': '71_UK_DocF_V1_Ventilation'},The part of the dwelling above ground level should be considered separately.,part-of,annotated
6a41a473-bd3c-4e38-a093-094b3fdae388_7,,,At least one in every 10 kN remaining surfaces must be provided with cable routes.,equal,synthetic
eefe1191-2903-4fb8-9138-6471e09fb67d,The internal temperature exceeds 23C at 11pm.,{'ID': '53_UK_DocO_Overheating'},The internal temperature exceeds 23C at 11pm.,selection,annotated
f420ae57-5656-4558-b1a3-1079e46bf6cc_10,,,"In the case of the storey-level door of a dwelling, or if the room temperature through the door exceeds 18 dm3/s, doors must open in the direction of the exit.",greater,synthetic
e32bbb47-c826-40c1-8ea4-8c32353d3fd2_1,,,There shall be 8 per cent (1:12.5) of Waste water provided for people in the building.,equal,synthetic
f420ae57-5656-4558-b1a3-1079e46bf6cc,"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",{'ID': '223_Finnish_FireSafety'},"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",none,annotated
4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",selection,annotated
079db365-cfed-474e-9329-25349ac0db4a_5,,,"In connection with the door of an outside space of an individual dwelling the building emission rate outside the door may be more than 1.501kWhPE/kWh if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic
d9b8f957-49e3-45d0-83ca-c0419a50361a,"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",{'ID': '48_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",selection,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",selection,annotated
3e9fc57e-bc69-4f17-a056-dd7767afa9bb_7,,,"If the insulating performance of the building does not exceed 2.5 ties/m2, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic
2c725d50-13d5-4e77-bacf-9f174530e27c,The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,{'ID': '17_UK_DocM_V2_AccessAndUseOfBuildings'},The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,none,annotated
35cacecf-06dc-4b0f-aadb-db2ee05518c7_6,,,The area of windows and roof windows (but excluding display windows) cleansed by water rinsing exceeds 230mm of the facade area.,greater,synthetic
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated
2f815a08-db3c-48a6-b248-d69aeac870ee_4,,,"the vertical rise is: a. not more than one per 100m2, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic
6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,selection,annotated
4a82f789-a98a-4379-9b81-2a20cfba6c87_1,,,"If the internal ties must be centred on the supporting line, the minimum value of the proportion of the cooling load relating to distribution pipework, 600mm, will also be applied to internal ties.",greater-equal,synthetic
38cd3221-7fc9-4462-be20-78b16a4309d3_3,,,The emission rate of openings in the newly created dwelling should not be more than 150m2 of the total floor area.,less-equal,synthetic
793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,necessity,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8_11,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the load of the steps must be no more than 20 millimetres and the tread must be no less than 300 millimetres.",less-equal,synthetic
6414854d-01f9-481f-a7f4-c4581e48d8b1,Special safety features are not necessary if the ladder is not more than 6m long.,{'ID': '112_UK_DocK_ProtectionFromFalling'},Special safety features are not necessary if the ladder is not more than 6m long.,none,annotated
493ec553-7761-4d1e-aa98-05d925ddf955_9,,,The layers of a horizontal hatch must be at least 100mm.,greater-equal,synthetic
7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",selection,annotated
bfdf95da-d422-47cd-83d7-a30a4969f2e6_7,,,"If the internal ties must be centred on the supporting line, the minimum value of the output, 400mm, will also be applied to internal ties.",greater-equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_6,,,"In buildings more than 5m and at most 28 metres in heat emission capacity, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",part-of,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_3,,,"Where the surface temperature of installing only cable routes is more than EI 30 of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_9,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major platform, there is no towel rail to install either electric vehicle charge points or cable routes.",not-part-of,synthetic
7f72632a-dc0a-4318-afd7-7090b42350fc,Mechanical supply terminals should be located and directed to avoid draughts.,{'ID': '106_UK_DocF_V1_Ventilation'},Mechanical supply terminals should be located and directed to avoid draughts.,selection,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
73b4b305-8971-489a-a290-f996e1f63e19,"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",{'ID': '19_Finnish_Accessibility'},"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",part-of,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_7,,,"The dwelling primary energy rate, dwelling emission rate and building emission rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and reverberation time, respectively.",less-equal,synthetic
7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,necessity,annotated
ef4ec541-e1a7-47d4-9a83-94715d8900ba_6,,,"Where E or more balcony are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic
43a7a088-718f-4a11-a392-88e71559466e,"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",{'ID': '107_UK_DocM_V2_AccessAndUseOfBuildings'},"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",selection,annotated
a86b58e8-046f-44b7-8e1b-00c876c8c647_2,,,"Parapets in going A to 1000m2 and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_7,,,"The sunken area, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the product certificate, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,selection,annotated
d791b3d9-ff45-46d6-90d4-39fdaf9d0879,Lighting should be designed based on CIBSEs SLL Lighting Handbook or an equivalent design guide.,{'ID': '310_UK_DocM_V2_AccessAndUseOfBuildings'},Lighting should be designed based on CIBSEs SLL Lighting Handbook or an equivalent design guide.,necessity,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd_7,,,"An residential unit with a potentially flammable or explosive atmosphere must not be located in a detrimental physical or chemical substances where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic
6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_9,,,"If parking spaces are provided for a building, an adequate number of Humus soil, but at least 1.2W/(m2K), shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic
ec419055-6ed3-4dac-9879-748e2d365a26,"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",{'ID': '180_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",none,annotated
99a53f17-48cb-4012-a47b-700761e0983b_8,,,Where a new building which is not a residential building or a mixed-use building has more than 100 enduse categories (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic
86831830-e7f0-4b90-aa27-dc0542b7ba4d,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",{'ID': '18_Finnish_SafetyOfUse'},"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",selection,annotated
29232335-402c-4ed9-af74-fd093ac22e28_8,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least fittings 20.,greater-equal,synthetic
aca1acce-65c1-4677-a979-ce2920457a55,The surface of stairs the must not be slippery.,{'ID': '14_Finnish_SafetyOfUse'},The surface of stairs the must not be slippery.,necessity,annotated
9ebe07e9-8381-451a-9ab8-701912478b30,The air flow rate of all mechanical ventilation fans should be tested.,{'ID': '210_UK_DocF_V1_Ventilation'},The air flow rate of all mechanical ventilation fans should be tested.,part-of,annotated
6414854d-01f9-481f-a7f4-c4581e48d8b1,Special safety features are not necessary if the ladder is not more than 6m long.,{'ID': '112_UK_DocK_ProtectionFromFalling'},Special safety features are not necessary if the ladder is not more than 6m long.,none,annotated
371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",none,annotated
f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",none,annotated
cf152151-90f9-47d0-9e4e-5a1cd813d4e5,System controls should be wired so that when there is no demand for space heating or hot water the heating appliance and pump are switched off.,{'ID': '247_UK_DocL_V1_ConsrvationOfFuelAndPower'},System controls should be wired so that when there is no demand for space heating or hot water the heating appliance and pump are switched off.,necessity,annotated
a235c68f-ae44-4770-b005-4e9d7b659eb7_0,,,All cavity walls should have leaves at least 2.2 metres gradients and cavities at least 50mm wide.,greater-equal,synthetic
ddf21ce1-bd2a-49f5-8ba6-d2bcb5edf575,Taps should be lever operated and capable of easy operation.,{'ID': '97_UK_DocM_V1_AccessAndUseOfBuildings'},Taps should be lever operated and capable of easy operation.,necessity,annotated
9b908e68-0f92-4883-9fd2-7fe013848b15,"Where a gas combination boiler is used, the boiler type should be selected to modulate down to the typical heating load of the dwelling.",{'ID': '237_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a gas combination boiler is used, the boiler type should be selected to modulate down to the typical heating load of the dwelling.",necessity,annotated
9952f64d-e0df-4b03-84af-150782f81387,"For mobility-impaired people, a going of at least 300mm is preferred.",{'ID': '124_UK_DocM_V2_AccessAndUseOfBuildings'},"For mobility-impaired people, a going of at least 300mm is preferred.",none,annotated
9415ae4b-7a74-4c70-a245-e4381c6d71bf_8,,,"At gables and party walls, insulation should extend to the wall; if the private curtilage between the wall and joist is less than 600 millimetres, perimeter insulation may be required.",less,synthetic
f0c72b35-5a0a-4554-8713-96f6f73a67f1_8,,,A cube with maximum capacity of no more than 16/01/2023 00:00 may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic
81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",necessity,annotated
85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",part-of,annotated
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_3,,,"If site constraints necessitate an Wheelchair users of 9mm or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic
32dec356-9315-4ea6-9213-86ad0a72802b,Drawings should be reviewed by the designer and installer and should include specifications for key materials.,{'ID': '177_UK_DocL_V1_ConsrvationOfFuelAndPower'},Drawings should be reviewed by the designer and installer and should include specifications for key materials.,necessity,annotated
1fc9255c-929e-4052-aaec-e3ffede5a62e,"For large or complex projects, a commissioning manager should be appointed.",{'ID': '374_UK_DocM_V2_AccessAndUseOfBuildings'},"For large or complex projects, a commissioning manager should be appointed.",selection,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd_10,,,"An Fixings with a potentially flammable or explosive atmosphere must not be located in a terraces where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic
6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_10,,,"If parking spaces are provided for a building, an adequate number of hearing enhancement, but at least 30m2, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic
84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",part-of,annotated
29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,none,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_2,,,"Where the work concerns a building containing more than 900-1000mm property, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic
5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",necessity,annotated
7f696221-52c9-4c52-8f90-74bd93c51299_0,,,This grippable handrail is 850-1000mm above the pitch line of the flight and design value at least 7 mg/m3 (6 ppm) beyond the top and bottom nosings.,greater-equal,synthetic
3ac96918-764f-403d-a588-37b5f4a16f46,"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",{'ID': '284_UK_DocM_V2_AccessAndUseOfBuildings'},"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",part-of,annotated
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_7,,,A building with a visual contrast exceeding 90 must be equipped with anchoring structures for safety lines.,greater,synthetic
4e8c5c50-44af-48f6-b959-e6f9b31afa1e,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",{'ID': '89_UK_DocM_V2_AccessAndUseOfBuildings'},"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",selection,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_4,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under total extract air flow two.",equal,synthetic
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_2,,,"In a cooling energy with no openable wet room, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_7,,,"There should be a Provision, in the absence of tobacco smoke or other excessive pollutants, of 400kg.",equal,synthetic
8207751f-13b8-4fe3-9bfe-4423093d4905_7,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the maximum number of occupants of the staircase and exit route is no more than two .,less-equal,synthetic
8c4a09c5-1eb2-4a41-86d9-b69c031b4592,Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,{'ID': '384_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,necessity,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_5,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 15 degrees in rise; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
a8b3e54e-902c-4502-99a2-8c41d46f1416_10,,,"If there are more than 3m dwelling in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_9,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for total useful floor area up to adequate number not more than 5m long.,less-equal,synthetic
8fcdc238-3c30-4659-9303-1b126a39b2cd_1,,,The design solar load should be link details as used in the actual building by at least 20 points.,greater-equal,synthetic
082c7ed9-3579-48c2-a0d2-076f1edd647c_4,,,"Each of the 50 fire resistance time of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic
d8a06af7-3a6b-4d68-8bba-342aac6d3ac0,Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,{'ID': '146_Finnish_Health-WaterAndSewerage'},Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,necessity,annotated
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,part-of,annotated
f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",necessity,annotated
7575211d-616b-42bb-b112-73a949e7ca6a,Any combined facility should be divided into distinct wet and dry areas.,{'ID': '176_UK_DocM_V2_AccessAndUseOfBuildings'},Any combined facility should be divided into distinct wet and dry areas.,selection,annotated
a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",none,annotated
eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,annotated
20518e80-6f7e-457f-8c5a-59fa4c0eb324_10,,,"When calculating the heat loss for a buildings design solution, the inaccuracies shall be used as the value of the number of wall ties per square metre for the building envelope.",equal,synthetic
e4fb8d18-8dbc-4351-a2df-d87f880f476a_6,,,The Air flow rates for balconies is 280mm that of the load-bearing structures of the storey.,equal,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_4,,,"The quality of the installation and building emission rate calculated using the measured air permeability must not be higher than the glare and reflections and target emission rate, respectively.",less-equal,synthetic
009e12eb-db83-485c-9ffc-e1f462251109_1,,,Each air terminal should have a gap of at least 400kg of the free area of its associated duct.,greater-equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",part-of,annotated
2ca092ec-4425-4552-a389-fd0dadfbd154_1,,,NOTE: A floor level with a Control of 50 millimetres or steeper should be designed as a ramp.,greater-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_5,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or ventilation system above EI 15 may be discounted when measuring clear width.,greater,synthetic
2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,selection,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_3,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or Air flows above 900-1000mm may be discounted when measuring clear width.,greater,synthetic
0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",none,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_11,,,"The alongside the leading edge of a barrier in a dwellings indoor areas may, however, be at least 270 millimetres if the drop is less than three metres.",greater-equal,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_1,,,"Where the minimum value of installing only cable routes is more than 50 m2 of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic
f6add908-4d45-4b3e-83a6-369f6c36c037_3,,,"Door rails, stiles and muntins should be at least 100mm Control.",greater-equal,synthetic
2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",necessity,annotated
23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",selection,annotated
13a437c0-918c-47f2-85bd-b80dd69eb027_4,,,"There are no energy efficiency on the fire resistance time requirement of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic
f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_4,,,No individual flight has a service life of more than 75 light source lumens per circuit-watt.,less-equal,synthetic
7a42150c-1f5d-449c-ac83-addfe816e46a,Accessible entrances should be clearly sign-posted and easily recognisable.,{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},Accessible entrances should be clearly sign-posted and easily recognisable.,necessity,annotated
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_8,,,2.0 m3/(h m2) stairs should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic
7577d9f7-9f3c-4d3b-b8d9-da31d3e1b201,"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",selection,annotated
53b7d989-c81f-4e01-a5ec-4b2cb30b4bfa,The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,{'ID': '104_Finnish_FireSafety'},The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,selection,annotated
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",part-of,annotated
dcc583b1-8c4c-42cf-a1ed-e8907de56254_1,,,"The air extract rate of the indoor steps of other spaces intended for everyday use may be no more than 25W/m2, and the tread must be no less than 270 millimetres.",less-equal,synthetic
35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",necessity,annotated
ca1e0369-2dfe-4cf2-8194-87f72ee5a633,"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",{'ID': '385_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",selection,annotated
56166e36-b14b-4632-9767-70b71d335d9c,"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",none,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8,"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",{'ID': '73_Finnish_Health-IndoorClimateAndVentilation'},"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",equal,annotated
df122091-ca53-4134-98a3-47779c06f9df,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,{'ID': '198_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,none,annotated
103f99ad-884b-4bae-9f22-ccb1c5bc3d26_10,,,"In an open garage of no more than 100 litres bath, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic
8efb6108-e49e-4d64-a1e4-22e3f9128b17_1,,,"When calculating the reference heat loss of a building, the value of 120 shall be used as the thresholds for the air leakage rate figure for the building envelope.",equal,synthetic
19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",selection,annotated
f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_5,,,No individual flight has a sum total of more than 0.8 metres.,less-equal,synthetic
99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,selection,annotated
4470dde4-6422-4c13-9781-de68c3e075dc_11,,,"The outdoor internal temperature of a dwelling unit, however, shall be designed to be a minimum of 1.",greater-equal,synthetic
bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",part-of,annotated
38cd3221-7fc9-4462-be20-78b16a4309d3_4,,,"The energy efficiency of openings in the newly created dwelling should not be more than 1,200 millimetres of the total floor area.",less-equal,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_10,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major Structures, there is no floor voids to install either electric vehicle charge points or cable routes.",not-part-of,synthetic
7f72632a-dc0a-4318-afd7-7090b42350fc,Mechanical supply terminals should be located and directed to avoid draughts.,{'ID': '106_UK_DocF_V1_Ventilation'},Mechanical supply terminals should be located and directed to avoid draughts.,necessity,annotated
6e5e61dd-039d-4079-9c3f-f52fc12efefb,For continuing horizontal structures the loaded area shall be calculated span by span.,{'ID': '12_Finnish_StabilityOfStructures'},For continuing horizontal structures the loaded area shall be calculated span by span.,none,annotated
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_1,,,"For sizes of cylinder not listed, the installation and commissioning checklist from the cylinder should not exceed B, where V is the volume in litres.",less-equal,synthetic
973c9430-2b4a-4ab4-82df-7060c3002f77_1,,,The air leakage rate figure for the community heating primary circuit should be a minimum of half a metre.,greater-equal,synthetic
6a41a473-bd3c-4e38-a093-094b3fdae388_8,,,At least one in every (16.66 8.33 V0.4)/(1000 24) remaining approach must be provided with cable routes.,equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_1,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for pitch up to 450mm not more than 5m long.,less-equal,synthetic
53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,none,annotated
01d924bf-4a69-4eb8-b05e-ce993aee3d45,Perimeter insulation should be continuous and have a minimum thickness of 25mm.,{'ID': '135_UK_DocL_V1_ConsrvationOfFuelAndPower'},Perimeter insulation should be continuous and have a minimum thickness of 25mm.,greater-equal,annotated
ddd6ec57-ed54-4a8a-abaf-4b1efc287dde,The flushing shall be carried out with household water to remove any dirt and debris from the pipe network.,{'ID': '111_Finnish_Health-WaterAndSewerage'},The flushing shall be carried out with household water to remove any dirt and debris from the pipe network.,necessity,annotated
2633c957-07b4-4caa-a9d6-5acbac16b0b0,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,{'ID': '245_UK_DocM_V2_AccessAndUseOfBuildings'},NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,none,annotated
c2e0629d-350b-45b8-9e9e-d58be1780f12_6,,,"If the door has no window, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic
6c789809-b1b8-429a-8fe2-8ce16f8a4b54_10,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the access does not exceed 60 persons.,less-equal,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_3,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than half a metre layers.,less-equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated
aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",part-of,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_2,,,The from the top and bottom corners of the door of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the service life of associated parking spaces.,greater,synthetic
993e54cc-49c3-43cb-995e-1a951c93c775_3,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an design value equal to 900-1000mm.",equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",none,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_1,,,"Extract air of service life 0.3W/m2, 3 and 4 shall not be used as recirculation air.",equal,synthetic
c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated
dd898f7c-ee89-4c12-adaf-0ba78a6b001f,"Provision shall be made to prevent people moving in or about the building from colliding with open windows, skylights or ventilators.",{'ID': '98_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent people moving in or about the building from colliding with open windows, skylights or ventilators.",necessity,annotated
0da52584-1b37-48b5-840f-3795ae695275_7,,,the minimum clear dimensions of the platform are: m3/(hm2) at 50Pa continuity and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_10,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 4 Air permeability.,less-equal,synthetic
ef4f54b6-1099-4404-9fa2-d0c0d5e55543_8,,,The feasibility of installing high-efficiency alternative systems must not exceed the individual dwellings side edges.,less-equal,synthetic
bc49524e-4bac-4d16-bc83-5a977019cfaa,Other ventilation systems may be acceptable if they can be shown to meet an equal level of performance.,{'ID': '30_UK_DocF_V1_Ventilation'},Other ventilation systems may be acceptable if they can be shown to meet an equal level of performance.,selection,annotated
a1f91cfd-21f8-49a4-8468-746f49f4848e_10,,,"For a building that contains more than 900mm patient rooms for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic
35cacecf-06dc-4b0f-aadb-db2ee05518c7,The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,{'ID': '495_UK_DocM_V2_AccessAndUseOfBuildings'},The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,greater,annotated
5ca184fa-e100-4f97-957d-e37ae944786f_0,,,The specification of installing electric vehicle charge points and cable routes is not more than 0.7 of the total capital cost of the major renovation.,less-equal,synthetic
c952db0f-b605-4335-8d56-97fc339ad5ba_7,,,All 32mm plaster-board of the installation and commissioning checklist should be completed.,equal,synthetic
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated
e4fb8d18-8dbc-4351-a2df-d87f880f476a,The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,{'ID': '90_Finnish_FireSafety'},The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,equal,annotated
5163f2fb-022f-4589-889f-2ade7a9d49c6,The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,{'ID': '109_UK_DocO_Overheating'},The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,part-of,annotated
9c2051ae-9878-4772-9471-bc5b8a28c3ae,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",{'ID': '23_UK_DocF_V2_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",necessity,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_11,,,The normal relationship between the dimensions of the rise and going is: 150m2 equals 25.,equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_6,,,Modular and portable buildings with a planned service life of more than two years but with an patterns in a single location of less than 40 degrees Celsius should be shown to comply with the energy efficiency requirements.,less,synthetic
103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",none,annotated
8fcdc238-3c30-4659-9303-1b126a39b2cd_4,,,The design solar load should be located away from the direct impact of the sources of local pollution by at least 0.2.,greater-equal,synthetic
8151be81-09ad-4dac-b2d2-f0d757915b6c_9,,,"However, when the snow load can occur, the habitable area of the load s should be at least 0.06 m2.",greater-equal,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection,annotated
c416d5e5-cb27-414c-b22e-7ed38be54ed1,There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,{'ID': '232_Finnish_FireSafety'},There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,selection,annotated
9abdce80-0a4a-400a-8725-205bb3b887e4,"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",{'ID': '218_UK_DocM_V2_AccessAndUseOfBuildings'},"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",selection,annotated
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,part-of,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,annotated
8e8f4fb5-00b5-404f-89df-a07287984748_9,,,"In buildings with a CO2 greater than 6m, automatic meter reading and data collection facilities should be installed.",greater,synthetic
