{"page_01_file_name": "images/MS-U01-01/few_sheet/01.png", "page_02_file_name": "images/MS-U01-01/few_sheet/02.png", "page_03_file_name": "images/MS-U01-01/few_sheet/03.png", "page_04_file_name": "images/MS-U01-01/few_sheet/04.png", "page_05_file_name": "images/MS-U01-01/few_sheet/05.png", "page_06_file_name": "images/MS-U01-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U01-01", "set": "U01", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "桥塔处的 C 类梁段,从跨中侧往桥塔侧,箱梁边部(边腹板与风嘴)的几何如何变化?下列说法哪些正确?", "options": [{"key": "A", "text": "边腹板在平面上逐渐向箱梁中心线方向内收", "correct": true}, {"key": "B", "text": "风嘴盖板斜向宽度由 1515 mm 增至 1934 mm", "correct": true}, {"key": "C", "text": "边腹板高度由约 1714 mm 增至约 2315 mm", "correct": true}, {"key": "D", "text": "箱梁中心处梁高也随之增大,在桥塔侧端部超过 3500 mm", "correct": false}, {"key": "E", "text": "边腹板高度的变化集中在中间的 W2 段,靠跨中侧的 W1 段与靠桥塔侧的 W3 段各自等高", "correct": true}, {"key": "F", "text": "风嘴外缘在平面上向外加宽,桥塔侧端部比跨中侧端部每侧宽 1853 mm", "correct": false}], "answer": ["A", "B", "C", "E"], "few_sheet_pages": [20, 14, 16, 17, 19, 5], "evidence_pages": [14, 16, 19, 20], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U01-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中,A-A(普通隔板)横断面顶部的两道“全宽/2=半宽”标注的半宽各是多少(较长一道从顶板外缘量起,较短一道从边腹板量起)?G-G(端封板)横断面顶部“全宽/2=半宽”标注的半宽是多少?以 JSON 返回三个字段 A-A顶板、A-A边腹板、G-G顶板,每个字段为 {value, unit},单位 mm。", "answer": "{\"A-A顶板\": {\"value\": 17350, \"unit\": \"mm\"}, \"A-A边腹板\": {\"value\": 16250, \"unit\": \"mm\"}, \"G-G顶板\": {\"value\": 15500, \"unit\": \"mm\"}}"}, {"id": "MS-U01-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中 A-A(普通隔板)和 G-G(端封板)两个横断面图上,风嘴盖板(风嘴外侧面板)旁标注的总宽各是多少?以 JSON 返回两个字段 A-A、G-G,每个字段为 {value, unit},单位 mm。", "answer": "{\"A-A\": {\"value\": 1515, \"unit\": \"mm\"}, \"G-G\": {\"value\": 1934, \"unit\": \"mm\"}}"}, {"id": "MS-U01-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中 A-A(普通隔板)和 G-G(端封板)两个横断面图上,箱梁中心线处标注的梁高各是多少?以 JSON 返回两个字段 A-A、G-G,每个字段为 {value, unit},单位 mm。", "answer": "{\"A-A\": {\"value\": 3500, \"unit\": \"mm\"}, \"G-G\": {\"value\": 3500, \"unit\": \"mm\"}}"}, {"id": "MS-U01-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中 H-H 展开图上,左端和右端标注的腹板总高各是多少?以 JSON 返回两个字段 左端、右端,每个字段为 {value, unit},单位 mm。", "answer": "{\"左端\": {\"value\": 1714, \"unit\": \"mm\"}, \"右端\": {\"value\": 2315, \"unit\": \"mm\"}}"}, {"id": "MS-U01-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中 H-H 展开图上,W1 段靠 W2 一端标注的腹板高度、W3 段靠 W2 一端标注的腹板高度各是多少?以 JSON 返回两个字段 W1、W3,每个字段为 {value, unit},单位 mm。", "answer": "{\"W1\": {\"value\": 1688, \"unit\": \"mm\"}, \"W3\": {\"value\": 2289, \"unit\": \"mm\"}}"}, {"id": "MS-U01-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥塔处 C 类梁段,桥塔侧端部(端封板处)的边腹板总高是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2315, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U01-02/few_sheet/01.png", "page_02_file_name": "images/MS-U01-02/few_sheet/02.png", "page_03_file_name": "images/MS-U01-02/few_sheet/03.png", "page_04_file_name": "images/MS-U01-02/few_sheet/04.png", "page_05_file_name": "images/MS-U01-02/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U01-02", "set": "U01", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿桥塔处 C 类梁段从跨中侧往桥塔侧,依次经过各道横隔板,箱梁顶面全宽随之变化。下列\"前一道横隔板(该处顶面全宽,mm)→ 紧接的下一道横隔板(该处顶面全宽,mm)\"中,哪些正确?", "options": [{"key": "A", "text": "支承横隔板(31000) → 半横隔板(31000)", "correct": false}, {"key": "B", "text": "加厚横隔板(32697) → 加厚横隔板(31000)", "correct": false}, {"key": "C", "text": "半横隔板(31000) → 支承横隔板(31000)", "correct": true}, {"key": "D", "text": "加厚横隔板(32697) → 半横隔板(31526)", "correct": true}, {"key": "E", "text": "普通横隔板(34700) → 加厚横隔板(32697)", "correct": true}, {"key": "F", "text": "半横隔板(31526) → 加厚横隔板(31000)", "correct": true}], "answer": ["C", "D", "E", "F"], "few_sheet_pages": [19, 11, 16, 18, 17], "evidence_pages": [16, 17, 18], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U01-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中 A-A、B-B 两个横断面图上,箱梁顶面全宽各是多少?取断面图顶部以“全宽/2=半宽”形式标注、并从本断面顶板外缘量起的那一道,返回全宽。以 JSON 返回两个字段 A-A、B-B,每个字段为 {value, unit},单位 mm。", "answer": "{\"A-A\": {\"value\": 34700, \"unit\": \"mm\"}, \"B-B\": {\"value\": 32697, \"unit\": \"mm\"}}"}, {"id": "MS-U01-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中 C-C、D-D 两个横断面图上,箱梁顶面全宽各是多少?取断面图顶部以“全宽/2=半宽”形式标注、并从本断面顶板外缘量起的那一道,返回全宽。以 JSON 返回两个字段 C-C、D-D,每个字段为 {value, unit},单位 mm。", "answer": "{\"C-C\": {\"value\": 31526, \"unit\": \"mm\"}, \"D-D\": {\"value\": 31000, \"unit\": \"mm\"}}"}, {"id": "MS-U01-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中 E-E、F-F 两个横断面图上,箱梁顶面全宽各是多少?取断面图顶部以“全宽/2=半宽”形式标注、并从本断面顶板外缘量起的那一道,返回全宽。以 JSON 返回两个字段 E-E、F-F,每个字段为 {value, unit},单位 mm。", "answer": "{\"E-E\": {\"value\": 31000, \"unit\": \"mm\"}, \"F-F\": {\"value\": 31000, \"unit\": \"mm\"}}"}, {"id": "MS-U01-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中 A-A、B-B、C-C 三个横断面图的标题括号里,各写的是哪种隔板?从下列五项中选:普通隔板、加厚隔板、半隔板、支承隔板、端封板。以 JSON 返回字段 A-A、B-B、C-C,每个字段按所列文字原样返回。", "answer": "{\"A-A\": \"普通隔板\", \"B-B\": \"加厚隔板\", \"C-C\": \"半隔板\"}"}, {"id": "MS-U01-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中 D-D、E-E、F-F 三个横断面图的标题括号里,各写的是哪种隔板?从下列五项中选:普通隔板、加厚隔板、半隔板、支承隔板、端封板。以 JSON 返回字段 D-D、E-E、F-F,每个字段按所列文字原样返回。", "answer": "{\"D-D\": \"加厚隔板\", \"E-E\": \"半隔板\", \"F-F\": \"支承隔板\"}"}, {"id": "MS-U01-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥塔处 C 类梁段内,从跨中侧往桥塔侧数,第 1 道、第 2 道、第 3 道横隔板处的横断面各是哪个字母?以 JSON 返回字段 \"1\"、\"2\"、\"3\",每个字段返回断面字母(形如 X)。", "answer": "{\"1\": \"A\", \"2\": \"B\", \"3\": \"C\"}"}, {"id": "MS-U01-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥塔处 C 类梁段内,从跨中侧往桥塔侧数,第 4 道、第 5 道、第 6 道横隔板处的横断面各是哪个字母?以 JSON 返回字段 \"4\"、\"5\"、\"6\",每个字段返回断面字母(形如 X)。", "answer": "{\"4\": \"D\", \"5\": \"E\", \"6\": \"F\"}"}]} {"page_01_file_name": "images/MS-U01-03/few_sheet/01.png", "page_02_file_name": "images/MS-U01-03/few_sheet/02.png", "page_03_file_name": "images/MS-U01-03/few_sheet/03.png", "page_04_file_name": "images/MS-U01-03/few_sheet/04.png", "page_05_file_name": "images/MS-U01-03/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U01-03", "set": "U01", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "桥塔处的 C 类梁段上,吊索锚固耳板(吊点)设在距该梁段跨中侧端部多远处?下列说法哪些正确?", "options": [{"key": "A", "text": "C 类梁段距跨中侧端部 2000 mm 处的第一道横隔板为普通横隔板,该处箱梁顶面全宽 34700 mm", "correct": true}, {"key": "B", "text": "C 类梁段桥塔侧端部为端封板,端封板外 510 mm 处为伸缩缝中心线", "correct": true}, {"key": "C", "text": "距跨中侧端部 7000 mm", "correct": false}, {"key": "D", "text": "C 类梁段上并没有吊索锚固耳板", "correct": true}, {"key": "E", "text": "距跨中侧端部 8000 mm", "correct": false}, {"key": "F", "text": "C 类梁段的横隔板中有一道吊索横隔板,主板厚 12 mm", "correct": false}], "answer": ["A", "B", "D"], "few_sheet_pages": [16, 3, 9, 21, 14], "evidence_pages": [14, 16, 21], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U01-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图的“顶板平面展开布置图”上,跨中侧端部到第一道横隔板的距离是多少?这道横隔板右侧标注的名称是什么(从下列中选:普通横隔板、加厚横隔板、半横隔板、支承隔板、端封板、吊索横隔板)?以 JSON 返回两个字段 距离、名称;距离为 {value, unit},单位 mm;名称按所列文字原样返回。", "answer": "{\"距离\": {\"value\": 2000, \"unit\": \"mm\"}, \"名称\": \"普通横隔板\"}"}, {"id": "MS-U01-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中 A-A(普通隔板)横断面图上,箱梁顶面全宽是多少?取断面图顶部以“全宽/2=半宽”形式标注的全宽。返回数值和单位(mm)。", "answer": "{\"value\": 34700, \"unit\": \"mm\"}"}, {"id": "MS-U01-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图的“顶板平面展开布置图”上,桥塔侧端部那道横隔板右侧标注的名称是什么(从下列中选:普通横隔板、加厚横隔板、半横隔板、支承隔板、端封板、吊索横隔板)?它到伸缩缝中心线的距离是多少?以 JSON 返回两个字段 名称、距离;名称按所列文字原样返回;距离为 {value, unit},单位 mm。", "answer": "{\"名称\": \"端封板\", \"距离\": {\"value\": 510, \"unit\": \"mm\"}}"}, {"id": "MS-U01-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁B类节段构造图的“顶板平面展开布置图”上,吊索锚固耳板所在的横隔板距跨中侧端部多远?返回数值和单位(mm)。", "answer": "{\"value\": 8000, \"unit\": \"mm\"}"}, {"id": "MS-U01-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁A类节段构造图的“顶板平面展开布置图”上,吊索锚固耳板所在的横隔板距北岸侧端部多远?返回数值和单位(mm)。", "answer": "{\"value\": 7000, \"unit\": \"mm\"}"}, {"id": "MS-U01-03-R6", "role": "read", "tiers": ["full_set"], "question": "加劲梁B类节段构造图的“工程量表”中,吊索横隔板 G2 的毛料规格里的板厚(规格形如 □宽×厚×长 的中间一项)是多少?返回数值和单位(mm)。", "answer": "{\"value\": 12, \"unit\": \"mm\"}"}, {"id": "MS-U01-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥塔处 C 类梁段上,距跨中侧端部 2000 mm 处那道横隔板所在位置的箱梁顶面全宽是多少?返回数值和单位(mm)。", "answer": "{\"value\": 34700, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U01-04/few_sheet/01.png", "page_02_file_name": "images/MS-U01-04/few_sheet/02.png", "page_03_file_name": "images/MS-U01-04/few_sheet/03.png", "page_04_file_name": "images/MS-U01-04/few_sheet/04.png", "page_05_file_name": "images/MS-U01-04/few_sheet/05.png", "page_06_file_name": "images/MS-U01-04/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U01-04", "set": "U01", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "全桥加劲梁所有梁段(A、B、C 三类)的顶板 U 肋合计多少根?", "options": [{"key": "A", "text": "2915", "correct": false}, {"key": "B", "text": "2860", "correct": false}, {"key": "C", "text": "2858", "correct": false}, {"key": "D", "text": "2200", "correct": false}, {"key": "E", "text": "2911", "correct": true}, {"key": "F", "text": "2809", "correct": false}], "answer": ["E"], "few_sheet_pages": [13, 2, 22, 27, 8, 21], "evidence_pages": [8, 13, 21, 22], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U01-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁A类节段构造图的“工程量表”中,顶板 U 肋 TU1 的数量(每个节段),以及表末“全桥共计 n 个节段总计”一行里的节段数 n 各是多少?以 JSON 返回两个字段 TU1、节段数,每个字段为 {value, unit};TU1 单位 根,节段数单位 个。", "answer": "{\"TU1\": {\"value\": 53, \"unit\": \"根\"}, \"节段数\": {\"value\": 1, \"unit\": \"个\"}}"}, {"id": "MS-U01-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁B类节段构造图的“工程量表”中,顶板 U 肋 TU1 的数量(每个节段),以及表末“全桥共计 n 个节段总计”一行里的节段数 n 各是多少?以 JSON 返回两个字段 TU1、节段数,每个字段为 {value, unit};TU1 单位 根,节段数单位 个。", "answer": "{\"TU1\": {\"value\": 53, \"unit\": \"根\"}, \"节段数\": {\"value\": 52, \"unit\": \"个\"}}"}, {"id": "MS-U01-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图的“工程量表”中,顶板 U 肋 TU1 的数量(每个节段),以及表末“全桥共计 n 个节段总计”一行里的节段数 n 各是多少?以 JSON 返回两个字段 TU1、节段数,每个字段为 {value, unit};TU1 单位 根,节段数单位 个。", "answer": "{\"TU1\": {\"value\": 51, \"unit\": \"根\"}, \"节段数\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U01-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁B类节段构造图的“工程量表”中,底板 U 肋 BU1 的数量(每个节段)是多少?返回数值和单位(根)。", "answer": "{\"value\": 40, \"unit\": \"根\"}"}, {"id": "MS-U01-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "全桥加劲梁中,全桥只有 2 个节段的那一类梁段,每个节段的顶板 U 肋有几根?返回数值和单位(根)。", "answer": "{\"value\": 51, \"unit\": \"根\"}"}]} {"page_01_file_name": "images/MS-U01-05/few_sheet/01.png", "page_02_file_name": "images/MS-U01-05/few_sheet/02.png", "page_03_file_name": "images/MS-U01-05/few_sheet/03.png", "page_04_file_name": "images/MS-U01-05/few_sheet/04.png", "page_05_file_name": "images/MS-U01-05/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U01-05", "set": "U01", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "桥塔处的 C 类梁段底部设有竖向支座和抗风支座。关于它们的位置和朝向,下列说法哪些正确?", "options": [{"key": "A", "text": "第二道半横隔板下方也设有竖向支座", "correct": false}, {"key": "B", "text": "抗风支座装在牛腿横桥向的两侧面上", "correct": true}, {"key": "C", "text": "抗风支座的牛腿设在支承横隔板处,位于箱梁中心线上,自底板向下伸出", "correct": true}, {"key": "D", "text": "抗风支座装在牛腿顺桥向的前、后两面上", "correct": false}, {"key": "E", "text": "竖向支座设在支承横隔板下方、靠近斜底板与水平底板交界处,不在箱梁中心线上", "correct": true}, {"key": "F", "text": "支承横隔板距梁段桥塔侧端部 2040 mm", "correct": false}], "answer": ["B", "C", "E"], "few_sheet_pages": [26, 19, 17, 18, 14], "evidence_pages": [14, 18, 26], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U01-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁抗风支座加劲构造图的“抗风支座横桥向布置图”上,牛腿的横桥向总宽(两侧承压板外侧之间)和牛腿在箱梁底板以下的高度各是多少?以 JSON 返回两个字段 横桥向总宽、底板以下高度,每个字段为 {value, unit},单位 mm。", "answer": "{\"横桥向总宽\": {\"value\": 2000, \"unit\": \"mm\"}, \"底板以下高度\": {\"value\": 750, \"unit\": \"mm\"}}"}, {"id": "MS-U01-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁抗风支座加劲构造图的“抗风支座横桥向布置图”上,牛腿横桥向分段尺寸中,紧靠箱梁中心线左、右两侧的两段各是多少?以 JSON 返回两个字段 左、右,每个字段为 {value, unit},单位 mm。", "answer": "{\"左\": {\"value\": 480, \"unit\": \"mm\"}, \"右\": {\"value\": 480, \"unit\": \"mm\"}}"}, {"id": "MS-U01-05-R3", "role": "read", "tiers": ["full_set"], "question": "加劲梁C类节段构造图的“工程量表”中,支承单元 ZD1 的数量(每个节段)是多少?返回数值和单位(块)。", "answer": "{\"value\": 2, \"unit\": \"块\"}"}, {"id": "MS-U01-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图的“顶板平面展开布置图”上,支承隔板到端封板的间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1490, \"unit\": \"mm\"}"}, {"id": "MS-U01-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图的“顶板平面展开布置图”上,从跨中侧数第二道标为“加厚横隔板”的横隔板,到紧接其后标为“半横隔板”的横隔板,间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2040, \"unit\": \"mm\"}"}, {"id": "MS-U01-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥塔处 C 类梁段上,下方设有抗风支座牛腿的那道横隔板,距梁段桥塔侧端部(端封板)多远?返回数值和单位(mm)。", "answer": "{\"value\": 1490, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U01-06/few_sheet/01.png", "page_02_file_name": "images/MS-U01-06/few_sheet/02.png", "page_03_file_name": "images/MS-U01-06/few_sheet/03.png", "page_04_file_name": "images/MS-U01-06/few_sheet/04.png", "page_05_file_name": "images/MS-U01-06/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U01-06", "set": "U01", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "桥塔处的 C 类梁段内,从跨中侧到桥塔侧共有七道横隔板(含端封板)。哪些横隔板处的水平底板上设有阻尼加劲板?", "options": [{"key": "A", "text": "支承横隔板", "correct": false}, {"key": "B", "text": "普通横隔板", "correct": false}, {"key": "C", "text": "第二道半横隔板", "correct": false}, {"key": "D", "text": "第一道加厚横隔板", "correct": true}, {"key": "E", "text": "第一道半横隔板", "correct": true}, {"key": "F", "text": "第二道加厚横隔板", "correct": true}], "answer": ["D", "E", "F"], "few_sheet_pages": [17, 18, 22, 16, 19], "evidence_pages": [16, 17, 18], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U01-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中 B-B(加厚隔板) 横断面图上,水平底板上方、U 肋以外的竖向加劲板中,最矮的那一块图上标注的编号是什么?按图中写法原样返回(形如 AB1)。", "answer": "\"ZNJ3\""}, {"id": "MS-U01-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中 C-C(半隔板)、D-D(加厚隔板)两个横断面图上,各自水平底板上方、U 肋以外的竖向加劲板中,最矮的那一块图上标注的编号是什么?以 JSON 返回两个字段 C-C、D-D,每个字段按图中写法原样返回编号(形如 AB1)。", "answer": "{\"C-C\": \"ZNJ3\", \"D-D\": \"ZNJ3\"}"}, {"id": "MS-U01-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图中 E-E(半隔板)、F-F(支承隔板)两个横断面图上,水平底板中部一组竖向加劲板下方、平铺在底板上的那块厚板,图上标注的编号各是什么?以 JSON 返回两个字段 E-E、F-F,每个字段按图中写法原样返回编号(形如 AB1)。", "answer": "{\"E-E\": \"ZD1\", \"F-F\": \"ZD1\"}"}, {"id": "MS-U01-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图的“工程量表”中,编号 ZNJ3 和 ZD1 两行的“名称”栏各写的是什么?从下列四项中选:阻尼加劲板、支承加劲板、角点加劲板、腹板加强板。以 JSON 返回两个字段 ZNJ3、ZD1,每个字段按所列文字原样返回。", "answer": "{\"ZNJ3\": \"阻尼加劲板\", \"ZD1\": \"支承加劲板\"}"}, {"id": "MS-U01-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥塔处 C 类梁段内,从跨中侧到桥塔侧共有七道横隔板(含端封板),各道处都有一个以字母命名的横断面。第一道加厚横隔板、第一道半横隔板、第二道加厚横隔板各在哪个横断面上?以 JSON 返回三个字段 第一道加厚、第一道半、第二道加厚,每个字段返回断面字母(形如 X)。", "answer": "{\"第一道加厚\": \"B\", \"第一道半\": \"C\", \"第二道加厚\": \"D\"}"}, {"id": "MS-U01-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥塔处 C 类梁段内,从跨中侧到桥塔侧共有七道横隔板(含端封板),各道处都有一个以字母命名的横断面。普通横隔板、第二道半横隔板、支承横隔板各在哪个横断面上?以 JSON 返回三个字段 普通、第二道半、支承,每个字段返回断面字母(形如 X)。", "answer": "{\"普通\": \"A\", \"第二道半\": \"E\", \"支承\": \"F\"}"}]} {"page_01_file_name": "images/MS-U01-07/few_sheet/01.png", "page_02_file_name": "images/MS-U01-07/few_sheet/02.png", "page_03_file_name": "images/MS-U01-07/few_sheet/03.png", "page_04_file_name": "images/MS-U01-07/few_sheet/04.png", "page_05_file_name": "images/MS-U01-07/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U01-07", "set": "U01", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "全桥加劲梁 A、B、C 三类梁段本体(不计梁段间纵向连接件和抗风支座加劲构造)的钢材总重(含焊缝)是多少 kg?", "options": [{"key": "A", "text": "13511864.31", "correct": false}, {"key": "B", "text": "13865116.48", "correct": false}, {"key": "C", "text": "14107950.13", "correct": true}, {"key": "D", "text": "14034551.85", "correct": false}, {"key": "E", "text": "13899458.41", "correct": false}, {"key": "F", "text": "13809907.22", "correct": false}], "answer": ["C"], "few_sheet_pages": [27, 8, 22, 26, 13], "evidence_pages": [8, 13, 22], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U01-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁A类节段构造图的“工程量表”末行“全桥共计 n 个节段总计(kg)”是多少?返回数值和单位(kg)。", "answer": "{\"value\": 242833.65, \"unit\": \"kg\"}"}, {"id": "MS-U01-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁B类节段构造图的“工程量表”末行“全桥共计 n 个节段总计(kg)”是多少?返回数值和单位(kg)。", "answer": "{\"value\": 13269030.66, \"unit\": \"kg\"}"}, {"id": "MS-U01-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图的“工程量表”末行“全桥共计 n 个节段总计(kg)”是多少?返回数值和单位(kg)。", "answer": "{\"value\": 596085.82, \"unit\": \"kg\"}"}, {"id": "MS-U01-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁B类节段构造图的“工程量表”中,“单个节段板件合计”和“单个节段焊缝(1.5%)”各是多少?以 JSON 返回两个字段 板件合计、焊缝,每个字段为 {value, unit},单位 kg。", "answer": "{\"板件合计\": {\"value\": 251402.63, \"unit\": \"kg\"}, \"焊缝\": {\"value\": 3771.04, \"unit\": \"kg\"}}"}, {"id": "MS-U01-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁抗风支座加劲构造图的“抗风支座加劲构造工程量表”中,末行“全桥共计 2 个牛腿总计(kg)”是多少?返回数值和单位(kg)。", "answer": "{\"value\": 4246.25, \"unit\": \"kg\"}"}, {"id": "MS-U01-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "全桥加劲梁中,“单个节段焊缝”为 4404.58 kg 的那一类梁段,全桥共有几个节段?返回数值和单位(个)。", "answer": "{\"value\": 2, \"unit\": \"个\"}"}]} {"page_01_file_name": "images/MS-U01-08/few_sheet/01.png", "page_02_file_name": "images/MS-U01-08/few_sheet/02.png", "page_03_file_name": "images/MS-U01-08/few_sheet/03.png", "page_04_file_name": "images/MS-U01-08/few_sheet/04.png", "page_05_file_name": "images/MS-U01-08/few_sheet/05.png", "page_06_file_name": "images/MS-U01-08/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U01-08", "set": "U01", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "全桥加劲梁按构造分为 A、B、C 三类梁段。下列构件中,哪些只在其中一类梁段里设置?", "options": [{"key": "A", "text": "腹板人孔镶边板", "correct": false}, {"key": "B", "text": "吊点加强板", "correct": false}, {"key": "C", "text": "风嘴人孔镶边板", "correct": false}, {"key": "D", "text": "支承加劲板", "correct": true}, {"key": "E", "text": "腹板加强板", "correct": false}, {"key": "F", "text": "阻尼加劲板", "correct": true}], "answer": ["D", "F"], "few_sheet_pages": [13, 8, 21, 22, 27, 26], "evidence_pages": [8, 13, 21, 22], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U01-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁A类节段构造图的“工程量表”中,编号 DJ1、编号 GX3 的“数量”栏(每个节段)各是多少?以 JSON 返回字段 \"DJ1\"、\"GX3\",每个字段为 {value, unit},单位 块。", "answer": "{\"DJ1\": {\"value\": 12, \"unit\": \"块\"}, \"GX3\": {\"value\": 10, \"unit\": \"块\"}}"}, {"id": "MS-U01-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁B类节段构造图的“工程量表”中,编号 WK1、编号 DJ1、编号 WX1 的“数量”栏(每个节段)各是多少?以 JSON 返回字段 \"WK1\"、\"DJ1\"、\"WX1\",每个字段为 {value, unit},单位 块。", "answer": "{\"WK1\": {\"value\": 4, \"unit\": \"块\"}, \"DJ1\": {\"value\": 12, \"unit\": \"块\"}, \"WX1\": {\"value\": 4, \"unit\": \"块\"}}"}, {"id": "MS-U01-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图的“工程量表”中,编号 WK1、编号 WX1 的“数量”栏(每个节段)各是多少?以 JSON 返回字段 \"WK1\"、\"WX1\",每个字段为 {value, unit},单位 块。", "answer": "{\"WK1\": {\"value\": 2, \"unit\": \"块\"}, \"WX1\": {\"value\": 2, \"unit\": \"块\"}}"}, {"id": "MS-U01-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁C类节段构造图的“工程量表”中,编号 ZNJ1、编号 ZD1 的“数量”栏(每个节段)各是多少?以 JSON 返回字段 \"ZNJ1\"、\"ZD1\",每个字段为 {value, unit},单位 块。", "answer": "{\"ZNJ1\": {\"value\": 4, \"unit\": \"块\"}, \"ZD1\": {\"value\": 2, \"unit\": \"块\"}}"}, {"id": "MS-U01-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "全桥加劲梁分 A、B、C 三类梁段。B 类梁段和 C 类梁段,每个节段各有几块风嘴人孔镶边板?以 JSON 返回两个字段 B类、C类,每个字段为 {value, unit},单位 块。", "answer": "{\"B类\": {\"value\": 10, \"unit\": \"块\"}, \"C类\": {\"value\": 10, \"unit\": \"块\"}}"}]} {"page_01_file_name": "images/MS-U01-09/few_sheet/01.png", "page_02_file_name": "images/MS-U01-09/few_sheet/02.png", "page_03_file_name": "images/MS-U01-09/few_sheet/03.png", "page_04_file_name": "images/MS-U01-09/few_sheet/04.png", "page_05_file_name": "images/MS-U01-09/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U01-09", "set": "U01", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "跨中的 A 类梁段上,吊索锚固耳板(吊点)设在距该梁段端部多远处?下列说法哪些正确?", "options": [{"key": "A", "text": "吊点位于梁段纵向正中,距两端各 7000 mm", "correct": true}, {"key": "B", "text": "扣索锚固耳板只设在梁段南岸侧一端", "correct": false}, {"key": "C", "text": "A 类梁段上并没有吊索锚固耳板", "correct": false}, {"key": "D", "text": "吊点距跨中侧端部 8000 mm、距桥塔侧端部 7000 mm", "correct": false}, {"key": "E", "text": "梁段两端距端部 1000 mm 处的横隔板上还各设有扣索锚固耳板", "correct": true}, {"key": "F", "text": "吊点处的吊索横隔板与其余横隔板主板厚度相同", "correct": false}], "answer": ["A", "E"], "few_sheet_pages": [8, 12, 7, 3, 9], "evidence_pages": [3, 7, 8], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U01-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁A类节段构造图的“顶板平面展开布置图”上,吊索锚固耳板所在的横隔板距北岸侧端部、距南岸侧端部各多远?以 JSON 返回两个字段 北岸侧、南岸侧,每个字段为 {value, unit},单位 mm。", "answer": "{\"北岸侧\": {\"value\": 7000, \"unit\": \"mm\"}, \"南岸侧\": {\"value\": 7000, \"unit\": \"mm\"}}"}, {"id": "MS-U01-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁A类节段构造图的“顶板平面展开布置图”上,北岸侧端部和南岸侧端部各自的第一道横隔板距该端多远?以 JSON 返回两个字段 北岸侧、南岸侧,每个字段为 {value, unit},单位 mm。", "answer": "{\"北岸侧\": {\"value\": 1000, \"unit\": \"mm\"}, \"南岸侧\": {\"value\": 1000, \"unit\": \"mm\"}}"}, {"id": "MS-U01-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁A类节段构造图的 D-D 立面图上,北岸侧端和南岸侧端的耳板处,各标注到的扣索加强板编号中数字最大的是哪个?以 JSON 返回两个字段 北岸侧、南岸侧,每个字段按图中写法原样返回编号(形如 AB9)。", "answer": "{\"北岸侧\": \"KJ4\", \"南岸侧\": \"KJ4\"}"}, {"id": "MS-U01-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁A类节段构造图的“工程量表”中,吊索横隔板 G2 和非吊索横隔板 G2a 的毛料规格里的板厚(规格形如 □宽×厚×长 的中间一项)各是多少?以 JSON 返回两个字段 G2、G2a,每个字段为 {value, unit},单位 mm。", "answer": "{\"G2\": {\"value\": 12, \"unit\": \"mm\"}, \"G2a\": {\"value\": 10, \"unit\": \"mm\"}}"}, {"id": "MS-U01-09-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "加劲梁B类节段构造图的“顶板平面展开布置图”上,吊索锚固耳板所在的横隔板距跨中侧端部多远?返回数值和单位(mm)。", "answer": "{\"value\": 8000, \"unit\": \"mm\"}"}, {"id": "MS-U01-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "全桥加劲梁中,全桥只有 1 个节段的那一类梁段,每个节段设几块吊点加强板 DJ1?返回数值和单位(块)。", "answer": "{\"value\": 12, \"unit\": \"块\"}"}]} {"page_01_file_name": "images/MS-U02-01/few_sheet/01.png", "page_02_file_name": "images/MS-U02-01/few_sheet/02.png", "page_03_file_name": "images/MS-U02-01/few_sheet/03.png", "page_04_file_name": "images/MS-U02-01/few_sheet/04.png", "page_05_file_name": "images/MS-U02-01/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U02-01", "set": "U02", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "本册有三种 SA 级防撞护栏:混凝土桥面路侧护栏、钢桥面路侧护栏和混凝土桥面中分带护栏。下列构件中,哪些三种护栏都用到、而且规格相同?", "options": [{"key": "A", "text": "预埋钢板(□430×20×270)", "correct": false}, {"key": "B", "text": "立柱钢板(□430×20×270)", "correct": true}, {"key": "C", "text": "M10×164 立柱螺栓", "correct": false}, {"key": "D", "text": "M24×1256 地脚螺栓", "correct": false}, {"key": "E", "text": "横梁拼接处的钢管3(φ114×δ7,长 330 mm)", "correct": true}, {"key": "F", "text": "钢管1(φ127×δ5,长 1500 mm)", "correct": true}], "answer": ["B", "E", "F"], "few_sheet_pages": [4, 17, 8, 14, 6], "evidence_pages": [4, 6, 8], "full_set_page_count": 19, "sub_questions": [{"id": "MS-U02-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(2/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“SA级组合式护栏材料数量表”中,钢管1 的外径和单根长度、立柱钢板单块重量、M10 立柱螺栓的长度(规格中“×”后的数)、横梁拼接处钢管3 的单根长度各是多少?返回 JSON 对象,字段名固定为 钢管1外径、钢管1长度、立柱钢板单重、M10立柱螺栓长度、钢管3长度,每个字段为 {value, unit};长度单位 mm,重量单位 kg。", "answer": "{\"钢管1外径\": {\"value\": 127, \"unit\": \"mm\"}, \"钢管1长度\": {\"value\": 1500, \"unit\": \"mm\"}, \"立柱钢板单重\": {\"value\": 18.23, \"unit\": \"kg\"}, \"M10立柱螺栓长度\": {\"value\": 164, \"unit\": \"mm\"}, \"钢管3长度\": {\"value\": 330, \"unit\": \"mm\"}}"}, {"id": "MS-U02-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(4/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“SA级组合式护栏材料数量表”中,钢管1 的外径和单根长度、立柱钢板单块重量、M10 立柱螺栓的长度(规格中“×”后的数)、横梁拼接处钢管3 的单根长度各是多少?返回 JSON 对象,字段名固定为 钢管1外径、钢管1长度、立柱钢板单重、M10立柱螺栓长度、钢管3长度,每个字段为 {value, unit};长度单位 mm,重量单位 kg。", "answer": "{\"钢管1外径\": {\"value\": 127, \"unit\": \"mm\"}, \"钢管1长度\": {\"value\": 1500, \"unit\": \"mm\"}, \"立柱钢板单重\": {\"value\": 18.23, \"unit\": \"kg\"}, \"M10立柱螺栓长度\": {\"value\": 164, \"unit\": \"mm\"}, \"钢管3长度\": {\"value\": 330, \"unit\": \"mm\"}}"}, {"id": "MS-U02-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“中央分隔护栏构造图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)的“SA级组合式中分带护栏材料数量表”中,钢管1 的外径和单根长度、立柱钢板单块重量、M10 立柱螺栓的长度(规格中“×”后的数)、横梁拼接处钢管3 的单根长度各是多少?返回 JSON 对象,字段名固定为 钢管1外径、钢管1长度、立柱钢板单重、M10立柱螺栓长度、钢管3长度,每个字段为 {value, unit};长度单位 mm,重量单位 kg。", "answer": "{\"钢管1外径\": {\"value\": 127, \"unit\": \"mm\"}, \"钢管1长度\": {\"value\": 1500, \"unit\": \"mm\"}, \"立柱钢板单重\": {\"value\": 18.23, \"unit\": \"kg\"}, \"M10立柱螺栓长度\": {\"value\": 166, \"unit\": \"mm\"}, \"钢管3长度\": {\"value\": 330, \"unit\": \"mm\"}}"}, {"id": "MS-U02-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "混凝土桥面中分带 SA 级防撞护栏所用 M10 立柱螺栓的长度(规格中“×”后的数)是多少?返回数值和单位(mm)。", "answer": "{\"value\": 166, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U02-02/few_sheet/01.png", "page_02_file_name": "images/MS-U02-02/few_sheet/02.png", "page_03_file_name": "images/MS-U02-02/few_sheet/03.png", "page_04_file_name": "images/MS-U02-02/few_sheet/04.png", "page_05_file_name": "images/MS-U02-02/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U02-02", "set": "U02", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "桥台处,竖向落地排水管(竖向排水管2)沿台身向下敷设。它的定位箍间距是多少?关于桥梁排水构造,下列说法哪些正确?", "options": [{"key": "A", "text": "桥台处不设竖向落地排水管", "correct": false}, {"key": "B", "text": "定位箍用 M8 膨胀螺栓固定在墩台身上", "correct": false}, {"key": "C", "text": "立于中分带的桥墩同样设竖向落地排水管,定位箍间距相同", "correct": false}, {"key": "D", "text": "雨水篦材质为镀锌钢板", "correct": false}, {"key": "E", "text": "落地排水管下端先进入沉砂井(构造详水施)", "correct": true}, {"key": "F", "text": "定位箍间距 2000 mm", "correct": true}], "answer": ["E", "F"], "few_sheet_pages": [9, 10, 11, 19, 1], "evidence_pages": [11, 9, 10], "full_set_page_count": 19, "sub_questions": [{"id": "MS-U02-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面排水构造图”(3/3)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥梁排水典型立面布置(一)”中,竖向排水管2 上定位箍的间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2000, \"unit\": \"mm\"}"}, {"id": "MS-U02-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面排水构造图”(1/3)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥梁排水典型横断面布置(一)”中,竖向排水管2 下端接入的构造名称是什么?从 {沉砂井, 检查井, 集水井, 雨水口} 中选一个,原样返回。", "answer": "\"沉砂井\""}, {"id": "MS-U02-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面排水构造图”(2/3)(分张序号按图框右上角“第 x 页 共 y 页”)中,定位箍和雨水篦的材质各是什么?返回 JSON 对象,字段名固定为 定位箍、雨水篦,每个字段从 {镀锌钢板, 铸铁, 不锈钢板, 球墨铸铁} 中取一个,原样返回。", "answer": "{\"定位箍\": \"镀锌钢板\", \"雨水篦\": \"铸铁\"}"}, {"id": "MS-U02-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩防撞保护一般构造图”中,固定槽钢骨架所用膨胀螺栓的规格是什么?按图中写法原样返回(形如 M16)。", "answer": "\"M8\""}, {"id": "MS-U02-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥台处,竖向排水管2 上定位箍的间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2000, \"unit\": \"mm\"}"}, {"id": "MS-U02-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "固定竖向排水管2 的定位箍所用膨胀螺栓的规格是什么?按图中写法原样返回(形如 M16)。", "answer": "\"M12\""}, {"id": "MS-U02-02-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥台处,竖向排水管2 下端接入的构造名称是什么?从 {沉砂井, 检查井, 集水井, 雨水口} 中选一个,原样返回。", "answer": "\"沉砂井\""}]} {"page_01_file_name": "images/MS-U02-03/few_sheet/01.png", "page_02_file_name": "images/MS-U02-03/few_sheet/02.png", "page_03_file_name": "images/MS-U02-03/few_sheet/03.png", "page_04_file_name": "images/MS-U02-03/few_sheet/04.png", "page_05_file_name": "images/MS-U02-03/few_sheet/05.png", "page_06_file_name": "images/MS-U02-03/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U02-03", "set": "U02", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "桥面雨水沿横坡流向桥面边缘,经竖向雨水口进入排水管后落地排走。关于各排水构造的位置和坡向,下列说法哪些正确?", "options": [{"key": "A", "text": "车行道横坡坡向防撞护栏一侧,竖向雨水口紧贴护栏内侧设置", "correct": true}, {"key": "B", "text": "渗水引流系统的 32 mm 螺旋排水管位于铺装上、下层交界处,紧贴防撞护栏", "correct": true}, {"key": "C", "text": "在桥台处,纵向排水管的纵坡坡向背离桥台(流向跨中)", "correct": false}, {"key": "D", "text": "在桥墩处,排水管绕到墩顶以下,水斗设在盖梁底面以下,再沿墩柱落地", "correct": true}, {"key": "E", "text": "钢箱梁桥面的车行道横坡坡向背离防撞护栏", "correct": false}, {"key": "F", "text": "在桥墩处纵向排水管从落水点两侧接入,在桥台处只从桥跨一侧接入", "correct": true}], "answer": ["A", "B", "D", "F"], "few_sheet_pages": [12, 1, 10, 9, 2, 11], "evidence_pages": [9, 1, 2, 11], "full_set_page_count": 19, "sub_questions": [{"id": "MS-U02-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面排水构造图”(1/3)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥梁排水典型横断面布置(一)”中:车行道横坡 i% 的箭头指向图面哪一侧?护栏在车行道的哪一侧?主线桥竖向雨水口在护栏的哪一侧?返回 JSON 对象,字段名固定为 横坡箭头、护栏、雨水口,每个字段从 {左, 右} 中取一个,原样返回。", "answer": "{\"横坡箭头\": \"左\", \"护栏\": \"左\", \"雨水口\": \"右\"}"}, {"id": "MS-U02-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道桥面铺装构造图”(1/2)(分张序号按图框右上角“第 x 页 共 y 页”)的“渗水引流系统”中,32mm 螺旋排水管正上方和正下方紧贴的各是什么?返回 JSON 对象,字段名固定为 上方、下方,每个字段从 {沥青类填缝料, 泡沫类填缝条, 防水粘结剂, 防撞护栏} 中取一个,原样返回。", "answer": "{\"上方\": \"沥青类填缝料\", \"下方\": \"泡沫类填缝条\"}"}, {"id": "MS-U02-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道桥面铺装构造图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)的“钢箱梁桥车行道桥面铺装”中:车行道横坡 i% 的箭头指向图面哪一侧?防撞护栏在图面哪一侧?返回 JSON 对象,字段名固定为 横坡箭头、护栏,每个字段从 {左, 右} 中取一个,原样返回。", "answer": "{\"横坡箭头\": \"左\", \"护栏\": \"左\"}"}, {"id": "MS-U02-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面排水构造图”(3/3)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥梁排水典型立面布置(一)”中:纵向排水管纵坡 j% 的箭头指向图面哪一侧?桥台在图面哪一侧?返回 JSON 对象,字段名固定为 纵坡箭头、桥台,每个字段从 {左, 右} 中取一个,原样返回。", "answer": "{\"纵坡箭头\": \"右\", \"桥台\": \"右\"}"}, {"id": "MS-U02-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面排水构造图”(1/3)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥梁排水典型横断面布置(二)”中,水斗位于哪里?从 {主梁翼缘以下、盖梁顶面以上, 盖梁侧面, 盖梁底面以下的墩柱旁} 中选一个,原样返回。", "answer": "\"盖梁底面以下的墩柱旁\""}, {"id": "MS-U02-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥台处和桥墩处,纵向排水管分别从落水点(竖向排水管1)的几侧接入?返回 JSON 对象,字段名固定为 桥台处、桥墩处,每个字段只返回阿拉伯数字 1 或 2。", "answer": "{\"桥台处\": \"1\", \"桥墩处\": \"2\"}"}, {"id": "MS-U02-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥墩处,水斗位于哪里?从 {主梁翼缘以下、盖梁顶面以上, 盖梁侧面, 盖梁底面以下的墩柱旁} 中选一个,原样返回。", "answer": "\"盖梁底面以下的墩柱旁\""}]} {"page_01_file_name": "images/MS-U02-04/few_sheet/01.png", "page_02_file_name": "images/MS-U02-04/few_sheet/02.png", "page_03_file_name": "images/MS-U02-04/few_sheet/03.png", "page_04_file_name": "images/MS-U02-04/few_sheet/04.png", "page_05_file_name": "images/MS-U02-04/few_sheet/05.png", "page_06_file_name": "images/MS-U02-04/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U02-04", "set": "U02", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "护栏图中的 H 是桥面铺装的厚度。下列护栏构件的尺寸或用量中,哪些会随 H 变化?", "options": [{"key": "A", "text": "混凝土桥面路侧护栏钢立柱本身的高度", "correct": false}, {"key": "B", "text": "钢桥面路侧护栏在每处伸缩缝处加设的 N3 钢板重量", "correct": true}, {"key": "C", "text": "钢桥面路侧护栏的 N1 钢板", "correct": false}, {"key": "D", "text": "中分带护栏每节段钢管1 的重量", "correct": false}, {"key": "E", "text": "混凝土桥面路侧护栏每节段 C35 底座的混凝土量", "correct": true}, {"key": "F", "text": "中分带护栏的 N2 钢筋(φ10)", "correct": false}], "answer": ["B", "E"], "few_sheet_pages": [13, 4, 6, 7, 8, 3], "evidence_pages": [4, 6, 8, 3], "full_set_page_count": 19, "sub_questions": [{"id": "MS-U02-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(2/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“SA级组合式护栏材料数量表”中,每节段 C35 底座的混凝土量,按铺装厚度 H=80 mm 和 H=100 mm 分别是多少?返回 JSON 对象,字段名固定为 H=80、H=100,每个字段为 {value, unit},单位 m³。", "answer": "{\"H=80\": {\"value\": 0.36, \"unit\": \"m³\"}, \"H=100\": {\"value\": 0.375, \"unit\": \"m³\"}}"}, {"id": "MS-U02-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(4/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“伸缩缝处(每处)”表中,N3 钢板(2 块合计)的重量,按 H=80 mm 和 H=100 mm 分别是多少?返回 JSON 对象,字段名固定为 H=80、H=100,每个字段为 {value, unit},单位 kg。", "answer": "{\"H=80\": {\"value\": 54.1, \"unit\": \"kg\"}, \"H=100\": {\"value\": 56.45, \"unit\": \"kg\"}}"}, {"id": "MS-U02-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“中央分隔护栏构造图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)的“SA级组合式中分带护栏材料数量表”中,每节段钢管1 的总重,按 H=80 mm 和 H=100 mm 分别是多少?返回 JSON 对象,字段名固定为 H=80、H=100,每个字段为 {value, unit},单位 kg。", "answer": "{\"H=80\": {\"value\": 135.36, \"unit\": \"kg\"}, \"H=100\": {\"value\": 135.36, \"unit\": \"kg\"}}"}, {"id": "MS-U02-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“中央分隔护栏构造图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)的“SA级组合式中分带护栏材料数量表”中(表头 L=220 mm),每节段 N2 钢筋的总重和 N1 钢筋的单根长度 L1,按 H=80 mm 和 H=100 mm 分别是多少?返回 JSON 对象,字段名固定为 N2总重_H80、N2总重_H100、N1单根长_H80、N1单根长_H100,每个字段为 {value, unit};重量单位 kg,长度单位 mm。", "answer": "{\"N2总重_H80\": {\"value\": 10.18, \"unit\": \"kg\"}, \"N2总重_H100\": {\"value\": 10.18, \"unit\": \"kg\"}, \"N1单根长_H80\": {\"value\": 2318, \"unit\": \"mm\"}, \"N1单根长_H100\": {\"value\": 2358, \"unit\": \"mm\"}}"}, {"id": "MS-U02-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(4/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“SA级组合式护栏材料数量表”“每段护栏”部分中,N1 钢板和 N2 钢板(2 块合计)的重量,按 H=80 mm 和 H=100 mm 分别是多少?返回 JSON 对象,字段名固定为 N1_H80、N1_H100、N2_H80、N2_H100,每个字段为 {value, unit},单位 kg。", "answer": "{\"N1_H80\": {\"value\": 117.75, \"unit\": \"kg\"}, \"N1_H100\": {\"value\": 117.75, \"unit\": \"kg\"}, \"N2_H80\": {\"value\": 173.33, \"unit\": \"kg\"}, \"N2_H100\": {\"value\": 180.86, \"unit\": \"kg\"}}"}, {"id": "MS-U02-04-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(2/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“立柱大样图”中,底座顶面以上立柱部分(含 20 mm 底板)的竖向高度,按 H=80 mm 和 H=100 mm 分别是多少(由分段尺寸相加,或由总高减底座高)?返回 JSON 对象,字段名固定为 H=80、H=100,每个字段为 {value, unit},单位 mm。", "answer": "{\"H=80\": {\"value\": 900, \"unit\": \"mm\"}, \"H=100\": {\"value\": 900, \"unit\": \"mm\"}}"}, {"id": "MS-U02-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "混凝土桥面中分带 SA 级防撞护栏,每节段 N2 钢筋的总重按 H=80 mm 和 H=100 mm 分别是多少?返回 JSON 对象,字段名固定为 H=80、H=100,每个字段为 {value, unit},单位 kg。", "answer": "{\"H=80\": {\"value\": 10.18, \"unit\": \"kg\"}, \"H=100\": {\"value\": 10.18, \"unit\": \"kg\"}}"}]} {"page_01_file_name": "images/MS-U02-05/few_sheet/01.png", "page_02_file_name": "images/MS-U02-05/few_sheet/02.png", "page_03_file_name": "images/MS-U02-05/few_sheet/03.png", "page_04_file_name": "images/MS-U02-05/few_sheet/04.png", "page_05_file_name": "images/MS-U02-05/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U02-05", "set": "U02", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "立于中分带的桥墩处,竖向落地排水管(竖向排水管2)沿墩柱向下敷设。它的定位箍间距是多少?关于桥梁排水构造,下列说法哪些正确?", "options": [{"key": "A", "text": "竖向排水管2 与竖向排水管1 直径相同,都是 150 mm", "correct": false}, {"key": "B", "text": "立于中分带的桥墩不设竖向落地排水管", "correct": true}, {"key": "C", "text": "纵向排水管的支撑托架间距为 5000 mm", "correct": true}, {"key": "D", "text": "定位箍为镀锌钢板(宽 50 mm、厚 3 mm),用 M12 膨胀螺栓固定", "correct": true}, {"key": "E", "text": "雨水篦材质为铸铁", "correct": true}, {"key": "F", "text": "定位箍间距 2000 mm", "correct": false}], "answer": ["B", "C", "D", "E"], "few_sheet_pages": [19, 10, 11, 9, 1], "evidence_pages": [9, 11, 10], "full_set_page_count": 19, "sub_questions": [{"id": "MS-U02-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面排水构造图”(3/3)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥梁排水典型立面布置(一)”中,排水管支撑托架的间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 5000, \"unit\": \"mm\"}"}, {"id": "MS-U02-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面排水构造图”(2/3)(分张序号按图框右上角“第 x 页 共 y 页”)的“定位箍”大样中,镀锌钢板定位箍的宽度和厚度各是多少?返回 JSON 对象,字段名固定为 宽度、厚度,每个字段为 {value, unit},单位 mm。", "answer": "{\"宽度\": {\"value\": 50, \"unit\": \"mm\"}, \"厚度\": {\"value\": 3, \"unit\": \"mm\"}}"}, {"id": "MS-U02-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面排水构造图”(2/3)(分张序号按图框右上角“第 x 页 共 y 页”)中,定位箍和雨水篦的材质各是什么?返回 JSON 对象,字段名固定为 定位箍、雨水篦,每个字段从 {镀锌钢板, 铸铁, 不锈钢板, 球墨铸铁} 中取一个,原样返回。", "answer": "{\"定位箍\": \"镀锌钢板\", \"雨水篦\": \"铸铁\"}"}, {"id": "MS-U02-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面排水构造图”(1/3)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥梁排水典型横断面布置(一)”中,竖向排水管1 和竖向排水管2 的直径各标为多少?返回 JSON 对象,字段名固定为 竖向排水管1、竖向排水管2;能读出数值的写数值(不带单位),图中以字母表示的照写字母。", "answer": "{\"竖向排水管1\": \"150\", \"竖向排水管2\": \"D\"}"}, {"id": "MS-U02-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面排水构造图”(1/3)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥梁排水典型横断面布置(二)”中,竖向排水管2 上定位箍的间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2000, \"unit\": \"mm\"}"}, {"id": "MS-U02-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "固定竖向排水管2 的定位箍所用膨胀螺栓的规格是什么?按图中写法原样返回(形如 M16)。", "answer": "\"M12\""}]} {"page_01_file_name": "images/MS-U02-06/few_sheet/01.png", "page_02_file_name": "images/MS-U02-06/few_sheet/02.png", "page_03_file_name": "images/MS-U02-06/few_sheet/03.png", "page_04_file_name": "images/MS-U02-06/few_sheet/04.png", "page_05_file_name": "images/MS-U02-06/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U02-06", "set": "U02", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "从行车路面往下,混凝土箱梁桥面、钢箱梁桥面和桥台搭板处各有一套自上而下的结构层次。下列\"上一层 → 紧接的下一层\"中,哪些正确?", "options": [{"key": "A", "text": "桥台搭板处:100 mm C20 素混凝土 → 350 mm 钢筋混凝土搭板", "correct": false}, {"key": "B", "text": "混凝土箱梁桥:改性乳化沥青粘层油 → 柔性防水涂料", "correct": false}, {"key": "C", "text": "钢箱梁桥:铺装下层 → 柔性防水涂料", "correct": false}, {"key": "D", "text": "桥台搭板处:350 mm 钢筋混凝土搭板 → 100 mm C20 素混凝土", "correct": true}, {"key": "E", "text": "混凝土箱梁桥:40 mm 厚 AC-16 改性沥青混凝土 → 柔性防水涂料", "correct": true}, {"key": "F", "text": "钢箱梁桥:40 mm 聚合物改性沥青 GA-10 → 专用粘结剂", "correct": true}], "answer": ["D", "E", "F"], "few_sheet_pages": [17, 13, 1, 18, 2], "evidence_pages": [1, 2, 18], "full_set_page_count": 19, "sub_questions": [{"id": "MS-U02-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道桥面铺装构造图”(1/2)(分张序号按图框右上角“第 x 页 共 y 页”)的“混凝土箱梁车行道桥面铺装构造”引线标注中,40mm 厚 AC-16 改性沥青混凝土和柔性防水涂料各是第几层?层序号自上而下从 1 起算(每条引线标注算一层),只返回阿拉伯数字(如 5)。返回 JSON 对象,字段名固定为 AC-16、柔性防水涂料。", "answer": "{\"AC-16\": \"3\", \"柔性防水涂料\": \"4\"}"}, {"id": "MS-U02-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道桥面铺装构造图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)“A大样”的引线标注中,“铺装下层:40mm聚合物改性沥青GA-10”和“专用粘结剂”各是第几层?层序号自上而下从 1 起算(每条引线标注算一层),只返回阿拉伯数字(如 5)。返回 JSON 对象,字段名固定为 GA-10、专用粘结剂。", "answer": "{\"GA-10\": \"3\", \"专用粘结剂\": \"4\"}"}, {"id": "MS-U02-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥台搭板钢筋构造图”1-1 断面右侧的引线标注中,350mm 钢筋混凝土搭板和 100mmC20 素混凝土各是第几层?层序号自上而下从 1 起算(每条引线标注算一层),只返回阿拉伯数字(如 5)。返回 JSON 对象,字段名固定为 搭板、C20素混凝土。", "answer": "{\"搭板\": \"2\", \"C20素混凝土\": \"3\"}"}, {"id": "MS-U02-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "混凝土箱梁桥的车行道桥面铺装中,40mm 厚 AC-16 改性沥青混凝土和柔性防水涂料自上而下各是第几层?层序号自上而下从 1 起算(每条引线标注算一层),只返回阿拉伯数字(如 5)。返回 JSON 对象,字段名固定为 AC-16、柔性防水涂料。", "answer": "{\"AC-16\": \"3\", \"柔性防水涂料\": \"4\"}"}, {"id": "MS-U02-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "钢箱梁桥的车行道桥面铺装中,铺装下层(40mm 聚合物改性沥青 GA-10)和专用粘结剂自上而下各是第几层?层序号自上而下从 1 起算(每条引线标注算一层),只返回阿拉伯数字(如 5)。返回 JSON 对象,字段名固定为 GA-10、专用粘结剂。", "answer": "{\"GA-10\": \"3\", \"专用粘结剂\": \"4\"}"}]} {"page_01_file_name": "images/MS-U02-07/few_sheet/01.png", "page_02_file_name": "images/MS-U02-07/few_sheet/02.png", "page_03_file_name": "images/MS-U02-07/few_sheet/03.png", "page_04_file_name": "images/MS-U02-07/few_sheet/04.png", "page_05_file_name": "images/MS-U02-07/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U02-07", "set": "U02", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "三种 SA 级防撞护栏(混凝土桥面路侧、钢桥面路侧、混凝土桥面中分带)在伸缩缝处都要断开并加设构件。三种护栏各一处伸缩缝,按图中取用的铺装厚度计,伸缩缝处加设的 Q355C 钢材合计是多少(kg)?", "options": [{"key": "A", "text": "231.42", "correct": true}, {"key": "B", "text": "177.32", "correct": false}, {"key": "C", "text": "187.09", "correct": false}, {"key": "D", "text": "222.01", "correct": false}, {"key": "E", "text": "285.52", "correct": false}, {"key": "F", "text": "73.15", "correct": false}], "answer": ["A"], "few_sheet_pages": [13, 4, 12, 6, 8], "evidence_pages": [4, 6, 8], "full_set_page_count": 19, "sub_questions": [{"id": "MS-U02-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(2/4)(分张序号按图框右上角“第 x 页 共 y 页”)“伸缩缝处(每处)”表的每处工程量小计中,Q355C 钢材是多少?返回数值和单位(kg)。", "answer": "{\"value\": 44.33, \"unit\": \"kg\"}"}, {"id": "MS-U02-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(4/4)(分张序号按图框右上角“第 x 页 共 y 页”)“伸缩缝处(每处)”表中,钢管2 的总重和每处工程量小计中的 Q355C 钢材各是多少?返回 JSON 对象,字段名固定为 钢管2、小计,每个字段为 {value, unit},单位 kg。", "answer": "{\"钢管2\": {\"value\": 44.33, \"unit\": \"kg\"}, \"小计\": {\"value\": 98.43, \"unit\": \"kg\"}}"}, {"id": "MS-U02-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“中央分隔护栏构造图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)“伸缩缝处(每处)”表中,钢管2 的根数和每处工程量小计中的 Q355C 钢材各是多少?返回 JSON 对象,字段名固定为 根数、小计,每个字段为 {value, unit};根数单位 根,小计单位 kg。", "answer": "{\"根数\": {\"value\": 6, \"unit\": \"根\"}, \"小计\": {\"value\": 88.66, \"unit\": \"kg\"}}"}, {"id": "MS-U02-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“中央分隔护栏构造图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)“横梁拼接处(每处)”表的每处工程量小计中,Q355C 钢材是多少?返回数值和单位(kg)。", "answer": "{\"value\": 36.57, \"unit\": \"kg\"}"}, {"id": "MS-U02-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "钢桥面路侧 SA 级防撞护栏在每处伸缩缝处加设的 Q355C 钢材合计是多少(按图中取用的铺装厚度)?返回数值和单位(kg)。", "answer": "{\"value\": 98.43, \"unit\": \"kg\"}"}, {"id": "MS-U02-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "混凝土桥面中分带 SA 级防撞护栏在每处伸缩缝处加设的 Q355C 钢材合计是多少?返回数值和单位(kg)。", "answer": "{\"value\": 88.66, \"unit\": \"kg\"}"}]} {"page_01_file_name": "images/MS-U02-08/few_sheet/01.png", "page_02_file_name": "images/MS-U02-08/few_sheet/02.png", "page_03_file_name": "images/MS-U02-08/few_sheet/03.png", "page_04_file_name": "images/MS-U02-08/few_sheet/04.png", "page_05_file_name": "images/MS-U02-08/few_sheet/05.png", "page_06_file_name": "images/MS-U02-08/few_sheet/06.png", "page_07_file_name": "images/MS-U02-08/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U02-08", "set": "U02", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于伸缩缝处的护栏、伸缩装置以及支座、桥台搭板在顺桥向、横桥向和上下方向的布置,下列说法哪些正确?", "options": [{"key": "A", "text": "钢桥面路侧护栏的钢板底座在伸缩缝两侧各设一块 N3 封端", "correct": true}, {"key": "B", "text": "桥台搭板的①号主筋(Φ20,单根 9140 mm)沿横桥向布置", "correct": false}, {"key": "C", "text": "跨缝的钢管2 在缝的两侧都用 M10 螺栓与护栏钢管连接", "correct": false}, {"key": "D", "text": "支座垫平块位于盆式橡胶支座下方、垫石上方", "correct": false}, {"key": "E", "text": "混凝土梁与钢箱梁之间伸缩缝的安装槽,混凝土梁一侧比钢箱梁一侧宽", "correct": true}, {"key": "F", "text": "伸缩缝两侧的两根护栏立柱间距为 1200 mm,小于标准间距 1500 mm", "correct": true}], "answer": ["A", "E", "F"], "few_sheet_pages": [5, 14, 17, 16, 13, 3, 18], "evidence_pages": [3, 5, 14, 17, 18], "full_set_page_count": 19, "sub_questions": [{"id": "MS-U02-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(1/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“防撞护栏立面”中,跨伸缩缝的两根立柱的间距和其余立柱的标准间距各是多少?返回 JSON 对象,字段名固定为 跨缝间距、标准间距,每个字段为 {value, unit},单位 mm。", "answer": "{\"跨缝间距\": {\"value\": 1200, \"unit\": \"mm\"}, \"标准间距\": {\"value\": 1500, \"unit\": \"mm\"}}"}, {"id": "MS-U02-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(1/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“防撞护栏立面”中,跨缝钢管2 上的 M10 螺栓画在伸缩缝 B 的哪一侧?从 {左侧, 右侧, 两侧} 中选一个,原样返回。", "answer": "\"右侧\""}, {"id": "MS-U02-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(3/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“防撞护栏立面”中,紧邻伸缩缝 B 两侧共标出几块 N3 钢板?返回数值和单位(块)。", "answer": "{\"value\": 2, \"unit\": \"块\"}"}, {"id": "MS-U02-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝构造图”(3/4)(分张序号按图框右上角“第 x 页 共 y 页”)“安装截面图 钢箱梁梁体+混凝土梁体”中,伸缩缝两侧安装槽的宽度各是多少?返回 JSON 对象,字段名固定为 钢箱梁侧、混凝土梁侧,每个字段为 {value, unit},单位 mm。", "answer": "{\"钢箱梁侧\": {\"value\": 500, \"unit\": \"mm\"}, \"混凝土梁侧\": {\"value\": 650, \"unit\": \"mm\"}}"}, {"id": "MS-U02-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支座垫石及垫平块钢筋构造图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)的“支座垫平块横立面”中,垫平块、盆式橡胶支座、垫石自上而下各排第几?只返回阿拉伯数字。返回 JSON 对象,字段名固定为 垫平块、盆式橡胶支座、垫石。", "answer": "{\"垫平块\": \"1\", \"盆式橡胶支座\": \"2\", \"垫石\": \"3\"}"}, {"id": "MS-U02-08-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥台搭板钢筋构造图”中,搭板的顺桥向长度、①号钢筋的单根长度各是多少?②号钢筋的单根长度如何标注?返回 JSON 对象,字段名固定为 搭板顺桥向长、①筋单根长、②筋单根长;前两个字段为 {value, unit}(单位 mm),第三个字段按图中写法原样返回字符串。", "answer": "{\"搭板顺桥向长\": {\"value\": 9000, \"unit\": \"mm\"}, \"①筋单根长\": {\"value\": 9140, \"unit\": \"mm\"}, \"②筋单根长\": \"B+140\"}"}, {"id": "MS-U02-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "混凝土梁与钢箱梁之间的伸缩缝,安装槽在钢箱梁一侧和混凝土梁一侧的宽度各是多少?返回 JSON 对象,字段名固定为 钢箱梁侧、混凝土梁侧,每个字段为 {value, unit},单位 mm。", "answer": "{\"钢箱梁侧\": {\"value\": 500, \"unit\": \"mm\"}, \"混凝土梁侧\": {\"value\": 650, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U03-01/few_sheet/01.png", "page_02_file_name": "images/MS-U03-01/few_sheet/02.png", "page_03_file_name": "images/MS-U03-01/few_sheet/03.png", "page_04_file_name": "images/MS-U03-01/few_sheet/04.png", "page_05_file_name": "images/MS-U03-01/few_sheet/05.png", "page_06_file_name": "images/MS-U03-01/few_sheet/06.png", "page_07_file_name": "images/MS-U03-01/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U03-01", "set": "U03", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "本册各类标志支撑结构和隔离设施都给了基础或垫层的材料数量。按各自的材料数量表,下列各项中,哪些单件(一个基础、一块垫层或一段)的体积超过 3 m³?", "options": [{"key": "A", "text": "门架式标志基础下的一块碎石垫层", "correct": false}, {"key": "B", "text": "Φ325 双悬臂(2T)标志的基础", "correct": true}, {"key": "C", "text": "Φ88 柱式标志的基础", "correct": false}, {"key": "D", "text": "车行道隔离墩(每 4 m 一段)", "correct": false}, {"key": "E", "text": "Φ273 单悬臂标志的基础", "correct": true}, {"key": "F", "text": "门架式标志一根立柱下的基础", "correct": true}], "answer": ["B", "E", "F"], "few_sheet_pages": [34, 25, 19, 29, 23, 21, 20], "evidence_pages": [19, 20, 23, 29, 34], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U03-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“Φ325-2T悬臂式标志杆结构设计图”的材料数量表中,“其它材料”一栏的 C25 混凝土(编号㉒)数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 3.33, \"unit\": \"m³\"}"}, {"id": "MS-U03-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“Φ273-2F悬臂式标志杆结构设计图(一)”的单悬臂式标志材料数量表中,“基础”一行的规格给出了三个尺寸。按这三个尺寸相乘,单个基础的体积是多少?返回数值和单位(m³)。", "answer": "{\"value\": 6.336, \"unit\": \"m³\"}"}, {"id": "MS-U03-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“Φ88柱式标志杆结构设计图(一)”的材料数量表中,C25 混凝土的单件数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 0.384, \"unit\": \"m³\"}"}, {"id": "MS-U03-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“龙门架大样图结构设计图(四)”的门架式标志基础材料数量表中,“混凝土26”一行的规格给出了三个尺寸。按这三个尺寸相乘,一件的体积是多少?返回数值和单位(m³)。", "answer": "{\"value\": 7.616, \"unit\": \"m³\"}"}, {"id": "MS-U03-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“龙门架大样图结构设计图(四)”的门架式标志基础材料数量表中,“碎石27”一行的规格给出了三个尺寸。按这三个尺寸相乘,一件的体积是多少?返回数值和单位(m³)。", "answer": "{\"value\": 1.088, \"unit\": \"m³\"}"}, {"id": "MS-U03-01-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“隔离墩大样图”的每4m隔离墩工程数量表中,C30 混凝土的数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 0.558, \"unit\": \"m³\"}"}, {"id": "MS-U03-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "本册某一类标志的材料数量表中,C25 混凝土数量写为 3.33 m³。这类标志的立柱钢管外径是多少?返回数值和单位(mm)。", "answer": "{\"value\": 325, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U03-02/few_sheet/01.png", "page_02_file_name": "images/MS-U03-02/few_sheet/02.png", "page_03_file_name": "images/MS-U03-02/few_sheet/03.png", "page_04_file_name": "images/MS-U03-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U03-02", "set": "U03", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "匝道C线环道内侧、牌面为'停'字的那块标志,关于其立柱与基础,下列说法哪些正确?", "options": [{"key": "A", "text": "立柱钢管长 4500 mm", "correct": false}, {"key": "B", "text": "地脚螺栓与法兰盘同用 Q235 钢制作", "correct": false}, {"key": "C", "text": "立柱底座钢板为 500×500×16", "correct": false}, {"key": "D", "text": "立柱底座共用 8 根地脚螺栓", "correct": false}, {"key": "E", "text": "标志杆热浸镀锌的镀锌量为 350 g/m²", "correct": false}, {"key": "F", "text": "基础为 800×600×800 的 C25 混凝土,方量 0.384 m³", "correct": true}], "answer": ["F"], "few_sheet_pages": [23, 25, 24, 1], "evidence_pages": [1, 23, 24], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U03-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“Φ88柱式标志杆结构设计图(一)”的材料数量表中:地脚螺栓的数量是多少?最后一行混凝土的强度等级和方量各是多少?以 JSON 返回三个字段:anchor_count(数值和单位 根)、concrete_grade(按表中写法写强度等级,形如 \"C30\")、concrete_volume(数值和单位 m³)。", "answer": "{\"anchor_count\": {\"value\": 4, \"unit\": \"根\"}, \"concrete_grade\": \"C25\", \"concrete_volume\": {\"value\": 0.384, \"unit\": \"m³\"}}"}, {"id": "MS-U03-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“Φ88柱式标志杆结构设计图(二)”的说明中:地脚螺栓采用什么钢材制作?标志杆热浸镀锌的镀锌量是多少?以 JSON 返回两个字段:bolt_steel(按说明原文写钢材名称,含“钢”字,形如 \"20号钢\" 或 \"Q345钢\")、pole_zinc(只写数值,不带单位,单位为 g/m²,写成字符串)。", "answer": "{\"bolt_steel\": \"45号钢\", \"pole_zinc\": \"600\"}"}, {"id": "MS-U03-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(一)”上,牌面为“停”字的那块标志,引注的立柱钢管长度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 3500, \"unit\": \"mm\"}"}, {"id": "MS-U03-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "Φ88 柱式标志杆结构设计图共两张。(1) “Φ88柱式标志杆结构设计图(一)”材料数量表中,螺母 M20 的数量是多少?(2) “Φ88柱式标志杆结构设计图(二)”说明中,法兰盘采用什么钢材制作?标志杆以外的其它外露部分和螺母、垫圈的镀锌量是多少?以 JSON 返回三个字段:nut_count(数值和单位 个)、flange_steel(按说明原文写钢材名称,含“钢”字,形如 \"20号钢\" 或 \"Q345钢\")、other_zinc(只写数值,不带单位,单位为 g/m²,写成字符串)。", "answer": "{\"nut_count\": {\"value\": 8, \"unit\": \"个\"}, \"flange_steel\": \"Q235钢\", \"other_zinc\": \"350\"}"}, {"id": "MS-U03-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“Φ140柱式 LED屏结构设计图”上,立柱底座钢板的边长和厚度各是多少?以 JSON 返回两个字段 side、thickness,每个字段为数值和单位(mm)。", "answer": "{\"side\": {\"value\": 500, \"unit\": \"mm\"}, \"thickness\": {\"value\": 16, \"unit\": \"mm\"}}"}, {"id": "MS-U03-02-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(一)”上,让行三角牌与菱形牌合挂在同一根立柱上的那处标志,引注的立柱钢管长度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 4500, \"unit\": \"mm\"}"}, {"id": "MS-U03-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道C线环道内侧、牌面为“停”字的那块标志,其立柱底座法兰盘的边长和厚度各是多少?以 JSON 返回两个字段 side、thickness,每个字段为数值和单位(mm)。", "answer": "{\"side\": {\"value\": 300, \"unit\": \"mm\"}, \"thickness\": {\"value\": 10, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U03-03/few_sheet/01.png", "page_02_file_name": "images/MS-U03-03/few_sheet/02.png", "page_03_file_name": "images/MS-U03-03/few_sheet/03.png", "page_04_file_name": "images/MS-U03-03/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U03-03", "set": "U03", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "set", "question": "下列标志中,哪些的立柱底座是用 M20 地脚螺栓锚固的?", "options": [{"key": "A", "text": "匝道C线环道内侧、牌面为'停'字的标志", "correct": true}, {"key": "B", "text": "让行三角牌与菱形牌合挂在同一根立柱上的那处标志", "correct": true}, {"key": "C", "text": "匝道C线环道内侧的悬臂标志", "correct": false}, {"key": "D", "text": "牌面为边长 1100 mm 三角形的单柱警告标志", "correct": true}, {"key": "E", "text": "还建道路3路口旁、挂有两块直径 1200 mm 圆牌的悬臂标志", "correct": false}, {"key": "F", "text": "主线旁挂有三块直径 1200 mm 圆牌的悬臂标志", "correct": false}], "answer": ["A", "B", "D"], "few_sheet_pages": [1, 20, 19, 23], "evidence_pages": [1, 23], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U03-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(一)”上有三处单柱标志:牌面为“停”字的那一块;让行三角牌与菱形牌合挂一根立柱的那一处;牌面为边长 1100 mm 三角形的那一块。它们引注的立柱钢管外径各是多少?以 JSON 返回三个字段 stop、yield_combo、tri1100,每个字段为数值和单位(mm)。", "answer": "{\"stop\": {\"value\": 88, \"unit\": \"mm\"}, \"yield_combo\": {\"value\": 88, \"unit\": \"mm\"}, \"tri1100\": {\"value\": 88, \"unit\": \"mm\"}}"}, {"id": "MS-U03-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(一)”上有三处悬臂标志:匝道C线环道内侧、版面 4800×2400 的那一处;还建道路3 路口旁挂两块直径 1200 mm 圆牌的那一处;主线旁挂三块直径 1200 mm 圆牌的那一处。它们引注的立柱钢管外径各是多少?以 JSON 返回三个字段 cloop、two_round、three_round,每个字段为数值和单位(mm)。", "answer": "{\"cloop\": {\"value\": 273, \"unit\": \"mm\"}, \"two_round\": {\"value\": 325, \"unit\": \"mm\"}, \"three_round\": {\"value\": 325, \"unit\": \"mm\"}}"}, {"id": "MS-U03-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“Φ88柱式标志杆结构设计图(一)”的材料数量表中,地脚螺栓的螺纹规格是什么?只写 M 加数字(形如 M16),不写长度。", "answer": "\"M20\""}, {"id": "MS-U03-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“Φ325-2T悬臂式标志杆结构设计图”的材料数量表中,直角地脚螺栓的螺纹规格是什么?只写 M 加数字(形如 M16),不写长度。", "answer": "\"M30\""}, {"id": "MS-U03-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“Φ273-2F悬臂式标志杆结构设计图(一)”的单悬臂式标志材料数量表中,地脚螺栓的螺纹规格是什么?只写 M 加数字(形如 M16),不写长度。", "answer": "\"M24\""}, {"id": "MS-U03-03-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "(1) “Φ325-2T悬臂式标志杆结构设计图”材料数量表中的六角螺栓,(2) “Φ273-2F悬臂式标志杆结构设计图(一)”材料数量表中的连接螺栓,螺纹规格各是什么?以 JSON 返回两个字段 hex_bolt_2T、conn_bolt_2F,每个字段只写 M 加数字(形如 M16),不写长度。", "answer": "{\"hex_bolt_2T\": \"M20\", \"conn_bolt_2F\": \"M20\"}"}, {"id": "MS-U03-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道C线环道内侧的那处悬臂标志,其立柱底座地脚螺栓的螺纹规格是什么?只写 M 加数字(形如 M16),不写长度。", "answer": "\"M24\""}]} {"page_01_file_name": "images/MS-U03-04/few_sheet/01.png", "page_02_file_name": "images/MS-U03-04/few_sheet/02.png", "page_03_file_name": "images/MS-U03-04/few_sheet/03.png", "page_04_file_name": "images/MS-U03-04/few_sheet/04.png", "page_05_file_name": "images/MS-U03-04/few_sheet/05.png", "page_06_file_name": "images/MS-U03-04/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U03-04", "set": "U03", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "主线上设有两处\"支坪长江大桥\"桥名标志。靠绕城高速一侧那处桥名标志所在的龙门架上装有雷视一体机。关于这处龙门架,下列说法哪些正确?", "options": [{"key": "A", "text": "这处龙门架只跨主线的一幅", "correct": false}, {"key": "B", "text": "这处龙门架上的全景枪球一体机两幅各装 1 台,与挂收费站预告标志的龙门架相同", "correct": true}, {"key": "C", "text": "这处龙门架上装有 6 台雷视一体机", "correct": true}, {"key": "D", "text": "这处龙门架上只装 1 台全景枪球一体机,与靠九龙坡那处桥名龙门架相同", "correct": false}, {"key": "E", "text": "这处龙门架上并没有雷视一体机", "correct": false}, {"key": "F", "text": "桥名标志挂在这处龙门架驶往绕城高速方向那一幅的一侧", "correct": false}], "answer": ["B", "C"], "few_sheet_pages": [5, 9, 11, 8, 3, 10], "evidence_pages": [8, 3, 11, 10], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U03-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“智慧交通设施平面布置图(二)”上,位于 ZX-RQ46 与 ZX-RQ47 两根路灯杆之间的那处龙门架,两侧标注合计有几台雷视一体机?没有标注的记 0。返回数值和单位(个)。", "answer": "{\"value\": 6, \"unit\": \"个\"}"}, {"id": "MS-U03-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“智慧交通设施平面布置图(二)”上,位于 ZX-RQ46 与 ZX-RQ47 两根路灯杆之间的那处龙门架,ZX-RQ 一侧和 ZX-LQ 一侧各标注了几台全景枪球一体机?返回 JSON 对象,字段名固定为 ZX-RQ一侧、ZX-LQ一侧,每个字段为数值和单位(个)。", "answer": "{\"ZX-RQ一侧\": {\"value\": 1, \"unit\": \"个\"}, \"ZX-LQ一侧\": {\"value\": 1, \"unit\": \"个\"}}"}, {"id": "MS-U03-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“智慧交通设施平面布置图(五)”上,旁边画有“支坪长江大桥”桥名板的那处龙门架,标注了几台全景枪球一体机?返回数值和单位(个)。", "answer": "{\"value\": 1, \"unit\": \"个\"}"}, {"id": "MS-U03-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(三)”上,挂“支坪长江大桥”桥名标志的那处龙门架,横跨主线的哪一部分?从 {往绕城高速方向的一幅, 往九龙坡方向的一幅, 两幅都跨} 中选一个原样返回。", "answer": "\"两幅都跨\""}, {"id": "MS-U03-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(三)”上,挂“支坪长江大桥”桥名标志的那处龙门架,往绕城高速方向那一幅一侧引出的标志版面宽度、往九龙坡方向那一幅一侧引出的标志版面宽度各是多少?返回 JSON 对象,字段名固定为 往绕城高速一侧、往九龙坡一侧,每个字段为数值和单位(mm)。", "answer": "{\"往绕城高速一侧\": {\"value\": 5000, \"unit\": \"mm\"}, \"往九龙坡一侧\": {\"value\": 4000, \"unit\": \"mm\"}}"}, {"id": "MS-U03-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上有两处挂“支坪长江大桥”桥名标志的龙门架。靠绕城高速一侧的那一处,在 ZX-RQ 编号路灯杆那一侧位于哪两根路灯杆之间?按图上编号原样返回(形如 ZX-RQ1)。返回 JSON 对象,字段名固定为 编号较小、编号较大。", "answer": "{\"编号较小\": \"ZX-RQ46\", \"编号较大\": \"ZX-RQ47\"}"}, {"id": "MS-U03-04-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上挂收费站预告标志的那处龙门架,ZX-RQ 一侧和 ZX-LQ 一侧各装了几台全景枪球一体机?返回 JSON 对象,字段名固定为 ZX-RQ一侧、ZX-LQ一侧,每个字段为数值和单位(个)。", "answer": "{\"ZX-RQ一侧\": {\"value\": 1, \"unit\": \"个\"}, \"ZX-LQ一侧\": {\"value\": 1, \"unit\": \"个\"}}"}]} {"page_01_file_name": "images/MS-U03-05/few_sheet/01.png", "page_02_file_name": "images/MS-U03-05/few_sheet/02.png", "page_03_file_name": "images/MS-U03-05/few_sheet/03.png", "page_04_file_name": "images/MS-U03-05/few_sheet/04.png", "page_05_file_name": "images/MS-U03-05/few_sheet/05.png", "page_06_file_name": "images/MS-U03-05/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U03-05", "set": "U03", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿主线桩号增大方向(由九龙坡侧设计范围线驶往绕城高速),主线上先后设有多处龙门架或悬臂式(架空)标志,直到驶往绕城高速那一幅分出匝道处的双悬臂标志为止。下列\"前一处 → 紧接的下一处\"中,哪些正确?", "options": [{"key": "A", "text": "挂收费站预告标志的龙门架 → 挂限速 40 标志的双悬臂标志", "correct": false}, {"key": "B", "text": "只挂两块指路标志、只跨一幅的龙门架 → 挂桥名标志和限速 80 标志的龙门架", "correct": true}, {"key": "C", "text": "挂桥名标志和限速 80 标志的龙门架 → 挂另一处桥名标志的龙门架", "correct": false}, {"key": "D", "text": "挂桥名标志和限速 80 标志的龙门架 → 挂收费站预告标志的龙门架", "correct": true}, {"key": "E", "text": "只挂两块指路标志、只跨一幅的龙门架 → 挂收费站预告标志的龙门架", "correct": false}, {"key": "F", "text": "挂另一处桥名标志的龙门架 → 挂收费站预告标志的龙门架", "correct": false}], "answer": ["B", "D"], "few_sheet_pages": [5, 10, 6, 3, 2, 4], "evidence_pages": [6, 5, 4, 3], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U03-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(六)”上,主线横跨有两处门架型标志:一处挂“支坪长江大桥”桥名标志,另一处只挂指路标志。两处各位于主线什么桩号?按图上桩号刻度估读,把桩号换算成米数(例如桩号 K3+210 记作 3210 m)。返回 JSON 对象,字段名固定为 桥名龙门架、指路龙门架,每个字段为数值和单位(m)。", "answer": "{\"桥名龙门架\": {\"value\": 124, \"unit\": \"m\"}, \"指路龙门架\": {\"value\": 21, \"unit\": \"m\"}}"}, {"id": "MS-U03-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(五)”上,主线横跨的那处门架型标志位于主线什么桩号?按图上桩号刻度估读,把桩号换算成米数(例如桩号 K3+210 记作 3210 m),返回数值和单位(m)。", "answer": "{\"value\": 779, \"unit\": \"m\"}"}, {"id": "MS-U03-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(三)”上,挂“支坪长江大桥”桥名标志的那处门架型标志位于主线什么桩号?按图上桩号刻度估读,把桩号换算成米数(例如桩号 K3+210 记作 3210 m),返回数值和单位(m)。", "answer": "{\"value\": 1745, \"unit\": \"m\"}"}, {"id": "MS-U03-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上挂收费站预告标志的那处龙门架,位于主线什么桩号?按图上桩号刻度估读,把桩号换算成米数(例如桩号 K3+210 记作 3210 m),返回数值和单位(m)。", "answer": "{\"value\": 779, \"unit\": \"m\"}"}, {"id": "MS-U03-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上有两处挂“支坪长江大桥”桥名标志的龙门架。其中同时挂有限速 80 圆形标志的那一处,位于主线什么桩号?按图上桩号刻度估读,把桩号换算成米数(例如桩号 K3+210 记作 3210 m),返回数值和单位(m)。", "answer": "{\"value\": 124, \"unit\": \"m\"}"}, {"id": "MS-U03-05-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上只挂两块指路标志、只跨一幅的那处龙门架,位于主线什么桩号?按图上桩号刻度估读,把桩号换算成米数(例如桩号 K3+210 记作 3210 m),返回数值和单位(m)。", "answer": "{\"value\": 21, \"unit\": \"m\"}"}, {"id": "MS-U03-05-B4", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上有两处挂“支坪长江大桥”桥名标志的龙门架。其中没有挂限速 80 圆形标志的那一处,位于主线什么桩号?按图上桩号刻度估读,把桩号换算成米数(例如桩号 K3+210 记作 3210 m),返回数值和单位(m)。", "answer": "{\"value\": 1745, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U03-06/few_sheet/01.png", "page_02_file_name": "images/MS-U03-06/few_sheet/02.png", "page_03_file_name": "images/MS-U03-06/few_sheet/03.png", "page_04_file_name": "images/MS-U03-06/few_sheet/04.png", "page_05_file_name": "images/MS-U03-06/few_sheet/05.png", "page_06_file_name": "images/MS-U03-06/few_sheet/06.png", "page_07_file_name": "images/MS-U03-06/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U03-06", "set": "U03", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿主线桩号增大方向(由九龙坡侧设计范围线驶往绕城高速),在 ZX-RQ 编号路灯杆那一侧,主线上的全景枪球一体机依次装在路灯杆或与标志共用的龙门架上,直到驶往绕城高速那一幅分出匝道处为止。下列\"前一台的安装位置 → 紧接的下一台的安装位置\"中,哪些正确?", "options": [{"key": "A", "text": "挂桥名标志和限速 80 标志的龙门架 → ZX-RQ8 路灯杆", "correct": true}, {"key": "B", "text": "ZX-RQ25 路灯杆 → ZX-RQ31 路灯杆", "correct": true}, {"key": "C", "text": "ZX-RQ37 路灯杆 → ZX-RQ42 路灯杆", "correct": true}, {"key": "D", "text": "ZX-RQ19 路灯杆 → ZX-RQ25 路灯杆", "correct": false}, {"key": "E", "text": "ZX-RQ14 路灯杆 → 挂收费站预告标志的龙门架", "correct": true}, {"key": "F", "text": "ZX-RQ42 路灯杆 → ZX-RQ53 路灯杆", "correct": false}], "answer": ["A", "B", "C", "E"], "few_sheet_pages": [9, 8, 11, 10, 5, 4, 7], "evidence_pages": [11, 10, 9, 8, 5], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U03-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“智慧交通设施平面布置图(四)”上,ZX-RQ 编号路灯杆那一侧标注“附着路灯杆件”的全景枪球一体机,按所在路灯杆编号从小到大,依次装在哪几根杆上?按图上编号原样返回(形如 ZX-RQ1)。返回 JSON 对象,字段名固定为 第1台、第2台。", "answer": "{\"第1台\": \"ZX-RQ8\", \"第2台\": \"ZX-RQ14\"}"}, {"id": "MS-U03-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“智慧交通设施平面布置图(三)”上,ZX-RQ 编号路灯杆那一侧标注“附着路灯杆件”的全景枪球一体机,按所在路灯杆编号从小到大,依次装在哪几根杆上?按图上编号原样返回(形如 ZX-RQ1)。返回 JSON 对象,字段名固定为 第1台、第2台、第3台。", "answer": "{\"第1台\": \"ZX-RQ25\", \"第2台\": \"ZX-RQ31\", \"第3台\": \"ZX-RQ37\"}"}, {"id": "MS-U03-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“智慧交通设施平面布置图(二)”上,ZX-RQ 编号路灯杆那一侧标注“附着路灯杆件”的全景枪球一体机,按所在路灯杆编号从小到大,依次装在哪几根杆上?按图上编号原样返回(形如 ZX-RQ1)。返回 JSON 对象,字段名固定为 第1台、第2台。", "answer": "{\"第1台\": \"ZX-RQ42\", \"第2台\": \"ZX-RQ53\"}"}, {"id": "MS-U03-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“智慧交通设施平面布置图(四)”上,ZX-RQ 编号路灯杆那一侧标注“与标志共用龙门架”的那台全景枪球一体机,所在龙门架位于哪两根路灯杆之间?按图上编号原样返回(形如 ZX-RQ1)。返回 JSON 对象,字段名固定为 编号较小、编号较大。", "answer": "{\"编号较小\": \"ZX-RQ18\", \"编号较大\": \"ZX-RQ19\"}"}, {"id": "MS-U03-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上有两处挂“支坪长江大桥”桥名标志的龙门架。靠九龙坡一侧的那一处,在 ZX-RQ 编号路灯杆那一侧位于哪两根路灯杆之间?按图上编号原样返回(形如 ZX-RQ1)。返回 JSON 对象,字段名固定为 编号较小、编号较大。", "answer": "{\"编号较小\": \"ZX-RQ4\", \"编号较大\": \"ZX-RQ5\"}"}, {"id": "MS-U03-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上挂收费站预告标志的那处龙门架,在 ZX-RQ 编号路灯杆那一侧位于哪两根路灯杆之间?按图上编号原样返回(形如 ZX-RQ1)。返回 JSON 对象,字段名固定为 编号较小、编号较大。", "answer": "{\"编号较小\": \"ZX-RQ18\", \"编号较大\": \"ZX-RQ19\"}"}, {"id": "MS-U03-06-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上有两处挂“支坪长江大桥”桥名标志的龙门架。靠绕城高速一侧的那一处,在 ZX-RQ 编号路灯杆那一侧位于哪两根路灯杆之间?按图上编号原样返回(形如 ZX-RQ1)。返回 JSON 对象,字段名固定为 编号较小、编号较大。", "answer": "{\"编号较小\": \"ZX-RQ46\", \"编号较大\": \"ZX-RQ47\"}"}]} {"page_01_file_name": "images/MS-U03-07/few_sheet/01.png", "page_02_file_name": "images/MS-U03-07/few_sheet/02.png", "page_03_file_name": "images/MS-U03-07/few_sheet/03.png", "page_04_file_name": "images/MS-U03-07/few_sheet/04.png", "page_05_file_name": "images/MS-U03-07/few_sheet/05.png", "page_06_file_name": "images/MS-U03-07/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U03-07", "set": "U03", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "主线上下两幅分别驶往绕城高速和九龙坡。关于主线上龙门架、标志和防撞垫所在的一幅或一侧,下列说法哪些正确?", "options": [{"key": "A", "text": "收费站预告标志挂在龙门架上驶往绕城高速方向那一幅的一侧", "correct": true}, {"key": "B", "text": "防撞垫设在驶往九龙坡方向那一幅匝道汇入的合流鼻端", "correct": false}, {"key": "C", "text": "合流诱导标志设在驶往九龙坡方向那一幅匝道汇入处的路侧", "correct": true}, {"key": "D", "text": "九龙坡侧设计范围线附近的那处龙门架只跨驶往九龙坡方向的那一幅", "correct": true}, {"key": "E", "text": "防撞垫设在驶往绕城高速方向那一幅分出匝道的分流鼻端", "correct": true}, {"key": "F", "text": "挂收费站预告标志的龙门架只跨驶往绕城高速方向的那一幅", "correct": false}], "answer": ["A", "C", "D", "E"], "few_sheet_pages": [6, 4, 5, 3, 14, 10], "evidence_pages": [6, 5, 3, 14], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U03-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(六)”上,只挂两块指路标志(2-5000×3600)的那处龙门架,横跨主线的哪一部分?从 {往江津方向的一幅, 往九龙坡方向的一幅, 两幅都跨} 中选一个原样返回。", "answer": "\"往九龙坡方向的一幅\""}, {"id": "MS-U03-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(五)”上的那处龙门架,横跨主线的哪一部分?从 {往江津方向的一幅, 往九龙坡方向的一幅, 两幅都跨} 中选一个原样返回。", "answer": "\"两幅都跨\""}, {"id": "MS-U03-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(五)”上,龙门架引出的标志中,画有“收费站”字样和车辆图案的那块版面,画在哪一幅一侧?从 {往江津方向的一幅一侧, 往九龙坡方向的一幅一侧, 两侧都有} 中选一个原样返回。", "answer": "\"往江津方向的一幅一侧\""}, {"id": "MS-U03-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(三)”上标注“防撞垫”的位置在哪里?从 {往绕城高速方向那一幅的分流鼻端, 往九龙坡方向那一幅的合流鼻端, 两处都有} 中选一个原样返回。", "answer": "\"往绕城高速方向那一幅的分流鼻端\""}, {"id": "MS-U03-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(三)”上,用 Φ88 立柱支撑的那块三角形标志:版面边长是多少?它立在哪一幅的路侧?返回 JSON 对象,字段名固定为 边长、所在一幅;边长为数值和单位(mm),所在一幅从 {往绕城高速方向的一幅, 往九龙坡方向的一幅} 中选一个原样返回。", "answer": "{\"边长\": {\"value\": 1100, \"unit\": \"mm\"}, \"所在一幅\": \"往九龙坡方向的一幅\"}"}, {"id": "MS-U03-07-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志版面设计图(一)”中,合流诱导标志尺寸标准图的三角形边长是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1100, \"unit\": \"mm\"}"}, {"id": "MS-U03-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "九龙坡侧设计范围线附近的那处龙门架,横跨主线的哪一部分?从 {驶往绕城高速的一幅, 驶往九龙坡的一幅, 两幅都跨} 中选一个原样返回。", "answer": "\"驶往九龙坡的一幅\""}]} {"page_01_file_name": "images/MS-U03-08/few_sheet/01.png", "page_02_file_name": "images/MS-U03-08/few_sheet/02.png", "page_03_file_name": "images/MS-U03-08/few_sheet/03.png", "page_04_file_name": "images/MS-U03-08/few_sheet/04.png", "page_05_file_name": "images/MS-U03-08/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U03-08", "set": "U03", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "互通的加速车道和减速车道处设有导流线、V 形渐变段和单向突起路标。沿行车方向看,关于这些标线和突起路标的前后位置,下列说法哪些正确?", "options": [{"key": "A", "text": "道路出口标线中,长度大于 30 m 的实线段在 V 形线渐变段的下游", "correct": false}, {"key": "B", "text": "道路入口标线中,V 形线渐变段的下游先接一段长度大于 30 m 的实线,再接虚线", "correct": true}, {"key": "C", "text": "减速车道处,先经过三角导流区,再经过 V 形线渐变段", "correct": false}, {"key": "D", "text": "加速车道处,先经过三角导流区(突起路标间距 4000 mm),再经过 V 形线渐变段(间距 5000 mm)", "correct": true}, {"key": "E", "text": "加速车道处,突起路标间距 6000 mm 的实线段在三角导流区的上游", "correct": false}, {"key": "F", "text": "减速车道处,突起路标间距 6000 mm 的实线段在三角导流区的上游", "correct": true}], "answer": ["B", "D", "F"], "few_sheet_pages": [31, 16, 17, 32, 33], "evidence_pages": [32, 33, 17], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U03-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“加速车道突起路标布置图”中,标注了突起路标间距的三段标线区段,按图面从左到右依次是哪一种?每个字段从 {三角导流区, V形线渐变段, 实线段} 中取一个,原样返回。返回 JSON 对象,字段名固定为 左、中、右。", "answer": "{\"左\": \"三角导流区\", \"中\": \"V形线渐变段\", \"右\": \"实线段\"}"}, {"id": "MS-U03-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“减速车道突起路标布置图”中,标注了突起路标间距的三段标线区段,按图面从左到右依次是哪一种?每个字段从 {三角导流区, V形线渐变段, 实线段} 中取一个,原样返回。返回 JSON 对象,字段名固定为 左、中、右。", "answer": "{\"左\": \"实线段\", \"中\": \"V形线渐变段\", \"右\": \"三角导流区\"}"}, {"id": "MS-U03-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“地面道路标线(二)”中的“道路入口标线”大样,沿图面从左到右依次是哪三种线形?每个字段从 {V形线, 实线, 虚线} 中取一个,原样返回。返回 JSON 对象,字段名固定为 左、中、右。", "answer": "{\"左\": \"V形线\", \"中\": \"实线\", \"右\": \"虚线\"}"}, {"id": "MS-U03-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“地面道路标线(二)”中的“道路出口标线”大样,沿图面从左到右依次是哪三种线形?每个字段从 {V形线, 实线, 虚线} 中取一个,原样返回。返回 JSON 对象,字段名固定为 左、中、右。", "answer": "{\"左\": \"虚线\", \"中\": \"实线\", \"右\": \"V形线\"}"}, {"id": "MS-U03-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "互通加速车道处,标注了突起路标间距的几段标线区段中,沿行车方向位于最上游的那一段,突起路标间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 4000, \"unit\": \"mm\"}"}, {"id": "MS-U03-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "互通减速车道处,标注了突起路标间距的几段标线区段中,沿行车方向位于最上游的那一段,突起路标间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 6000, \"unit\": \"mm\"}"}, {"id": "MS-U03-08-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "道路入口标线和道路出口标线中,沿行驶方向位于最下游一端的分别是哪种线形?每个字段从 {V形线, 实线, 虚线} 中取一个,原样返回。返回 JSON 对象,字段名固定为 入口、出口。", "answer": "{\"入口\": \"虚线\", \"出口\": \"V形线\"}"}]} {"page_01_file_name": "images/MS-U03-09/few_sheet/01.png", "page_02_file_name": "images/MS-U03-09/few_sheet/02.png", "page_03_file_name": "images/MS-U03-09/few_sheet/03.png", "page_04_file_name": "images/MS-U03-09/few_sheet/04.png", "page_05_file_name": "images/MS-U03-09/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U03-09", "set": "U03", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "主线上设有两处\"支坪长江大桥\"桥名标志。靠九龙坡一侧那处桥名标志所在的龙门架上装有雷视一体机。关于这处龙门架,下列说法哪些正确?", "options": [{"key": "A", "text": "这处龙门架上装有 6 台雷视一体机", "correct": false}, {"key": "B", "text": "这处龙门架上并没有雷视一体机", "correct": true}, {"key": "C", "text": "这处龙门架只跨主线的一幅,即驶往绕城高速方向的那一幅", "correct": true}, {"key": "D", "text": "这处龙门架上除桥名标志外,还挂有限速 80 的圆形标志", "correct": true}, {"key": "E", "text": "这处龙门架与另一处桥名标志所在的龙门架一样,都只跨主线一幅", "correct": false}, {"key": "F", "text": "两处桥名标志的版面规格相同", "correct": true}], "answer": ["B", "C", "D", "F"], "few_sheet_pages": [11, 10, 3, 6, 5], "evidence_pages": [11, 6, 3], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U03-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“智慧交通设施平面布置图(五)”上,旁边画有“支坪长江大桥”桥名板的那处龙门架,标注了几台雷视一体机?没有标注的记 0。返回数值和单位(个)。", "answer": "{\"value\": 0, \"unit\": \"个\"}"}, {"id": "MS-U03-09-R2", "role": "read", "tiers": ["full_set"], "question": "“智慧交通设施平面布置图(二)”上,旁边画有“支坪长江大桥”桥名板的那处龙门架,标注了几台雷视一体机?返回数值和单位(个)。", "answer": "{\"value\": 6, \"unit\": \"个\"}"}, {"id": "MS-U03-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(六)”上,挂“支坪长江大桥”桥名标志的那处龙门架,横跨主线的哪一部分?从 {往江津方向的一幅, 往九龙坡方向的一幅, 两幅都跨} 中选一个原样返回。", "answer": "\"往江津方向的一幅\""}, {"id": "MS-U03-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(三)”上,挂“支坪长江大桥”桥名标志的那处龙门架,横跨主线的哪一部分?从 {往绕城高速方向的一幅, 往九龙坡方向的一幅, 两幅都跨} 中选一个原样返回。", "answer": "\"两幅都跨\""}, {"id": "MS-U03-09-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(六)”上,挂“支坪长江大桥”桥名标志的那处龙门架:桥名标志的版面宽、高各是多少?桥名板旁那块红圈圆形标志上写的数字是多少?返回 JSON 对象,字段名固定为 宽、高、圆形标志数字;宽、高为数值和单位(mm),圆形标志数字只写阿拉伯数字。", "answer": "{\"宽\": {\"value\": 4000, \"unit\": \"mm\"}, \"高\": {\"value\": 2000, \"unit\": \"mm\"}, \"圆形标志数字\": \"80\"}"}, {"id": "MS-U03-09-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“交通标志标线设计图(三)”上,挂在龙门架上的“支坪长江大桥”桥名标志,版面宽、高各是多少?返回 JSON 对象,字段名固定为 宽、高,每个字段为数值和单位(mm)。", "answer": "{\"宽\": {\"value\": 4000, \"unit\": \"mm\"}, \"高\": {\"value\": 2000, \"unit\": \"mm\"}}"}, {"id": "MS-U03-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上有两处挂“支坪长江大桥”桥名标志的龙门架。靠九龙坡一侧的那一处,横跨主线的哪一部分?从 {驶往绕城高速的一幅, 驶往九龙坡的一幅, 两幅都跨} 中选一个原样返回。", "answer": "\"驶往绕城高速的一幅\""}]} {"page_01_file_name": "images/MS-U03-10/few_sheet/01.png", "page_02_file_name": "images/MS-U03-10/few_sheet/02.png", "page_03_file_name": "images/MS-U03-10/few_sheet/03.png", "page_04_file_name": "images/MS-U03-10/few_sheet/04.png", "page_05_file_name": "images/MS-U03-10/few_sheet/05.png", "page_06_file_name": "images/MS-U03-10/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U03-10", "set": "U03", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "主线自九龙坡侧设计范围线起,至驶往绕城高速那一幅分出匝道处(分流鼻端设双悬臂标志)为止,两侧合计共设多少台全景枪球一体机?", "options": [{"key": "A", "text": "26", "correct": false}, {"key": "B", "text": "18", "correct": false}, {"key": "C", "text": "20", "correct": true}, {"key": "D", "text": "14", "correct": false}, {"key": "E", "text": "10", "correct": false}, {"key": "F", "text": "6", "correct": false}], "answer": ["C"], "few_sheet_pages": [8, 10, 7, 5, 11, 9], "evidence_pages": [11, 10, 9, 8], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U03-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“智慧交通设施平面布置图(五)”上,主线两侧一共画了几台全景枪球一体机?按图上各处“全景枪球一体机×n”的标注相加,返回数值和单位(个)。", "answer": "{\"value\": 2, \"unit\": \"个\"}"}, {"id": "MS-U03-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“智慧交通设施平面布置图(四)”上,主线两侧一共画了几台全景枪球一体机?按图上各处“全景枪球一体机×n”的标注相加,返回数值和单位(个)。", "answer": "{\"value\": 6, \"unit\": \"个\"}"}, {"id": "MS-U03-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“智慧交通设施平面布置图(三)”上,主线两侧一共画了几台全景枪球一体机?按图上各处“全景枪球一体机×n”的标注相加,返回数值和单位(个)。", "answer": "{\"value\": 6, \"unit\": \"个\"}"}, {"id": "MS-U03-10-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“智慧交通设施平面布置图(二)”上,主线两侧(不计驶往绕城高速那一幅分流鼻端双悬臂标志处的设备)一共画了几台全景枪球一体机?按图上各处“全景枪球一体机×n”的标注相加,返回数值和单位(个)。", "answer": "{\"value\": 6, \"unit\": \"个\"}"}, {"id": "MS-U03-10-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“智慧交通设施平面布置图(二)”上,挂“支坪长江大桥”桥名标志的那处龙门架,标注了几台雷视一体机?返回数值和单位(个)。", "answer": "{\"value\": 6, \"unit\": \"个\"}"}, {"id": "MS-U03-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上有两处挂“支坪长江大桥”桥名标志的龙门架。靠九龙坡一侧的那一处龙门架上,装了几台全景枪球一体机?返回数值和单位(个)。", "answer": "{\"value\": 1, \"unit\": \"个\"}"}, {"id": "MS-U03-10-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上只挂两块指路标志、只跨一幅的那处龙门架上,装了几台全景枪球一体机?返回数值和单位(个)。", "answer": "{\"value\": 1, \"unit\": \"个\"}"}]} {"page_01_file_name": "images/MS-U03-11/few_sheet/01.png", "page_02_file_name": "images/MS-U03-11/few_sheet/02.png", "page_03_file_name": "images/MS-U03-11/few_sheet/03.png", "page_04_file_name": "images/MS-U03-11/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U03-11", "set": "U03", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "约 K1+750 处,与'支坪长江大桥'桥名牌挂在同一座门架上的那几块 3600 mm 高的标志板,下列说法哪些正确?", "options": [{"key": "A", "text": "每块板两端的竖向条材中心距板边各 250 mm", "correct": false}, {"key": "B", "text": "每块板背面两道横梁的中心间距为 1600 mm", "correct": false}, {"key": "C", "text": "这座门架上这样的标志板共 3 块", "correct": false}, {"key": "D", "text": "这几块板背面的竖向条材合计 18 根", "correct": true}, {"key": "E", "text": "这几块板背面的竖向条材合计 24 根", "correct": false}, {"key": "F", "text": "每块板背面下横梁中心距板底边 900 mm", "correct": true}], "answer": ["D", "F"], "few_sheet_pages": [27, 28, 3, 26], "evidence_pages": [3, 26, 27], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U03-11-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "约 K1+750 处,与'支坪长江大桥'桥名牌挂在同一座门架上的 3600 mm 高的标志板共有几块?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 2, \"unit\": \"块\"}"}, {"id": "MS-U03-11-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "约 K1+750 处,与'支坪长江大桥'桥名牌挂在同一座门架上的 3600 mm 高的标志板,每块宽多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 5000, \"unit\": \"mm\"}"}, {"id": "MS-U03-11-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "龙门架大样图结构设计图(二)中,宽 5000 mm 标志板的标志板背面连接图里,竖向条材共有几根?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 9, \"unit\": \"根\"}"}, {"id": "MS-U03-11-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "龙门架大样图结构设计图(二)中,宽 3000 mm 标志板的标志板背面连接图里,竖向条材共有几根?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 6, \"unit\": \"根\"}"}, {"id": "MS-U03-11-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "龙门架大样图结构设计图(二)中,宽 5000 mm 标志板的标志板背面连接图底部的横向尺寸链里,标 500 的分段共有几段?只返回数字。", "answer": "\"10\""}, {"id": "MS-U03-11-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "龙门架大样图结构设计图(一)的门架式标志材料数量表(不含基础)中,规格 3000×3600×3 的标志板有几块?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1, \"unit\": \"块\"}"}]} {"page_01_file_name": "images/MS-U04-01/few_sheet/01.png", "page_02_file_name": "images/MS-U04-01/few_sheet/02.png", "page_03_file_name": "images/MS-U04-01/few_sheet/03.png", "page_04_file_name": "images/MS-U04-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-01", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "以 P8 桥塔中心桩号处的纵断面地面高为基准,关于 P8 桥塔基础与塔柱各控制面的高低,下列说法哪些正确?", "options": [{"key": "A", "text": "桩基桩底低于地面 26.427 m", "correct": true}, {"key": "B", "text": "塔座顶面高出地面 0.073 m", "correct": true}, {"key": "C", "text": "C20 素混凝土填充段顶面高出地面 21.923 m", "correct": false}, {"key": "D", "text": "C20 素混凝土填充段顶面高出地面 5.073 m", "correct": false}, {"key": "E", "text": "承台底面低于地面 6.427 m", "correct": true}, {"key": "F", "text": "承台顶面低于地面 1.427 m", "correct": true}], "answer": ["A", "B", "E", "F"], "few_sheet_pages": [7, 9, 2, 8], "evidence_pages": [2, 7, 8, 9], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "P8 桥塔中心线对应的纵断面桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K1+221.000\""}, {"id": "MS-U04-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "P8 桥塔承台厚度尺寸 500 的上端标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 177.293, \"unit\": \"m\"}"}, {"id": "MS-U04-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥立面布置图纵断面表中,桩号 K1+221.000 一栏的地面高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 178.72, \"unit\": \"m\"}"}, {"id": "MS-U04-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥立面布置图纵断面表中,桩号 K0+401.000 一栏的地面高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 195.088, \"unit\": \"m\"}"}, {"id": "MS-U04-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "P8 桥塔一般构造图半 B-B 图中,塔座顶面的标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 178.793, \"unit\": \"m\"}"}, {"id": "MS-U04-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "P8 桥塔基础构造图立面中,钻孔 CP8-9 的孔口标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 178.37, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U04-02/few_sheet/01.png", "page_02_file_name": "images/MS-U04-02/few_sheet/02.png", "page_03_file_name": "images/MS-U04-02/few_sheet/03.png", "page_04_file_name": "images/MS-U04-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-02", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "路线桩号 K1+221.000 处的那座桥塔,关于它的水位变化及溅浪区与塔身涂装,下列说法哪些正确?", "options": [{"key": "A", "text": "水位变化及溅浪区上界比该塔承台底面高 34.797 m", "correct": false}, {"key": "B", "text": "水位变化及溅浪区上界比该塔承台底面高 13.477 m", "correct": false}, {"key": "C", "text": "水位变化及溅浪区上界比该塔塔座顶面高 23.477 m", "correct": true}, {"key": "D", "text": "该塔水位变化区涂装面积为 1598.0 m²", "correct": true}, {"key": "E", "text": "水位变化及溅浪区上界比该塔塔座顶面高 28.297 m", "correct": false}, {"key": "F", "text": "该塔大气区涂装面积为 15131.1 m²", "correct": false}], "answer": ["C", "D"], "few_sheet_pages": [8, 2, 11, 9], "evidence_pages": [2, 8, 9, 11], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "路线桩号 K1+221.000 处的墩(塔)编号是什么?按图中编号原样返回(形如 P3)。", "answer": "\"P8\""}, {"id": "MS-U04-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主桥桥塔的水位变化及溅浪区,上界标高是多少 m?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 202.27, \"unit\": \"m\"}"}, {"id": "MS-U04-02-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "路线桩号 K0+401.000 处的墩(塔)编号是什么?按图中编号原样返回(形如 P3)。", "answer": "\"P7\""}, {"id": "MS-U04-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔一般构造图(第 2 页 共 2 页)的 P8 塔半立面图中,塔座顶面标高是多少 m?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 178.793, \"unit\": \"m\"}"}, {"id": "MS-U04-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔一般构造图(第 1 页 共 2 页)的 P7 塔半立面图中,塔座顶面标高是多少 m?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 195.293, \"unit\": \"m\"}"}, {"id": "MS-U04-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔一般构造图(第 2 页 共 2 页)的 P8 塔半侧面图中,300年一遇洪水位是多少 m?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 202.09, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U04-03/few_sheet/01.png", "page_02_file_name": "images/MS-U04-03/few_sheet/02.png", "page_03_file_name": "images/MS-U04-03/few_sheet/03.png", "page_04_file_name": "images/MS-U04-03/few_sheet/04.png", "page_05_file_name": "images/MS-U04-03/few_sheet/05.png", "page_06_file_name": "images/MS-U04-03/few_sheet/06.png", "page_07_file_name": "images/MS-U04-03/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-03", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "桥塔上、下横梁预应力钢束在立面和平面上的走向与排列,下列说法哪些正确?", "options": [{"key": "A", "text": "上横梁各层钢束在立面上沿梁长水平布置,不设竖弯", "correct": true}, {"key": "B", "text": "下横梁同一钢束两端距梁顶缘的距离相同,立面上不设竖弯", "correct": true}, {"key": "C", "text": "上横梁每侧两束中,T*-1 一束靠横梁侧面,T*-2 一束在其内侧", "correct": true}, {"key": "D", "text": "下横梁钢束中 B1 为最上一层、B11 为最下一层", "correct": false}, {"key": "E", "text": "上横梁钢束在平面上于梁中段最靠近侧面,向两端锚固处逐渐内收", "correct": true}, {"key": "F", "text": "上横梁钢束在平面上自梁中段向两端逐渐外移、靠近侧面", "correct": false}], "answer": ["A", "B", "C", "E"], "few_sheet_pages": [16, 21, 14, 15, 20, 19, 17], "evidence_pages": [14, 15, 16, 19, 20], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔上横梁预应力布置图的 B—B 断面中,每侧腹板内有两列钢束。横梁侧面到外侧一列钢束中心的距离、外侧一列到内侧一列钢束中心的距离各是多少?以 JSON 返回两个字段 side_to_outer、outer_to_inner,每个为数值和单位(cm)。", "answer": "{\"side_to_outer\": {\"value\": 15, \"unit\": \"cm\"}, \"outer_to_inner\": {\"value\": 20, \"unit\": \"cm\"}}"}, {"id": "MS-U04-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔上横梁预应力布置图的 C—C 断面中,横梁侧面到外侧一列锚具中心的距离是多少?返回数值和单位(cm)。", "answer": "{\"value\": 50, \"unit\": \"cm\"}"}, {"id": "MS-U04-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "上横梁预应力钢束 T6-2,在桥塔中心线所在的横截面上,钢束中心距上横梁侧面多少?返回数值和单位(cm)。", "answer": "{\"value\": 35, \"unit\": \"cm\"}"}, {"id": "MS-U04-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔上横梁预应力布置图的“上横梁预应力立面布置图”中,梁端一侧的竖向尺寸标注里,最下层钢束 T1 以下那一段的尺寸和钢束层间距各是多少?以 JSON 返回两个字段 below_T1、spacing,每个为数值和单位(cm)。", "answer": "{\"below_T1\": {\"value\": 160, \"unit\": \"cm\"}, \"spacing\": {\"value\": 80, \"unit\": \"cm\"}}"}, {"id": "MS-U04-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔上横梁预应力布置图的 B—B 断面中,竖向尺寸标注里最下层钢束以下那一段的尺寸和钢束层间距各是多少?以 JSON 返回两个字段 below_T1、spacing,每个为数值和单位(cm)。", "answer": "{\"below_T1\": {\"value\": 160, \"unit\": \"cm\"}, \"spacing\": {\"value\": 80, \"unit\": \"cm\"}}"}, {"id": "MS-U04-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔下横梁预应力钢束参数表中,B1-1 和 B11-1 的 Y 值各是多少?以 JSON 返回两个字段 B1_1、B11_1,每个为数值和单位(cm)。", "answer": "{\"B1_1\": {\"value\": 550, \"unit\": \"cm\"}, \"B11_1\": {\"value\": 50, \"unit\": \"cm\"}}"}, {"id": "MS-U04-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "下横梁预应力钢束 B4-1,在梁端锚固一侧和在桥塔中心线处,钢束中心距下横梁顶缘的竖向距离各是多少?以 JSON 返回两个字段 end、center,每个为数值和单位(cm)。", "answer": "{\"end\": {\"value\": 400, \"unit\": \"cm\"}, \"center\": {\"value\": 400, \"unit\": \"cm\"}}"}]} {"page_01_file_name": "images/MS-U04-04/few_sheet/01.png", "page_02_file_name": "images/MS-U04-04/few_sheet/02.png", "page_03_file_name": "images/MS-U04-04/few_sheet/03.png", "page_04_file_name": "images/MS-U04-04/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-04", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "主桥两座桥塔中,设置了船撞防撞设施的那一座,关于它的基础和防撞设施,下列说法哪些正确?", "options": [{"key": "A", "text": "基础开挖石方工程量为 7936.8 m³", "correct": true}, {"key": "B", "text": "桩底砂质泥岩天然单轴抗压强度标准值要求不小于 8.5 MPa", "correct": false}, {"key": "C", "text": "基础开挖土方工程量为 23471.4 m³", "correct": false}, {"key": "D", "text": "防撞设施为 B 型多级目标耗能套箱", "correct": false}, {"key": "E", "text": "防撞套箱的竖向高度为 1400 cm", "correct": false}, {"key": "F", "text": "嵌岩桩桩底标高为 152.293 m", "correct": true}], "answer": ["A", "F"], "few_sheet_pages": [27, 6, 2, 7], "evidence_pages": [27, 7], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“P8桥塔基础构造图”上:右侧“工程数量表(m³)”中的土方、石方工程量,附注要求的桩底砂质泥岩天然单轴抗压强度标准值下限,以及立面图上的嵌岩桩桩底标高,各是多少?以 JSON 返回四个字段:earth(数值和单位 m³)、rock(数值和单位 m³)、rock_strength(只写附注中的数值,不带单位,单位为 MPa,写成字符串)、pile_bottom(数值和单位 m)。", "answer": "{\"earth\": {\"value\": 2607.9, \"unit\": \"m³\"}, \"rock\": {\"value\": 7936.8, \"unit\": \"m³\"}, \"rock_strength\": \"10.53\", \"pile_bottom\": {\"value\": 152.293, \"unit\": \"m\"}}"}, {"id": "MS-U04-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“P7桥塔基础构造图”上:右侧“工程数量表(m³)”中的土方工程量,以及附注要求的桩底砂质泥岩天然单轴抗压强度标准值下限,各是多少?以 JSON 返回两个字段:earth(数值和单位 m³)、rock_strength(只写附注中的数值,不带单位,单位为 MPa,写成字符串)。", "answer": "{\"earth\": {\"value\": 23471.4, \"unit\": \"m³\"}, \"rock_strength\": \"8.5\"}"}, {"id": "MS-U04-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔防撞设施总体布置图”的立面图上,桥塔处所画防撞套箱:引注写的是哪一型套箱?套箱的竖向高度(立面上竖直方向的尺寸)是多少?以 JSON 返回两个字段:type(只写型式字母,一个大写字母)、height(数值和单位 cm)。", "answer": "{\"type\": \"A\", \"height\": {\"value\": 400, \"unit\": \"cm\"}}"}, {"id": "MS-U04-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主桥立面布置图”上,P9、P10 两个墩的墩身上所设套箱,引注写的是哪一型套箱?只写型式字母(一个大写字母)。按图中记号或文字原样返回一个字符串。", "answer": "\"B\""}, {"id": "MS-U04-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔防撞设施总体布置图”的立面图上,桥塔处所画防撞套箱的横向尺寸(立面上水平方向的尺寸)是多少?返回数值和单位(cm)。", "answer": "{\"value\": 1400, \"unit\": \"cm\"}"}, {"id": "MS-U04-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主桥两座桥塔中,设置了船撞防撞设施的那一座,其基础嵌岩桩的桩底标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 152.293, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U04-05/few_sheet/01.png", "page_02_file_name": "images/MS-U04-05/few_sheet/02.png", "page_03_file_name": "images/MS-U04-05/few_sheet/03.png", "page_04_file_name": "images/MS-U04-05/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-05", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "P8 桥塔下横梁上下缘之间的那道剖切,其对应的塔柱断面,下列说法哪些正确?", "options": [{"key": "A", "text": "外侧斜角处壁厚为 184.2 cm", "correct": true}, {"key": "B", "text": "内侧 1:1 斜面处标注的壁厚为 150 cm", "correct": true}, {"key": "C", "text": "内侧 1:1 斜面处标注的壁厚为 80 cm", "correct": false}, {"key": "D", "text": "塔壁直线段厚度为 100 cm", "correct": false}, {"key": "E", "text": "外侧斜角处壁厚为 113.1 cm", "correct": false}, {"key": "F", "text": "塔壁直线段厚度为 90 cm", "correct": false}], "answer": ["A", "B"], "few_sheet_pages": [15, 19, 10, 9], "evidence_pages": [9, 10, 19], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "P8 桥塔下横梁上下缘之间的那道剖切,标注的是哪个字母?只返回一个大写字母。", "answer": "\"C\""}, {"id": "MS-U04-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "P8 桥塔下横梁上缘以上最近的一道剖切,标注的是哪个字母?只返回一个大写字母。", "answer": "\"E\""}, {"id": "MS-U04-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔断面构造图 C-C 断面中,塔壁直线段的厚度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 150, \"unit\": \"cm\"}"}, {"id": "MS-U04-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔断面构造图 D-D 断面中,塔壁直线段的厚度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 100, \"unit\": \"cm\"}"}, {"id": "MS-U04-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔断面构造图 C-C 断面中,外侧斜角处标注的壁厚是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 184.2, \"unit\": \"cm\"}"}, {"id": "MS-U04-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔断面构造图 D-D 断面中,外侧斜角处标注的壁厚是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 113.1, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U04-06/few_sheet/01.png", "page_02_file_name": "images/MS-U04-06/few_sheet/02.png", "page_03_file_name": "images/MS-U04-06/few_sheet/03.png", "page_04_file_name": "images/MS-U04-06/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-06", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "P7 桥塔塔柱 C20 素混凝土填充段顶面以上最近的一道剖切,下列说法哪些正确?", "options": [{"key": "A", "text": "其断面内腔转角倒角为 50 cm × 50 cm", "correct": false}, {"key": "B", "text": "其断面外侧斜角处壁厚为 184.2 cm", "correct": false}, {"key": "C", "text": "其断面外侧斜角处壁厚为 113.1 cm", "correct": true}, {"key": "D", "text": "其断面塔壁直线段比 P8 桥塔填充段顶面以上最近一道剖切处薄 20 cm", "correct": true}, {"key": "E", "text": "其断面外轮廓尺寸为 700 cm × 600 cm", "correct": false}, {"key": "F", "text": "其断面塔壁直线段与 P8 桥塔填充段顶面以上最近一道剖切处厚度相同", "correct": false}], "answer": ["C", "D"], "few_sheet_pages": [9, 18, 10, 8], "evidence_pages": [8, 9, 10, 18], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "P7 桥塔塔柱 C20 素混凝土填充段顶面以上最近的一道剖切,标注的是哪个字母?只返回一个大写字母。", "answer": "\"D\""}, {"id": "MS-U04-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "P8 桥塔塔柱 C20 素混凝土填充段顶面以上最近的一道剖切,标注的是哪个字母?只返回一个大写字母。", "answer": "\"H\""}, {"id": "MS-U04-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔断面构造图 D-D 断面中,外侧斜角处标注的壁厚是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 113.1, \"unit\": \"cm\"}"}, {"id": "MS-U04-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔断面构造图 C-C 断面中,外侧斜角处标注的壁厚是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 184.2, \"unit\": \"cm\"}"}, {"id": "MS-U04-06-R3", "role": "read", "tiers": ["full_set"], "question": "桥塔断面构造图 H-H 断面中,外侧斜角处标注的壁厚是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 141.4, \"unit\": \"cm\"}"}, {"id": "MS-U04-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔断面构造图 D-D 断面中,塔壁直线段的厚度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 100, \"unit\": \"cm\"}"}, {"id": "MS-U04-06-R5", "role": "read", "tiers": ["full_set"], "question": "桥塔断面构造图 H-H 断面中,塔壁直线段的厚度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 120, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U04-07/few_sheet/01.png", "page_02_file_name": "images/MS-U04-07/few_sheet/02.png", "page_03_file_name": "images/MS-U04-07/few_sheet/03.png", "page_04_file_name": "images/MS-U04-07/few_sheet/04.png", "page_05_file_name": "images/MS-U04-07/few_sheet/05.png", "page_06_file_name": "images/MS-U04-07/few_sheet/06.png", "page_07_file_name": "images/MS-U04-07/few_sheet/07.png", "page_08_file_name": "images/MS-U04-07/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-07", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "下列构造或设施中,哪些只在 P8 桥塔设置,P7 桥塔没有?", "options": [{"key": "A", "text": "横向抗风支座", "correct": false}, {"key": "B", "text": "无泄漏黏滞阻尼器", "correct": false}, {"key": "C", "text": "A 型多级目标耗能套箱", "correct": true}, {"key": "D", "text": "塔柱底部填充 C20 素混凝土", "correct": false}, {"key": "E", "text": "塔柱下段壁厚 120 cm 的空心断面段", "correct": true}, {"key": "F", "text": "上塔柱内的检修电梯", "correct": false}], "answer": ["C", "E"], "few_sheet_pages": [7, 11, 10, 22, 27, 4, 9, 8], "evidence_pages": [27, 8, 9, 11, 22, 4], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔一般构造图”的“P7塔半立面图”和“P8塔半立面图”上,沿塔柱自塔底向上,紧接塔底 C—C 剖切之后的第一个剖切符号各是哪个字母?以 JSON 返回两个字段 P7、P8,各按图中字母原样返回一个大写字母(形如 X)。", "answer": "{\"P7\": \"D\", \"P8\": \"H\"}"}, {"id": "MS-U04-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔断面构造图”中 H—H 断面的壁厚是多少?返回数值和单位(cm)。", "answer": "{\"value\": 120, \"unit\": \"cm\"}"}, {"id": "MS-U04-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔一般构造图”的“P7塔半立面图”和“P8塔半立面图”上,塔柱底部填充的素混凝土强度等级各是什么?以 JSON 返回两个字段 P7、P8,按图中写法返回(形如 C30)。", "answer": "{\"P7\": \"C20\", \"P8\": \"C20\"}"}, {"id": "MS-U04-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔检修爬梯及电梯布置图”附注中,每个桥塔设置的电梯部数和全桥电梯总部数各是多少?以 JSON 返回两个字段 per_tower、total,各只写阿拉伯数字(字符串)。", "answer": "{\"per_tower\": \"1\", \"total\": \"2\"}"}, {"id": "MS-U04-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主桥约束体系布置图”的“主桥约束体系平面布置图”上,P7 主塔一端和 P8 主塔一端:横向抗风支座标注的型号各是什么,无泄漏黏滞阻尼器各画了几个?以 JSON 返回四个字段:P7_wind、P8_wind(型号,按图中写法原样返回,形如 ABQZ-SX)、P7_damper、P8_damper(数值和单位 个)。", "answer": "{\"P7_wind\": \"KFQZ-SX\", \"P8_wind\": \"KFQZ-SX\", \"P7_damper\": {\"value\": 2, \"unit\": \"个\"}, \"P8_damper\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U04-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "设有 A型多级目标耗能套箱 的那座桥塔,其基础承台顶面标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 177.293, \"unit\": \"m\"}"}, {"id": "MS-U04-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "全桥两座桥塔中,未设置防撞设施的那一座,桥塔总高度是多少?返回数值和单位(m)。", "answer": "{\"value\": 177.5, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U04-08/few_sheet/01.png", "page_02_file_name": "images/MS-U04-08/few_sheet/02.png", "page_03_file_name": "images/MS-U04-08/few_sheet/03.png", "page_04_file_name": "images/MS-U04-08/few_sheet/04.png", "page_05_file_name": "images/MS-U04-08/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-08", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿 P8 桥塔塔柱自塔底向上,塔柱空心断面的壁厚分段变化。下列\"前一段壁厚 → 紧接的上一段壁厚\"(cm)中,哪些正确?", "options": [{"key": "A", "text": "100 → 80", "correct": false}, {"key": "B", "text": "150 → 100", "correct": false}, {"key": "C", "text": "150 → 120", "correct": true}, {"key": "D", "text": "120 → 150", "correct": false}, {"key": "E", "text": "120 → 100", "correct": true}, {"key": "F", "text": "100 → 150", "correct": true}], "answer": ["C", "E", "F"], "few_sheet_pages": [10, 11, 22, 9, 8], "evidence_pages": [9, 10, 11], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔一般构造图”的“P8塔半立面图”上,沿塔柱自塔底向上,依次出现的前五个不同位置的剖切符号字母是什么(同一字母在相邻位置重复出现时只记一次)?以 JSON 返回五个字段 s1~s5,各为一个大写字母(形如 X)。", "answer": "{\"s1\": \"C\", \"s2\": \"H\", \"s3\": \"D\", \"s4\": \"C\", \"s5\": \"E\"}"}, {"id": "MS-U04-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔断面构造图”中 C—C、D—D、E—E 三个断面的壁厚各是多少?以 JSON 返回三个字段 C、D、E,每个为数值和单位(cm)。", "answer": "{\"C\": {\"value\": 150, \"unit\": \"cm\"}, \"D\": {\"value\": 100, \"unit\": \"cm\"}, \"E\": {\"value\": 80, \"unit\": \"cm\"}}"}, {"id": "MS-U04-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔断面构造图”中 H—H 断面的壁厚是多少?返回数值和单位(cm)。", "answer": "{\"value\": 120, \"unit\": \"cm\"}"}, {"id": "MS-U04-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔一般构造图”的“P7塔半立面图”上,沿塔柱自塔底向上,依次出现的前三个不同位置的剖切符号字母是什么(同一字母在相邻位置重复出现时只记一次)?以 JSON 返回三个字段 s1~s3,各为一个大写字母(形如 X)。", "answer": "{\"s1\": \"C\", \"s2\": \"D\", \"s3\": \"C\"}"}, {"id": "MS-U04-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "P8 桥塔塔柱在下横梁高度处所设的空心断面,壁厚是多少?返回数值和单位(cm)。", "answer": "{\"value\": 150, \"unit\": \"cm\"}"}, {"id": "MS-U04-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "P8 桥塔塔柱上壁厚为 120 cm 的那一段,在立面上标注的剖切符号是哪个字母?按图中字母原样返回一个大写字母(形如 X)。", "answer": "\"H\""}]} {"page_01_file_name": "images/MS-U04-09/few_sheet/01.png", "page_02_file_name": "images/MS-U04-09/few_sheet/02.png", "page_03_file_name": "images/MS-U04-09/few_sheet/03.png", "page_04_file_name": "images/MS-U04-09/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-09", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "主桥桥塔下横梁的 B9-2 预应力钢束,下列说法哪些正确?", "options": [{"key": "A", "text": "在桥塔中心线处,其轴线标高为 256.893 m", "correct": false}, {"key": "B", "text": "其钢绞线单根长为 49.253 m", "correct": false}, {"key": "C", "text": "两侧腹板中的 B9-2 钢束在桥塔中心线处相距 6.60 m", "correct": false}, {"key": "D", "text": "全桥该编号钢束共用锚具 4 套", "correct": false}, {"key": "E", "text": "在桥塔中心线处,其轴线标高为 259.893 m", "correct": true}, {"key": "F", "text": "两侧腹板中的 B9-2 钢束在桥塔中心线处相距 8.20 m", "correct": false}], "answer": ["E"], "few_sheet_pages": [21, 18, 17, 20], "evidence_pages": [18, 20, 21], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主桥桥塔下横梁的 B9-2 钢束,在桥塔中心线处其轴线位于下横梁顶面以下多少 cm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 150, \"unit\": \"cm\"}"}, {"id": "MS-U04-09-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主桥桥塔下横梁的 B9-2 钢束,在桥塔中心线处其轴线位于下横梁底面以上多少 cm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 450, \"unit\": \"cm\"}"}, {"id": "MS-U04-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔下横梁一般构造图的下横梁半立面图中,下横梁顶面标高是多少 m?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 261.393, \"unit\": \"m\"}"}, {"id": "MS-U04-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔下横梁预应力材料数量表中,B9-2 的钢绞线单根长是多少 cm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 5125.4, \"unit\": \"cm\"}"}, {"id": "MS-U04-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔下横梁预应力材料数量表中,B9-2 的波纹管单根长是多少 cm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 4925.3, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U04-10/few_sheet/01.png", "page_02_file_name": "images/MS-U04-10/few_sheet/02.png", "page_03_file_name": "images/MS-U04-10/few_sheet/03.png", "page_04_file_name": "images/MS-U04-10/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-10", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "P7 桥塔塔柱排水口的竖向位置,下列说法哪些正确?", "options": [{"key": "A", "text": "排水口比塔座顶面高 23.50 m", "correct": false}, {"key": "B", "text": "排水口比塔座顶面高 5.50 m", "correct": false}, {"key": "C", "text": "排水口比桩基桩底高 67.50 m", "correct": true}, {"key": "D", "text": "排水口标高为 200.793 m", "correct": false}, {"key": "E", "text": "排水口比承台底面高 13.50 m", "correct": true}, {"key": "F", "text": "排水口标高为 202.293 m", "correct": true}], "answer": ["C", "E", "F"], "few_sheet_pages": [6, 8, 25, 9], "evidence_pages": [6, 8, 9, 25], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "P7 桥塔塔柱底 C20 素混凝土填充段,其竖向尺寸线的下端标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 195.293, \"unit\": \"m\"}"}, {"id": "MS-U04-10-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥塔塔柱排水口的竖向尺寸线,下端落在哪个面上?