103f99ad-884b-4bae-9f22-ccb1c5bc3d26_2,,,"In an open garage of no more than 6m Gasfired boilers, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic
dcc583b1-8c4c-42cf-a1ed-e8907de56254_10,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the net absorber area must be no less than 50 m2.",greater-equal,synthetic
26980508-105c-49db-8595-bf001a48d757_7,,,"In places with no fixed seats or Timing and temperature demand control, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
ef9dc94d-b79c-4fba-897a-eed2b90084b2,"Thermal bridging, including at the party wall, should be reasonably limited.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"Thermal bridging, including at the party wall, should be reasonably limited.",necessity,annotated
83ff563b-077a-4849-b526-382fbb012647,The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,{'ID': '67_Finnish_SafetyOfUse'},The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,necessity,annotated
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_7,,,"The free air flow rate from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 1,500 millimetres, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic
6075de3c-d339-4ba4-9945-990480975615,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",{'ID': '94_UK_DocF_V1_Ventilation'},"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,annotated
7d35f4c4-fa65-4d68-a974-f54386ca8aee,"However, a horizontal gap in a protective part must be no higher than ten millimetres.",{'ID': '49_Finnish_SafetyOfUse'},"However, a horizontal gap in a protective part must be no higher than ten millimetres.",less-equal,annotated
bfe386ee-8c0b-41d4-9967-6e873edf7229,"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",{'ID': '148_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",selection,annotated
d504fd87-d13d-4936-9d7a-71d17954760d_3,,,The glare and reflections of the steps in an exit may be no more than 230mm.,less-equal,synthetic
11f2902d-29c2-474e-97d0-628a2a97a666_6,,,"air extract rate of over 0.15 must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic
f9de28ac-45bb-4400-9d9f-8afee73bd2e3_3,,,The wide should not exceed five of dwelling floor area.,less-equal,synthetic
2de867fe-80e7-4617-ad18-36225dd45ab1_4,,,Hinged or pivot windows with an either side of less than 9 metres are not suitable for purge ventilation.,less,synthetic
84cd76d7-e5d0-4f39-94bc-0236c65d533a_5,,,"in residential buildings of not more than two storeys, one exit of no less than 90mm in widened is permitted.",greater-equal,synthetic
9a574829-3211-4b4f-8c0c-c7a7ab9cfd54,The whole building ventilation rate should be met.,{'ID': '47_UK_DocF_V2_Ventilation'},The whole building ventilation rate should be met.,necessity,annotated
38cd3221-7fc9-4462-be20-78b16a4309d3_0,,,The elevation difference of openings in the newly created dwelling should not be more than 10m of the total floor area.,less-equal,synthetic
e32bbb47-c826-40c1-8ea4-8c32353d3fd2_10,,,There shall be 65mm of room provided for people in the building.,equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",part-of,annotated
f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",necessity,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8,"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",{'ID': '73_Finnish_Health-IndoorClimateAndVentilation'},"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",necessity,annotated
956efc87-87de-4d3c-99fb-dc58eab9353b_8,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a Signs of at least proportion.,greater-equal,synthetic
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78,"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",{'ID': '83_UK_DocF_V1_Ventilation'},"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",part-of,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_2,,,Where the kitchens is within the private curtilage of the dwelling (but not within a carport or chambers) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic
0ea1e862-2434-4fc8-97a2-b076c992ef20_1,,,"The total supply air flow of an exit must be at least 9mm and its free height must be at least 2,100 millimetres.",greater-equal,synthetic
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_5,,,"In spaces intended for more than 60 persons, the away of the access route must be at least 900mm.",greater-equal,synthetic
72d7716f-7e3e-442c-9e42-14d4b19e18e3_0,,,A habitable rooms that is being connected to a new building should not have a absence for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic
103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",selection,annotated
9415ae4b-7a74-4c70-a245-e4381c6d71bf_1,,,"At gables and party walls, insulation should extend to the wall; if the electrically operated appliance between the wall and joist is less than 3, perimeter insulation may be required.",less,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",none,annotated
77f993c6-dff1-4f9a-8f66-73221d3cbaff,"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",{'ID': '43_UK_DocF_V1_Ventilation'},"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",part-of,annotated
3121fe90-27db-405e-a42a-df3cd22ee176_9,,,"Where necessary, 1.3 secondsholes, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",none,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
d0b6759e-deec-451d-bd7a-ec65b96048be_3,,,"extract air of heat 190 millimetres shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic
e93da678-4b62-493b-8c4d-31a95da3885d,An energy declaration shall be drawn up when designing a building.,{'ID': '172_Finnish_EnergyEfficiency'},An energy declaration shall be drawn up when designing a building.,necessity,annotated
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_0,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 1100mm windows.,greater,synthetic
239bd568-c5f2-4ab5-955c-f2d8d86b7b7f,"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",{'ID': '90_UK_DocM_V2_AccessAndUseOfBuildings'},"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",necessity,annotated
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_0,,,The size must not exceed the individual dwellings service life.,less-equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,selection,annotated
6c789809-b1b8-429a-8fe2-8ce16f8a4b54_2,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the Control does not exceed 300 millimetres.,less-equal,synthetic
34a524ec-6994-426f-86af-78788fd34a80_2,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the proportion should be 390 millimetres.",equal,synthetic
7323113d-fcd0-4e19-a24a-c6171ec8c2b7,District heat networks and community heating systems should be designed to accommodate heat meter(s) for each dwelling.,{'ID': '295_UK_DocL_V1_ConsrvationOfFuelAndPower'},District heat networks and community heating systems should be designed to accommodate heat meter(s) for each dwelling.,none,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,annotated
d687ab7a-74e0-4d2e-8aad-27e009651634,Joints between vertical and horizontal structures shall always be designed without a reduction factor.,{'ID': '13_Finnish_StabilityOfStructures'},Joints between vertical and horizontal structures shall always be designed without a reduction factor.,necessity,annotated
f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",none,annotated
fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",part-of,annotated
203faa23-7b71-47c9-a6e5-2333ac45389e,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",{'ID': '22_Finnish_SafetyOfUse'},"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",part-of,annotated
f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",necessity,annotated
c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8_0,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the power input from controls must be no less than 900mm.",greater-equal,synthetic
8b9e1d32-efa8-409b-873b-22e2eae5b537,External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,{'ID': '95_Finnish_Health-Humidity'},External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,part-of,annotated
5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",necessity,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,annotated
a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",selection,annotated
86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,annotated
63af9f99-6939-4e8c-a6a9-8b10942e1597_8,,,"The handle to at least 1m2 heat release in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_10,,,Individual flights are: for input charge up to 850 millimetres not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",none,annotated
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",necessity,annotated
64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",selection,annotated
74002ed3-548e-4e2f-8835-be76e643c67d_4,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least 160 millimetres number of appliances.,greater-equal,synthetic
c6d0c791-e7f9-4a3f-abc1-631a2e6be0d1,Manual reset should be possible if there is an over-temperature trip.,{'ID': '269_UK_DocM_V2_AccessAndUseOfBuildings'},Manual reset should be possible if there is an over-temperature trip.,necessity,annotated
baee716c-b8c2-4500-b4de-63fa11f007b1_9,,,A minimum of one in 1800mm of the remaining Standing areas must have access to cable routes.,equal,synthetic
01bd7c41-594c-4440-8058-c34f1c4bad09,"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",{'ID': '82_UK_DocO_Overheating'},"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",selection,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_10,,,"In buildings more than 25mm and at most 28 metres in long, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic
8aa4b706-1659-4e30-a4fe-e7f33efe3241_10,,,All E staircase of the compliance checklist should be completed.,equal,synthetic
8e8f4fb5-00b5-404f-89df-a07287984748_10,,,"In buildings with a power requirements greater than 450mm, automatic meter reading and data collection facilities should be installed.",greater,synthetic
23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",none,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_7,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major Handrails, there is no Ventilation ductwork to install either electric vehicle charge points or cable routes.",not-part-of,synthetic
12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",none,annotated
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_10,,,The approach route is a minimum of 900mm wide with a maximum intermediate landing of One.,less-equal,synthetic
85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",none,annotated
76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,none,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50_8,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the design flow rate of the heat emitters to be installed does not exceed 500 millimetres.",less-equal,synthetic
83344b26-7cf0-452a-9dac-c0288c46393d,"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '37_UK_DocQ_Security_Dwellings'},"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_4,,,The level with entry of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the results of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic
b810df40-4dd8-44c4-80c4-b33bb873a5e9,"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '103_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",selection,annotated
cc72106e-9e7f-47cf-8a95-0173a8305dad_3,,,"In a new building, the crawl space cross-sectional area must be two on average at the minimum.",greater-equal,synthetic
500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,selection,annotated
710ef992-e187-4b1a-894b-e0e222f54359_11,,,"NOTE: For grid-supplied electricity, a presence of 300mm and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic
02f5e3fb-7a8b-4a88-a6e5-337cc0835284,"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",{'ID': '90_UK_DocO_Overheating'},"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",selection,annotated
419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",necessity,annotated
3ec0e36a-0227-4b76-9fd5-7a2f77877d99,A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '23_UK_DocM_V2_AccessAndUseOfBuildings'},A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,necessity,annotated
eccd4f77-ef4a-41fd-a22a-620c84fdddd4_11,,,There is a minimum of 30 of worktop to at least distance of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_3,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 25 decibels devices that will close the door in the event of fire is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic
77be05f2-cd8c-4d35-85e4-6637b999d8e7,The value of the consequential improvement works should not be less than 10 of the value of the principal works.,{'ID': '452_UK_DocM_V2_AccessAndUseOfBuildings'},The value of the consequential improvement works should not be less than 10 of the value of the principal works.,selection,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_0,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the Geo-location may be no more than 20 degrees Celsius.",less-equal,synthetic
c416d5e5-cb27-414c-b22e-7ed38be54ed1,There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,{'ID': '232_Finnish_FireSafety'},There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,necessity,annotated
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_8,,,A building with a maximum number of occupants exceeding certain proportion must be equipped with anchoring structures for safety lines.,greater,synthetic
7d35f4c4-fa65-4d68-a974-f54386ca8aee_11,,,"However, a horizontal Waste water in a protective part must be no higher than four.",less-equal,synthetic
bf798097-bb99-42d0-a73f-8cebab8fbeb8_10,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the fire resistance time must be no less than 1,500 millimetres.",greater-equal,synthetic
e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,necessity,annotated
9a574829-3211-4b4f-8c0c-c7a7ab9cfd54,The whole building ventilation rate should be met.,{'ID': '47_UK_DocF_V2_Ventilation'},The whole building ventilation rate should be met.,selection,annotated
beeec1b2-c382-40cc-aec2-6eda86f5782e,"Each residential unit, shared communal room and common space should be categorised separately.",{'ID': '25_UK_DocO_Overheating'},"Each residential unit, shared communal room and common space should be categorised separately.",necessity,annotated
ef561e39-db90-462c-8dde-15fbeae954e5,A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,{'ID': '50_Finnish_SafetyOfUse'},A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,necessity,annotated
7134933d-17df-4a8c-b72e-1c09177bad1c,The spread of fire in voids of wall-type building elements must be restricted at least by storey.,{'ID': '130_Finnish_FireSafety'},The spread of fire in voids of wall-type building elements must be restricted at least by storey.,necessity,annotated
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated
2f815a08-db3c-48a6-b248-d69aeac870ee,"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",{'ID': '173_UK_DocM_V2_AccessAndUseOfBuildings'},"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,annotated
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,necessity,annotated
533762d6-e592-494d-a08b-a0817b5b4f9f,"If there are associated parking spaces where there is not a requirement to install electric vehicle charge points, cable routes must be installed in all remaining associated parking spaces.",{'ID': '50_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are associated parking spaces where there is not a requirement to install electric vehicle charge points, cable routes must be installed in all remaining associated parking spaces.",selection,annotated
66249fda-33bf-4d93-8bf9-53fb82ad0e95,"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",{'ID': '87_Finnish_SafetyOfUse'},"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",part-of,annotated
ff3e8f86-1542-4f54-a776-cfdc8482bad7_10,,,The prevailing wind direction of an air conditioner working in cooling mode should be a minimum of 56 metres.,greater-equal,synthetic
86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",necessity,annotated
01d924bf-4a69-4eb8-b05e-ce993aee3d45_5,,,Perimeter insulation should be continuous and have a minimum surface area of 1800mm.,greater-equal,synthetic
"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_10",,,"However, if the diameter is no more than 0.9 metres, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_6,,,twice the rise plus the going (2R G) submission should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",selection,annotated
66249fda-33bf-4d93-8bf9-53fb82ad0e95,"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",{'ID': '87_Finnish_SafetyOfUse'},"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",part-of,annotated
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_7,,,20mm systems should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic
835d8fad-7a27-4299-aa38-a5b1771a6779_5,,,"In large building complexes, such as retail parks and large sports centres, there should be 600 x 600 millimetres wheelchair-accessible unisex block of flats capable of including an adult changing table.",equal,synthetic
7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",part-of,annotated
9952f64d-e0df-4b03-84af-150782f81387_9,,,"For mobility-impaired people, a courtyard of at least 900-1000mm is preferred.",greater-equal,synthetic
cf35d4a4-3170-421b-9be1-b68d928eed1d_10,,,"A roof with a energy savings greater than 24 degrees Celsius must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic
c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",selection,annotated
8aad11d6-bd81-4a57-bd73-7c1319a76494,"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",{'ID': '331_UK_DocM_V2_AccessAndUseOfBuildings'},"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",selection,annotated
21bf2954-bfa8-44ef-bb2e-4e34367965ba,"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",{'ID': '88_Finnish_FireSafety'},"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",necessity,annotated
5aebe4f8-6ca6-4448-94db-5272b5541efb,"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",{'ID': '359_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",part-of,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",part-of,annotated
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_2,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 55 degrees Celsius cooker.,greater,synthetic
0ea1e862-2434-4fc8-97a2-b076c992ef20,"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",{'ID': '214_Finnish_FireSafety'},"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",greater-equal,annotated
2cadb28f-a6c8-4fe2-b1c9-a918eb5437f9,On-site electricity generation systems must be commissioned to ensure that they produce as much electricity as is reasonable in the circumstances.,{'ID': '372_UK_DocL_V1_ConsrvationOfFuelAndPower'},On-site electricity generation systems must be commissioned to ensure that they produce as much electricity as is reasonable in the circumstances.,necessity,annotated
76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,none,annotated
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_8,,,"If the drop of a mechanical ventilation systems air duct is designed to be greater than 20 millimetres, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_8,,,"The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 1,000 millimetres expanded metal.",greater,synthetic
656aa2fa-18cb-41ee-ae28-28deb3dffcc3_4,,,The total floor area of the water in the hot water system shall be at least 300mm and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic
8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c,"However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",{'ID': '9_Finnish_Accessibility'},"However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",part-of,annotated
4e8c5c50-44af-48f6-b959-e6f9b31afa1e_10,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical water removal system may be exit enclosure.",equal,synthetic
c47598f9-df79-4d77-aba9-8f380342372f_10,,,extract air of total combined window area 3.3m shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_4,,,Skirtings totalling up to 50mm total thickness and shallow projecting indoor steps or casings above 100mm may be discounted when measuring clear width.,greater,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_8,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear maximum number of occupants of 900mm, except in doorways.",equal,synthetic
1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",selection,annotated
992e8f11-81ac-4d2f-b7d1-60e46b4b7261,Wheelchair accessible dwellings must also provide both a level access shower and a bath.,{'ID': '108_UK_DocM_V1_AccessAndUseOfBuildings'},Wheelchair accessible dwellings must also provide both a level access shower and a bath.,selection,annotated
825053cb-af5d-43a9-b59b-e2a5ae78ea73_10,,,The number of occupants of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the intended purpose of associated parking spaces.,greater,synthetic
13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",part-of,annotated
164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",selection,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f_6,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 3.3m of non-fire-compartmented light well that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic
50e89a86-e2be-439d-b230-79274cd7199b_0,,,Modular and portable buildings with a planned widened of more than 0.3 at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic
77f993c6-dff1-4f9a-8f66-73221d3cbaff_3,,,"If the dwelling only has one habitable room, a minimum room temperature of 0.06 m2 should be used.",greater-equal,synthetic
f420ae57-5656-4558-b1a3-1079e46bf6cc_5,,,"In the case of the storey-level door of a dwelling, or if the target emission rate through the door exceeds 850 millimetres, doors must open in the direction of the exit.",greater,synthetic
31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",necessity,annotated
079db365-cfed-474e-9329-25349ac0db4a_9,,,"In connection with the door of an outside space of an individual dwelling the standards outside the door may be more than 2.4m if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic
56517433-cf40-4b88-a9d4-18e61e0e9993,"In addition, on both sides of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '55_Finnish_Accessibility'},"In addition, on both sides of the toilet seat there shall be a free space of at least 800 millimetres.",greater-equal,annotated
5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,part-of,annotated
5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",none,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_10,,,"In buildings more than 9 metres and at most One in service life, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_10,,,"When replacing an existing system, the fire compartmenting requirement of the new system should be no less than storage capacity of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic
0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",selection,annotated
3ec0e36a-0227-4b76-9fd5-7a2f77877d99,A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '23_UK_DocM_V2_AccessAndUseOfBuildings'},A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,selection,annotated
4d80c4d1-08ee-481a-9f9c-e9151ce1094d_3,,,"The cold side of windows, roof windows, rooflights and doors should not exceed 20 litres per second of the total floor area of the dwelling.",less-equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_10,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be length 9mm.",equal,synthetic
05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",none,annotated
64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",selection,annotated
f0c72b35-5a0a-4554-8713-96f6f73a67f1_11,,,A cube with target emission rate of no more than 300mm may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic
6075de3c-d339-4ba4-9945-990480975615_9,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than One building of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic
5fa7daca-cb50-4397-a736-617e52d30187_7,,,"If efficiencies at below 30% are required and unavailable, the flow rate may be taken as equal to that at 850 millimetres.",equal,synthetic
29c431ee-ea93-491d-ab13-06418d93c488_10,,,"If deep is greater than eight per cent, manual control is acceptable.",greater,synthetic
0d8c2f7d-5234-4bec-bbbe-961e499ebbbc,"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",{'ID': '129_UK_DocM_V2_AccessAndUseOfBuildings'},"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",part-of,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,annotated
8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2,"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",{'ID': '111_Finnish_EnergyEfficiency'},"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",part-of,annotated
38cd3221-7fc9-4462-be20-78b16a4309d3_2,,,The ending of openings in the newly created dwelling should not be more than 120 of the total floor area.,less-equal,synthetic
37f01a2c-b944-45a2-a7f4-140d8c03d7ac,"After rebating, frame components should retain at least 32mm of timber.",{'ID': '29_UK_DocQ_Security_Dwellings'},"After rebating, frame components should retain at least 32mm of timber.",selection,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_9,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the class may be no more than four.",less-equal,synthetic
38cd3221-7fc9-4462-be20-78b16a4309d3_11,,,The fire igniting of openings in the newly created dwelling should not be more than 300 millimetres of the total floor area.,less-equal,synthetic
8421f806-70f2-46a9-a308-90a40da3541d,"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",{'ID': '41_UK_DocM_V2_AccessAndUseOfBuildings'},"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",part-of,annotated
8aa4b706-1659-4e30-a4fe-e7f33efe3241_0,,,All three seconds Window handles of the compliance checklist should be completed.,equal,synthetic
5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",none,annotated
13a437c0-918c-47f2-85bd-b80dd69eb027_7,,,"There are no air flow resistance on the Ventilation of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic
0da52584-1b37-48b5-840f-3795ae695275_1,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where one metre Heating systems are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_6,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 8 per cent (1:12.5) in condition and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
eefe1191-2903-4fb8-9138-6471e09fb67d_9,,,The flow rate exceeds 190 millimetres at 11pm.,greater,synthetic
4d54279f-8590-4a58-86d5-afb7f3069870,"The apartment-specific water meters shall be located in a place where they are easy to install, read and service.",{'ID': '75_Finnish_Health-WaterAndSewerage'},"The apartment-specific water meters shall be located in a place where they are easy to install, read and service.",necessity,annotated
569c7958-b7d6-4b9c-9dd9-13307e95e59b,"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",{'ID': '385_UK_DocM_V2_AccessAndUseOfBuildings'},"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",selection,annotated
5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,none,annotated
956efc87-87de-4d3c-99fb-dc58eab9353b_10,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a quality of the installation of at least 1.501kWhPE/kWh.,greater-equal,synthetic
7f696221-52c9-4c52-8f90-74bd93c51299,This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,{'ID': '73_UK_DocM_V1_AccessAndUseOfBuildings'},This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,none,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2,The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,{'ID': '19_UK_DocK_ProtectionFromFalling'},The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,part-of,annotated
3153d771-404e-4a54-ac05-ed1b75e37506_4,,,"Gangways should not be less than A category unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,synthetic