只返回'承台顶'、'塔座顶'、'C20素混凝土顶面'三者之一。", "answer": "\"C20素混凝土顶面\""}, {"id": "MS-U04-10-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "P7 桥塔承台厚度尺寸 500 的上端标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 193.793, \"unit\": \"m\"}"}, {"id": "MS-U04-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "P7 桥塔一般构造图半 B-B 图中,塔柱底 C20 素混凝土填充段旁的竖向尺寸数值是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 500, \"unit\": \"cm\"}"}, {"id": "MS-U04-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "P7 桥塔一般构造图半侧面图中,300年一遇洪水位是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 202.09, \"unit\": \"m\"}"}, {"id": "MS-U04-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥塔排水一般构造图中,排水口处的竖向尺寸数值是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 200, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U04-11/few_sheet/01.png", "page_02_file_name": "images/MS-U04-11/few_sheet/02.png", "page_03_file_name": "images/MS-U04-11/few_sheet/03.png", "page_04_file_name": "images/MS-U04-11/few_sheet/04.png", "page_05_file_name": "images/MS-U04-11/few_sheet/05.png", "page_06_file_name": "images/MS-U04-11/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-11", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "按图中列出的混凝土工程量,两座主塔连同各自基础(含垫层)的混凝土合计多少立方米?", "options": [{"key": "A", "text": "60290.65", "correct": false}, {"key": "B", "text": "23110.80", "correct": false}, {"key": "C", "text": "51765.48", "correct": false}, {"key": "D", "text": "52654.95", "correct": false}, {"key": "E", "text": "51616.15", "correct": false}, {"key": "F", "text": "53039.85", "correct": true}], "answer": ["F"], "few_sheet_pages": [6, 21, 8, 9, 7, 17], "evidence_pages": [6, 7, 8, 9], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-11-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“P7桥塔基础构造图”的工程数量表(按分项、材料列出混凝土工程量的那张)中,塔座、承台、系梁、桩基、垫层的工程量各是多少?以 JSON 返回五个字段 tower_base、cap、tie_beam、pile、cushion,每个为数值和单位(m³)。", "answer": "{\"tower_base\": {\"value\": 543.8, \"unit\": \"m³\"}, \"cap\": {\"value\": 3830.4, \"unit\": \"m³\"}, \"tie_beam\": {\"value\": 1423.7, \"unit\": \"m³\"}, \"pile\": {\"value\": 9160.9, \"unit\": \"m³\"}, \"cushion\": {\"value\": 222.0, \"unit\": \"m³\"}}"}, {"id": "MS-U04-11-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“P8桥塔基础构造图”的工程数量表(按分项、材料列出混凝土工程量的那张)中,塔座、承台、桩基、垫层的工程量各是多少?以 JSON 返回四个字段 tower_base、cap、pile、cushion,每个为数值和单位(m³)。", "answer": "{\"tower_base\": {\"value\": 543.8, \"unit\": \"m³\"}, \"cap\": {\"value\": 3830.4, \"unit\": \"m³\"}, \"pile\": {\"value\": 3392.9, \"unit\": \"m³\"}, \"cushion\": {\"value\": 162.9, \"unit\": \"m³\"}}"}, {"id": "MS-U04-11-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔一般构造图”中画 P7 塔的那一张,附注写明塔柱和上、下横梁所用 C55 混凝土共计多少?返回数值和单位(m³)。", "answer": "{\"value\": 14327.34, \"unit\": \"m³\"}"}, {"id": "MS-U04-11-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔一般构造图”中画 P8 塔的那一张,附注写明塔柱和上、下横梁所用 C55 混凝土共计多少?返回数值和单位(m³)。", "answer": "{\"value\": 15601.71, \"unit\": \"m³\"}"}, {"id": "MS-U04-11-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "嵌岩桩桩长为 20 m 的那座桥塔,塔柱和上、下横梁的 C55 混凝土共计多少?返回数值和单位(m³)。", "answer": "{\"value\": 15601.71, \"unit\": \"m³\"}"}, {"id": "MS-U04-11-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "两座主塔中,两个承台之间设有系梁的那一座,其基础 C20 垫层的工程量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 222.0, \"unit\": \"m³\"}"}]} {"page_01_file_name": "images/MS-U04-12/few_sheet/01.png", "page_02_file_name": "images/MS-U04-12/few_sheet/02.png", "page_03_file_name": "images/MS-U04-12/few_sheet/03.png", "page_04_file_name": "images/MS-U04-12/few_sheet/04.png", "page_05_file_name": "images/MS-U04-12/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-12", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "P7 桥塔两个承台之间的系梁,关于其混凝土和施工,下列说法哪些正确?", "options": [{"key": "A", "text": "P8 桥塔两承台之间也设有同样的系梁", "correct": false}, {"key": "B", "text": "P7 桥塔的两个承台之间并没有设置系梁", "correct": false}, {"key": "C", "text": "P7 基础的 C20 垫层工程量为 162.9 m³", "correct": false}, {"key": "D", "text": "P7 系梁采用 C40 混凝土,工程量 1423.7 m³", "correct": true}, {"key": "E", "text": "系梁在施工第一阶段与钻孔桩、承台、塔座一并完成", "correct": true}, {"key": "F", "text": "系梁与塔座采用同一强度等级的混凝土", "correct": false}], "answer": ["D", "E"], "few_sheet_pages": [7, 18, 6, 26, 8], "evidence_pages": [6, 7, 26], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-12-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“P7桥塔基础构造图”中按分项、材料列出混凝土工程量的那张工程数量表:系梁的材料强度等级和工程量、塔座的材料强度等级、垫层的工程量各是什么?以 JSON 返回四个字段:tie_grade、base_grade(强度等级,按表中写法去掉“砼”字,形如 C30)、tie_qty、cushion(各为数值和单位 m³)。", "answer": "{\"tie_grade\": \"C40\", \"tie_qty\": {\"value\": 1423.7, \"unit\": \"m³\"}, \"base_grade\": \"C50\", \"cushion\": {\"value\": 222.0, \"unit\": \"m³\"}}"}, {"id": "MS-U04-12-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“P8桥塔基础构造图”中按分项、材料列出混凝土工程量的那张工程数量表:一共列了几个分项(不算表头),垫层的工程量是多少?以 JSON 返回两个字段:n_items(只写阿拉伯数字,字符串)、cushion(数值和单位 m³)。", "answer": "{\"n_items\": \"4\", \"cushion\": {\"value\": 162.9, \"unit\": \"m³\"}}"}, {"id": "MS-U04-12-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔指导性施工流程图”中,系梁在第几阶段施工?只返回阿拉伯数字(字符串)。", "answer": "\"1\""}, {"id": "MS-U04-12-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "嵌岩桩桩长为 54 m 的那座主塔,两承台之间系梁的混凝土工程量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 1423.7, \"unit\": \"m³\"}"}, {"id": "MS-U04-12-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "嵌岩桩桩长为 54 m 的那座主塔,其基础 C20 垫层的工程量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 222.0, \"unit\": \"m³\"}"}]} {"page_01_file_name": "images/MS-U04-13/few_sheet/01.png", "page_02_file_name": "images/MS-U04-13/few_sheet/02.png", "page_03_file_name": "images/MS-U04-13/few_sheet/03.png", "page_04_file_name": "images/MS-U04-13/few_sheet/04.png", "page_05_file_name": "images/MS-U04-13/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-13", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "P8 桥塔两个承台之间的系梁,关于其混凝土和相关基础数量,下列说法哪些正确?", "options": [{"key": "A", "text": "P8 系梁宽 900 cm", "correct": false}, {"key": "B", "text": "P8 系梁采用 C40 混凝土,工程量 1423.7 m³", "correct": false}, {"key": "C", "text": "P8 系梁在施工第一阶段与承台、塔座一并完成", "correct": false}, {"key": "D", "text": "P8 基础的 C20 垫层工程量为 222.0 m³", "correct": false}, {"key": "E", "text": "P8 桥塔的两个承台之间并没有设置系梁", "correct": true}, {"key": "F", "text": "P8 承台 C40 混凝土工程量与 P7 相同,均为 3830.4 m³", "correct": true}], "answer": ["E", "F"], "few_sheet_pages": [6, 18, 7, 9, 26], "evidence_pages": [7, 6, 26], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-13-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“P8桥塔基础构造图”中按分项、材料列出混凝土工程量的那张工程数量表:一共列了几个分项(不算表头),承台和垫层的工程量各是多少?以 JSON 返回三个字段:n_items(只写阿拉伯数字,字符串)、cap、cushion(各为数值和单位 m³)。", "answer": "{\"n_items\": \"4\", \"cap\": {\"value\": 3830.4, \"unit\": \"m³\"}, \"cushion\": {\"value\": 162.9, \"unit\": \"m³\"}}"}, {"id": "MS-U04-13-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“P7桥塔基础构造图”中按分项、材料列出混凝土工程量的那张工程数量表:承台、系梁、垫层的工程量各是多少?以 JSON 返回三个字段 cap、tie_beam、cushion,每个为数值和单位(m³)。", "answer": "{\"cap\": {\"value\": 3830.4, \"unit\": \"m³\"}, \"tie_beam\": {\"value\": 1423.7, \"unit\": \"m³\"}, \"cushion\": {\"value\": 222.0, \"unit\": \"m³\"}}"}, {"id": "MS-U04-13-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“P7桥塔基础构造图”的“P7桥塔基础平面图”上,两承台之间系梁的宽度是多少?返回数值和单位(cm)。", "answer": "{\"value\": 900, \"unit\": \"cm\"}"}, {"id": "MS-U04-13-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔指导性施工流程图”第一阶段的施工内容中,“系梁”后面括注的桥塔编号是什么?按图中写法返回(形如 P1)。", "answer": "\"P7\""}, {"id": "MS-U04-13-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "两座主塔中,两个承台之间画有系梁的那一座,其嵌岩桩桩长是多少?返回数值和单位(cm)。", "answer": "{\"value\": 5400, \"unit\": \"cm\"}"}, {"id": "MS-U04-13-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "嵌岩桩桩长为 20 m 的那座主塔,其基础 C20 垫层的工程量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 162.9, \"unit\": \"m³\"}"}]} {"page_01_file_name": "images/MS-U04-14/few_sheet/01.png", "page_02_file_name": "images/MS-U04-14/few_sheet/02.png", "page_03_file_name": "images/MS-U04-14/few_sheet/03.png", "page_04_file_name": "images/MS-U04-14/few_sheet/04.png", "page_05_file_name": "images/MS-U04-14/few_sheet/05.png", "page_06_file_name": "images/MS-U04-14/few_sheet/06.png", "page_07_file_name": "images/MS-U04-14/few_sheet/07.png", "page_08_file_name": "images/MS-U04-14/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-14", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "桥塔上横梁与下横梁都配有横向预应力钢束。下列各项中,哪些是上、下横梁钢束完全相同的?", "options": [{"key": "A", "text": "竖向相邻两层钢束的间距", "correct": false}, {"key": "B", "text": "设计张拉控制应力", "correct": true}, {"key": "C", "text": "波纹管内径", "correct": true}, {"key": "D", "text": "钢束的张拉顺序", "correct": false}, {"key": "E", "text": "平弯处的转弯半径", "correct": true}, {"key": "F", "text": "钢绞线规格与单束张拉力", "correct": true}], "answer": ["B", "C", "E", "F"], "few_sheet_pages": [18, 16, 14, 17, 12, 19, 21, 20], "evidence_pages": [14, 16, 17, 19, 20, 21], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-14-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔上横梁预应力材料数量表”及其所在图纸的附注中:钢绞线规格栏里每束的钢绞线根数和公称直径、单束张拉力、波纹管内径、设计张拉控制应力,各是多少?以 JSON 返回五个字段:strands(数值和单位 根)、diameter(数值和单位 mm)、tension_kN(只写数值,单位 kN,写成字符串)、duct_inner(数值和单位 mm)、control_MPa(只写数值,单位 MPa,写成字符串)。", "answer": "{\"strands\": {\"value\": 12, \"unit\": \"根\"}, \"diameter\": {\"value\": 15.2, \"unit\": \"mm\"}, \"tension_kN\": \"2249.9\", \"duct_inner\": {\"value\": 90, \"unit\": \"mm\"}, \"control_MPa\": \"1339.2\"}"}, {"id": "MS-U04-14-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔下横梁预应力材料数量表”及其所在图纸的附注中:钢绞线规格栏里每束的钢绞线根数和公称直径、单束张拉力、波纹管内径、设计张拉控制应力,各是多少?以 JSON 返回五个字段:strands(数值和单位 根)、diameter(数值和单位 mm)、tension_kN(只写数值,单位 kN,写成字符串)、duct_inner(数值和单位 mm)、control_MPa(只写数值,单位 MPa,写成字符串)。", "answer": "{\"strands\": {\"value\": 12, \"unit\": \"根\"}, \"diameter\": {\"value\": 15.2, \"unit\": \"mm\"}, \"tension_kN\": \"2249.9\", \"duct_inner\": {\"value\": 90, \"unit\": \"mm\"}, \"control_MPa\": \"1339.2\"}"}, {"id": "MS-U04-14-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“上横梁预应力立面布置图”和“下横梁预应力立面布置图”中,梁端竖向尺寸标注给出的竖向相邻两层钢束间距各是多少?以 JSON 返回两个字段 upper、lower,每个为数值和单位(cm)。", "answer": "{\"upper\": {\"value\": 80, \"unit\": \"cm\"}, \"lower\": {\"value\": 50, \"unit\": \"cm\"}}"}, {"id": "MS-U04-14-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“T1-1~T8-1钢束平弯大样”中钢束平弯处标注的转弯半径,以及“桥塔下横梁预应力布置图”附注中钢束弯折处的转弯半径,各是多少?以 JSON 返回两个字段 upper、lower,每个为数值和单位(cm)。", "answer": "{\"upper\": {\"value\": 1000, \"unit\": \"cm\"}, \"lower\": {\"value\": 1000, \"unit\": \"cm\"}}"}, {"id": "MS-U04-14-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥塔两道横梁中,钢束张拉顺序为 B1→B2→…→B11 依次张拉的那一道,竖向相邻两层钢束的间距是多少?返回数值和单位(cm)。", "answer": "{\"value\": 50, \"unit\": \"cm\"}"}, {"id": "MS-U04-14-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥塔两道横梁中,钢束按“从中间向上下对称张拉”顺序张拉的那一道,竖向相邻两层钢束的间距是多少?返回数值和单位(cm)。", "answer": "{\"value\": 80, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U04-15/few_sheet/01.png", "page_02_file_name": "images/MS-U04-15/few_sheet/02.png", "page_03_file_name": "images/MS-U04-15/few_sheet/03.png", "page_04_file_name": "images/MS-U04-15/few_sheet/04.png", "page_05_file_name": "images/MS-U04-15/few_sheet/05.png", "page_06_file_name": "images/MS-U04-15/few_sheet/06.png", "page_07_file_name": "images/MS-U04-15/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U04-15", "set": "U04", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "将 P8 桥塔与 P7 桥塔(各连同其基础)逐项比较。下列各项中,哪些是 P8 塔的数值大于 P7 塔?", "options": [{"key": "A", "text": "承台顶面标高", "correct": false}, {"key": "B", "text": "桩基 C35 水下混凝土工程量", "correct": false}, {"key": "C", "text": "水位变化区涂装面积", "correct": true}, {"key": "D", "text": "桥塔总高度", "correct": true}, {"key": "E", "text": "对桩底砂质泥岩天然单轴抗压强度标准值的要求", "correct": true}, {"key": "F", "text": "嵌岩桩桩长", "correct": false}], "answer": ["C", "D", "E"], "few_sheet_pages": [6, 11, 5, 7, 10, 8, 9], "evidence_pages": [6, 7, 8, 9, 11], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U04-15-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“P7桥塔基础构造图”上:承台顶面标高、嵌岩桩桩长、工程数量表中桩基 C35 水下砼的工程量、附注要求的桩底砂质泥岩天然单轴抗压强度标准值下限,各是多少?以 JSON 返回四个字段:cap_top(数值和单位 m)、pile_length(数值和单位 cm)、pile_concrete(数值和单位 m³)、rock_strength(只写附注中的数值,不带单位,单位为 MPa,写成字符串)。", "answer": "{\"cap_top\": {\"value\": 193.793, \"unit\": \"m\"}, \"pile_length\": {\"value\": 5400, \"unit\": \"cm\"}, \"pile_concrete\": {\"value\": 9160.9, \"unit\": \"m³\"}, \"rock_strength\": \"8.5\"}"}, {"id": "MS-U04-15-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“P8桥塔基础构造图”上:承台顶面标高、嵌岩桩桩长、工程数量表中桩基 C35 水下砼的工程量、附注要求的桩底砂质泥岩天然单轴抗压强度标准值下限,各是多少?以 JSON 返回四个字段:cap_top(数值和单位 m)、pile_length(数值和单位 cm)、pile_concrete(数值和单位 m³)、rock_strength(只写附注中的数值,不带单位,单位为 MPa,写成字符串)。", "answer": "{\"cap_top\": {\"value\": 177.293, \"unit\": \"m\"}, \"pile_length\": {\"value\": 2000, \"unit\": \"cm\"}, \"pile_concrete\": {\"value\": 3392.9, \"unit\": \"m³\"}, \"rock_strength\": \"10.53\"}"}, {"id": "MS-U04-15-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔一般构造图”(共 2 张,一张画 P7 塔、一张画 P8 塔)的附注中,P7 塔和 P8 塔的总高度各是多少?以 JSON 返回两个字段 P7、P8,每个为数值和单位(m)。", "answer": "{\"P7\": {\"value\": 177.5, \"unit\": \"m\"}, \"P8\": {\"value\": 194, \"unit\": \"m\"}}"}, {"id": "MS-U04-15-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔断面构造图”的附注中,P7 桥塔和 P8 桥塔的水位变化区涂装面积各是多少?以 JSON 返回两个字段 P7、P8,每个为数值和单位(m²)。", "answer": "{\"P7\": {\"value\": 476.0, \"unit\": \"m²\"}, \"P8\": {\"value\": 1598.0, \"unit\": \"m²\"}}"}, {"id": "MS-U04-15-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "总高度为 194 m 的那座桥塔,其基础承台顶面标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 177.293, \"unit\": \"m\"}"}, {"id": "MS-U04-15-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "嵌岩桩桩长为 54 m 的那座桥塔,其水位变化区涂装面积是多少?返回数值和单位(m²)。", "answer": "{\"value\": 476.0, \"unit\": \"m²\"}"}]} {"page_01_file_name": "images/MS-U05-01/few_sheet/01.png", "page_02_file_name": "images/MS-U05-01/few_sheet/02.png", "page_03_file_name": "images/MS-U05-01/few_sheet/03.png", "page_04_file_name": "images/MS-U05-01/few_sheet/04.png", "page_05_file_name": "images/MS-U05-01/few_sheet/05.png", "page_06_file_name": "images/MS-U05-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U05-01", "set": "U05", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "每根主缆依次经过牟家湾侧散索鞍、牟家湾侧主索鞍、支坪侧主索鞍、支坪侧散索鞍。就各鞍座 I.P. 点两侧主缆的几何是否对称而言,下列说法哪些正确?", "options": [{"key": "A", "text": "牟家湾侧散索鞍:两侧切线长相等", "correct": false}, {"key": "B", "text": "支坪侧散索鞍:两侧切线与水平线的夹角相等", "correct": true}, {"key": "C", "text": "牟家湾侧主索鞍:两侧切线长相等", "correct": true}, {"key": "D", "text": "支坪侧散索鞍:两侧切线长相等", "correct": false}, {"key": "E", "text": "牟家湾侧主索鞍:两侧切线与水平线的夹角相等", "correct": false}, {"key": "F", "text": "支坪侧主索鞍:两侧切线与水平线的夹角相等", "correct": false}], "answer": ["B", "C"], "few_sheet_pages": [13, 14, 5, 9, 11, 8], "evidence_pages": [5, 8, 11, 14], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U05-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中牟家湾侧主索鞍的立面上,I.P. 点边跨侧、中跨侧两段切线各标注多长?以 JSON 返回两个字段 边跨侧、中跨侧,每个字段为 {value, unit},单位 mm。", "answer": "{\"边跨侧\": {\"value\": 2747.79, \"unit\": \"mm\"}, \"中跨侧\": {\"value\": 2747.79, \"unit\": \"mm\"}}"}, {"id": "MS-U05-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中牟家湾侧主索鞍的立面上,边跨侧、中跨侧的主缆切线与水平线的夹角各是多少度?以 JSON 返回两个字段 边跨侧、中跨侧,每个字段按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "{\"边跨侧\": \"21.576\", \"中跨侧\": \"23.631\"}"}, {"id": "MS-U05-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪侧主索鞍处,主缆在 I.P. 点边跨一侧和中跨一侧的切线,与水平线的夹角各是多少度?以 JSON 返回两个字段 边跨侧、中跨侧,每个字段按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "{\"边跨侧\": \"23.621\", \"中跨侧\": \"23.631\"}"}, {"id": "MS-U05-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中牟家湾侧散索鞍的 A—A 视图上,I.P. 点锚跨侧、边跨侧两段切线各标注多长?以 JSON 返回两个字段 锚跨侧、边跨侧,每个字段为 {value, unit},单位 mm。", "answer": "{\"锚跨侧\": {\"value\": 1600, \"unit\": \"mm\"}, \"边跨侧\": {\"value\": 1700, \"unit\": \"mm\"}}"}, {"id": "MS-U05-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中支坪侧散索鞍的 A—A 视图上,I.P. 点锚跨侧、边跨侧两段切线各标注多长?以 JSON 返回两个字段 锚跨侧、边跨侧,每个字段为 {value, unit},单位 mm。", "answer": "{\"锚跨侧\": {\"value\": 1700, \"unit\": \"mm\"}, \"边跨侧\": {\"value\": 1800, \"unit\": \"mm\"}}"}, {"id": "MS-U05-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪侧散索鞍处,主缆在 I.P. 点锚跨一侧和边跨一侧的切线,与水平线的夹角各是多少度?以 JSON 返回两个字段 锚跨侧、边跨侧,每个字段按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "{\"锚跨侧\": \"12.035\", \"边跨侧\": \"12.035\"}"}]} {"page_01_file_name": "images/MS-U05-02/few_sheet/01.png", "page_02_file_name": "images/MS-U05-02/few_sheet/02.png", "page_03_file_name": "images/MS-U05-02/few_sheet/03.png", "page_04_file_name": "images/MS-U05-02/few_sheet/04.png", "page_05_file_name": "images/MS-U05-02/few_sheet/05.png", "page_06_file_name": "images/MS-U05-02/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U05-02", "set": "U05", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "主缆经两端散索鞍进入锚碇。关于散索鞍处主缆在竖平面和水平面内的走向,下列说法哪些正确?", "options": [{"key": "A", "text": "支坪侧散索鞍上,主缆在竖平面内的转向角为 2×10.31°", "correct": false}, {"key": "B", "text": "两座散索鞍处,边跨侧主缆的倾角相同", "correct": false}, {"key": "C", "text": "在平面上,索股从索鞍中心线边跨一侧的平弯圆弧起点开始向锚跨方向散开", "correct": true}, {"key": "D", "text": "牟家湾侧:边跨来的主缆与水平线成 19.38°,出鞍后以 40° 向下进入锚跨", "correct": true}, {"key": "E", "text": "支坪侧:主缆出鞍后以 45° 向下进入锚跨", "correct": true}, {"key": "F", "text": "两座散索鞍的平弯圆弧起点距索鞍中心线都是 1264 mm", "correct": false}], "answer": ["C", "D", "E"], "few_sheet_pages": [5, 12, 11, 16, 13, 14], "evidence_pages": [11, 13, 14, 16], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U05-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中牟家湾侧散索鞍的“安装位置”图上,边跨侧主缆与水平线的夹角、锚跨侧主缆与水平线的夹角各标注多少度?以 JSON 返回两个字段 边跨侧、锚跨侧,每个字段按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "{\"边跨侧\": \"19.38\", \"锚跨侧\": \"40\"}"}, {"id": "MS-U05-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中支坪侧散索鞍的“安装位置”图上,边跨侧主缆与水平线的夹角、锚跨侧主缆与水平线的夹角各标注多少度?以 JSON 返回两个字段 边跨侧、锚跨侧,每个字段按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "{\"边跨侧\": \"20.93\", \"锚跨侧\": \"45\"}"}, {"id": "MS-U05-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中支坪侧散索鞍的 A—A 视图上,锚跨侧、边跨侧的主缆切线与水平线的夹角各是多少度?以 JSON 返回两个字段 锚跨侧、边跨侧,每个字段按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "{\"锚跨侧\": \"12.035\", \"边跨侧\": \"12.035\"}"}, {"id": "MS-U05-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中牟家湾侧散索鞍的 A—A 视图上,锚跨侧的主缆切线与水平线的夹角是多少度?按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "\"10.31\""}, {"id": "MS-U05-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中牟家湾侧散索鞍的“散索鞍平面图”上,索鞍中心线到平弯圆弧起点的尺寸是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1264, \"unit\": \"mm\"}"}, {"id": "MS-U05-02-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中支坪侧散索鞍的“散索鞍平面图”上,索鞍中心线到平弯圆弧起点的尺寸是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1466.7, \"unit\": \"mm\"}"}, {"id": "MS-U05-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "牟家湾侧散索鞍处,索股在平面上开始散开的平弯圆弧起点,相对索鞍中心线的顺桥向位置是多少?以朝锚跨一侧为正、朝边跨一侧为负,返回带正负号的数值和单位(mm)。", "answer": "{\"value\": -1264, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U05-03/few_sheet/01.png", "page_02_file_name": "images/MS-U05-03/few_sheet/02.png", "page_03_file_name": "images/MS-U05-03/few_sheet/03.png", "page_04_file_name": "images/MS-U05-03/few_sheet/04.png", "page_05_file_name": "images/MS-U05-03/few_sheet/05.png", "page_06_file_name": "images/MS-U05-03/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U05-03", "set": "U05", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "全桥所有主索鞍和散索鞍(两侧、两根主缆)槽路里用的锌填块合计多少块?", "options": [{"key": "A", "text": "1503", "correct": false}, {"key": "B", "text": "2376", "correct": false}, {"key": "C", "text": "1948", "correct": false}, {"key": "D", "text": "3006", "correct": true}, {"key": "E", "text": "2884", "correct": false}, {"key": "F", "text": "2454", "correct": false}], "answer": ["D"], "few_sheet_pages": [16, 6, 7, 13, 10, 15], "evidence_pages": [7, 10, 13, 16], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U05-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中牟家湾侧主索鞍的构件材料表里,锌填块1、锌填块2 的数量各是多少?以 JSON 返回两个字段 锌填块1、锌填块2,每个字段为 {value, unit},单位 块。", "answer": "{\"锌填块1\": {\"value\": 90, \"unit\": \"块\"}, \"锌填块2\": {\"value\": 378, \"unit\": \"块\"}}"}, {"id": "MS-U05-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中支坪侧主索鞍的构件材料表里,锌填块1、锌填块2 的数量各是多少?以 JSON 返回两个字段 锌填块1、锌填块2,每个字段为 {value, unit},单位 块。", "answer": "{\"锌填块1\": {\"value\": 110, \"unit\": \"块\"}, \"锌填块2\": {\"value\": 396, \"unit\": \"块\"}}"}, {"id": "MS-U05-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中牟家湾侧散索鞍的“单套散索鞍构件表”里,锌填块 1、锌填块 2 的数量各是多少?以 JSON 返回两个字段 锌填块1、锌填块2,每个字段为 {value, unit},单位 块。", "answer": "{\"锌填块1\": {\"value\": 55, \"unit\": \"块\"}, \"锌填块2\": {\"value\": 198, \"unit\": \"块\"}}"}, {"id": "MS-U05-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中支坪侧散索鞍的“单套散索鞍构件表”里,锌填块 1、锌填块 2 的数量各是多少?以 JSON 返回两个字段 锌填块1、锌填块2,每个字段为 {value, unit},单位 块。", "answer": "{\"锌填块1\": {\"value\": 60, \"unit\": \"块\"}, \"锌填块2\": {\"value\": 216, \"unit\": \"块\"}}"}, {"id": "MS-U05-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "牟家湾侧主索鞍、支坪侧主索鞍,全桥各有几套?以 JSON 返回两个字段 牟家湾侧、支坪侧,每个字段为 {value, unit},单位 套。", "answer": "{\"牟家湾侧\": {\"value\": 2, \"unit\": \"套\"}, \"支坪侧\": {\"value\": 2, \"unit\": \"套\"}}"}, {"id": "MS-U05-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "牟家湾侧散索鞍、支坪侧散索鞍,全桥各有几套?以 JSON 返回两个字段 牟家湾侧、支坪侧,每个字段为 {value, unit},单位 套。", "answer": "{\"牟家湾侧\": {\"value\": 2, \"unit\": \"套\"}, \"支坪侧\": {\"value\": 2, \"unit\": \"套\"}}"}]} {"page_01_file_name": "images/MS-U05-04/few_sheet/01.png", "page_02_file_name": "images/MS-U05-04/few_sheet/02.png", "page_03_file_name": "images/MS-U05-04/few_sheet/03.png", "page_04_file_name": "images/MS-U05-04/few_sheet/04.png", "page_05_file_name": "images/MS-U05-04/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U05-04", "set": "U05", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "两岸主索鞍在施工中要沿顺桥向顶推到位。主索鞍的顶推量是多少?下列说法哪些正确?", "options": [{"key": "A", "text": "主索鞍并不顶推:按\"空缆位置\"安装后不再移动", "correct": false}, {"key": "B", "text": "主索鞍朝边跨侧顶推", "correct": false}, {"key": "C", "text": "牟家湾侧主索鞍顶推 1804 mm", "correct": true}, {"key": "D", "text": "牟家湾侧主索鞍顶推 180.4 mm", "correct": false}, {"key": "E", "text": "支坪侧主索鞍顶推 2732 mm", "correct": true}, {"key": "F", "text": "支坪侧主索鞍顶推 1804 mm", "correct": false}], "answer": ["C", "E"], "few_sheet_pages": [13, 8, 7, 6, 9], "evidence_pages": [6, 7, 9], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U05-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中牟家湾侧主索鞍的“1/2平面(空缆状态)”上,主索鞍预偏位置到桥塔中心线的尺寸是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1804, \"unit\": \"mm\"}"}, {"id": "MS-U05-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中支坪侧主索鞍的“1/2平面(空缆状态)”上,标注的预偏量是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2732, \"unit\": \"mm\"}"}, {"id": "MS-U05-04-R3", "role": "read", "tiers": ["full_set"], "question": "主桥缆索系统总体布置图的“空缆线形”中,P7 下方标注的预偏值是多少?按该图注写明的尺寸单位,返回数值和单位。", "answer": "{\"value\": 180.4, \"unit\": \"cm\"}"}, {"id": "MS-U05-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "两岸主索鞍在空缆状态下,鞍体相对各自桥塔中心线的顺桥向偏移量各是多少?以朝本塔中跨一侧为正、朝边跨一侧为负。以 JSON 返回两个字段 牟家湾侧、支坪侧,每个字段为 {value, unit},带正负号,单位 mm。", "answer": "{\"牟家湾侧\": {\"value\": -1804, \"unit\": \"mm\"}, \"支坪侧\": {\"value\": -2732, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U05-05/few_sheet/01.png", "page_02_file_name": "images/MS-U05-05/few_sheet/02.png", "page_03_file_name": "images/MS-U05-05/few_sheet/03.png", "page_04_file_name": "images/MS-U05-05/few_sheet/04.png", "page_05_file_name": "images/MS-U05-05/few_sheet/05.png", "page_06_file_name": "images/MS-U05-05/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U05-05", "set": "U05", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "两岸散索鞍在施工中要沿顺桥向顶推到位。散索鞍的顶推量是多少?下列说法哪些正确?", "options": [{"key": "A", "text": "支坪侧散索鞍由空缆位置到成桥位置转过 1.203°", "correct": false}, {"key": "B", "text": "牟家湾侧散索鞍由空缆位置到成桥位置转过 1.203°", "correct": true}, {"key": "C", "text": "支坪侧散索鞍顶推 2732 mm", "correct": false}, {"key": "D", "text": "散索鞍并不顶推:按\"空缆位置\"安装,加劲梁架设完成后处于\"成桥位置\"", "correct": true}, {"key": "E", "text": "牟家湾侧散索鞍顶推 1804 mm", "correct": false}, {"key": "F", "text": "支坪侧散索鞍由空缆位置到成桥位置转过 0.827°", "correct": true}], "answer": ["B", "D", "F"], "few_sheet_pages": [13, 7, 16, 9, 6, 11], "evidence_pages": [7, 9, 13, 16], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U05-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中牟家湾侧散索鞍的“安装位置”图上,散索鞍由空缆位置到成桥位置转过的角度标注为多少度?按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "\"1.203\""}, {"id": "MS-U05-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中支坪侧散索鞍的“安装位置”图上,散索鞍由空缆位置到成桥位置转过的角度标注为多少度?按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "\"0.827\""}, {"id": "MS-U05-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中牟家湾侧散索鞍的注里,散索鞍吊装时按哪个位置调定初始位置?加劲梁架设完成后,散索鞍处于哪个位置?以 JSON 返回两个字段 初始位置、架设完成后,每个字段从下列四项中选一项,按所列文字原样返回:空缆位置、成桥位置、预偏位置、桥塔中心线位置。", "answer": "{\"初始位置\": \"空缆位置\", \"架设完成后\": \"成桥位置\"}"}, {"id": "MS-U05-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中牟家湾侧主索鞍的注里,主索鞍安装时向边跨侧偏移多少?返回数值和单位(mm)。", "answer": "{\"value\": 1804, \"unit\": \"mm\"}"}, {"id": "MS-U05-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中支坪侧主索鞍的“1/2平面(空缆状态)”上,标注的预偏量是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2732, \"unit\": \"mm\"}"}, {"id": "MS-U05-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "图中标注的 1804 mm 安装偏移和 2732 mm 预偏量,各属于哪一个鞍座?以 JSON 返回两个字段 1804、2732,每个字段从下列四项中选一项,按所列文字原样返回:牟家湾侧主索鞍、支坪侧主索鞍、牟家湾侧散索鞍、支坪侧散索鞍。", "answer": "{\"1804\": \"牟家湾侧主索鞍\", \"2732\": \"支坪侧主索鞍\"}"}]} {"page_01_file_name": "images/MS-U05-06/few_sheet/01.png", "page_02_file_name": "images/MS-U05-06/few_sheet/02.png", "page_03_file_name": "images/MS-U05-06/few_sheet/03.png", "page_04_file_name": "images/MS-U05-06/few_sheet/04.png", "page_05_file_name": "images/MS-U05-06/few_sheet/05.png", "page_06_file_name": "images/MS-U05-06/few_sheet/06.png", "page_07_file_name": "images/MS-U05-06/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U05-06", "set": "U05", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "两座主塔塔顶的主索鞍,在空缆状态、成桥状态下的位置以及附属构造的朝向,下列说法哪些正确?", "options": [{"key": "A", "text": "主索鞍顶推到位、拆除临时安装板后,挡块装在边跨侧", "correct": true}, {"key": "B", "text": "两座主索鞍的格栅及反力架都设在各自的边跨侧", "correct": true}, {"key": "C", "text": "牟家湾侧主索鞍的鞍槽圆弧中心偏离主塔中心线,位于中跨侧 128.2 mm 处", "correct": false}, {"key": "D", "text": "牟家湾侧主索鞍空缆状态下,安装板外露的部分在中跨侧,上面加临时盖板", "correct": true}, {"key": "E", "text": "支坪侧主索鞍在空缆状态下偏向中跨侧 2732 mm", "correct": false}, {"key": "F", "text": "两座主索鞍在空缆状态下都偏离桥塔中心线、偏向各自的边跨侧", "correct": true}], "answer": ["A", "B", "D", "F"], "few_sheet_pages": [5, 7, 2, 8, 6, 11, 9], "evidence_pages": [5, 6, 7, 8, 9], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U05-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中牟家湾侧主索鞍的“1/2平面(空缆状态)”上,主索鞍预偏位置到桥塔中心线的尺寸是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1804, \"unit\": \"mm\"}"}, {"id": "MS-U05-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中支坪侧主索鞍的“1/2平面(空缆状态)”上,标注的预偏量是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2732, \"unit\": \"mm\"}"}, {"id": "MS-U05-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "两岸主索鞍在空缆状态下,鞍体相对各自桥塔中心线的顺桥向偏移量各是多少?以朝本塔中跨一侧为正、朝边跨一侧为负。以 JSON 返回两个字段 牟家湾侧、支坪侧,每个字段为 {value, unit},带正负号,单位 mm。", "answer": "{\"牟家湾侧\": {\"value\": -1804, \"unit\": \"mm\"}, \"支坪侧\": {\"value\": -2732, \"unit\": \"mm\"}}"}, {"id": "MS-U05-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中牟家湾侧主索鞍的立面上,鞍槽圆弧中心相对主塔中心线的水平偏距是多少?以朝中跨侧为正、朝边跨侧为负,返回带正负号的数值和单位(mm)。", "answer": "{\"value\": -128.2, \"unit\": \"mm\"}"}, {"id": "MS-U05-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中牟家湾侧主索鞍的构件材料表里,“牟家湾侧主索鞍临时盖板”的序号是多少?按表中序号原样返回数字字符串(形如 \"99\")。", "answer": "\"18\""}, {"id": "MS-U05-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "两岸主索鞍的格栅及反力架,各设在本塔桥塔中心线的哪一侧?以 JSON 返回两个字段 牟家湾侧、支坪侧,每个字段从 边跨侧、中跨侧 中选一项原样返回。", "answer": "{\"牟家湾侧\": \"边跨侧\", \"支坪侧\": \"边跨侧\"}"}, {"id": "MS-U05-06-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "牟家湾侧主索鞍:(1) 空缆状态下,安装板外露部分所加的临时盖板位于桥塔中心线的哪一侧?(2) 顶推到位、拆除临时安装板后再安装的挡块位于哪一侧?以 JSON 返回两个字段 临时盖板、挡块,每个字段从 边跨侧、中跨侧 中选一项原样返回。", "answer": "{\"临时盖板\": \"中跨侧\", \"挡块\": \"边跨侧\"}"}]} {"page_01_file_name": "images/MS-U05-07/few_sheet/01.png", "page_02_file_name": "images/MS-U05-07/few_sheet/02.png", "page_03_file_name": "images/MS-U05-07/few_sheet/03.png", "page_04_file_name": "images/MS-U05-07/few_sheet/04.png", "page_05_file_name": "images/MS-U05-07/few_sheet/05.png", "page_06_file_name": "images/MS-U05-07/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U05-07", "set": "U05", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "一根主缆从牟家湾侧锚跨到支坪侧锚跨,依次绕过牟家湾侧散索鞍、牟家湾侧主索鞍、支坪侧主索鞍、支坪侧散索鞍。主缆在这四个鞍座处竖平面内的方向改变量合计是多少度?", "options": [{"key": "A", "text": "139.214", "correct": false}, {"key": "B", "text": "92.459", "correct": false}, {"key": "C", "text": "137.149", "correct": true}, {"key": "D", "text": "133.699", "correct": false}, {"key": "E", "text": "135.104", "correct": false}, {"key": "F", "text": "114.804", "correct": false}], "answer": ["C"], "few_sheet_pages": [13, 5, 14, 11, 8, 9], "evidence_pages": [5, 8, 11, 14], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U05-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中牟家湾侧主索鞍的立面上,边跨侧、中跨侧的主缆切线与水平线的夹角各是多少度?以 JSON 返回两个字段 边跨侧、中跨侧,每个字段按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "{\"边跨侧\": \"21.576\", \"中跨侧\": \"23.631\"}"}, {"id": "MS-U05-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪侧主索鞍处,主缆在 I.P. 点边跨一侧和中跨一侧的切线,与水平线的夹角各是多少度?以 JSON 返回两个字段 边跨侧、中跨侧,每个字段按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "{\"边跨侧\": \"23.621\", \"中跨侧\": \"23.631\"}"}, {"id": "MS-U05-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中牟家湾侧散索鞍的 A—A 视图上,锚跨侧、边跨侧的主缆切线与水平线的夹角各是多少度?以 JSON 返回两个字段 锚跨侧、边跨侧,每个字段按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "{\"锚跨侧\": \"10.31\", \"边跨侧\": \"10.31\"}"}, {"id": "MS-U05-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪侧散索鞍处,主缆在 I.P. 点锚跨一侧和边跨一侧的切线,与水平线的夹角各是多少度?以 JSON 返回两个字段 锚跨侧、边跨侧,每个字段按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "{\"锚跨侧\": \"12.035\", \"边跨侧\": \"12.035\"}"}, {"id": "MS-U05-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中牟家湾侧散索鞍的“安装位置”图上,边跨侧主缆与水平线的夹角、锚跨侧主缆与水平线的夹角各标注多少度?以 JSON 返回两个字段 边跨侧、锚跨侧,每个字段按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "{\"边跨侧\": \"19.38\", \"锚跨侧\": \"40\"}"}]} {"page_01_file_name": "images/MS-U05-08/few_sheet/01.png", "page_02_file_name": "images/MS-U05-08/few_sheet/02.png", "page_03_file_name": "images/MS-U05-08/few_sheet/03.png", "page_04_file_name": "images/MS-U05-08/few_sheet/04.png", "page_05_file_name": "images/MS-U05-08/few_sheet/05.png", "page_06_file_name": "images/MS-U05-08/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U05-08", "set": "U05", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "全桥的主索鞍、散索鞍在牟家湾侧和支坪侧各有一种设计。把两侧的同类鞍座(主索鞍对主索鞍、散索鞍对散索鞍)逐一对照,下列构件中,哪些单套用量(件数)两侧不同?", "options": [{"key": "A", "text": "散索鞍的锌填块(填块 1、填块 2 合计)", "correct": true}, {"key": "B", "text": "主索鞍的拉杆(拉杆 1、拉杆 2、长拉杆)", "correct": false}, {"key": "C", "text": "主索鞍的锌填块(填块 1、填块 2 合计)", "correct": true}, {"key": "D", "text": "散索鞍的拉杆", "correct": false}, {"key": "E", "text": "主索鞍的安装板", "correct": false}, {"key": "F", "text": "主索鞍的临时安装板", "correct": true}], "answer": ["A", "C", "F"], "few_sheet_pages": [13, 9, 10, 16, 7, 12], "evidence_pages": [7, 10, 13, 16], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U05-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中牟家湾侧主索鞍的构件材料表里,锌填块1、锌填块2、牟家湾侧主索鞍临时安装板的数量各是多少?以 JSON 返回三个字段 锌填块1、锌填块2、临时安装板,每个字段为 {value, unit},单位 块。", "answer": "{\"锌填块1\": {\"value\": 90, \"unit\": \"块\"}, \"锌填块2\": {\"value\": 378, \"unit\": \"块\"}, \"临时安装板\": {\"value\": 4, \"unit\": \"块\"}}"}, {"id": "MS-U05-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中支坪侧主索鞍的构件材料表里,锌填块1、锌填块2、支坪侧主索鞍临时安装板的数量各是多少?以 JSON 返回三个字段 锌填块1、锌填块2、临时安装板,每个字段为 {value, unit},单位 块。", "answer": "{\"锌填块1\": {\"value\": 110, \"unit\": \"块\"}, \"锌填块2\": {\"value\": 396, \"unit\": \"块\"}, \"临时安装板\": {\"value\": 6, \"unit\": \"块\"}}"}, {"id": "MS-U05-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中牟家湾侧散索鞍的“单套散索鞍构件表”里,锌填块 1、锌填块 2 的数量各是多少?表中名称以“拉杆”开头的各行,数量加起来是多少?以 JSON 返回三个字段 锌填块1、锌填块2、拉杆,每个字段为 {value, unit};锌填块单位 块,拉杆单位 根。", "answer": "{\"锌填块1\": {\"value\": 55, \"unit\": \"块\"}, \"锌填块2\": {\"value\": 198, \"unit\": \"块\"}, \"拉杆\": {\"value\": 7, \"unit\": \"根\"}}"}, {"id": "MS-U05-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "散索鞍构造图中支坪侧散索鞍的“单套散索鞍构件表”里,锌填块 1、锌填块 2 的数量各是多少?表中名称以“拉杆”开头的各行,数量加起来是多少?以 JSON 返回三个字段 锌填块1、锌填块2、拉杆,每个字段为 {value, unit};锌填块单位 块,拉杆单位 根。", "answer": "{\"锌填块1\": {\"value\": 60, \"unit\": \"块\"}, \"锌填块2\": {\"value\": 216, \"unit\": \"块\"}, \"拉杆\": {\"value\": 7, \"unit\": \"根\"}}"}, {"id": "MS-U05-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中牟家湾侧主索鞍的构件材料表里,牟家湾侧主索鞍安装板、拉杆1、拉杆2 的数量各是多少?以 JSON 返回三个字段 安装板、拉杆1、拉杆2,每个字段为 {value, unit};安装板单位 块,拉杆单位 根。", "answer": "{\"安装板\": {\"value\": 8, \"unit\": \"块\"}, \"拉杆1\": {\"value\": 6, \"unit\": \"根\"}, \"拉杆2\": {\"value\": 4, \"unit\": \"根\"}}"}, {"id": "MS-U05-08-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中支坪侧主索鞍的构件材料表里,支坪侧主索鞍安装板、拉杆1、拉杆2 的数量各是多少?以 JSON 返回三个字段 安装板、拉杆1、拉杆2,每个字段为 {value, unit};安装板单位 块,拉杆单位 根。", "answer": "{\"安装板\": {\"value\": 8, \"unit\": \"块\"}, \"拉杆1\": {\"value\": 6, \"unit\": \"根\"}, \"拉杆2\": {\"value\": 4, \"unit\": \"根\"}}"}, {"id": "MS-U05-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "牟家湾侧主索鞍和支坪侧主索鞍,每套各用几根长拉杆?以 JSON 返回两个字段 牟家湾侧、支坪侧,每个字段为 {value, unit},单位 根。", "answer": "{\"牟家湾侧\": {\"value\": 2, \"unit\": \"根\"}, \"支坪侧\": {\"value\": 2, \"unit\": \"根\"}}"}]} {"page_01_file_name": "images/MS-U05-09/few_sheet/01.png", "page_02_file_name": "images/MS-U05-09/few_sheet/02.png", "page_03_file_name": "images/MS-U05-09/few_sheet/03.png", "page_04_file_name": "images/MS-U05-09/few_sheet/04.png", "page_05_file_name": "images/MS-U05-09/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U05-09", "set": "U05", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "缆索系统施工中,主索鞍、散索鞍和主缆防护带各有规定的工序。下列\"前一步 → 紧接的后一步\"中,哪些正确?", "options": [{"key": "A", "text": "主缆防护带:缠绕防护带 → 加热防护带", "correct": true}, {"key": "B", "text": "主索鞍:各槽路用锌填块填平 → 上拉杆", "correct": true}, {"key": "C", "text": "散索鞍:安装压紧梁 → 安装拉杆", "correct": true}, {"key": "D", "text": "主缆防护带:加热防护带 → 在防护带顶部涂防滑层", "correct": false}, {"key": "E", "text": "散索鞍:用锌填块将槽路填平 → 安装拉杆", "correct": false}, {"key": "F", "text": "主索鞍:安装边跨侧挡块 → 拆除临时安装板", "correct": false}], "answer": ["A", "B", "C"], "few_sheet_pages": [11, 7, 4, 3, 13], "evidence_pages": [4, 7, 13], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U05-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主缆防护布置图的“主缆防护施工流程”里,安装防护带共分四步。“缠绕”“加热”“防滑层”分别是第几步?以 JSON 返回三个字段 缠绕、加热、防滑层,每个字段为步骤序号的阿拉伯数字字符串(形如 \"9\")。", "answer": "{\"缠绕\": \"1\", \"加热\": \"2\", \"防滑层\": \"4\"}"}, {"id": "MS-U05-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中牟家湾侧主索鞍的注里,主索鞍顶推到位后,“拆除临时安装板”之后紧接的一道工序是什么?从下列四项中选一项,按所列文字原样返回:安装边跨侧挡块、割除上承板的导向部分、拆除下承板的临时底板部分、上拉杆。", "answer": "\"安装边跨侧挡块\""}, {"id": "MS-U05-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主索鞍构造图中牟家湾侧主索鞍的注里,全部索股架设完成后,“各槽路用锌填块填平”之后紧接的一道工序是什么?从下列四项中选一项,按所列文字原样返回:上拉杆、安装压紧梁、拆除临时安装板、安装边跨侧挡块。", "answer": "\"上拉杆\""}, {"id": "MS-U05-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "散索鞍在全部索股架设完成后:(1) 用锌填块将槽路填平之后,紧接的一道工序是什么?(2) 安装压紧梁之后,紧接的一道工序是什么?以 JSON 返回两个字段 填平之后、压紧梁之后,每个字段从下列四项中选一项,按所列文字原样返回:安装压紧梁、安装拉杆、拆除临时安装板、安装边跨侧挡块。", "answer": "{\"填平之后\": \"安装压紧梁\", \"压紧梁之后\": \"安装拉杆\"}"}]} {"page_01_file_name": "images/MS-U06-01/few_sheet/01.png", "page_02_file_name": "images/MS-U06-01/few_sheet/02.png", "page_03_file_name": "images/MS-U06-01/few_sheet/03.png", "page_04_file_name": "images/MS-U06-01/few_sheet/04.png", "page_05_file_name": "images/MS-U06-01/few_sheet/05.png", "page_06_file_name": "images/MS-U06-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U06-01", "set": "U06", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "支坪长江大桥左幅桥梁自其设计起点至设计终点之间,主线跨越了哪些道路或铁路?", "options": [{"key": "A", "text": "支坪滨江路", "correct": true}, {"key": "B", "text": "栀花大道", "correct": false}, {"key": "C", "text": "匝道F线", "correct": false}, {"key": "D", "text": "现状成渝铁路", "correct": true}, {"key": "E", "text": "图中名称就叫\"规划道路\"的那条道路(不是规划滨江路)", "correct": false}, {"key": "F", "text": "规划次干路", "correct": true}], "answer": ["A", "D", "F"], "few_sheet_pages": [32, 33, 30, 29, 31, 14], "evidence_pages": [33, 29, 31, 32], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U06-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "道路分纵断面图(一)上,主线上跨现状成渝铁路处、主线上跨支坪滨江路处各标注的主线桩号是多少?以 JSON 返回 {\"成渝铁路\": ..., \"支坪滨江路\": ...},桩号按图上写法原样返回,含三位小数(形如 K9+123.456)。", "answer": "{\"成渝铁路\": \"K0+302.078\", \"支坪滨江路\": \"K1+521.972\"}"}, {"id": "MS-U06-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "道路分纵断面图(二)上,主线上跨规划次干路处标注的主线桩号是多少?按 K数字+数字 的形式返回。", "answer": "\"K1+900.278\""}, {"id": "MS-U06-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "道路分纵断面图(四)上,主线上跨匝道F线处、主线上跨栀花大道处各标注的主线桩号是多少?以 JSON 返回 {\"匝道F线\": ..., \"栀花大道\": ...},返回主线桩号,按图上写法原样返回,含三位小数(形如 K9+123.456)。", "answer": "{\"匝道F线\": \"K2+497.957\", \"栀花大道\": \"K2+575.166\"}"}, {"id": "MS-U06-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "道路分纵断面图(五)上,主线上跨规划道路处标注的主线桩号是多少?按 K数字+数字 的形式返回。", "answer": "\"K2+878.096\""}, {"id": "MS-U06-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "道路分纵断面图(五)上标注的本次设计终点桩号是多少?按 K数字+数字 的形式返回。", "answer": "\"K2+900\""}, {"id": "MS-U06-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪长江大桥左幅桥梁的设计终点桩号是多少?按 K数字+数字 的形式返回。", "answer": "\"K1+989\""}, {"id": "MS-U06-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪长江大桥左幅桥梁的设计起点桩号是多少?按 K数字+数字 的形式返回。", "answer": "\"K0+081\""}]} {"page_01_file_name": "images/MS-U06-02/few_sheet/01.png", "page_02_file_name": "images/MS-U06-02/few_sheet/02.png", "page_03_file_name": "images/MS-U06-02/few_sheet/03.png", "page_04_file_name": "images/MS-U06-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U06-02", "set": "U06", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "主线上编号为 JD2 的交点,关于它的平曲线与前一个平曲线以及两者之间的直线段,下列说法哪些正确?", "options": [{"key": "A", "text": "两者之间的直线段长度为 427.757 m", "correct": false}, {"key": "B", "text": "前一个平曲线的半径为 1500 m", "correct": false}, {"key": "C", "text": "两者之间直线段的起点桩号为 K0-519.332", "correct": false}, {"key": "D", "text": "两者之间的直线段长度为 1324.544 m", "correct": true}, {"key": "E", "text": "两者之间直线段的计算方位角为 191°31′58″", "correct": false}, {"key": "F", "text": "两者之间直线段的计算方位角为 162°24′01″", "correct": false}], "answer": ["D"], "few_sheet_pages": [19, 20, 21, 25], "evidence_pages": [20, 25], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U06-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线直线、曲线及转角一览表中,交点桩号为 K1+690.845 的是第几号交点?只返回数字(形如 5)。", "answer": "\"8\""}, {"id": "MS-U06-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主线道路分平面图(七)的交点表中,JD2 的交点桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K1+690.845\""}, {"id": "MS-U06-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主线直线、曲线及转角一览表中,交点7 与交点8 之间那一行的'直线长度'是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1324.544, \"unit\": \"m\"}"}, {"id": "MS-U06-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主线直线、曲线及转角一览表中,交点6 与交点7 之间那一行的'直线长度'是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 427.757, \"unit\": \"m\"}"}, {"id": "MS-U06-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主线直线、曲线及转角一览表中,交点7 与交点8 之间那一行的'交点间距'是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1666.031, \"unit\": \"m\"}"}, {"id": "MS-U06-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主线道路分平面图(七)的交点表中,JD2 的第一切线长 T1 是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 224.834, \"unit\": \"m\"}"}, {"id": "MS-U06-02-R6", "role": "read", "tiers": ["full_set"], "question": "主线道路分平面图(一)中,曲线点 YZ7 的桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K0+141.466\""}, {"id": "MS-U06-02-R7", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主线直线、曲线及转角一览表中,交点6 与交点7 之间那一行的'交点间距'是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 848.499, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U06-03/few_sheet/01.png", "page_02_file_name": "images/MS-U06-03/few_sheet/02.png", "page_03_file_name": "images/MS-U06-03/few_sheet/03.png", "page_04_file_name": "images/MS-U06-03/few_sheet/04.png", "page_05_file_name": "images/MS-U06-03/few_sheet/05.png", "page_06_file_name": "images/MS-U06-03/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U06-03", "set": "U06", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿主线桩号增大方向,下列\"竖曲线半径 → 紧接的下一处竖曲线半径\"中,哪些与主线纵断面一致?(单位 m)", "options": [{"key": "A", "text": "5000 → 7000", "correct": true}, {"key": "B", "text": "30000 → 15000", "correct": true}, {"key": "C", "text": "7000 → 5000", "correct": false}, {"key": "D", "text": "30000 → 5000", "correct": false}, {"key": "E", "text": "15000 → 5000", "correct": true}, {"key": "F", "text": "15000 → 7000", "correct": false}], "answer": ["A", "B", "E"], "few_sheet_pages": [31, 25, 30, 32, 29, 33], "evidence_pages": [33, 29, 30, 31], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U06-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(一)”上,变坡点桩号为 K0+811 的那处竖曲线,半径 R 是多少?返回数值和单位(m)。", "answer": "{\"value\": 30000, \"unit\": \"m\"}"}, {"id": "MS-U06-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(一)”上,变坡点桩号为 K1+351 的那处竖曲线,半径 R 是多少?返回数值和单位(m)。", "answer": "{\"value\": 15000, \"unit\": \"m\"}"}, {"id": "MS-U06-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(三)”上,变坡点桩号为 K2+178.769 的那处竖曲线,半径 R 是多少?返回数值和单位(m)。", "answer": "{\"value\": 5000, \"unit\": \"m\"}"}, {"id": "MS-U06-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(五)”上,变坡点桩号为 K2+725 的那处竖曲线,半径 R 是多少?返回数值和单位(m)。", "answer": "{\"value\": 7000, \"unit\": \"m\"}"}, {"id": "MS-U06-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线纵断面上,沿桩号增大方向,变坡点 K0+811 之后紧接的那段直坡,坡长是多少?返回数值和单位(m)。", "answer": "{\"value\": 540, \"unit\": \"m\"}"}, {"id": "MS-U06-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线纵断面上,沿桩号增大方向,变坡点 K1+351 之后紧接的那段直坡,坡长是多少?返回数值和单位(m)。", "answer": "{\"value\": 827.769, \"unit\": \"m\"}"}, {"id": "MS-U06-03-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线纵断面上,沿桩号增大方向,变坡点 K2+178.769 之后紧接的那段直坡,坡长是多少?返回数值和单位(m)。", "answer": "{\"value\": 546.231, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U06-04/few_sheet/01.png", "page_02_file_name": "images/MS-U06-04/few_sheet/02.png", "page_03_file_name": "images/MS-U06-04/few_sheet/03.png", "page_04_file_name": "images/MS-U06-04/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U06-04", "set": "U06", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "主线右幅桥梁设计起点所在桩号处,下列说法哪些正确?", "options": [{"key": "A", "text": "该处至所在平曲线终点(YZ)的里程差为 60.466 m", "correct": false}, {"key": "B", "text": "该处主线设计高程为 265.405 m", "correct": false}, {"key": "C", "text": "该处沿桩号增大方向至第一个竖曲线起点的里程差为 661 m", "correct": false}, {"key": "D", "text": "该处沿桩号增大方向至第一个竖曲线起点的里程差为 580 m", "correct": false}, {"key": "E", "text": "该处主线设计高程为 265.365 m", "correct": true}, {"key": "F", "text": "该处主线纵坡为 −0.5%", "correct": false}], "answer": ["E"], "few_sheet_pages": [14, 29, 15, 33], "evidence_pages": [14, 33], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U06-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线纵断面上,桩号 K0+073 所在的那段直坡,终点处的变坡点桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K0+811\""}, {"id": "MS-U06-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主线道路分平面图(一)中,右幅桥梁设计起点的桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K0+073.000\""}, {"id": "MS-U06-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "道路分纵断面图(一)中,本次设计起点 K0+000 处标注的 H设 是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 265, \"unit\": \"m\"}"}, {"id": "MS-U06-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "道路分纵断面图(一)坡度/坡长栏中,桩号 +811 处标注的变坡点高程是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 269.055, \"unit\": \"m\"}"}, {"id": "MS-U06-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "道路分纵断面图(一)中,所标注的'左幅桥梁设计起点'桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K0+081\""}, {"id": "MS-U06-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "道路分纵断面图(一)设计高程栏中,桩号 K0+060 的设计高程是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 265.3, \"unit\": \"m\"}"}, {"id": "MS-U06-04-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "道路分纵断面图(一)设计高程栏中,桩号 K0+080 的设计高程是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 265.4, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U06-05/few_sheet/01.png", "page_02_file_name": "images/MS-U06-05/few_sheet/02.png", "page_03_file_name": "images/MS-U06-05/few_sheet/03.png", "page_04_file_name": "images/MS-U06-05/few_sheet/04.png", "page_05_file_name": "images/MS-U06-05/few_sheet/05.png", "page_06_file_name": "images/MS-U06-05/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U06-05", "set": "U06", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "主线上半径为 900 m 的那处平曲线(ZY 至 HZ),关于其范围内的竖曲线和纵坡,下列说法哪些正确?", "options": [{"key": "A", "text": "该平曲线范围内有一处半径 5000 m 的竖曲线", "correct": true}, {"key": "B", "text": "该平曲线范围内还有一处半径 7000 m 的竖曲线", "correct": false}, {"key": "C", "text": "这处竖曲线完全位于该平曲线的圆曲线段(ZY 至 YH)内", "correct": true}, {"key": "D", "text": "这处竖曲线是凸形竖曲线", "correct": false}, {"key": "E", "text": "该平曲线范围内没有竖曲线", "correct": false}, {"key": "F", "text": "沿桩号增大方向,该平曲线范围内主线纵坡先下坡后上坡", "correct": true}], "answer": ["A", "C", "F"], "few_sheet_pages": [30, 32, 31, 20, 25, 29], "evidence_pages": [25, 29, 30, 31], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U06-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(三)”上,SJD11 竖曲线的半径、起点桩号和终点桩号各是多少?返回 JSON 对象,字段名固定为 半径、起点、终点;半径为 {value, unit},单位 m;桩号按图上写法原样返回(形如 K9+123.456)。", "answer": "{\"半径\": {\"value\": 5000, \"unit\": \"m\"}, \"起点\": \"K2+091.269\", \"终点\": \"K2+266.269\"}"}, {"id": "MS-U06-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(四)”上,右上角那处竖曲线的半径和起点桩号各是多少?返回 JSON 对象,字段名固定为 半径、起点;半径为 {value, unit},单位 m;桩号按图上写法原样返回(形如 K9+123.456)。", "answer": "{\"半径\": {\"value\": 7000, \"unit\": \"m\"}, \"起点\": \"K2+647.916\"}"}, {"id": "MS-U06-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(三)”上,变坡点 K2+178.769 前、后两段直坡的纵坡和坡长各是多少?返回 JSON 对象,字段名固定为 之前纵坡、之前坡长、之后纵坡、之后坡长;纵坡按百分数返回,带正负号(上坡写 +,下坡写 -),保留图上的小数位(形如 \"+0.3%\");坡长为 {value, unit},单位 m。", "answer": "{\"之前纵坡\": \"-1.9%\", \"之前坡长\": {\"value\": 827.769, \"unit\": \"m\"}, \"之后纵坡\": \"+1.6%\", \"之后坡长\": {\"value\": 546.231, \"unit\": \"m\"}}"}, {"id": "MS-U06-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主线直线、曲线及转角表”中,交点9 的曲线起点(第一缓和曲线起点 ZH 列)、YH(YZ) 和 HZ 桩号各是多少?返回 JSON 对象,字段名固定为 起点、YH、HZ,桩号按图上写法原样返回(形如 K9+123.456)。", "answer": "{\"起点\": \"K1+868.778\", \"YH\": \"K2+427.067\", \"HZ\": \"K2+577.067\"}"}, {"id": "MS-U06-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上半径为 900 m 的那处平曲线,ZY、YH、HZ 的桩号各是多少?返回 JSON 对象,字段名固定为 ZY、YH、HZ,桩号按图上写法原样返回(形如 K9+123.456)。", "answer": "{\"ZY\": \"K1+868.778\", \"YH\": \"K2+427.067\", \"HZ\": \"K2+577.067\"}"}]} {"page_01_file_name": "images/MS-U06-06/few_sheet/01.png", "page_02_file_name": "images/MS-U06-06/few_sheet/02.png", "page_03_file_name": "images/MS-U06-06/few_sheet/03.png", "page_04_file_name": "images/MS-U06-06/few_sheet/04.png", "page_05_file_name": "images/MS-U06-06/few_sheet/05.png", "page_06_file_name": "images/MS-U06-06/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U06-06", "set": "U06", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "主线上半径为 500 m 的那处平曲线(ZH 至 HZ),关于其范围内的竖曲线和纵坡,下列说法哪些正确?", "options": [{"key": "A", "text": "该平曲线终点(HZ)在主线上跨规划次干路处之前", "correct": true}, {"key": "B", "text": "该平曲线范围内没有竖曲线", "correct": true}, {"key": "C", "text": "该平曲线范围内有一处半径 15000 m 的竖曲线", "correct": false}, {"key": "D", "text": "该平曲线整段位于 −1.9% 的直坡段上", "correct": true}, {"key": "E", "text": "该平曲线起点(ZH)位于 −0.5% 的坡段上", "correct": false}, {"key": "F", "text": "该平曲线范围内有一处半径 5000 m 的竖曲线", "correct": false}], "answer": ["A", "B", "D"], "few_sheet_pages": [25, 33, 30, 29, 31, 22], "evidence_pages": [25, 33, 29, 30], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U06-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(一)”上,SJD10 竖曲线的起点桩号和终点桩号各是多少?返回 JSON 对象,字段名固定为 起点、终点,桩号按图上写法原样返回(形如 K9+123)。", "answer": "{\"起点\": \"K1+246\", \"终点\": \"K1+456\"}"}, {"id": "MS-U06-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(三)”上,SJD11 竖曲线的起点桩号和终点桩号各是多少?返回 JSON 对象,字段名固定为 起点、终点,桩号按图上写法原样返回(形如 K9+123.456)。", "answer": "{\"起点\": \"K2+091.269\", \"终点\": \"K2+266.269\"}"}, {"id": "MS-U06-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(一)”上,变坡点 K1+351 前、后两段直坡的纵坡各是多少?其后那段直坡的坡长是多少?返回 JSON 对象,字段名固定为 之前纵坡、之后纵坡、之后坡长;纵坡按百分数返回,带正负号(上坡写 +,下坡写 -),保留图上的小数位(形如 \"+0.3%\");坡长为 {value, unit},单位 m。", "answer": "{\"之前纵坡\": \"-0.5%\", \"之后纵坡\": \"-1.9%\", \"之后坡长\": {\"value\": 827.769, \"unit\": \"m\"}}"}, {"id": "MS-U06-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(二)”上,主线与规划次干路立体交叉处标注的主线桩号是多少?按 K数字+数字 的形式返回。", "answer": "\"K1+900.278\""}, {"id": "MS-U06-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主线直线、曲线及转角表”中,交点8 的第一缓和曲线起点 ZH 和第二缓和曲线终点 HZ 桩号各是多少?返回 JSON 对象,字段名固定为 ZH、HZ,桩号按图上写法原样返回(形如 K9+123.456)。", "answer": "{\"ZH\": \"K1+466.011\", \"HZ\": \"K1+868.778\"}"}, {"id": "MS-U06-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线上半径为 500 m 的那处平曲线,ZH 和 HZ 的桩号各是多少?返回 JSON 对象,字段名固定为 ZH、HZ,桩号按图上写法原样返回(形如 K9+123.456)。", "answer": "{\"ZH\": \"K1+466.011\", \"HZ\": \"K1+868.778\"}"}]} {"page_01_file_name": "images/MS-U06-07/few_sheet/01.png", "page_02_file_name": "images/MS-U06-07/few_sheet/02.png", "page_03_file_name": "images/MS-U06-07/few_sheet/03.png", "page_04_file_name": "images/MS-U06-07/few_sheet/04.png", "page_05_file_name": "images/MS-U06-07/few_sheet/05.png", "page_06_file_name": "images/MS-U06-07/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U06-07", "set": "U06", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "主线(本次设计 K0+000~K2+900)沿线与多条道路、铁路立体交叉。下列交叉对象中,哪些从主线下方通过,且该处主线设计高程比它高出 30 m 以上?", "options": [{"key": "A", "text": "规划道路", "correct": false}, {"key": "B", "text": "市郊铁路鱼江线", "correct": false}, {"key": "C", "text": "支坪滨江路", "correct": true}, {"key": "D", "text": "现状成渝铁路", "correct": true}, {"key": "E", "text": "规划次干路", "correct": false}, {"key": "F", "text": "匝道F线", "correct": false}], "answer": ["C", "D"], "few_sheet_pages": [29, 33, 30, 31, 23, 32], "evidence_pages": [33, 29, 31, 32], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U06-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(一)”上,主线与现状成渝铁路立体交叉处的引注中,主线设计高程和现状成渝铁路的高程各是多少?返回 JSON 对象,字段名固定为 主线、被交叉对象,每个字段为 {value, unit},单位 m。", "answer": "{\"主线\": {\"value\": 266.51, \"unit\": \"m\"}, \"被交叉对象\": {\"value\": 202.968, \"unit\": \"m\"}}"}, {"id": "MS-U06-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(一)”上,主线与支坪滨江路立体交叉处的引注中,主线设计高程和支坪滨江路的高程各是多少?返回 JSON 对象,字段名固定为 主线、被交叉对象,每个字段为 {value, unit},单位 m。", "answer": "{\"主线\": {\"value\": 263.107, \"unit\": \"m\"}, \"被交叉对象\": {\"value\": 199.61, \"unit\": \"m\"}}"}, {"id": "MS-U06-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(二)”上,主线与规划次干路立体交叉处的引注中,主线设计高程和规划次干路的高程各是多少?返回 JSON 对象,字段名固定为 主线、被交叉对象,每个字段为 {value, unit},单位 m。", "answer": "{\"主线\": {\"value\": 255.919, \"unit\": \"m\"}, \"被交叉对象\": {\"value\": 227.09, \"unit\": \"m\"}}"}, {"id": "MS-U06-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(四)”上,主线与匝道F线立体交叉处的引注中,主线设计高程和匝道F线的高程各是多少?返回 JSON 对象,字段名固定为 主线、被交叉对象,每个字段为 {value, unit},单位 m。", "answer": "{\"主线\": {\"value\": 255.734, \"unit\": \"m\"}, \"被交叉对象\": {\"value\": 236.346, \"unit\": \"m\"}}"}, {"id": "MS-U06-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(五)”上,主线与规划道路立体交叉处的引注中,主线设计高程和规划道路的高程各是多少?返回 JSON 对象,字段名固定为 主线、被交叉对象,每个字段为 {value, unit},单位 m。", "answer": "{\"主线\": {\"value\": 258.445, \"unit\": \"m\"}, \"被交叉对象\": {\"value\": 248.471, \"unit\": \"m\"}}"}, {"id": "MS-U06-07-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(四)”上,主线桩号 K2+575.166 处那条三层交叉引注中,H上、H中、H下 各是多少?返回 JSON 对象,字段名固定为 H上、H中、H下,每个字段为 {value, unit},单位 m。", "answer": "{\"H上\": {\"value\": 266.0, \"unit\": \"m\"}, \"H中\": {\"value\": 256.97, \"unit\": \"m\"}, \"H下\": {\"value\": 247.668, \"unit\": \"m\"}}"}, {"id": "MS-U06-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线与市郊铁路鱼江线立体交叉处,主线的设计高程和鱼江线的高程各是多少?返回 JSON 对象,字段名固定为 主线、鱼江线,每个字段为 {value, unit},单位 m。", "answer": "{\"主线\": {\"value\": 256.97, \"unit\": \"m\"}, \"鱼江线\": {\"value\": 266.0, \"unit\": \"m\"}}"}]} {"page_01_file_name": "images/MS-U06-08/few_sheet/01.png", "page_02_file_name": "images/MS-U06-08/few_sheet/02.png", "page_03_file_name": "images/MS-U06-08/few_sheet/03.png", "page_04_file_name": "images/MS-U06-08/few_sheet/04.png", "page_05_file_name": "images/MS-U06-08/few_sheet/05.png", "page_06_file_name": "images/MS-U06-08/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U06-08", "set": "U06", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿主线桩号增大方向,下列\"交叉对象 → 紧接的下一个交叉对象\"中,哪些正确?", "options": [{"key": "A", "text": "规划滨江路 → 现状成渝铁路", "correct": true}, {"key": "B", "text": "规划次干路 → 栀花大道", "correct": false}, {"key": "C", "text": "匝道F线 → 栀花大道", "correct": true}, {"key": "D", "text": "支坪滨江路 → 规划次干路", "correct": true}, {"key": "E", "text": "栀花大道 → 匝道F线", "correct": false}, {"key": "F", "text": "规划滨江路 → 支坪滨江路", "correct": false}], "answer": ["A", "C", "D"], "few_sheet_pages": [32, 33, 29, 30, 21, 31], "evidence_pages": [33, 29, 30, 31], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U06-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(一)”上,主线与现状成渝铁路、支坪滨江路立体交叉处,各标注的主线桩号是多少?返回 JSON 对象,字段名固定为 现状成渝铁路、支坪滨江路,桩号按图上写法原样返回(形如 K9+123.456)。", "answer": "{\"现状成渝铁路\": \"K0+302.078\", \"支坪滨江路\": \"K1+521.972\"}"}, {"id": "MS-U06-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(二)”上,主线与规划次干路立体交叉处标注的主线桩号是多少?按 K数字+数字 的形式返回。", "answer": "\"K1+900.278\""}, {"id": "MS-U06-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(四)”上,主线与匝道F线、栀花大道立体交叉处,各标注的主线桩号是多少?返回 JSON 对象,字段名固定为 匝道F线、栀花大道,返回主线桩号,桩号按图上写法原样返回(形如 K9+123.456)。", "answer": "{\"匝道F线\": \"K2+497.957\", \"栀花大道\": \"K2+575.166\"}"}, {"id": "MS-U06-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "下面三张图上,各有几处写有“主线K…”桩号并带 H上、H下 高程的立体交叉引注?返回 JSON 对象,字段名固定为 一、二、四,分别对应“道路分纵断面图(一)”“道路分纵断面图(二)”“道路分纵断面图(四)”,每个字段为 {value, unit},单位 处。", "answer": "{\"一\": {\"value\": 3, \"unit\": \"处\"}, \"二\": {\"value\": 1, \"unit\": \"处\"}, \"四\": {\"value\": 2, \"unit\": \"处\"}}"}, {"id": "MS-U06-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(四)”上的两条交叉引注里,匝道F线、栀花大道自身的桩号各写的是多少?返回 JSON 对象,字段名固定为 匝道F线、栀花大道,桩号按图上写法原样返回(形如 K9+123.456)。", "answer": "{\"匝道F线\": \"K0+488.564\", \"栀花大道\": \"K0+314.764\"}"}, {"id": "MS-U06-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线与规划滨江路立体交叉处,主线桩号是多少?按 K数字+数字 的形式返回。", "answer": "\"K0+208.223\""}]} {"page_01_file_name": "images/MS-U06-09/few_sheet/01.png", "page_02_file_name": "images/MS-U06-09/few_sheet/02.png", "page_03_file_name": "images/MS-U06-09/few_sheet/03.png", "page_04_file_name": "images/MS-U06-09/few_sheet/04.png", "page_05_file_name": "images/MS-U06-09/few_sheet/05.png", "page_06_file_name": "images/MS-U06-09/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U06-09", "set": "U06", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "主线本次设计范围(K0+000~K2+900)内的断链与实际路线长度,下列说法哪些正确?", "options": [{"key": "A", "text": "实际路线长度为 7005.281 m", "correct": false}, {"key": "B", "text": "本次设计范围内主线没有断链", "correct": true}, {"key": "C", "text": "两张分纵断面图在 K1+660 处衔接时桩号重复,形成一处短链", "correct": false}, {"key": "D", "text": "本次设计范围的实际路线长度为 2900 m", "correct": true}, {"key": "E", "text": "实际路线长度为 1908 m", "correct": false}, {"key": "F", "text": "实际路线长度为 3020 m", "correct": false}], "answer": ["B", "D"], "few_sheet_pages": [33, 30, 29, 32, 25, 31], "evidence_pages": [25, 33, 29, 32], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U06-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主线直线、曲线及转角表”中,“直线长度”列合计和“曲线长度 L”列合计各是多少?返回 JSON 对象,字段名固定为 直线长度合计、曲线长度合计,每个字段为 {value, unit},单位 m。", "answer": "{\"直线长度合计\": {\"value\": 3259.566, \"unit\": \"m\"}, \"曲线长度合计\": {\"value\": 3745.716, \"unit\": \"m\"}}"}, {"id": "MS-U06-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主线直线、曲线及转角表”中,起点、终点两行的交点桩号各写的是什么?返回 JSON 对象,字段名固定为 起点、终点,按表中写法原样返回(形如 K9+123.456;负号照写)。", "answer": "{\"起点\": \"K-1-109.631\", \"终点\": \"K5+895.65\"}"}, {"id": "MS-U06-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(五)”上,纵断面图幅最右端(设计线虚线延伸段的终点)标注的桩号是多少?按 K数字+数字 的形式返回。", "answer": "\"K3+020\""}, {"id": "MS-U06-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(一)”上标注的左幅桥梁设计起点桩号、“道路分纵断面图(二)”上标注的左幅桥梁设计终点桩号各是多少?返回 JSON 对象,字段名固定为 起点、终点,桩号按图上写法原样返回(形如 K9+123)。", "answer": "{\"起点\": \"K0+081\", \"终点\": \"K1+989\"}"}, {"id": "MS-U06-09-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(一)”最右端、“道路分纵断面图(二)”最左端各标注的桩号和设计高程 H 是多少?返回 JSON 对象,字段名固定为 一右端桩号、一右端高程、二左端桩号、二左端高程;桩号按图上写法原样返回(形如 K9+123),高程为 {value, unit},单位 m。", "answer": "{\"一右端桩号\": \"K1+660\", \"一右端高程\": {\"value\": 260.484, \"unit\": \"m\"}, \"二左端桩号\": \"K1+660\", \"二左端高程\": {\"value\": 260.484, \"unit\": \"m\"}}"}, {"id": "MS-U06-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线本次设计的起点桩号和终点桩号各是多少?返回 JSON 对象,字段名固定为 起点、终点,桩号按图上写法原样返回(形如 K9+123)。", "answer": "{\"起点\": \"K0+000\", \"终点\": \"K2+900\"}"}]} {"page_01_file_name": "images/MS-U06-10/few_sheet/01.png", "page_02_file_name": "images/MS-U06-10/few_sheet/02.png", "page_03_file_name": "images/MS-U06-10/few_sheet/03.png", "page_04_file_name": "images/MS-U06-10/few_sheet/04.png", "page_05_file_name": "images/MS-U06-10/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U06-10", "set": "U06", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "按道路工程数量表,主线本次设计全线(K0+000~K2+900)\"中分带 C30 立式砼路缘石\"合计多长(m)?", "options": [{"key": "A", "text": "2579.13", "correct": false}, {"key": "B", "text": "1324.72", "correct": false}, {"key": "C", "text": "969.13", "correct": false}, {"key": "D", "text": "2753.13", "correct": false}, {"key": "E", "text": "1318.13", "correct": true}, {"key": "F", "text": "1144.13", "correct": false}], "answer": ["E"], "few_sheet_pages": [7, 9, 6, 5, 8], "evidence_pages": [5, 6, 8], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U06-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“第一段主线(北岸K0+000~K0+400)+还建道路15道路工程数量表”中,“中分带C30立式砼路缘石”的工程量是多少?返回数值和单位(m)。", "answer": "{\"value\": 174, \"unit\": \"m\"}"}, {"id": "MS-U06-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二段,南岸主线K0+400-K2+160以及还建道路2”数量表中,“中分带C30立式砼路缘石”的工程量是多少?返回数值和单位(m)。", "answer": "{\"value\": 349, \"unit\": \"m\"}"}, {"id": "MS-U06-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主线K2+160-K2+900主线+还建G348+还建道路道路工程数量表”中,“中分带C30立式砼路缘石”的工程量是多少?返回数值和单位(m)。", "answer": "{\"value\": 795.13, \"unit\": \"m\"}"}, {"id": "MS-U06-10-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交+栀花大道+还建道路2道路工程数量表”中,“中分带C30立式砼路缘石”的工程量是多少?返回数值和单位(m)。", "answer": "{\"value\": 1435.0, \"unit\": \"m\"}"}, {"id": "MS-U06-10-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "下面三张道路工程数量表中,“路侧C30立式砼路缘石”的工程量各是多少?返回 JSON 对象,字段名固定为 第一段、二段、K2段,分别对应“第一段主线(北岸K0+000~K0+400)+还建道路15道路工程数量表”“二段,南岸主线K0+400-K2+160以及还建道路2”“主线K2+160-K2+900主线+还建G348+还建道路道路工程数量表”,每个字段为 {value, unit},单位 m。", "answer": "{\"第一段\": {\"value\": 176, \"unit\": \"m\"}, \"二段\": {\"value\": 352, \"unit\": \"m\"}, \"K2段\": {\"value\": 796.72, \"unit\": \"m\"}}"}, {"id": "MS-U06-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "按道路工程数量表,主线 K0+000~K0+400 这一段的“中分带C30立式砼路缘石”工程量是多少?返回数值和单位(m)。", "answer": "{\"value\": 174, \"unit\": \"m\"}"}, {"id": "MS-U06-10-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "按道路工程数量表,主线 K2+160~K2+900 这一段的“中分带C30立式砼路缘石”工程量是多少?返回数值和单位(m)。", "answer": "{\"value\": 795.13, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U06-11/few_sheet/01.png", "page_02_file_name": "images/MS-U06-11/few_sheet/02.png", "page_03_file_name": "images/MS-U06-11/few_sheet/03.png", "page_04_file_name": "images/MS-U06-11/few_sheet/04.png", "page_05_file_name": "images/MS-U06-11/few_sheet/05.png", "page_06_file_name": "images/MS-U06-11/few_sheet/06.png", "page_07_file_name": "images/MS-U06-11/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U06-11", "set": "U06", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "主线本次设计起点至终点之间,扣除各竖曲线范围后,直坡段的总长度是多少(m)?", "options": [{"key": "A", "text": "2180.832", "correct": false}, {"key": "B", "text": "2480.416", "correct": false}, {"key": "C", "text": "2360.832", "correct": false}, {"key": "D", "text": "2060.832", "correct": true}, {"key": "E", "text": "2215.000", "correct": false}, {"key": "F", "text": "1647.478", "correct": false}], "answer": ["D"], "few_sheet_pages": [32, 29, 26, 33, 25, 30, 31], "evidence_pages": [33, 29, 30, 31, 32], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U06-11-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(一)”上,SJD9、SJD10 两处竖曲线的切线长 T 各是多少?返回 JSON 对象,字段名固定为 SJD9、SJD10,每个字段为 {value, unit},单位 m。", "answer": "{\"SJD9\": {\"value\": 150, \"unit\": \"m\"}, \"SJD10\": {\"value\": 105, \"unit\": \"m\"}}"}, {"id": "MS-U06-11-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(三)”上,SJD11 竖曲线的切线长 T 是多少?返回数值和单位(m)。", "answer": "{\"value\": 87.5, \"unit\": \"m\"}"}, {"id": "MS-U06-11-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(五)”上,SJD12 竖曲线的切线长 T 是多少?返回数值和单位(m)。", "answer": "{\"value\": 77.084, \"unit\": \"m\"}"}, {"id": "MS-U06-11-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“道路分纵断面图(五)”上,纵断面图幅最右端(设计线虚线延伸段的终点)标注的桩号是多少?按 K数字+数字 的形式返回。", "answer": "\"K3+020\""}, {"id": "MS-U06-11-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主线直线、曲线及转角表”中,交点8、交点9 的曲线长度 L 各是多少?返回 JSON 对象,字段名固定为 交点8、交点9,每个字段为 {value, unit},单位 m。", "answer": "{\"交点8\": {\"value\": 402.768, \"unit\": \"m\"}, \"交点9\": {\"value\": 708.288, \"unit\": \"m\"}}"}, {"id": "MS-U06-11-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线本次设计起点至终点之间,纵断面上共有几处竖曲线?返回数值和单位(处)。", "answer": "{\"value\": 4, \"unit\": \"处\"}"}, {"id": "MS-U06-11-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线本次设计的起点桩号和终点桩号各是多少?返回 JSON 对象,字段名固定为 起点、终点,桩号按图上写法原样返回(形如 K9+123)。", "answer": "{\"起点\": \"K0+000\", \"终点\": \"K2+900\"}"}]} {"page_01_file_name": "images/MS-U06-12/few_sheet/01.png", "page_02_file_name": "images/MS-U06-12/few_sheet/02.png", "page_03_file_name": "images/MS-U06-12/few_sheet/03.png", "page_04_file_name": "images/MS-U06-12/few_sheet/04.png", "page_05_file_name": "images/MS-U06-12/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U06-12", "set": "U06", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "沿主线桩号增大方向(往泸州),关于主线在平面上的走向,下列说法哪些正确?", "options": [{"key": "A", "text": "过 JD3 后的直线段,主线大致朝南偏东", "correct": false}, {"key": "B", "text": "过 JD3 后的直线段,主线大致朝西南(南偏西约 50°)", "correct": true}, {"key": "C", "text": "主线在 JD2 处向左转", "correct": false}, {"key": "D", "text": "主线跨越长江的那段直线(JD1 与 JD2 之间)大致朝南偏东", "correct": true}, {"key": "E", "text": "过 JD2 后的直线段,主线大致朝南偏西", "correct": true}, {"key": "F", "text": "主线跨越长江的那段直线大致朝北偏西", "correct": false}], "answer": ["B", "D", "E"], "few_sheet_pages": [21, 14, 22, 20, 23], "evidence_pages": [14, 20, 22], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U06-12-R1", "role": "read", "tiers": ["full_set"], "question": "“主线直线、曲线及转角表”中,交点7 与交点8 之间那段直线的计算方位角是多少?返回 JSON 对象,字段名固定为 度、分、秒,每个字段按表中数字原样写成字符串(形如 {\"度\": \"12\", \"分\": \"03\", \"秒\": \"45\"})。", "answer": "{\"度\": \"155\", \"分\": \"43\", \"秒\": \"26\"}"}, {"id": "MS-U06-12-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主线道路分平面图(七)”上的 JD2 曲线要素表中,转角 α 的偏向和数值是多少?返回 JSON 对象,字段名固定为 偏向、度、分、秒;偏向取 左偏 或 右偏;度、分、秒按表中数字原样写成字符串(形如 \"12\"、\"03\"、\"45.6\")。", "answer": "{\"偏向\": \"右偏\", \"度\": \"35\", \"分\": \"48\", \"秒\": \"31.3\"}"}, {"id": "MS-U06-12-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主线道路分平面图(九)”上的 JD3 曲线要素表中,转角 α 的偏向和数值是多少?返回 JSON 对象,字段名固定为 偏向、度、分、秒;偏向取 左偏 或 右偏;度、分、秒按表中数字原样写成字符串(形如 \"12\"、\"03\"、\"45.6\")。", "answer": "{\"偏向\": \"右偏\", \"度\": \"40\", \"分\": \"18\", \"秒\": \"59\"}"}, {"id": "MS-U06-12-B1", "role": "bind", "tiers": ["full_set"], "question": "主线跨越长江的那段直线,沿桩号增大方向的计算方位角是多少?返回 JSON 对象,字段名固定为 度、分、秒,每个字段按表中数字原样写成字符串(形如 {\"度\": \"12\", \"分\": \"03\", \"秒\": \"45\"})。", "answer": "{\"度\": \"155\", \"分\": \"43\", \"秒\": \"26\"}"}, {"id": "MS-U06-12-B2", "role": "bind", "tiers": ["full_set"], "question": "主线过 JD2 之后那段直线,沿桩号增大方向的计算方位角是多少?返回 JSON 对象,字段名固定为 度、分、秒,每个字段按表中数字原样写成字符串(形如 {\"度\": \"12\", \"分\": \"03\", \"秒\": \"45\"})。", "answer": "{\"度\": \"191\", \"分\": \"31\", \"秒\": \"58\"}"}]} {"page_01_file_name": "images/MS-U07-01/few_sheet/01.png", "page_02_file_name": "images/MS-U07-01/few_sheet/02.png", "page_03_file_name": "images/MS-U07-01/few_sheet/03.png", "page_04_file_name": "images/MS-U07-01/few_sheet/04.png", "page_05_file_name": "images/MS-U07-01/few_sheet/05.png", "page_06_file_name": "images/MS-U07-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U07-01", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "本次设计的雨水管道中,哪些管段采用铸铁管(含球墨铸铁管),而不是常规砂垫层基础上的管道?", "options": [{"key": "A", "text": "1Y-193 → 1Y-192", "correct": true}, {"key": "B", "text": "1Y-4 → 1Y-5", "correct": true}, {"key": "C", "text": "1Y-196 → 1Y-198", "correct": false}, {"key": "D", "text": "DG-2 → DG-5", "correct": false}, {"key": "E", "text": "1Y-1 → 1Y-2", "correct": true}, {"key": "F", "text": "1Y-174 → 1Y-171", "correct": true}], "answer": ["A", "B", "E", "F"], "few_sheet_pages": [20, 24, 21, 23, 22, 17], "evidence_pages": [17, 20, 24, 23], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(一)”上画了三幅纵断面。井号自 1Y-1 起的那幅、自 1Y-4 起的那幅,其“管道基础”栏里写“球磨铸铁管段”的那一格,下游端各到哪个检查井为止?返回 JSON 对象,字段名固定为 自1Y-1起、自1Y-4起,按图中编号原样返回(形如 1Y-10)。", "answer": "{\"自1Y-1起\": \"1Y-2\", \"自1Y-4起\": \"1Y-5\"}"}, {"id": "MS-U07-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(四)”上,“管道基础”栏写“球墨铸铁管段”的那一幅小纵断面,起点、终点检查井各是什么?返回 JSON 对象,字段名固定为 起点、终点,按图中编号原样返回(形如 1Y-10)。", "answer": "{\"起点\": \"1Y-174\", \"终点\": \"1Y-171\"}"}, {"id": "MS-U07-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签中图名栏空白、图号为 C06P-12-8 的雨水纵断面图上,主纵断面(井号自 1Y-195 起)的“管道基础”栏中写“铸铁管段”的那一格,覆盖的管段起点、终点检查井各是什么?返回 JSON 对象,字段名固定为 起点、终点,按图中编号原样返回(形如 1Y-10)。", "answer": "{\"起点\": \"1Y-193\", \"终点\": \"1Y-192\"}"}, {"id": "MS-U07-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签中图名栏空白、图号为 C06P-12-8 的雨水纵断面图上,右侧管径 dn2400 的那幅小纵断面,“管道基础”栏写“180°混凝土基础”的那一格覆盖的管段起点、终点检查井各是什么?返回 JSON 对象,字段名固定为 起点、终点,按图中编号原样返回(形如 1Y-10)。", "answer": "{\"起点\": \"1Y-196\", \"终点\": \"1Y-198\"}"}, {"id": "MS-U07-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(七)”上,井号自 DG-1 起的那幅纵断面,“管道基础”栏写“顶管段”的那一格覆盖的管段起点、终点检查井各是什么?返回 JSON 对象,字段名固定为 起点、终点,按图中编号原样返回(形如 DG-9)。", "answer": "{\"起点\": \"DG-2\", \"终点\": \"DG-5\"}"}, {"id": "MS-U07-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "雨水管道中管径为 d800、管道基础为球墨铸铁管段的那一段,起点、终点检查井各是什么?返回 JSON 对象,字段名固定为 起点、终点,按图中编号原样返回(形如 1Y-10)。", "answer": "{\"起点\": \"1Y-174\", \"终点\": \"1Y-171\"}"}]} {"page_01_file_name": "images/MS-U07-02/few_sheet/01.png", "page_02_file_name": "images/MS-U07-02/few_sheet/02.png", "page_03_file_name": "images/MS-U07-02/few_sheet/03.png", "page_04_file_name": "images/MS-U07-02/few_sheet/04.png", "page_05_file_name": "images/MS-U07-02/few_sheet/05.png", "page_06_file_name": "images/MS-U07-02/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U07-02", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "本次设计的雨水管道中,管径 1200 mm 的管段合计长多少(m)?", "options": [{"key": "A", "text": "316.22", "correct": false}, {"key": "B", "text": "638.73", "correct": false}, {"key": "C", "text": "447.07", "correct": false}, {"key": "D", "text": "541.85", "correct": true}, {"key": "E", "text": "526.03", "correct": false}, {"key": "F", "text": "300.40", "correct": false}], "answer": ["D"], "few_sheet_pages": [24, 23, 25, 22, 21, 19], "evidence_pages": [19, 21, 23, 24], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(三)”上,自 1Y-62 至 1Y-91 各段、自 1Y-91 至 1Y-93 各段的“平面距离”之和各是多少?返回 JSON 对象,字段名固定为 62至91、91至93,每个字段为 {value, unit},单位 m。", "answer": "{\"62至91\": {\"value\": 205.62, \"unit\": \"m\"}, \"91至93\": {\"value\": 94.78, \"unit\": \"m\"}}"}, {"id": "MS-U07-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(七)”上,井号自 DG-1 起的那幅纵断面,管径是多少?DG-1 至 DG-5 各段“平面距离”之和是多少?返回 JSON 对象,字段名固定为 管径、长度,每个字段为 {value, unit}(管径单位 mm,长度单位 m)。", "answer": "{\"管径\": {\"value\": 1200, \"unit\": \"mm\"}, \"长度\": {\"value\": 225.63, \"unit\": \"m\"}}"}, {"id": "MS-U07-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(五)”上,右下角井号为 DG-6、DG-7 的那幅小纵断面,管径和“平面距离”各是多少?返回 JSON 对象,字段名固定为 管径、长度,每个字段为 {value, unit}(管径单位 mm,长度单位 m)。", "answer": "{\"管径\": {\"value\": 1200, \"unit\": \"mm\"}, \"长度\": {\"value\": 15.82, \"unit\": \"m\"}}"}, {"id": "MS-U07-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签中图名栏空白、图号为 C06P-12-8 的雨水纵断面图上,右侧那幅小纵断面(1Y-196 至 1Y-198)的管径和各段“平面距离”之和各是多少?返回 JSON 对象,字段名固定为 管径、长度,每个字段为 {value, unit}(管径单位 mm,长度单位 m)。", "answer": "{\"管径\": {\"value\": 2400, \"unit\": \"mm\"}, \"长度\": {\"value\": 96.88, \"unit\": \"m\"}}"}, {"id": "MS-U07-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "井号以 1Y 开头的雨水干管中,管径为 d1200 的那一段连续管道,起点、终点检查井各是什么?返回 JSON 对象,字段名固定为 起点、终点,按图中编号原样返回(形如 1Y-10)。", "answer": "{\"起点\": \"1Y-62\", \"终点\": \"1Y-93\"}"}]} {"page_01_file_name": "images/MS-U07-03/few_sheet/01.png", "page_02_file_name": "images/MS-U07-03/few_sheet/02.png", "page_03_file_name": "images/MS-U07-03/few_sheet/03.png", "page_04_file_name": "images/MS-U07-03/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U07-03", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "雨水沿设计雨水管从 1Y-12 流到 1Y-93。对这股水流进入 1Y-93 所经的那段管道,下列说法哪些正确?", "options": [{"key": "A", "text": "这段管道末端的管内底埋深为 3.008 m", "correct": false}, {"key": "B", "text": "1Y-12 处的设计管内底标高比这段管道末端的设计管内底标高高 22.808 m", "correct": false}, {"key": "C", "text": "这段管道的坡度为 0.017,平面长度为 54.82 m", "correct": true}, {"key": "D", "text": "这段管道的上游井为 1Y-89", "correct": false}, {"key": "E", "text": "1Y-12 处的设计管内底标高比这段管道末端的设计管内底标高高 24.847 m", "correct": false}, {"key": "F", "text": "这段管道的管径为 d1200", "correct": true}], "answer": ["C", "F"], "few_sheet_pages": [18, 19, 21, 22], "evidence_pages": [19, 21, 22], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "自 1Y-12 起的那段雨水纵断,沿流向的终点井号是什么?按图中编号原样返回(形如 1Y-1)。", "answer": "\"1Y-62\""}, {"id": "MS-U07-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "从 1Y-62 沿流向一直走到所在雨水纵断的末端,末端井号是什么?按图中编号原样返回(形如 1Y-1)。", "answer": "\"1Y-93\""}, {"id": "MS-U07-03-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "从 1Y-89 流入 1Y-93 的那段雨水管管径是多少 mm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1000, \"unit\": \"mm\"}"}, {"id": "MS-U07-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "雨水纵断面图(五)左侧纵断中,1Y-12 的设计管内底标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 251.35, \"unit\": \"m\"}"}, {"id": "MS-U07-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "雨水纵断面图(三)左侧纵断表中,1Y-93 列的设计管内底标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 229.103, \"unit\": \"m\"}"}, {"id": "MS-U07-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "雨水纵断面图(六)纵断表中,1Y-93 列的设计管内底标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 228.542, \"unit\": \"m\"}"}, {"id": "MS-U07-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "雨水纵断面图(五)左侧纵断中,1Y-12 的设计路面标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 253.95, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U07-04/few_sheet/01.png", "page_02_file_name": "images/MS-U07-04/few_sheet/02.png", "page_03_file_name": "images/MS-U07-04/few_sheet/03.png", "page_04_file_name": "images/MS-U07-04/few_sheet/04.png", "page_05_file_name": "images/MS-U07-04/few_sheet/05.png", "page_06_file_name": "images/MS-U07-04/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U07-04", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "下列\"上游井 → 下游井\"的雨水流向中,哪些与设计一致?", "options": [{"key": "A", "text": "1Y-151 → 1Y-152", "correct": false}, {"key": "B", "text": "1Y-163 → 1Y-31", "correct": true}, {"key": "C", "text": "1Y-150 → 1Y-151", "correct": true}, {"key": "D", "text": "1Y-85 → 1Y-112", "correct": false}, {"key": "E", "text": "1Y-20 → 1Y-172", "correct": false}, {"key": "F", "text": "1Y-31 → 1Y-161", "correct": false}], "answer": ["B", "C"], "few_sheet_pages": [22, 21, 23, 24, 20, 17], "evidence_pages": [17, 20, 21, 23], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(四)”上,1Y-163 与 1Y-31 之间那一段,两端的“设计管内底标高”各是多少?返回 JSON 对象,字段名固定为 1Y-163端、1Y-31端,每个字段为 {value, unit},单位 m。", "answer": "{\"1Y-163端\": {\"value\": 240.833, \"unit\": \"m\"}, \"1Y-31端\": {\"value\": 240.731, \"unit\": \"m\"}}"}, {"id": "MS-U07-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(一)”上,1Y-150 与 1Y-151 之间那一段,两端的“设计管内底标高”各是多少?返回 JSON 对象,字段名固定为 1Y-150端、1Y-151端,每个字段为 {value, unit},单位 m。", "answer": "{\"1Y-150端\": {\"value\": 202.788, \"unit\": \"m\"}, \"1Y-151端\": {\"value\": 202.72, \"unit\": \"m\"}}"}, {"id": "MS-U07-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(七)”上,1Y-172 与 1Y-20 之间那一段,两端的“设计管内底标高”各是多少?返回 JSON 对象,字段名固定为 1Y-172端、1Y-20端,每个字段为 {value, unit},单位 m。", "answer": "{\"1Y-172端\": {\"value\": 240.483, \"unit\": \"m\"}, \"1Y-20端\": {\"value\": 240.383, \"unit\": \"m\"}}"}, {"id": "MS-U07-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(五)”上,中部井号为 1Y-112、1Y-85 的那幅小纵断面,两井的“设计管内底标高”各是多少?返回 JSON 对象,字段名固定为 1Y-112、1Y-85,每个字段为 {value, unit},单位 m。", "answer": "{\"1Y-112\": {\"value\": 233.542, \"unit\": \"m\"}, \"1Y-85\": {\"value\": 233.342, \"unit\": \"m\"}}"}, {"id": "MS-U07-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "雨水管 1Y-31 与 1Y-161 之间那一段,1Y-161 端和 1Y-31 端的设计管内底标高各是多少?返回 JSON 对象,字段名固定为 1Y-161端、1Y-31端,每个字段为 {value, unit},单位 m。", "answer": "{\"1Y-161端\": {\"value\": 243.357, \"unit\": \"m\"}, \"1Y-31端\": {\"value\": 241.017, \"unit\": \"m\"}}"}, {"id": "MS-U07-04-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "雨水管 1Y-152 与 1Y-151 之间那一段,1Y-152 端和 1Y-151 端的设计管内底标高各是多少?返回 JSON 对象,字段名固定为 1Y-152端、1Y-151端,每个字段为 {value, unit},单位 m。", "answer": "{\"1Y-152端\": {\"value\": 202.773, \"unit\": \"m\"}, \"1Y-151端\": {\"value\": 202.72, \"unit\": \"m\"}}"}]} {"page_01_file_name": "images/MS-U07-05/few_sheet/01.png", "page_02_file_name": "images/MS-U07-05/few_sheet/02.png", "page_03_file_name": "images/MS-U07-05/few_sheet/03.png", "page_04_file_name": "images/MS-U07-05/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U07-05", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "排水分平面图(四)中,有一段污水管在约桩号 +740~+780 之间斜穿道路,把两条平行的污水管连起来。关于这段斜管,下列说法哪些正确?", "options": [{"key": "A", "text": "下游端检查井内的跌水为 0.91 m", "correct": false}, {"key": "B", "text": "上游端的管内底埋深为 3.027 m", "correct": true}, {"key": "C", "text": "上游端的设计管内底标高为 233.342 m", "correct": false}, {"key": "D", "text": "上游端的设计管内底标高为 234.370 m", "correct": false}, {"key": "E", "text": "下游端检查井内的跌水为 0.38 m", "correct": true}, {"key": "F", "text": "下游端的设计管内底标高为 230.992 m", "correct": true}], "answer": ["B", "E", "F"], "few_sheet_pages": [13, 28, 27, 14], "evidence_pages": [14, 27], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "排水分平面图(四)中,约桩号 +740~+780 之间斜穿道路、连接两条平行污水管的那段污水管,其上游端检查井井号是什么?按图中编号原样返回(形如 1W-1)。", "answer": "\"1W-22\""}, {"id": "MS-U07-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "排水分平面图(四)中,约桩号 +740~+780 之间斜穿道路的那段污水管,其下游端检查井井号是什么?按图中编号原样返回(形如 1W-1)。", "answer": "\"1W-24\""}, {"id": "MS-U07-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "污水纵断面图(三)左侧纵断表中,1W-22 列的设计路面标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 235.3, \"unit\": \"m\"}"}, {"id": "MS-U07-05-R2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "1W-22 至 1W-24 污水管段在 1W-22 一端的管内底埋深是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 3.027, \"unit\": \"m\"}"}, {"id": "MS-U07-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "污水纵断面图(三)左侧纵断表中,1W-24 列两个设计管内底标高中较高的那个是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 230.992, \"unit\": \"m\"}"}, {"id": "MS-U07-05-R4", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "1W-21 至 1W-22 污水管段在 1W-22 一端的管内底埋深是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1.958, \"unit\": \"m\"}"}, {"id": "MS-U07-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "污水纵断面图(三)左侧纵断表中,1W-21 列的设计管内底标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 234.37, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U07-06/few_sheet/01.png", "page_02_file_name": "images/MS-U07-06/few_sheet/02.png", "page_03_file_name": "images/MS-U07-06/few_sheet/03.png", "page_04_file_name": "images/MS-U07-06/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U07-06", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "紧邻'设备用房'的那口雨水检查井,与其下游相邻的检查井之间有一段雨水管。关于这段管道,下列说法哪些正确?", "options": [{"key": "A", "text": "管径为 d600,坡度为 0.109", "correct": true}, {"key": "B", "text": "上游端管内底比下游端管内底高 5.704 m", "correct": false}, {"key": "C", "text": "上游端检查井内的跌水为 0.34 m", "correct": true}, {"key": "D", "text": "平面长度为 4.44 m", "correct": false}, {"key": "E", "text": "上游端管内底比下游端管内底高 0.072 m", "correct": false}, {"key": "F", "text": "平面长度为 35.31 m", "correct": false}], "answer": ["A", "C"], "few_sheet_pages": [11, 18, 17, 16], "evidence_pages": [11, 16, 17], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "紧邻'设备用房'的雨水检查井井号是什么?按图中编号原样返回(形如 1Y-1)。", "answer": "\"1Y-7\""}, {"id": "MS-U07-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "1Y-7 至 1Y-8 这段雨水管在 1Y-7 一端的设计管内底标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 208.675, \"unit\": \"m\"}"}, {"id": "MS-U07-06-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "1Y-7 至 1Y-8 这段雨水管在 1Y-8 一端的设计管内底标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 203.315, \"unit\": \"m\"}"}, {"id": "MS-U07-06-B4", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "1Y-6 至 1Y-7 这段雨水管在 1Y-7 一端的设计管内底标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 209.019, \"unit\": \"m\"}"}, {"id": "MS-U07-06-B5", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "1Y-8 至 1Y-152 这段雨水管在 1Y-8 一端的设计管内底标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 202.845, \"unit\": \"m\"}"}, {"id": "MS-U07-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "雨水纵断面图(一)中间一段纵断里,1Y-7 沿流向的下一口检查井井号是什么?按图中编号原样返回(形如 1Y-1)。", "answer": "\"1Y-8\""}, {"id": "MS-U07-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "雨水纵断面图(一)中间一段纵断里,1Y-6 列的设计管内底标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 209.162, \"unit\": \"m\"}"}, {"id": "MS-U07-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "雨水纵断面图(一)中间一段纵断里,1Y-152 列的设计管内底标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 202.773, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U07-07/few_sheet/01.png", "page_02_file_name": "images/MS-U07-07/few_sheet/02.png", "page_03_file_name": "images/MS-U07-07/few_sheet/03.png", "page_04_file_name": "images/MS-U07-07/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U07-07", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "按设计,1Y-55 两侧的雨水管段管径相同。沿这条雨水管线,与这两段管径相同且连续敷设的整段管道,下列说法哪些正确?", "options": [{"key": "A", "text": "这段管道最末一个管段的坡度为 0.025,平面长度为 20.8 m", "correct": false}, {"key": "B", "text": "这段管道上游起于 1Y-61", "correct": false}, {"key": "C", "text": "这段管道上游起于 1Y-18", "correct": false}, {"key": "D", "text": "这段管道下游止于 1Y-62", "correct": true}, {"key": "E", "text": "这段管道下游末端的设计管内底标高为 236.873 m", "correct": false}, {"key": "F", "text": "这段管道最末一个管段的坡度为 0.032,平面长度为 35.47 m", "correct": false}], "answer": ["D"], "few_sheet_pages": [17, 18, 19, 21], "evidence_pages": [18, 19, 21], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "含 1Y-55 的那段雨水纵断上,管径为 d800 的管段在该段纵断内从哪口井起、到哪口井止?按图中编号原样返回起止两个井号(形如 1Y-1)。", "answer": "[\"1Y-47\", \"1Y-61\"]"}, {"id": "MS-U07-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "自 1Y-12 起的雨水支管上,管径为 d800 的连续管段从哪口井起、到哪口井止?按图中编号原样返回起止两个井号(形如 1Y-1)。", "answer": "[\"1Y-18\", \"1Y-62\"]"}, {"id": "MS-U07-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "雨水纵断面图(三)左侧纵断中,1Y-61 至 1Y-62 管段的管径是多少 mm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 800, \"unit\": \"mm\"}"}, {"id": "MS-U07-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "雨水纵断面图(三)左侧纵断中,1Y-62 至 1Y-63 管段的管径是多少 mm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1200, \"unit\": \"mm\"}"}, {"id": "MS-U07-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "雨水纵断面图(二)左侧纵断中,1Y-55 至 1Y-56 管段的管径是多少 mm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 800, \"unit\": \"mm\"}"}, {"id": "MS-U07-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "雨水纵断面图(三)左侧纵断中,1Y-63 至 1Y-64 管段的管径是多少 mm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1200, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U07-08/few_sheet/01.png", "page_02_file_name": "images/MS-U07-08/few_sheet/02.png", "page_03_file_name": "images/MS-U07-08/few_sheet/03.png", "page_04_file_name": "images/MS-U07-08/few_sheet/04.png", "page_05_file_name": "images/MS-U07-08/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U07-08", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "污水管道沿线与多根其它管道交叉。下列交叉管中,哪些从污水管下方穿过?", "options": [{"key": "A", "text": "1W-28 与 1W-29 之间交叉的 d400 管", "correct": false}, {"key": "B", "text": "1W-8 下游紧邻处交叉的 d800 管", "correct": false}, {"key": "C", "text": "1W-12-1 与 1W-12 之间交叉的 dn1200 管", "correct": true}, {"key": "D", "text": "1W-45 与 1W-46 之间交叉的 d400 管", "correct": false}, {"key": "E", "text": "1W-41 处交叉的 d1200 管", "correct": true}, {"key": "F", "text": "1W-30 与 1W-31 之间交叉的 d600 管", "correct": false}], "answer": ["C", "E"], "few_sheet_pages": [27, 22, 25, 26, 28], "evidence_pages": [25, 26, 28], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签中图名栏空白、图号为 C06P-13-1 的污水纵断面图上,下面三处的“设计管内底标高”各是多少?1W-41 处下游一段起点(同一井位两个数中的下游段那个);1W-45;1W-46。返回 JSON 对象,字段名固定为 1W-41下游段、1W-45、1W-46,每个字段为 {value, unit},单位 m。", "answer": "{\"1W-41下游段\": {\"value\": 236.901, \"unit\": \"m\"}, \"1W-45\": {\"value\": 232.834, \"unit\": \"m\"}, \"1W-46\": {\"value\": 231.711, \"unit\": \"m\"}}"}, {"id": "MS-U07-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交污水纵断面图(二)”上,下面三处的“设计管内底标高”各是多少?1W-8;1W-12-1;1W-12 处上游一段终点(同一井位两个数中的上游段那个)。返回 JSON 对象,字段名固定为 1W-8、1W-12-1、1W-12上游段,每个字段为 {value, unit},单位 m。", "answer": "{\"1W-8\": {\"value\": 246.201, \"unit\": \"m\"}, \"1W-12-1\": {\"value\": 243.602, \"unit\": \"m\"}, \"1W-12上游段\": {\"value\": 243.057, \"unit\": \"m\"}}"}, {"id": "MS-U07-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签中图名栏空白、图号为 C06P-13-4 的污水纵断面图上,1W-28、1W-29、1W-30、1W-31 四个井的“设计管内底标高”各是多少?返回 JSON 对象,字段名固定为 1W-28、1W-29、1W-30、1W-31,每个字段为 {value, unit},单位 m。", "answer": "{\"1W-28\": {\"value\": 247.49, \"unit\": \"m\"}, \"1W-29\": {\"value\": 247.37, \"unit\": \"m\"}, \"1W-30\": {\"value\": 247.25, \"unit\": \"m\"}, \"1W-31\": {\"value\": 247.13, \"unit\": \"m\"}}"}, {"id": "MS-U07-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签中图名栏空白、图号为 C06P-13-1 的污水纵断面图的纵断面图上有两处“d400”引注(一处在 1W-44 井位,一处在 1W-45 与 1W-46 之间),标高数值各是多少?返回 JSON 对象,字段名固定为 1W-44处、45与46之间,每个字段为 {value, unit},单位 m。", "answer": "{\"1W-44处\": {\"value\": 233.955, \"unit\": \"m\"}, \"45与46之间\": {\"value\": 233.399, \"unit\": \"m\"}}"}, {"id": "MS-U07-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "与设计污水管相交的两根大管:在 1W-41 井位相交、标为 d1200 的那根,在 1W-12-1 与 1W-12 两井之间相交、标为 dn1200 的那根,标注的标高各是多少?返回 JSON 对象,字段名固定为 1W-41处、12-1与12之间,每个字段为 {value, unit},单位 m。", "answer": "{\"1W-41处\": {\"value\": 231.853, \"unit\": \"m\"}, \"12-1与12之间\": {\"value\": 232.765, \"unit\": \"m\"}}"}, {"id": "MS-U07-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "与设计污水管交叉的四根管:1W-8 下游紧邻处的 d800、1W-30 与 1W-31 之间的 d600、1W-28 与 1W-29 之间的 d400、1W-45 与 1W-46 之间的 d400,标注的标高各是多少?返回 JSON 对象,字段名固定为 d800、d600、28与29之间、45与46之间,每个字段为 {value, unit},单位 m。", "answer": "{\"d800\": {\"value\": 247.286, \"unit\": \"m\"}, \"d600\": {\"value\": 248.289, \"unit\": \"m\"}, \"28与29之间\": {\"value\": 249.041, \"unit\": \"m\"}, \"45与46之间\": {\"value\": 233.399, \"unit\": \"m\"}}"}]} {"page_01_file_name": "images/MS-U07-09/few_sheet/01.png", "page_02_file_name": "images/MS-U07-09/few_sheet/02.png", "page_03_file_name": "images/MS-U07-09/few_sheet/03.png", "page_04_file_name": "images/MS-U07-09/few_sheet/04.png", "page_05_file_name": "images/MS-U07-09/few_sheet/05.png", "page_06_file_name": "images/MS-U07-09/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U07-09", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "本次设计的污水管道沿水流方向在哪里扩大管径?下列说法哪些正确?", "options": [{"key": "A", "text": "设计污水管全部为 d400,沿程没有扩大管径", "correct": true}, {"key": "B", "text": "在 1W-30 与 1W-31 之间扩大为 d600", "correct": false}, {"key": "C", "text": "在 1W-8 附近扩大为 d800", "correct": false}, {"key": "D", "text": "自 1W-48 来的一路与自 1W-25 来的一路在 1W-26 汇合", "correct": true}, {"key": "E", "text": "在 1W-41 处扩大为 d1200", "correct": false}, {"key": "F", "text": "汇合后 1W-26 至 1W-49 段坡度为 0.005", "correct": true}], "answer": ["A", "D", "F"], "few_sheet_pages": [18, 27, 28, 22, 25, 26], "evidence_pages": [25, 26, 27, 28], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "下面四张污水纵断面图(含右侧小纵断面)的“管径(mm)及坡度”栏中,出现的管径数值(d 后面的数字)各有哪些?若只有一种,写一个数字;若有多种,按从小到大用顿号分隔(形如 \"300、500\")。图:图签中图名栏空白、图号为 C06P-13-1 的污水纵断面图;“支坪立交污水纵断面图(二)”;“支坪立交污水纵断面图(三)”;图签中图名栏空白、图号为 C06P-13-4 的污水纵断面图。返回 JSON 对象,字段名固定为 C06P-13-1、二、三、C06P-13-4。", "answer": "{\"C06P-13-1\": \"400\", \"二\": \"400\", \"三\": \"400\", \"C06P-13-4\": \"400\"}"}, {"id": "MS-U07-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "下面三处与污水管交叉的管道标注,标高数值各是多少?“支坪立交污水纵断面图(二)”上 1W-8 下游紧邻处的 d800;图签中图名栏空白、图号为 C06P-13-1 的污水纵断面图上 1W-41 处的 d1200;图签中图名栏空白、图号为 C06P-13-4 的污水纵断面图上 1W-30 与 1W-31 之间的 d600。返回 JSON 对象,字段名固定为 d800、d1200、d600,每个字段为 {value, unit},单位 m。", "answer": "{\"d800\": {\"value\": 247.286, \"unit\": \"m\"}, \"d1200\": {\"value\": 231.853, \"unit\": \"m\"}, \"d600\": {\"value\": 248.289, \"unit\": \"m\"}}"}, {"id": "MS-U07-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交污水纵断面图(三)”上,主纵断面中 1W-25 的下游相邻井是哪个?最右一段(止于 1W-49)的坡度 i 是多少?返回 JSON 对象,字段名固定为 1W-25下游、末段坡度;井号按图中编号原样返回(形如 1W-10),坡度按图上写法原样返回小数(形如 \"0.123\")。", "answer": "{\"1W-25下游\": \"1W-26\", \"末段坡度\": \"0.005\"}"}, {"id": "MS-U07-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签中图名栏空白、图号为 C06P-13-1 的污水纵断面图上,主纵断面最右端(止于最后一个井)的那一段,起点、终点检查井各是什么?返回 JSON 对象,字段名固定为 起点、终点,按图中编号原样返回(形如 1W-10)。", "answer": "{\"起点\": \"1W-48\", \"终点\": \"1W-26\"}"}, {"id": "MS-U07-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "下面三段设计污水管本身的管径各是多少?1W-8 下游紧邻的那一段;1W-41 下游紧邻的那一段;1W-30 至 1W-31 那一段。返回 JSON 对象,字段名固定为 1W-8下游、1W-41下游、1W-30至1W-31,每个字段为 {value, unit},单位 mm。", "answer": "{\"1W-8下游\": {\"value\": 400, \"unit\": \"mm\"}, \"1W-41下游\": {\"value\": 400, \"unit\": \"mm\"}, \"1W-30至1W-31\": {\"value\": 400, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U07-10/few_sheet/01.png", "page_02_file_name": "images/MS-U07-10/few_sheet/02.png", "page_03_file_name": "images/MS-U07-10/few_sheet/03.png", "page_04_file_name": "images/MS-U07-10/few_sheet/04.png", "page_05_file_name": "images/MS-U07-10/few_sheet/05.png", "page_06_file_name": "images/MS-U07-10/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U07-10", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "污水自检查井 1W-28 起沿设计污水管流到 1W-49,沿途管道的平面长度合计是多少(m)?", "options": [{"key": "A", "text": "822.12", "correct": false}, {"key": "B", "text": "574.54", "correct": false}, {"key": "C", "text": "1686.91", "correct": false}, {"key": "D", "text": "864.79", "correct": false}, {"key": "E", "text": "778.61", "correct": false}, {"key": "F", "text": "850.13", "correct": true}], "answer": ["F"], "few_sheet_pages": [4, 18, 26, 27, 25, 28], "evidence_pages": [28, 25, 27, 26], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签中图名栏空白、图号为 C06P-13-4 的污水纵断面图上,主纵断面自 1W-28 至 1W-35 各段“平面距离”之和是多少?返回数值和单位(m)。", "answer": "{\"value\": 275.59, \"unit\": \"m\"}"}, {"id": "MS-U07-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签中图名栏空白、图号为 C06P-13-1 的污水纵断面图上,自 1W-35 至 1W-26 各段“平面距离”之和是多少?返回数值和单位(m)。", "answer": "{\"value\": 546.53, \"unit\": \"m\"}"}, {"id": "MS-U07-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交污水纵断面图(三)”上,主纵断面最右一段(止于 1W-49)的“平面距离”是多少?返回数值和单位(m)。", "answer": "{\"value\": 28.01, \"unit\": \"m\"}"}, {"id": "MS-U07-10-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签中图名栏空白、图号为 C06P-13-1 的污水纵断面图上,自 1W-35 至 1W-48 各段“平面距离”之和是多少?返回数值和单位(m)。", "answer": "{\"value\": 503.02, \"unit\": \"m\"}"}, {"id": "MS-U07-10-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "下面两段污水管的“平面距离”之和各是多少?“支坪立交污水纵断面图(二)”上 1W-3 至 1W-14 各段;“支坪立交污水纵断面图(三)”上 1W-14 至 1W-26 各段。返回 JSON 对象,字段名固定为 二、三,每个字段为 {value, unit},单位 m。", "answer": "{\"二\": {\"value\": 452.66, \"unit\": \"m\"}, \"三\": {\"value\": 384.12, \"unit\": \"m\"}}"}, {"id": "MS-U07-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "沿设计污水管的水流方向,检查井 1W-48 的下游相邻井、检查井 1W-26 的下游相邻井各是哪个?返回 JSON 对象,字段名固定为 1W-48下游、1W-26下游,按图中编号原样返回(形如 1W-10)。", "answer": "{\"1W-48下游\": \"1W-26\", \"1W-26下游\": \"1W-49\"}"}]} {"page_01_file_name": "images/MS-U07-11/few_sheet/01.png", "page_02_file_name": "images/MS-U07-11/few_sheet/02.png", "page_03_file_name": "images/MS-U07-11/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U07-11", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "平面图上标注接入'预留上游市政道路污水'的那口污水检查井,下列说法哪些正确?", "options": [{"key": "A", "text": "该井设计路面标高 250.750 m", "correct": true}, {"key": "B", "text": "该井处设有跌水,出水管内底比进水管内底低 0.24 m", "correct": false}, {"key": "C", "text": "从上游相邻检查井到该井的管段,平面距离为 40.02 m", "correct": true}, {"key": "D", "text": "该井管内底埋深 1.763 m", "correct": false}, {"key": "E", "text": "该井管内底埋深 3.590 m", "correct": true}, {"key": "F", "text": "该井设计管内底标高 247.160 m", "correct": true}], "answer": ["A", "C", "E", "F"], "few_sheet_pages": [18, 26, 13], "evidence_pages": [13, 26], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-11-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交污水纵断面图(二)”上,检查井 1W-4 的设计路面标高、设计管内底标高、管内底埋深各是多少?该井处跌水高度是多少(图上该井未注跌水的返回 0)?以 JSON 返回四个字段:road、invert、depth、drop,每个字段为数值和单位(m)。", "answer": "{\"road\": {\"value\": 250.75, \"unit\": \"m\"}, \"invert\": {\"value\": 247.16, \"unit\": \"m\"}, \"depth\": {\"value\": 3.59, \"unit\": \"m\"}, \"drop\": {\"value\": 0, \"unit\": \"m\"}}"}, {"id": "MS-U07-11-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交污水纵断面图(二)”上,检查井 1W-3 至 1W-4 这一管段的平面距离是多少?返回数值和单位(m)。", "answer": "{\"value\": 40.02, \"unit\": \"m\"}"}, {"id": "MS-U07-11-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交污水纵断面图(二)”上,检查井 1W-5 列的设计管内底标高栏写了两个标高。这两个标高各是多少?以 JSON 返回两个字段 higher、lower,每个字段为数值和单位(m)。", "answer": "{\"higher\": {\"value\": 247.04, \"unit\": \"m\"}, \"lower\": {\"value\": 246.8, \"unit\": \"m\"}}"}, {"id": "MS-U07-11-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(二)”上,检查井 1Y-47 的管内底埋深是多少?返回数值和单位(m)。", "answer": "{\"value\": 1.763, \"unit\": \"m\"}"}, {"id": "MS-U07-11-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "排水平面图上标注接入“预留上游市政道路污水”的那口污水检查井,编号是什么?按图中编号原样返回(形如 1W-10)。", "answer": "\"1W-4\""}, {"id": "MS-U07-11-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "排水平面图上标注接入“预留上游市政道路污水”的那口污水检查井,其管内底埋深是多少?返回数值和单位(m)。", "answer": "{\"value\": 3.59, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U07-12/few_sheet/01.png", "page_02_file_name": "images/MS-U07-12/few_sheet/02.png", "page_03_file_name": "images/MS-U07-12/few_sheet/03.png", "page_04_file_name": "images/MS-U07-12/few_sheet/04.png", "page_05_file_name": "images/MS-U07-12/few_sheet/05.png", "page_06_file_name": "images/MS-U07-12/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U07-12", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "雨水自检查井 1Y-169 起沿管道流到 1Y-93。沿水流方向,下列\"前一管段坡度 → 紧接的下一管段坡度\"中,哪些与设计一致?", "options": [{"key": "A", "text": "0.025 → 0.026", "correct": true}, {"key": "B", "text": "0.026 → 0.017", "correct": true}, {"key": "C", "text": "0.047 → 0.025", "correct": false}, {"key": "D", "text": "0.047 → 0.003", "correct": true}, {"key": "E", "text": "0.003 → 0.025", "correct": true}, {"key": "F", "text": "0.037 → 0.025", "correct": false}], "answer": ["A", "B", "D", "E"], "few_sheet_pages": [21, 20, 18, 19, 23, 22], "evidence_pages": [20, 23, 21, 19], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-12-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(四)”上,1Y-161 至 1Y-31 这一段的坡度 i 是多少?坡度按图上写法原样返回小数(形如 \"0.123\")。", "answer": "\"0.047\""}, {"id": "MS-U07-12-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(七)”上,井号自 1Y-31 起、止于 1Y-20 的那幅纵断面,管道坡度 i 是多少?坡度按图上写法原样返回小数(形如 \"0.123\")。", "answer": "\"0.003\""}, {"id": "MS-U07-12-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(五)”上,主纵断面中 1Y-18 至 1Y-20、1Y-20 至 1Y-62 两段的坡度 i 各是多少?返回 JSON 对象,字段名固定为 18至20、20至62,坡度按图上写法原样返回小数(形如 \"0.123\")。", "answer": "{\"18至20\": \"0.037\", \"20至62\": \"0.025\"}"}, {"id": "MS-U07-12-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(三)”上,1Y-62 至 1Y-91、1Y-91 至 1Y-93 两段的坡度 i 各是多少?返回 JSON 对象,字段名固定为 62至91、91至93,坡度按图上写法原样返回小数(形如 \"0.123\")。", "answer": "{\"62至91\": \"0.026\", \"91至93\": \"0.017\"}"}, {"id": "MS-U07-12-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "雨水自 1Y-31 继续向下游流到 1Y-20。进入 1Y-20 之前经过的最后一个检查井是哪个?按图中编号原样返回(形如 1Y-10)。", "answer": "\"1Y-172\""}, {"id": "MS-U07-12-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "沿水流方向,检查井 1Y-31 的下游相邻井、检查井 1Y-62 的下游相邻井各是哪个?返回 JSON 对象,字段名固定为 1Y-31下游、1Y-62下游,按图中编号原样返回(形如 1Y-10)。", "answer": "{\"1Y-31下游\": \"1Y-32\", \"1Y-62下游\": \"1Y-63\"}"}]} {"page_01_file_name": "images/MS-U07-13/few_sheet/01.png", "page_02_file_name": "images/MS-U07-13/few_sheet/02.png", "page_03_file_name": "images/MS-U07-13/few_sheet/03.png", "page_04_file_name": "images/MS-U07-13/few_sheet/04.png", "page_05_file_name": "images/MS-U07-13/few_sheet/05.png", "page_06_file_name": "images/MS-U07-13/few_sheet/06.png", "page_07_file_name": "images/MS-U07-13/few_sheet/07.png", "page_08_file_name": "images/MS-U07-13/few_sheet/08.png", "page_09_file_name": "images/MS-U07-13/few_sheet/09.png", "page_10_file_name": "images/MS-U07-13/few_sheet/10.png", "id": "MS-U07-13", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "本次设计的雨水管道最终有几个去向。