50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,selection,annotated
29232335-402c-4ed9-af74-fd093ac22e28_6,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least rise between landings 100.,greater-equal,synthetic
984c252b-74f4-4d85-9080-1c8ae1851eca_6,,,"If performance requires thicker glass to be used, an equivalent window unit with cross-sectional area (30m2) glazing should be shown to meet the required standard.",equal,synthetic
53e31e26-a39b-4047-a86e-bdb8021413e8_10,,,Window handles on windows that open outwards are not more than 600 millimetres maximum capacity when the window is at its maximum openable angle.,less-equal,synthetic
533762d6-e592-494d-a08b-a0817b5b4f9f,"If there are associated parking spaces where there is not a requirement to install electric vehicle charge points, cable routes must be installed in all remaining associated parking spaces.",{'ID': '50_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are associated parking spaces where there is not a requirement to install electric vehicle charge points, cable routes must be installed in all remaining associated parking spaces.",necessity,annotated
405a2082-beb9-4c5f-bc9f-d688b72e723b,Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,{'ID': '162_UK_DocL_V1_ConsrvationOfFuelAndPower'},Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,selection,annotated
a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",part-of,annotated
a387fcb8-ead2-4094-9be9-72d783468b33_4,,,"If the air leakage rate figure of windows, roof windows, rooflights and doors exceeds 30% load of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1_1,,,A minimum of one in 32mm of the remaining energy declaration must have access to cable routes.,equal,synthetic
793cb939-b3d9-46eb-ae65-71a4d5c8031b_1,,,Where the site is within the private curtilage of the dwelling (but not within a carport or blocks of flats) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic
f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",none,annotated
77f993c6-dff1-4f9a-8f66-73221d3cbaff,"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",{'ID': '43_UK_DocF_V1_Ventilation'},"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",greater-equal,annotated
9ebe07e9-8381-451a-9ab8-701912478b30,The air flow rate of all mechanical ventilation fans should be tested.,{'ID': '210_UK_DocF_V1_Ventilation'},The air flow rate of all mechanical ventilation fans should be tested.,selection,annotated
079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",selection,annotated
f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",necessity,annotated
05698d4d-c140-4bce-94b3-386ce02baa6b,The storm water sewers within the building shall be equipped with condensation insulation.,{'ID': '169_Finnish_Health-WaterAndSewerage'},The storm water sewers within the building shall be equipped with condensation insulation.,necessity,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_7,,,"In buildings more than 9 metres and at most 15 in absence, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_9,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 0.9 metres in extract air categories; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
b5edf19f-56df-436a-89f0-9ab5bf6963ea,"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '106_Finnish_FireSafety'},"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated
a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",none,annotated
dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",less-equal,annotated
45338082-ca66-418b-8fe1-8f2be926f330_8,,,A early childhood education premises of no more than twice the rise plus the going (2R G) may pass between the stair steps.,less-equal,synthetic
eefe1191-2903-4fb8-9138-6471e09fb67d_8,,,The surface area exceeds 600 millimetres at 11pm.,greater,synthetic
b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",part-of,annotated
956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",greater-equal,annotated
208b093d-361f-4aec-819d-4abca4e72c68_11,,,"in an evacuation area where the exit is 2m, the second exit may be no less than 900 millimetres in width.",equal,synthetic
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated
ae098b28-f01d-44df-b601-b7ac7631101d,"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",{'ID': '54_Finnish_SafetyOfUse'},"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",none,annotated
72d7716f-7e3e-442c-9e42-14d4b19e18e3,A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,{'ID': '336_UK_DocM_V2_AccessAndUseOfBuildings'},A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,none,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",selection,annotated
500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,none,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74_6,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a potentially flammable number of steps of 9mm.",equal,synthetic
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,selection,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",selection,annotated
8805ec9f-3f5f-44fc-9078-3ae62439c973,"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",{'ID': '108_UK_DocL_V1_ConsrvationOfFuelAndPower'},"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",none,annotated
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_6,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be exposure coefficient 50.",equal,synthetic
a0d4a888-a5f8-449e-b28c-43fd1003dca3, The fire compartment shall be partitioned by accommodation room.,{'ID': '258_Finnish_FireSafety'},The fire compartment shall be partitioned by accommodation room.,necessity,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",none,annotated
38745b5e-4dea-43fe-9378-5befa5a2399d,A copy of the completed commissioning sheet should be given to the owner of the building.,{'ID': '99_UK_DocF_V2_Ventilation'},A copy of the completed commissioning sheet should be given to the owner of the building.,none,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",none,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_8,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for maintained up to four not more than 5m long.,less-equal,synthetic
76acc6bd-50c0-4f3f-b015-42e171ec6ce7_8,,,40 degrees Celsius chamber must be installed.,equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_9,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 50 m in boiler efficiency, these must be accessible via the interior.",greater,synthetic
3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_5,,,"These fittings should not exceed a combined dead,imposed and wind loads of 2.5 ties/m2.",less-equal,synthetic
43a7a088-718f-4a11-a392-88e71559466e,"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",{'ID': '107_UK_DocM_V2_AccessAndUseOfBuildings'},"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",necessity,annotated
6a553c19-481f-4947-9047-fd2c4d0daa44,"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",{'ID': '83_UK_DocM_V1_AccessAndUseOfBuildings'},"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",necessity,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_2,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the one side may be no more than 600kg/m3.",less-equal,synthetic
34a524ec-6994-426f-86af-78788fd34a80_8,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the Air permeability should be 2.4m.",equal,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",{'ID': '22_Finnish_SafetyOfUse'},"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",part-of,annotated
a8b3e54e-902c-4502-99a2-8c41d46f1416,"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",{'ID': '106_Finnish_SafetyOfUse'},"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",part-of,annotated
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_2,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear maximum capacity of 190 millimetres, except in doorways.",equal,synthetic
06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",necessity,annotated
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_11,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear combined dead,imposed and wind loads of 56 metres, except in doorways.",equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,selection,annotated
5e51b653-449e-4d00-be19-0e20ecff5c49_3,,,The default wide should be 300mm.,equal,synthetic
c952db0f-b605-4335-8d56-97fc339ad5ba_11,,,All 1m2 construction layers of the installation and commissioning checklist should be completed.,equal,synthetic
fb1da22f-8ddb-4399-b441-64dca68da9af_11,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 1 agreed level of provision.",greater-equal,synthetic
e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,selection,annotated
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_9,,,An upstand built on site should not exceed a annual efficiency of heat recovery from ventilation extract air of 1m3/s.,less-equal,synthetic
009e12eb-db83-485c-9ffc-e1f462251109_8,,,Each air terminal should have a sheathing board of at least 190 millimetres of the free area of its associated duct.,greater-equal,synthetic
c33e482e-252a-4e99-a905-7861a480d024,"Geo-location should be enabled to confirm the location, date and time of each image.",{'ID': '484_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Geo-location should be enabled to confirm the location, date and time of each image.",selection,annotated
922bf8df-3a70-4f45-8c04-200b638d3b3c_9,,,The cold water pipe shall be designed and installed so that the reverberation time in the cold water system may not exceed 1m3/s.,less-equal,synthetic
12f51746-1632-4628-9d8a-98dcf58ed9fc,Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,{'ID': '116_UK_DocM_V1_AccessAndUseOfBuildings'},Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,necessity,annotated
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated
302c413e-fefd-47f1-914f-0dc787e4a761_7,,,"Where drop on surfaces is greater than 850 millimetres, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic
493ec553-7761-4d1e-aa98-05d925ddf955,The opening of a horizontal hatch must be at least 600 x 600 millimetres.,{'ID': '84_Finnish_SafetyOfUse'},The opening of a horizontal hatch must be at least 600 x 600 millimetres.,greater-equal,annotated
5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",necessity,annotated
d82c4149-8daa-48b2-8f46-c959a5f9ebe3,"Artificial lighting should be designed to give good colour rendering of all surfaces, without creating glare or pools of bright light and strong shadows.",{'ID': '152_UK_DocM_V2_AccessAndUseOfBuildings'},"Artificial lighting should be designed to give good colour rendering of all surfaces, without creating glare or pools of bright light and strong shadows.",necessity,annotated
ebb26e9f-622f-4faa-a2c8-997158e30499,Mortar snots should be removed to ensure a tight fit with the structure and cavities cleared of all debris.,{'ID': '142_UK_DocL_V1_ConsrvationOfFuelAndPower'},Mortar snots should be removed to ensure a tight fit with the structure and cavities cleared of all debris.,necessity,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_5,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the number of people evacuating from these spaces does not exceed 6mm of the total air flow in the vertical duct.",less-equal,synthetic
793cb939-b3d9-46eb-ae65-71a4d5c8031b_8,,,Where the pipes is within the private curtilage of the dwelling (but not within a carport or thermal energy streams) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic
eccc60e7-3d76-46c0-a9d9-e398bf3e475a,The part of the dwelling above ground level should be considered separately.,{'ID': '71_UK_DocF_V1_Ventilation'},The part of the dwelling above ground level should be considered separately.,none,annotated
d504fd87-d13d-4936-9d7a-71d17954760d_6,,,The heat recovery of the steps in an exit may be no more than 0.055555556.,less-equal,synthetic
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,necessity,annotated
d2b6e6e7-1545-4d84-ae81-e136edd3be74,A handrail must be designed and shaped so that it allows a firm grip.,{'ID': '56_Finnish_SafetyOfUse'},A handrail must be designed and shaped so that it allows a firm grip.,necessity,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,annotated
339fc78c-a2f2-481c-a410-3aeb41e24b8a_5,,,Solid walls constructed of coursed brickwork or blockwork should be at least as total combined window area as 6mm of the storey height.,greater-equal,synthetic
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_0,,,The resilient layer should be to the full height of the door and adequate means shape of the doorset.,equal,synthetic
b5addb77-be99-45a2-8dc0-fdf5d1969a57,Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,{'ID': '194_Finnish_StabilityOfStructures'},Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,selection,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",selection,annotated
45b99da0-5bce-49b7-9ce2-04810c7e5a19,"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",{'ID': '151_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",part-of,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0_5,,,"For dwellings, for external tapered steps and stairs that are part of the building the riser of each step should be a minimum of 0.7 metres.",greater-equal,synthetic
fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",selection,annotated
fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",none,annotated
ec1783bd-3e59-42d6-9709-cd0cc7d2c365,The air flow resistance of all components should be considered when specifying ventilation systems.,{'ID': '55_UK_DocF_V1_Ventilation'},The air flow resistance of all components should be considered when specifying ventilation systems.,necessity,annotated
36650de0-ef3c-4fd1-8199-f47c0e576076_9,,,the total capital cost of the platform does not exceed 300mm.,less-equal,synthetic
f2bf62e6-9577-48b5-b15d-9fe4904acf52,"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",{'ID': '268_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",none,annotated
cf152151-90f9-47d0-9e4e-5a1cd813d4e5,System controls should be wired so that when there is no demand for space heating or hot water the heating appliance and pump are switched off.,{'ID': '247_UK_DocL_V1_ConsrvationOfFuelAndPower'},System controls should be wired so that when there is no demand for space heating or hot water the heating appliance and pump are switched off.,selection,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_7,,,"The heat gain of a barrier in a dwellings indoor areas may, however, be at least 0.055555556 if the drop is less than three metres.",greater-equal,synthetic
9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",none,annotated
81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",none,annotated
81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",necessity,annotated
a8b3e54e-902c-4502-99a2-8c41d46f1416_9,,,"If there are more than 500kW pressure tests in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic
1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",selection,annotated
75c60084-6878-472d-8694-e8739e0dd76c_10,,,The width of access routes in assembly areas with a heat gain of 300mm must be at least 900 millimetres.,equal,synthetic
3ca5cb38-b90b-4449-ba14-4268866df8e1_3,,,The water heater is close to the draw-off points and has a equivalent area no greater than One.,less-equal,synthetic
19478a13-7457-4dd3-a394-744f826db7b0_0,,,"The handle to at least two years Rigid connectors in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f,"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",part-of,annotated
9b329413-b6d6-4953-9b34-c82d3a2e9c44,"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",{'ID': '216_UK_DocM_V2_AccessAndUseOfBuildings'},"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",necessity,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
339fc78c-a2f2-481c-a410-3aeb41e24b8a,Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,{'ID': '32_UK_DocA_Structure'},Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,none,annotated
0ea1e862-2434-4fc8-97a2-b076c992ef20_0,,,"The thresholds of an exit must be at least 16/01/2023 00:00 and its free height must be at least 2,100 millimetres.",greater-equal,synthetic
b5addb77-be99-45a2-8dc0-fdf5d1969a57,Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,{'ID': '194_Finnish_StabilityOfStructures'},Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,none,annotated
bb309bf3-9e86-43d9-8b6e-ebff176d1c88,The sink is not more than 150mm deep with insulation to the underside to prevent scalding of a wheelchair users legs.,{'ID': '96_UK_DocM_V1_AccessAndUseOfBuildings'},The sink is not more than 150mm deep with insulation to the underside to prevent scalding of a wheelchair users legs.,selection,annotated
33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",selection,annotated
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,part-of,annotated
f5a71c7b-e852-40f2-8f88-91cda7902a7e_1,,,"If a new building has a space heating or airconditioning system with an primary energy factor greater than two years, a building automation and control system should be installed.",greater,synthetic
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated
0ea1e862-2434-4fc8-97a2-b076c992ef20_1,,,"The width of an exit must be at least 1,200 millimetres and its free shallow projecting must be at least five.",greater-equal,synthetic
793cb939-b3d9-46eb-ae65-71a4d5c8031b_9,,,Where the community heating primary circuit is within the private curtilage of the dwelling (but not within a carport or retaining rail) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic
77be05f2-cd8c-4d35-85e4-6637b999d8e7,The value of the consequential improvement works should not be less than 10 of the value of the principal works.,{'ID': '452_UK_DocM_V2_AccessAndUseOfBuildings'},The value of the consequential improvement works should not be less than 10 of the value of the principal works.,part-of,annotated
103f99ad-884b-4bae-9f22-ccb1c5bc3d26_3,,,"In an open garage of no more than 3 appliance, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic
2cfc6994-0cbe-4bdf-9ed5-af8d40c79d8c,The load shall be stated on this sign in kg/m2.,{'ID': '22_Finnish_StabilityOfStructures'},The load shall be stated on this sign in kg/m2.,necessity,annotated
33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated
17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",necessity,annotated
f2e57c55-e340-4fa2-87c5-03f4bf8e5942,"Where the dwelling is defined as wheelchair adaptable, it should be easy to install a lift.",{'ID': '82_UK_DocM_V1_AccessAndUseOfBuildings'},"Where the dwelling is defined as wheelchair adaptable, it should be easy to install a lift.",selection,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_6,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 8.5m2 in difference in light reflectance value; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
5ca184fa-e100-4f97-957d-e37ae944786f_4,,,The ventilation of installing electric vehicle charge points and cable routes is not more than 25 decibels of the total capital cost of the major renovation.,less-equal,synthetic
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_4,,,Storage premises with a quality of the installation exceeding 2.4 metres are not permitted within the building.,greater,synthetic
0262f6e5-21bc-4312-9388-8ac93b79416d_10,,,The minimum full vicinity of the absorption chillers should be no worse than 1100mm.,greater-equal,synthetic
d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated
c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",selection,annotated
b02f9b87-d934-4c2f-8a59-b3b8c0a7be17,"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",{'ID': '124_UK_DocF_V2_Ventilation'},"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",selection,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d_6,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a side exceeding 100 and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic
07565483-7508-43fc-b15e-82d95881e81e,"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",{'ID': '70_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",necessity,annotated
11710051-ee66-4fe2-83f9-85ea53aa5b03,"The ventilation system shall produce an adequate outdoor air flow to the building and extract from indoor air substances that are harmful to health, excessive humidity, odours with adverse effects on comfort and indoor air impurities arising from humans, construction products and activities.",{'ID': '46_Finnish_Health-IndoorClimateAndVentilation'},"The ventilation system shall produce an adequate outdoor air flow to the building and extract from indoor air substances that are harmful to health, excessive humidity, odours with adverse effects on comfort and indoor air impurities arising from humans, construction products and activities.",necessity,annotated
f0c72b35-5a0a-4554-8713-96f6f73a67f1,A cube with edges of no more than 50 millimetres may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,{'ID': '51_Finnish_SafetyOfUse'},A cube with edges of no more than 50 millimetres may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,annotated
12907c6f-e734-436d-a7de-c8a1626fbe92,"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",{'ID': '496_UK_DocM_V2_AccessAndUseOfBuildings'},"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",selection,annotated
9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",none,annotated
fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",part-of,annotated
710ef992-e187-4b1a-894b-e0e222f54359,"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",{'ID': '199_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",selection,annotated
c952db0f-b605-4335-8d56-97fc339ad5ba_1,,,All 20 litres per second organic substances of the installation and commissioning checklist should be completed.,equal,synthetic
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_6,,,The approach route is a minimum of 900mm wide with a maximum long of 1.501kWhPE/kWh.,less-equal,synthetic
bf798097-bb99-42d0-a73f-8cebab8fbeb8_8,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the frequency of the steps must be no more than 0.7W/(m2K) and the tread must be no less than 300 millimetres.",less-equal,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_3,,,"The heat exchanger area, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the output, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic
72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",part-of,annotated
a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",selection,annotated
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_1,,,The resilient layer should be to the full height of the door and One design temperature difference of the doorset.,equal,synthetic
7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,necessity,annotated
20518e80-6f7e-457f-8c5a-59fa4c0eb324,"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",{'ID': '137_Finnish_EnergyEfficiency'},"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",part-of,annotated
45338082-ca66-418b-8fe1-8f2be926f330_5,,,A network distribution point of no more than 1 in 40 may pass between the stair steps.,less-equal,synthetic
10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",necessity,annotated
c2c49207-78b3-42b0-8b61-ad506f5a80e2,"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce lime-scale accumulation.",{'ID': '381_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce lime-scale accumulation.",necessity,annotated
0085ecdd-f2f0-45f5-948d-ded697c69866,"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '44_Finnish_Accessibility'},"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",part-of,annotated
72d7716f-7e3e-442c-9e42-14d4b19e18e3_4,,,"A Fixings that is being connected to a new building should not have a combined dead,imposed and wind loads for delivered heat to the building which is greater than 0.350kgCO2/kWh.",not-part-of,synthetic
31e6f85a-97ea-4224-9144-bc3d1daad96d,Consideration should be given to providing a low level urinal for children in male washrooms.,{'ID': '174_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to providing a low level urinal for children in male washrooms.,none,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f_8,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than one metre of non-fire-compartmented water meters that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1_0,,,A minimum of one in 1.3 seconds of the remaining WC pans must have access to cable routes.,equal,synthetic
c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",selection,annotated
eeb4239f-3819-475c-ad20-756bed80c4ff_2,,,"In reference heat loss calculations, the value used as the service of the buildings ventilation system shall be 150mm.",equal,synthetic
113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",necessity,annotated
208b093d-361f-4aec-819d-4abca4e72c68,"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",{'ID': '216_Finnish_FireSafety'},"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",equal,annotated
ee0c8c7c-c65e-4403-92e6-628fd680f3bf,Any panel within the doorset should be at least 15mm thick.,{'ID': '30_UK_DocQ_Security_Dwellings'},Any panel within the doorset should be at least 15mm thick.,none,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50_4,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the internal temperature of the heat emitters to be installed does not exceed 0.15m/s.",less-equal,synthetic
009e12eb-db83-485c-9ffc-e1f462251109_0,,,Each air terminal should have a living quarters of at least 70 kN of the free area of its associated duct.,greater-equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_1,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be target fabric energy efficiency rate adequate means.",equal,synthetic
e874f337-2067-4e77-ad32-c3b857f40e7a_6,,,"If the domestic hot water cylinder heat loss exceeds 8.5m2, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic
d0b6759e-deec-451d-bd7a-ec65b96048be_9,,,"extract air of indoor units 60 persons shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic
3ca5cb38-b90b-4449-ba14-4268866df8e1_8,,,The water heater is close to the draw-off points and has a opening no greater than 850 millimetres.,less-equal,synthetic
63af9f99-6939-4e8c-a6a9-8b10942e1597,"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",{'ID': '57_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",none,annotated
47e50ddf-6174-436d-851b-7ddf46c10ccf,A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,{'ID': '380_UK_DocL_V1_ConsrvationOfFuelAndPower'},A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,selection,annotated
f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",selection,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",none,annotated
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_8,,,The total supply air flow must not exceed the individual dwellings cost.,less-equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_1,,,"If the domestic hot water circulation heat loss between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 20 degrees Celsius, the wall in question must be class EI 15.",less,synthetic
77be05f2-cd8c-4d35-85e4-6637b999d8e7_9,,,The slope of the consequential improvement works should not be less than 01:20:00 of the value of the principal works.,greater-equal,synthetic
02f5e3fb-7a8b-4a88-a6e5-337cc0835284,"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",{'ID': '90_UK_DocO_Overheating'},"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",necessity,annotated
981a0996-c526-4ee7-b679-0f17bd5ecd29,"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",{'ID': '209_UK_DocM_V2_AccessAndUseOfBuildings'},"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",none,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",part-of,annotated
33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated
319372c4-2f9b-4594-8150-b9fd2c7670c4,A stack vent located in cold premises shall be thermally insulated.,{'ID': '136_Finnish_Health-WaterAndSewerage'},A stack vent located in cold premises shall be thermally insulated.,necessity,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_8,,,"Extract air of termination points 2, 3 and 160 millimetres shall not be used as recirculation air.",equal,synthetic
4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",none,annotated
e21fa967-934e-4a29-a66d-252fdbbf928f_7,,,"If the parasitic energy use is unknown, an rate of heat release of twice the rise plus the going (2R G) should be made for any control system.",equal,synthetic
b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",necessity,annotated
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_2,,,The approach route is a minimum of 900mm wide with a maximum Extract of five.,less-equal,synthetic
a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",part-of,annotated
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated
12f51746-1632-4628-9d8a-98dcf58ed9fc,Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,{'ID': '116_UK_DocM_V1_AccessAndUseOfBuildings'},Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,necessity,annotated
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,greater,annotated
aa921550-3c5f-470b-b578-1788f83b49a7,Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,{'ID': '153_UK_DocM_V2_AccessAndUseOfBuildings'},Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,selection,annotated
23cff3c3-1251-4c5f-9fd9-8f52d25eb494_6,,,Gasfired boilers and multi-stage oilfired boilers with an level with entry of more than 450mm should have fully modulating burner controls.,greater,synthetic
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_0,,,"Generally, a thermal element once upgraded should not have a axle group load greater than 20 litres per second.",less-equal,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73_0,,,The efficiency of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the class of associated parking spaces.,greater,synthetic
8fcdc238-3c30-4659-9303-1b126a39b2cd,The design solar load should be reduced by at least 20%.,{'ID': '499_UK_DocM_V2_AccessAndUseOfBuildings'},The design solar load should be reduced by at least 20%.,necessity,annotated
2de867fe-80e7-4617-ad18-36225dd45ab1_10,,,Hinged or pivot windows with an number of appliances of less than 0.15 dm3/s per m2 are not suitable for purge ventilation.,less,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74_7,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a include specifications for key materials number of steps of 190 kN.",equal,synthetic
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_3,,,"There should be a steps, in the absence of tobacco smoke or other excessive pollutants, of 25 decibels.",equal,synthetic
a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",selection,annotated
208b093d-361f-4aec-819d-4abca4e72c68,"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",{'ID': '216_Finnish_FireSafety'},"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",none,annotated
f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",selection,annotated
2de867fe-80e7-4617-ad18-36225dd45ab1_3,,,Hinged or pivot windows with an Moisture of less than 8.5m2 are not suitable for purge ventilation.,less,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_6,,,Individual flights are: for locations up to 9 metres not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection,annotated
ddf21ce1-bd2a-49f5-8ba6-d2bcb5edf575,Taps should be lever operated and capable of easy operation.,{'ID': '97_UK_DocM_V1_AccessAndUseOfBuildings'},Taps should be lever operated and capable of easy operation.,necessity,annotated
36650de0-ef3c-4fd1-8199-f47c0e576076_7,,,the installation of the platform does not exceed 190 kN.,less-equal,synthetic
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_3,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 400 millimetres in air distribution and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
fdd9e41e-20a5-4f5b-9dae-91653467c3ec,Multiple cooling units should be provided with controls that ensure that the combined plant operates in its most efficient modes.,{'ID': '275_UK_DocM_V2_AccessAndUseOfBuildings'},Multiple cooling units should be provided with controls that ensure that the combined plant operates in its most efficient modes.,necessity,annotated
1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,selection,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",part-of,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_4,,,"Where the work concerns a building containing more than three cords, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic
05fdde92-d8af-42ad-963b-9019c69a8ab3_7,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same air extract rate as the extension used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic
54907849-c48f-4267-b5f0-fc7e9279da7c,"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",{'ID': '409_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",necessity,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",necessity,annotated
ec419055-6ed3-4dac-9879-748e2d365a26,"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",{'ID': '180_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",selection,annotated
99a53f17-48cb-4012-a47b-700761e0983b_1,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 0.06 m2 of those fan units must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic
18797f16-0b56-41e9-a4e6-d4150db4165d,A new building must be built to a minimum standard of total energy performance.,{'ID': '47_UK_DocM_V2_AccessAndUseOfBuildings'},A new building must be built to a minimum standard of total energy performance.,selection,annotated
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78,"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",{'ID': '83_UK_DocF_V1_Ventilation'},"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",selection,annotated
38020928-c137-486e-88d7-c8feec038c99,A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,{'ID': '189_Finnish_FireSafety'},A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,none,annotated
b5addb77-be99-45a2-8dc0-fdf5d1969a57,Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,{'ID': '194_Finnish_StabilityOfStructures'},Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,selection,annotated
7134933d-17df-4a8c-b72e-1c09177bad1c,The spread of fire in voids of wall-type building elements must be restricted at least by storey.,{'ID': '130_Finnish_FireSafety'},The spread of fire in voids of wall-type building elements must be restricted at least by storey.,part-of,annotated
12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",part-of,annotated
ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",selection,annotated
588857f5-9281-4c32-8d83-c98230d5b934,The use of boards with lapped or tongue and groove edges should be considered.,{'ID': '146_UK_DocL_V1_ConsrvationOfFuelAndPower'},The use of boards with lapped or tongue and groove edges should be considered.,necessity,annotated
a235c68f-ae44-4770-b005-4e9d7b659eb7,All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,{'ID': '35_UK_DocA_Structure'},All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,greater-equal,annotated
02648917-f651-4c45-9449-1623cafd6cdc,Public Health Englands Indoor Air Quality Guidelines for Selected Volatile Organic Compounds (VOCs) in the UK should be used.,{'ID': '118_UK_DocF_V2_Ventilation'},Public Health Englands Indoor Air Quality Guidelines for Selected Volatile Organic Compounds (VOCs) in the UK should be used.,necessity,annotated
a1f91cfd-21f8-49a4-8468-746f49f4848e_11,,,"For a building that contains more than 2.4 metres acoustic environment for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic
29c431ee-ea93-491d-ab13-06418d93c488_1,,,"If air extract rate is greater than 30, manual control is acceptable.",greater,synthetic
2633c957-07b4-4caa-a9d6-5acbac16b0b0_3,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and two design value.,equal,synthetic
bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",part-of,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_10,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the rise of that installation exceeds 25 decibels of the total cost of the major renovation.",greater,synthetic
2f815a08-db3c-48a6-b248-d69aeac870ee_5,,,"the vertical efficiencies is: a. not more than 180kW, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic
956efc87-87de-4d3c-99fb-dc58eab9353b_5,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a fire resistance time requirement of at least 10 litres per second per person.,greater-equal,synthetic
f4557f58-1986-4de0-b0b8-539906b7fbcb,"For rooflights, U-values should be calculated based on a horizontal position.",{'ID': '130_UK_DocM_V2_AccessAndUseOfBuildings'},"For rooflights, U-values should be calculated based on a horizontal position.",part-of,annotated
a1f91cfd-21f8-49a4-8468-746f49f4848e_3,,,"For a building that contains more than 0.15m/s Manual controls for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic
f2bf62e6-9577-48b5-b15d-9fe4904acf52,"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",{'ID': '268_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",selection,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_10,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the supports from these spaces does not exceed 1m3/s of the total air flow in the vertical duct.",less-equal,synthetic
42f29765-356f-4d9c-9a73-bc99e7044e07,"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",{'ID': '47_UK_DocM_V2_AccessAndUseOfBuildings'},"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",selection,annotated
d3654276-d6c6-4f32-af90-2d1040cb536c,Mechanical ventilation with heat recovery systems should be designed to avoid the moist air from the wet rooms recirculating to the habitable rooms.,{'ID': '107_UK_DocF_V1_Ventilation'},Mechanical ventilation with heat recovery systems should be designed to avoid the moist air from the wet rooms recirculating to the habitable rooms.,part-of,annotated
f72a98f3-b7d2-4633-b244-0d7242dfb0c9_4,,,Every single bedroom has a minimum air flow resistance of 20mm and is at least 2.4m wide.,greater-equal,synthetic
7323113d-fcd0-4e19-a24a-c6171ec8c2b7,District heat networks and community heating systems should be designed to accommodate heat meter(s) for each dwelling.,{'ID': '295_UK_DocL_V1_ConsrvationOfFuelAndPower'},District heat networks and community heating systems should be designed to accommodate heat meter(s) for each dwelling.,necessity,annotated
bfdf95da-d422-47cd-83d7-a30a4969f2e6_6,,,"If the internal ties must be centred on the supporting line, the minimum value of the CO2 emission factor, one, will also be applied to internal ties.",greater-equal,synthetic
b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",none,annotated
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_5,,,"Generally, a thermal element once upgraded should not have a design greater than 55 degrees Celsius.",less-equal,synthetic
8805ec9f-3f5f-44fc-9078-3ae62439c973,"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",{'ID': '108_UK_DocL_V1_ConsrvationOfFuelAndPower'},"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",part-of,annotated
eccc60e7-3d76-46c0-a9d9-e398bf3e475a,The part of the dwelling above ground level should be considered separately.,{'ID': '71_UK_DocF_V1_Ventilation'},The part of the dwelling above ground level should be considered separately.,selection,annotated
7e78bb20-5337-45b1-ad14-de356d35a020,Ventilation ductwork should be made and assembled so as to be reasonably airtight.,{'ID': '299_UK_DocM_V2_AccessAndUseOfBuildings'},Ventilation ductwork should be made and assembled so as to be reasonably airtight.,necessity,annotated
4470dde4-6422-4c13-9781-de68c3e075dc_10,,,"The outdoor total cost of a dwelling unit, however, shall be designed to be a minimum of E.",greater-equal,synthetic
43e26628-8b62-4cc6-91e2-284335df1564_9,,,"In rooms used for sleeping or rest, the fire performance may not exceed 2.5 ties/m2.",less-equal,synthetic
5e226793-2805-41b0-bcb6-49319afaefc7,"If the building has a floor area greater than 150m2, heating should be split into different heating zones and each zone should have separate controls for timing and temperature demand.",{'ID': '258_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building has a floor area greater than 150m2, heating should be split into different heating zones and each zone should have separate controls for timing and temperature demand.",none,annotated
c952db0f-b605-4335-8d56-97fc339ad5ba_5,,,All 1100mm construction of the installation and commissioning checklist should be completed.,equal,synthetic
7f696221-52c9-4c52-8f90-74bd93c51299_2,,,This grippable handrail is 850-1000mm above the pitch line of the flight and standards at least 230mm beyond the top and bottom nosings.,greater-equal,synthetic
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c,One bedroom should be close to an accessible bathroom suitable for a wheelchair user.,{'ID': '100_UK_DocM_V1_AccessAndUseOfBuildings'},One bedroom should be close to an accessible bathroom suitable for a wheelchair user.,equal,annotated
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,part-of,annotated
29c431ee-ea93-491d-ab13-06418d93c488,"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",{'ID': '338_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",none,annotated
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_11,,,Storage premises with a headroom exceeding 6m are not permitted within the building.,greater,synthetic
5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,selection,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",selection,annotated
06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",selection,annotated
e32bbb47-c826-40c1-8ea4-8c32353d3fd2_2,,,There shall be 16/01/2023 00:00 of waste water pumping station provided for people in the building.,equal,synthetic
3ca5cb38-b90b-4449-ba14-4268866df8e1_10,,,The water heater is close to the draw-off points and has a water vapour resistance no greater than 8.5m2.,less-equal,synthetic
40b40b1b-d1b1-49d8-b9b7-13c5845a169d_2,,,The structure of the control appliance of the plumbing fixture shall be such that its air distribution does not arise above five.,less-equal,synthetic
f19c920a-bd5a-49ac-a111-69fb944271b4,The net heating energy demand for ventilation shall be calculated on the basis of the heating of air after heat recovery to supply air temperature and any heating before heat recovery.,{'ID': '86_Finnish_EnergyEfficiency'},The net heating energy demand for ventilation shall be calculated on the basis of the heating of air after heat recovery to supply air temperature and any heating before heat recovery.,part-of,annotated
cf35d4a4-3170-421b-9be1-b68d928eed1d,"A roof with a pitch greater than 1:8 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",{'ID': '125_Finnish_SafetyOfUse'},"A roof with a pitch greater than 1:8 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",part-of,annotated
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated
5ca184fa-e100-4f97-957d-e37ae944786f_7,,,The dwelling primary energy rate of installing electric vehicle charge points and cable routes is not more than 850 millimetres of the total capital cost of the major renovation.,less-equal,synthetic
13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",part-of,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd_0,,,"An rails with a potentially flammable or explosive atmosphere must not be located in a motor where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic
c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",none,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",part-of,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_9,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in eight per cent hot water circuit properties, where there should be no fewer than four.",equal,synthetic
511c1a7f-08b9-48ec-aea6-9b749fdf31a1_5,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an EI 30 of appropriately located hot water storage vessel which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic
208b093d-361f-4aec-819d-4abca4e72c68_1,,,"in an evacuation area where the total thickness is 24 metres, the second exit may be no less than 900 millimetres in width.",equal,synthetic
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_5,,,"In a that part with no openable drawings, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic
51284e52-f2f4-41b5-85e2-3fa96ab8602a,"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",{'ID': '132_UK_DocM_V2_AccessAndUseOfBuildings'},"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",part-of,annotated
a86b58e8-046f-44b7-8e1b-00c876c8c647_6,,,"Parapets in air flow resistance A to proportion and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",selection,annotated
e43c1e88-be80-42d9-944e-1bf0f0f82479_0,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for load EER up to 390 millimetres not more than 5m long.,less-equal,synthetic
5e51b653-449e-4d00-be19-0e20ecff5c49_8,,,The default habitable area should be 0.3W/m2.,equal,synthetic
8719164e-370a-42f2-9240-0a1b8db1a2c7,Extensive voids must be partitioned in order to restrict the spread of fire.,{'ID': '129_Finnish_FireSafety'},Extensive voids must be partitioned in order to restrict the spread of fire.,selection,annotated
4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_9,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear rise between landings of 100 millimetres, except in doorways.",equal,synthetic
6c789809-b1b8-429a-8fe2-8ce16f8a4b54_5,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the going does not exceed 230mm.,less-equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",greater,annotated
a1f91cfd-21f8-49a4-8468-746f49f4848e_7,,,"For a building that contains more than two years kitchens for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",part-of,annotated
7e34700e-92de-4b00-a820-f4085a2e186c_10,,,"If the free gap between facing walls of adjacent glazed balconies or the energy efficiency of the wall to the window of an adjacent fire compartment is less than 55, the wall in question must be class EI 15.",less,synthetic
755b768a-b9d0-4175-8b69-398c399aeac7,It should be possible for information about the building to be easily obtained from a reception point or gathered from notice boards and signs.,{'ID': '86_UK_DocM_V2_AccessAndUseOfBuildings'},It should be possible for information about the building to be easily obtained from a reception point or gathered from notice boards and signs.,necessity,annotated
d342429e-d3fc-46e0-a195-527cfef1fd4b_10,,,"When an existing building with a total useful shallow projecting of over 1,000 millimetres is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic
50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,selection,annotated
c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,none,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_6,,,"The thresholds of steps in covered or heated outdoor staircases must be no less than E, and the riser may be no more than 160 millimetres.",greater-equal,synthetic
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_7,,,The energy savings must not exceed the individual dwellings energy performance.,less-equal,synthetic
cc72106e-9e7f-47cf-8a95-0173a8305dad,"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",{'ID': '83_Finnish_Health-Humidity'},"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",none,annotated
37f01a2c-b944-45a2-a7f4-140d8c03d7ac_7,,,"After rebating, frame components should retain at least 50 of heat sources.",greater-equal,synthetic
19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,annotated
c2e0629d-350b-45b8-9e9e-d58be1780f12_2,,,"If the playgrounds has no Beading, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506_6,,,"Gangways should not be less than 1100mm total supply air flow unless used by not more than 50 persons, in which case gangways should be a minimum of 90.",greater-equal,synthetic
419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",necessity,annotated
082c7ed9-3579-48c2-a0d2-076f1edd647c_0,,,"Each of the 0.7 metres service of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic
33d3a432-5793-4102-ba93-da485c334abd,The termination points of cable duct should be sited where access to maintain in future is unrestricted.,{'ID': '113_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The termination points of cable duct should be sited where access to maintain in future is unrestricted.,part-of,annotated
103f99ad-884b-4bae-9f22-ccb1c5bc3d26_0,,,"In an open garage of no more than 20 degrees Celsius lighting, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic
0085ecdd-f2f0-45f5-948d-ded697c69866,"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '55_Finnish_Accessibility'},"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",necessity,annotated
079db365-cfed-474e-9329-25349ac0db4a_8,,,"In connection with the door of an outside space of an individual dwelling the edges outside the door may be more than 6m if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic
451e7c91-d39f-4401-a0e3-5ab455ab0442,"The approach route should be level, gently sloping, or, where necessary, ramped.",{'ID': '15_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be level, gently sloping, or, where necessary, ramped.",necessity,annotated
f0c72b35-5a0a-4554-8713-96f6f73a67f1_3,,,A cube with indoor and outdoor conditions of no more than 0.1m2 may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic
bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated
ef4f54b6-1099-4404-9fa2-d0c0d5e55543_6,,,The Extract must not exceed the individual dwellings anthracite figure.,less-equal,synthetic
e4fb8d18-8dbc-4351-a2df-d87f880f476a_11,,,The limits for balconies is 13l/s that of the load-bearing structures of the storey.,equal,synthetic
2ff58135-b89d-40d1-a145-51aad9e5a942_9,,,"The landing in front of the outside door shall be at least 21 C proportion and at least 1,500 millimetres long.",greater-equal,synthetic
f9de28ac-45bb-4400-9d9f-8afee73bd2e3_2,,,The rise should not exceed 0.7W/(m2K) of dwelling floor area.,less-equal,synthetic
043258d7-d35e-42d9-87c5-b83565c39ad6,"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",{'ID': '133_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",selection,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",selection,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_0,,,Where the window unit is within the private curtilage of the dwelling (but not within a carport or joints) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1_10,,,A minimum of one in two of the remaining Door furniture must have access to cable routes.,equal,synthetic
b2b81097-97a3-41c2-922c-ffec3e2dd8c0,Turning circle should be clear of top step of any adjacent flight of steps.,{'ID': '87_UK_DocM_V1_AccessAndUseOfBuildings'},Turning circle should be clear of top step of any adjacent flight of steps.,necessity,annotated
45338082-ca66-418b-8fe1-8f2be926f330_0,,,A parking garage of no more than 25mm may pass between the stair steps.,less-equal,synthetic
8edf6848-bdc2-4970-8328-5a24d69a2f0d,"Unit length should be measured through midline of the worktop, not the front or rear edge.",{'ID': '94_UK_DocM_V1_AccessAndUseOfBuildings'},"Unit length should be measured through midline of the worktop, not the front or rear edge.",necessity,annotated
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated
6a41a473-bd3c-4e38-a093-094b3fdae388_10,,,At least one in every 01:08:00 remaining malfunction detector must be provided with cable routes.,equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_1,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and travel distance 500 millimetres air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
38cd3221-7fc9-4462-be20-78b16a4309d3_10,,,The class of openings in the newly created dwelling should not be more than 25W/m2 of the total floor area.,less-equal,synthetic
d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,selection,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",part-of,annotated
e9d02df9-2fcb-4acc-bd08-18a4348cd823,"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",{'ID': '46_UK_DocM_V2_AccessAndUseOfBuildings'},"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",necessity,annotated
079db365-cfed-474e-9329-25349ac0db4a_10,,,"In connection with the door of an outside space of an individual dwelling the from the inside face of the wall outside the door may be more than three seconds if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic
aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_10,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 2m barrier.,greater,synthetic
afd03eb1-8356-4755-a764-6869d0ac4171,"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",{'ID': '9_UK_DocM_V1_AccessAndUseOfBuildings'},"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",none,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
c06bb553-d8f1-47f5-ab33-cfdebb6bca52,"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",part-of,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_3,,,Where the free space is within the private curtilage of the dwelling (but not within a carport or hard water areas) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic
cea6e7bd-c494-4146-9f81-3fd2ed64a2a6,The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,{'ID': '119_Finnish_SafetyOfUse'},The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,less-equal,annotated
e32bbb47-c826-40c1-8ea4-8c32353d3fd2,There shall be adequate means of ventilation provided for people in the building.,{'ID': '15_UK_DocF_V1_Ventilation'},There shall be adequate means of ventilation provided for people in the building.,equal,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",part-of,annotated
e21fa967-934e-4a29-a66d-252fdbbf928f_4,,,"If the parasitic energy use is unknown, an constraints of 70 kN should be made for any control system.",equal,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df,"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",{'ID': '356_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,annotated
dcc583b1-8c4c-42cf-a1ed-e8907de56254_7,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the relationship must be no less than 190 kN.",greater-equal,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9_8,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 900mm building emission rate from any projecting corner.",greater-equal,synthetic
082c7ed9-3579-48c2-a0d2-076f1edd647c_11,,,"Each of the 0.7 SEER of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2_0,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 500kW insulating material properties, where there should be no fewer than four.",equal,synthetic
561480d1-56e5-41be-a56d-f2f2222bcb17,"Any damage, such as tears, should be repaired before boarding.",{'ID': '185_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any damage, such as tears, should be repaired before boarding.",selection,annotated
c5c5365f-273f-4c29-8491-4f50aabc3b78,"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",{'ID': '74_UK_DocM_V2_AccessAndUseOfBuildings'},"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",part-of,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_7,,,"The free opening of the vertical hatch or window of an emergency exit must be at least three metres in mechanical ventilation and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
36650de0-ef3c-4fd1-8199-f47c0e576076_4,,,the fire performance of the platform does not exceed A.,less-equal,synthetic
72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",none,annotated
e8340500-38b6-461b-b00d-d3aa44ac1f0b_6,,,The condition of the water available from the hot water system may not exceed 50 m.,less-equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated
78b82c71-b2a9-41ea-a5f9-45bdba64fa7a,The correct operation of each control function should be tested where it is practical.,{'ID': '218_UK_DocF_V1_Ventilation'},The correct operation of each control function should be tested where it is practical.,part-of,annotated
956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",none,annotated
6d190990-05e3-4496-8945-320d5937c7b8,Controls should be provided for ventilators so that the ventilation in each room can be adjusted.,{'ID': '58_UK_DocF_V2_Ventilation'},Controls should be provided for ventilators so that the ventilation in each room can be adjusted.,necessity,annotated
5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",selection,annotated
fdd9f39e-e397-4172-b4da-3d213a30f987,On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,{'ID': '335_UK_DocM_V2_AccessAndUseOfBuildings'},On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,selection,annotated
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_11,,,"For sizes of cylinder not listed, the street areas from the cylinder should not exceed 4, where V is the volume in litres.",less-equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_10,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 300mm in operation, these must be accessible via the interior.",greater,synthetic
e15250c0-1279-4d29-a1ec-31560b045007_5,,,Turning circle of basement storeys must not be connected to fire and smoke-proof seats.,not-part-of,synthetic
51284e52-f2f4-41b5-85e2-3fa96ab8602a,"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",{'ID': '132_UK_DocM_V2_AccessAndUseOfBuildings'},"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",none,annotated
6414854d-01f9-481f-a7f4-c4581e48d8b1_2,,,Special safety features are not necessary if the lead boiler is not more than (16.66 8.33 V0.4)/(1000 24) long.,less-equal,synthetic
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_7,,,"For sizes of cylinder not listed, the roof windows from the cylinder should not exceed 300mm, where V is the volume in litres.",less-equal,synthetic
a387fcb8-ead2-4094-9be9-72d783468b33_6,,,"If the protective part of windows, roof windows, rooflights and doors exceeds 20 points of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic
703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated
ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",necessity,annotated
4e119abd-0cf7-4c60-9c7b-1083f9b46280,"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",{'ID': '85_UK_DocF_V2_Ventilation'},"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",none,annotated
eccd4f77-ef4a-41fd-a22a-620c84fdddd4_6,,,There is a minimum of 55 of worktop to at least inner surfaces of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic
ec1783bd-3e59-42d6-9709-cd0cc7d2c365,The air flow resistance of all components should be considered when specifying ventilation systems.,{'ID': '55_UK_DocF_V1_Ventilation'},The air flow resistance of all components should be considered when specifying ventilation systems.,part-of,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_8,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for presence 0.052083333 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated
8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",none,annotated
8e83d841-dcab-479c-a131-a5ce80cd416d,The fan speed should be set to achieve the desired continuous flow rate.,{'ID': '197_UK_DocF_V1_Ventilation'},The fan speed should be set to achieve the desired continuous flow rate.,necessity,annotated
cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",selection,annotated
c952db0f-b605-4335-8d56-97fc339ad5ba,All three parts of the installation and commissioning checklist should be completed.,{'ID': '262_UK_DocF_V1_Ventilation'},All three parts of the installation and commissioning checklist should be completed.,part-of,annotated
511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",selection,annotated
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,necessity,annotated
9c9a27b6-b4be-4946-854a-c46ee812140c,"In general, accessible bedrooms should be no less advantageously situated than other bedrooms.",{'ID': '142_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, accessible bedrooms should be no less advantageously situated than other bedrooms.",selection,annotated
ad30824c-74be-4f4f-916a-dfe1e0a89205,"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",selection,annotated
339fc78c-a2f2-481c-a410-3aeb41e24b8a_3,,,Solid walls constructed of coursed brickwork or blockwork should be at least as projection as 50 of the storey height.,greater-equal,synthetic
9b908e68-0f92-4883-9fd2-7fe013848b15,"Where a gas combination boiler is used, the boiler type should be selected to modulate down to the typical heating load of the dwelling.",{'ID': '237_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a gas combination boiler is used, the boiler type should be selected to modulate down to the typical heating load of the dwelling.",part-of,annotated
0da52584-1b37-48b5-840f-3795ae695275_5,,,the minimum clear dimensions of the platform are: 1100mm wide and 65 degrees Celsius open outwards where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",none,annotated
8aa4b706-1659-4e30-a4fe-e7f33efe3241_4,,,All certain proportion exhaust outlets of the compliance checklist should be completed.,equal,synthetic
6b2f3ca5-8cea-4616-8679-438446bc6233,"Since doors are potential barriers, their use should be avoided whenever appropriate.",{'ID': '88_UK_DocM_V2_AccessAndUseOfBuildings'},"Since doors are potential barriers, their use should be avoided whenever appropriate.",selection,annotated
e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,necessity,annotated
6075de3c-d339-4ba4-9945-990480975615_11,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 2 leaf of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic
cc72106e-9e7f-47cf-8a95-0173a8305dad_1,,,"In a new building, the crawl space effective rated output must be 0.2 on average at the minimum.",greater-equal,synthetic
d6a2b6b7-57d2-449d-89f5-56d3df4755e2,Any radiator or towel rail should be clear of all access zones.,{'ID': '56_UK_DocM_V1_AccessAndUseOfBuildings'},Any radiator or towel rail should be clear of all access zones.,none,annotated
ef4f54b6-1099-4404-9fa2-d0c0d5e55543_1,,,The long must not exceed the individual dwellings rated output.,less-equal,synthetic
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88,The resilient layer should be to the full height of the door and 600mm either side of the doorset.,{'ID': '15_UK_DocQ_Security_Dwellings'},The resilient layer should be to the full height of the door and 600mm either side of the doorset.,necessity,annotated
5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,part-of,annotated
2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",selection,annotated
75c60084-6878-472d-8694-e8739e0dd76c_9,,,The width of access routes in assembly areas with a sizes of 15 must be at least 900 millimetres.,equal,synthetic
81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",selection,annotated
113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",part-of,annotated
8c4a09c5-1eb2-4a41-86d9-b69c031b4592,Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,{'ID': '384_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,part-of,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated
a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",necessity,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,necessity,annotated
baee716c-b8c2-4500-b4de-63fa11f007b1_3,,,A minimum of one in 16/01/2023 00:00 of the remaining Water pipes must have access to cable routes.,equal,synthetic
f4b0b5b8-ab26-46a2-8028-c279958fa927,"Any justification and strategy should be in line with the approved airtightness testing methodology, CIBSEs TM23.",{'ID': '355_UK_DocM_V2_AccessAndUseOfBuildings'},"Any justification and strategy should be in line with the approved airtightness testing methodology, CIBSEs TM23.",necessity,annotated
45338082-ca66-418b-8fe1-8f2be926f330_4,,,A fire compartments of no more than 160 millimetres may pass between the stair steps.,less-equal,synthetic
1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated
45adb0b6-63ee-4f42-b6a3-8fc396221c67_3,,,The length of the insulation plus any required air gap should be at least to the internal temperature of the rafters.,greater-equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_11,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the value of that installation exceeds 8 per cent (1:12.5) of the total cost of the major renovation.",greater,synthetic
984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",none,annotated
8364a5f1-f80e-484c-9f38-bffc6f4c1876_9,,,"Where communal parking is provided to blocks of flats, at least 0.15 dm3/s per m2 standard access points is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_8,,,Individual flights are: for gradients up to 1:15 not more than 1.2W/(m2K) surface area; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
29232335-402c-4ed9-af74-fd093ac22e28_1,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least either side 3m.,greater-equal,synthetic
3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_5,,,The approach route is a minimum of 900mm wide with a maximum directions of 30m2.,less-equal,synthetic
eccd4f77-ef4a-41fd-a22a-620c84fdddd4_0,,,There is a minimum of one of worktop to at least calculation of primary energy and CO2 emissions of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic
8d11b1a7-732a-4153-9564-3f35cc111cb6,A dwelling that is only a basement should be treated as a single-storey dwelling above ground level.,{'ID': '74_UK_DocF_V1_Ventilation'},A dwelling that is only a basement should be treated as a single-storey dwelling above ground level.,selection,annotated
38cd3221-7fc9-4462-be20-78b16a4309d3_9,,,The entrance level of openings in the newly created dwelling should not be more than 15mm of the total floor area.,less-equal,synthetic
6b2f3ca5-8cea-4616-8679-438446bc6233,"Since doors are potential barriers, their use should be avoided whenever appropriate.",{'ID': '88_UK_DocM_V2_AccessAndUseOfBuildings'},"Since doors are potential barriers, their use should be avoided whenever appropriate.",none,annotated
5fa7daca-cb50-4397-a736-617e52d30187_1,,,"If efficiencies at below 30% are required and unavailable, the constraints may be taken as equal to that at 600kg/m3.",equal,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e_7,,,"The facade area of the indoor steps of dwelling units and living quarters may be no more than 100, and the tread must be no less than 250 millimetres.",less-equal,synthetic
6bf41e87-d7c1-42a5-bf0d-67c711a21753,"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",{'ID': '105_UK_DocM_V2_AccessAndUseOfBuildings'},"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",necessity,annotated
31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",part-of,annotated
2c725d50-13d5-4e77-bacf-9f174530e27c,The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,{'ID': '17_UK_DocM_V2_AccessAndUseOfBuildings'},The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,none,annotated
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_5,,,"There should be a motor, in the absence of tobacco smoke or other excessive pollutants, of 600 x 600 millimetres.",equal,synthetic
ff3e8f86-1542-4f54-a776-cfdc8482bad7_0,,,The air flow resistance of an air conditioner working in cooling mode should be a minimum of 0.15 dm3/s per m2.,greater-equal,synthetic
759d26ff-821f-4949-9096-a7e15c5580f6,Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,{'ID': '137_UK_DocL_V1_ConsrvationOfFuelAndPower'},Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,necessity,annotated
8fcdc238-3c30-4659-9303-1b126a39b2cd_8,,,The design solar load should be from outside to inside the dwelling by at least 800 millimetres.,greater-equal,synthetic
e32bbb47-c826-40c1-8ea4-8c32353d3fd2_3,,,There shall be 6m of ties provided for people in the building.,equal,synthetic
f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c,A building with a height exceeding 9 metres must be equipped with anchoring structures for safety lines.,{'ID': '127_Finnish_SafetyOfUse'},A building with a height exceeding 9 metres must be equipped with anchoring structures for safety lines.,greater,annotated
8421f806-70f2-46a9-a308-90a40da3541d_6,,,"Where the internal temperature of the approach, whether over its whole length or in part, is 1 in 40 or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic
ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",selection,annotated
993e54cc-49c3-43cb-995e-1a951c93c775_5,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an Manual control equal to 20 points.",equal,synthetic
5925ca4d-801c-42e4-b581-a176dea2519f,"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",{'ID': '76_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",part-of,annotated
81314489-dcd9-410f-9b15-595b87e7c8f9_3,,,"The resilient layer should be timber sheathing at least 25 decibels heat, expanded metal or a similar resilient material.",greater-equal,synthetic
c9983da5-23f1-4211-88ce-68e4753e4ab9,"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",{'ID': '102_UK_DocM_V2_AccessAndUseOfBuildings'},"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",none,annotated
f0c72b35-5a0a-4554-8713-96f6f73a67f1_4,,,A cube with size of no more than 30% load may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic
2695c899-0ada-478c-9b2d-796f79ea4c52,"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",{'ID': '92_UK_DocK_ProtectionFromFalling'},"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",necessity,annotated
a235c68f-ae44-4770-b005-4e9d7b659eb7_1,,,All cavity walls should have leaves at least 90mm thick and cavities at least three metres Signs.,greater-equal,synthetic
759d26ff-821f-4949-9096-a7e15c5580f6,Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,{'ID': '137_UK_DocL_V1_ConsrvationOfFuelAndPower'},Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,necessity,annotated
7602a501-a5b5-429c-99e1-8bc801243494,"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",{'ID': '111_Finnish_Health-Humidity'},"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",necessity,annotated
d988e207-c3f9-4314-9a16-f99b334595f4_4,,,The Activation must be no less than 0.15 dm3/s per m2.,greater-equal,synthetic
5fa7daca-cb50-4397-a736-617e52d30187_7,,,"If span at below 30% are required and unavailable, the planned time of use may be taken as equal to that at 30% load.",equal,synthetic
46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",none,annotated
c47598f9-df79-4d77-aba9-8f380342372f_8,,,extract air of floor area 18 dm3/s shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic
3121fe90-27db-405e-a42a-df3cd22ee176_6,,,"Where necessary, 0.7design solution, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic
f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",selection,annotated
b5addb77-be99-45a2-8dc0-fdf5d1969a57,Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,{'ID': '194_Finnish_StabilityOfStructures'},Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,selection,annotated
113b8bf8-1856-45f5-a54b-d65ef100b437_11,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 44mm of the following sections, appropriate to the system, should be installed.",greater-equal,synthetic
51517a5d-dd11-41b9-b44b-36d87b959127,The presence of the door should be apparent not only when it is shut but also when it is open.,{'ID': '77_UK_DocM_V2_AccessAndUseOfBuildings'},The presence of the door should be apparent not only when it is shut but also when it is open.,selection,annotated
77b0edab-012f-4047-a2db-fe6303993780,"Ventilation systems that, under normal operation, recirculate air between more than one space, room or zone should also be able to operate in a mode that reduces the risk of the transmission of airborne infection.",{'ID': '60_UK_DocF_V2_Ventilation'},"Ventilation systems that, under normal operation, recirculate air between more than one space, room or zone should also be able to operate in a mode that reduces the risk of the transmission of airborne infection.",necessity,annotated
9415ae4b-7a74-4c70-a245-e4381c6d71bf_10,,,"At gables and party walls, insulation should extend to the wall; if the Windows, skylights and ventilators between the wall and joist is less than 0.7 metres, perimeter insulation may be required.",less,synthetic
19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",necessity,annotated
45338082-ca66-418b-8fe1-8f2be926f330,A cube of no more than 100 millimetres may pass between the stair steps.,{'ID': '52_Finnish_SafetyOfUse'},A cube of no more than 100 millimetres may pass between the stair steps.,less-equal,annotated
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",necessity,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",necessity,annotated
a387fcb8-ead2-4094-9be9-72d783468b33_5,,,"If the exit of windows, roof windows, rooflights and doors exceeds 8.5m2 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic
12e545d1-64f4-45c9-a520-5b8a003eba0a_5,,,"If the dwelling has more than 20mm exposed gas combination boiler, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic
39a37d5e-3361-43b9-a209-e5cd45918abc,"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",{'ID': '95_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",part-of,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_10,,,"If the air flows of location 150m2 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
0aaf71f0-a482-4a72-a407-0d6db79c7f6f_3,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 900mm of non-fire-compartmented Linear interpolation that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic
4d80c4d1-08ee-481a-9f9c-e9151ce1094d_2,,,"The vertical spacing of windows, roof windows, rooflights and doors should not exceed 400kg of the total floor area of the dwelling.",less-equal,synthetic
08075a86-82be-487e-915b-2c8423f95cb8,The equivalent area of the opening should meet or exceed the free area of the opening.,{'ID': '39_UK_DocO_Overheating'},The equivalent area of the opening should meet or exceed the free area of the opening.,necessity,annotated
0ea1e862-2434-4fc8-97a2-b076c992ef20_6,,,"The width of an exit must be at least 1,200 millimetres and its free energy consumption must be at least 1.",greater-equal,synthetic
baee716c-b8c2-4500-b4de-63fa11f007b1_10,,,"A minimum of 1,000 millimetres in five of the remaining air-leakage gaps must have access to cable routes.",greater-equal,synthetic
26980508-105c-49db-8595-bf001a48d757_0,,,"In Roofs with no fixed seats or Insulating materials, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
e21fa967-934e-4a29-a66d-252fdbbf928f_8,,,"If the parasitic energy use is unknown, an performance standards of 4 should be made for any control system.",equal,synthetic
a235c68f-ae44-4770-b005-4e9d7b659eb7_3,,,All cavity walls should have leaves at least 10m Unit length and cavities at least 50mm wide.,greater-equal,synthetic
e15250c0-1279-4d29-a1ec-31560b045007,Extinguishing routes of basement storeys must not be connected to fire and smoke-proof exits.,{'ID': '244_Finnish_FireSafety'},Extinguishing routes of basement storeys must not be connected to fire and smoke-proof exits.,not-part-of,annotated
29c431ee-ea93-491d-ab13-06418d93c488,"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",{'ID': '338_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",selection,annotated
f2e57c55-e340-4fa2-87c5-03f4bf8e5942,"Where the dwelling is defined as wheelchair adaptable, it should be easy to install a lift.",{'ID': '82_UK_DocM_V1_AccessAndUseOfBuildings'},"Where the dwelling is defined as wheelchair adaptable, it should be easy to install a lift.",necessity,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_10,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom justification, where there should be no fewer than 50 millimetres.",greater-equal,synthetic
51517a5d-dd11-41b9-b44b-36d87b959127,The presence of the door should be apparent not only when it is shut but also when it is open.,{'ID': '77_UK_DocM_V2_AccessAndUseOfBuildings'},The presence of the door should be apparent not only when it is shut but also when it is open.,selection,annotated
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_8,,,"Generally, a thermal element once upgraded should not have a ending greater than 20 degrees Celsius.",less-equal,synthetic
8421f806-70f2-46a9-a308-90a40da3541d,"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",{'ID': '41_UK_DocM_V2_AccessAndUseOfBuildings'},"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",greater-equal,annotated
01008f69-874b-443e-bcb2-2f5630280049_9,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the dimension may be no more than ten millimetres and the tread must be no less than 220 millimetres.",less-equal,synthetic
082c7ed9-3579-48c2-a0d2-076f1edd647c,"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",{'ID': '112_UK_DocO_Overheating'},"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",necessity,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_3,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the Geo-location may be no more than 120.",less-equal,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_5,,,"The building primary energy rate and type and quality calculated using the measured air permeability must not be higher than the target primary energy rate and quality of the installation, respectively.",less-equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_0,,,"If the design between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 15, the wall in question must be class EI 15.",less,synthetic
45338082-ca66-418b-8fe1-8f2be926f330_2,,,A they of no more than 24 degrees Celsius may pass between the stair steps.,less-equal,synthetic
3f7b1106-06a0-4c3f-a01d-e275421775ac,That background ventilators allow fresh air into the home and should be left open.,{'ID': '228_UK_DocF_V1_Ventilation'},That background ventilators allow fresh air into the home and should be left open.,selection,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_11,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 180kW exhaust outlets properties, where there should be no fewer than four.",equal,synthetic
66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_10,,,"In a barrier with no openable driveways, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506_5,,,"Gangways should not be less than 200 lux projection unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,synthetic
33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",necessity,annotated
ef561e39-db90-462c-8dde-15fbeae954e5,A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,{'ID': '50_Finnish_SafetyOfUse'},A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,part-of,annotated
46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",part-of,annotated
759d26ff-821f-4949-9096-a7e15c5580f6,Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,{'ID': '137_UK_DocL_V1_ConsrvationOfFuelAndPower'},Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,part-of,annotated
835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",selection,annotated
fc129e2c-abfa-48be-9fd6-e85f077ae67b,"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",none,annotated
563cd5fb-adc9-4bde-8b34-4accc93ac84b,"Systems should not be significantly oversized in most circumstances, the cooling appliance should not be sized for more than 120 of the design cooling load.",{'ID': '331_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Systems should not be significantly oversized in most circumstances, the cooling appliance should not be sized for more than 120 of the design cooling load.",necessity,annotated
e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_5,,,9mm floor should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic
46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",necessity,annotated
19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",none,annotated
536b172d-ccd1-479a-8136-6ee05db0f264_4,,,"Where pipework is above ground, the performance of the pipe Beading should be at least as high as the pressures of pipework in the buried part of the system.",greater-equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c_6,,,The width of access routes in assembly areas with a horizontal spacing of 180kW must be at least 900 millimetres.,equal,synthetic
dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",none,annotated
7f3f59a4-fc7e-4b14-8074-384f6cacf548_10,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the number of persons is less than 900mm.",less,synthetic
d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,none,annotated
244aeb26-ba33-498c-8a28-989b5aa879a8,The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,{'ID': '129_Finnish_Health-WaterAndSewerage'},The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,necessity,annotated
082c7ed9-3579-48c2-a0d2-076f1edd647c_10,,,"Each of the 0.05 total capital cost of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic
7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",necessity,annotated
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,none,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",part-of,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8_5,,,"The illuminance of steps in covered or heated outdoor staircases must be no less than 30% load, and the riser may be no more than 160 millimetres.",greater-equal,synthetic
d54852df-8e3c-4e99-8484-31c403b78558,"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",{'ID': '256_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",none,annotated
977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",selection,annotated
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_7,,,An upstand built on site should not exceed a gradient of 0.15.,less-equal,synthetic
7d552257-2212-4139-8d13-b982e0e7744f,"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",{'ID': '143_UK_DocM_V2_AccessAndUseOfBuildings'},"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",selection,annotated
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4,"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",{'ID': '125_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",less-equal,annotated
922bf8df-3a70-4f45-8c04-200b638d3b3c,The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,{'ID': '59_Finnish_Health-WaterAndSewerage'},The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,none,annotated
1fc9255c-929e-4052-aaec-e3ffede5a62e,"For large or complex projects, a commissioning manager should be appointed.",{'ID': '374_UK_DocM_V2_AccessAndUseOfBuildings'},"For large or complex projects, a commissioning manager should be appointed.",necessity,annotated
389c960b-525d-4f2e-9a2c-1805eb2dc20d_3,,,The full free gap under a stair that forms part of the storage provision should be counted as 60.,equal,synthetic
0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_11,,,The sizes of the extension does not exceed 65mm.,less-equal,synthetic
2ef73ac0-d424-4e28-9782-3dbaf6e0a046,Attics and uppermost floor voids shall be divided into 400 m2 parts.,{'ID': '107_Finnish_FireSafety'},Attics and uppermost floor voids shall be divided into 400 m2 parts.,necessity,annotated
84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",part-of,annotated
bfdf95da-d422-47cd-83d7-a30a4969f2e6_11,,,"If the internal ties must be centred on the supporting line, the minimum value of the axle group load, 1m2, will also be applied to internal ties.",greater-equal,synthetic
6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_0,,,"If parking spaces are provided for a building, an adequate number of door or gate, but at least 70 kN, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic
536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",part-of,annotated
fb1da22f-8ddb-4399-b441-64dca68da9af_7,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 1,200 MJ/m2 one side.",greater-equal,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",{'ID': '22_Finnish_SafetyOfUse'},"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",greater-equal,annotated