下列雨水管段中,哪些管段的来水最终经检查井 1Y-93 排出?", "options": [{"key": "A", "text": "1Y-199 → 1Y-70(d600)", "correct": true}, {"key": "B", "text": "1Y-184 → 1Y-186(d800)", "correct": false}, {"key": "C", "text": "1Y-174 → 1Y-171(d800 陡坡管)", "correct": true}, {"key": "D", "text": "1Y-8 → 1Y-151(d800)", "correct": false}, {"key": "E", "text": "1Y-154 → 1Y-159(d800)", "correct": false}, {"key": "F", "text": "1Y-112 → 1Y-85(d400)", "correct": true}], "answer": ["A", "C", "F"], "few_sheet_pages": [19, 23, 24, 15, 20, 17, 18, 22, 21, 25], "evidence_pages": [15, 17, 18, 19, 20, 21, 22, 24], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-13-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(六)”上的雨水管纵断面,井编号栏中最上游(起点)和最下游(终点)的检查井编号各是什么?返回 start、end 两个字段,按图中编号原样写(形如 1Y-10)。", "answer": "{\"start\": \"1Y-173\", \"end\": \"1Y-93\"}"}, {"id": "MS-U07-13-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "下面两处标注各指向哪个本次设计的雨水检查井?river:“支坪立交排水分平面图(五)”上标注“排入下游现状河沟”的那座检查井;mujiawan:“支坪立交雨水纵断面图(一)”上标注“接入牟家湾立交雨水系统”的那座检查井。返回 river、mujiawan 两个字段,按图中编号原样写(形如 1Y-10)。", "answer": "{\"river\": \"1Y-159\", \"mujiawan\": \"1Y-186\"}"}, {"id": "MS-U07-13-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "雨水管段 1Y-174→1Y-171(d800 陡坡管)在 1Y-171 汇入一条雨水干管。在以 1Y-171 为中间井(上下游都有管段)的那条干管纵断面上,最下游的检查井编号是什么?按图中编号原样返回(形如 1Y-10)。", "answer": "\"1Y-62\""}, {"id": "MS-U07-13-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "在以 1Y-62 为中间井(上下游都有管段)的那条雨水干管纵断面上,最下游的检查井编号是什么?按图中编号原样返回(形如 1Y-10)。", "answer": "\"1Y-93\""}, {"id": "MS-U07-13-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "雨水支管 1Y-112→1Y-85 在 1Y-85 汇入一条雨水干管。在以 1Y-85 为中间井(上下游都有管段)的那条干管纵断面上,最上游(起点)的检查井编号是什么?按图中编号原样返回(形如 1Y-10)。", "answer": "\"1Y-173\""}, {"id": "MS-U07-13-B4", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "雨水支管 1Y-199→1Y-201→1Y-70 在 1Y-70 汇入一条雨水干管。在以 1Y-70 为中间井(上下游都有管段)的那条干管纵断面上,最下游的检查井编号是什么?按图中编号原样返回(形如 1Y-10)。", "answer": "\"1Y-173\""}, {"id": "MS-U07-13-B5", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "雨水管段 1Y-8→1Y-152→1Y-151 的来水在 1Y-151 接出,经一段短管进入事故池。从事故池接出、继续向下游排水的那条雨水管,其起点检查井编号是什么?按图中编号原样返回(形如 1Y-10)。", "answer": "\"1Y-154\""}]} {"page_01_file_name": "images/MS-U07-14/few_sheet/01.png", "page_02_file_name": "images/MS-U07-14/few_sheet/02.png", "page_03_file_name": "images/MS-U07-14/few_sheet/03.png", "page_04_file_name": "images/MS-U07-14/few_sheet/04.png", "page_05_file_name": "images/MS-U07-14/few_sheet/05.png", "page_06_file_name": "images/MS-U07-14/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U07-14", "set": "U07", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "雨水自检查井 1Y-47 沿干管流到 1Y-93,沿水流方向在哪里扩大管径?下列说法哪些正确?", "options": [{"key": "A", "text": "沿程没有扩大管径,全程为 d800", "correct": false}, {"key": "B", "text": "在 1Y-91 处由 d1200 再扩大为更大管径", "correct": false}, {"key": "C", "text": "1Y-62 处另有一路 d800 管(自 1Y-171 来)汇入", "correct": true}, {"key": "D", "text": "在 1Y-62 处由 d800 扩大为 d1200", "correct": true}, {"key": "E", "text": "在 1Y-93 处汇入的另一条干管也是 d1200", "correct": false}, {"key": "F", "text": "扩径前(1Y-47 至 1Y-62)各管段坡度都不小于 0.01", "correct": false}], "answer": ["C", "D"], "few_sheet_pages": [18, 22, 24, 21, 17, 19], "evidence_pages": [18, 19, 21, 22], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U07-14-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(二)”上,1Y-47 至 1Y-61 主纵断面各段的管径是多少?1Y-47 至 1Y-48、1Y-48 至 1Y-49 两段的坡度 i 各是多少?返回 JSON 对象,字段名固定为 管径、47至48、48至49;管径为 {value, unit},单位 mm;坡度按图上写法原样返回小数(形如 \"0.123\")。", "answer": "{\"管径\": {\"value\": 800, \"unit\": \"mm\"}, \"47至48\": \"0.001\", \"48至49\": \"0.005\"}"}, {"id": "MS-U07-14-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(三)”上,1Y-61 至 1Y-62、1Y-62 至 1Y-63、1Y-91 至 1Y-92 三段的管径各是多少?返回 JSON 对象,字段名固定为 61至62、62至63、91至92,每个字段为 {value, unit},单位 mm。", "answer": "{\"61至62\": {\"value\": 800, \"unit\": \"mm\"}, \"62至63\": {\"value\": 1200, \"unit\": \"mm\"}, \"91至92\": {\"value\": 1200, \"unit\": \"mm\"}}"}, {"id": "MS-U07-14-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(五)”上,主纵断面最后一段(1Y-171 至 1Y-62)的管径是多少?返回数值和单位(mm)。", "answer": "{\"value\": 800, \"unit\": \"mm\"}"}, {"id": "MS-U07-14-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交雨水纵断面图(六)”上,主纵断面(1Y-173 至 1Y-93)各段的管径是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1000, \"unit\": \"mm\"}"}, {"id": "MS-U07-14-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "雨水干管自 1Y-61 流入 1Y-62。在 1Y-62 处汇入的另一路雨水管,其上游相邻检查井是哪个?按图中编号原样返回(形如 1Y-10)。", "answer": "\"1Y-171\""}, {"id": "MS-U07-14-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "自 1Y-62 方向来的雨水干管流到 1Y-93。在 1Y-93 处汇入的另一条雨水干管,其最上游(起点)检查井是哪个?按图中编号原样返回(形如 1Y-10)。", "answer": "\"1Y-173\""}]} {"page_01_file_name": "images/MS-U08-01/few_sheet/01.png", "page_02_file_name": "images/MS-U08-01/few_sheet/02.png", "page_03_file_name": "images/MS-U08-01/few_sheet/03.png", "page_04_file_name": "images/MS-U08-01/few_sheet/04.png", "page_05_file_name": "images/MS-U08-01/few_sheet/05.png", "page_06_file_name": "images/MS-U08-01/few_sheet/06.png", "page_07_file_name": "images/MS-U08-01/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U08-01", "set": "U08", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "两个施工阶段合计需要新做的限高门架,其基础 C30 混凝土共多少 m³?同一座门架在两阶段间沿用或搬迁的只计一次。", "options": [{"key": "A", "text": "68.640", "correct": false}, {"key": "B", "text": "45.760", "correct": true}, {"key": "C", "text": "91.520", "correct": false}, {"key": "D", "text": "0(两阶段都沿用既有门架,无需新做)", "correct": false}, {"key": "E", "text": "22.880", "correct": false}, {"key": "F", "text": "11.440", "correct": false}], "answer": ["B"], "few_sheet_pages": [11, 2, 3, 5, 16, 6, 15], "evidence_pages": [2, 3, 5, 6, 16], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U08-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“限高门架大样图(三)”的门架式标志材料数量表中,“砼”C30 一行的单件量和合计各是多少?以 JSON 返回 unit_vol、total 两个字段,每个为数值和单位(m³)。", "answer": "{\"unit_vol\": {\"value\": 11.44, \"unit\": \"m³\"}, \"total\": {\"value\": 22.88, \"unit\": \"m³\"}}"}, {"id": "MS-U08-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工期间交通组织设计图(一)”上画了几座限高门架?门架旁有无“已设/利旧”类注记?以 JSON 返回 n(数值和单位,个)、note(只能从“上阶段已设”“迁移利旧”“利旧”“无注记”四种中选一,照写)两个字段。", "answer": "{\"n\": {\"value\": 1, \"unit\": \"个\"}, \"note\": \"无注记\"}"}, {"id": "MS-U08-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工期间交通组织设计图(二)”上画了几座限高门架?门架旁有无“已设/利旧”类注记?以 JSON 返回 n(数值和单位,个)、note(只能从“上阶段已设”“迁移利旧”“利旧”“无注记”四种中选一,照写)两个字段。", "answer": "{\"n\": {\"value\": 1, \"unit\": \"个\"}, \"note\": \"无注记\"}"}, {"id": "MS-U08-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(一)”上,靠 G348 一侧的限高门架旁的注记是什么?只能从“上阶段已设”“迁移利旧”“利旧”“无注记”四种中选一,照写。按图中记号或文字原样返回一个字符串。", "answer": "\"上阶段已设\""}, {"id": "MS-U08-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "二阶段施工期间,东端(路口一侧)限高门架旁注记中,门架本身的处理方式是什么?只能从“上阶段已设”“迁移利旧”“利旧”“无注记”四种中选一,照写。按图中记号或文字原样返回一个字符串。", "answer": "\"迁移利旧\""}]} {"page_01_file_name": "images/MS-U08-02/few_sheet/01.png", "page_02_file_name": "images/MS-U08-02/few_sheet/02.png", "page_03_file_name": "images/MS-U08-02/few_sheet/03.png", "page_04_file_name": "images/MS-U08-02/few_sheet/04.png", "page_05_file_name": "images/MS-U08-02/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U08-02", "set": "U08", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "与一阶段相比,二阶段施工期间下列交通组织设施中,哪些是沿用一阶段、且原位不动的?", "options": [{"key": "A", "text": "东段北侧的 50m 车道减少预告标志", "correct": true}, {"key": "B", "text": "东段路口南侧的波形护栏", "correct": false}, {"key": "C", "text": "隔开双向车流的水泥隔离墩", "correct": false}, {"key": "D", "text": "西端(G348 一侧)的限高门架", "correct": true}, {"key": "E", "text": "东端(路口一侧)的限高门架", "correct": false}, {"key": "F", "text": "西端的备用可移动式红绿灯", "correct": true}], "answer": ["A", "D", "F"], "few_sheet_pages": [2, 5, 4, 6, 3], "evidence_pages": [3, 5, 6], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U08-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(一)”上,靠 G348 一侧的限高门架、那台备用的可移动式红绿灯、以及分隔双向车流的水泥隔离墩,各自旁边的注记是什么?以 JSON 返回 gantry、signal、barrier 三个字段,每个只能从“上阶段已设”“迁移利旧”“利旧”“无注记”四种中选一,照写(注记嵌在文字里也算)。", "answer": "{\"gantry\": \"上阶段已设\", \"signal\": \"上阶段已设\", \"barrier\": \"迁移利旧\"}"}, {"id": "MS-U08-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(二)”上,东端(路口一侧)的限高门架旁有一行注记,分别说明交通监控和门架本身的处理方式。以 JSON 返回 monitor、gantry 两个字段,每个只能从“上阶段已设”“迁移利旧”“利旧”“无注记”四种中选一,照写。", "answer": "{\"monitor\": \"利旧\", \"gantry\": \"迁移利旧\"}"}, {"id": "MS-U08-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工期间交通组织设计图(二)”上,路口南侧沿路缘布置的那段波形护栏标注长度是多少?返回数值和单位(m)。", "answer": "{\"value\": 80, \"unit\": \"m\"}"}, {"id": "MS-U08-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(二)”上,从施工围挡东端头引出、伸向路口南侧的那段波形护栏,标注长度是多少?旁边有无利旧类注记?以 JSON 返回 length(数值和单位,m)、note(只能从“上阶段已设”“迁移利旧”“利旧”“无注记”四种中选一,照写)两个字段。", "answer": "{\"length\": {\"value\": 70, \"unit\": \"m\"}, \"note\": \"无注记\"}"}, {"id": "MS-U08-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "二阶段施工期间,栀花大道东段北侧那块带“50m”距离牌的车道减少预告标志,旁边的注记是什么?只能从“上阶段已设”“迁移利旧”“利旧”“无注记”四种中选一,照写。按图中记号或文字原样返回一个字符串。", "answer": "\"上阶段已设\""}]} {"page_01_file_name": "images/MS-U08-03/few_sheet/01.png", "page_02_file_name": "images/MS-U08-03/few_sheet/02.png", "page_03_file_name": "images/MS-U08-03/few_sheet/03.png", "page_04_file_name": "images/MS-U08-03/few_sheet/04.png", "page_05_file_name": "images/MS-U08-03/few_sheet/05.png", "page_06_file_name": "images/MS-U08-03/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U08-03", "set": "U08", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "二阶段施工时,东端(栀花大道东侧路口一侧)的限高门架仍留在一阶段的原位置。关于这座门架,下列说法哪些正确?", "options": [{"key": "A", "text": "门架设计限高 4.5 m", "correct": true}, {"key": "B", "text": "二阶段这座门架是新制作的", "correct": false}, {"key": "C", "text": "一阶段这座门架横跨的是北半幅", "correct": false}, {"key": "D", "text": "二阶段这座门架上的交通监控沿用一阶段的设备", "correct": true}, {"key": "E", "text": "它并未留在原位:一阶段横跨南半幅的通行车道,二阶段搬到横跨北半幅的通行车道", "correct": true}, {"key": "F", "text": "二阶段西端门架也同样搬到了另一侧", "correct": false}], "answer": ["A", "D", "E"], "few_sheet_pages": [14, 2, 3, 15, 6, 5], "evidence_pages": [3, 5, 6, 14], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U08-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工期间交通组织设计图(二)”上,东端(路口一侧)限高门架从施工围挡一侧跨到栀花大道哪一侧的路缘?门架上设几套交通监控?以 JSON 返回 side(只写一个字:南 或 北)、monitor(数值和单位,套)两个字段。门架位置按平面上跨越车道的那条带圆点黑线(二阶段东端为品红线)判读,旁边蓝色门架图标只是示意。", "answer": "{\"side\": \"南\", \"monitor\": {\"value\": 1, \"unit\": \"套\"}}"}, {"id": "MS-U08-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(二)”上,东端限高门架从施工围挡一侧跨到栀花大道哪一侧的路缘?门架本身的注记是什么?以 JSON 返回 side(只写一个字:南 或 北)、gantry(只能从“上阶段已设”“迁移利旧”“利旧”“无注记”四种中选一,照写)两个字段。门架位置按平面上跨越车道的那条带圆点黑线(二阶段东端为品红线)判读,旁边蓝色门架图标只是示意。", "answer": "{\"side\": \"北\", \"gantry\": \"迁移利旧\"}"}, {"id": "MS-U08-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“限高门架大样图(一)”的门架立面图中,路面到横梁下缘的净空标注多少?横梁上挂的限高标志牌写的是多少米?以 JSON 返回 clearance(数值和单位,mm)、sign(数值和单位,m)两个字段。", "answer": "{\"clearance\": {\"value\": 4500, \"unit\": \"mm\"}, \"sign\": {\"value\": 4.5, \"unit\": \"m\"}}"}, {"id": "MS-U08-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(一)”上,靠 G348 一侧的限高门架旁的注记是什么?只能从“上阶段已设”“迁移利旧”“利旧”“无注记”四种中选一,照写。按图中记号或文字原样返回一个字符串。", "answer": "\"上阶段已设\""}, {"id": "MS-U08-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "二阶段施工期间,东端(路口一侧)限高门架上的交通监控有几套?注记是什么?以 JSON 返回 n(数值和单位,套)、note(只能从“上阶段已设”“迁移利旧”“利旧”“无注记”四种中选一,照写)两个字段。", "answer": "{\"n\": {\"value\": 1, \"unit\": \"套\"}, \"note\": \"利旧\"}"}]} {"page_01_file_name": "images/MS-U08-04/few_sheet/01.png", "page_02_file_name": "images/MS-U08-04/few_sheet/02.png", "page_03_file_name": "images/MS-U08-04/few_sheet/03.png", "page_04_file_name": "images/MS-U08-04/few_sheet/04.png", "page_05_file_name": "images/MS-U08-04/few_sheet/05.png", "page_06_file_name": "images/MS-U08-04/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U08-04", "set": "U08", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿栀花大道由东(支坪方向)往西(G348 方向),只考虑栀花大道上的柱式标志牌、限高门架和施工围挡的两个端头(不含 G348 上的标志),下列\"前一项 → 紧接的后一项\"中,哪些与对应阶段的交通组织设计图一致?", "options": [{"key": "A", "text": "二阶段:\"结束\"标志 → 西端限高门架", "correct": true}, {"key": "B", "text": "一阶段:50m 车道减少标志 → 东端限高门架", "correct": false}, {"key": "C", "text": "一阶段:100m 施工预告标志 → 50m 车道减少标志", "correct": true}, {"key": "D", "text": "二阶段:东端限高门架 → 南侧\"施工区域\"标志", "correct": false}, {"key": "E", "text": "二阶段:围挡西端 → 南侧\"施工区域\"标志", "correct": true}, {"key": "F", "text": "一阶段:东端限高门架 → 围挡西端", "correct": true}], "answer": ["A", "C", "E", "F"], "few_sheet_pages": [2, 4, 7, 5, 6, 3], "evidence_pages": [2, 3, 5, 6], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U08-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工期间交通组织设计图(二)”上,沿栀花大道自东向西数,最东边的第一块和第二块柱式标志牌,下方距离牌分别标多少米?这两块之间还有几块柱式标志牌或几座限高门架?以 JSON 返回 first、second(数值和单位,m)和 between(数值和单位,块)三个字段。", "answer": "{\"first\": {\"value\": 100, \"unit\": \"m\"}, \"second\": {\"value\": 50, \"unit\": \"m\"}, \"between\": {\"value\": 0, \"unit\": \"块\"}}"}, {"id": "MS-U08-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工期间交通组织设计图(二)”上,在 50m 车道减少标志以西、东端限高门架以东的这段栀花大道上,另设有几块柱式标志牌?返回数值和单位(块)。", "answer": "{\"value\": 1, \"unit\": \"块\"}"}, {"id": "MS-U08-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "从“一阶段施工期间交通组织设计图(二)”上的东端限高门架起,沿栀花大道向西,直到“一阶段施工期间交通组织设计图(一)”上施工围挡的西端头为止,途中设有几块柱式标志牌和几座限高门架?以 JSON 返回 signs(块)、gantries(个)两个字段,每个为数值和单位。", "answer": "{\"signs\": {\"value\": 0, \"unit\": \"块\"}, \"gantries\": {\"value\": 0, \"unit\": \"个\"}}"}, {"id": "MS-U08-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(一)”上,从施工围挡的西端头起沿栀花大道向西,依次遇到的前三个设施是什么(不含 G348 上的标志)?以 JSON 返回 first、second、third 三个字段,每个只能从“施工区域标志”“结束标志”“限高门架”“红绿灯”四种中选一,照写。", "answer": "{\"first\": \"施工区域标志\", \"second\": \"结束标志\", \"third\": \"限高门架\"}"}, {"id": "MS-U08-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "二阶段施工期间,从东端限高门架起沿栀花大道向西,到南侧“施工区域”标志之前,途中经过的柱式标志牌、限高门架和施工围挡端头共有几处?返回数值和单位(处)。", "answer": "{\"value\": 1, \"unit\": \"处\"}"}]} {"page_01_file_name": "images/MS-U08-05/few_sheet/01.png", "page_02_file_name": "images/MS-U08-05/few_sheet/02.png", "page_03_file_name": "images/MS-U08-05/few_sheet/03.png", "page_04_file_name": "images/MS-U08-05/few_sheet/04.png", "page_05_file_name": "images/MS-U08-05/few_sheet/05.png", "page_06_file_name": "images/MS-U08-05/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U08-05", "set": "U08", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "两个施工阶段合计,栀花大道及 G348 上需要设置的柱式施工标志牌(顶部带太阳能爆闪灯)共有多少块?同一块标志在两阶段间沿用的只计一次。", "options": [{"key": "A", "text": "3", "correct": false}, {"key": "B", "text": "7", "correct": true}, {"key": "C", "text": "14", "correct": false}, {"key": "D", "text": "4", "correct": false}, {"key": "E", "text": "10", "correct": false}, {"key": "F", "text": "5", "correct": false}], "answer": ["B"], "few_sheet_pages": [3, 6, 1, 2, 7, 5], "evidence_pages": [2, 3, 5, 6], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U08-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工期间交通组织设计图(一)”上共画了几块柱式施工标志牌(含 G348 上的)?返回数值和单位(块)。", "answer": "{\"value\": 4, \"unit\": \"块\"}"}, {"id": "MS-U08-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工期间交通组织设计图(二)”上共画了几块柱式施工标志牌?返回数值和单位(块)。", "answer": "{\"value\": 3, \"unit\": \"块\"}"}, {"id": "MS-U08-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(一)”上共画了几块柱式施工标志牌(含 G348 上的)?其中注明“上阶段已设”的有几块?以 JSON 返回 total、noted 两个字段,每个为数值和单位(块)。", "answer": "{\"total\": {\"value\": 4, \"unit\": \"块\"}, \"noted\": {\"value\": 4, \"unit\": \"块\"}}"}, {"id": "MS-U08-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(二)”上共画了几块柱式施工标志牌?其中注明“上阶段已设”的有几块?以 JSON 返回 total、noted 两个字段,每个为数值和单位(块)。", "answer": "{\"total\": {\"value\": 3, \"unit\": \"块\"}, \"noted\": {\"value\": 3, \"unit\": \"块\"}}"}, {"id": "MS-U08-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "一阶段施工期间,G348 上设置的柱式施工标志牌有几块?返回数值和单位(块)。", "answer": "{\"value\": 2, \"unit\": \"块\"}"}]} {"page_01_file_name": "images/MS-U08-06/few_sheet/01.png", "page_02_file_name": "images/MS-U08-06/few_sheet/02.png", "page_03_file_name": "images/MS-U08-06/few_sheet/03.png", "page_04_file_name": "images/MS-U08-06/few_sheet/04.png", "page_05_file_name": "images/MS-U08-06/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U08-06", "set": "U08", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "二阶段施工期间,关于栀花大道上施工区与双向通行车道的布置,下列说法哪些正确?", "options": [{"key": "A", "text": "施工区在栀花大道南半幅", "correct": true}, {"key": "B", "text": "往支坪方向(向东)的车道在水泥隔离墩南侧,紧贴施工围挡", "correct": true}, {"key": "C", "text": "西端围挡端头向北折入施工区", "correct": false}, {"key": "D", "text": "往 G348 方向(向西)的车道在水泥隔离墩南侧", "correct": false}, {"key": "E", "text": "施工区在栀花大道北半幅", "correct": false}, {"key": "F", "text": "东端从围挡端头引出的 70 m 波形护栏斜向东北,伸向北侧", "correct": false}], "answer": ["A", "B"], "few_sheet_pages": [4, 2, 5, 6, 3], "evidence_pages": [4, 5, 6], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U08-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(一)”上(图上方为北),施工围挡西端头的那一段从围挡转角折向哪个方向?朝东(往支坪)的行车箭头在水泥隔离墩的哪一侧?朝西的行车箭头在哪一侧?以 JSON 返回 corner(只写一个字:东、南、西、北之一)、eastbound、westbound(各只写一个字:南 或 北)三个字段。", "answer": "{\"corner\": \"南\", \"eastbound\": \"南\", \"westbound\": \"北\"}"}, {"id": "MS-U08-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(二)”上(图上方为北),从施工围挡东端头引出的那段 70 m 波形护栏朝哪个方向斜伸?朝西的行车箭头在水泥隔离墩的哪一侧?以 JSON 返回 guardrail(只能从“东北”“东南”“西北”“西南”四种中选一)、westbound(只写一个字:南 或 北)两个字段。", "answer": "{\"guardrail\": \"东南\", \"westbound\": \"北\"}"}, {"id": "MS-U08-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工范围图”上,施工区域网格在栀花大道的哪半幅?只写一个字:南 或 北。按图中记号或文字原样返回一个字符串。", "answer": "\"南\""}, {"id": "MS-U08-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工期间交通组织设计图(二)”上(图上方为北),从施工围挡东端头引出的那段 70 m 波形护栏朝哪个方向斜伸?只能从“东北”“东南”“西北”“西南”四种中选一。按图中记号或文字原样返回一个字符串。", "answer": "\"东北\""}, {"id": "MS-U08-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工期间交通组织设计图(一)”上,施工围挡西端头的那一段从围挡转角折向哪个方向?只写一个字:东、南、西、北之一(按指北针取最接近者)。按图中记号或文字原样返回一个字符串。", "answer": "\"北\""}, {"id": "MS-U08-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "二阶段施工期间,栀花大道上的施工区在哪半幅?西端施工围挡端头从转角折向哪个方向?以 JSON 返回 zone(只写一个字:南 或 北)、corner(只写一个字:东、南、西、北之一)两个字段。", "answer": "{\"zone\": \"南\", \"corner\": \"南\"}"}]} {"page_01_file_name": "images/MS-U08-07/few_sheet/01.png", "page_02_file_name": "images/MS-U08-07/few_sheet/02.png", "page_03_file_name": "images/MS-U08-07/few_sheet/03.png", "page_04_file_name": "images/MS-U08-07/few_sheet/04.png", "page_05_file_name": "images/MS-U08-07/few_sheet/05.png", "page_06_file_name": "images/MS-U08-07/few_sheet/06.png", "page_07_file_name": "images/MS-U08-07/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U08-07", "set": "U08", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "二阶段施工时,西端(G348 一侧)的限高门架仍留在一阶段的原位置。关于这座门架及其附近设施,下列说法哪些正确?", "options": [{"key": "A", "text": "一阶段这座门架上设有一套交通监控", "correct": true}, {"key": "B", "text": "门架横梁跨度为 8000 mm", "correct": false}, {"key": "C", "text": "二阶段东端门架同样留在原位", "correct": false}, {"key": "D", "text": "二阶段图上这座门架注明为上阶段已设", "correct": true}, {"key": "E", "text": "它并未留在原位,二阶段搬到了另一侧", "correct": false}, {"key": "F", "text": "一阶段这座门架以东设有一台备用的可移动式红绿灯", "correct": false}], "answer": ["A", "D"], "few_sheet_pages": [6, 2, 15, 5, 14, 16, 3], "evidence_pages": [2, 3, 5, 6, 14], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U08-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(一)”上,靠 G348 一侧的限高门架和那台备用的可移动式红绿灯,旁边的注记各是什么?以 JSON 返回 gantry、signal 两个字段,每个只能从“上阶段已设”“迁移利旧”“利旧”“无注记”四种中选一,照写。", "answer": "{\"gantry\": \"上阶段已设\", \"signal\": \"上阶段已设\"}"}, {"id": "MS-U08-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工期间交通组织设计图(一)”上,靠 G348 一侧的限高门架上设几套交通监控?备用的可移动式红绿灯在这座门架的东边还是西边?以 JSON 返回 monitor(数值和单位,套)、signal_side(只写一个字:东 或 西)两个字段。", "answer": "{\"monitor\": {\"value\": 1, \"unit\": \"套\"}, \"signal_side\": \"西\"}"}, {"id": "MS-U08-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“限高门架大样图(一)”的门架立面图中,横梁跨度(顶部总尺寸)标注多少?返回数值和单位(mm)。", "answer": "{\"value\": 12000, \"unit\": \"mm\"}"}, {"id": "MS-U08-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“限高门架大样图(三)”的门架式标志材料数量表中,钢管立柱和钢管横梁的规格长度各是多少?以 JSON 返回 column、beam 两个字段,每个为数值和单位(mm)。", "answer": "{\"column\": {\"value\": 8000, \"unit\": \"mm\"}, \"beam\": {\"value\": 12000, \"unit\": \"mm\"}}"}, {"id": "MS-U08-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "二阶段施工期间,东端(路口一侧)限高门架旁注记中,门架本身的处理方式是什么?只能从“上阶段已设”“迁移利旧”“利旧”“无注记”四种中选一,照写。按图中记号或文字原样返回一个字符串。", "answer": "\"迁移利旧\""}]} {"page_01_file_name": "images/MS-U08-08/few_sheet/01.png", "page_02_file_name": "images/MS-U08-08/few_sheet/02.png", "page_03_file_name": "images/MS-U08-08/few_sheet/03.png", "page_04_file_name": "images/MS-U08-08/few_sheet/04.png", "page_05_file_name": "images/MS-U08-08/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U08-08", "set": "U08", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "一阶段施工期间,关于栀花大道上施工区、施工围挡端头和导流设施的方位,下列说法哪些正确?", "options": [{"key": "A", "text": "施工区在栀花大道北半幅", "correct": true}, {"key": "B", "text": "施工区在栀花大道南半幅", "correct": false}, {"key": "C", "text": "西端围挡端头向北折入施工区", "correct": true}, {"key": "D", "text": "往支坪方向(向东)的车道紧贴施工围挡", "correct": false}, {"key": "E", "text": "东端从围挡端头引出的 70 m 波形护栏斜向东北,伸向栀花大道北侧", "correct": true}, {"key": "F", "text": "东端限高门架横跨在南半幅的通行车道上", "correct": true}], "answer": ["A", "C", "E", "F"], "few_sheet_pages": [6, 5, 1, 2, 3], "evidence_pages": [1, 2, 3], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U08-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工范围图”上,施工区域网格在栀花大道的哪半幅?只写一个字:南 或 北。按图中记号或文字原样返回一个字符串。", "answer": "\"北\""}, {"id": "MS-U08-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工期间交通组织设计图(一)”上,施工围挡西端头的那一段从围挡转角折向哪个方向(按指北针取最接近者)?朝东(往支坪)的行车箭头在水泥隔离墩的哪一侧?朝西的行车箭头在哪一侧?以 JSON 返回 corner(只写一个字:东、南、西、北之一)、eastbound、westbound(各只写一个字:南 或 北)三个字段。", "answer": "{\"corner\": \"北\", \"eastbound\": \"南\", \"westbound\": \"北\"}"}, {"id": "MS-U08-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“一阶段施工期间交通组织设计图(二)”上(图上方为北),从施工围挡东端头引出的那段 70 m 波形护栏朝哪个方向斜伸?东端限高门架从围挡一侧跨到栀花大道哪一侧的路缘?以 JSON 返回 guardrail(只能从“东北”“东南”“西北”“西南”四种中选一)、gantry_side(只写一个字:南 或 北)两个字段。门架位置按平面上跨越车道的那条带圆点黑线(二阶段东端为品红线)判读,旁边蓝色门架图标只是示意。", "answer": "{\"guardrail\": \"东北\", \"gantry_side\": \"南\"}"}, {"id": "MS-U08-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(二)”上(图上方为北),从施工围挡东端头引出的那段 70 m 波形护栏朝哪个方向斜伸?只能从“东北”“东南”“西北”“西南”四种中选一。按图中记号或文字原样返回一个字符串。", "answer": "\"东南\""}, {"id": "MS-U08-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“二阶段施工期间交通组织设计图(一)”上,施工围挡西端头的那一段从围挡转角折向哪个方向?只写一个字:东、南、西、北之一。按图中记号或文字原样返回一个字符串。", "answer": "\"南\""}, {"id": "MS-U08-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "一阶段施工期间,栀花大道上的施工区在哪半幅?西端施工围挡端头从转角折向哪个方向(按指北针取最接近者)?以 JSON 返回 zone(只写一个字:南 或 北)、corner(只写一个字:东、南、西、北之一)两个字段。", "answer": "{\"zone\": \"北\", \"corner\": \"北\"}"}, {"id": "MS-U08-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "一阶段施工期间,东端(路口一侧)限高门架从施工围挡一侧跨到栀花大道哪一侧的路缘?门架上设几套交通监控?以 JSON 返回 side(只写一个字:南 或 北)、monitor(数值和单位,套)两个字段。", "answer": "{\"side\": \"南\", \"monitor\": {\"value\": 1, \"unit\": \"套\"}}"}]} {"page_01_file_name": "images/MS-U08-09/few_sheet/01.png", "page_02_file_name": "images/MS-U08-09/few_sheet/02.png", "page_03_file_name": "images/MS-U08-09/few_sheet/03.png", "page_04_file_name": "images/MS-U08-09/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U08-09", "set": "U08", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "第一阶段施工期间的交通组织所设置的全部限高门架,按本册所列工程数量合计,下列说法哪些正确?", "options": [{"key": "A", "text": "钢管立柱共 4 根", "correct": true}, {"key": "B", "text": "Φ12 基础钢筋共重 73.22 kg", "correct": false}, {"key": "C", "text": "底座法兰盘共重 200.96 kg", "correct": false}, {"key": "D", "text": "M24×1200 高强地脚螺栓共 48 个", "correct": true}, {"key": "E", "text": "Φ18 基础钢筋共重 101.016 kg", "correct": false}, {"key": "F", "text": "基础 C30 混凝土共 45.760 m³", "correct": true}], "answer": ["A", "D", "F"], "few_sheet_pages": [16, 2, 11, 3], "evidence_pages": [2, 3, 11, 16], "full_set_page_count": 16, "sub_questions": [{"id": "MS-U08-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "第一阶段施工期间,在 G348 与栀花大道相接的一端设置的限高门架有几处?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1, \"unit\": \"处\"}"}, {"id": "MS-U08-09-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "第一阶段施工期间,在栀花大道施工段往支坪方向的一端设置的限高门架有几处?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1, \"unit\": \"处\"}"}, {"id": "MS-U08-09-B3", "role": "bind", "tiers": ["full_set"], "question": "一处限高门架下设有几座 C30 混凝土基础?只写数字(形如 5)。只写数字,形如 5。", "answer": "\"2\""}, {"id": "MS-U08-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "门架式标志材料数量表中,'砼(m³)C30'一行最右一栏的数值是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 22.88, \"unit\": \"m³\"}"}, {"id": "MS-U08-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "门架式标志材料数量表中,'砼(m³)C30'一行'单件'一栏的数值是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 11.44, \"unit\": \"m³\"}"}]} {"page_01_file_name": "images/MS-U09-01/few_sheet/01.png", "page_02_file_name": "images/MS-U09-01/few_sheet/02.png", "page_03_file_name": "images/MS-U09-01/few_sheet/03.png", "page_04_file_name": "images/MS-U09-01/few_sheet/04.png", "page_05_file_name": "images/MS-U09-01/few_sheet/05.png", "page_06_file_name": "images/MS-U09-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U09-01", "set": "U09", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "主桥北端(北桥塔处)梁端伸缩缝上方的人行道栏杆,跨缝处是怎样构造的?下列说法哪些正确?", "options": [{"key": "A", "text": "跨缝处栏杆用钢中有 06Cr18Ni11Ti 椭圆管 (135×65×3)×1830", "correct": false}, {"key": "B", "text": "该处桥面外侧的护栏跨缝时,每道用 φ114×δ7 钢管 4 根、单根长 1520 mm", "correct": true}, {"key": "C", "text": "跨缝两侧栏杆立柱距伸缩缝中心线分别为 1340 mm 和 750 mm", "correct": false}, {"key": "D", "text": "该处梁端间隙在安装温度 25°C 时预留 1060 mm", "correct": false}, {"key": "E", "text": "北桥塔处伸缩缝上方并没有人行道栏杆", "correct": true}, {"key": "F", "text": "该处梁端间隙在设计中间温度时预留 1060 mm", "correct": true}], "answer": ["B", "E", "F"], "few_sheet_pages": [13, 11, 5, 20, 15, 4], "evidence_pages": [4, 5, 11, 20], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U09-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行道栏杆构造图”的“伸缩缝及断缝处栏杆材料表(每道)”中,编号 N6 的材质和规格中的管长各是什么?返回 材质、管长 两个字段;材质按表中牌号原样写,管长为 {value, unit}(mm)。", "answer": "{\"材质\": \"06Cr18Ni11Ti\", \"管长\": {\"value\": 1830, \"unit\": \"mm\"}}"}, {"id": "MS-U09-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行道栏杆构造图”的“伸缩缝处栏杆立面图”上,跨缝两侧栏杆立柱到伸缩缝中心线的距离各是多少?返回 引桥侧、主桥侧 两个字段,每个字段为 {value, unit}(mm)。", "answer": "{\"引桥侧\": {\"value\": 1340, \"unit\": \"mm\"}, \"主桥侧\": {\"value\": 750, \"unit\": \"mm\"}}"}, {"id": "MS-U09-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”的“材料数量表”中,“伸缩缝处(每道)”一栏钢管2a 的根数和单根长度各是多少?返回 根数、单根长度 两个字段,每个字段为 {value, unit}(单位分别为 根、mm)。", "answer": "{\"根数\": {\"value\": 4, \"unit\": \"根\"}, \"单根长度\": {\"value\": 1520, \"unit\": \"mm\"}}"}, {"id": "MS-U09-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝布置图”上:附注写明的设计中间温度时梁端间隙取值是多少;“梁端间隙B参照表”中安装温度 25℃ 对应的预留间隙是多少(不计 ± 允许误差)?返回 设计中间温度、安装温度25 两个字段,每个字段为 {value, unit}(mm)。", "answer": "{\"设计中间温度\": {\"value\": 1060, \"unit\": \"mm\"}, \"安装温度25\": {\"value\": 875, \"unit\": \"mm\"}}"}, {"id": "MS-U09-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“护栏区段划分图”的两张横断面布置图上,桥面最外侧(吊索区内侧、检修道外侧)布置的护栏或栏杆各是哪一种?每个字段从 {车行道防撞护栏A, 车行道防撞护栏B, 人行道栏杆, 中央防撞护栏} 中取一项原样返回,字段名固定为 双层段、单层段。", "answer": "{\"双层段\": \"车行道防撞护栏B\", \"单层段\": \"人行道栏杆\"}"}, {"id": "MS-U09-01-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“护栏区段划分图”的“防撞护栏区段划分图”上,双层防撞护栏段的起点墩和段内最后一个墩各是哪个?按图中墩号原样返回(形如 P9),字段名固定为 起点墩、最后一墩。", "answer": "{\"起点墩\": \"P2\", \"最后一墩\": \"P7\"}"}, {"id": "MS-U09-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主桥北端(北桥塔处)梁端伸缩缝上方,桥面最外侧(吊索区内侧、检修道外侧)布置的是哪一种护栏或栏杆?从 {车行道防撞护栏A, 车行道防撞护栏B, 人行道栏杆, 中央防撞护栏} 中选一项原样返回。", "answer": "\"车行道防撞护栏B\""}]} {"page_01_file_name": "images/MS-U09-02/few_sheet/01.png", "page_02_file_name": "images/MS-U09-02/few_sheet/02.png", "page_03_file_name": "images/MS-U09-02/few_sheet/03.png", "page_04_file_name": "images/MS-U09-02/few_sheet/04.png", "page_05_file_name": "images/MS-U09-02/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U09-02", "set": "U09", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "主桥两端的梁端伸缩缝处,一侧为主桥钢箱梁、另一侧为引桥梁体。下列伸缩装置的组成部分中,哪些设在主桥钢箱梁一侧?", "options": [{"key": "A", "text": "多向变位铰", "correct": true}, {"key": "B", "text": "固定梳齿板", "correct": false}, {"key": "C", "text": "预埋钢板与剪力钉组合件", "correct": false}, {"key": "D", "text": "C50 钢纤维混凝土", "correct": false}, {"key": "E", "text": "支撑肋板", "correct": true}, {"key": "F", "text": "止水带挂耳板", "correct": true}], "answer": ["A", "E", "F"], "few_sheet_pages": [13, 20, 6, 18, 19], "evidence_pages": [18, 19, 20], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U09-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝布置图”的“桥梁伸缩缝断面布置图 A-A”图例中,多向变位铰、固定梳齿板、后浇C50钢纤维混凝土的编号各是多少?按图例中的阿拉伯数字原样返回,字段名固定为 多向变位铰、固定梳齿板、C50钢纤维混凝土。", "answer": "{\"多向变位铰\": \"1\", \"固定梳齿板\": \"6\", \"C50钢纤维混凝土\": \"7\"}"}, {"id": "MS-U09-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝布置图”的“每道缝预埋件材料用量表(全桥共2道)”中,支撑肋板、挂耳板1、N1预埋钢板的编号各是什么?按表中编号原样返回(形如 N7),字段名固定为 支撑肋板、挂耳板1、预埋钢板。", "answer": "{\"支撑肋板\": \"N3\", \"挂耳板1\": \"N5\", \"预埋钢板\": \"N1\"}"}, {"id": "MS-U09-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主桥梁端伸缩缝车行道断面上,伸缩装置图例编号为 1、6、7 的部件,各自坐落(固定或浇筑)在缝哪一侧的梁体上?每个字段从 {主桥钢箱梁, 引桥梁体} 中取一项原样返回,字段名固定为 1、6、7。", "answer": "{\"1\": \"主桥钢箱梁\", \"6\": \"引桥梁体\", \"7\": \"引桥梁体\"}"}, {"id": "MS-U09-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主桥梁端伸缩缝车行道处的预埋件中,编号 N3、N5、N1 的三种,各自固定在缝哪一侧的梁体上?每个字段从 {主桥钢箱梁, 引桥梁体} 中取一项原样返回,字段名固定为 N3、N5、N1。", "answer": "{\"N3\": \"主桥钢箱梁\", \"N5\": \"主桥钢箱梁\", \"N1\": \"引桥梁体\"}"}]} {"page_01_file_name": "images/MS-U09-03/few_sheet/01.png", "page_02_file_name": "images/MS-U09-03/few_sheet/02.png", "page_03_file_name": "images/MS-U09-03/few_sheet/03.png", "page_04_file_name": "images/MS-U09-03/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U09-03", "set": "U09", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "支坪长江大桥主桥设双层防撞护栏的区段,检修道两侧各有一道车行道防撞护栏,一道紧靠车行道,一道紧靠吊索区。下列说法哪些正确?", "options": [{"key": "A", "text": "紧靠车行道的那道,底座端部高度与中央防撞护栏的底座端部高度相同", "correct": true}, {"key": "B", "text": "紧靠吊索区的那道,立柱顶端比中央防撞护栏的立柱顶端低 50 mm", "correct": true}, {"key": "C", "text": "紧靠吊索区的那道,底座端部高度与中央防撞护栏的底座端部高度相同", "correct": false}, {"key": "D", "text": "紧靠吊索区的那道,立柱顶端高出主梁结构顶面 1685 mm", "correct": false}, {"key": "E", "text": "紧靠车行道的那道,立柱顶端比紧靠吊索区的那道低 50 mm", "correct": false}, {"key": "F", "text": "紧靠车行道的那道,立柱顶端高出主梁结构顶面 1685 mm", "correct": true}], "answer": ["A", "B", "F"], "few_sheet_pages": [11, 5, 7, 10], "evidence_pages": [5, 7, 10, 11], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U09-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪长江大桥主桥设双层防撞护栏的区段,检修道与吊索区相邻处的那道车行道防撞护栏是哪一型?只返回型号字母(形如 C)。", "answer": "\"B\""}, {"id": "MS-U09-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "同一区段,护栏区内紧靠车行道的那道车行道防撞护栏是哪一型?只返回型号字母(形如 C)。", "answer": "\"A\""}, {"id": "MS-U09-03-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪长江大桥主桥设单层防撞护栏的区段,护栏区内紧靠车行道的那道车行道防撞护栏是哪一型?只返回型号字母(形如 C)。", "answer": "\"A\""}, {"id": "MS-U09-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "车行道防撞护栏构造图中,'适用于车行道防撞护栏A'的立柱及底座侧面图上,底座端部的高度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 85, \"unit\": \"mm\"}"}, {"id": "MS-U09-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "车行道防撞护栏构造图中,'适用于车行道防撞护栏B'的立柱及底座侧面图上,底座端部的高度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 35, \"unit\": \"mm\"}"}, {"id": "MS-U09-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "车行道防撞护栏构造图中,'适用于车行道防撞护栏A'的立柱及底座侧面图上,左侧标注的立柱总高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1600, \"unit\": \"mm\"}"}, {"id": "MS-U09-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "车行道防撞护栏构造图的地伏横断面图中,地伏端部的高度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 85, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U09-04/few_sheet/01.png", "page_02_file_name": "images/MS-U09-04/few_sheet/02.png", "page_03_file_name": "images/MS-U09-04/few_sheet/03.png", "page_04_file_name": "images/MS-U09-04/few_sheet/04.png", "page_05_file_name": "images/MS-U09-04/few_sheet/05.png", "page_06_file_name": "images/MS-U09-04/few_sheet/06.png", "page_07_file_name": "images/MS-U09-04/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U09-04", "set": "U09", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "主桥南端(南桥塔处)梁端伸缩缝上方的人行道栏杆,跨缝处是怎样构造的?下列说法哪些正确?", "options": [{"key": "A", "text": "人行道栏杆每 18 m 设一道伸缩节", "correct": false}, {"key": "B", "text": "每道伸缩缝处的栏杆用钢合计约 119 kg", "correct": true}, {"key": "C", "text": "南桥塔处伸缩缝上方并没有人行道栏杆", "correct": false}, {"key": "D", "text": "跨缝处的椭圆管为 Q235B 钢", "correct": false}, {"key": "E", "text": "跨缝两侧栏杆立柱距伸缩缝中心线:引桥侧 1340 mm,主桥侧 750 mm", "correct": true}, {"key": "F", "text": "跨缝处用 φ114×δ7 钢管 4 根、单根长 1520 mm", "correct": false}], "answer": ["B", "E"], "few_sheet_pages": [5, 15, 14, 12, 9, 13, 4], "evidence_pages": [4, 5, 12, 13, 15], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U09-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行道栏杆构造图”的“伸缩缝及断缝处栏杆材料表(每道)”中:规格为椭圆管的各项,材质是什么;表中写明的一道伸缩缝栏杆用钢合计是多少?返回 椭圆管材质、一道合计 两个字段;材质按表中牌号原样写,合计为 {value, unit}(kg)。", "answer": "{\"椭圆管材质\": \"06Cr18Ni11Ti\", \"一道合计\": {\"value\": 119, \"unit\": \"kg\"}}"}, {"id": "MS-U09-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行道栏杆构造图”的“伸缩缝及断缝处栏杆材料表(每道)”中,规格为圆管(以 Φ 开头)的各项:材质是什么;单根管长是多少?返回 材质、管长 两个字段;材质按表中牌号原样写,管长为 {value, unit}(mm)。", "answer": "{\"材质\": \"Q235B\", \"管长\": {\"value\": 1830, \"unit\": \"mm\"}}"}, {"id": "MS-U09-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行道栏杆构造图”的“伸缩缝处栏杆立面图”上,跨缝两侧栏杆立柱到伸缩缝中心线的距离各是多少?返回 引桥侧、主桥侧 两个字段,每个字段为 {value, unit}(mm)。", "answer": "{\"引桥侧\": {\"value\": 1340, \"unit\": \"mm\"}, \"主桥侧\": {\"value\": 750, \"unit\": \"mm\"}}"}, {"id": "MS-U09-04-R4", "role": "read", "tiers": ["full_set"], "question": "“车行道防撞护栏构造图”的“材料数量表”中,“伸缩缝处(每道)”一栏钢管2a 的根数和单根长度各是多少?返回 根数、单根长度 两个字段,每个字段为 {value, unit}(单位分别为 根、mm)。", "answer": "{\"根数\": {\"value\": 4, \"unit\": \"根\"}, \"单根长度\": {\"value\": 1520, \"unit\": \"mm\"}}"}, {"id": "MS-U09-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行道栏杆构造图”(栏杆立面图所在的那张)的附注中,护栏每隔多少米设置一道伸缩节?返回数值和单位(m)。", "answer": "{\"value\": 30, \"unit\": \"m\"}"}, {"id": "MS-U09-04-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(图签分张号“第 1 页 共 3 页”)的附注中,护栏每隔多少米设置一道伸缩节?返回数值和单位(m)。", "answer": "{\"value\": 18, \"unit\": \"m\"}"}, {"id": "MS-U09-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主桥南端(南桥塔处)梁端伸缩缝上方,桥面最外侧(吊索区内侧、检修道外侧)布置的是哪一种护栏或栏杆?从 {车行道防撞护栏A, 车行道防撞护栏B, 人行道栏杆, 中央防撞护栏} 中选一项原样返回。", "answer": "\"人行道栏杆\""}]} {"page_01_file_name": "images/MS-U09-05/few_sheet/01.png", "page_02_file_name": "images/MS-U09-05/few_sheet/02.png", "page_03_file_name": "images/MS-U09-05/few_sheet/03.png", "page_04_file_name": "images/MS-U09-05/few_sheet/04.png", "page_05_file_name": "images/MS-U09-05/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U09-05", "set": "U09", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "护栏和栏杆跨过主桥梁端伸缩缝时,横管怎样适应梁端的伸缩?下列说法哪些正确?", "options": [{"key": "A", "text": "防撞护栏伸缩缝处钢管长度按安装温度 15°C 取值", "correct": false}, {"key": "B", "text": "防撞护栏:内套钢管在主桥一侧立柱处周边点焊固定,引桥一侧横管端部为自由端", "correct": true}, {"key": "C", "text": "人行道栏杆跨缝两侧立柱,引桥侧距伸缩缝中心线 1340 mm,主桥侧 750 mm", "correct": true}, {"key": "D", "text": "伸缩装置的安装温度越高,预留梁端间隙越大", "correct": false}, {"key": "E", "text": "人行道栏杆跨缝立面按梁端间隙 1060 mm 绘制,即伸缩装置设计中间温度时的预留间隙", "correct": true}, {"key": "F", "text": "人行道栏杆:同样在主桥一侧焊接固定,引桥一侧横管端部为自由边", "correct": true}], "answer": ["B", "C", "E", "F"], "few_sheet_pages": [13, 14, 20, 6, 7], "evidence_pages": [6, 13, 20], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U09-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝布置图”的“梁端间隙B参照表”中,安装温度 −5℃ 和 35℃ 对应的预留间隙各是多少(不计 ± 允许误差)?返回 安装温度-5、安装温度35 两个字段,每个字段为 {value, unit}(mm)。", "answer": "{\"安装温度-5\": {\"value\": 1430, \"unit\": \"mm\"}, \"安装温度35\": {\"value\": 690, \"unit\": \"mm\"}}"}, {"id": "MS-U09-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝布置图”的附注中,设计中间温度时梁端间隙尺寸的取值是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1060, \"unit\": \"mm\"}"}, {"id": "MS-U09-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行道栏杆构造图”的“伸缩缝处栏杆立面图”上:跨缝两侧栏杆立柱到伸缩缝中心线的距离各是多少;图中两梁端之间的间隙总尺寸是多少?返回 引桥侧、主桥侧、梁端间隙 三个字段,每个字段为 {value, unit}(mm)。", "answer": "{\"引桥侧\": {\"value\": 1340, \"unit\": \"mm\"}, \"主桥侧\": {\"value\": 750, \"unit\": \"mm\"}, \"梁端间隙\": {\"value\": 1060, \"unit\": \"mm\"}}"}, {"id": "MS-U09-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“中央防撞护栏构造图”(图签分张号“第 1 页 共 3 页”)的附注中,伸缩缝处钢管长度按安装温度多少摄氏度取值?只返回阿拉伯数字(不写单位)。", "answer": "\"20\""}, {"id": "MS-U09-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝布置图”的“梁端间隙B参照表”中,预留间隙 1060±20 mm 对应的安装温度是多少摄氏度?只返回阿拉伯数字(不写单位)。", "answer": "\"15\""}, {"id": "MS-U09-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "护栏和栏杆跨过主桥梁端伸缩缝时,横管在缝的一侧焊接固定、另一侧端部可自由伸缩。防撞护栏和人行道栏杆各自是在哪一侧焊接固定?每个字段从 {主桥, 引桥} 中取一项原样返回,字段名固定为 防撞护栏、人行道栏杆。", "answer": "{\"防撞护栏\": \"主桥\", \"人行道栏杆\": \"主桥\"}"}]} {"page_01_file_name": "images/MS-U09-06/few_sheet/01.png", "page_02_file_name": "images/MS-U09-06/few_sheet/02.png", "page_03_file_name": "images/MS-U09-06/few_sheet/03.png", "page_04_file_name": "images/MS-U09-06/few_sheet/04.png", "page_05_file_name": "images/MS-U09-06/few_sheet/05.png", "page_06_file_name": "images/MS-U09-06/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U09-06", "set": "U09", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "跨江主桥桥面上的雨水,在横向和纵向上分别往哪里流、在哪里汇集?下列说法哪些正确?", "options": [{"key": "A", "text": "排水槽设在检修道与车行道之间的护栏区内", "correct": false}, {"key": "B", "text": "主跨上纵向一律流向南桥塔", "correct": false}, {"key": "C", "text": "主跨上纵向由纵坡最高点(K0+811)分别流向南北两座桥塔", "correct": true}, {"key": "D", "text": "车行道横坡坡向中央分隔带,在分隔带处汇集", "correct": false}, {"key": "E", "text": "车行道横坡 2%,坡向背离道路中心线的桥面外侧", "correct": true}, {"key": "F", "text": "排水槽设在中央分隔带两侧", "correct": false}], "answer": ["C", "E"], "few_sheet_pages": [2, 22, 1, 18, 5, 21], "evidence_pages": [1, 2, 21, 22], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U09-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“跨江桥排水布置图”的“跨江桥主桥排水横断面布置图”上:车行道横坡标注的数值是多少;“排水槽”位于哪个分区?返回 横坡、排水槽分区 两个字段;横坡按图中原样写(形如 1.5%),分区从 {吊索区, 检修道, 车行道, 中央分隔带} 中取一项原样返回。", "answer": "{\"横坡\": \"2%\", \"排水槽分区\": \"吊索区\"}"}, {"id": "MS-U09-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“跨江桥排水布置图”的“排水立面布置图”纵断面栏中,主跨纵坡最高点的桩号是多少?按 K0+123 形式返回。", "answer": "\"K0+811\""}, {"id": "MS-U09-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“跨江桥排水布置图”的“排水立面布置图”纵断面“坡度/坡长”栏中,主跨纵坡最高点前、后两段的坡度各是多少?按栏中原样写(含正负号和 %),字段名固定为 前段、后段。", "answer": "{\"前段\": \"0.50%\", \"后段\": \"-0.50%\"}"}, {"id": "MS-U09-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主桥标准横断面上,沿车行道横坡向下,车行道低侧边缘到道路中心线的水平距离是多少?返回数值和单位(mm)。", "answer": "{\"value\": 13000, \"unit\": \"mm\"}"}, {"id": "MS-U09-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主跨桥面雨水沿纵桥向排水槽流到主跨两端后,分别在哪两个墩号处排下?按图中墩号原样返回(形如 P9),字段名固定为 北端、南端。", "answer": "{\"北端\": \"P7\", \"南端\": \"P8\"}"}]} {"page_01_file_name": "images/MS-U09-07/few_sheet/01.png", "page_02_file_name": "images/MS-U09-07/few_sheet/02.png", "page_03_file_name": "images/MS-U09-07/few_sheet/03.png", "page_04_file_name": "images/MS-U09-07/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U09-07", "set": "U09", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "主线悬索桥单层防撞护栏段,检修道与吊索区之间设置的那一道栏杆,关于其构造与用料,下列说法哪些正确?", "options": [{"key": "A", "text": "立柱纵向间距为 2 m", "correct": true}, {"key": "B", "text": "纵向扶手钢管为 Φ127×5 的圆钢管", "correct": false}, {"key": "C", "text": "每 2 m 一段栏杆含 Φ32 竖杆 13 根", "correct": true}, {"key": "D", "text": "每道伸缩缝处栏杆的材料合计约 119 kg", "correct": true}, {"key": "E", "text": "立柱采用 Q355C 钢", "correct": false}, {"key": "F", "text": "每隔 18 m 设置一道伸缩节", "correct": false}], "answer": ["A", "C", "D"], "few_sheet_pages": [12, 5, 15, 9], "evidence_pages": [5, 12, 15], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U09-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行道栏杆构造图”(栏杆立面图所在的那一张)的附注中:钢立柱间距是多少?N1 立柱的材料是什么?护栏每隔多长设置一道伸缩节?以 JSON 返回三个字段:post_spacing(数值和单位 m)、post_material(按附注原文写材料牌号,不含“铸钢件”等字样,形如 \"ZG270-500\")、joint_interval(数值和单位 m)。", "answer": "{\"post_spacing\": {\"value\": 2, \"unit\": \"m\"}, \"post_material\": \"ZG200-400h\", \"joint_interval\": {\"value\": 30, \"unit\": \"m\"}}"}, {"id": "MS-U09-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行道栏杆构造图”中的两张材料表:(1) “栏杆工程材料表(2m)”里 N4 的外径和数量、N3 的外径各是多少?(2) “伸缩缝及断缝处栏杆材料表(每道)”的合计栏写的一道伸缩缝材料重量是多少?以 JSON 返回四个字段:n4_diameter(数值和单位 mm)、n4_count(数值和单位 根)、n3_diameter(数值和单位 mm)、per_joint_total(数值和单位 kg)。", "answer": "{\"n4_diameter\": {\"value\": 32, \"unit\": \"mm\"}, \"n4_count\": {\"value\": 13, \"unit\": \"根\"}, \"n3_diameter\": {\"value\": 60, \"unit\": \"mm\"}, \"per_joint_total\": {\"value\": 119, \"unit\": \"kg\"}}"}, {"id": "MS-U09-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(防撞护栏立面所在的那一张)上:附注规定栏杆钢管、立柱、锚栓采用什么钢材?护栏每隔多长设置一道伸缩节?立面上“钢管1”的外径是多少?以 JSON 返回三个字段:steel(按附注原文写钢材牌号,不含“钢”字,形如 \"Q345B\")、joint_interval(数值和单位 m)、tube1_diameter(数值和单位 mm)。", "answer": "{\"steel\": \"Q355C\", \"joint_interval\": {\"value\": 18, \"unit\": \"m\"}, \"tube1_diameter\": {\"value\": 127, \"unit\": \"mm\"}}"}, {"id": "MS-U09-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线悬索桥单层防撞护栏段,检修道与吊索区之间设置的那一道栏杆(护栏)叫什么?只从“人行道栏杆、车行道防撞护栏A、车行道防撞护栏B、中央防撞护栏”中选一个原样返回。", "answer": "\"人行道栏杆\""}, {"id": "MS-U09-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线悬索桥单层防撞护栏段,检修道与吊索区之间设置的那一道栏杆,每隔多长设置一道伸缩节?返回数值和单位(m)。", "answer": "{\"value\": 30, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U09-08/few_sheet/01.png", "page_02_file_name": "images/MS-U09-08/few_sheet/02.png", "page_03_file_name": "images/MS-U09-08/few_sheet/03.png", "page_04_file_name": "images/MS-U09-08/few_sheet/04.png", "page_05_file_name": "images/MS-U09-08/few_sheet/05.png", "page_06_file_name": "images/MS-U09-08/few_sheet/06.png", "page_07_file_name": "images/MS-U09-08/few_sheet/07.png", "page_08_file_name": "images/MS-U09-08/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U09-08", "set": "U09", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "主桥桥面附属设施中,下列构件哪些采用不锈钢制作?", "options": [{"key": "A", "text": "人行道栏杆顶部的椭圆管扶手", "correct": true}, {"key": "B", "text": "桥面铺装边缘防排水处理中嵌在填缝料里的编织网管", "correct": true}, {"key": "C", "text": "梁端伸缩装置跨缝梳齿板处的安装螺栓", "correct": true}, {"key": "D", "text": "人行道栏杆立柱", "correct": false}, {"key": "E", "text": "中央与车行道防撞护栏的栏杆钢管", "correct": false}, {"key": "F", "text": "跨江桥排水槽的内衬板", "correct": true}], "answer": ["A", "B", "C", "F"], "few_sheet_pages": [22, 2, 18, 15, 8, 6, 14, 12], "evidence_pages": [2, 6, 12, 15, 18, 22], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U09-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行道栏杆构造图”中的“栏杆工程材料表(2m)”里,编号 N1 和 N2 的材质各是什么?按表中材质栏原样返回(牌号照抄),字段名固定为 N1、N2。", "answer": "{\"N1\": \"ZG200-400h\", \"N2\": \"06Cr18Ni11Ti\"}"}, {"id": "MS-U09-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“中央防撞护栏构造图”(图签分张号“第 1 页 共 3 页”)的附注中,栏杆钢管、立柱、锚栓采用的钢材牌号是什么?按图中原样返回牌号。", "answer": "\"Q355C\""}, {"id": "MS-U09-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“跨江桥排水布置图”的“排水槽大样图”中,排水槽内贴钢板的材质牌号是什么?按图中原样返回牌号。", "answer": "\"0Cr18Ni10Ti\""}, {"id": "MS-U09-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝布置图”的“桥梁伸缩缝断面布置图 A-A”中,跨缝梳齿板端部压板处那组 M10 安装螺栓,图上标注的材质是什么?从 {不锈钢, 热浸镀锌钢, Q355C 钢, 铸钢} 中选一项,按所列文字原样返回。", "answer": "\"不锈钢\""}, {"id": "MS-U09-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面铺装构造图”的“边缘防排水处理”详图中,沥青类填缝料里嵌着的那根编织网管,图上标注的材质是什么?从 {不锈钢, 热浸镀锌钢, Q355C 钢, 铸钢} 中选一项,按所列文字原样返回。", "answer": "\"不锈钢\""}, {"id": "MS-U09-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主桥人行道栏杆中,位于栏杆断面最顶部的那根纵向扶手管,以及栏杆的立柱,构件编号各是什么?按图中编号原样返回(形如 N7),字段名固定为 扶手、立柱。", "answer": "{\"扶手\": \"N2\", \"立柱\": \"N1\"}"}]} {"page_01_file_name": "images/MS-U09-09/few_sheet/01.png", "page_02_file_name": "images/MS-U09-09/few_sheet/02.png", "page_03_file_name": "images/MS-U09-09/few_sheet/03.png", "page_04_file_name": "images/MS-U09-09/few_sheet/04.png", "page_05_file_name": "images/MS-U09-09/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U09-09", "set": "U09", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿桩号增大方向(由牟家湾立交往支坪立交),全桥桥面沿线有这样几类特征点:事故池、桥面外侧开始或不再设置车行道防撞护栏B 处、成渝铁路上方、桥塔、纵坡变坡点(含纵坡最高点)、桥墩排水接入排水系统处。下列\"前一处 → 紧接的后一处\"中,哪些正确?", "options": [{"key": "A", "text": "南桥塔 → 桥墩排水接入排水系统处", "correct": false}, {"key": "B", "text": "北桥塔 → 桥面外侧不再设置车行道防撞护栏B 处", "correct": true}, {"key": "C", "text": "桥面外侧开始设置车行道防撞护栏B 处 → 北桥塔", "correct": false}, {"key": "D", "text": "北桥塔 → 主跨纵坡最高点", "correct": false}, {"key": "E", "text": "北侧事故池 → 桥面外侧开始设置车行道防撞护栏B 处", "correct": true}, {"key": "F", "text": "桥面外侧不再设置车行道防撞护栏B 处 → 主跨纵坡最高点", "correct": true}], "answer": ["B", "E", "F"], "few_sheet_pages": [5, 21, 1, 22, 4], "evidence_pages": [4, 5, 21], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U09-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“护栏区段划分图”的“防撞护栏区段划分图”上:双层防撞护栏段从哪个墩开始;它越过 P7 之后在主跨内的长度是多少;成渝铁路位于哪两个墩之间?返回 起点墩、主跨内长度、铁路北侧墩、铁路南侧墩 四个字段;墩号按图中原样写(形如 P9),长度为 {value, unit}。", "answer": "{\"起点墩\": \"P2\", \"主跨内长度\": {\"value\": 70, \"unit\": \"m\"}, \"铁路北侧墩\": \"P5\", \"铁路南侧墩\": \"P6\"}"}, {"id": "MS-U09-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“跨江桥排水布置图”的“排水立面布置图”上,北桥塔所在的 P7 和南桥塔所在的 P8 的桩号各是多少?字段名固定为 P7、P8,桩号写成 K0+123 的形式(不带小数)。", "answer": "{\"P7\": \"K0+401\", \"P8\": \"K1+221\"}"}, {"id": "MS-U09-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“跨江桥排水布置图”的“排水立面布置图”上,主跨纵坡最高点(+0.50% 与 −0.50% 两段纵坡的变坡点)的桩号是多少?按 K0+123 形式返回。", "answer": "\"K0+811\""}, {"id": "MS-U09-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“跨江桥排水布置图”的“排水立面布置图”上,南段 −0.50% 与 −1.90% 两段纵坡的变坡点桩号是多少?按 K0+123 形式返回。", "answer": "\"K1+351\""}, {"id": "MS-U09-09-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“跨江桥排水布置图”的“排水立面布置图”上,北端(牟家湾立交一侧)的事故池紧邻哪个墩台?按图中墩台编号原样返回(形如 P9)。", "answer": "\"A1\""}, {"id": "MS-U09-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "沿桩号增大方向,桥面外侧(吊索区内侧)设置车行道防撞护栏B 的那一段:从哪个墩开始;越过北桥塔后在主跨内延伸多长?返回 起点墩、主跨内长度 两个字段;墩号按图中原样写(形如 P9),长度为 {value, unit}。", "answer": "{\"起点墩\": \"P2\", \"主跨内长度\": {\"value\": 70, \"unit\": \"m\"}}"}, {"id": "MS-U09-09-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "跨江桥桥面雨水通过“桥墩排水”接入排水系统的那个桥墩,桩号是多少?按 K0+123 形式返回。", "answer": "\"K1+561\""}]} {"page_01_file_name": "images/MS-U09-10/few_sheet/01.png", "page_02_file_name": "images/MS-U09-10/few_sheet/02.png", "page_03_file_name": "images/MS-U09-10/few_sheet/03.png", "page_04_file_name": "images/MS-U09-10/few_sheet/04.png", "page_05_file_name": "images/MS-U09-10/few_sheet/05.png", "page_06_file_name": "images/MS-U09-10/few_sheet/06.png", "page_07_file_name": "images/MS-U09-10/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U09-10", "set": "U09", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "主桥两端的两道梁端伸缩缝处,中央防撞护栏和车行道防撞护栏跨缝所用的伸缩缝处钢管(φ114×δ7),全桥合计多少根?", "options": [{"key": "A", "text": "48", "correct": false}, {"key": "B", "text": "120", "correct": false}, {"key": "C", "text": "16", "correct": false}, {"key": "D", "text": "40", "correct": true}, {"key": "E", "text": "32", "correct": false}, {"key": "F", "text": "24", "correct": false}], "answer": ["D"], "few_sheet_pages": [6, 13, 5, 8, 4, 20, 11], "evidence_pages": [4, 5, 8, 11, 20], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U09-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“中央防撞护栏构造图”的“材料数量表”中,“伸缩缝处(每道)”一栏里钢管2a 的根数是多少?返回数值和单位(根)。", "answer": "{\"value\": 4, \"unit\": \"根\"}"}, {"id": "MS-U09-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”的“材料数量表”中,“伸缩缝处(每道)”一栏里钢管2a 的根数是多少?返回数值和单位(根)。", "answer": "{\"value\": 4, \"unit\": \"根\"}"}, {"id": "MS-U09-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“中央防撞护栏构造图”的“材料数量表”中,“伸缩缝处(每道)”一栏里横梁螺栓封闭螺母的件数是多少?返回数值和单位(个)。", "answer": "{\"value\": 12, \"unit\": \"个\"}"}, {"id": "MS-U09-10-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝布置图”的附注中,全桥梁端伸缩缝共几道?返回阿拉伯数字。", "answer": "\"2\""}, {"id": "MS-U09-10-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“护栏区段划分图”的“双层防撞护栏段横断面布置图”和“单层防撞护栏段横断面布置图”上,全幅各画了几道车行道防撞护栏(护栏A、护栏B 合计)、几道中央防撞护栏?返回 双层_车行道、双层_中央、单层_车行道、单层_中央 四个字段,均为阿拉伯数字。", "answer": "{\"双层_车行道\": \"4\", \"双层_中央\": \"2\", \"单层_车行道\": \"2\", \"单层_中央\": \"2\"}"}, {"id": "MS-U09-10-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“护栏区段划分图”的“防撞护栏区段划分图”上,双层防撞护栏段覆盖的墩:起点墩和段内最后一个墩各是哪个?按图中墩号原样返回(形如 P9),字段名固定为 起点墩、最后一墩。", "answer": "{\"起点墩\": \"P2\", \"最后一墩\": \"P7\"}"}, {"id": "MS-U09-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主桥北端(北桥塔处)和南端(南桥塔处)的梁端伸缩缝上,分别有几道防撞护栏(中央防撞护栏与车行道防撞护栏合计)跨过该缝?返回 北端、南端 两个字段,均为阿拉伯数字。", "answer": "{\"北端\": \"6\", \"南端\": \"4\"}"}]} {"page_01_file_name": "images/MS-U09-11/few_sheet/01.png", "page_02_file_name": "images/MS-U09-11/few_sheet/02.png", "page_03_file_name": "images/MS-U09-11/few_sheet/03.png", "page_04_file_name": "images/MS-U09-11/few_sheet/04.png", "page_05_file_name": "images/MS-U09-11/few_sheet/05.png", "page_06_file_name": "images/MS-U09-11/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U09-11", "set": "U09", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "主跨 820 m 范围内,中央防撞护栏、车行道防撞护栏和人行道栏杆三类护栏/栏杆沿桥纵向布置的横管(含扶手),按各自标准段的用量折算(不计伸缩节、伸缩缝和拼接处的附加钢管),合计长度约为多少 m?", "options": [{"key": "A", "text": "26028.75", "correct": false}, {"key": "B", "text": "17620", "correct": false}, {"key": "C", "text": "13680", "correct": false}, {"key": "D", "text": "19680", "correct": false}, {"key": "E", "text": "18180", "correct": true}, {"key": "F", "text": "14900", "correct": false}], "answer": ["E"], "few_sheet_pages": [11, 14, 8, 16, 15, 12], "evidence_pages": [8, 11, 12, 15], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U09-11-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“中央防撞护栏构造图”(材料数量表所在的那张)上:附注写明的跨江桥段中央防撞护栏长度是多少;材料数量表“每段栏杆长度:1.5米”一栏中钢管1 的根数是多少?返回 长度、钢管1根数 两个字段,每个字段为 {value, unit}(单位分别为 m、根)。", "answer": "{\"长度\": {\"value\": 1640, \"unit\": \"m\"}, \"钢管1根数\": {\"value\": 4, \"unit\": \"根\"}}"}, {"id": "MS-U09-11-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行道防撞护栏构造图”(材料数量表所在的那张)上:附注写明的跨江桥段车行道防撞护栏长度是多少;材料数量表“每段栏杆长度:1.5米”一栏中钢管1 的根数是多少?返回 长度、钢管1根数 两个字段,每个字段为 {value, unit}(单位分别为 m、根)。", "answer": "{\"长度\": {\"value\": 1780, \"unit\": \"m\"}, \"钢管1根数\": {\"value\": 4, \"unit\": \"根\"}}"}, {"id": "MS-U09-11-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行道栏杆构造图”(栏杆工程材料表所在的那张)的附注中,跨江桥段人行道栏杆长度是多少?返回数值和单位(m)。", "answer": "{\"value\": 1500, \"unit\": \"m\"}"}, {"id": "MS-U09-11-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行道栏杆构造图”的“栏杆工程材料表(2m)”中,N4 的数量和单根长度各是多少?返回 数量、单根长度 两个字段,每个字段为 {value, unit}(单位分别为 根、mm)。", "answer": "{\"数量\": {\"value\": 13, \"unit\": \"根\"}, \"单根长度\": {\"value\": 805, \"unit\": \"mm\"}}"}, {"id": "MS-U09-11-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主桥人行道栏杆每 2 m 标准段中,沿桥纵向通长布置的管件(含顶部扶手)共有几根?返回数值和单位(根)。", "answer": "{\"value\": 3, \"unit\": \"根\"}"}]} {"page_01_file_name": "images/MS-U10-01/few_sheet/01.png", "page_02_file_name": "images/MS-U10-01/few_sheet/02.png", "page_03_file_name": "images/MS-U10-01/few_sheet/03.png", "page_04_file_name": "images/MS-U10-01/few_sheet/04.png", "page_05_file_name": "images/MS-U10-01/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U10-01", "set": "U10", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "关于匝道D线桥桥面范围内的那处凸形竖曲线,下列说法哪些正确?", "options": [{"key": "A", "text": "1#桥台轴线处桥面设计高程为 257.956 m", "correct": false}, {"key": "B", "text": "桥上并没有凸形竖曲线", "correct": false}, {"key": "C", "text": "0#桥台轴线处桥面设计高程比 K0+020 处低", "correct": false}, {"key": "D", "text": "该竖曲线半径为 1200 m", "correct": false}, {"key": "E", "text": "K0+040 处桥面设计高程低于0#桥台轴线处", "correct": true}, {"key": "F", "text": "变坡点两侧,0#桥台轴线处桥面设计高程高于1#桥台轴线处", "correct": true}], "answer": ["E", "F"], "few_sheet_pages": [3, 5, 4, 2, 6], "evidence_pages": [3, 5, 6], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U10-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“匝道D线桥立面布置”中,沿桩号增大方向,变坡点 SJD1 之前和之后的两段设计纵坡各是上坡还是下坡?返回 JSON 对象,字段名固定为 前、后,每个字段从 {上坡, 下坡} 中取一个,原样返回。", "answer": "{\"前\": \"上坡\", \"后\": \"下坡\"}"}, {"id": "MS-U10-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“匝道D线桥立面布置”的纵断面表中,桩号 K0+020、K0+040 处的设计高程各是多少?返回 JSON 对象,字段名固定为 K0+020、K0+040,每个字段为 {value, unit},单位 m。", "answer": "{\"K0+020\": {\"value\": 257.894, \"unit\": \"m\"}, \"K0+040\": {\"value\": 257.504, \"unit\": \"m\"}}"}, {"id": "MS-U10-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥地质横断面图”(1/2)(分张序号按图框右上角“第 x 页 共 y 页”)上,匝道D K0+043.655 处标注的桥面设计高程 Hs 是多少?返回数值和单位(m)。", "answer": "{\"value\": 257.385, \"unit\": \"m\"}"}, {"id": "MS-U10-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥地质横断面图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)上,匝道D K0+008.655 处标注的桥面设计高程 Hs 是多少?返回数值和单位(m)。", "answer": "{\"value\": 257.956, \"unit\": \"m\"}"}, {"id": "MS-U10-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“匝道D线桥立面布置”的纵断面表中,“直线及平曲线”栏标注的曲线半径 R 是多少?返回数值和单位(m)。", "answer": "{\"value\": 1200, \"unit\": \"m\"}"}, {"id": "MS-U10-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥1#桥台轴线处的桥面设计高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 257.385, \"unit\": \"m\"}"}, {"id": "MS-U10-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥0#桥台轴线处的桥面设计高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 257.956, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U10-02/few_sheet/01.png", "page_02_file_name": "images/MS-U10-02/few_sheet/02.png", "page_03_file_name": "images/MS-U10-02/few_sheet/03.png", "page_04_file_name": "images/MS-U10-02/few_sheet/04.png", "page_05_file_name": "images/MS-U10-02/few_sheet/05.png", "page_06_file_name": "images/MS-U10-02/few_sheet/06.png", "page_07_file_name": "images/MS-U10-02/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U10-02", "set": "U10", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "匝道D线桥两端桥台处,主线3号桥和匝道C线桥的桥台与之并排设置。下列桥台中,哪些台身(前墙)高度超过 8 m?", "options": [{"key": "A", "text": "主线3号桥1#桥台", "correct": false}, {"key": "B", "text": "匝道D线桥0#桥台", "correct": false}, {"key": "C", "text": "匝道C线桥1#桥台", "correct": true}, {"key": "D", "text": "主线3号桥0#桥台", "correct": true}, {"key": "E", "text": "匝道C线桥0#桥台", "correct": false}, {"key": "F", "text": "匝道D线桥1#桥台", "correct": false}], "answer": ["C", "D"], "few_sheet_pages": [6, 11, 13, 5, 2, 4, 1], "evidence_pages": [1, 5, 6, 11, 13], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U10-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥地质横断面图”(1/2)上(分张序号按图框右上角“第 x 页 共 y 页”),主线 K2+859.773、匝道C K0+217.966、匝道D K0+043.655 三处桥台的台身(前墙)高度标注各是多少?返回 JSON 对象,字段名固定为 主线、匝道C、匝道D,每个字段为 {value, unit},单位 mm。", "answer": "{\"主线\": {\"value\": 8500, \"unit\": \"mm\"}, \"匝道C\": {\"value\": 6000, \"unit\": \"mm\"}, \"匝道D\": {\"value\": 7500, \"unit\": \"mm\"}}"}, {"id": "MS-U10-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥地质横断面图”(2/2)上(分张序号按图框右上角“第 x 页 共 y 页”),主线 K2+894.773、匝道C K0+252.966、匝道D K0+008.655 三处桥台的台身(前墙)高度标注各是多少?返回 JSON 对象,字段名固定为 主线、匝道C、匝道D,每个字段为 {value, unit},单位 mm。", "answer": "{\"主线\": {\"value\": 8000, \"unit\": \"mm\"}, \"匝道C\": {\"value\": 8144, \"unit\": \"mm\"}, \"匝道D\": {\"value\": 7610, \"unit\": \"mm\"}}"}, {"id": "MS-U10-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥0#桥台和1#桥台所在处,主线的桩号各是多少?返回 JSON 对象,字段名固定为 0#、1#,桩号按图中写法原样返回(形如 K1+234.567)。", "answer": "{\"0#\": \"K2+859.773\", \"1#\": \"K2+894.773\"}"}, {"id": "MS-U10-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道C线桥0#桥台和1#桥台的桥台轴线桩号各是多少?返回 JSON 对象,字段名固定为 0#、1#,桩号按图中写法原样返回(形如 K1+234.567)。", "answer": "{\"0#\": \"K0+217.966\", \"1#\": \"K0+252.966\"}"}]} {"page_01_file_name": "images/MS-U10-03/few_sheet/01.png", "page_02_file_name": "images/MS-U10-03/few_sheet/02.png", "page_03_file_name": "images/MS-U10-03/few_sheet/03.png", "page_04_file_name": "images/MS-U10-03/few_sheet/04.png", "page_05_file_name": "images/MS-U10-03/few_sheet/05.png", "page_06_file_name": "images/MS-U10-03/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U10-03", "set": "U10", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "匝道D线桥两个桥台的基础混凝土体积(不含桩)合计约为多少(m³)?", "options": [{"key": "A", "text": "269.99", "correct": false}, {"key": "B", "text": "209.92", "correct": false}, {"key": "C", "text": "292.04", "correct": false}, {"key": "D", "text": "162.51", "correct": false}, {"key": "E", "text": "348.57", "correct": false}, {"key": "F", "text": "283.85", "correct": true}], "answer": ["F"], "few_sheet_pages": [11, 12, 1, 13, 4, 14], "evidence_pages": [11, 12, 13, 14], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U10-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥桥台一般构造图”(1/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥台正立面”上,基础横桥向宽度和基础厚度各是多少?返回 JSON 对象,字段名固定为 基础宽、基础厚,每个字段为 {value, unit},单位 mm。", "answer": "{\"基础宽\": {\"value\": 10240, \"unit\": \"mm\"}, \"基础厚\": {\"value\": 1500, \"unit\": \"mm\"}}"}, {"id": "MS-U10-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥桥台一般构造图”(2/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥台侧立面”上,基础顺桥向长度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 7900, \"unit\": \"mm\"}"}, {"id": "MS-U10-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥桥台一般构造图”(3/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥台正立面”上,基础横桥向宽度(分段标注时相加)和基础厚度各是多少?返回 JSON 对象,字段名固定为 基础宽、基础厚,每个字段为 {value, unit},单位 mm。", "answer": "{\"基础宽\": {\"value\": 10240, \"unit\": \"mm\"}, \"基础厚\": {\"value\": 2300, \"unit\": \"mm\"}}"}, {"id": "MS-U10-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥桥台一般构造图”(4/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥台侧立面”上,基础顺桥向长度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 6900, \"unit\": \"mm\"}"}, {"id": "MS-U10-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥桥台一般构造图”(2/4)和(4/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥台平面”上,桥台轴线至台尾线(①—①′、⓪—⓪′)的距离各是多少?返回 JSON 对象,字段名固定为 2/4、4/4,每个字段为 {value, unit},单位 mm。", "answer": "{\"2/4\": {\"value\": 6000, \"unit\": \"mm\"}, \"4/4\": {\"value\": 5000, \"unit\": \"mm\"}}"}, {"id": "MS-U10-03-R6", "role": "read", "tiers": ["full_set"], "question": "“支坪立交匝道D线桥地质横断面图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)上,匝道D K0+008.655 处桥台台身的横桥向宽度标注是多少?返回数值和单位(mm)。", "answer": "{\"value\": 9740, \"unit\": \"mm\"}"}, {"id": "MS-U10-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥0#桥台的基础,顺桥向长度和厚度各是多少?返回 JSON 对象,字段名固定为 基础长、基础厚,每个字段为 {value, unit},单位 mm。", "answer": "{\"基础长\": {\"value\": 6900, \"unit\": \"mm\"}, \"基础厚\": {\"value\": 2300, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U10-04/few_sheet/01.png", "page_02_file_name": "images/MS-U10-04/few_sheet/02.png", "page_03_file_name": "images/MS-U10-04/few_sheet/03.png", "page_04_file_name": "images/MS-U10-04/few_sheet/04.png", "page_05_file_name": "images/MS-U10-04/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U10-04", "set": "U10", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "匝道D线桥0#桥台(桥梁起点一端)桩基的桩长合计是多少(m)?", "options": [{"key": "A", "text": "51.5", "correct": false}, {"key": "B", "text": "121.7", "correct": false}, {"key": "C", "text": "23.4", "correct": false}, {"key": "D", "text": "35.1", "correct": false}, {"key": "E", "text": "84.0", "correct": false}, {"key": "F", "text": "70.2", "correct": true}], "answer": ["F"], "few_sheet_pages": [4, 12, 6, 13, 14], "evidence_pages": [6, 13, 14], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U10-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥桥台一般构造图”(3/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥台正立面”上画出了几根桩?返回数值和单位(根)。", "answer": "{\"value\": 3, \"unit\": \"根\"}"}, {"id": "MS-U10-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥桥台一般构造图”(4/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥台侧立面”上画出了几根桩?返回数值和单位(根)。", "answer": "{\"value\": 2, \"unit\": \"根\"}"}, {"id": "MS-U10-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥地质横断面图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)上,匝道D K0+008.655 处桥台基础下每根桩的桩长标注是多少?返回数值和单位(mm)。", "answer": "{\"value\": 11700, \"unit\": \"mm\"}"}, {"id": "MS-U10-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥地质横断面图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)上,主线 K2+894.773 处桥台基础下画出了几根桩?返回数值和单位(根)。", "answer": "{\"value\": 7, \"unit\": \"根\"}"}, {"id": "MS-U10-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥地质横断面图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)上,匝道D K0+008.655 处桥台基础顶面和桩底的标高各是多少?返回 JSON 对象,字段名固定为 基础顶、桩底,每个字段为 {value, unit},单位 m。", "answer": "{\"基础顶\": {\"value\": 247.268, \"unit\": \"m\"}, \"桩底\": {\"value\": 233.268, \"unit\": \"m\"}}"}, {"id": "MS-U10-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥0#桥台基础下单根桩的桩长是多少?返回数值和单位(m)。", "answer": "{\"value\": 11.7, \"unit\": \"m\"}"}, {"id": "MS-U10-04-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥0#桥台的桩基,横桥向和顺桥向各布置几根?返回 JSON 对象,字段名固定为 横桥向、顺桥向,每个字段为 {value, unit},单位 根。", "answer": "{\"横桥向\": {\"value\": 3, \"unit\": \"根\"}, \"顺桥向\": {\"value\": 2, \"unit\": \"根\"}}"}]} {"page_01_file_name": "images/MS-U10-05/few_sheet/01.png", "page_02_file_name": "images/MS-U10-05/few_sheet/02.png", "page_03_file_name": "images/MS-U10-05/few_sheet/03.png", "page_04_file_name": "images/MS-U10-05/few_sheet/04.png", "page_05_file_name": "images/MS-U10-05/few_sheet/05.png", "page_06_file_name": "images/MS-U10-05/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U10-05", "set": "U10", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于匝道D线桥在平面和立面上的方位、走向,下列说法哪些正确?", "options": [{"key": "A", "text": "D线桥位于主线3号桥的东南侧", "correct": true}, {"key": "B", "text": "沿D线桩号增大方向(由0#桥台往1#桥台),桥梁大致朝西南方向延伸", "correct": false}, {"key": "C", "text": "沿D线桩号增大方向,桥下地面逐渐升高", "correct": true}, {"key": "D", "text": "沿D线桩号增大方向,桥面纵坡始终为下坡", "correct": false}, {"key": "E", "text": "D线桥0#桥台紧邻主线3号桥0#桥台", "correct": false}, {"key": "F", "text": "D线桥1#桥台紧邻主线3号桥0#桥台", "correct": true}], "answer": ["A", "C", "F"], "few_sheet_pages": [1, 13, 7, 3, 11, 4], "evidence_pages": [1, 3, 11, 13], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U10-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“匝道D线桥桥位图”上,指北针的北向指向图面的哪个方向?从 {上, 下, 左, 右, 左上, 左下, 右上, 右下} 中选一个,原样返回。", "answer": "\"左下\""}, {"id": "MS-U10-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“匝道D线桥桥位图”上:匝道D线桥画在主线3号桥的图面哪一侧?匝道D线桩号增大的方向指向图面哪一侧?返回 JSON 对象,字段名固定为 D线桥位置、桩号增大方向,每个字段从 {上, 下, 左, 右} 中取一个,原样返回。", "answer": "{\"D线桥位置\": \"上\", \"桩号增大方向\": \"左\"}"}, {"id": "MS-U10-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“匝道D线桥立面布置”的纵断面表中,桩号 K0+000、K0+020、K0+040、K0+060 处的地面高程各是多少?返回 JSON 对象,字段名固定为 K0+000、K0+020、K0+040、K0+060,每个字段为 {value, unit},单位 m。", "answer": "{\"K0+000\": {\"value\": 242.832, \"unit\": \"m\"}, \"K0+020\": {\"value\": 248.618, \"unit\": \"m\"}, \"K0+040\": {\"value\": 254.118, \"unit\": \"m\"}, \"K0+060\": {\"value\": 257.748, \"unit\": \"m\"}}"}, {"id": "MS-U10-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“匝道D线桥立面布置”中,沿桩号增大方向,变坡点 SJD1 之前和之后的两段设计纵坡各是上坡还是下坡?返回 JSON 对象,字段名固定为 前、后,每个字段从 {上坡, 下坡} 中取一个,原样返回。", "answer": "{\"前\": \"上坡\", \"后\": \"下坡\"}"}, {"id": "MS-U10-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“匝道D线桥桥位图”上,匝道D线桥 0# 和 1# 桥台轴线的桩号各是多少?返回 JSON 对象,字段名固定为 0#、1#,桩号按图中写法原样返回(形如 K1+234.567)。", "answer": "{\"0#\": \"K0+008.655\", \"1#\": \"K0+043.655\"}"}, {"id": "MS-U10-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "与主线3号桥0#桥台紧邻并排的那座匝道D线桥桥台,其桥台轴线桩号是多少?桩号按图中写法原样返回(形如 K1+234.567)。", "answer": "\"K0+043.655\""}, {"id": "MS-U10-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "与主线3号桥1#桥台紧邻并排的那座匝道D线桥桥台,其桥台轴线桩号是多少?桩号按图中写法原样返回(形如 K1+234.567)。", "answer": "\"K0+008.655\""}]} {"page_01_file_name": "images/MS-U10-06/few_sheet/01.png", "page_02_file_name": "images/MS-U10-06/few_sheet/02.png", "page_03_file_name": "images/MS-U10-06/few_sheet/03.png", "page_04_file_name": "images/MS-U10-06/few_sheet/04.png", "page_05_file_name": "images/MS-U10-06/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U10-06", "set": "U10", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "关于匝道D线桥桥面范围内的那处凹形竖曲线,下列说法哪些正确?", "options": [{"key": "A", "text": "0#桥台轴线处桥面设计高程比1#桥台轴线处高", "correct": true}, {"key": "B", "text": "1#桥台轴线处桥面设计高程比 K0+040 处高", "correct": false}, {"key": "C", "text": "该竖曲线半径为 1200 m", "correct": false}, {"key": "D", "text": "桥上并没有凹形竖曲线,桥上那处竖曲线是凸形的", "correct": true}, {"key": "E", "text": "0#桥台轴线处桥面设计高程比 K0+000 处高", "correct": true}, {"key": "F", "text": "1#桥台轴线处桥面设计高程为 257.956 m", "correct": false}], "answer": ["A", "D", "E"], "few_sheet_pages": [6, 2, 7, 5, 3], "evidence_pages": [3, 5, 6], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U10-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“匝道D线桥立面布置”中,沿桩号增大方向,变坡点 SJD1 之前和之后的两段设计纵坡各是上坡还是下坡?返回 JSON 对象,字段名固定为 前、后,每个字段从 {上坡, 下坡} 中取一个,原样返回。", "answer": "{\"前\": \"上坡\", \"后\": \"下坡\"}"}, {"id": "MS-U10-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“匝道D线桥立面布置”的纵断面表中,桩号 K0+000、K0+040 处的设计高程各是多少?返回 JSON 对象,字段名固定为 K0+000、K0+040,每个字段为 {value, unit},单位 m。", "answer": "{\"K0+000\": {\"value\": 257.937, \"unit\": \"m\"}, \"K0+040\": {\"value\": 257.504, \"unit\": \"m\"}}"}, {"id": "MS-U10-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥地质横断面图”(1/2)(分张序号按图框右上角“第 x 页 共 y 页”)上,匝道D K0+043.655 处标注的桥面设计高程 Hs 是多少?返回数值和单位(m)。", "answer": "{\"value\": 257.385, \"unit\": \"m\"}"}, {"id": "MS-U10-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥地质横断面图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)上,匝道D K0+008.655 处标注的桥面设计高程 Hs 是多少?返回数值和单位(m)。", "answer": "{\"value\": 257.956, \"unit\": \"m\"}"}, {"id": "MS-U10-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“匝道D线桥立面布置”的纵断面表中,“直线及平曲线”栏标注的曲线半径 R 是多少?返回数值和单位(m)。", "answer": "{\"value\": 1200, \"unit\": \"m\"}"}, {"id": "MS-U10-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥1#桥台轴线处的桥面设计高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 257.385, \"unit\": \"m\"}"}, {"id": "MS-U10-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥0#桥台轴线处的桥面设计高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 257.956, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U10-07/few_sheet/01.png", "page_02_file_name": "images/MS-U10-07/few_sheet/02.png", "page_03_file_name": "images/MS-U10-07/few_sheet/03.png", "page_04_file_name": "images/MS-U10-07/few_sheet/04.png", "page_05_file_name": "images/MS-U10-07/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U10-07", "set": "U10", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿匝道D线桥现浇箱梁从任一端梁端走向跨中,下列\"前一处 → 紧接的下一处\"中,哪些正确?", "options": [{"key": "A", "text": "底板 φ100 泄水孔所在处 → 腹板厚 500 mm、顶板厚 250 mm、底板厚 220 mm 的截面", "correct": true}, {"key": "B", "text": "腹板厚 900 mm、底板厚 470 mm 的截面 → 底板 φ100 泄水孔所在处", "correct": true}, {"key": "C", "text": "支座中心线 → 腹板厚 900 mm、底板厚 470 mm 的截面", "correct": true}, {"key": "D", "text": "梁端实心截面 → 腹板厚 900 mm、底板厚 470 mm 的截面", "correct": false}, {"key": "E", "text": "腹板厚 900 mm、底板厚 470 mm 的截面 → 腹板厚 500 mm、顶板厚 250 mm、底板厚 220 mm 的截面", "correct": false}, {"key": "F", "text": "底板 φ100 泄水孔所在处 → 腹板厚 900 mm、底板厚 470 mm 的截面", "correct": false}], "answer": ["A", "B", "C"], "few_sheet_pages": [9, 10, 8, 7, 4], "evidence_pages": [7, 8, 9], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U10-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥现浇箱梁一般构造图”(3/3)(分张序号按图框右上角“第 x 页 共 y 页”)中的 2-2 断面,腹板厚度和底板厚度各是多少?返回 JSON 对象,字段名固定为 腹板厚、底板厚,每个字段为 {value, unit},单位 mm。", "answer": "{\"腹板厚\": {\"value\": 900, \"unit\": \"mm\"}, \"底板厚\": {\"value\": 470, \"unit\": \"mm\"}}"}, {"id": "MS-U10-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥现浇箱梁一般构造图”(3/3)(分张序号按图框右上角“第 x 页 共 y 页”)中的 3-3 断面,腹板厚度、顶板厚度和底板厚度各是多少?返回 JSON 对象,字段名固定为 腹板厚、顶板厚、底板厚,每个字段为 {value, unit},单位 mm。", "answer": "{\"腹板厚\": {\"value\": 500, \"unit\": \"mm\"}, \"顶板厚\": {\"value\": 250, \"unit\": \"mm\"}, \"底板厚\": {\"value\": 220, \"unit\": \"mm\"}}"}, {"id": "MS-U10-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥现浇箱梁一般构造图”(1/3)(分张序号按图框右上角“第 x 页 共 y 页”)的“立面”上,支座中心线距梁端(箱梁端面)的距离是多少?返回数值和单位(mm)。", "answer": "{\"value\": 600, \"unit\": \"mm\"}"}, {"id": "MS-U10-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥现浇箱梁一般构造图”(2/3)(分张序号按图框右上角“第 x 页 共 y 页”)的“底平面”上,底板 φ100 泄水孔距梁端(箱梁端面)的距离是多少(按图中分段尺寸相加)?返回数值和单位(mm)。", "answer": "{\"value\": 6500, \"unit\": \"mm\"}"}, {"id": "MS-U10-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥现浇箱梁一般构造图”(1/3)(分张序号按图框右上角“第 x 页 共 y 页”)的“立面”上,剖切线 2-2 和 3-3 各距较近一端梁端(箱梁端面)多远?3-3 没有直接标注时按分段尺寸推算。返回 JSON 对象,字段名固定为 2-2、3-3,每个字段为 {value, unit},单位 mm。", "answer": "{\"2-2\": {\"value\": 1500, \"unit\": \"mm\"}, \"3-3\": {\"value\": 17450, \"unit\": \"mm\"}}"}, {"id": "MS-U10-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥现浇箱梁上,腹板厚 900 mm、底板厚 470 mm 的那个截面,剖切位置距较近一端梁端(箱梁端面)多远?返回数值和单位(mm)。", "answer": "{\"value\": 1500, \"unit\": \"mm\"}"}, {"id": "MS-U10-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥现浇箱梁上,腹板厚 500 mm、顶板厚 250 mm、底板厚 220 mm 的那个截面,剖切位置距较近一端梁端(箱梁端面)多远?返回数值和单位(mm)。", "answer": "{\"value\": 17450, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U10-08/few_sheet/01.png", "page_02_file_name": "images/MS-U10-08/few_sheet/02.png", "page_03_file_name": "images/MS-U10-08/few_sheet/03.png", "page_04_file_name": "images/MS-U10-08/few_sheet/04.png", "page_05_file_name": "images/MS-U10-08/few_sheet/05.png", "page_06_file_name": "images/MS-U10-08/few_sheet/06.png", "page_07_file_name": "images/MS-U10-08/few_sheet/07.png", "page_08_file_name": "images/MS-U10-08/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U10-08", "set": "U10", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "匝道D线桥两个桥台的下列构造尺寸中,哪些在两端桥台上相同?", "options": [{"key": "A", "text": "桥台轴线至台尾的长度", "correct": false}, {"key": "B", "text": "台帽高度", "correct": true}, {"key": "C", "text": "前墙(台身)高度", "correct": false}, {"key": "D", "text": "基础横桥向宽度", "correct": true}, {"key": "E", "text": "基础顺桥向长度", "correct": false}, {"key": "F", "text": "基础厚度", "correct": false}], "answer": ["B", "D"], "few_sheet_pages": [5, 13, 6, 11, 12, 4, 14, 7], "evidence_pages": [5, 6, 11, 12, 13, 14], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U10-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥桥台一般构造图”(1/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥台正立面”上,台帽高度、基础横桥向宽度、基础厚度各是多少?返回 JSON 对象,字段名固定为 台帽高、基础宽、基础厚,每个字段为 {value, unit},单位 mm。", "answer": "{\"台帽高\": {\"value\": 800, \"unit\": \"mm\"}, \"基础宽\": {\"value\": 10240, \"unit\": \"mm\"}, \"基础厚\": {\"value\": 1500, \"unit\": \"mm\"}}"}, {"id": "MS-U10-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥桥台一般构造图”(3/4)(分张序号按图框右上角“第 x 页 共 y 页”)的“桥台正立面”上,台帽高度、基础横桥向宽度(分段标注时相加)、基础厚度各是多少?返回 JSON 对象,字段名固定为 台帽高、基础宽、基础厚,每个字段为 {value, unit},单位 mm。", "answer": "{\"台帽高\": {\"value\": 800, \"unit\": \"mm\"}, \"基础宽\": {\"value\": 10240, \"unit\": \"mm\"}, \"基础厚\": {\"value\": 2300, \"unit\": \"mm\"}}"}, {"id": "MS-U10-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥桥台一般构造图”(2/4)(分张序号按图框右上角“第 x 页 共 y 页”)上,桥台轴线至台尾的长度(“桥台平面”中轴线①至①′的距离)和“桥台侧立面”上的基础顺桥向长度各是多少?返回 JSON 对象,字段名固定为 轴线至台尾、基础长,每个字段为 {value, unit},单位 mm。", "answer": "{\"轴线至台尾\": {\"value\": 6000, \"unit\": \"mm\"}, \"基础长\": {\"value\": 7900, \"unit\": \"mm\"}}"}, {"id": "MS-U10-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道D线桥桥台一般构造图”(4/4)(分张序号按图框右上角“第 x 页 共 y 页”)上,桥台轴线至台尾的长度(“桥台平面”中轴线⓪至⓪′的距离)和“桥台侧立面”上的基础顺桥向长度各是多少?返回 JSON 对象,字段名固定为 轴线至台尾、基础长,每个字段为 {value, unit},单位 mm。", "answer": "{\"轴线至台尾\": {\"value\": 5000, \"unit\": \"mm\"}, \"基础长\": {\"value\": 6900, \"unit\": \"mm\"}}"}, {"id": "MS-U10-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "两张“支坪立交匝道D线桥地质横断面图”上,匝道D K0+043.655 处和匝道D K0+008.655 处桥台的台身(前墙)高度标注各是多少?返回 JSON 对象,字段名固定为 K0+043.655、K0+008.655,每个字段为 {value, unit},单位 mm。", "answer": "{\"K0+043.655\": {\"value\": 7500, \"unit\": \"mm\"}, \"K0+008.655\": {\"value\": 7610, \"unit\": \"mm\"}}"}, {"id": "MS-U10-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥0#桥台的基础厚度和基础顺桥向长度各是多少?返回 JSON 对象,字段名固定为 基础厚、基础长,每个字段为 {value, unit},单位 mm。", "answer": "{\"基础厚\": {\"value\": 2300, \"unit\": \"mm\"}, \"基础长\": {\"value\": 6900, \"unit\": \"mm\"}}"}, {"id": "MS-U10-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥1#桥台的台身(前墙)高度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 7500, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U11-01/few_sheet/01.png", "page_02_file_name": "images/MS-U11-01/few_sheet/02.png", "page_03_file_name": "images/MS-U11-01/few_sheet/03.png", "page_04_file_name": "images/MS-U11-01/few_sheet/04.png", "page_05_file_name": "images/MS-U11-01/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U11-01", "set": "U11", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "两座梯道的中间休息平台下各由一根梯柱支承,梯柱下设钻孔桩。关于梯柱及梯道的支承,下列说法哪些正确?", "options": [{"key": "A", "text": "梯柱下并没有桩,梯柱直接坐在 C20 砼垫层上", "correct": false}, {"key": "B", "text": "梯道钢梁主体为宽 600 mm、高 300 mm 的箱形截面", "correct": true}, {"key": "C", "text": "梯柱两侧的上、下梯段,水平投影各为 17×300 mm", "correct": true}, {"key": "D", "text": "梯柱设在梯道最下端、与梯道台相接处", "correct": false}, {"key": "E", "text": "梯柱下的桩径为 1000 mm", "correct": true}, {"key": "F", "text": "梯道台下同样设有钻孔桩", "correct": false}], "answer": ["B", "C", "E"], "few_sheet_pages": [7, 6, 8, 2, 3], "evidence_pages": [3, 6, 8], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U11-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥标准横断面图”的“人行天桥梯道标准横断面”中,梯柱下钻孔桩的直径是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1000, \"unit\": \"mm\"}"}, {"id": "MS-U11-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道台一般构造图”的“梯道台立面一般构造(B#梯道台)”中,台身底面下方那一层的混凝土强度等级(按图中写法,形如 C25)和该层每侧伸出台身的宽度各是多少?返回 JSON 对象,字段名固定为 强度等级、每侧伸出宽度;强度等级为字符串,每侧伸出宽度为 {value, unit},单位 mm。", "answer": "{\"强度等级\": \"C20\", \"每侧伸出宽度\": {\"value\": 200, \"unit\": \"mm\"}}"}, {"id": "MS-U11-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道梁一般构造图”的“1--1”断面中,梯道梁断面的两个总尺寸(水平向、竖向)各是多少?返回 JSON 对象,字段名固定为 水平向、竖向,每个字段为 {value, unit},单位 mm。", "answer": "{\"水平向\": {\"value\": 600, \"unit\": \"mm\"}, \"竖向\": {\"value\": 300, \"unit\": \"mm\"}}"}, {"id": "MS-U11-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道梁一般构造图”立面图中,两段梯段各自的水平投影(按“n*300”相乘)是多少?返回 JSON 对象,字段名固定为 下段梯段、上段梯段,每个字段为 {value, unit},单位 mm。", "answer": "{\"下段梯段\": {\"value\": 5100, \"unit\": \"mm\"}, \"上段梯段\": {\"value\": 5100, \"unit\": \"mm\"}}"}, {"id": "MS-U11-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道梁一般构造图”立面图中,标注“梯柱轴线”的那条竖线所在水平段的标注长度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2000, \"unit\": \"mm\"}"}, {"id": "MS-U11-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "人行天桥梯道中间平台下梯柱的钻孔桩直径是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1000, \"unit\": \"mm\"}"}, {"id": "MS-U11-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "人行天桥梯道底端的梯道台,台身底面下方那一层的混凝土强度等级(按图中写法,形如 C25)和该层每侧伸出台身的宽度各是多少?返回 JSON 对象,字段名固定为 强度等级、每侧伸出宽度;强度等级为字符串,每侧伸出宽度为 {value, unit},单位 mm。", "answer": "{\"强度等级\": \"C20\", \"每侧伸出宽度\": {\"value\": 200, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U11-02/few_sheet/01.png", "page_02_file_name": "images/MS-U11-02/few_sheet/02.png", "page_03_file_name": "images/MS-U11-02/few_sheet/03.png", "page_04_file_name": "images/MS-U11-02/few_sheet/04.png", "page_05_file_name": "images/MS-U11-02/few_sheet/05.png", "page_06_file_name": "images/MS-U11-02/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U11-02", "set": "U11", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于人行天桥主桥纵坡的坡向、墩顶支座的布置方向,以及梯道两端的搭接位置,下列说法哪些正确?", "options": [{"key": "A", "text": "梯道台上的两个支座沿梯道行走方向一前一后布置", "correct": false}, {"key": "B", "text": "板式橡胶支座 300 mm 的边沿横桥向布置", "correct": true}, {"key": "C", "text": "梯道钢梁上端搭在主桥钢箱梁上,下端支承在梯道台的支座上", "correct": true}, {"key": "D", "text": "墩顶两个板式橡胶支座沿横桥向并排布置,中心距 1600 mm", "correct": true}, {"key": "E", "text": "梯道台的混凝土踏步设在台身靠支座、挡块的一端", "correct": false}, {"key": "F", "text": "沿主桥纵向,桥面由⓪号墩一端向①号墩一端下坡(1.0%)", "correct": true}], "answer": ["B", "C", "D", "F"], "few_sheet_pages": [5, 2, 4, 7, 6, 8], "evidence_pages": [4, 7, 8, 6], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U11-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥箱梁一般构造图”(1/2)(分张序号按图框右上角“第 x 页 共 y 页”)的“支坪立交一号人行天桥钢箱梁立面构造”中,“1.0%”箭头在图面上指向左还是右?⓪ 号墩在图面的哪一端?返回 JSON 对象,字段名固定为 箭头指向、0号墩位置,每个字段从 {左, 右} 中取一个。", "answer": "{\"箭头指向\": \"右\", \"0号墩位置\": \"左\"}"}, {"id": "MS-U11-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥桥墩一般构造图”中,墩顶总宽 2100 所在立面的方向标注是什么?“3--3”平面中板式橡胶支座沿 2100 方向和沿 800 方向的边长、两支座中心距各是多少?返回 JSON 对象,字段名固定为 2100所在方向、沿2100边长、沿800边长、中心距;2100所在方向从 {横桥向, 顺桥向} 中取一个,其余为 {value, unit},单位 mm。", "answer": "{\"2100所在方向\": \"横桥向\", \"沿2100边长\": {\"value\": 300, \"unit\": \"mm\"}, \"沿800边长\": {\"value\": 250, \"unit\": \"mm\"}, \"中心距\": {\"value\": 1600, \"unit\": \"mm\"}}"}, {"id": "MS-U11-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道台一般构造图”的“2--2”平面中,“支座”“挡块”所在条带的宽度(顺梯道方向)和长度,以及该条带与踏步段之间台顶段的长度各是多少?返回 JSON 对象,字段名固定为 条带宽度、条带长度、台顶段长度,每个字段为 {value, unit},单位 mm。", "answer": "{\"条带宽度\": {\"value\": 360, \"unit\": \"mm\"}, \"条带长度\": {\"value\": 3900, \"unit\": \"mm\"}, \"台顶段长度\": {\"value\": 1790, \"unit\": \"mm\"}}"}, {"id": "MS-U11-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道梁一般构造图”的“5--5”断面中,梯道梁上端所接、标在断面顶部引线上的构件名称是什么?按图中写法原样返回。", "answer": "\"钢箱梁顶板\""}, {"id": "MS-U11-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道台一般构造图”的“梯道台立面一般构造(B#梯道台)”中,支座左侧竖向尺寸自台顶向下的第一段是多少?返回数值和单位(mm)。", "answer": "{\"value\": 450, \"unit\": \"mm\"}"}, {"id": "MS-U11-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "人行天桥主桥墩顶两个板式橡胶支座的中心距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1600, \"unit\": \"mm\"}"}, {"id": "MS-U11-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "人行天桥主桥墩顶板式橡胶支座沿横桥向和沿顺桥向的边长各是多少?返回 JSON 对象,字段名固定为 横桥向、顺桥向,每个字段为 {value, unit},单位 mm。", "answer": "{\"横桥向\": {\"value\": 300, \"unit\": \"mm\"}, \"顺桥向\": {\"value\": 250, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U11-03/few_sheet/01.png", "page_02_file_name": "images/MS-U11-03/few_sheet/02.png", "page_03_file_name": "images/MS-U11-03/few_sheet/03.png", "page_04_file_name": "images/MS-U11-03/few_sheet/04.png", "page_05_file_name": "images/MS-U11-03/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U11-03", "set": "U11", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "在主桥⓪号墩处,从钢箱梁向下直到桩基,竖向依次相接的构件或部位中,下列\"上一个 → 紧接其下的一个\"哪些正确?", "options": [{"key": "A", "text": "墩身等截面段 → 桩长 8500 mm 的 φ1500 钻孔桩", "correct": true}, {"key": "B", "text": "墩身等截面段 → 桩长 6000 mm 的 φ1500 钻孔桩", "correct": false}, {"key": "C", "text": "钢箱梁底板 → 板式橡胶支座(GJZ 250×300×63)", "correct": true}, {"key": "D", "text": "墩顶 200 mm 等厚段 → 墩身横桥向圆弧变宽段(高 2500 mm)", "correct": true}, {"key": "E", "text": "钢箱梁底板 → 墩身横桥向圆弧变宽段", "correct": false}, {"key": "F", "text": "板式橡胶支座 → 墩身横桥向圆弧变宽段", "correct": false}], "answer": ["A", "C", "D"], "few_sheet_pages": [2, 6, 5, 8, 7], "evidence_pages": [5, 7, 2], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U11-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥桥墩一般构造图”的“桥墩一般构造”(横桥向)中,墩身左侧竖向尺寸线自墩顶 H1 向下的前两段各是多少?返回 JSON 对象,字段名固定为 第1段、第2段,每个字段为 {value, unit},单位 mm。", "answer": "{\"第1段\": {\"value\": 200, \"unit\": \"mm\"}, \"第2段\": {\"value\": 2500, \"unit\": \"mm\"}}"}, {"id": "MS-U11-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥桥墩一般构造图”的“桥墩一般构造”(横桥向)中,板式橡胶支座所在面、墩身底面(桩顶)、桩底面分别标注的标高符号是什么?返回 JSON 对象,字段名固定为 支座所在面、墩身底面、桩底面,每个字段按图中写法返回(形如 H3)。", "answer": "{\"支座所在面\": \"H1\", \"墩身底面\": \"H2\", \"桩底面\": \"H4\"}"}, {"id": "MS-U11-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥立面图”中,⓪ 号墩下钻孔桩的直径和桩长各是多少?返回 JSON 对象,字段名固定为 桩径、桩长,每个字段为 {value, unit},单位 mm。", "answer": "{\"桩径\": {\"value\": 1500, \"unit\": \"mm\"}, \"桩长\": {\"value\": 8500, \"unit\": \"mm\"}}"}, {"id": "MS-U11-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥立面图”中,⓪ 号墩左侧竖向尺寸线上,墩顶至桩顶的那一段标注是多少?返回数值和单位(mm)。", "answer": "{\"value\": 6000, \"unit\": \"mm\"}"}, {"id": "MS-U11-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "人行天桥主桥 ⓪ 号墩下钻孔桩的直径和桩长各是多少?返回 JSON 对象,字段名固定为 桩径、桩长,每个字段为 {value, unit},单位 mm。", "answer": "{\"桩径\": {\"value\": 1500, \"unit\": \"mm\"}, \"桩长\": {\"value\": 8500, \"unit\": \"mm\"}}"}, {"id": "MS-U11-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "人行天桥主桥桥墩自墩顶向下,墩顶等厚段和横桥向圆弧变宽段的高度各是多少?返回 JSON 对象,字段名固定为 墩顶等厚段、圆弧变宽段,每个字段为 {value, unit},单位 mm。", "answer": "{\"墩顶等厚段\": {\"value\": 200, \"unit\": \"mm\"}, \"圆弧变宽段\": {\"value\": 2500, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U11-04/few_sheet/01.png", "page_02_file_name": "images/MS-U11-04/few_sheet/02.png", "page_03_file_name": "images/MS-U11-04/few_sheet/03.png", "page_04_file_name": "images/MS-U11-04/few_sheet/04.png", "page_05_file_name": "images/MS-U11-04/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U11-04", "set": "U11", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "行人从一端梯道底走上天桥、过桥再走到另一端。沿行走方向既无纵坡、也无踏步(即水平)的通行面有哪些?", "options": [{"key": "A", "text": "梯道的钢梯段", "correct": false}, {"key": "B", "text": "主桥⓪号墩与①号墩之间的整段桥面", "correct": false}, {"key": "C", "text": "梯道台的顶面(台上踏步以上部分)", "correct": true}, {"key": "D", "text": "梯道上、下两段梯段之间的休息平台", "correct": true}, {"key": "E", "text": "主桥钢箱梁两端与梯道相接的平台段", "correct": true}, {"key": "F", "text": "梯道台远离支座一端的部分", "correct": false}], "answer": ["C", "D", "E"], "few_sheet_pages": [6, 4, 2, 5, 8], "evidence_pages": [4, 6, 8], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U11-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥箱梁一般构造图”(1/2)(分张序号按图框右上角“第 x 页 共 y 页”)的“支坪立交一号人行天桥钢箱梁立面构造”中,下方分段尺寸自 ⓪ 号墩一端起依次三段(平台段、纵坡段、平台段)的长度各是多少(纵坡段按“n*2000”相乘)?返回 JSON 对象,字段名固定为 第1段、第2段、第3段,每个字段为 {value, unit},单位 mm。", "answer": "{\"第1段\": {\"value\": 3900, \"unit\": \"mm\"}, \"第2段\": {\"value\": 12000, \"unit\": \"mm\"}, \"第3段\": {\"value\": 4079, \"unit\": \"mm\"}}"}, {"id": "MS-U11-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道梁一般构造图”立面图中,两段梯段之间水平段的长度、踏步宽度和踏步高度各是多少?返回 JSON 对象,字段名固定为 中间水平段长度、踏步宽度、踏步高度,每个字段为 {value, unit},单位 mm。", "answer": "{\"中间水平段长度\": {\"value\": 2000, \"unit\": \"mm\"}, \"踏步宽度\": {\"value\": 300, \"unit\": \"mm\"}, \"踏步高度\": {\"value\": 150, \"unit\": \"mm\"}}"}, {"id": "MS-U11-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道台一般构造图”的“梯道台立面一般构造(B#梯道台)”中,台顶标高线所在水平段的长度、台上踏步段的水平总长(按“n x 300”相乘)和踏步段的竖向总高(按“n x 150”相乘)各是多少?返回 JSON 对象,字段名固定为 台顶水平段、踏步段水平总长、踏步段竖向总高,每个字段为 {value, unit},单位 mm。", "answer": "{\"台顶水平段\": {\"value\": 1790, \"unit\": \"mm\"}, \"踏步段水平总长\": {\"value\": 1800, \"unit\": \"mm\"}, \"踏步段竖向总高\": {\"value\": 900, \"unit\": \"mm\"}}"}, {"id": "MS-U11-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "人行天桥主桥钢箱梁自 ⓪ 号墩一端起,平台段、纵坡段、平台段的长度各是多少?返回 JSON 对象,字段名固定为 第1段、第2段、第3段,每个字段为 {value, unit},单位 mm。", "answer": "{\"第1段\": {\"value\": 3900, \"unit\": \"mm\"}, \"第2段\": {\"value\": 12000, \"unit\": \"mm\"}, \"第3段\": {\"value\": 4079, \"unit\": \"mm\"}}"}, {"id": "MS-U11-04-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "人行天桥梯道上、下两段梯段之间那段水平段的长度,以及梯段的踏步宽度、踏步高度各是多少?返回 JSON 对象,字段名固定为 中间水平段长度、踏步宽度、踏步高度,每个字段为 {value, unit},单位 mm。", "answer": "{\"中间水平段长度\": {\"value\": 2000, \"unit\": \"mm\"}, \"踏步宽度\": {\"value\": 300, \"unit\": \"mm\"}, \"踏步高度\": {\"value\": 150, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U11-05/few_sheet/01.png", "page_02_file_name": "images/MS-U11-05/few_sheet/02.png", "page_03_file_name": "images/MS-U11-05/few_sheet/03.png", "page_04_file_name": "images/MS-U11-05/few_sheet/04.png", "page_05_file_name": "images/MS-U11-05/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U11-05", "set": "U11", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "行人从 B# 梯道台起步,沿梯道一路走上主桥。沿途依次经过的通行段中,下列\"前一段 → 紧接的下一段\"哪些正确?", "options": [{"key": "A", "text": "B#梯道台上的 6 级混凝土踏步 → 下段钢梯段", "correct": false}, {"key": "B", "text": "上段钢梯段 → 主桥钢箱梁的纵坡段", "correct": false}, {"key": "C", "text": "上段钢梯段 → 梯道中间休息平台", "correct": false}, {"key": "D", "text": "梯道台顶面的水平段 → 梯道中间休息平台", "correct": false}, {"key": "E", "text": "梯道台顶面的水平段 → 下段钢梯段", "correct": true}, {"key": "F", "text": "梯道中间休息平台 → 主桥钢箱梁端部的平台段", "correct": false}], "answer": ["E"], "few_sheet_pages": [4, 5, 8, 2, 6], "evidence_pages": [8, 6, 4], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U11-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道台一般构造图”的“梯道台立面一般构造(B#梯道台)”中,顶部水平分段尺寸自“支座”一端起依次三段各是多少(踏步段按“n x 300”相乘)?返回 JSON 对象,字段名固定为 第1段、第2段、第3段,每个字段为 {value, unit},单位 mm。", "answer": "{\"第1段\": {\"value\": 360, \"unit\": \"mm\"}, \"第2段\": {\"value\": 1790, \"unit\": \"mm\"}, \"第3段\": {\"value\": 1800, \"unit\": \"mm\"}}"}, {"id": "MS-U11-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道梁一般构造图”立面图中,自下端起:下段梯段的水平投影(按“n*300”相乘)、中间水平段长度、上段梯段的水平投影各是多少?返回 JSON 对象,字段名固定为 下段梯段、中间水平段、上段梯段,每个字段为 {value, unit},单位 mm。", "answer": "{\"下段梯段\": {\"value\": 5100, \"unit\": \"mm\"}, \"中间水平段\": {\"value\": 2000, \"unit\": \"mm\"}, \"上段梯段\": {\"value\": 5100, \"unit\": \"mm\"}}"}, {"id": "MS-U11-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥箱梁一般构造图”(1/2)(分张序号按图框右上角“第 x 页 共 y 页”)的“支坪立交一号人行天桥钢箱梁立面构造”中,两端平台段的长度各是多少?返回 JSON 对象,字段名固定为 0号墩端、1号墩端,每个字段为 {value, unit},单位 mm。", "answer": "{\"0号墩端\": {\"value\": 3900, \"unit\": \"mm\"}, \"1号墩端\": {\"value\": 4079, \"unit\": \"mm\"}}"}, {"id": "MS-U11-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道梁一般构造图”的“5--5”断面中,梯道梁上端所接、标在断面顶部引线上的构件名称是什么?按图中写法原样返回。", "answer": "\"钢箱梁顶板\""}, {"id": "MS-U11-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "台上设 6 级混凝土踏步的那座梯道台,台顶自支座一端起的三段水平尺寸各是多少(踏步段按水平总长)?返回 JSON 对象,字段名固定为 第1段、第2段、第3段,每个字段为 {value, unit},单位 mm。", "answer": "{\"第1段\": {\"value\": 360, \"unit\": \"mm\"}, \"第2段\": {\"value\": 1790, \"unit\": \"mm\"}, \"第3段\": {\"value\": 1800, \"unit\": \"mm\"}}"}, {"id": "MS-U11-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "人行天桥主桥钢箱梁两端平台段的长度各是多少?返回 JSON 对象,字段名固定为 0号墩端、1号墩端,每个字段为 {value, unit},单位 mm。", "answer": "{\"0号墩端\": {\"value\": 3900, \"unit\": \"mm\"}, \"1号墩端\": {\"value\": 4079, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U11-06/few_sheet/01.png", "page_02_file_name": "images/MS-U11-06/few_sheet/02.png", "page_03_file_name": "images/MS-U11-06/few_sheet/03.png", "page_04_file_name": "images/MS-U11-06/few_sheet/04.png", "page_05_file_name": "images/MS-U11-06/few_sheet/05.png", "page_06_file_name": "images/MS-U11-06/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U11-06", "set": "U11", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "人行天桥(主桥、两座梯道及梯道底端的梯道台)的下列组成部分中,哪些是用钢板焊接制作的?", "options": [{"key": "A", "text": "主桥的主梁", "correct": true}, {"key": "B", "text": "梯道桥面铺装层", "correct": false}, {"key": "C", "text": "主桥桥面铺装层", "correct": false}, {"key": "D", "text": "梯道上、下两段梯段的承重梁及中间休息平台梁", "correct": true}, {"key": "E", "text": "梯道台两端的挡块", "correct": false}, {"key": "F", "text": "梯道底端的梯道台", "correct": false}], "answer": ["A", "D"], "few_sheet_pages": [7, 4, 8, 6, 3, 2], "evidence_pages": [4, 6, 8, 3], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U11-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥标准横断面图”中,“人行天桥主桥标准横断面”和“人行天桥梯道标准横断面”的桥面铺装引线标注里,3mm 厚聚氨酯彩色薄层之下那一层(20mm 厚)的材料各是什么?返回 JSON 对象,字段名固定为 主桥、梯道,每个字段从 {C30细石混凝土, 水泥砂浆找平层, 改性沥青混凝土, 防水混凝土} 中取一个,原样返回。", "answer": "{\"主桥\": \"C30细石混凝土\", \"梯道\": \"水泥砂浆找平层\"}"}, {"id": "MS-U11-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道台一般构造图”的说明第 2 条中,梯道台及挡块所用混凝土的强度等级、混凝土类别和施工方式各是什么?返回 JSON 对象,字段名固定为 强度等级、混凝土类别、施工方式;强度等级按图中写法返回(形如 C25),混凝土类别从 {素混凝土, 钢筋混凝土} 中取一个,施工方式从 {现浇, 预制} 中取一个。", "answer": "{\"强度等级\": \"C30\", \"混凝土类别\": \"素混凝土\", \"施工方式\": \"现浇\"}"}, {"id": "MS-U11-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道梁一般构造图”中,说明里“凡未注明的焊缝厚度”是多少?立面图中 ⑨ 号踏步板标注的板厚 t 是多少?返回 JSON 对象,字段名固定为 未注明焊缝厚度、踏步板厚度,每个字段为 {value, unit},单位 mm。", "answer": "{\"未注明焊缝厚度\": {\"value\": 6, \"unit\": \"mm\"}, \"踏步板厚度\": {\"value\": 8, \"unit\": \"mm\"}}"}, {"id": "MS-U11-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥箱梁一般构造图”(1/2)(分张序号按图框右上角“第 x 页 共 y 页”)中,两幅主视图的图名(形如“支坪立交一号人行天桥××顶平面构造”“支坪立交一号人行天桥××立面构造”)里,“××”处的构件名称是什么?按图中写法原样返回。", "answer": "\"钢箱梁\""}, {"id": "MS-U11-06-R5", "role": "read", "tiers": ["full_set"], "question": "“支坪立交1号人行天桥箱梁一般构造图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)中,① 号板件平面图上标注的板厚 t 是多少?说明里“凡未注明的焊缝厚度”是多少?返回 JSON 对象,字段名固定为 1号板厚度、未注明焊缝厚度,每个字段为 {value, unit},单位 mm。", "answer": "{\"1号板厚度\": {\"value\": 14, \"unit\": \"mm\"}, \"未注明焊缝厚度\": {\"value\": 6, \"unit\": \"mm\"}}"}, {"id": "MS-U11-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "人行天桥梯道底端的梯道台及其挡块,所用混凝土的强度等级是什么?按图中写法返回(形如 C25)。", "answer": "\"C30\""}, {"id": "MS-U11-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "人行天桥梯道钢梁箱形截面的腹板厚度和顶、底板厚度各是多少?返回 JSON 对象,字段名固定为 腹板厚度、顶底板厚度,每个字段为 {value, unit},单位 mm。", "answer": "{\"腹板厚度\": {\"value\": 12, \"unit\": \"mm\"}, \"顶底板厚度\": {\"value\": 14, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U11-07/few_sheet/01.png", "page_02_file_name": "images/MS-U11-07/few_sheet/02.png", "page_03_file_name": "images/MS-U11-07/few_sheet/03.png", "page_04_file_name": "images/MS-U11-07/few_sheet/04.png", "page_05_file_name": "images/MS-U11-07/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U11-07", "set": "U11", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "关于主桥⓪号墩(立面图上标出墩高与桩长的那个墩)及其墩顶支承,下列数值哪些正确?", "options": [{"key": "A", "text": "桩基嵌岩深度要求不小于 3.0 m", "correct": false}, {"key": "B", "text": "墩身下部等截面段长 3500 mm", "correct": false}, {"key": "C", "text": "墩顶两支座中心距比钢箱梁底宽小 500 mm", "correct": true}, {"key": "D", "text": "桩基嵌岩深度要求不小于 4.5 m", "correct": true}, {"key": "E", "text": "墩身下部等截面段长 3300 mm", "correct": true}, {"key": "F", "text": "墩顶横桥向宽度与钢箱梁底宽相同,均为 2100 mm", "correct": true}], "answer": ["C", "D", "E", "F"], "few_sheet_pages": [7, 8, 5, 6, 2], "evidence_pages": [2, 7, 5], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U11-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥立面图”中,⓪ 号墩左侧竖向尺寸线上,墩顶至桩顶的那一段标注是多少?返回数值和单位(mm)。", "answer": "{\"value\": 6000, \"unit\": \"mm\"}"}, {"id": "MS-U11-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥桥墩一般构造图”的“桥墩一般构造”(横桥向)中,墩身左侧竖向尺寸线自墩顶向下的三段各标为多少?返回 JSON 对象,字段名固定为 第1段、第2段、第3段;数值段写数值(不带单位),以符号表示的段照写图中表达式。", "answer": "{\"第1段\": \"200\", \"第2段\": \"2500\", \"第3段\": \"DL-2700\"}"}, {"id": "MS-U11-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥立面图”的说明第 2 条中,桩基嵌岩深度要求不小于几倍桩径?⓪ 号墩下桩的直径是多少?返回 JSON 对象,字段名固定为 倍数、桩径;倍数只返回阿拉伯数字(如 2),桩径为 {value, unit},单位 mm。", "answer": "{\"倍数\": \"3\", \"桩径\": {\"value\": 1500, \"unit\": \"mm\"}}"}, {"id": "MS-U11-07-R4", "role": "read", "tiers": ["full_set"], "question": "“支坪立交1号人行天桥标准横断面图”的“人行天桥梯道标准横断面”中,梯柱下钻孔桩的直径是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1000, \"unit\": \"mm\"}"}, {"id": "MS-U11-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥桥墩一般构造图”的“3--3”平面中,墩顶横桥向总宽和两个板式橡胶支座的中心距各是多少?返回 JSON 对象,字段名固定为 墩顶宽、支座中心距,每个字段为 {value, unit},单位 mm。", "answer": "{\"墩顶宽\": {\"value\": 2100, \"unit\": \"mm\"}, \"支座中心距\": {\"value\": 1600, \"unit\": \"mm\"}}"}, {"id": "MS-U11-07-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥箱梁一般构造图”(2/2)(分张序号按图框右上角“第 x 页 共 y 页”)的“1--1”断面(1/2)中,钢箱梁底部宽度按全宽计是多少(图中按半幅标注)?返回数值和单位(mm)。", "answer": "{\"value\": 2100, \"unit\": \"mm\"}"}, {"id": "MS-U11-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "人行天桥主桥 ⓪ 号墩(立面上标出墩高与桩长的那个墩)下桩的直径是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1500, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U11-08/few_sheet/01.png", "page_02_file_name": "images/MS-U11-08/few_sheet/02.png", "page_03_file_name": "images/MS-U11-08/few_sheet/03.png", "page_04_file_name": "images/MS-U11-08/few_sheet/04.png", "page_05_file_name": "images/MS-U11-08/few_sheet/05.png", "page_06_file_name": "images/MS-U11-08/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U11-08", "set": "U11", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "两座梯道底端的梯道台都支承在钻孔桩上。关于梯道台及梯道的下部支承,下列说法哪些正确?", "options": [{"key": "A", "text": "梯道台下并没有桩:C30 素混凝土台身直接坐在 C20 砼垫层上,地基承载力不足时换填", "correct": true}, {"key": "B", "text": "主桥两墩下的桩径与梯柱下的桩径相同", "correct": false}, {"key": "C", "text": "梯道台下的桩径为 1000 mm(与梯柱相同)", "correct": false}, {"key": "D", "text": "B#梯道台在 b 梯道底端(台上 6 级混凝土踏步)", "correct": true}, {"key": "E", "text": "梯道中间平台下的梯柱支承在 φ1000 钻孔桩上", "correct": true}, {"key": "F", "text": "梯道中间平台下的梯柱宽度与主桥墩身等截面段相同(1000 mm)", "correct": false}], "answer": ["A", "D", "E"], "few_sheet_pages": [3, 6, 1, 2, 8, 7], "evidence_pages": [8, 3, 6, 1], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U11-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道台一般构造图”的“梯道台立面一般构造(B#梯道台)”中,台身底面下方那一层的混凝土强度等级(按图中写法,形如 C25)和该层每侧伸出台身的宽度各是多少?返回 JSON 对象,字段名固定为 强度等级、每侧伸出宽度;强度等级为字符串,每侧伸出宽度为 {value, unit},单位 mm。", "answer": "{\"强度等级\": \"C20\", \"每侧伸出宽度\": {\"value\": 200, \"unit\": \"mm\"}}"}, {"id": "MS-U11-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥标准横断面图”的“人行天桥梯道标准横断面”中,梯柱宽度和梯柱下钻孔桩的直径各是多少?返回 JSON 对象,字段名固定为 梯柱宽、桩径,每个字段为 {value, unit},单位 mm。", "answer": "{\"梯柱宽\": {\"value\": 500, \"unit\": \"mm\"}, \"桩径\": {\"value\": 1000, \"unit\": \"mm\"}}"}, {"id": "MS-U11-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥标准横断面图”的“人行天桥主桥标准横断面”中,墩身下部等截面段的宽度和墩下钻孔桩的直径各是多少?返回 JSON 对象,字段名固定为 墩身宽、桩径,每个字段为 {value, unit},单位 mm。", "answer": "{\"墩身宽\": {\"value\": 1000, \"unit\": \"mm\"}, \"桩径\": {\"value\": 1500, \"unit\": \"mm\"}}"}, {"id": "MS-U11-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道梁一般构造图”立面图中,标注“梯柱轴线”的那条竖线所在水平段的标注长度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2000, \"unit\": \"mm\"}"}, {"id": "MS-U11-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥平面图”中,a梯道和 b梯道最下端踏步段的水平总长(按“n x 300”相乘)各是多少?返回 JSON 对象,字段名固定为 a梯道、b梯道,每个字段为 {value, unit},单位 mm。", "answer": "{\"a梯道\": {\"value\": 600, \"unit\": \"mm\"}, \"b梯道\": {\"value\": 1800, \"unit\": \"mm\"}}"}, {"id": "MS-U11-08-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交1号人行天桥梯道台一般构造图”的“梯道台立面一般构造(B#梯道台)”中,台上踏步段的水平总长(按“n x 300”相乘)是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1800, \"unit\": \"mm\"}"}, {"id": "MS-U11-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "人行天桥梯道底端的梯道台,台身底面下方那一层的混凝土强度等级(按图中写法,形如 C25)和该层每侧伸出台身的宽度各是多少?