3121fe90-27db-405e-a42a-df3cd22ee176_8,,,"Where necessary, 15mmmuntins, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_8,,,Modular and portable buildings with a planned room temperature of more than 0.055555556 but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic
"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_8",,,"However, if the axle group load is no more than 65 degrees Celsius, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic
f6add908-4d45-4b3e-83a6-369f6c36c037_5,,,"Door rails, stiles and muntins should be at least 25 decibels edges.",greater-equal,synthetic
20518e80-6f7e-457f-8c5a-59fa4c0eb324_2,,,"When calculating the heat loss for a buildings design solution, the surface area shall be used as the value of the domestic hot water circulation heat loss for the building envelope.",equal,synthetic
b5addb77-be99-45a2-8dc0-fdf5d1969a57,Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,{'ID': '194_Finnish_StabilityOfStructures'},Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,necessity,annotated
eefe1191-2903-4fb8-9138-6471e09fb67d_1,,,The U-value exceeds 50 at 11pm.,greater,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_1,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major secure doorset, there is no cavity to install either electric vehicle charge points or cable routes.",not-part-of,synthetic
9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_6,,,"If the energy efficiency of a mechanical ventilation systems air duct is designed to be greater than 60, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic
9fd15b82-fc32-4364-8724-f1ef14f0c047_11,,,The cooker hood should habitable area at least the exposure coefficient of the cooker.,greater-equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c_11,,,"The width of access routes in assembly areas with a thresholds of 1,500 millimetres must be at least 900 millimetres.",equal,synthetic
8421f806-70f2-46a9-a308-90a40da3541d_1,,,"Where the air leakage rate figure of the approach, whether over its whole length or in part, is E 15 or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic
11f2902d-29c2-474e-97d0-628a2a97a666_11,,,"maximum capacity of over 50 m must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic
10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,part-of,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_0,,,"The wall ties should have a horizontal spacing of 900mm and a glare and reflections of 0.35W/(m2K), or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated
8b7e8e7e-81dd-4a76-bdd3-8269ac00f74b,The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,{'ID': '24_UK_DocM_V1_AccessAndUseOfBuildings'},The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,part-of,annotated
d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",selection,annotated
079db365-cfed-474e-9329-25349ac0db4a_3,,,"In connection with the door of an outside space of an individual dwelling the total flow rate outside the door may be more than adequate means if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic
e7be7432-5505-47ad-b586-2a2e3f5a1a37,"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '203_UK_DocF_V1_Ventilation'},"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",none,annotated
e4fb8d18-8dbc-4351-a2df-d87f880f476a_7,,,The net absorber area for balconies is 8.5m2 that of the load-bearing structures of the storey.,equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_4,,,Individual flights are: for Extract up to 8.5m2 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
cf35d4a4-3170-421b-9be1-b68d928eed1d,"A roof with a pitch greater than 1:8 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",{'ID': '125_Finnish_SafetyOfUse'},"A roof with a pitch greater than 1:8 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,annotated
511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",none,annotated
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_6,,,"For sizes of cylinder not listed, the dwelling unit from the cylinder should not exceed 0.7, where V is the volume in litres.",less-equal,synthetic
fc8ee55c-408d-48a9-ae4c-a6961b5745ce,Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,selection,annotated
113b8bf8-1856-45f5-a54b-d65ef100b437_5,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least twice the rise plus the going (2R G) of the following cold side, appropriate to the system, should be installed.",greater-equal,synthetic
7f3f59a4-fc7e-4b14-8074-384f6cacf548_3,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the distance is less than 200 lux.",less,synthetic
77f993c6-dff1-4f9a-8f66-73221d3cbaff_3,,,"If the dwelling only has 2.2 metres electricity generation systems, a minimum ventilation rate of 13l/s should be used.",equal,synthetic
11f2902d-29c2-474e-97d0-628a2a97a666_1,,,"high of over 100 must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic
a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated
c5c5365f-273f-4c29-8491-4f50aabc3b78,"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",{'ID': '74_UK_DocM_V2_AccessAndUseOfBuildings'},"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",necessity,annotated
973c9430-2b4a-4ab4-82df-7060c3002f77_11,,,The axle group load for the community heating primary circuit should be a minimum of two persons per square metre.,greater-equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_2,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the fittings of that installation exceeds 400 millimetres of the total cost of the major renovation.",greater,synthetic
244aeb26-ba33-498c-8a28-989b5aa879a8,The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,{'ID': '129_Finnish_Health-WaterAndSewerage'},The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,none,annotated
3121fe90-27db-405e-a42a-df3cd22ee176,"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",{'ID': '55_Finnish_SafetyOfUse'},"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,annotated
fc8ee55c-408d-48a9-ae4c-a6961b5745ce,Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,necessity,annotated
959b4ba1-2cf2-4ae9-84d4-055e9c0040f1,The inaccuracies of the crane wheels should be determined together with the crane supplier.,{'ID': '229_Finnish_StabilityOfStructures'},The inaccuracies of the crane wheels should be determined together with the crane supplier.,part-of,annotated
f420ae57-5656-4558-b1a3-1079e46bf6cc_1,,,"In the case of the storey-level door of a dwelling, or if the power input from controls through the door exceeds two , doors must open in the direction of the exit.",greater,synthetic
0da52584-1b37-48b5-840f-3795ae695275_6,,,"the minimum clear dimensions of the platform are: 1100mm wide and 1,200 millimetres speed where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.",equal,synthetic
710ef992-e187-4b1a-894b-e0e222f54359_10,,,"NOTE: For grid-supplied electricity, a feasibility of installing high-efficiency alternative systems of 16/01/2023 00:00 and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_5,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for surface 1 and 30m2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
bfdf95da-d422-47cd-83d7-a30a4969f2e6_3,,,"If the internal ties must be centred on the supporting line, the minimum value of the mechanical ventilation, 1800mm, will also be applied to internal ties.",greater-equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_10,,,Individual flights are: for gradients up to 1:15 not more than 2 metres primary energy factor; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
8fec1c4a-527e-49b6-9267-89ff700a9291,"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",{'ID': '182_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",necessity,annotated
244aeb26-ba33-498c-8a28-989b5aa879a8,The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,{'ID': '129_Finnish_Health-WaterAndSewerage'},The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,necessity,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_1,,,"The dwelling primary energy rate, dwelling emission rate and fire resistance time, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and internal temperature, respectively.",less-equal,synthetic
20216261-f56d-4f79-8a46-c781abe19f04,"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",{'ID': '98_UK_DocF_V2_Ventilation'},"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",necessity,annotated
3ca5cb38-b90b-4449-ba14-4268866df8e1,The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,{'ID': '463_UK_DocM_V2_AccessAndUseOfBuildings'},The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,less-equal,annotated
efe27c3d-80a8-4999-9310-77160105fe37,"Instead, the building primary energy rate and building emission rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"Instead, the building primary energy rate and building emission rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",necessity,annotated
28c47652-47a0-4fa4-8343-beee0af2691c,"Large roof surfaces must be divided into parts of no more than 2,400 square metres.",{'ID': '181_Finnish_FireSafety'},"Large roof surfaces must be divided into parts of no more than 2,400 square metres.",selection,annotated
6a41a473-bd3c-4e38-a093-094b3fdae388,At least one in every five remaining parking spaces must be provided with cable routes.,{'ID': '68_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},At least one in every five remaining parking spaces must be provided with cable routes.,necessity,annotated
a235c68f-ae44-4770-b005-4e9d7b659eb7_9,,,All cavity walls should have leaves at least 90mm thick and cavities at least 20 millimetres ventilation rate.,greater-equal,synthetic
e8340500-38b6-461b-b00d-d3aa44ac1f0b,The temperature of the water available from the hot water system may not exceed 65 degrees Celsius.,{'ID': '62_Finnish_Health-WaterAndSewerage'},The temperature of the water available from the hot water system may not exceed 65 degrees Celsius.,less-equal,annotated
01d924bf-4a69-4eb8-b05e-ce993aee3d45,Perimeter insulation should be continuous and have a minimum thickness of 25mm.,{'ID': '135_UK_DocL_V1_ConsrvationOfFuelAndPower'},Perimeter insulation should be continuous and have a minimum thickness of 25mm.,part-of,annotated
451e7c91-d39f-4401-a0e3-5ab455ab0442,"The approach route should be level, gently sloping, or, where necessary, ramped.",{'ID': '15_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be level, gently sloping, or, where necessary, ramped.",necessity,annotated
f6ea9be6-644d-4dc6-8954-d115bdd528c8,"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",necessity,annotated
4fc3b5b1-a838-4429-b385-d8e80e6633eb_6,,,"In the absence of relevant harmonised European Standards, products with a cold side exceeding 270 millimetres must have a product certificate issued by a Notified Body.",greater,synthetic
588857f5-9281-4c32-8d83-c98230d5b934,The use of boards with lapped or tongue and groove edges should be considered.,{'ID': '146_UK_DocL_V1_ConsrvationOfFuelAndPower'},The use of boards with lapped or tongue and groove edges should be considered.,none,annotated
203faa23-7b71-47c9-a6e5-2333ac45389e_11,,,"The air flow rates of the indoor steps of dwelling units and living quarters may be no more than 0.05, and the tread must be no less than 250 millimetres.",less-equal,synthetic
f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_11,,,No individual flight has a pitch of more than 5m.,less-equal,synthetic
3931f0fa-433e-4fb8-96bf-a747f3622ee0,"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",{'ID': '97_UK_DocM_V2_AccessAndUseOfBuildings'},"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",none,annotated
7d552257-2212-4139-8d13-b982e0e7744f,"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",{'ID': '143_UK_DocM_V2_AccessAndUseOfBuildings'},"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",none,annotated
043258d7-d35e-42d9-87c5-b83565c39ad6,"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",{'ID': '133_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",necessity,annotated
0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated
5b4380ba-0066-4735-a362-316d4c8e70b2_0,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10m exit enclosure after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic
fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",part-of,annotated
956efc87-87de-4d3c-99fb-dc58eab9353b_0,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a level differences of at least 30% load.,greater-equal,synthetic
0f67dad7-6df9-444b-8e72-f447668e3fde,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",{'ID': '104_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",part-of,annotated
9027959e-efc1-4d32-acbe-e0775d40f001_1,,,"The morticed bolts should have a minimum Capacities of 65mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9_2,,,"Door entry controls, where provided, are mounted one per 100m2 ending finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_10,,,Modular and portable buildings with a planned ventilation rate of more than 0.06 m2 but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic
eeb4239f-3819-475c-ad20-756bed80c4ff_11,,,"In reference heat loss calculations, the value used as the power requirements of the buildings ventilation system shall be 300 millimetres.",equal,synthetic
12e545d1-64f4-45c9-a520-5b8a003eba0a_1,,,"If the dwelling has more than 160 millimetres exposed floor-to-wall junctions, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic
3ca5cb38-b90b-4449-ba14-4268866df8e1,The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,{'ID': '463_UK_DocM_V2_AccessAndUseOfBuildings'},The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,necessity,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_1,,,"In buildings more than 9 metres and at most 0.9 metres in from the inside face of the wall, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic
6bf41e87-d7c1-42a5-bf0d-67c711a21753,"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",{'ID': '105_UK_DocM_V2_AccessAndUseOfBuildings'},"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",selection,annotated
8364a5f1-f80e-484c-9f38-bffc6f4c1876_5,,,"Where communal parking is provided to blocks of flats, at least proportion standard water is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic
656aa2fa-18cb-41ee-ae28-28deb3dffcc3,The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,{'ID': '61_Finnish_Health-WaterAndSewerage'},The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,necessity,annotated
636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_1,,,"Where a new building contains more than 0.7W/(m2K) ticket dispensing machines, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic
5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_4,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the total minimum width of that installation exceeds EI 30 of the total cost of the major renovation.",greater,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3_9,,,"If the air flows of equivalent area 100 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
0262f6e5-21bc-4312-9388-8ac93b79416d_11,,,"The minimum full dwelling primary energy rate of the absorption chillers should be no worse than 1,000 millimetres.",greater-equal,synthetic
6414854d-01f9-481f-a7f4-c4581e48d8b1_9,,,Special safety features are not necessary if the facility is not more than 800 millimetres long.,less-equal,synthetic
38cd3221-7fc9-4462-be20-78b16a4309d3_7,,,The location of openings in the newly created dwelling should not be more than ten millimetres of the total floor area.,less-equal,synthetic
825053cb-af5d-43a9-b59b-e2a5ae78ea73_5,,,The shallow projecting of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the pressures of associated parking spaces.,greater,synthetic
164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",necessity,annotated
c952db0f-b605-4335-8d56-97fc339ad5ba_6,,,All 200 millimetres day-care institutions of the installation and commissioning checklist should be completed.,equal,synthetic
05864826-21ef-4ae7-9af8-2aaeffc7267a_11,,,Modular and portable buildings with a planned service life of more than two years but with an total capital cost in a single location of less than 13l/s should be shown to comply with the energy efficiency requirements.,less,synthetic
a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",selection,annotated
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",part-of,annotated
eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,selection,annotated
3e9fc57e-bc69-4f17-a056-dd7767afa9bb_2,,,"If the surface area of the building does not exceed two years, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic
dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",part-of,annotated
05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",necessity,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated
d8066a73-49c2-4e99-825a-b49b9b2ba67d_7,,,A landing measuring at least 1m2 in atmosphere must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic
2a256a9c-0b8a-4acf-87e1-86a5857f36a3_9,,,"Where a driveway forms all, or part of, the approach route, an behind surfaces exposed to running water, repetitious splash water or water condensation of at least 100 wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic
29ad081e-90f4-4eb0-9cea-a4f49beea768,Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,{'ID': '298_UK_DocM_V2_AccessAndUseOfBuildings'},Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,none,annotated
9027959e-efc1-4d32-acbe-e0775d40f001,"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",{'ID': '38_UK_DocQ_Security_Dwellings'},"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",part-of,annotated
d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,selection,annotated
371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",none,annotated
cb2f2c09-8ae6-42a4-ac21-861c912c30f9_0,,,"In buildings more than 9 metres and at most 190 kN in anthracite figure, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic
33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated
4e1bda84-398f-4bae-a335-2c7f24501b09,The water heater is situated centrally with a distribution system to supply water to the drawoff points and has a capacity greater than 300 litres.,{'ID': '456_UK_DocM_V2_AccessAndUseOfBuildings'},The water heater is situated centrally with a distribution system to supply water to the drawoff points and has a capacity greater than 300 litres.,part-of,annotated
67657794-a272-4ab2-9b19-df29e9d24844,Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,{'ID': '160_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,part-of,annotated
fb5d3054-4911-4049-ba09-1c3e80f9c07c_9,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the boiler type may be no more than 1.501kWhPE/kWh.",less-equal,synthetic
c952db0f-b605-4335-8d56-97fc339ad5ba_3,,,All 0.9 metres Humus soil of the installation and commissioning checklist should be completed.,equal,synthetic
a1f91cfd-21f8-49a4-8468-746f49f4848e_9,,,"For a building that contains more than 9 metres emergency repairs for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_7,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or materials above 2m may be discounted when measuring clear width.,greater,synthetic
984c252b-74f4-4d85-9080-1c8ae1851eca_4,,,"If performance requires thicker glass to be used, an equivalent window unit with product certificate (01:08:00) glazing should be shown to meet the required standard.",equal,synthetic
d988e207-c3f9-4314-9a16-f99b334595f4_6,,,"The one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise must be no less than 25mm.",greater-equal,synthetic
f3c5d35c-ad38-46d6-8a75-1a331555b89e,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,{'ID': '206_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,necessity,annotated
0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated
7f696221-52c9-4c52-8f90-74bd93c51299_8,,,This grippable handrail is 850-1000mm above the pitch line of the flight and Capacities at least 250 millimetres beyond the top and bottom nosings.,greater-equal,synthetic
06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",necessity,annotated
f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",selection,annotated
df09194e-2fe6-4007-b6c1-1a7383f1baba,"Generally, gradients within the approach should be as gentle as possible.",{'ID': '40_UK_DocM_V2_AccessAndUseOfBuildings'},"Generally, gradients within the approach should be as gentle as possible.",necessity,annotated
2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d,An upstand built on site should not exceed a U-value of 0.35W/(m2K).,{'ID': '115_UK_DocL_V1_ConsrvationOfFuelAndPower'},An upstand built on site should not exceed a U-value of 0.35W/(m2K).,less-equal,annotated
8151be81-09ad-4dac-b2d2-f0d757915b6c_11,,,"However, when the snow load can occur, the air flow of the load s should be at least E.",greater-equal,synthetic
f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",selection,annotated
aec934d9-6175-4624-9e8d-1ee6f71fb49d,Sufficient information about the overheating mitigation strategy and its maintenance requirements must be given to owners so that it can be used effectively.,{'ID': '92_UK_DocO_Overheating'},Sufficient information about the overheating mitigation strategy and its maintenance requirements must be given to owners so that it can be used effectively.,selection,annotated
0da52584-1b37-48b5-840f-3795ae695275_3,,,the minimum clear dimensions of the platform are: 1100mm wide and 0.3 average carbon monoxide concentration where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
5577528f-8fa0-4ca3-96f6-ea418091cb86_5,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 55 in heat exchanger area is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic
8aa4b706-1659-4e30-a4fe-e7f33efe3241_11,,,All 25 decibels notice of the compliance checklist should be completed.,equal,synthetic
5ed671ca-0cd0-47e2-ad68-1d910e5ddbdf,The access route in the seating area or standing auditorium must be directly accessible from the end of each row.,{'ID': '114_Finnish_SafetyOfUse'},The access route in the seating area or standing auditorium must be directly accessible from the end of each row.,necessity,annotated
86831830-e7f0-4b90-aa27-dc0542b7ba4d_4,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 190 kN construction.",greater-equal,synthetic
ffbc85cb-4301-4bcb-9a56-7487c95cf16d,Only the proportion of openings which can be opened with a very low risk of occupants falling from height should be considered to form part of the overheating mitigation strategy.,{'ID': '83_UK_DocO_Overheating'},Only the proportion of openings which can be opened with a very low risk of occupants falling from height should be considered to form part of the overheating mitigation strategy.,necessity,annotated
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_7,,,"In spaces intended for more than 60 persons, the level differences of the access route must be at least one per 100m2.",greater-equal,synthetic
ef561e39-db90-462c-8dde-15fbeae954e5_0,,,A cube with intermediate landing of no more than 1 may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic
3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_8,,,These fittings should not exceed a stairs of 2.0 m3/(h m2).,less-equal,synthetic
3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",selection,annotated
164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",selection,annotated
c5c5365f-273f-4c29-8491-4f50aabc3b78,"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",{'ID': '74_UK_DocM_V2_AccessAndUseOfBuildings'},"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",none,annotated
caa5332f-5180-4d07-a41f-e6e0e044a8c1,An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,{'ID': '287_UK_DocL_V1_ConsrvationOfFuelAndPower'},An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,selection,annotated
c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",none,annotated
78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",necessity,annotated
5577528f-8fa0-4ca3-96f6-ea418091cb86_4,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than half a metre in heat is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic
8fec1c4a-527e-49b6-9267-89ff700a9291,"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",{'ID': '182_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",none,annotated
0a53e4af-84a7-46aa-b28a-cb1d873c8cae,"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",{'ID': '151_UK_DocM_V2_AccessAndUseOfBuildings'},"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",selection,annotated
4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",none,annotated
419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",none,annotated
72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",selection,annotated
74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",selection,annotated
f420ae57-5656-4558-b1a3-1079e46bf6cc_2,,,"In the case of the storey-level door of a dwelling, or if the intended purpose through the door exceeds 35 mg/m3 (30 ppm), doors must open in the direction of the exit.",greater,synthetic
a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",none,annotated
203faa23-7b71-47c9-a6e5-2333ac45389e,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",{'ID': '22_Finnish_SafetyOfUse'},"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",none,annotated
0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",selection,annotated
793cb939-b3d9-46eb-ae65-71a4d5c8031b_10,,,Where the restaurant is within the private curtilage of the dwelling (but not within a carport or Structures) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",part-of,annotated
2238d6ef-421b-4f84-b24d-d46c6ba2afc5,"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",{'ID': '92_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",selection,annotated
46f5be2a-1514-420b-bc39-331fc6e0d2df_6,,,"The dwelling primary energy rate, dwelling emission rate and layers, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target primary energy rate, respectively.",less-equal,synthetic
d988e207-c3f9-4314-9a16-f99b334595f4_7,,,The maximum number of occupants must be no less than 200 m2.,greater-equal,synthetic
10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",none,annotated
328fb8e7-cae4-4465-b7a7-24f0d066d65a,"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",{'ID': '360_UK_DocM_V2_AccessAndUseOfBuildings'},"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",part-of,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c_10,,,"The indoor and outdoor conditions for a building's total combined window area is 500 millimetres of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_10,,,"The building primary energy rate and sections calculated using the measured air permeability must not be higher than the target primary energy rate and topography, respectively.",less-equal,synthetic
339fc78c-a2f2-481c-a410-3aeb41e24b8a,Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,{'ID': '32_UK_DocA_Structure'},Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,selection,annotated
f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",selection,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74_5,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a undertaken on a mixed-use building number of steps of 25mm.",equal,synthetic
a235c68f-ae44-4770-b005-4e9d7b659eb7,All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,{'ID': '35_UK_DocA_Structure'},All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,part-of,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_11,,,"If the air flows of use 1 and adequate means are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
f27a8dbb-737a-410e-9470-fba4193c0b4f,"Air pressure tests should be performed following the guidance in the approved airtightness testing methodology, CIBSEs TM23.",{'ID': '362_UK_DocM_V2_AccessAndUseOfBuildings'},"Air pressure tests should be performed following the guidance in the approved airtightness testing methodology, CIBSEs TM23.",necessity,annotated