返回 JSON 对象,字段名固定为 强度等级、每侧伸出宽度;强度等级为字符串,每侧伸出宽度为 {value, unit},单位 mm。", "answer": "{\"强度等级\": \"C20\", \"每侧伸出宽度\": {\"value\": 200, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U12-01/few_sheet/01.png", "page_02_file_name": "images/MS-U12-01/few_sheet/02.png", "page_03_file_name": "images/MS-U12-01/few_sheet/03.png", "page_04_file_name": "images/MS-U12-01/few_sheet/04.png", "page_05_file_name": "images/MS-U12-01/few_sheet/05.png", "page_06_file_name": "images/MS-U12-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U12-01", "set": "U12", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "支坪立交区内一条东端接津坪大道的道路,中央分隔带内与黄花风铃木交替成组种植的红叶李每组几株?下列说法哪些正确?", "options": [{"key": "A", "text": "每组 7 株", "correct": false}, {"key": "B", "text": "分隔带西端(圆头一端)第一组乔木是黄花风铃木", "correct": true}, {"key": "C", "text": "分隔带下各段翠芦莉面积都是 220 m²", "correct": false}, {"key": "D", "text": "该分隔带内并没有种红叶李", "correct": false}, {"key": "E", "text": "每组 4 株", "correct": true}, {"key": "F", "text": "分隔带地被与主线中分带一样满铺麦冬", "correct": false}], "answer": ["B", "E"], "few_sheet_pages": [19, 17, 20, 32, 35, 13], "evidence_pages": [17, 20, 32, 35], "full_set_page_count": 38, "sub_questions": [{"id": "MS-U12-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B013 的乔木平面图上,东端接津坪大道那条道路的中央分隔带内,标注为红叶李的各组,每组几株?返回数值和单位(株)。", "answer": "{\"value\": 4, \"unit\": \"株\"}"}, {"id": "MS-U12-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B013 的乔木平面图上,东端接津坪大道那条道路的中央分隔带,从西端圆头起的第一组乔木是什么树、几株?返回 JSON 对象,字段名固定为 树种、株数;树种按图上名称原样返回,株数为数值和单位(株)。", "answer": "{\"树种\": \"黄花风铃木\", \"株数\": {\"value\": 7, \"unit\": \"株\"}}"}, {"id": "MS-U12-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B028 的灌木地被平面图上,东端接津坪大道那条道路的中央分隔带内,翠芦莉三段的面积自西向东各是多少?返回 JSON 对象,字段名固定为 第1段、第2段、第3段,每个字段为数值和单位(m²)。", "answer": "{\"第1段\": {\"value\": 210, \"unit\": \"m²\"}, \"第2段\": {\"value\": 200, \"unit\": \"m²\"}, \"第3段\": {\"value\": 220, \"unit\": \"m²\"}}"}, {"id": "MS-U12-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B031 的灌木地被平面图上,东端接津坪大道那条道路的中央分隔带内,金叶女贞、翠芦莉、麦冬每段的标注面积各是多少?各段面积相同时填该值,该图分隔带内没有的植物填 0。返回 JSON 对象,字段名固定为 金叶女贞、翠芦莉、麦冬,每个字段为数值和单位(m²)。", "answer": "{\"金叶女贞\": {\"value\": 88, \"unit\": \"m²\"}, \"翠芦莉\": {\"value\": 220, \"unit\": \"m²\"}, \"麦冬\": {\"value\": 0, \"unit\": \"m²\"}}"}, {"id": "MS-U12-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B013 的乔木平面图上,分隔带北侧三角形绿岛内的那组红叶李标注了几株?返回数值和单位(株)。", "answer": "{\"value\": 7, \"unit\": \"株\"}"}, {"id": "MS-U12-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪立交区内一条东端接津坪大道的道路,中央分隔带下面分段铺地被。从分隔带西端(圆头一端)起的第一段地被,标注面积是多少?返回数值和单位(m²)。", "answer": "{\"value\": 210, \"unit\": \"m²\"}"}]} {"page_01_file_name": "images/MS-U12-02/few_sheet/01.png", "page_02_file_name": "images/MS-U12-02/few_sheet/02.png", "page_03_file_name": "images/MS-U12-02/few_sheet/03.png", "page_04_file_name": "images/MS-U12-02/few_sheet/04.png", "page_05_file_name": "images/MS-U12-02/few_sheet/05.png", "page_06_file_name": "images/MS-U12-02/few_sheet/06.png", "page_07_file_name": "images/MS-U12-02/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U12-02", "set": "U12", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "主线中央分隔带内,与刺柏间隔成组种植的红叶李每组几株?下列说法哪些正确?", "options": [{"key": "A", "text": "中分带地被为金叶女贞与翠芦莉分段相间", "correct": false}, {"key": "B", "text": "每组 7 株", "correct": false}, {"key": "C", "text": "大桥南端落地处起,中分带标注刺柏 150 株、麦冬 362 m²", "correct": true}, {"key": "D", "text": "北岸桥头段中分带种刺柏 70 株,下铺麦冬 168 m²", "correct": true}, {"key": "E", "text": "主线中分带内并没有种红叶李,中分带乔木只有一行刺柏", "correct": true}, {"key": "F", "text": "每组 4 株", "correct": false}], "answer": ["C", "D", "E"], "few_sheet_pages": [10, 20, 13, 14, 22, 21, 28], "evidence_pages": [10, 13, 14, 22, 28], "full_set_page_count": 38, "sub_questions": [{"id": "MS-U12-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B006 的乔木平面图上,主线中央分隔带内那一行刺柏标注了多少株?返回数值和单位(株)。", "answer": "{\"value\": 70, \"unit\": \"株\"}"}, {"id": "MS-U12-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B018 的灌木地被平面图上,主线中央分隔带内地被的标注是哪种植物、面积多少?返回 JSON 对象,字段名固定为 植物、面积;植物按图上名称原样返回,面积为数值和单位(m²)。", "answer": "{\"植物\": \"麦冬\", \"面积\": {\"value\": 168, \"unit\": \"m²\"}}"}, {"id": "MS-U12-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B009 的乔木平面图上,主线中央分隔带内那一行刺柏标注了多少株?返回数值和单位(株)。", "answer": "{\"value\": 150, \"unit\": \"株\"}"}, {"id": "MS-U12-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B024 的灌木地被平面图上,主线中央分隔带内地被的标注是哪种植物、面积多少?返回 JSON 对象,字段名固定为 植物、面积;植物按图上名称原样返回,面积为数值和单位(m²)。", "answer": "{\"植物\": \"麦冬\", \"面积\": {\"value\": 362, \"unit\": \"m²\"}}"}, {"id": "MS-U12-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B006、C09B009、C09B010 的三张乔木平面图上,主线中央分隔带内各标注了多少株红叶李?没有的填 0。返回 JSON 对象,字段名固定为 C09B006、C09B009、C09B010,每个字段为数值和单位(株)。", "answer": "{\"C09B006\": {\"value\": 0, \"unit\": \"株\"}, \"C09B009\": {\"value\": 0, \"unit\": \"株\"}, \"C09B010\": {\"value\": 0, \"unit\": \"株\"}}"}, {"id": "MS-U12-02-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B016 的乔木平面图上,东端接津坪大道那条道路的中央分隔带内,红叶李和黄花风铃木每组各几株?返回 JSON 对象,字段名固定为 红叶李、黄花风铃木,每个字段为数值和单位(株)。", "answer": "{\"红叶李\": {\"value\": 4, \"unit\": \"株\"}, \"黄花风铃木\": {\"value\": 7, \"unit\": \"株\"}}"}, {"id": "MS-U12-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线自大桥南端落地处起,中央分隔带内种有一行乔木。这一段中分带上标注的乔木株数是多少?返回数值和单位(株)。", "answer": "{\"value\": 150, \"unit\": \"株\"}"}]} {"page_01_file_name": "images/MS-U12-03/few_sheet/01.png", "page_02_file_name": "images/MS-U12-03/few_sheet/02.png", "page_03_file_name": "images/MS-U12-03/few_sheet/03.png", "page_04_file_name": "images/MS-U12-03/few_sheet/04.png", "page_05_file_name": "images/MS-U12-03/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U12-03", "set": "U12", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "主线中央分隔带种有一行刺柏。按各分区平面图的指北针,下列关于这行刺柏在不同路段走向的说法,哪些正确?", "options": [{"key": "A", "text": "大桥南端落地处(还建步道东侧),刺柏行大致为北偏东—南偏西走向", "correct": true}, {"key": "B", "text": "北岸桥头段与大桥南端落地处,刺柏行走向相同", "correct": false}, {"key": "C", "text": "北岸桥头段(设计范围线以南、引桥之前),刺柏行大致为北偏西—南偏东走向", "correct": true}, {"key": "D", "text": "支坪110kV变电站西北侧,刺柏行大致为西北—东南走向", "correct": false}, {"key": "E", "text": "北岸桥头段,刺柏行大致为东北—西南走向", "correct": false}, {"key": "F", "text": "支坪110kV变电站西北侧,刺柏行大致为东北—西南走向", "correct": true}], "answer": ["A", "C", "F"], "few_sheet_pages": [14, 13, 24, 21, 10], "evidence_pages": [10, 13, 21], "full_set_page_count": 38, "sub_questions": [{"id": "MS-U12-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B006 的乔木平面图上,主线中央分隔带内那一行刺柏:标注了多少株?按该图指北针,这一行的走向属于 {北偏东—南偏西, 北偏西—南偏东, 东北—西南, 西北—东南} 中的哪一种(前两种指与南北轴夹角小于 45°,后两种指大于 45°)?返回 JSON 对象,字段名固定为 株数、走向;株数为数值和单位(株),走向从上面四种中选一个原样返回。", "answer": "{\"株数\": {\"value\": 70, \"unit\": \"株\"}, \"走向\": \"北偏西—南偏东\"}"}, {"id": "MS-U12-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B009 的乔木平面图上,主线中央分隔带内那一行刺柏:标注了多少株?按该图指北针,这一行的走向属于 {北偏东—南偏西, 北偏西—南偏东, 东北—西南, 西北—东南} 中的哪一种(前两种指与南北轴夹角小于 45°,后两种指大于 45°)?返回 JSON 对象,字段名固定为 株数、走向;株数为数值和单位(株),走向从上面四种中选一个原样返回。", "answer": "{\"株数\": {\"value\": 150, \"unit\": \"株\"}, \"走向\": \"北偏东—南偏西\"}"}, {"id": "MS-U12-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B017 的乔木平面图上,主线中央分隔带内那一行刺柏:标注了多少株?按该图指北针,这一行的走向属于 {北偏东—南偏西, 北偏西—南偏东, 东北—西南, 西北—东南} 中的哪一种(前两种指与南北轴夹角小于 45°,后两种指大于 45°)?返回 JSON 对象,字段名固定为 株数、走向;株数为数值和单位(株),走向从上面四种中选一个原样返回。", "answer": "{\"株数\": {\"value\": 67, \"unit\": \"株\"}, \"走向\": \"东北—西南\"}"}, {"id": "MS-U12-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线中央分隔带种有一行刺柏,分在几张分区图上。北岸桥头段(设计范围线以南、引桥之前)的那一段刺柏,图上标注了多少株?返回数值和单位(株)。", "answer": "{\"value\": 70, \"unit\": \"株\"}"}, {"id": "MS-U12-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线中央分隔带种有一行刺柏,分在几张分区图上。大桥南端落地处(还建步道东侧)的那一段刺柏,图上标注了多少株?返回数值和单位(株)。", "answer": "{\"value\": 150, \"unit\": \"株\"}"}, {"id": "MS-U12-03-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线中央分隔带种有一行刺柏,分在几张分区图上。支坪110kV变电站西北侧的那一段刺柏,图上标注了多少株?返回数值和单位(株)。", "answer": "{\"value\": 67, \"unit\": \"株\"}"}]} {"page_01_file_name": "images/MS-U12-04/few_sheet/01.png", "page_02_file_name": "images/MS-U12-04/few_sheet/02.png", "page_03_file_name": "images/MS-U12-04/few_sheet/03.png", "page_04_file_name": "images/MS-U12-04/few_sheet/04.png", "page_05_file_name": "images/MS-U12-04/few_sheet/05.png", "page_06_file_name": "images/MS-U12-04/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U12-04", "set": "U12", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "支坪立交区内有一条东端接津坪大道的道路,其中央分隔带上红叶李与黄花风铃木分组交替种植,下面分段铺金叶女贞和翠芦莉。从分隔带西端到东端,种在金叶女贞地被段上的乔木共多少株?", "options": [{"key": "A", "text": "24", "correct": true}, {"key": "B", "text": "28", "correct": false}, {"key": "C", "text": "16", "correct": false}, {"key": "D", "text": "12", "correct": false}, {"key": "E", "text": "66", "correct": false}, {"key": "F", "text": "42", "correct": false}], "answer": ["A"], "few_sheet_pages": [19, 34, 20, 17, 32, 35], "evidence_pages": [17, 20, 32, 35], "full_set_page_count": 38, "sub_questions": [{"id": "MS-U12-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B013 的乔木平面图上,东端接津坪大道的那条道路的中央分隔带内,标注了几组红叶李?每组几株?返回 JSON 对象,字段名固定为 组数、每组株数;组数为数值和单位(组),每组株数为数值和单位(株)。", "answer": "{\"组数\": {\"value\": 3, \"unit\": \"组\"}, \"每组株数\": {\"value\": 4, \"unit\": \"株\"}}"}, {"id": "MS-U12-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B016 的乔木平面图上,同一条道路(东端接津坪大道)的中央分隔带内,画出的红叶李组中,有几组标注了“红叶李4NR”,另有几组画出了但没有标注?返回 JSON 对象,字段名固定为 已标注、未标注,每个字段为数值和单位(组)。", "answer": "{\"已标注\": {\"value\": 3, \"unit\": \"组\"}, \"未标注\": {\"value\": 1, \"unit\": \"组\"}}"}, {"id": "MS-U12-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B028 和 C09B031 的两张灌木地被平面图上,东端接津坪大道那条道路的中央分隔带内,“金叶女贞88m²”的标注各有几处?返回 JSON 对象,字段名固定为 C09B028、C09B031,每个字段为数值和单位(处)。", "answer": "{\"C09B028\": {\"value\": 2, \"unit\": \"处\"}, \"C09B031\": {\"value\": 4, \"unit\": \"处\"}}"}, {"id": "MS-U12-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B016 的乔木平面图上,东端接津坪大道那条道路的中央分隔带内,黄花风铃木每组几株?返回数值和单位(株)。", "answer": "{\"value\": 7, \"unit\": \"株\"}"}, {"id": "MS-U12-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪立交区内有一条东端接津坪大道的道路,中央分隔带下面分段铺金叶女贞和翠芦莉。种在金叶女贞地被段上的那些乔木,每组几株?返回数值和单位(株)。", "answer": "{\"value\": 4, \"unit\": \"株\"}"}, {"id": "MS-U12-04-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪立交区内有一条东端接津坪大道的道路,中央分隔带上的乔木分组种植,西段与东段分画在两张乔木平面图上,接缝处有一组乔木在两张图上都画了出来。从分隔带西端(圆头一端)数起,这一组是第几组乔木?只返回阿拉伯数字。", "answer": "\"6\""}]} {"page_01_file_name": "images/MS-U12-05/few_sheet/01.png", "page_02_file_name": "images/MS-U12-05/few_sheet/02.png", "page_03_file_name": "images/MS-U12-05/few_sheet/03.png", "page_04_file_name": "images/MS-U12-05/few_sheet/04.png", "page_05_file_name": "images/MS-U12-05/few_sheet/05.png", "page_06_file_name": "images/MS-U12-05/few_sheet/06.png", "page_07_file_name": "images/MS-U12-05/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U12-05", "set": "U12", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "长江两岸引桥桥下(画有桥墩承台的带状绿地)满铺麦冬。两岸这两条桥下麦冬带的面积合计是多少 m²?", "options": [{"key": "A", "text": "8951.30", "correct": false}, {"key": "B", "text": "19355.30", "correct": false}, {"key": "C", "text": "10210.00", "correct": false}, {"key": "D", "text": "18993.30", "correct": true}, {"key": "E", "text": "19161.30", "correct": false}, {"key": "F", "text": "20473.30", "correct": false}], "answer": ["D"], "few_sheet_pages": [24, 26, 22, 29, 27, 28, 23], "evidence_pages": [23, 27, 22, 28, 29], "full_set_page_count": 38, "sub_questions": [{"id": "MS-U12-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B019 的灌木地被平面图上,麦冬的标注面积是多少?返回数值和单位(m²)。", "answer": "{\"value\": 8783.3, \"unit\": \"m²\"}"}, {"id": "MS-U12-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B023 的灌木地被平面图上,麦冬的标注面积是多少?返回数值和单位(m²)。", "answer": "{\"value\": 10210, \"unit\": \"m²\"}"}, {"id": "MS-U12-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B018 的灌木地被平面图上,主线中央分隔带内麦冬的标注面积是多少?返回数值和单位(m²)。", "answer": "{\"value\": 168, \"unit\": \"m²\"}"}, {"id": "MS-U12-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B024 的灌木地被平面图上,主线中央分隔带内麦冬的标注面积是多少?返回数值和单位(m²)。", "answer": "{\"value\": 362, \"unit\": \"m²\"}"}, {"id": "MS-U12-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B025 的灌木地被平面图上,主线中央分隔带内麦冬的标注面积是多少?返回数值和单位(m²)。", "answer": "{\"value\": 1480, \"unit\": \"m²\"}"}, {"id": "MS-U12-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "长江北岸引桥桥下有一条画有桥墩承台的带状绿地,满铺麦冬。图上给这条带标注的麦冬面积是多少?返回数值和单位(m²)。", "answer": "{\"value\": 8783.3, \"unit\": \"m²\"}"}, {"id": "MS-U12-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "长江南岸引桥桥下有一条画有桥墩承台的带状绿地,满铺麦冬。图上给这条带标注的麦冬面积是多少?返回数值和单位(m²)。", "answer": "{\"value\": 10210, \"unit\": \"m²\"}"}]} {"page_01_file_name": "images/MS-U12-06/few_sheet/01.png", "page_02_file_name": "images/MS-U12-06/few_sheet/02.png", "page_03_file_name": "images/MS-U12-06/few_sheet/03.png", "page_04_file_name": "images/MS-U12-06/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U12-06", "set": "U12", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "设有 4# 大桥管理用房和事故池的那片绿地中铺种的灌木地被,下列说法哪些正确?", "options": [{"key": "A", "text": "春鹃铺种面积为 942 m²", "correct": false}, {"key": "B", "text": "木春菊修剪后高度为 45–50 cm", "correct": false}, {"key": "C", "text": "红继木的种植密度为 49 株/m²", "correct": false}, {"key": "D", "text": "木春菊的种植密度为 49 株/m²", "correct": true}, {"key": "E", "text": "马尼拉草坪铺种面积为 5918 m²", "correct": false}, {"key": "F", "text": "绿化带种植土厚度为 0.75 m", "correct": true}], "answer": ["D", "F"], "few_sheet_pages": [5, 26, 38, 25], "evidence_pages": [5, 26, 38], "full_set_page_count": 38, "sub_questions": [{"id": "MS-U12-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“分区五灌木地被平面图”上,春鹃地块和马尼拉草坪地块标注的面积各是多少?以 JSON 返回两个字段 chunjuan、manila,每个字段为数值和单位(m²)。", "answer": "{\"chunjuan\": {\"value\": 52, \"unit\": \"m²\"}, \"manila\": {\"value\": 130, \"unit\": \"m²\"}}"}, {"id": "MS-U12-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“景观工程量表”中“K0+000-K2+160段(长江南段,包含桥下锚定公园)”的灌木地被部分:木春菊的高度和种植密度、红继木的种植密度各是多少?种植土一行备注的种植厚度是多少?以 JSON 返回四个字段:mcj_height(按表中写法写高度范围,单位 cm,写成字符串,形如 \"10-20\")、mcj_density、hjm_density(这两个字段只写数值,不带单位,单位为 株/m²,写成字符串)、soil(数值和单位 m)。", "answer": "{\"mcj_height\": \"25-30\", \"mcj_density\": \"49\", \"hjm_density\": \"25\", \"soil\": {\"value\": 0.75, \"unit\": \"m\"}}"}, {"id": "MS-U12-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“景观工程量表”中“K0+000-K2+160段(长江南段,包含桥下锚定公园)”的灌木地被部分:春鹃、马尼拉草坪的数量各是多少?金叶女贞的高度是多少?以 JSON 返回三个字段:chunjuan、manila(数值和单位 m²)、jynz_height(按表中写法写高度范围,单位 cm,写成字符串,形如 \"10-20\")。", "answer": "{\"chunjuan\": {\"value\": 942, \"unit\": \"m²\"}, \"manila\": {\"value\": 5918, \"unit\": \"m²\"}, \"jynz_height\": \"45-50\"}"}, {"id": "MS-U12-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“景观工程量表”中“主线K2+160~K2+900,包含支坪立交”的灌木地被部分:木春菊的种植密度是多少?种植土一行备注的种植厚度是多少?以 JSON 返回两个字段:mcj_density(只写数值,不带单位,单位为 株/m²,写成字符串)、soil(数值和单位 m)。", "answer": "{\"mcj_density\": \"25\", \"soil\": {\"value\": 0.3, \"unit\": \"m\"}}"}, {"id": "MS-U12-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "设有 4# 大桥管理用房和事故池的那片绿地,其灌木地被在景观工程量表中归入哪一段统计?从 {长江北段, 长江南段, 主线段} 中选一个原样返回(主线段指主线 K2+160~K2+900、包含支坪立交的那一段)。", "answer": "\"长江南段\""}, {"id": "MS-U12-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "设有 4# 大桥管理用房和事故池的那片绿地中,春鹃的铺种面积是多少?返回数值和单位(m²)。", "answer": "{\"value\": 52, \"unit\": \"m²\"}"}]} {"page_01_file_name": "images/MS-U12-07/few_sheet/01.png", "page_02_file_name": "images/MS-U12-07/few_sheet/02.png", "page_03_file_name": "images/MS-U12-07/few_sheet/03.png", "page_04_file_name": "images/MS-U12-07/few_sheet/04.png", "page_05_file_name": "images/MS-U12-07/few_sheet/05.png", "page_06_file_name": "images/MS-U12-07/few_sheet/06.png", "page_07_file_name": "images/MS-U12-07/few_sheet/07.png", "page_08_file_name": "images/MS-U12-07/few_sheet/08.png", "page_09_file_name": "images/MS-U12-07/few_sheet/09.png", "page_10_file_name": null, "id": "MS-U12-07", "set": "U12", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "长江南岸支坪立交区(不含桥头锚定公园和大桥管理用房场地)的灌木、地被成片种植。下列品种中,哪些在立交区内有单块面积超过 2000 m² 的地块?", "options": [{"key": "A", "text": "翠芦莉", "correct": true}, {"key": "B", "text": "红叶石楠", "correct": false}, {"key": "C", "text": "春鹃", "correct": false}, {"key": "D", "text": "木春菊", "correct": false}, {"key": "E", "text": "金叶女贞", "correct": false}, {"key": "F", "text": "马尼拉草坪", "correct": true}], "answer": ["A", "F"], "few_sheet_pages": [31, 35, 33, 36, 25, 38, 30, 32, 34], "evidence_pages": [30, 31, 32, 33, 34, 35, 36], "full_set_page_count": 38, "sub_questions": [{"id": "MS-U12-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B026 的灌木地被平面图上,标注面积最大的那块马尼拉草坪是多少平方米?返回数值和单位(m²)。", "answer": "{\"value\": 2245, \"unit\": \"m²\"}"}, {"id": "MS-U12-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B027 的灌木地被平面图上,标注面积最大的那块翠芦莉是多少平方米?返回数值和单位(m²)。", "answer": "{\"value\": 2128, \"unit\": \"m²\"}"}, {"id": "MS-U12-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B028 的灌木地被平面图上,金叶女贞、红叶石楠各自标注面积最大的那一块是多少平方米?返回 JSON 对象,字段名固定为 金叶女贞、红叶石楠,每个字段为数值和单位(m²)。", "answer": "{\"金叶女贞\": {\"value\": 1368, \"unit\": \"m²\"}, \"红叶石楠\": {\"value\": 1261, \"unit\": \"m²\"}}"}, {"id": "MS-U12-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B029 的灌木地被平面图上,标注面积最大的那块木春菊是多少平方米?返回数值和单位(m²)。", "answer": "{\"value\": 1066, \"unit\": \"m²\"}"}, {"id": "MS-U12-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B021 的灌木地被平面图上,标注面积最大的那块春鹃是多少平方米?返回数值和单位(m²)。", "answer": "{\"value\": 563, \"unit\": \"m²\"}"}, {"id": "MS-U12-07-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观工程量表“主线K2+160~K2+900,包含支坪立交”一段的灌木地被部分,金叶女贞、红叶石楠、木春菊的数量各是多少?返回 JSON 对象,字段名固定为 金叶女贞、红叶石楠、木春菊,每个字段为数值和单位(m²)。", "answer": "{\"金叶女贞\": {\"value\": 4112, \"unit\": \"m²\"}, \"红叶石楠\": {\"value\": 2997, \"unit\": \"m²\"}, \"木春菊\": {\"value\": 4388, \"unit\": \"m²\"}}"}, {"id": "MS-U12-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "长江南岸支坪立交区的灌木地被图上,“红叶石楠1261m²”和“木春菊1066m²”这两条标注,各自都在两张相邻分区图上出现。按实际地块计,面积 1261 m² 的红叶石楠地块、面积 1066 m² 的木春菊地块各有几块?返回 JSON 对象,字段名固定为 红叶石楠、木春菊,每个字段为数值和单位(块)。", "answer": "{\"红叶石楠\": {\"value\": 1, \"unit\": \"块\"}, \"木春菊\": {\"value\": 1, \"unit\": \"块\"}}"}]} {"page_01_file_name": "images/MS-U12-08/few_sheet/01.png", "page_02_file_name": "images/MS-U12-08/few_sheet/02.png", "page_03_file_name": "images/MS-U12-08/few_sheet/03.png", "page_04_file_name": "images/MS-U12-08/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U12-08", "set": "U12", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "匝道 A 线旁那一分区铺种的灌木地被,下列说法哪些正确?", "options": [{"key": "A", "text": "翠芦莉的种植密度为 25 株/m²", "correct": true}, {"key": "B", "text": "木春菊的种植密度为 25 株/m²", "correct": true}, {"key": "C", "text": "翠芦莉高度为 45–50 cm", "correct": false}, {"key": "D", "text": "马尼拉草坪铺种面积为 13285 m²", "correct": false}, {"key": "E", "text": "紫娇花铺种面积为 5889 m²", "correct": false}, {"key": "F", "text": "金叶女贞的种植密度为 49 株/m²", "correct": false}], "answer": ["A", "B"], "few_sheet_pages": [38, 32, 5, 33], "evidence_pages": [5, 32, 38], "full_set_page_count": 38, "sub_questions": [{"id": "MS-U12-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“分区十一灌木地被平面图”上:紫娇花地块标注的面积是多少?图右侧与“红叶石楠326m²”地块相邻的那块马尼拉草坪,标注面积是多少?以 JSON 返回两个字段 zijiaohua、manila,每个字段为数值和单位(m²)。", "answer": "{\"zijiaohua\": {\"value\": 394, \"unit\": \"m²\"}, \"manila\": {\"value\": 1097, \"unit\": \"m²\"}}"}, {"id": "MS-U12-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“景观工程量表”中“主线K2+160~K2+900,包含支坪立交”的灌木地被部分:翠芦莉的高度和种植密度、木春菊的种植密度、金叶女贞的种植密度各是多少?以 JSON 返回四个字段:clq_height(按表中写法写高度范围,单位 cm,写成字符串,形如 \"10-20\")、clq_density、mcj_density、jynz_density(这三个字段只写数值,不带单位,单位为 株/m²,写成字符串)。", "answer": "{\"clq_height\": \"35-45\", \"clq_density\": \"25\", \"mcj_density\": \"25\", \"jynz_density\": \"25\"}"}, {"id": "MS-U12-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“景观工程量表”中“主线K2+160~K2+900,包含支坪立交”的灌木地被部分:马尼拉草坪、紫娇花的数量各是多少?红叶石楠的高度是多少?以 JSON 返回三个字段:manila、zijiaohua(数值和单位 m²)、hysn_height(按表中写法写高度范围,单位 cm,写成字符串,形如 \"10-20\")。", "answer": "{\"manila\": {\"value\": 13285, \"unit\": \"m²\"}, \"zijiaohua\": {\"value\": 5889, \"unit\": \"m²\"}, \"hysn_height\": \"45-50\"}"}, {"id": "MS-U12-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“景观工程量表”中“K0+000-K2+160段(长江南段,包含桥下锚定公园)”的灌木地被部分:金叶女贞、翠芦莉的种植密度各是多少?以 JSON 返回两个字段 jynz_density、clq_density,每个字段只写数值,不带单位,单位为 株/m²,写成字符串。", "answer": "{\"jynz_density\": \"49\", \"clq_density\": \"49\"}"}, {"id": "MS-U12-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道 A 线旁那一分区铺种的灌木地被,在景观工程量表中归入哪一段统计?从 {长江北段, 长江南段, 主线段} 中选一个原样返回(主线段指主线 K2+160~K2+900、包含支坪立交的那一段)。", "answer": "\"主线段\""}, {"id": "MS-U12-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道 A 线旁那一分区中铺种的紫娇花,面积是多少?返回数值和单位(m²)。", "answer": "{\"value\": 394, \"unit\": \"m²\"}"}]} {"page_01_file_name": "images/MS-U12-09/few_sheet/01.png", "page_02_file_name": "images/MS-U12-09/few_sheet/02.png", "page_03_file_name": "images/MS-U12-09/few_sheet/03.png", "page_04_file_name": "images/MS-U12-09/few_sheet/04.png", "page_05_file_name": "images/MS-U12-09/few_sheet/05.png", "page_06_file_name": "images/MS-U12-09/few_sheet/06.png", "page_07_file_name": "images/MS-U12-09/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U12-09", "set": "U12", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "把长江南岸支坪立交区(不含桥头锚定公园和大桥管理用房场地)的木春菊地块按单块面积从大到小排列(同一地块只算一次)。下列\"前一块面积 → 紧接的下一块面积\"(m²)中,哪些正确?", "options": [{"key": "A", "text": "469 → 512", "correct": false}, {"key": "B", "text": "512 → 469", "correct": true}, {"key": "C", "text": "829 → 512", "correct": false}, {"key": "D", "text": "593 → 512", "correct": true}, {"key": "E", "text": "1066 → 829", "correct": true}, {"key": "F", "text": "829 → 593", "correct": true}], "answer": ["B", "D", "E", "F"], "few_sheet_pages": [34, 30, 31, 33, 32, 36, 25], "evidence_pages": [30, 31, 32, 33, 36], "full_set_page_count": 38, "sub_questions": [{"id": "MS-U12-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B026 的灌木地被平面图上,标注面积最大的那块木春菊是多少平方米?返回数值和单位(m²)。", "answer": "{\"value\": 469, \"unit\": \"m²\"}"}, {"id": "MS-U12-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B027 的灌木地被平面图上,标注面积最大的那块木春菊是多少平方米?返回数值和单位(m²)。", "answer": "{\"value\": 512, \"unit\": \"m²\"}"}, {"id": "MS-U12-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B028 的灌木地被平面图上,标注面积最大的那块木春菊是多少平方米?返回数值和单位(m²)。", "answer": "{\"value\": 829, \"unit\": \"m²\"}"}, {"id": "MS-U12-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B029 的灌木地被平面图上,木春菊标注面积最大的两块各是多少平方米?返回 JSON 对象,字段名固定为 最大、第二大,每个字段为数值和单位(m²)。", "answer": "{\"最大\": {\"value\": 1066, \"unit\": \"m²\"}, \"第二大\": {\"value\": 593, \"unit\": \"m²\"}}"}, {"id": "MS-U12-09-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B032 的灌木地被平面图上,标注面积最大的那块木春菊是多少平方米?返回数值和单位(m²)。", "answer": "{\"value\": 1066, \"unit\": \"m²\"}"}, {"id": "MS-U12-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "长江南岸支坪立交区的灌木地被图上,“木春菊1066m²”这条标注在两张相邻分区图上各出现一次。按实际地块计,面积 1066 m² 的木春菊地块有几块?返回数值和单位(块)。", "answer": "{\"value\": 1, \"unit\": \"块\"}"}]} {"page_01_file_name": "images/MS-U12-10/few_sheet/01.png", "page_02_file_name": "images/MS-U12-10/few_sheet/02.png", "page_03_file_name": "images/MS-U12-10/few_sheet/03.png", "page_04_file_name": "images/MS-U12-10/few_sheet/04.png", "page_05_file_name": "images/MS-U12-10/few_sheet/05.png", "page_06_file_name": "images/MS-U12-10/few_sheet/06.png", "page_07_file_name": "images/MS-U12-10/few_sheet/07.png", "page_08_file_name": "images/MS-U12-10/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U12-10", "set": "U12", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "长江南岸支坪立交区的乔木种植中,大规格的黄葛树只在少数几处成丛种植。下列分区中,哪些分区的乔木平面图上种有黄葛树?", "options": [{"key": "A", "text": "分区九", "correct": true}, {"key": "B", "text": "分区十四", "correct": false}, {"key": "C", "text": "分区十五", "correct": false}, {"key": "D", "text": "分区十二", "correct": false}, {"key": "E", "text": "分区十三", "correct": true}, {"key": "F", "text": "分区十", "correct": true}], "answer": ["A", "E", "F"], "few_sheet_pages": [20, 16, 18, 15, 38, 21, 30, 19], "evidence_pages": [15, 16, 19, 18, 20, 21], "full_set_page_count": 38, "sub_questions": [{"id": "MS-U12-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B011 的乔木平面图上,黄葛树一共种了几株?把图上各处黄葛树标注的株数(NR)加起来,返回数值和单位(株)。", "answer": "{\"value\": 4, \"unit\": \"株\"}"}, {"id": "MS-U12-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B012 的乔木平面图上,黄葛树一共种了几株?把图上各处黄葛树标注的株数(NR)加起来,返回数值和单位(株)。", "answer": "{\"value\": 7, \"unit\": \"株\"}"}, {"id": "MS-U12-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B015 的乔木平面图上,黄葛树一共种了几株?把图上各处黄葛树标注的株数(NR)加起来,返回数值和单位(株)。", "answer": "{\"value\": 2, \"unit\": \"株\"}"}, {"id": "MS-U12-10-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图号为 C09B014、C09B016、C09B017 的三张乔木平面图上,黄葛树各种了几株?每张图把黄葛树标注的株数(NR)加起来,图上没有黄葛树的填 0。按字段 C09B014、C09B016、C09B017 返回,每个字段返回数值和单位(株)。", "answer": "{\"C09B014\": {\"value\": 0, \"unit\": \"株\"}, \"C09B016\": {\"value\": 0, \"unit\": \"株\"}, \"C09B017\": {\"value\": 0, \"unit\": \"株\"}}"}, {"id": "MS-U12-10-R5", "role": "read", "tiers": ["full_set"], "question": "图号为 C09B013 的乔木平面图上,黄葛树一共种了几株?把图上各处黄葛树标注的株数(NR)加起来,返回数值和单位(株)。", "answer": "{\"value\": 7, \"unit\": \"株\"}"}, {"id": "MS-U12-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "长江南岸支坪立交区的乔木种植中,有两丛黄葛树,每丛标注\"黄葛树2NR\",分别种在两条美国红枫种植带的端头。这两丛黄葛树画在哪个分区的乔木平面图上?返回分区序号的阿拉伯数字(例如分区三返回 3)。", "answer": "\"9\""}, {"id": "MS-U12-10-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "长江南岸支坪立交区的乔木种植中,有一丛标注\"黄葛树3NR\"的黄葛树,旁边是\"木芙蓉11NR\"和\"美人梅11NR\"两组种植。这丛黄葛树画在哪个分区的乔木平面图上?返回分区序号的阿拉伯数字(例如分区三返回 3)。", "answer": "\"10\""}]} {"page_01_file_name": "images/MS-U13-01/few_sheet/01.png", "page_02_file_name": "images/MS-U13-01/few_sheet/02.png", "page_03_file_name": "images/MS-U13-01/few_sheet/03.png", "page_04_file_name": "images/MS-U13-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U13-01", "set": "U13", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "支坪立交匝道C线桥桥台前墙与现浇箱梁底板上的 φ100 泄水孔,下列关于个数的说法哪些正确?", "options": [{"key": "A", "text": "1# 桥台前墙与箱梁底板靠 1# 桥台半跨内的泄水孔共 5 个", "correct": false}, {"key": "B", "text": "两座桥台前墙与箱梁底板全梁的泄水孔共 10 个", "correct": false}, {"key": "C", "text": "0# 桥台前墙的泄水孔比箱梁底板靠 0# 桥台半跨内的多 3 个", "correct": false}, {"key": "D", "text": "0# 桥台前墙与箱梁底板靠 0# 桥台半跨内的泄水孔共 6 个", "correct": true}, {"key": "E", "text": "0# 桥台前墙与箱梁底板靠 0# 桥台半跨内的泄水孔共 9 个", "correct": false}, {"key": "F", "text": "1# 桥台前墙与箱梁底板靠 1# 桥台半跨内的泄水孔共 10 个", "correct": false}], "answer": ["D"], "few_sheet_pages": [13, 12, 11, 8], "evidence_pages": [8, 11, 13], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U13-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥箱梁底板上靠 ⓪ 号轴线一侧的那处'φ100泄水孔'标注,引线指向几个孔?按'个'计。以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 2, \"unit\": \"个\"}"}, {"id": "MS-U13-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥桥台一般构造图(1/4)的桥台正立面中,标注'φ100@2000 泄水孔'的泄水孔画了几个?按'个'计。以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 4, \"unit\": \"个\"}"}, {"id": "MS-U13-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥桥台一般构造图(3/4)的桥台正立面中,标注'φ100@2000 泄水孔'的泄水孔画了几个?按'个'计。以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 4, \"unit\": \"个\"}"}, {"id": "MS-U13-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥现浇箱梁一般构造图(2/3)底平面中,⓪ 号轴线到跨中之间,'φ100泄水孔'这几个字一共标注了几处?按'处'计。以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1, \"unit\": \"处\"}"}]} {"page_01_file_name": "images/MS-U13-02/few_sheet/01.png", "page_02_file_name": "images/MS-U13-02/few_sheet/02.png", "page_03_file_name": "images/MS-U13-02/few_sheet/03.png", "page_04_file_name": "images/MS-U13-02/few_sheet/04.png", "page_05_file_name": "images/MS-U13-02/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U13-02", "set": "U13", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "匝道D线桥起点一端的桥台下设有基桩。关于该桥台的基础,下列说法哪些正确?", "options": [{"key": "A", "text": "该桥台前墙高度为 7500 mm", "correct": false}, {"key": "B", "text": "该桥台下没有基桩,采用扩大基础", "correct": false}, {"key": "C", "text": "该桥台位于D线桥靠九龙坡的一端", "correct": false}, {"key": "D", "text": "基桩桩长 11.7 m、桩径 1.5 m", "correct": true}, {"key": "E", "text": "该桥台承台底面高程为 244.968,与同一断面上C线桥桥台的基础底面同高", "correct": true}, {"key": "F", "text": "基桩桩长 10.5 m", "correct": false}], "answer": ["D", "E"], "few_sheet_pages": [2, 5, 6, 3, 4], "evidence_pages": [2, 6, 5], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U13-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"匝道C线桥平面布置图\"中,匝道D线桥的\"桥梁起点\"和\"桥梁终点\"标注的桩号各是多少?以 JSON 返回两个字段 start、finish,均按 K0+123.456 形式的字符串。", "answer": "{\"start\": \"K0+003.655\", \"finish\": \"K0+049.655\"}"}, {"id": "MS-U13-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中,匝道D线桥桥台下画了几根桩?各桩标注的桩径和桩长是多少?以 JSON 返回三个字段 count(根)、diameter(mm)、length(mm),每个字段为数值和单位。", "answer": "{\"count\": {\"value\": 3, \"unit\": \"根\"}, \"diameter\": {\"value\": 1500, \"unit\": \"mm\"}, \"length\": {\"value\": 11700, \"unit\": \"mm\"}}"}, {"id": "MS-U13-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中:匝道D线桥桥台的前墙(台身)高度、承台底面高程各是多少?同图匝道C线桥桥台的基础底面高程是多少?以 JSON 返回三个字段 d_wall(mm)、d_cap_bottom(m)、c_base_bottom(m),每个字段为数值和单位。", "answer": "{\"d_wall\": {\"value\": 7610, \"unit\": \"mm\"}, \"d_cap_bottom\": {\"value\": 244.968, \"unit\": \"m\"}, \"c_base_bottom\": {\"value\": 244.968, \"unit\": \"m\"}}"}, {"id": "MS-U13-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥0#桥台处)中,匝道D线桥桥台的前墙(台身)高度是多少?其基础之下画了几根桩(不设桩填 0)?以 JSON 返回两个字段 wall(mm)、piles(根),每个字段为数值和单位。", "answer": "{\"wall\": {\"value\": 7500, \"unit\": \"mm\"}, \"piles\": {\"value\": 0, \"unit\": \"根\"}}"}, {"id": "MS-U13-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中,主线3号桥桥台下所画的一排桩里,最靠匝道D线桥一侧那根桩的桩长是多少?返回数值和单位(mm)。", "answer": "{\"value\": 10500, \"unit\": \"mm\"}"}, {"id": "MS-U13-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥起点一端的桥台,其轴线在匝道D线上的桩号是多少?按 K数字+数字 的形式返回(含三位小数)。", "answer": "\"K0+008.655\""}, {"id": "MS-U13-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥起点一端的桥台与主线3号桥的一个桥台并排。该处主线桩号是多少?按 K数字+数字 的形式返回(含三位小数)。", "answer": "\"K2+894.773\""}]} {"page_01_file_name": "images/MS-U13-03/few_sheet/01.png", "page_02_file_name": "images/MS-U13-03/few_sheet/02.png", "page_03_file_name": "images/MS-U13-03/few_sheet/03.png", "page_04_file_name": "images/MS-U13-03/few_sheet/04.png", "page_05_file_name": "images/MS-U13-03/few_sheet/05.png", "page_06_file_name": "images/MS-U13-03/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U13-03", "set": "U13", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "匝道C线桥与主线3号桥、匝道D线桥并行布置,三座桥两端的桥台分别并排。关于它们的相对位置和走向,下列说法哪些正确?", "options": [{"key": "A", "text": "C线桥的0#桥台在靠泸州的一端", "correct": false}, {"key": "B", "text": "C线桥靠泸州一端的桥台,与D线桥终点一端的桥台在同一横断面上并排", "correct": false}, {"key": "C", "text": "C线桥靠九龙坡一端的桥台,与D线桥终点一端的桥台在同一横断面上并排", "correct": true}, {"key": "D", "text": "在两道桥台横断面上,C线桥桥台都紧贴主线3号桥桥台(以 20 mm 变形缝分开),不与D线桥桥台直接相接", "correct": true}, {"key": "E", "text": "C线桥两端桥台的基础,都朝主线3号桥一侧比台身多伸出 500 mm", "correct": false}, {"key": "F", "text": "C线桥桩号由九龙坡往泸州增大,D线桥桩号则由泸州往九龙坡增大", "correct": true}], "answer": ["C", "D", "F"], "few_sheet_pages": [3, 2, 4, 5, 6, 10], "evidence_pages": [2, 3, 5, 6], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U13-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"匝道C线桥平面布置图\"中,匝道C线桥和匝道D线桥各自最靠\"九龙坡⇦\"一侧的桥梁端点(0' 或 1')标注的桩号是多少?以 JSON 返回两个字段 ramp_c、ramp_d,均按 K0+123.456 形式的字符串。", "answer": "{\"ramp_c\": \"K0+211.966\", \"ramp_d\": \"K0+049.655\"}"}, {"id": "MS-U13-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"匝道C线桥立面布置\"中,靠\"九龙坡⇦\"一侧和靠\"⇨泸州\"一侧的桥台轴线(⓪ 或 ①)标注的桩号各是多少?以 JSON 返回两个字段 jiulongpo_side、luzhou_side,均按 K0+123.456 形式的字符串。", "answer": "{\"jiulongpo_side\": \"K0+217.966\", \"luzhou_side\": \"K0+252.966\"}"}, {"id": "MS-U13-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥0#桥台处)中,匝道C线和匝道D线各自标注的桩号是多少?以 JSON 返回两个字段 ramp_c、ramp_d,均按 K0+123.456 形式的字符串。", "answer": "{\"ramp_c\": \"K0+217.966\", \"ramp_d\": \"K0+043.655\"}"}, {"id": "MS-U13-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中,匝道C线和匝道D线各自标注的桩号是多少?以 JSON 返回两个字段 ramp_c、ramp_d,均按 K0+123.456 形式的字符串。", "answer": "{\"ramp_c\": \"K0+252.966\", \"ramp_d\": \"K0+008.655\"}"}, {"id": "MS-U13-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥0#桥台处)中,匝道C线桥桥台的基础宽度、台帽横向宽度各是多少?它与相邻主线3号桥桥台之间的缝宽是多少?以 JSON 返回三个字段 base_width、cap_width、joint,每个字段为数值和单位(mm)。", "answer": "{\"base_width\": {\"value\": 10240, \"unit\": \"mm\"}, \"cap_width\": {\"value\": 9740, \"unit\": \"mm\"}, \"joint\": {\"value\": 20, \"unit\": \"mm\"}}"}, {"id": "MS-U13-03-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中,主线3号桥桥台与匝道C线桥桥台之间、与匝道D线桥桥台之间的缝宽各是多少?以 JSON 返回两个字段 joint_c、joint_d,每个字段为数值和单位(mm)。", "answer": "{\"joint_c\": {\"value\": 20, \"unit\": \"mm\"}, \"joint_d\": {\"value\": 20, \"unit\": \"mm\"}}"}, {"id": "MS-U13-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "与匝道C线桥靠九龙坡一端的桥台并排的匝道D线桥桥台,其轴线在匝道D线上的桩号是多少?按 K数字+数字 的形式返回(含三位小数)。", "answer": "\"K0+043.655\""}]} {"page_01_file_name": "images/MS-U13-04/few_sheet/01.png", "page_02_file_name": "images/MS-U13-04/few_sheet/02.png", "page_03_file_name": "images/MS-U13-04/few_sheet/03.png", "page_04_file_name": "images/MS-U13-04/few_sheet/04.png", "page_05_file_name": "images/MS-U13-04/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U13-04", "set": "U13", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于匝道C线桥与所跨道路、并排桥台在竖向(高程)上的关系,下列说法哪些正确?", "options": [{"key": "A", "text": "C线桥从还建G348上方跨过,交叉处桥面设计高程比G348高 9.634 m", "correct": true}, {"key": "B", "text": "C线桥1#桥台的基础底面比0#桥台的基础底面高", "correct": false}, {"key": "C", "text": "沿C线桩号增大方向,桥面先上坡、过变坡点后转为下坡", "correct": true}, {"key": "D", "text": "在1#桥台横断面上,C线桥桥面设计高程高于并排的主线3号桥", "correct": false}, {"key": "E", "text": "在1#桥台横断面上,C线桥桥台基础顶面与并排主线3号桥桥台承台顶面同高", "correct": false}, {"key": "F", "text": "在0#桥台横断面上,C线桥桥面设计高程低于并排的主线3号桥", "correct": true}], "answer": ["A", "C", "F"], "few_sheet_pages": [4, 5, 6, 12, 3], "evidence_pages": [3, 5, 6], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U13-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"匝道C线桥立面布置\"图顶部与还建G348交叉处的标注中,Hs上 和 Hs下 各是多少?以 JSON 返回两个字段 hs_upper、hs_lower,每个字段为数值和单位(m)。", "answer": "{\"hs_upper\": {\"value\": 257.214, \"unit\": \"m\"}, \"hs_lower\": {\"value\": 247.58, \"unit\": \"m\"}}"}, {"id": "MS-U13-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"匝道C线桥立面布置\"图下表格\"坡度/坡长\"一行中,变坡点前、后两段的坡度各是多少(沿桩号增大方向)?以 JSON 返回两个字段 before、after,坡度按图上数字原样写成字符串(保留图上的小数位和负号,不带 % 号,形如 \"1.50\")。", "answer": "{\"before\": \"6.00\", \"after\": \"-0.60\"}"}, {"id": "MS-U13-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥0#桥台处)中,匝道C线和主线各自标注的桥面高程 Hs 是多少?以 JSON 返回两个字段 ramp_c、main,每个字段为数值和单位(m)。", "answer": "{\"ramp_c\": {\"value\": 256.347, \"unit\": \"m\"}, \"main\": {\"value\": 258.557, \"unit\": \"m\"}}"}, {"id": "MS-U13-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中,匝道C线和主线各自标注的桥面高程 Hs 是多少?以 JSON 返回两个字段 ramp_c、main,每个字段为数值和单位(m)。", "answer": "{\"ramp_c\": {\"value\": 257.692, \"unit\": \"m\"}, \"main\": {\"value\": 258.348, \"unit\": \"m\"}}"}, {"id": "MS-U13-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中:匝道C线桥桥台基础的顶面、底面高程各是多少?并排主线3号桥桥台承台的顶面高程是多少?以 JSON 返回三个字段 c_top、c_bottom、main_cap_top,每个字段为数值和单位(m)。", "answer": "{\"c_top\": {\"value\": 246.468, \"unit\": \"m\"}, \"c_bottom\": {\"value\": 244.968, \"unit\": \"m\"}, \"main_cap_top\": {\"value\": 247.268, \"unit\": \"m\"}}"}, {"id": "MS-U13-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道C线桥两端桥台中,靠九龙坡一端的那一座,基础底面高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 245.767, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U13-05/few_sheet/01.png", "page_02_file_name": "images/MS-U13-05/few_sheet/02.png", "page_03_file_name": "images/MS-U13-05/few_sheet/03.png", "page_04_file_name": "images/MS-U13-05/few_sheet/04.png", "page_05_file_name": "images/MS-U13-05/few_sheet/05.png", "page_06_file_name": "images/MS-U13-05/few_sheet/06.png", "page_07_file_name": "images/MS-U13-05/few_sheet/07.png", "page_08_file_name": "images/MS-U13-05/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U13-05", "set": "U13", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "匝道C线桥设有多种排水构造。下列构造中,哪些是两端桥台本身都设有的?", "options": [{"key": "A", "text": "雨水口", "correct": false}, {"key": "B", "text": "φ100 PVC 管,间距 2000,就近接入排水系统", "correct": true}, {"key": "C", "text": "φ100 泄水孔,间距 2000", "correct": true}, {"key": "D", "text": "通气孔", "correct": false}, {"key": "E", "text": "设在每个封闭箱室四角的泄水孔", "correct": false}, {"key": "F", "text": "弹塑性透水软管", "correct": true}], "answer": ["B", "C", "F"], "few_sheet_pages": [8, 11, 4, 12, 14, 2, 13, 7], "evidence_pages": [11, 13, 12, 14, 8, 2], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U13-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥桥台一般构造图中,0#桥台\"桥台正立面\"前墙下部所标泄水孔的直径、间距各是多少?图中一共画出几个泄水孔?以 JSON 返回三个字段 diameter(mm)、spacing(mm)、count(个),每个字段为数值和单位。", "answer": "{\"diameter\": {\"value\": 100, \"unit\": \"mm\"}, \"spacing\": {\"value\": 2000, \"unit\": \"mm\"}, \"count\": {\"value\": 4, \"unit\": \"个\"}}"}, {"id": "MS-U13-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥桥台一般构造图中,1#桥台\"桥台正立面\"前墙下部所标泄水孔的直径、间距各是多少?图中一共画出几个泄水孔?以 JSON 返回三个字段 diameter(mm)、spacing(mm)、count(个),每个字段为数值和单位。", "answer": "{\"diameter\": {\"value\": 100, \"unit\": \"mm\"}, \"spacing\": {\"value\": 2000, \"unit\": \"mm\"}, \"count\": {\"value\": 4, \"unit\": \"个\"}}"}, {"id": "MS-U13-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥桥台一般构造图中,0#桥台\"桥台侧立面\":台前地面处所标 PVC 管的直径和间距各是多少?弹塑性透水软管所在的砂卵石反滤层厚度是多少?以 JSON 返回三个字段 pvc_diameter、pvc_spacing、filter_thickness,每个字段为数值和单位(mm)。", "answer": "{\"pvc_diameter\": {\"value\": 100, \"unit\": \"mm\"}, \"pvc_spacing\": {\"value\": 2000, \"unit\": \"mm\"}, \"filter_thickness\": {\"value\": 500, \"unit\": \"mm\"}}"}, {"id": "MS-U13-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥桥台一般构造图中,1#桥台\"桥台侧立面\":台前地面处所标 PVC 管的直径和间距各是多少?弹塑性透水软管所在的砂卵石反滤层厚度是多少?以 JSON 返回三个字段 pvc_diameter、pvc_spacing、filter_thickness,每个字段为数值和单位(mm)。", "answer": "{\"pvc_diameter\": {\"value\": 100, \"unit\": \"mm\"}, \"pvc_spacing\": {\"value\": 2000, \"unit\": \"mm\"}, \"filter_thickness\": {\"value\": 500, \"unit\": \"mm\"}}"}, {"id": "MS-U13-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道C线桥的雨水口设在哪类构件上?只从\"桥台、箱梁、桥面\"三者中选一个回答。", "answer": "\"桥面\""}, {"id": "MS-U13-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道C线桥的通气孔设在哪类构件上?只从\"桥台、箱梁、桥面\"三者中选一个回答。", "answer": "\"箱梁\""}, {"id": "MS-U13-05-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道C线桥中,设在每个封闭箱室四角的泄水孔属于哪类构件?只从\"桥台、箱梁、桥面\"三者中选一个回答。", "answer": "\"箱梁\""}]} {"page_01_file_name": "images/MS-U13-06/few_sheet/01.png", "page_02_file_name": "images/MS-U13-06/few_sheet/02.png", "page_03_file_name": "images/MS-U13-06/few_sheet/03.png", "page_04_file_name": "images/MS-U13-06/few_sheet/04.png", "page_05_file_name": "images/MS-U13-06/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U13-06", "set": "U13", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿匝道C线桩号增大方向(由九龙坡往泸州),桥梁范围内依次出现桥台轴线、支座中心线、箱梁截面变化处、平曲线终点、纵断面变坡点和与其他道路的交叉。下列\"前一处 → 紧接的下一处\"中,哪些正确?", "options": [{"key": "A", "text": "纵断面变坡点 → 上跨还建G348处", "correct": false}, {"key": "B", "text": "上跨还建G348处 → 1#端箱梁由等截面段进入变截面段处", "correct": false}, {"key": "C", "text": "平曲线终点 → 0#端支座中心线", "correct": false}, {"key": "D", "text": "纵断面变坡点 → 1#端箱梁由等截面段进入变截面段处", "correct": true}, {"key": "E", "text": "0#端支座中心线 → 0#端箱梁由变截面段进入等截面段处", "correct": false}, {"key": "F", "text": "0#端箱梁由变截面段进入等截面段处 → 上跨还建G348处", "correct": true}], "answer": ["D", "F"], "few_sheet_pages": [8, 9, 7, 3, 10], "evidence_pages": [3, 7, 8], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U13-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"匝道C线桥立面布置\"中:图顶部与还建G348交叉处标注的本项目桩号、图下表格\"坡度/坡长\"行中变坡点的桩号、\"桩号\"行中标 YZ1 的桩号各是多少?以 JSON 返回三个字段 crossing、grade_change、yz1,均按 K0+123.456 形式的字符串(表中只写\"+\"的补上 K0)。", "answer": "{\"crossing\": \"K0+235.888\", \"grade_change\": \"K0+245.920\", \"yz1\": \"K0+215.478\"}"}, {"id": "MS-U13-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"匝道C线桥立面布置\"中,⓪ 轴和 ① 轴(两端桥台轴线)标注的桩号各是多少?以 JSON 返回两个字段 axis0、axis1,均按 K0+123.456 形式的字符串。", "answer": "{\"axis0\": \"K0+217.966\", \"axis1\": \"K0+252.966\"}"}, {"id": "MS-U13-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥现浇箱梁一般构造图的\"立面\"中,⓪ 轴一端:桥梁轴线到梁端、梁端到支座中心线的距离各是多少?以 JSON 返回两个字段 axis_to_end、end_to_bearing,每个字段为数值和单位(mm)。", "answer": "{\"axis_to_end\": {\"value\": 50, \"unit\": \"mm\"}, \"end_to_bearing\": {\"value\": 600, \"unit\": \"mm\"}}"}, {"id": "MS-U13-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥现浇箱梁一般构造图的\"底平面\"顶部纵向分段标注中,自 ⓪ 轴一端的梁端起,第一段、第二段、第三段的长度各是多少?以 JSON 返回三个字段 seg1、seg2、seg3,每个字段为数值和单位(mm)。", "answer": "{\"seg1\": {\"value\": 1500, \"unit\": \"mm\"}, \"seg2\": {\"value\": 5000, \"unit\": \"mm\"}, \"seg3\": {\"value\": 21900, \"unit\": \"mm\"}}"}, {"id": "MS-U13-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道C线桥箱梁靠九龙坡一端的支座中心线,位于匝道C线哪个桩号?按 K数字+数字 的形式返回(含三位小数)。", "answer": "\"K0+218.616\""}, {"id": "MS-U13-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道C线桥箱梁靠泸州一端,箱梁截面由等截面变为变截面的位置,位于匝道C线哪个桩号?按 K数字+数字 的形式返回(含三位小数)。", "answer": "\"K0+246.416\""}]} {"page_01_file_name": "images/MS-U13-07/few_sheet/01.png", "page_02_file_name": "images/MS-U13-07/few_sheet/02.png", "page_03_file_name": "images/MS-U13-07/few_sheet/03.png", "page_04_file_name": "images/MS-U13-07/few_sheet/04.png", "page_05_file_name": "images/MS-U13-07/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U13-07", "set": "U13", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "匝道C线桥靠泸州一端的桥台下设有基桩。关于该桥台的基础,下列说法哪些正确?", "options": [{"key": "A", "text": "该桥台基础底面高程为 244.968,与并排的主线3号桥桥台承台底面同高", "correct": true}, {"key": "B", "text": "该桥台轴线至桥梁终点的台后长度为 6 m", "correct": false}, {"key": "C", "text": "该桥台前墙高度与另一端桥台相同,都是 6000 mm", "correct": false}, {"key": "D", "text": "基桩桩底高程为 238.968", "correct": false}, {"key": "E", "text": "该桥台下没有基桩,采用扩大基础", "correct": true}, {"key": "F", "text": "基桩桩长 11.7 m、桩径 1.5 m", "correct": false}], "answer": ["A", "E"], "few_sheet_pages": [6, 3, 5, 4, 11], "evidence_pages": [3, 6, 5], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U13-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中,匝道C线桥1#桥台:前墙(台身)高度、基础底面高程各是多少?基础之下画了几根桩(不设桩填 0)?以 JSON 返回三个字段 wall(mm)、base_bottom(m)、piles(根),每个字段为数值和单位。", "answer": "{\"wall\": {\"value\": 8144, \"unit\": \"mm\"}, \"base_bottom\": {\"value\": 244.968, \"unit\": \"m\"}, \"piles\": {\"value\": 0, \"unit\": \"根\"}}"}, {"id": "MS-U13-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中,主线3号桥桥台承台的顶面、底面高程各是多少?以 JSON 返回两个字段 cap_top、cap_bottom,每个字段为数值和单位(m)。", "answer": "{\"cap_top\": {\"value\": 247.268, \"unit\": \"m\"}, \"cap_bottom\": {\"value\": 244.968, \"unit\": \"m\"}}"}, {"id": "MS-U13-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中,匝道D线桥桥台下所画桩的桩长和桩径各是多少?以 JSON 返回两个字段 length、diameter,每个字段为数值和单位(mm)。", "answer": "{\"length\": {\"value\": 11700, \"unit\": \"mm\"}, \"diameter\": {\"value\": 1500, \"unit\": \"mm\"}}"}, {"id": "MS-U13-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中,主线3号桥桥台下所画的一排桩里,最靠匝道C线桥一侧那根桩的桩长和桩底高程各是多少?以 JSON 返回两个字段 length(mm)、bottom(m),每个字段为数值和单位。", "answer": "{\"length\": {\"value\": 6000, \"unit\": \"mm\"}, \"bottom\": {\"value\": 238.968, \"unit\": \"m\"}}"}, {"id": "MS-U13-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"匝道C线桥立面布置\"图顶部的分段尺寸中,0'(桥梁起点)到 ⓪ 轴、① 轴到 1'(桥梁终点)的长度各是多少?以 JSON 返回两个字段 start_end、finish_end,每个字段为数值和单位(mm)。", "answer": "{\"start_end\": {\"value\": 6000, \"unit\": \"mm\"}, \"finish_end\": {\"value\": 5000, \"unit\": \"mm\"}}"}, {"id": "MS-U13-07-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥0#桥台处)中,匝道C线桥0#桥台前墙(台身)的高度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 6000, \"unit\": \"mm\"}"}, {"id": "MS-U13-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道C线桥靠泸州一端的桥台,其轴线在匝道C线上的桩号是多少?按 K数字+数字 的形式返回(含三位小数)。", "answer": "\"K0+252.966\""}]} {"page_01_file_name": "images/MS-U13-08/few_sheet/01.png", "page_02_file_name": "images/MS-U13-08/few_sheet/02.png", "page_03_file_name": "images/MS-U13-08/few_sheet/03.png", "page_04_file_name": "images/MS-U13-08/few_sheet/04.png", "page_05_file_name": "images/MS-U13-08/few_sheet/05.png", "page_06_file_name": "images/MS-U13-08/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U13-08", "set": "U13", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "匝道C线桥两端桥台的前墙(台身)高度合计是多少(mm)?", "options": [{"key": "A", "text": "14000", "correct": false}, {"key": "B", "text": "13610", "correct": false}, {"key": "C", "text": "14500", "correct": false}, {"key": "D", "text": "14144", "correct": true}, {"key": "E", "text": "17144", "correct": false}, {"key": "F", "text": "15110", "correct": false}], "answer": ["D"], "few_sheet_pages": [6, 12, 5, 13, 11, 4], "evidence_pages": [5, 6, 11, 13], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U13-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥0#桥台处)中,匝道C线桥0#桥台前墙(台身)的高度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 6000, \"unit\": \"mm\"}"}, {"id": "MS-U13-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中,匝道C线桥1#桥台前墙(台身)的高度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 8144, \"unit\": \"mm\"}"}, {"id": "MS-U13-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥0#桥台处)中,与C线桥桥台并排的主线3号桥桥台、匝道D线桥桥台,前墙(台身)高度各是多少?以 JSON 返回两个字段 main、ramp_d,每个字段为数值和单位(mm)。", "answer": "{\"main\": {\"value\": 8500, \"unit\": \"mm\"}, \"ramp_d\": {\"value\": 7500, \"unit\": \"mm\"}}"}, {"id": "MS-U13-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中,与C线桥桥台并排的主线3号桥桥台、匝道D线桥桥台,前墙(台身)高度各是多少?以 JSON 返回两个字段 main、ramp_d,每个字段为数值和单位(mm)。", "answer": "{\"main\": {\"value\": 8000, \"unit\": \"mm\"}, \"ramp_d\": {\"value\": 7610, \"unit\": \"mm\"}}"}, {"id": "MS-U13-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥的两张地质横断面图(0#桥台处、1#桥台处)中,C线桥桥台台身下方基础的厚度各是多少?以 JSON 返回两个字段 at0、at1,每个字段为数值和单位(mm)。", "answer": "{\"at0\": {\"value\": 1500, \"unit\": \"mm\"}, \"at1\": {\"value\": 1500, \"unit\": \"mm\"}}"}, {"id": "MS-U13-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道C线桥1#桥台处的横断面上并排画着三座桥的桥台。其中前墙(台身)高 8144 mm 的桥台属于哪座桥?只从\"匝道C线桥、匝道D线桥、主线3号桥\"中选一个回答。", "answer": "\"匝道C线桥\""}, {"id": "MS-U13-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道C线桥0#桥台处的横断面上并排画着三座桥的桥台。其中前墙(台身)高 7500 mm 的桥台属于哪座桥?只从\"匝道C线桥、匝道D线桥、主线3号桥\"中选一个回答。", "answer": "\"匝道D线桥\""}]} {"page_01_file_name": "images/MS-U13-09/few_sheet/01.png", "page_02_file_name": "images/MS-U13-09/few_sheet/02.png", "page_03_file_name": "images/MS-U13-09/few_sheet/03.png", "page_04_file_name": "images/MS-U13-09/few_sheet/04.png", "page_05_file_name": "images/MS-U13-09/few_sheet/05.png", "page_06_file_name": "images/MS-U13-09/few_sheet/06.png", "page_07_file_name": "images/MS-U13-09/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U13-09", "set": "U13", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "匝道C线桥两端各有一个桥台。