df24d65a-425f-4ddd-b3aa-0ae34be4b0c1,Beading should be mechanically fixed and glued in position.,{'ID': '32_UK_DocQ_Security_Dwellings'},Beading should be mechanically fixed and glued in position.,necessity,annotated
63af9f99-6939-4e8c-a6a9-8b10942e1597,"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",{'ID': '57_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",part-of,annotated
77be05f2-cd8c-4d35-85e4-6637b999d8e7_5,,,The number of wall ties per square metre of the consequential improvement works should not be less than 16/01/2023 00:00 of the value of the principal works.,greater-equal,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e_9,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the feasibility of installing high-efficiency alternative systems must be no less than 1,500 millimetres.",greater-equal,synthetic
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_11,,,"Where the work concerns a building containing more than 20 points lead boiler, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic
8207751f-13b8-4fe3-9bfe-4423093d4905_9,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the design flow rate of the staircase and exit route is no more than one per 100m2.,less-equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_9,,,Individual flights are: for U-value up to two not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic
f420ae57-5656-4558-b1a3-1079e46bf6cc_7,,,"In the case of the storey-level door of a dwelling, or if the dimensions through the door exceeds 14 metres, doors must open in the direction of the exit.",greater,synthetic
9952f64d-e0df-4b03-84af-150782f81387_3,,,"For mobility-impaired people, a onsite electricity generation and storage of at least 150m2 is preferred.",greater-equal,synthetic
a4fccc69-c508-4405-92aa-2cfe36bfca39,Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,{'ID': '209_Finnish_FireSafety'},Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,none,annotated
bb9ec292-062b-43c3-8590-856dd5f6b890_7,,,"The building primary energy rate and agreed level of provision calculated using the measured air permeability must not be higher than the target primary energy rate and sales counter, respectively.",less-equal,synthetic
7f696221-52c9-4c52-8f90-74bd93c51299,This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,{'ID': '73_UK_DocM_V1_AccessAndUseOfBuildings'},This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,selection,annotated
9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",selection,annotated
4e8c5c50-44af-48f6-b959-e6f9b31afa1e,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",{'ID': '89_UK_DocM_V2_AccessAndUseOfBuildings'},"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",part-of,annotated
e7be7432-5505-47ad-b586-2a2e3f5a1a37,"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '203_UK_DocF_V1_Ventilation'},"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",none,annotated
d796dece-45f6-4527-a151-c59b007e9028,"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",{'ID': '132_Finnish_SafetyOfUse'},"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",none,annotated
457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",selection,annotated
6ab07828-b6aa-4a60-8860-333f061a0fde,"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",{'ID': '71_UK_DocM_V2_AccessAndUseOfBuildings'},"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",selection,annotated
244aeb26-ba33-498c-8a28-989b5aa879a8,The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,{'ID': '129_Finnish_Health-WaterAndSewerage'},The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,none,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_2,,,The normal relationship between the dimensions of the rise and going is: 40 equals 450mm.,equal,synthetic
5577528f-8fa0-4ca3-96f6-ea418091cb86_11,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 55 degrees Celsius in specification is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic
b47066e6-d145-4427-91c0-8763c5ea92c5,Remedial work should be carried out to achieve satisfactory performance in retests.,{'ID': '387_UK_DocM_V2_AccessAndUseOfBuildings'},Remedial work should be carried out to achieve satisfactory performance in retests.,selection,annotated
f733b7c9-a406-4f5a-b383-9d3f8b70a559,The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,{'ID': '5_UK_DocA_Structure'},The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,selection,annotated
a9c88566-e4e5-4cba-8165-9916820d9cc5,"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",{'ID': '75_Finnish_SafetyOfUse'},"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",necessity,annotated
4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9,"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",{'ID': '116_Finnish_SafetyOfUse'},"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",selection,annotated
9b2e2a40-6d63-4ee6-a539-da1d15dd68bd,"Where relevant work is undertaken on a mixed-use building, it should be determined which parking spaces are associated parking spaces for the use of occupants of the dwellings, and which parking spaces are for use by users of the non-residential function of the building.",{'ID': '94_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where relevant work is undertaken on a mixed-use building, it should be determined which parking spaces are associated parking spaces for the use of occupants of the dwellings, and which parking spaces are for use by users of the non-residential function of the building.",necessity,annotated
60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",necessity,annotated
f162906e-1097-420e-b2a0-dd746d5794c7,"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",{'ID': '265_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",necessity,annotated
fe2a31f5-7b10-4b21-ad13-154856ecdcc8,"Where sheathing board forms the air barrier, airsealing tape should be applied at junctions and edges.",{'ID': '186_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where sheathing board forms the air barrier, airsealing tape should be applied at junctions and edges.",selection,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9_3,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 0.35W/(m2K) density from any projecting corner.",greater-equal,synthetic
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_4,,,"There should be a screed floors, in the absence of tobacco smoke or other excessive pollutants, of 50 m.",equal,synthetic
8e7e4d9a-05b8-4512-91c5-e8dbb9488685,"At night, windows, patio doors and balcony doors should be modelled as closed.",{'ID': '55_UK_DocO_Overheating'},"At night, windows, patio doors and balcony doors should be modelled as closed.",necessity,annotated
511c1a7f-08b9-48ec-aea6-9b749fdf31a1_2,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an (16.66 8.33 V0.4)/(1000 24) of appropriately located hatch which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic
cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",part-of,annotated
0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_0,,,The facade area of the extension does not exceed 32mm.,less-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_9,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 9 metres entrance are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
ef4f54b6-1099-4404-9fa2-d0c0d5e55543_2,,,The exposure coefficient must not exceed the individual dwellings energy consumption.,less-equal,synthetic
fb5d3054-4911-4049-ba09-1c3e80f9c07c_6,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the above may be no more than 400-600mm.",less-equal,synthetic
ec419055-6ed3-4dac-9879-748e2d365a26,"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",{'ID': '180_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",none,annotated
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_8,,,"Extract air of distance of the basement storey floor from the entry level 2.4m, 3 and 4 shall not be used as recirculation air.",equal,synthetic
23cff3c3-1251-4c5f-9fd9-8f52d25eb494,Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,{'ID': '252_UK_DocM_V2_AccessAndUseOfBuildings'},Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,necessity,annotated
46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",part-of,annotated
f17de50f-3c64-4ab3-ac80-dcfb15b99842,Every flight has a minimum clear width of 900mm.,{'ID': '20_UK_DocM_V1_AccessAndUseOfBuildings'},Every flight has a minimum clear width of 900mm.,part-of,annotated
2f815a08-db3c-48a6-b248-d69aeac870ee_3,,,"the vertical total supply air flow is: a. not more than 14 metres, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic
956efc87-87de-4d3c-99fb-dc58eab9353b_9,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a Unit length of at least 1400mm.,greater-equal,synthetic
8aa4b706-1659-4e30-a4fe-e7f33efe3241_5,,,All between 550mm and 700mm Dwellings of the compliance checklist should be completed.,equal,synthetic
f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",part-of,annotated
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",none,annotated
29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,part-of,annotated
e505b13c-7b62-4857-aa2d-544dc986e9c0_8,,,"For dwellings, for external tapered steps and stairs that are part of the building the shallow projecting of each step should be a minimum of 50 m2.",greater-equal,synthetic
eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,selection,annotated
aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",necessity,annotated
9b594ead-759a-420d-8d1c-52f007daaca4,"Each office should have the means to provide purge ventilation, to reduce pollutants before the office space is occupied or after activities such as painting.",{'ID': '56_UK_DocF_V2_Ventilation'},"Each office should have the means to provide purge ventilation, to reduce pollutants before the office space is occupied or after activities such as painting.",selection,annotated
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",necessity,annotated
09b2a395-5293-4b7d-82d4-5312482d59e9_7,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 200 lux constraints from any projecting corner.",greater-equal,synthetic
6bf41e87-d7c1-42a5-bf0d-67c711a21753,"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",{'ID': '105_UK_DocM_V2_AccessAndUseOfBuildings'},"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",selection,annotated
14d1a086-d933-4946-b222-98f707d16c03,Lifting devices should be positioned with the end opposite to the entry point located against a wall at every floor level.,{'ID': '86_UK_DocM_V1_AccessAndUseOfBuildings'},Lifting devices should be positioned with the end opposite to the entry point located against a wall at every floor level.,necessity,annotated
5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",none,annotated
34a524ec-6994-426f-86af-78788fd34a80_5,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the CO2 emission factor should be 1 in 40.",equal,synthetic
3f7b1106-06a0-4c3f-a01d-e275421775ac,That background ventilators allow fresh air into the home and should be left open.,{'ID': '228_UK_DocF_V1_Ventilation'},That background ventilators allow fresh air into the home and should be left open.,necessity,annotated
ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",necessity,annotated
208b093d-361f-4aec-819d-4abca4e72c68_7,,,"in an evacuation area where the Manual control is 300mm, the second exit may be no less than 900 millimetres in width.",equal,synthetic
984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",necessity,annotated
10b37d1a-a0b5-4dfb-8bcc-39317d144580,"On variable volume systems, variable speed glandless circulators should be used.",{'ID': '289_UK_DocM_V2_AccessAndUseOfBuildings'},"On variable volume systems, variable speed glandless circulators should be used.",selection,annotated
1d10aa43-7650-46b1-83c3-867f212ab9c3,Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,{'ID': '58_UK_DocF_V1_Ventilation'},Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,none,annotated
4a82f789-a98a-4379-9b81-2a20cfba6c87_2,,,"If the internal ties must be centred on the supporting line, the minimum value of the flushing, two persons per square metre, will also be applied to internal ties.",greater-equal,synthetic
29c431ee-ea93-491d-ab13-06418d93c488_11,,,"If cross-sectional area is greater than 600 x 600 millimetres, manual control is acceptable.",greater,synthetic
4e8c5c50-44af-48f6-b959-e6f9b31afa1e_2,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical storey may be exhaust outlets.",equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",selection,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_4,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the air flow rate is not less than 50 m.",greater-equal,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9_3,,,"Door entry controls, where provided, are mounted 7 mg/m3 (6 ppm) surface finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated
f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",necessity,annotated
67657794-a272-4ab2-9b19-df29e9d24844,Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,{'ID': '160_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,necessity,annotated
ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",none,annotated
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_1,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or cavity wall above 70 kN may be discounted when measuring clear width.,greater,synthetic
3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated
493ec553-7761-4d1e-aa98-05d925ddf955_8,,,The energy savings of a horizontal hatch must be at least 40 degrees Celsius.,greater-equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74_4,,,"In a tier that is uninterrupted by cross-gangways, and where the effective rated output exceeds 3.3m, use a maximum number of steps of 40.",greater,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated
5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,none,annotated
7d35f4c4-fa65-4d68-a974-f54386ca8aee_10,,,"However, a horizontal fan unit in a protective part must be no higher than EI 15.",less-equal,synthetic
60024014-cb6a-4a53-9b12-9497e0a1e5e8_2,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for travel distance A and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
4470dde4-6422-4c13-9781-de68c3e075dc,"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",{'ID': '54_Finnish_Health-IndoorClimateAndVentilation'},"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",part-of,annotated
45adb0b6-63ee-4f42-b6a3-8fc396221c67_2,,,The Geo-location of the insulation plus any required air gap should be at least to the fire compartmenting requirement of the rafters.,greater-equal,synthetic
0ea1e862-2434-4fc8-97a2-b076c992ef20_7,,,"The width of an exit must be at least 1,200 millimetres and its free building primary energy rate must be at least 300 litres.",greater-equal,synthetic
9497b383-7217-4366-80c5-6f5677b30893,"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",{'ID': '325_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",necessity,annotated
3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",part-of,annotated
9952f64d-e0df-4b03-84af-150782f81387_6,,,"For mobility-impaired people, a air of at least 1800mm is preferred.",greater-equal,synthetic
1cf2f287-457b-4f89-8c43-135ffda5029a,"The provision made must be sufficient to (a) meet the needs of occupants with differing needs, including some older or disabled people; and (b) to allow adaptation of the dwelling to meet the changing needs of occupants over time.",{'ID': '36_UK_DocM_V1_AccessAndUseOfBuildings'},"The provision made must be sufficient to (a) meet the needs of occupants with differing needs, including some older or disabled people; and (b) to allow adaptation of the dwelling to meet the changing needs of occupants over time.",necessity,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_2,,,"If the air flows of load capacity 1 and six metres are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
bfc84a1d-db59-4f4a-bd93-3d5f1043d11e,A notice of the measured air flow rates must be given to the building control body.,{'ID': '183_UK_DocF_V1_Ventilation'},A notice of the measured air flow rates must be given to the building control body.,selection,annotated
f6ea9be6-644d-4dc6-8954-d115bdd528c8,"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",part-of,annotated
7d877df3-9aa7-4dff-a64d-5356a66c944d_8,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a energy efficiency exceeding 2.5 ties/m2 and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic
e21fa967-934e-4a29-a66d-252fdbbf928f_3,,,"If the parasitic energy use is unknown, an automatic flow adjustment of 0.8 metres should be made for any control system.",equal,synthetic
eefe1191-2903-4fb8-9138-6471e09fb67d_10,,,The breaking exceeds EI 15 at 11pm.,greater,synthetic
99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,none,annotated
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_7,,,"If the fire performance of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 160 millimetres of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic
0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",less-equal,annotated
15c28729-22a9-4992-b43a-bdcf457c0526,"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",{'ID': '45_UK_DocM_V2_AccessAndUseOfBuildings'},"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",necessity,annotated
385a4365-40c0-4c07-8854-b07bde292fd2,"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",{'ID': '109_Finnish_EnergyEfficiency'},"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",selection,annotated
fdd9f39e-e397-4172-b4da-3d213a30f987,On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,{'ID': '335_UK_DocM_V2_AccessAndUseOfBuildings'},On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,selection,annotated
203faa23-7b71-47c9-a6e5-2333ac45389e_7,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the widened must be no less than 160 millimetres.",greater-equal,synthetic
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",selection,annotated
73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",none,annotated
7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_8,,,The resilient layer should be to the full height of the door and 65mm centre pane U-value of the doorset.,equal,synthetic
29232335-402c-4ed9-af74-fd093ac22e28_11,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least number of storeys 180 millimetres.,greater-equal,synthetic
0f67dad7-6df9-444b-8e72-f447668e3fde_6,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 25mm protection.",greater-equal,synthetic
1e3d8e3a-93fd-47e2-833e-d7f36c901c77_7,,,Skirtings totalling up to 20 degrees Celsius distance and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic
d3e7a947-536e-4a49-9823-e27fc0f68b27_3,,,tread of landings to be at least equal to the proportion of the cooling load relating to distribution pipework of the ramp.,greater-equal,synthetic
fa8a6d84-eb99-490e-8169-3c65353fb553_2,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the room temperature shall be at least 9mm.",greater-equal,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated
2c12675d-93c9-496a-acf9-b30465dae93d,Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,{'ID': '113_UK_DocF_V1_Ventilation'},Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,none,annotated
df122091-ca53-4134-98a3-47779c06f9df,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,{'ID': '198_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,necessity,annotated
49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",selection,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_8,,,"The wall ties should have a horizontal spacing of 900mm and a axle group load of 20 millimetres, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic
bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",selection,annotated
ee0c8c7c-c65e-4403-92e6-628fd680f3bf_5,,,Any panel within the doorset should be at least 0.35W/(m2K) power input from controls.,greater-equal,synthetic
76bf63bd-30f4-440d-81a0-61ca16170f70_0,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the service life is less than 4 of the total load.,less,synthetic
977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",necessity,annotated
5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",selection,annotated
e9d02df9-2fcb-4acc-bd08-18a4348cd823,"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",{'ID': '46_UK_DocM_V2_AccessAndUseOfBuildings'},"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",necessity,annotated
53b7d989-c81f-4e01-a5ec-4b2cb30b4bfa,The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,{'ID': '104_Finnish_FireSafety'},The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,part-of,annotated
9952f64d-e0df-4b03-84af-150782f81387_4,,,"For mobility-impaired people, a commissioning sheet of at least 60 is preferred.",greater-equal,synthetic
b63dcef6-1840-4e9e-ad51-f8fc481fe856_3,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the distance of the uppermost floor level from the entry level is not less than six metres.",greater-equal,synthetic
082c7ed9-3579-48c2-a0d2-076f1edd647c_1,,,"Each of the 1,500 millimetres primary energy factor of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_8,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the shape of that installation exceeds 850 millimetres of the total cost of the major renovation.",greater,synthetic
8151be81-09ad-4dac-b2d2-f0d757915b6c_8,,,"However, when the snow load can occur, the domestic hot water cylinder heat loss of the load s should be at least 2.",greater-equal,synthetic
5fa7daca-cb50-4397-a736-617e52d30187_2,,,"If performance at below 30% are required and unavailable, the Length may be taken as equal to that at 30% load.",equal,synthetic
e20c760b-a97f-4309-b96a-bcec7cc52b39,Water must be able to drain off the roof without causing damage to the building.,{'ID': '102_Finnish_Health-Humidity'},Water must be able to drain off the roof without causing damage to the building.,necessity,annotated
0ea1e862-2434-4fc8-97a2-b076c992ef20_3,,,"The width of an exit must be at least 1,200 millimetres and its free primary energy must be at least 01:20:00.",greater-equal,synthetic
84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",greater-equal,annotated
d8066a73-49c2-4e99-825a-b49b9b2ba67d,A landing measuring at least 800 millimetres in length must be reserved in front of and behind a door located in an exit route.,{'ID': '34_Finnish_SafetyOfUse'},A landing measuring at least 800 millimetres in length must be reserved in front of and behind a door located in an exit route.,part-of,annotated
31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",none,annotated
26980508-105c-49db-8595-bf001a48d757_8,,,"In room temperature sensor with no fixed seats or test data, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic
d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",part-of,annotated
a387fcb8-ead2-4094-9be9-72d783468b33_1,,,"If the Level differences of windows, roof windows, rooflights and doors exceeds 56 metres of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic
f02161e2-1942-4ddf-9627-e3343df63909,"System controls should be wired so that when there is no demand for space heating, the heating appliance and pump are switched off.",{'ID': '214_UK_DocM_V2_AccessAndUseOfBuildings'},"System controls should be wired so that when there is no demand for space heating, the heating appliance and pump are switched off.",selection,annotated
656aa2fa-18cb-41ee-ae28-28deb3dffcc3_11,,,The energy efficiency measures of the water in the hot water system shall be at least 5m and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic
7f3f59a4-fc7e-4b14-8074-384f6cacf548_2,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the product certificate is less than 1,500 millimetres.",less,synthetic
0ea1e862-2434-4fc8-97a2-b076c992ef20,"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",{'ID': '214_Finnish_FireSafety'},"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",greater-equal,annotated
0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated
956efc87-87de-4d3c-99fb-dc58eab9353b_1,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a configuration of at least 90.,greater-equal,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_6,,,"Where the entrance level of installing only cable routes is more than 2.0 m3/(h m2) of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic
984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",selection,annotated
84cd76d7-e5d0-4f39-94bc-0236c65d533a_11,,,"in residential buildings of not more than two storeys, one exit of no less than E 15 in feasibility of installing high-efficiency alternative systems is permitted.",greater-equal,synthetic
4a82f789-a98a-4379-9b81-2a20cfba6c87_3,,,"If the internal ties must be centred on the supporting line, the minimum value of the sum total, 24 metres, will also be applied to internal ties.",greater-equal,synthetic
3153d771-404e-4a54-ac05-ed1b75e37506_4,,,"Gangways should not be less than 1100mm building emission rate unless used by not more than 50 persons, in which case gangways should be a minimum of 900-1000mm.",greater-equal,synthetic
5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated
2a256a9c-0b8a-4acf-87e1-86a5857f36a3_10,,,"Where a driveway forms all, or part of, the approach route, an between a solar primary and secondary system of at least 600kg/m3 wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic
3c6b438e-d99a-4c4d-aa19-0ec4f3f27662,"When installing controlled fittings, the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '162_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing controlled fittings, the controlled fitting should be well fitted and reasonably draught-proof.",selection,annotated
2cadb28f-a6c8-4fe2-b1c9-a918eb5437f9,On-site electricity generation systems must be commissioned to ensure that they produce as much electricity as is reasonable in the circumstances.,{'ID': '372_UK_DocL_V1_ConsrvationOfFuelAndPower'},On-site electricity generation systems must be commissioned to ensure that they produce as much electricity as is reasonable in the circumstances.,selection,annotated
8aa4b706-1659-4e30-a4fe-e7f33efe3241,All three parts of the compliance checklist should be completed.,{'ID': '108_UK_DocO_Overheating'},All three parts of the compliance checklist should be completed.,part-of,annotated
a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_2,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 9 metres in integrity and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic
3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_0,,,These fittings should not exceed a that of 20 degrees Celsius.,less-equal,synthetic
81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",greater-equal,annotated
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_3,,,"Where the work concerns a building containing more than 450mm patient rooms, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic
0da52584-1b37-48b5-840f-3795ae695275_11,,,the minimum clear dimensions of the platform are: 200 m2 energy savings and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated
c384013b-c40f-4925-acbe-465e1ca5bc13_4,,,24 degrees Celsius commercial part per detail should be recorded.,equal,synthetic
984c252b-74f4-4d85-9080-1c8ae1851eca_9,,,"If performance requires thicker glass to be used, an equivalent window unit with rated speed (600 millimetres) glazing should be shown to meet the required standard.",equal,synthetic
09b2a395-5293-4b7d-82d4-5312482d59e9_4,,,"Door entry controls, where provided, are mounted 50mm energy consumption finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic
7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_10,,,"For sizes of cylinder not listed, the areas from the cylinder should not exceed 90mm, where V is the volume in litres.",less-equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",selection,annotated
4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",none,annotated
0a6d6be2-bb25-4a7d-ac98-33351e1a2bb7,"Wheelchair-accessible bedrooms should be sufficiently spacious to enable a wheelchair user to transfer to one side of a bed, with or without assistance.",{'ID': '144_UK_DocM_V2_AccessAndUseOfBuildings'},"Wheelchair-accessible bedrooms should be sufficiently spacious to enable a wheelchair user to transfer to one side of a bed, with or without assistance.",selection,annotated
12e545d1-64f4-45c9-a520-5b8a003eba0a_7,,,"If the dwelling has more than 10 kN exposed boom barriers, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic
46f5be2a-1514-420b-bc39-331fc6e0d2df_8,,,"The dwelling primary energy rate, relationship and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, tread and target fabric energy efficiency rate, respectively.",less-equal,synthetic
ccc405a0-c6d6-4ace-ad70-e0cfe07cd1e3,"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",{'ID': '14_UK_DocK_ProtectionFromFalling'},"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",necessity,annotated
ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",part-of,annotated
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,annotated
ef4f54b6-1099-4404-9fa2-d0c0d5e55543,The dwelling primary energy rate must not exceed the individual dwellings target primary energy rate.,{'ID': '64_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling primary energy rate must not exceed the individual dwellings target primary energy rate.,less-equal,annotated
bb9ec292-062b-43c3-8590-856dd5f6b890_5,,,"The supports and building emission rate calculated using the measured air permeability must not be higher than the from the inside face of the wall and target emission rate, respectively.",less-equal,synthetic
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,selection,annotated
2633c957-07b4-4caa-a9d6-5acbac16b0b0,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,{'ID': '245_UK_DocM_V2_AccessAndUseOfBuildings'},NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,selection,annotated
bf798097-bb99-42d0-a73f-8cebab8fbeb8_2,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the planned time of use of the steps must be no more than 150mm and the tread must be no less than 300 millimetres.",less-equal,synthetic
7e34700e-92de-4b00-a820-f4085a2e186c_2,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be diameter 100 millimetres.",equal,synthetic
77f993c6-dff1-4f9a-8f66-73221d3cbaff_10,,,"If the dwelling only has 1,000 millimetres staircase, a minimum ventilation rate of 13l/s should be used.",equal,synthetic
75c60084-6878-472d-8694-e8739e0dd76c_7,,,The that of access routes in assembly areas with a maximum capacity of 60 persons must be at least 300mm.,greater-equal,synthetic
bfdf95da-d422-47cd-83d7-a30a4969f2e6_0,,,"If the internal ties must be centred on the supporting line, the minimum value of the control capabilities, 0.3W/m2, will also be applied to internal ties.",greater-equal,synthetic
a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",part-of,annotated
4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",none,annotated
a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",part-of,annotated
d0b6759e-deec-451d-bd7a-ec65b96048be,"extract air of category 3 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",{'ID': '130_Finnish_Health-IndoorClimateAndVentilation'},"extract air of category 3 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,annotated
4ec44f57-abad-41aa-bd8c-5c4656e62bf9,The air in a building shall flow from spaces of higher indoor air purity to spaces of lower indoor air purity.,{'ID': '81_Finnish_Health-IndoorClimateAndVentilation'},The air in a building shall flow from spaces of higher indoor air purity to spaces of lower indoor air purity.,necessity,annotated
9fd15b82-fc32-4364-8724-f1ef14f0c047,The cooker hood should span at least the full width of the cooker.,{'ID': '36_UK_DocF_V1_Ventilation'},The cooker hood should span at least the full width of the cooker.,greater-equal,annotated
76bf63bd-30f4-440d-81a0-61ca16170f70_4,,,"Control should be maximised and heat gain to uninsulated pipes should only be permitted where the number is less than 2,100 millimetres of the total load.",less,synthetic
6ab07828-b6aa-4a60-8860-333f061a0fde,"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",{'ID': '71_UK_DocM_V2_AccessAndUseOfBuildings'},"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",part-of,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3_6,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and installation 200 m2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic
e46efdc3-02a8-4440-870d-a6cdc1b34430,NOTE: Rooms that are designed to contain printers and photocopiers in substantial use (more than 30 minutes per hour) should not be designed to be occupied.,{'ID': '44_UK_DocF_V2_Ventilation'},NOTE: Rooms that are designed to contain printers and photocopiers in substantial use (more than 30 minutes per hour) should not be designed to be occupied.,selection,annotated
86831830-e7f0-4b90-aa27-dc0542b7ba4d_9,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 180 millimetres directions.",greater-equal,synthetic
3724fd47-22f7-432c-81a2-1abcb95c7df2_1,,,"The fastening points installed in a dwellings habitable rooms and kitchens should be no fewer than 190 kN, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic
ef4ec541-e1a7-47d4-9a83-94715d8900ba_7,,,"Where 1 or more existing system are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic
56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3,"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",{'ID': '73_Finnish_FireSafety'},"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",part-of,annotated
493ec553-7761-4d1e-aa98-05d925ddf955_3,,,The step of a horizontal hatch must be at least 20C.,greater-equal,synthetic
e874f337-2067-4e77-ad32-c3b857f40e7a_8,,,"If the one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise exceeds one metre, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic
da4d5959-6e64-4e04-a1f3-8b42b6addab0_3,,,The outdoor difference in light reflectance value used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 23C.,greater-equal,synthetic
2a8898d7-8561-4f67-9979-1bbba8ad42e6,"If insulating material is inserted into a cavity in a cavity wall, reasonable precautions shall be taken to prevent the subsequent permeation of any toxic fumes from that material into any part of the building occupied by people.",{'ID': '3_UK_DocD_ToxicSubstances'},"If insulating material is inserted into a cavity in a cavity wall, reasonable precautions shall be taken to prevent the subsequent permeation of any toxic fumes from that material into any part of the building occupied by people.",part-of,annotated
12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,annotated
20609d43-016e-4314-9620-256f73f1c6ed,"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",{'ID': '160_UK_DocF_V1_Ventilation'},"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",selection,annotated
05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",none,annotated
354c849e-8e02-47ec-992c-e5431a62cb3f,Ventilation systems that provide supply and extract ventilation should be fitted with a heat recovery system where technically feasible.,{'ID': '309_UK_DocM_V2_AccessAndUseOfBuildings'},Ventilation systems that provide supply and extract ventilation should be fitted with a heat recovery system where technically feasible.,necessity,annotated
8efb6108-e49e-4d64-a1e4-22e3f9128b17_7,,,"When calculating the reference heat loss of a building, the value of 2 shall be used as the height for the air leakage rate figure for the building envelope.",equal,synthetic
316c89ee-aa42-4e7a-9372-960cf25b3265,Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,{'ID': '105_UK_DocF_V2_Ventilation'},Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,part-of,annotated
8efb6108-e49e-4d64-a1e4-22e3f9128b17,"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",{'ID': '136_Finnish_EnergyEfficiency'},"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",part-of,annotated
ad30824c-74be-4f4f-916a-dfe1e0a89205,"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",necessity,annotated
8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,less-equal,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8_0,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for habitable area 1.501kWhPE/kWh and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic
88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",selection,annotated
dcc583b1-8c4c-42cf-a1ed-e8907de56254_10,,,"The intermediate landing of the indoor steps of other spaces intended for everyday use may be no more than 8 per cent (1:12.5), and the tread must be no less than 270 millimetres.",less-equal,synthetic
082c7ed9-3579-48c2-a0d2-076f1edd647c_3,,,"Each of the 90mm above of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic
cb531516-b36e-4155-a8fa-5114e3e71dbc,The insulant should be chosen to achieve the lowest practicable U-value.,{'ID': '129_UK_DocL_V1_ConsrvationOfFuelAndPower'},The insulant should be chosen to achieve the lowest practicable U-value.,necessity,annotated
56517433-cf40-4b88-a9d4-18e61e0e9993_8,,,"In addition, on both sides of the toilet seat there shall be a electric resistance heating of at least 8 per cent (1:12.5).",greater-equal,synthetic
208b093d-361f-4aec-819d-4abca4e72c68,"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",{'ID': '216_Finnish_FireSafety'},"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",part-of,annotated
bb9ec292-062b-43c3-8590-856dd5f6b890_2,,,"The patterns and building emission rate calculated using the measured air permeability must not be higher than the edges and target emission rate, respectively.",less-equal,synthetic
40b40b1b-d1b1-49d8-b9b7-13c5845a169d_7,,,The structure of the control appliance of the plumbing fixture shall be such that its capacity does not arise above 30.,less-equal,synthetic
f439dcde-3cf9-4b40-b555-a2107ae5559f,"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '104_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",none,annotated
5577528f-8fa0-4ca3-96f6-ea418091cb86_9,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 01:08:00 in lengths is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e_8,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the design solar load must be no less than 400 millimetres.",greater-equal,synthetic
569c7958-b7d6-4b9c-9dd9-13307e95e59b,"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",{'ID': '385_UK_DocM_V2_AccessAndUseOfBuildings'},"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",necessity,annotated
922bf8df-3a70-4f45-8c04-200b638d3b3c_11,,,The cold water pipe shall be designed and installed so that the breaking in the cold water system may not exceed 8 per cent (1:12.5).,less-equal,synthetic
0da52584-1b37-48b5-840f-3795ae695275_7,,,the minimum clear dimensions of the platform are: 1100mm wide and 25 decibels boiler efficiency where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic
4094b859-b3b4-4035-94cd-8cf47ccbd801_7,,,The distance of the uppermost floor level from the entry level is at least eight per cent.,greater-equal,synthetic
7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,part-of,annotated
0aad98a7-74e6-4678-9620-2f80355e7ba8,commissioning notice must be given to the building control body.,{'ID': '94_UK_DocF_V2_Ventilation'},commissioning notice must be given to the building control body.,necessity,annotated
7f696221-52c9-4c52-8f90-74bd93c51299_6,,,This grippable handrail is 850-1000mm above the pitch line of the flight and output at least 70 kN beyond the top and bottom nosings.,greater-equal,synthetic
98ef7ffc-fba9-439f-ab36-5fd6fd1d8e0f,Complex details should be avoided wherever possible.,{'ID': '154_UK_DocL_V1_ConsrvationOfFuelAndPower'},Complex details should be avoided wherever possible.,selection,annotated
6414854d-01f9-481f-a7f4-c4581e48d8b1_3,,,Special safety features are not necessary if the Manual controls is not more than 35 mg/m3 (30 ppm) long.,less-equal,synthetic
35cacecf-06dc-4b0f-aadb-db2ee05518c7_10,,,The area of windows and roof windows (but excluding display windows) commissioned to ensure that they produce as much electricity as is reasonable in the circumstances exceeds 100 of the facade area.,greater,synthetic
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",selection,annotated
2f815a08-db3c-48a6-b248-d69aeac870ee,"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",{'ID': '173_UK_DocM_V2_AccessAndUseOfBuildings'},"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",selection,annotated
2633c957-07b4-4caa-a9d6-5acbac16b0b0,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,{'ID': '245_UK_DocM_V2_AccessAndUseOfBuildings'},NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,none,annotated
5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_1,,,"Generally, a thermal element once upgraded should not have a building emission rate greater than 1,500 millimetres.",less-equal,synthetic
7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,none,annotated
2de867fe-80e7-4617-ad18-36225dd45ab1,Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,{'ID': '53_UK_DocF_V1_Ventilation'},Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,selection,annotated
726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",selection,annotated
60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated
c0a6d35c-cc20-428b-941d-c3e3e6365c74_11,,,"In a tier that is uninterrupted by cross-gangways, and where the luminous efficacy exceeds 200 millimetres, use a maximum number of steps of 40.",greater,synthetic
56b3f993-37b5-4cb1-9540-432972f8056e,"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",{'ID': '99_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",part-of,annotated
7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",selection,annotated
525aa713-65e1-4368-a6f4-38f628be7fed,"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",none,annotated
d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated
52de82bc-2c00-4500-81ec-a46781a8e4e7,Automatic control of input charge should be provided.,{'ID': '279_UK_DocL_V1_ConsrvationOfFuelAndPower'},Automatic control of input charge should be provided.,necessity,annotated
fab95d95-4789-4384-8d57-a575190f9e73,The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,{'ID': '297_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,part-of,annotated
656aa2fa-18cb-41ee-ae28-28deb3dffcc3,The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,{'ID': '61_Finnish_Health-WaterAndSewerage'},The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,none,annotated
11f2902d-29c2-474e-97d0-628a2a97a666_9,,,"control capabilities of over 0.3 must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic
2c12675d-93c9-496a-acf9-b30465dae93d,Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,{'ID': '113_UK_DocF_V1_Ventilation'},Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,selection,annotated
35cacecf-06dc-4b0f-aadb-db2ee05518c7_1,,,The area of windows and roof windows (but excluding display windows) practical exceeds off of the facade area.,greater,synthetic
3121fe90-27db-405e-a42a-df3cd22ee176_4,,,"Where necessary, 390 millimetresrafters, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic
7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",necessity,annotated
569c7958-b7d6-4b9c-9dd9-13307e95e59b_10,,,"For ducted systems that are served by fans with a ending greater than 1,500 millimetres, ductwork leakage tests should be carried out.",greater,synthetic
31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",selection,annotated
5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_2,,,"When replacing an existing system, the control capabilities of the new system should be no less than value of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic
99a53f17-48cb-4012-a47b-700761e0983b_11,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 2 of those casings must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic
1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated
81314489-dcd9-410f-9b15-595b87e7c8f9_10,,,"The resilient layer should be timber sheathing at least EI 15 size, expanded metal or a similar resilient material.",greater-equal,synthetic
5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated
ccc405a0-c6d6-4ace-ad70-e0cfe07cd1e3,"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",{'ID': '14_UK_DocK_ProtectionFromFalling'},"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",none,annotated
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_0,,,The normal relationship between the dimensions of the rise and going is: 30% load equals 15 degrees.,equal,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,annotated
b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",none,annotated
1913381b-a2cc-496e-9168-82ccf2a01d50_10,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the air-tightness of the heat emitters to be installed does not exceed 18 dm3/s.",less-equal,synthetic
cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",part-of,annotated
d48274a1-bd70-4db9-8490-14075029cbb7,All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.,{'ID': '109_UK_DocM_V2_AccessAndUseOfBuildings'},All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.,part-of,annotated
0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_4,,,The total minimum width of the extension does not exceed 600kg/m3.,less-equal,synthetic
0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",none,annotated
2633c957-07b4-4caa-a9d6-5acbac16b0b0,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,{'ID': '245_UK_DocM_V2_AccessAndUseOfBuildings'},NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,equal,annotated
bfe386ee-8c0b-41d4-9967-6e873edf7229,"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",{'ID': '148_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",part-of,annotated
3724fd47-22f7-432c-81a2-1abcb95c7df2_6,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 200 m2 morticed bolts properties, where there should be no fewer than four.",equal,synthetic
da4d5959-6e64-4e04-a1f3-8b42b6addab0_2,,,The outdoor drop used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 1.3 seconds.,greater-equal,synthetic
e43c1e88-be80-42d9-944e-1bf0f0f82479_7,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 300 millimetres travel distance.,less-equal,synthetic
7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",selection,annotated
9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_4,,,The temperature must not exceed the individual dwellings tie force.,less-equal,synthetic
64f259ba-5280-4bf5-bea2-e18cb837a940,A water point shall incorporate a drainage point that is connected to the sewer via a drainage fixture.,{'ID': '124_Finnish_Health-WaterAndSewerage'},A water point shall incorporate a drainage point that is connected to the sewer via a drainage fixture.,selection,annotated
6075de3c-d339-4ba4-9945-990480975615,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",{'ID': '94_UK_DocF_V1_Ventilation'},"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",none,annotated
86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",none,annotated
5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,necessity,annotated
01008f69-874b-443e-bcb2-2f5630280049_11,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the Extract may be no more than 150m2 and the tread must be no less than 220 millimetres.",less-equal,synthetic
1d10aa43-7650-46b1-83c3-867f212ab9c3,Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,{'ID': '58_UK_DocF_V1_Ventilation'},Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,necessity,annotated
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_10,,,The smaller frequency of each panel which can be either the width or height of the panel should be 0.3W/m2 or less.,less-equal,synthetic
ef561e39-db90-462c-8dde-15fbeae954e5_7,,,A cube with extends of no more than 28 metres may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic
5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",none,annotated
7d35f4c4-fa65-4d68-a974-f54386ca8aee,"However, a horizontal gap in a protective part must be no higher than ten millimetres.",{'ID': '49_Finnish_SafetyOfUse'},"However, a horizontal gap in a protective part must be no higher than ten millimetres.",selection,annotated
ded852b5-c826-4649-8ce5-dece0eba6061,"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",{'ID': '32_Finnish_Health-IndoorClimateAndVentilation'},"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",none,annotated
103f99ad-884b-4bae-9f22-ccb1c5bc3d26_8,,,"In an open garage of no more than 900-1000mm test data, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic
84cd76d7-e5d0-4f39-94bc-0236c65d533a_7,,,"in residential buildings of not more than two storeys, one exit of no less than 650mm in selection is permitted.",greater-equal,synthetic
c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",none,annotated
f034fbd1-7547-425a-8163-513fcac0b66b,The roof structures and joints must be properly inclined and sealed for water drainage.,{'ID': '103_Finnish_Health-Humidity'},The roof structures and joints must be properly inclined and sealed for water drainage.,necessity,annotated
e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none,annotated
dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",none,annotated
49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",selection,annotated
3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_6,,,These fittings should not exceed a rise between landings of 8.5m2.,less-equal,synthetic
a372d2c4-f734-479d-bc8d-d3a8aa15362d,"A wide range of people, including accompanied wheelchair users, should be able to access and use the lift.",{'ID': '49_UK_DocM_V1_AccessAndUseOfBuildings'},"A wide range of people, including accompanied wheelchair users, should be able to access and use the lift.",selection,annotated
3cbfb816-4071-496e-aec2-87d424df047f,Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,{'ID': '181_UK_DocM_V2_AccessAndUseOfBuildings'},Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,necessity,annotated
4e8c5c50-44af-48f6-b959-e6f9b31afa1e,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",{'ID': '89_UK_DocM_V2_AccessAndUseOfBuildings'},"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",selection,annotated
d3fc8c9b-c23a-4188-8723-369caa90453c_1,,,"The illuminance for a building's total combined window area is 90 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic
bed3cb74-fdd3-4888-80ab-b416d1b060ad,"For systems that have the ability to use free cooling or heat recovery, the SEER should be derived for the specific application, including free cooling or heat recovery elements.",{'ID': '282_UK_DocM_V2_AccessAndUseOfBuildings'},"For systems that have the ability to use free cooling or heat recovery, the SEER should be derived for the specific application, including free cooling or heat recovery elements.",none,annotated
6ec243f2-9294-4b7c-89a4-1c46e4a69cc9,"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",necessity,annotated
bb9ec292-062b-43c3-8590-856dd5f6b890_0,,,"The building primary energy rate and rise calculated using the measured air permeability must not be higher than the target primary energy rate and efficiencies, respectively.",less-equal,synthetic
7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_5,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major timber sheathing, there is no battery storage to install either electric vehicle charge points or cable routes.",not-part-of,synthetic
d3e7a947-536e-4a49-9823-e27fc0f68b27_4,,,performance of landings to be at least equal to the extract air categories of the ramp.,greater-equal,synthetic
2f8d4247-e53b-49ae-bd26-c4f1765eaee8_2,,,"Extract air of habitable area 2, 3 and 13l/s shall not be used as recirculation air.",equal,synthetic
0667134c-1290-4fe0-99eb-41c0b9e63a27,CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,part-of,annotated
a387fcb8-ead2-4094-9be9-72d783468b33_8,,,"If the fire igniting of windows, roof windows, rooflights and doors exceeds 300 millimetres of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic
40b40b1b-d1b1-49d8-b9b7-13c5845a169d,The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,{'ID': '71_Finnish_Health-WaterAndSewerage'},The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,part-of,annotated
103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",selection,annotated
3121fe90-27db-405e-a42a-df3cd22ee176_7,,,"Where necessary, 4information, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic
6a41a473-bd3c-4e38-a093-094b3fdae388_3,,,At least one in every 600kg/m3 remaining drainage water must be provided with cable routes.,equal,synthetic
2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_3,,,The normal relationship between the side edges of the rise and going is: 50 m2 equals between 550mm and 700mm.,equal,synthetic
7d877df3-9aa7-4dff-a64d-5356a66c944d_9,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a rated output exceeding 0.15 dm3/s per m2 and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated
d3e7a947-536e-4a49-9823-e27fc0f68b27_9,,,standards of landings to be at least equal to the selection of the ramp.,greater-equal,synthetic
a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",part-of,annotated
f64c5a32-2f88-4be6-abf4-8870a4e51fdf,"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",{'ID': '72_Finnish_Health-IndoorClimateAndVentilation'},"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",necessity,annotated
981a0996-c526-4ee7-b679-0f17bd5ecd29,"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",{'ID': '209_UK_DocM_V2_AccessAndUseOfBuildings'},"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",selection,annotated
ff3e8f86-1542-4f54-a776-cfdc8482bad7_1,,,The rise between landings of an air conditioner working in cooling mode should be a minimum of 1.3 seconds.,greater-equal,synthetic
38020928-c137-486e-88d7-c8feec038c99,A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,{'ID': '189_Finnish_FireSafety'},A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,necessity,annotated
b63dcef6-1840-4e9e-ad51-f8fc481fe856_7,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the intended purpose is not less than 75 light source lumens per circuit-watt.",greater-equal,synthetic
f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_1,,,No individual flight has a level differences of more than 30.,less-equal,synthetic
a1f91cfd-21f8-49a4-8468-746f49f4848e_6,,,"For a building that contains more than 2.4m roof windows for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic
203faa23-7b71-47c9-a6e5-2333ac45389e,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",{'ID': '22_Finnish_SafetyOfUse'},"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",less-equal,annotated
01bd7c41-594c-4440-8058-c34f1c4bad09,"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",{'ID': '82_UK_DocO_Overheating'},"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",none,annotated
74002ed3-548e-4e2f-8835-be76e643c67d_5,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least 25 total extract air flow.,greater-equal,synthetic
bb9ec292-062b-43c3-8590-856dd5f6b890_1,,,"The building primary energy rate and calculations calculated using the measured air permeability must not be higher than the target primary energy rate and density, respectively.",less-equal,synthetic
2a256a9c-0b8a-4acf-87e1-86a5857f36a3_7,,,"Where a driveway forms all, or part of, the approach route, an fixed to a base of at least 01:20:00 wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic
9a574829-3211-4b4f-8c0c-c7a7ab9cfd54,The whole building ventilation rate should be met.,{'ID': '47_UK_DocF_V2_Ventilation'},The whole building ventilation rate should be met.,part-of,annotated