比较这两个桥台,下列各项中,哪些两端不同?", "options": [{"key": "A", "text": "台帽顶面高程", "correct": true}, {"key": "B", "text": "前墙(台身)高度", "correct": true}, {"key": "C", "text": "支座组合高度", "correct": false}, {"key": "D", "text": "桥台轴线至桥梁起点(或终点)的台后长度", "correct": true}, {"key": "E", "text": "台帽横向宽度", "correct": false}, {"key": "F", "text": "基础底面高程", "correct": true}], "answer": ["A", "B", "D", "F"], "few_sheet_pages": [7, 3, 4, 5, 11, 6, 13], "evidence_pages": [3, 5, 6, 11, 13], "full_set_page_count": 14, "sub_questions": [{"id": "MS-U13-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥0#桥台处)中,匝道C线桥0#桥台的前墙(台身)高度、基础顶面高程、基础底面高程各是多少?以 JSON 返回三个字段 wall(mm)、base_top(m)、base_bottom(m),每个字段为数值和单位。", "answer": "{\"wall\": {\"value\": 6000, \"unit\": \"mm\"}, \"base_top\": {\"value\": 247.267, \"unit\": \"m\"}, \"base_bottom\": {\"value\": 245.767, \"unit\": \"m\"}}"}, {"id": "MS-U13-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥地质横断面图(匝道C线桥1#桥台处)中,匝道C线桥1#桥台的前墙(台身)高度、基础顶面高程、基础底面高程各是多少?以 JSON 返回三个字段 wall(mm)、base_top(m)、base_bottom(m),每个字段为数值和单位。", "answer": "{\"wall\": {\"value\": 8144, \"unit\": \"mm\"}, \"base_top\": {\"value\": 246.468, \"unit\": \"m\"}, \"base_bottom\": {\"value\": 244.968, \"unit\": \"m\"}}"}, {"id": "MS-U13-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"匝道C线桥立面布置\"图顶部的分段尺寸中,0'(桥梁起点)到 ⓪ 轴、① 轴到 1'(桥梁终点)的长度各是多少?以 JSON 返回两个字段 start_end、finish_end,每个字段为数值和单位(mm)。", "answer": "{\"start_end\": {\"value\": 6000, \"unit\": \"mm\"}, \"finish_end\": {\"value\": 5000, \"unit\": \"mm\"}}"}, {"id": "MS-U13-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥桥台一般构造图中,0#桥台\"桥台正立面\"上台帽的厚度、台帽的横向宽度各是多少?附注中支座组合高度是多少?以 JSON 返回三个字段 cap_thickness、cap_width、bearing_height,每个字段为数值和单位(mm)。", "answer": "{\"cap_thickness\": {\"value\": 800, \"unit\": \"mm\"}, \"cap_width\": {\"value\": 9740, \"unit\": \"mm\"}, \"bearing_height\": {\"value\": 300, \"unit\": \"mm\"}}"}, {"id": "MS-U13-09-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道C线桥桥台一般构造图中,1#桥台\"桥台正立面\"上台帽的厚度、台帽的横向宽度各是多少?附注中支座组合高度是多少?以 JSON 返回三个字段 cap_thickness、cap_width、bearing_height,每个字段为数值和单位(mm)。", "answer": "{\"cap_thickness\": {\"value\": 800, \"unit\": \"mm\"}, \"cap_width\": {\"value\": 9740, \"unit\": \"mm\"}, \"bearing_height\": {\"value\": 300, \"unit\": \"mm\"}}"}, {"id": "MS-U13-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道C线桥两端桥台中,前墙(台身)高 8144 mm 的那一座,其基础底面高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 244.968, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U14-01/few_sheet/01.png", "page_02_file_name": "images/MS-U14-01/few_sheet/02.png", "page_03_file_name": "images/MS-U14-01/few_sheet/03.png", "page_04_file_name": "images/MS-U14-01/few_sheet/04.png", "page_05_file_name": "images/MS-U14-01/few_sheet/05.png", "page_06_file_name": "images/MS-U14-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U14-01", "set": "U14", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于外场管线、手孔和接地装置在地下的上下、内外位置,下列说法哪些正确?", "options": [{"key": "A", "text": "管线手孔设在车行道下,以便钢管直接进井", "correct": false}, {"key": "B", "text": "车行道下:管道与人行道下一样用 HDPE 管,只是埋深加大到不小于 700 mm", "correct": false}, {"key": "C", "text": "相邻两根接地极的间距约为 2.5 m", "correct": false}, {"key": "D", "text": "电子警察杆基础顶面高出地面 200 mm", "correct": false}, {"key": "E", "text": "人行道下:3 根 HDPE 管(3×100)直埋于夯实回填土中,管顶距人行道面不小于 500 mm", "correct": true}, {"key": "F", "text": "接地极(50×50×5 角钢)竖直打入地下,顶端在地坪以下不小于 700 mm,单根长 2500 mm", "correct": true}], "answer": ["E", "F"], "few_sheet_pages": [20, 1, 21, 7, 22, 8], "evidence_pages": [21, 22, 20, 8], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U14-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“管线人、车行道下埋设示意图”中的“管线人行道下埋设示意图”上,管材是什么?单管管径是多少?管顶以上的覆土深度标注是多少?以 JSON 返回 material(只写管材缩写或名称,按图注原文)、D(mm)、cover(mm)三个字段,后两个为数值和单位。", "answer": "{\"material\": \"HDPE\", \"D\": {\"value\": 100, \"unit\": \"mm\"}, \"cover\": {\"value\": 500, \"unit\": \"mm\"}}"}, {"id": "MS-U14-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“管线人、车行道下埋设示意图”中的“管线车行道下埋设示意图”上,管材是什么?单管管径是多少?路面至包封顶的深度标注是多少?以 JSON 返回 material(按图注原文,形如 铸铁管)、D(mm)、cover(mm)三个字段,后两个为数值和单位。", "answer": "{\"material\": \"镀锌钢管\", \"D\": {\"value\": 114, \"unit\": \"mm\"}, \"cover\": {\"value\": 700, \"unit\": \"mm\"}}"}, {"id": "MS-U14-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“接地示意图”上,接地极的单根长度是多少?接地极顶端在地坪以下的深度标注是多少?以 JSON 返回 length、top_depth 两个字段,每个为数值和单位(mm)。", "answer": "{\"length\": {\"value\": 2500, \"unit\": \"mm\"}, \"top_depth\": {\"value\": 700, \"unit\": \"mm\"}}"}, {"id": "MS-U14-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "外场监控设施就近接地时,相邻两根接地极之间的间距约为多少?返回数值和单位(mm)。", "answer": "{\"value\": 5000, \"unit\": \"mm\"}"}, {"id": "MS-U14-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂6-8米电子警察安装结构图(一)”的说明中,基础顶面的埋深是多少?返回数值和单位(cm)。", "answer": "{\"value\": 20, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U14-02/few_sheet/01.png", "page_02_file_name": "images/MS-U14-02/few_sheet/02.png", "page_03_file_name": "images/MS-U14-02/few_sheet/03.png", "page_04_file_name": "images/MS-U14-02/few_sheet/04.png", "page_05_file_name": "images/MS-U14-02/few_sheet/05.png", "page_06_file_name": "images/MS-U14-02/few_sheet/06.png", "page_07_file_name": "images/MS-U14-02/few_sheet/07.png", "page_08_file_name": "images/MS-U14-02/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U14-02", "set": "U14", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于本单元各类悬臂杆件上设备、孔洞和穿线管的位置与朝向,下列说法哪些正确?", "options": [{"key": "A", "text": "悬臂9-10米电子警察杆:基础内 φ60 PVC 穿线管朝横臂方向的反方向水平引出", "correct": true}, {"key": "B", "text": "悬臂6-8米交通信号灯杆:基础平面 1200×2000,其中 2000 一边沿横向(垂直于道路)布置", "correct": false}, {"key": "C", "text": "悬臂6-8米交通信号灯杆:立柱上 300×110 电缆检修洞口在人行横道灯下方,距地面约 1 m", "correct": true}, {"key": "D", "text": "悬臂6-8米电子警察杆:立柱上的设备箱装在与横臂相对的一侧,箱底距地面不小于 2.5 m", "correct": true}, {"key": "E", "text": "悬臂9-10米交通信号灯杆:横梁接在立柱顶以下 500 mm 处,与立柱的夹角为 91.3°", "correct": false}, {"key": "F", "text": "悬臂11-12米电子警察杆:基础内 φ60 PVC 穿线管朝横臂方向水平引出", "correct": false}], "answer": ["A", "C", "D"], "few_sheet_pages": [3, 11, 4, 13, 8, 1, 9, 5], "evidence_pages": [3, 8, 13, 11, 4, 5], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U14-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂6-8米交通信号灯安装结构图(一)”的立面图上:300×110 洞口标注的离地高度是多少?人行横道灯灯箱底离地高度是多少?横梁与立柱的夹角标注是多少度?以 JSON 返回 hole(mm)、ped_bottom(mm)两个数值和单位字段,以及 angle(只写度数数字,如 90.5)。", "answer": "{\"hole\": {\"value\": 1000, \"unit\": \"mm\"}, \"ped_bottom\": {\"value\": 2000, \"unit\": \"mm\"}, \"angle\": \"91.3\"}"}, {"id": "MS-U14-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂6-8米电子警察安装结构图(一)”的立面图上,横臂伸向立柱哪一侧?设备箱装在立柱哪一侧?设备箱底到地面的标注尺寸是多少?以 JSON 返回 arm、box(按图面左右,填“左”或“右”)和 box_bottom(数值和单位,mm)三个字段。", "answer": "{\"arm\": \"左\", \"box\": \"右\", \"box_bottom\": {\"value\": 2500, \"unit\": \"mm\"}}"}, {"id": "MS-U14-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂11-12米电子警察安装结构图(二)”的基础平面图上,“横臂方向”箭头指向哪一侧?φ60 PVC 管从立柱中心向哪一侧水平伸出?以 JSON 返回 arm、pvc 两个字段(按图面左右,填“左”或“右”)。", "answer": "{\"arm\": \"左\", \"pvc\": \"右\"}"}, {"id": "MS-U14-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "悬臂9-10米电子警察杆的基础平面中,“横臂方向”箭头指向哪一侧?φ60 PVC 管从立柱中心向哪一侧水平伸出?以 JSON 返回 arm、pvc 两个字段(按图面左右,填“左”或“右”)。", "answer": "{\"arm\": \"左\", \"pvc\": \"右\"}"}, {"id": "MS-U14-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂6-8米交通信号灯安装结构图(二)”的 A—A 剖面上,注“横向”的那一边和注“沿道路方向”的那一边,尺寸各是多少?以 JSON 返回 transverse、along_road 两个字段,每个为数值和单位(mm)。", "answer": "{\"transverse\": {\"value\": 1200, \"unit\": \"mm\"}, \"along_road\": {\"value\": 2000, \"unit\": \"mm\"}}"}, {"id": "MS-U14-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂9-10米交通信号灯安装结构图(一)”的立面图上,横梁中心线距立柱顶的尺寸是多少?横梁与立柱的夹角标注是多少度?以 JSON 返回 below_top(数值和单位,mm)、angle(只写度数数字,如 90.5)两个字段。", "answer": "{\"below_top\": {\"value\": 500, \"unit\": \"mm\"}, \"angle\": \"91.8\"}"}]} {"page_01_file_name": "images/MS-U14-03/few_sheet/01.png", "page_02_file_name": "images/MS-U14-03/few_sheet/02.png", "page_03_file_name": "images/MS-U14-03/few_sheet/03.png", "page_04_file_name": "images/MS-U14-03/few_sheet/04.png", "page_05_file_name": "images/MS-U14-03/few_sheet/05.png", "page_06_file_name": "images/MS-U14-03/few_sheet/06.png", "page_07_file_name": "images/MS-U14-03/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U14-03", "set": "U14", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "悬臂9-10米电子警察杆的基础底部设有 C10 细石混凝土垫层。关于这处垫层及相关杆件的基础,下列说法哪些正确?", "options": [{"key": "A", "text": "该垫层方量为 0.28 m³", "correct": false}, {"key": "B", "text": "该杆基础底部并没有 C10 细石混凝土垫层", "correct": true}, {"key": "C", "text": "该垫层厚 100 mm,其下还有 200 mm 厚片石夯实层", "correct": false}, {"key": "D", "text": "该杆基础为 1800×1800×1800 的 C30 混凝土", "correct": false}, {"key": "E", "text": "悬臂11-12米电子警察杆的基础底部同样没有垫层", "correct": false}, {"key": "F", "text": "同为 9-10 米悬臂的悬臂9-10米交通信号灯杆,基础底部设 100 mm 厚 C10 细石混凝土垫层", "correct": true}], "answer": ["B", "F"], "few_sheet_pages": [13, 10, 6, 12, 9, 11, 5], "evidence_pages": [10, 11, 6, 12, 13], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U14-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂9-10米电子警察安装结构图(一)”的立面图上,混凝土基础的宽度和高度各是多少?基础底面以下另设的垫层(混凝土垫层、片石层等)总厚度是多少,没有则填 0?以 JSON 返回 width、height、below 三个字段,每个为数值和单位(mm)。", "answer": "{\"width\": {\"value\": 1400, \"unit\": \"mm\"}, \"height\": {\"value\": 1800, \"unit\": \"mm\"}, \"below\": {\"value\": 0, \"unit\": \"mm\"}}"}, {"id": "MS-U14-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂11-12米电子警察安装结构图(一)”的立面图上,基础底面以下两层垫层的厚度各是多少?以 JSON 返回 cushion(C10 细石混凝土垫层)、stone(其下一层)两个字段,每个为数值和单位(mm)。", "answer": "{\"cushion\": {\"value\": 100, \"unit\": \"mm\"}, \"stone\": {\"value\": 200, \"unit\": \"mm\"}}"}, {"id": "MS-U14-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂9-10米交通信号灯安装结构图(二)”上,材料清单中 C10 混凝土垫层的方量是多少?信号灯立柱基础构造图中 C10 细石混凝土垫层的厚度是多少?以 JSON 返回 volume(数值和单位,m³)、thickness(数值和单位,mm)两个字段。", "answer": "{\"volume\": {\"value\": 0.28, \"unit\": \"m³\"}, \"thickness\": {\"value\": 100, \"unit\": \"mm\"}}"}, {"id": "MS-U14-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂11-12米电子警察安装结构图(二)”的材料数量表中,“基础”一行的平面边长和高度各是多少?以 JSON 返回 side、height 两个字段,每个为数值和单位(mm)。", "answer": "{\"side\": {\"value\": 1800, \"unit\": \"mm\"}, \"height\": {\"value\": 1800, \"unit\": \"mm\"}}"}, {"id": "MS-U14-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "悬臂长度为 9–10 米的两种杆件中,基础底部设有 C10 细石混凝土垫层的那一种,其 C10 垫层方量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 0.28, \"unit\": \"m³\"}"}]} {"page_01_file_name": "images/MS-U14-04/few_sheet/01.png", "page_02_file_name": "images/MS-U14-04/few_sheet/02.png", "page_03_file_name": "images/MS-U14-04/few_sheet/03.png", "page_04_file_name": "images/MS-U14-04/few_sheet/04.png", "page_05_file_name": "images/MS-U14-04/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U14-04", "set": "U14", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "三种悬臂电子警察杆(6-8 米、9-10 米、11-12 米)各一根,其基础中的 1 号钢筋箍筋(φ8)总长度合计是多少(mm)?", "options": [{"key": "A", "text": "57680", "correct": false}, {"key": "B", "text": "95272", "correct": false}, {"key": "C", "text": "88540", "correct": true}, {"key": "D", "text": "53680", "correct": false}, {"key": "E", "text": "65720", "correct": false}, {"key": "F", "text": "17708", "correct": false}], "answer": ["C"], "few_sheet_pages": [4, 10, 11, 9, 13], "evidence_pages": [9, 11, 13], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U14-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂6-8米电子警察安装结构图(二)”的箍筋大样图中,1 号钢筋(箍筋)的根数和单根长度 L 各是多少?以 JSON 返回 n(数值和单位,根)、L(数值和单位,mm)两个字段。", "answer": "{\"n\": {\"value\": 5, \"unit\": \"根\"}, \"L\": {\"value\": 4564, \"unit\": \"mm\"}}"}, {"id": "MS-U14-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂9-10米电子警察安装结构图(二)”的箍筋大样图中,1 号钢筋(箍筋)的根数和单根长度 L 各是多少?以 JSON 返回 n(数值和单位,根)、L(数值和单位,mm)两个字段。", "answer": "{\"n\": {\"value\": 5, \"unit\": \"根\"}, \"L\": {\"value\": 6172, \"unit\": \"mm\"}}"}, {"id": "MS-U14-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂11-12米电子警察安装结构图(二)”上,箍筋大样图中 1 号钢筋的单根长度是多少?地脚螺栓箍筋大样图中 3 号钢筋的根数和单根长度各是多少?以 JSON 返回 L1(mm)、n3(根)、L3(mm)三个字段,每个为数值和单位。", "answer": "{\"L1\": {\"value\": 6972, \"unit\": \"mm\"}, \"n3\": {\"value\": 3, \"unit\": \"根\"}, \"L3\": {\"value\": 2244, \"unit\": \"mm\"}}"}, {"id": "MS-U14-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "悬臂11-12米电子警察杆基础中,单根长 6972 mm 的那种 φ8 钢筋共有几根?返回数值和单位(根)。", "answer": "{\"value\": 5, \"unit\": \"根\"}"}]} {"page_01_file_name": "images/MS-U14-05/few_sheet/01.png", "page_02_file_name": "images/MS-U14-05/few_sheet/02.png", "page_03_file_name": "images/MS-U14-05/few_sheet/03.png", "page_04_file_name": "images/MS-U14-05/few_sheet/04.png", "page_05_file_name": "images/MS-U14-05/few_sheet/05.png", "page_06_file_name": "images/MS-U14-05/few_sheet/06.png", "page_07_file_name": "images/MS-U14-05/few_sheet/07.png", "page_08_file_name": "images/MS-U14-05/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U14-05", "set": "U14", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "本单元给出了人行信号灯杆、两种悬臂交通信号灯杆和三种悬臂电子警察杆的标准安装图。下列杆件中,哪些的基础混凝土强度等级是 C25,而不是 C30?", "options": [{"key": "A", "text": "悬臂6-8米交通信号灯杆", "correct": true}, {"key": "B", "text": "悬臂6-8米电子警察杆", "correct": false}, {"key": "C", "text": "人行信号灯杆", "correct": false}, {"key": "D", "text": "悬臂9-10米交通信号灯杆", "correct": true}, {"key": "E", "text": "悬臂11-12米电子警察杆", "correct": false}, {"key": "F", "text": "悬臂9-10米电子警察杆", "correct": false}], "answer": ["A", "D"], "few_sheet_pages": [11, 3, 1, 5, 9, 13, 4, 6], "evidence_pages": [4, 6, 1, 9, 11, 13], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U14-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂6-8米交通信号灯安装结构图(二)”的材料清单中,基础混凝土的强度等级和方量各是多少?以 JSON 返回 grade(按图中写法,形如 C40)、volume(数值和单位,m³)两个字段。", "answer": "{\"grade\": \"C25\", \"volume\": {\"value\": 4.8, \"unit\": \"m³\"}}"}, {"id": "MS-U14-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂9-10米交通信号灯安装结构图(二)”的材料清单中,基础混凝土的强度等级和方量各是多少?以 JSON 返回 grade(按图中写法,形如 C40)、volume(数值和单位,m³)两个字段。", "answer": "{\"grade\": \"C25\", \"volume\": {\"value\": 5.6, \"unit\": \"m³\"}}"}, {"id": "MS-U14-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行信号灯灯杆安装图”的人行信号灯灯杆材料表中,基础混凝土的强度等级和方量各是多少?以 JSON 返回 grade(按图中写法,形如 C40)、volume(数值和单位,m³)两个字段。", "answer": "{\"grade\": \"C30\", \"volume\": {\"value\": 0.64, \"unit\": \"m³\"}}"}, {"id": "MS-U14-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂6-8米电子警察安装结构图(二)”和“悬臂11-12米电子警察安装结构图(二)”的材料数量表中,“基础”一行备注的混凝土强度等级各是什么?以 JSON 返回 ep68、ep1112 两个字段(按图中写法,形如 C40)。", "answer": "{\"ep68\": \"C30\", \"ep1112\": \"C30\"}"}, {"id": "MS-U14-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "悬臂9-10米电子警察杆的基础,混凝土强度等级是什么?基础高度是多少?以 JSON 返回 grade(按图中写法,形如 C40)、height(数值和单位,mm)两个字段。", "answer": "{\"grade\": \"C30\", \"height\": {\"value\": 1800, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U14-06/few_sheet/01.png", "page_02_file_name": "images/MS-U14-06/few_sheet/02.png", "page_03_file_name": "images/MS-U14-06/few_sheet/03.png", "page_04_file_name": "images/MS-U14-06/few_sheet/04.png", "page_05_file_name": "images/MS-U14-06/few_sheet/05.png", "page_06_file_name": "images/MS-U14-06/few_sheet/06.png", "page_07_file_name": "images/MS-U14-06/few_sheet/07.png", "page_08_file_name": "images/MS-U14-06/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U14-06", "set": "U14", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "把本单元六种外场杆件(人行信号灯杆,悬臂6-8米交通信号灯杆、悬臂9-10米交通信号灯杆,悬臂6-8米电子警察杆、悬臂9-10米电子警察杆、悬臂11-12米电子警察杆)按单根杆件基础混凝土方量(不含垫层)从小到大排序。下列\"前一项 → 紧接的后一项\"中,哪些正确?", "options": [{"key": "A", "text": "悬臂9-10米交通信号灯杆 → 悬臂11-12米电子警察杆", "correct": true}, {"key": "B", "text": "悬臂6-8米电子警察杆 → 悬臂6-8米交通信号灯杆", "correct": false}, {"key": "C", "text": "人行信号灯杆 → 悬臂6-8米电子警察杆", "correct": true}, {"key": "D", "text": "悬臂9-10米电子警察杆 → 悬臂9-10米交通信号灯杆", "correct": false}, {"key": "E", "text": "悬臂6-8米交通信号灯杆 → 悬臂9-10米电子警察杆", "correct": false}, {"key": "F", "text": "悬臂9-10米电子警察杆 → 悬臂6-8米交通信号灯杆", "correct": true}], "answer": ["A", "C", "F"], "few_sheet_pages": [3, 22, 4, 9, 1, 6, 13, 11], "evidence_pages": [1, 9, 11, 13, 4, 6], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U14-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行信号灯灯杆安装图”的人行信号灯灯杆材料表中,C30 混凝土的方量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 0.64, \"unit\": \"m³\"}"}, {"id": "MS-U14-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂6-8米交通信号灯安装结构图(二)”的材料清单中,C25 混凝土的方量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 4.8, \"unit\": \"m³\"}"}, {"id": "MS-U14-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂9-10米交通信号灯安装结构图(二)”的材料清单中,C25 混凝土的方量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 5.6, \"unit\": \"m³\"}"}, {"id": "MS-U14-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂6-8米电子警察安装结构图(二)”的材料数量表中,“基础”一行的平面边长和高度各是多少?以 JSON 返回 side、height 两个字段,每个为数值和单位(mm)。", "answer": "{\"side\": {\"value\": 1000, \"unit\": \"mm\"}, \"height\": {\"value\": 1400, \"unit\": \"mm\"}}"}, {"id": "MS-U14-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂11-12米电子警察安装结构图(二)”的材料数量表中,“基础”一行的平面边长和高度各是多少?以 JSON 返回 side、height 两个字段,每个为数值和单位(mm)。", "answer": "{\"side\": {\"value\": 1800, \"unit\": \"mm\"}, \"height\": {\"value\": 1800, \"unit\": \"mm\"}}"}, {"id": "MS-U14-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "悬臂9-10米电子警察杆的混凝土基础,平面边长和高度各是多少?以 JSON 返回 side、height 两个字段,每个为数值和单位(mm)。", "answer": "{\"side\": {\"value\": 1400, \"unit\": \"mm\"}, \"height\": {\"value\": 1800, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U14-07/few_sheet/01.png", "page_02_file_name": "images/MS-U14-07/few_sheet/02.png", "page_03_file_name": "images/MS-U14-07/few_sheet/03.png", "page_04_file_name": "images/MS-U14-07/few_sheet/04.png", "page_05_file_name": "images/MS-U14-07/few_sheet/05.png", "page_06_file_name": "images/MS-U14-07/few_sheet/06.png", "page_07_file_name": "images/MS-U14-07/few_sheet/07.png", "page_08_file_name": "images/MS-U14-07/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U14-07", "set": "U14", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "外场杆件的电缆要从基础内引入立柱。下列杆件中,哪些在基础内预埋了 φ60 PVC 穿线管?", "options": [{"key": "A", "text": "悬臂6-8米交通信号灯杆", "correct": false}, {"key": "B", "text": "人行信号灯杆", "correct": true}, {"key": "C", "text": "悬臂9-10米电子警察杆", "correct": true}, {"key": "D", "text": "悬臂6-8米电子警察杆", "correct": true}, {"key": "E", "text": "悬臂9-10米交通信号灯杆", "correct": false}, {"key": "F", "text": "悬臂11-12米电子警察杆", "correct": true}], "answer": ["B", "C", "D", "F"], "few_sheet_pages": [11, 4, 6, 13, 1, 20, 3, 9], "evidence_pages": [1, 9, 11, 13, 4, 6], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U14-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“人行信号灯灯杆安装图”的基础立面图上,从立柱底部弯出、穿出基础侧面的那根预埋管,管材和管径各是什么?以 JSON 返回 material(只写管材缩写,形如 HDPE)、D(数值和单位,mm)两个字段。", "answer": "{\"material\": \"PVC\", \"D\": {\"value\": 60, \"unit\": \"mm\"}}"}, {"id": "MS-U14-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂6-8米电子警察安装结构图(二)”和“悬臂11-12米电子警察安装结构图(二)”的材料数量表中,“PVC穿线管”一行的管径各是多少?以 JSON 返回 ep68、ep1112 两个字段,每个为数值和单位(mm)。", "answer": "{\"ep68\": {\"value\": 60, \"unit\": \"mm\"}, \"ep1112\": {\"value\": 60, \"unit\": \"mm\"}}"}, {"id": "MS-U14-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂6-8米交通信号灯安装结构图(二)”上,信号灯立柱基础内的电缆线按“硅芯管包封大样图”包封。包封外廓的宽度和高度各是多少?以 JSON 返回 width、height 两个字段,每个为数值和单位(mm)。", "answer": "{\"width\": {\"value\": 260, \"unit\": \"mm\"}, \"height\": {\"value\": 130, \"unit\": \"mm\"}}"}, {"id": "MS-U14-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "悬臂长度 9–10 米的电子警察杆,基础内从立柱底部引出的预埋穿线管,管材和管径各是什么?以 JSON 返回 material(只写管材缩写,形如 HDPE)、D(数值和单位,mm)两个字段。", "answer": "{\"material\": \"PVC\", \"D\": {\"value\": 60, \"unit\": \"mm\"}}"}, {"id": "MS-U14-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "悬臂9-10米交通信号灯杆基础内的电缆线采用包封保护。包封外廓的宽度和高度各是多少?以 JSON 返回 width、height 两个字段,每个为数值和单位(mm)。", "answer": "{\"width\": {\"value\": 260, \"unit\": \"mm\"}, \"height\": {\"value\": 130, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U14-08/few_sheet/01.png", "page_02_file_name": "images/MS-U14-08/few_sheet/02.png", "page_03_file_name": "images/MS-U14-08/few_sheet/03.png", "page_04_file_name": "images/MS-U14-08/few_sheet/04.png", "page_05_file_name": "images/MS-U14-08/few_sheet/05.png", "page_06_file_name": "images/MS-U14-08/few_sheet/06.png", "page_07_file_name": "images/MS-U14-08/few_sheet/07.png", "page_08_file_name": "images/MS-U14-08/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U14-08", "set": "U14", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "悬臂11-12米电子警察杆的基础底部设有 C10 细石混凝土垫层。关于这处垫层及相关杆件的基础,下列说法哪些正确?", "options": [{"key": "A", "text": "该垫层下还有 200 mm 厚片石夯实层,表层灌沙", "correct": true}, {"key": "B", "text": "悬臂9-10米电子警察杆的基础底部同样设有 100 mm 厚的 C10 垫层", "correct": false}, {"key": "C", "text": "悬臂9-10米交通信号灯杆的 C10 垫层方量为 0.28 m³,比该杆垫层方量大", "correct": false}, {"key": "D", "text": "该杆基础底部并没有 C10 细石混凝土垫层", "correct": false}, {"key": "E", "text": "悬臂6-8米交通信号灯杆的 C10 垫层方量为 0.24 m³,比该杆垫层方量小", "correct": true}, {"key": "F", "text": "该垫层平面与基础相同(1800×1800),厚 100 mm,方量 0.324 m³", "correct": true}], "answer": ["A", "E", "F"], "few_sheet_pages": [6, 13, 9, 11, 8, 4, 12, 10], "evidence_pages": [12, 13, 10, 11, 4, 6], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U14-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂11-12米电子警察安装结构图(二)”的材料数量表中,“基础垫层1”和“基础垫层2”的平面边长和厚度各是多少?以 JSON 返回 side(两层相同的平面边长)、t1(垫层1 厚度)、t2(垫层2 厚度)三个字段,每个为数值和单位(mm)。", "answer": "{\"side\": {\"value\": 1800, \"unit\": \"mm\"}, \"t1\": {\"value\": 100, \"unit\": \"mm\"}, \"t2\": {\"value\": 200, \"unit\": \"mm\"}}"}, {"id": "MS-U14-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂6-8米交通信号灯安装结构图(二)”的材料清单中,C10 混凝土垫层的方量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 0.24, \"unit\": \"m³\"}"}, {"id": "MS-U14-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂9-10米交通信号灯安装结构图(二)”的材料清单中,C10 混凝土垫层的方量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 0.28, \"unit\": \"m³\"}"}, {"id": "MS-U14-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“悬臂9-10米电子警察安装结构图(一)”的立面图上,基础底面以下另设的垫层(混凝土垫层、片石层等)总厚度是多少?没有则填 0,返回数值和单位(mm)。", "answer": "{\"value\": 0, \"unit\": \"mm\"}"}, {"id": "MS-U14-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "三种悬臂电子警察杆中,基础底部设有 C10 细石混凝土垫层的那一种,其混凝土基础的平面边长是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1800, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U15-01/few_sheet/01.png", "page_02_file_name": "images/MS-U15-01/few_sheet/02.png", "page_03_file_name": "images/MS-U15-01/few_sheet/03.png", "page_04_file_name": "images/MS-U15-01/few_sheet/04.png", "page_05_file_name": "images/MS-U15-01/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U15-01", "set": "U15", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "沿桥纵向看主缆的走向(主缆上装有 A-10 灯具),下列说法哪些正确?", "options": [{"key": "A", "text": "主跨主缆在跨中附近最低,最低处仍在桥面以上", "correct": true}, {"key": "B", "text": "南边跨主缆自 P8 塔顶向南下行,在 P10 与 P11 之间穿过桥面,此后在桥面以下继续下行", "correct": true}, {"key": "C", "text": "南边跨主缆在 P8 与 P9 之间就已降到桥面以下", "correct": false}, {"key": "D", "text": "主缆上的 A-10 灯具全部在桥面以上", "correct": false}, {"key": "E", "text": "北边跨主缆自 P7 塔顶向北下行,到桥梁起点附近降到桥面以下,端部在桥面以下", "correct": true}, {"key": "F", "text": "两侧边跨主缆都从塔顶向桥外侧上升,锚在高于塔顶的山体上", "correct": false}], "answer": ["A", "B", "E"], "few_sheet_pages": [16, 17, 13, 15, 14], "evidence_pages": [14, 15, 16], "full_set_page_count": 17, "sub_questions": [{"id": "MS-U15-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“灯具安装电气立面图(三)”上,挂有 A-10 灯具的那条缆索从塔顶往南下行,在哪两个墩之间与桥面线相交?墩号以图中各墩下方断面标记(形如 P10-1-P10-1')里的墩号为准,按原样返回两个,不分先后,以 JSON 数组返回(形如 [\"P12\", \"P13\"])。", "answer": "[\"P10\", \"P11\"]"}, {"id": "MS-U15-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“灯具安装电气立面图(三)”上,沿缆索离塔最远(最靠近缆索下端)的那个 A-10 灯具,位于桥面的什么位置?只能从 桥面以上、桥面处、桥面以下 中选一个原样返回。", "answer": "\"桥面以下\""}, {"id": "MS-U15-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“灯具安装电气立面图(一)”上,挂有 A-10 灯具的那条缆索的北端端点(小圆圈),以及沿缆索最靠近该端点的那个 A-10 灯具,各位于桥面的什么位置?以 JSON 返回两个字段 end_point、last_lamp,每个只能从 桥面以上、桥面处、桥面以下 中选一个原样返回。", "answer": "{\"end_point\": \"桥面以下\", \"last_lamp\": \"桥面以下\"}"}, {"id": "MS-U15-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“灯具安装电气立面图(二)”上,挂有 A-10 灯具的那条缆索在主跨内的最低处,位于桥面的什么位置?只能从 桥面以上、桥面处、桥面以下 中选一个原样返回。", "answer": "\"桥面以上\""}, {"id": "MS-U15-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“灯具安装电气立面图(一)”上,从主塔塔顶沿挂有 A-10 灯具的缆索向图左(北)走到其端点,缆索高程如何变化?只能从 一路下降、先降后升、一路上升 中选一个原样返回。", "answer": "\"一路下降\""}, {"id": "MS-U15-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "挂有 A-10 灯具的缆索,在南边跨从哪两个墩之间穿过桥面?按图中墩号原样返回两个,不分先后,以 JSON 数组返回(形如 [\"P12\", \"P13\"])。", "answer": "[\"P10\", \"P11\"]"}, {"id": "MS-U15-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "挂有 A-10 灯具的缆索,在两座主塔之间那一跨的最低处,位于桥面的什么位置?只能从 桥面以上、桥面处、桥面以下 中选一个原样返回。", "answer": "\"桥面以上\""}]} {"page_01_file_name": "images/MS-U15-02/few_sheet/01.png", "page_02_file_name": "images/MS-U15-02/few_sheet/02.png", "page_03_file_name": "images/MS-U15-02/few_sheet/03.png", "page_04_file_name": "images/MS-U15-02/few_sheet/04.png", "page_05_file_name": "images/MS-U15-02/few_sheet/05.png", "page_06_file_name": "images/MS-U15-02/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U15-02", "set": "U15", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "两座主塔墩(P7、P8)处安装的 A-04 极窄光束矩形投光灯,下列说法哪些正确?", "options": [{"key": "A", "text": "A-04 向上、向下两个方向照射", "correct": true}, {"key": "B", "text": "主塔墩处并没有安装 A-04", "correct": false}, {"key": "C", "text": "P7、P8 两处都装有 A-04,且桥轴线两侧都有", "correct": true}, {"key": "D", "text": "A-04 的色温与引桥桥面的 A-06 相同,都是 4200K", "correct": false}, {"key": "E", "text": "A-04 由上向下单向照射,与引桥墩上的 A-07 相同", "correct": false}, {"key": "F", "text": "A-04 与同名的 A-03 装在同一高度", "correct": false}], "answer": ["A", "C"], "few_sheet_pages": [13, 6, 10, 17, 15, 5], "evidence_pages": [5, 10, 15, 17], "full_set_page_count": 17, "sub_questions": [{"id": "MS-U15-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩投光照明布置图”上,A-04 灯具布置在哪两个墩处?按图中墩号原样返回两个,不分先后,以 JSON 数组返回(形如 [\"P12\", \"P13\"])。", "answer": "[\"P7\", \"P8\"]"}, {"id": "MS-U15-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩投光照明布置图”上,P7 和 P8 两处的 A-04 灯具,各布置在桥轴线(图中水平中心线)的哪一侧的塔柱上?以 JSON 返回两个字段 P7、P8,每个只能从 轴线上方、轴线下方、上下两侧 中选一个原样返回。", "answer": "{\"P7\": \"上下两侧\", \"P8\": \"上下两侧\"}"}, {"id": "MS-U15-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“灯具安装电气立面图(二)”上,主塔处桥面以下、带文字引注的那组灯具:以 JSON 返回两个字段 code(设备编号,按图中编号原样返回,形如 A-00)、direction(引注里写的照射方向,只能从 上照、下照、上下双向 中选一个原样返回)。", "answer": "{\"code\": \"A-04\", \"direction\": \"上下双向\"}"}, {"id": "MS-U15-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩投光照明布置图”上,A-07 灯具的文字引注里写的照射方向是什么?只能从 上照、下照、上下双向 中选一个原样返回。", "answer": "\"下照\""}, {"id": "MS-U15-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪大桥景观照明材料表”的灯具材料清单中,A-04 和 A-06 的色温各是多少?以 JSON 返回两个字段 A_04、A_06,只写数值(单位 K,写成字符串)。", "answer": "{\"A_04\": \"3700\", \"A_06\": \"4200\"}"}, {"id": "MS-U15-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主塔塔柱上、位于桥面以上且安装于桥塔内侧的那组灯具,设备编号是什么?按图中编号原样返回(形如 A-00)。", "answer": "\"A-03\""}, {"id": "MS-U15-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "安装在两座主塔墩上、向上向下照射的那种灯具,色温是多少?只写数值(单位 K,写成字符串)。按图中记号或文字原样返回一个字符串。", "answer": "\"3700\""}]} {"page_01_file_name": "images/MS-U15-03/few_sheet/01.png", "page_02_file_name": "images/MS-U15-03/few_sheet/02.png", "page_03_file_name": "images/MS-U15-03/few_sheet/03.png", "page_04_file_name": "images/MS-U15-03/few_sheet/04.png", "page_05_file_name": "images/MS-U15-03/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U15-03", "set": "U15", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "北引桥 P2–P6 各桥墩上安装的 A-04 极窄光束矩形投光灯,关于这些桥墩上的投光照明,下列说法哪些正确?", "options": [{"key": "A", "text": "北引桥各墩上的投光灯色温为 3700K", "correct": false}, {"key": "B", "text": "北引桥各墩上安装的是 A-07 双排极窄投光灯,由上向下照射", "correct": true}, {"key": "C", "text": "北引桥各墩上的投光灯与主塔塔柱内侧向上照射的灯具色温相同", "correct": false}, {"key": "D", "text": "北引桥 P2–P6 各墩上并没有安装 A-04", "correct": true}, {"key": "E", "text": "北引桥各墩上的投光灯与主塔墩上的 A-04 是同一名称的灯具", "correct": false}, {"key": "F", "text": "北引桥各墩上的投光灯色温为 4200K", "correct": true}], "answer": ["B", "D", "F"], "few_sheet_pages": [17, 12, 16, 5, 10], "evidence_pages": [5, 10, 17], "full_set_page_count": 17, "sub_questions": [{"id": "MS-U15-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩投光照明布置图”上,A-04 灯具布置在哪两个墩处?按图中墩号原样返回两个,不分先后,以 JSON 数组返回(形如 [\"P12\", \"P13\"])。", "answer": "[\"P7\", \"P8\"]"}, {"id": "MS-U15-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩投光照明布置图”上,北引桥 P3 墩处布置的灯具:以 JSON 返回两个字段 code(设备编号,按图中编号原样返回,形如 A-00)、direction(该灯具文字引注里写的照射方向,只能从 上照、下照、上下双向 中选一个原样返回)。", "answer": "{\"code\": \"A-07\", \"direction\": \"下照\"}"}, {"id": "MS-U15-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪大桥景观照明材料表”的灯具材料清单中,A-07、A-04、A-03 的色温各是多少?以 JSON 返回三个字段 A_07、A_04、A_03,只写数值(单位 K,写成字符串)。", "answer": "{\"A_07\": \"4200\", \"A_04\": \"3700\", \"A_03\": \"3700\"}"}, {"id": "MS-U15-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“灯具安装电气剖面图”的主塔立面图上,桥面以上、安装于桥塔内侧的那组灯具:以 JSON 返回两个字段 code(设备编号,形如 A-00)、direction(只能从 上照、下照、上下双向 中选一个原样返回)。", "answer": "{\"code\": \"A-03\", \"direction\": \"上照\"}"}, {"id": "MS-U15-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "设备名称为“双排极窄投光灯”的灯具,设备编号是什么?按图中编号原样返回(形如 A-00)。", "answer": "\"A-07\""}, {"id": "MS-U15-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主塔塔柱内侧向上照射的那种灯具,色温是多少?只写数值(单位 K,写成字符串)。按图中记号或文字原样返回一个字符串。", "answer": "\"3700\""}]} {"page_01_file_name": "images/MS-U15-04/few_sheet/01.png", "page_02_file_name": "images/MS-U15-04/few_sheet/02.png", "page_03_file_name": "images/MS-U15-04/few_sheet/03.png", "page_04_file_name": "images/MS-U15-04/few_sheet/04.png", "page_05_file_name": "images/MS-U15-04/few_sheet/05.png", "page_06_file_name": "images/MS-U15-04/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U15-04", "set": "U15", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "下列灯具中,哪些在全桥平面上只布置在两座主塔(P7、P8)处,引桥各墩和主跨其余位置都没有?", "options": [{"key": "A", "text": "A-09(线性投光灯)", "correct": false}, {"key": "B", "text": "A-03(极窄光束矩形投光灯)", "correct": true}, {"key": "C", "text": "A-07(双排极窄投光灯)", "correct": false}, {"key": "D", "text": "A-04(极窄光束矩形投光灯)", "correct": true}, {"key": "E", "text": "A-01(新型斜拉索投光灯)", "correct": false}, {"key": "F", "text": "A-10", "correct": false}], "answer": ["B", "D"], "few_sheet_pages": [11, 3, 12, 10, 17, 13], "evidence_pages": [10, 11, 12, 13], "full_set_page_count": 17, "sub_questions": [{"id": "MS-U15-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩投光照明布置图”上,A-04 灯具布置在哪两个墩处?按图中墩号原样返回两个,不分先后,以 JSON 数组返回(形如 [\"P12\", \"P13\"])。", "answer": "[\"P7\", \"P8\"]"}, {"id": "MS-U15-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩投光照明布置图”上,北引桥范围内布置 A-07 灯具的桥墩中,墩号最小的是哪个?按图中墩号原样返回(形如 P12)。", "answer": "\"P2\""}, {"id": "MS-U15-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“翼檐灯具照明布置图”上,A-09 灯具的文字引注中写的安装部位是什么?安装部位只能从下列图中引注用语里选一个原样返回:桥塔内侧、桥拱内侧顶端、主塔墩、桥墩、桥梁翼檐、桥面、斜拉索、悬索根部。", "answer": "\"桥梁翼檐\""}, {"id": "MS-U15-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面灯具照明布置图”上,A-01 灯具的文字引注中写的安装部位是什么?安装部位只能从下列图中引注用语里选一个原样返回:桥塔内侧、桥拱内侧顶端、主塔墩、桥墩、桥梁翼檐、桥面、斜拉索、悬索根部。", "answer": "\"悬索根部\""}, {"id": "MS-U15-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“拉索投光照明布置图”上,A-10 灯具的文字引注中写的安装部位是什么?安装部位只能从下列图中引注用语里选一个原样返回:桥塔内侧、桥拱内侧顶端、主塔墩、桥墩、桥梁翼檐、桥面、斜拉索、悬索根部。", "answer": "\"斜拉索\""}, {"id": "MS-U15-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "A-03 灯具在全桥平面上布置在哪两个墩(塔)处?按图中墩号原样返回两个,不分先后,以 JSON 数组返回(形如 [\"P12\", \"P13\"])。", "answer": "[\"P7\", \"P8\"]"}]} {"page_01_file_name": "images/MS-U15-05/few_sheet/01.png", "page_02_file_name": "images/MS-U15-05/few_sheet/02.png", "page_03_file_name": "images/MS-U15-05/few_sheet/03.png", "page_04_file_name": "images/MS-U15-05/few_sheet/04.png", "page_05_file_name": "images/MS-U15-05/few_sheet/05.png", "page_06_file_name": "images/MS-U15-05/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U15-05", "set": "U15", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "全桥景观照明的各类灯具中,哪些是由下向上照射的?", "options": [{"key": "A", "text": "A-06(线形极窄投光灯)", "correct": true}, {"key": "B", "text": "A-09(线性投光灯)", "correct": false}, {"key": "C", "text": "A-02(新型斜拉索投光灯)", "correct": true}, {"key": "D", "text": "A-05(线形极窄投光灯)", "correct": false}, {"key": "E", "text": "A-07(双排极窄投光灯)", "correct": false}, {"key": "F", "text": "A-03(极窄光束矩形投光灯)", "correct": true}], "answer": ["A", "C", "F"], "few_sheet_pages": [10, 17, 11, 13, 5, 12], "evidence_pages": [10, 11, 12, 17], "full_set_page_count": 17, "sub_questions": [{"id": "MS-U15-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面灯具照明布置图”上,A-02 和 A-06 两种灯具的文字引注里写的照射方向各是什么?以 JSON 返回两个字段 A_02、A_06;照射方向只能从 上照、下照、上下双向 中选一个原样返回。", "answer": "{\"A_02\": \"上照\", \"A_06\": \"上照\"}"}, {"id": "MS-U15-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“灯具安装电气剖面图”的主塔立面图上,A-03 和 A-05 两种灯具的文字引注里写的照射方向各是什么?以 JSON 返回两个字段 A_03、A_05;照射方向只能从 上照、下照、上下双向 中选一个原样返回。", "answer": "{\"A_03\": \"上照\", \"A_05\": \"下照\"}"}, {"id": "MS-U15-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“翼檐灯具照明布置图”上,A-09 灯具的文字引注里写的照射方向是什么?照射方向只能从 上照、下照、上下双向 中选一个原样返回。", "answer": "\"下照\""}, {"id": "MS-U15-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩投光照明布置图”上,A-07 灯具的文字引注里写的照射方向是什么?照射方向只能从 上照、下照、上下双向 中选一个原样返回。", "answer": "\"下照\""}, {"id": "MS-U15-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "设备名称为“线形极窄投光灯”、色温为 3700K 的那种灯具,设备编号是什么?按图中编号原样返回(形如 A-00)。", "answer": "\"A-05\""}, {"id": "MS-U15-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "设备名称为“线形极窄投光灯”、色温为 4200K 的那种灯具,设备编号是什么?按图中编号原样返回(形如 A-00)。", "answer": "\"A-06\""}]} {"page_01_file_name": "images/MS-U15-06/few_sheet/01.png", "page_02_file_name": "images/MS-U15-06/few_sheet/02.png", "page_03_file_name": "images/MS-U15-06/few_sheet/03.png", "page_04_file_name": "images/MS-U15-06/few_sheet/04.png", "page_05_file_name": "images/MS-U15-06/few_sheet/05.png", "page_06_file_name": "images/MS-U15-06/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U15-06", "set": "U15", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "主塔及其附近安装的各类灯具,关于安装位置和照射方向,下列说法哪些正确?", "options": [{"key": "A", "text": "A-04 也装在南、北引桥各桥墩墩顶", "correct": false}, {"key": "B", "text": "A-04 装在主塔墩处,向上、向下两个方向照射", "correct": true}, {"key": "C", "text": "A-08 装在塔顶两侧的缆索上", "correct": true}, {"key": "D", "text": "A-08 装在塔墩承台周围、桥面以下", "correct": false}, {"key": "E", "text": "A-05 装在桥面以下桥拱内侧的顶端,向下照射", "correct": true}, {"key": "F", "text": "A-03 装在桥面以上的塔柱内侧,向上照射", "correct": true}], "answer": ["B", "C", "E", "F"], "few_sheet_pages": [10, 5, 11, 17, 15, 13], "evidence_pages": [10, 13, 15, 17], "full_set_page_count": 17, "sub_questions": [{"id": "MS-U15-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "灯具安装电气剖面图(主塔立面图)上,位于桥面以上、带文字引注的那组灯具:以 JSON 返回三个字段 {\"编号\": ..., \"安装部位\": ..., \"照射方向\": ...}。编号按图中设备编号原样返回(形如 A-0X);安装部位只能从下列图中引注用语里选一个原样返回:桥塔内侧、桥拱内侧顶端、主塔墩、桥墩、桥梁翼檐、桥面、斜拉索、悬索根部;照射方向只能从 上照、下照、上下双向 中选一个。", "answer": "{\"编号\": \"A-03\", \"安装部位\": \"桥塔内侧\", \"照射方向\": \"上照\"}"}, {"id": "MS-U15-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "灯具安装电气剖面图(主塔立面图)上,位于桥面以下、带文字引注的那组灯具:以 JSON 返回三个字段 {\"编号\": ..., \"安装部位\": ..., \"照射方向\": ...}。编号按图中设备编号原样返回(形如 A-0X);安装部位只能从下列图中引注用语里选一个原样返回:桥塔内侧、桥拱内侧顶端、主塔墩、桥墩、桥梁翼檐、桥面、斜拉索、悬索根部;照射方向只能从 上照、下照、上下双向 中选一个。", "answer": "{\"编号\": \"A-05\", \"安装部位\": \"桥拱内侧顶端\", \"照射方向\": \"下照\"}"}, {"id": "MS-U15-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥墩投光照明布置图上,P7 墩处带\"安装于……\"文字引注的那种灯具:以 JSON 返回三个字段 {\"编号\": ..., \"安装部位\": ..., \"照射方向\": ...}。编号按图中设备编号原样返回(形如 A-0X);安装部位只能从下列图中引注用语里选一个原样返回:桥塔内侧、桥拱内侧顶端、主塔墩、桥墩、桥梁翼檐、桥面、斜拉索、悬索根部;照射方向只能从 上照、下照、上下双向 中选一个。", "answer": "{\"编号\": \"A-04\", \"安装部位\": \"主塔墩\", \"照射方向\": \"上下双向\"}"}, {"id": "MS-U15-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥墩投光照明布置图上,北引桥 P3 墩处带\"安装于……\"文字引注的那种灯具:以 JSON 返回三个字段 {\"编号\": ..., \"安装部位\": ..., \"照射方向\": ...}。编号按图中设备编号原样返回(形如 A-0X);安装部位只能从下列图中引注用语里选一个原样返回:桥塔内侧、桥拱内侧顶端、主塔墩、桥墩、桥梁翼檐、桥面、斜拉索、悬索根部;照射方向只能从 上照、下照、上下双向 中选一个。", "answer": "{\"编号\": \"A-07\", \"安装部位\": \"桥墩\", \"照射方向\": \"下照\"}"}, {"id": "MS-U15-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "灯具安装电气立面图(二)上,紧靠塔顶两侧、沿缆索成串布置、图例为带十字圆圈的那组灯具,设备编号是什么?按图中设备编号原样返回(形如 A-0X)。", "answer": "\"A-08\""}, {"id": "MS-U15-06-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "拉索投光照明布置图上,P7 墩承台方框两侧、沿索线紧挨承台成串布置、图例为带十字圆圈的那几盏灯具,设备编号是什么?按图中设备编号原样返回(形如 A-0X)。", "answer": "\"A-08\""}, {"id": "MS-U15-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "A-04 灯具安装在哪两个墩上?按图中墩号原样返回两个,不分先后,以 JSON 数组返回(形如 [\"P12\", \"P13\"])。", "answer": "[\"P7\", \"P8\"]"}]} {"page_01_file_name": "images/MS-U15-07/few_sheet/01.png", "page_02_file_name": "images/MS-U15-07/few_sheet/02.png", "page_03_file_name": "images/MS-U15-07/few_sheet/03.png", "page_04_file_name": "images/MS-U15-07/few_sheet/04.png", "page_05_file_name": "images/MS-U15-07/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U15-07", "set": "U15", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "南引桥各桥墩墩顶设置的避雷针,下列说法哪些正确?", "options": [{"key": "A", "text": "南引桥墩顶避雷针的支撑杆为 Φ80×5 不锈钢管", "correct": false}, {"key": "B", "text": "南引桥各桥墩并没有设避雷针", "correct": true}, {"key": "C", "text": "南引桥 P9–P18 每墩 1 套,共 10 套", "correct": false}, {"key": "D", "text": "南引桥桥面利用拉索检修栏杆做避雷带", "correct": false}, {"key": "E", "text": "桥墩利用墩内 Φ20 及以上结构主筋作防雷引下线", "correct": true}, {"key": "F", "text": "全桥避雷针只有 2 套,每座主塔 1 套", "correct": false}], "answer": ["B", "E"], "few_sheet_pages": [17, 3, 4, 10, 2], "evidence_pages": [2, 3, 4], "full_set_page_count": 17, "sub_questions": [{"id": "MS-U15-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪大桥防雷平面图”上,“预放电避雷针”引注的引出线指向哪两个墩(塔)处?按图中墩号原样返回两个,不分先后,以 JSON 数组返回(形如 [\"P12\", \"P13\"])。", "answer": "[\"P7\", \"P8\"]"}, {"id": "MS-U15-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主桥防雷系统主要设备材料表”中,提前放电避雷针的数量和保护半径各是多少?以 JSON 返回两个字段:n_sets(数值和单位 套)、radius(保护半径下限,数值和单位 m)。", "answer": "{\"n_sets\": {\"value\": 4, \"unit\": \"套\"}, \"radius\": {\"value\": 78, \"unit\": \"m\"}}"}, {"id": "MS-U15-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪大桥防雷平面图”上,P9 与 P11 之间桥面上的引注写的是哪种防雷做法?只能从下列图中引注用语里选一个原样返回:利用拉索检修栏杆做避雷带、利用钢箱梁作桥面等电位连接、利用梁内Φ20及以上钢筋横向连通。", "answer": "\"利用钢箱梁作桥面等电位连接\""}, {"id": "MS-U15-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪大桥防雷平面图”右上角指向桥墩的那条引注中,用作防雷引下线的结构主筋直径下限是多少?返回数值和单位(mm)。", "answer": "{\"value\": 20, \"unit\": \"mm\"}"}, {"id": "MS-U15-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主桥防雷系统主要设备材料表”中,两种避雷针支撑杆的规格和数量:以 JSON 返回四个字段 pipe1_d、pipe1_len(第一行支撑杆的管外径和数量)、pipe2_d、pipe2_len(第二行),管外径为数值和单位 mm,数量为数值和单位 m。", "answer": "{\"pipe1_d\": {\"value\": 50, \"unit\": \"mm\"}, \"pipe1_len\": {\"value\": 6, \"unit\": \"m\"}, \"pipe2_d\": {\"value\": 80, \"unit\": \"mm\"}, \"pipe2_len\": {\"value\": 8, \"unit\": \"m\"}}"}, {"id": "MS-U15-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "保护半径不小于 78 m 的那种避雷针,装在哪两个墩(塔)处?按图中墩号原样返回两个,不分先后,以 JSON 数组返回(形如 [\"P12\", \"P13\"])。", "answer": "[\"P7\", \"P8\"]"}, {"id": "MS-U15-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "全桥“利用拉索检修栏杆做避雷带”的做法用于哪一段桥?只能从 北引桥、主桥、南引桥 中选一个原样返回。", "answer": "\"主桥\""}]} {"page_01_file_name": "images/MS-U15-08/few_sheet/01.png", "page_02_file_name": "images/MS-U15-08/few_sheet/02.png", "page_03_file_name": "images/MS-U15-08/few_sheet/03.png", "page_04_file_name": "images/MS-U15-08/few_sheet/04.png", "page_05_file_name": "images/MS-U15-08/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U15-08", "set": "U15", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "两座主塔塔顶设置的避雷针,下列说法哪些正确?", "options": [{"key": "A", "text": "主塔塔顶并没有设避雷针", "correct": false}, {"key": "B", "text": "主塔利用塔内 Φ20 及以上主筋作防雷引下线", "correct": true}, {"key": "C", "text": "每座主塔在两个塔肢顶端各设 1 套,全桥共 4 套", "correct": true}, {"key": "D", "text": "避雷针保护半径不小于 78 m", "correct": true}, {"key": "E", "text": "避雷针设在两塔肢之间弧形塔顶的中点", "correct": false}, {"key": "F", "text": "每套避雷针底座配 4 块不锈钢加劲肋、4 根地脚螺栓", "correct": true}], "answer": ["B", "C", "D", "F"], "few_sheet_pages": [4, 10, 3, 2, 17], "evidence_pages": [2, 3, 4], "full_set_page_count": 17, "sub_questions": [{"id": "MS-U15-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪大桥防雷平面图”上,“预放电避雷针”引注的引出线指向哪两个墩(塔)处?按图中墩号原样返回两个,不分先后,以 JSON 数组返回(形如 [\"P12\", \"P13\"])。", "answer": "[\"P7\", \"P8\"]"}, {"id": "MS-U15-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪大桥防雷立面图”右侧的“P7塔半立面图”上,塔顶画了几根避雷针?这些避雷针立在什么部位?以 JSON 返回两个字段:n_rods(数值和单位 根)、position(只能从 塔肢顶端、弧形塔顶中点、上横梁顶面 中选一个原样返回)。", "answer": "{\"n_rods\": {\"value\": 2, \"unit\": \"根\"}, \"position\": \"塔肢顶端\"}"}, {"id": "MS-U15-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主桥防雷系统主要设备材料表”中,提前放电避雷针的数量和保护半径各是多少?以 JSON 返回两个字段:n_sets(数值和单位 套)、radius(保护半径下限,数值和单位 m)。", "answer": "{\"n_sets\": {\"value\": 4, \"unit\": \"套\"}, \"radius\": {\"value\": 78, \"unit\": \"m\"}}"}, {"id": "MS-U15-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主桥防雷系统主要设备材料表”中,避雷针底座、避雷针不锈钢底座加劲肋、地脚螺栓的数量各是多少?以 JSON 返回三个字段 base、rib、bolt,每个为数值和单位(底座、加劲肋用 块,地脚螺栓用 个)。", "answer": "{\"base\": {\"value\": 4, \"unit\": \"块\"}, \"rib\": {\"value\": 16, \"unit\": \"块\"}, \"bolt\": {\"value\": 16, \"unit\": \"个\"}}"}, {"id": "MS-U15-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪大桥防雷平面图”上,P7 处“预放电避雷针”那条引注的第二行中,用作防雷引下线的主筋直径下限是多少?返回数值和单位(mm)。", "answer": "{\"value\": 20, \"unit\": \"mm\"}"}, {"id": "MS-U15-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "立在主塔塔肢顶端的避雷针,保护半径下限是多少?返回数值和单位(m)。", "answer": "{\"value\": 78, \"unit\": \"m\"}"}, {"id": "MS-U15-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "每套提前放电避雷针的不锈钢底座配几块加劲肋?返回数值和单位(块)。", "answer": "{\"value\": 4, \"unit\": \"块\"}"}]} {"page_01_file_name": "images/MS-U16-01/few_sheet/01.png", "page_02_file_name": "images/MS-U16-01/few_sheet/02.png", "page_03_file_name": "images/MS-U16-01/few_sheet/03.png", "page_04_file_name": "images/MS-U16-01/few_sheet/04.png", "page_05_file_name": "images/MS-U16-01/few_sheet/05.png", "page_06_file_name": "images/MS-U16-01/few_sheet/06.png", "page_07_file_name": "images/MS-U16-01/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U16-01", "set": "U16", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "隧道各衬砌段中,哪些段(或部分)的开挖土石方没有在本段衬砌竣工图的数量表中计列,而是计入元江口一端的边仰坡开挖工程?", "options": [{"key": "A", "text": "K120+765~K120+775 明洞段", "correct": true}, {"key": "B", "text": "K120+750~K120+765 明暗洞段的暗挖部分", "correct": false}, {"key": "C", "text": "II 类围岩复合式衬砌段(含上行线 K120+735~K120+750)", "correct": false}, {"key": "D", "text": "III 类围岩复合式衬砌段", "correct": false}, {"key": "E", "text": "K120+750~K120+765 明暗洞段的明挖部分", "correct": true}, {"key": "F", "text": "下行线 K120+744~K120+750 明洞段", "correct": false}], "answer": ["A", "E"], "few_sheet_pages": [10, 2, 8, 24, 6, 9, 7], "evidence_pages": [10, 9, 7, 6, 2], "full_set_page_count": 24, "sub_questions": [{"id": "MS-U16-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "本册衬砌断面图中,断面下方注明桩号 K120+775 的那段衬砌,其土石方开挖数量计在哪里?从 {本图数量表, 元江口边仰坡工程, 玉溪口边仰坡工程} 中选一个返回。", "answer": "\"元江口边仰坡工程\""}, {"id": "MS-U16-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道k120+765~750段明暗洞工程竣工图”上:附注说此段明挖土石方计在哪里?数量表“暗挖”栏的土方、石方数量各是多少?按字段 明挖计入、暗挖土方、暗挖石方 返回;明挖计入从 {本图数量表, 元江口边仰坡工程, 玉溪口边仰坡工程} 中选(附注写的“元江端”即元江口),两个数量为数值和单位(m³)。", "answer": "{\"明挖计入\": \"元江口边仰坡工程\", \"暗挖土方\": {\"value\": 1053, \"unit\": \"m³\"}, \"暗挖石方\": {\"value\": 702, \"unit\": \"m³\"}}"}, {"id": "MS-U16-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道下行线k120+750~744段明洞工程竣工图”的主要工程数量表中,“明挖”栏的土方、石方数量各是多少?按字段 土方、石方 返回,每个字段为数值和单位(m³)。", "answer": "{\"土方\": {\"value\": 626, \"unit\": \"m³\"}, \"石方\": {\"value\": 431, \"unit\": \"m³\"}}"}, {"id": "MS-U16-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道II类围岩复合式衬砌竣工图”的主要工程数量表中,“开挖”栏的土方、石方数量各是多少?按字段 土方、石方 返回,每个字段为数值和单位(m³)。", "answer": "{\"土方\": {\"value\": 6623, \"unit\": \"m³\"}, \"石方\": {\"value\": 4462, \"unit\": \"m³\"}}"}, {"id": "MS-U16-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江隧道III类围岩复合式衬砌竣工图”的主要工程数量表中,“开挖”栏的土方、石方数量各是多少?按字段 土方、石方 返回,每个字段为数值和单位(m³)。", "answer": "{\"土方\": {\"value\": 9932.8, \"unit\": \"m³\"}, \"石方\": {\"value\": 6621.6, \"unit\": \"m³\"}}"}]} {"page_01_file_name": "images/MS-U16-02/few_sheet/01.png", "page_02_file_name": "images/MS-U16-02/few_sheet/02.png", "page_03_file_name": "images/MS-U16-02/few_sheet/03.png", "page_04_file_name": "images/MS-U16-02/few_sheet/04.png", "page_05_file_name": "images/MS-U16-02/few_sheet/05.png", "page_06_file_name": "images/MS-U16-02/few_sheet/06.png", "page_07_file_name": "images/MS-U16-02/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U16-02", "set": "U16", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "按本册各段衬砌竣工图的数量表,隧道 K120+615~K120+775 范围内全部衬砌段的衬砌钢筋混凝土(复合式衬砌的二次衬砌模筑钢筋砼,明洞、明暗洞的防水钢筋砼;不含仰拱、回填)合计多少 m³?", "options": [{"key": "A", "text": "4827.44", "correct": false}, {"key": "B", "text": "5751.32", "correct": false}, {"key": "C", "text": "6784.07", "correct": true}, {"key": "D", "text": "6548.69", "correct": false}, {"key": "E", "text": "6095.57", "correct": false}, {"key": "F", "text": "4755.03", "correct": false}], "answer": ["C"], "few_sheet_pages": [15, 2, 6, 7, 9, 10, 24], "evidence_pages": [2, 6, 7, 9, 10], "full_set_page_count": 24, "sub_questions": [{"id": "MS-U16-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江隧道III类围岩复合式衬砌竣工图”的主要工程数量表中,二次衬砌“模筑钢筋砼”的数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 2798.4, \"unit\": \"m³\"}"}, {"id": "MS-U16-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道II类围岩复合式衬砌竣工图”的主要工程数量表中,二次衬砌“模筑钢筋砼”的数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 2029.04, \"unit\": \"m³\"}"}, {"id": "MS-U16-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道下行线k120+750~744段明洞工程竣工图”的主要工程数量表中,“防水钢筋砼”的数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 235.38, \"unit\": \"m³\"}"}, {"id": "MS-U16-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道k120+765~750段明暗洞工程竣工图”的主要工程数量表中,“防水钢筋砼”的数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 1032.75, \"unit\": \"m³\"}"}, {"id": "MS-U16-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道k120+765~775段明洞工程竣工图”的主要工程数量表中,“模筑钢筋砼 防水砼”一栏的数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 688.5, \"unit\": \"m³\"}"}, {"id": "MS-U16-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "隧道 K120+747 处,上行线和下行线各属于哪类衬砌段?按字段 上行线、下行线 返回,每个字段从 {明洞, 明暗洞, II类围岩, III类围岩}(II、III 用半角拉丁字母 I,按词表原样返回) 中选。", "answer": "{\"上行线\": \"II类围岩\", \"下行线\": \"明洞\"}"}]} {"page_01_file_name": "images/MS-U16-03/few_sheet/01.png", "page_02_file_name": "images/MS-U16-03/few_sheet/02.png", "page_03_file_name": "images/MS-U16-03/few_sheet/03.png", "page_04_file_name": "images/MS-U16-03/few_sheet/04.png", "page_05_file_name": "images/MS-U16-03/few_sheet/05.png", "page_06_file_name": "images/MS-U16-03/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U16-03", "set": "U16", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "比较下行线 K120+740 与 K120+700 两处断面的二次衬砌配筋,下列哪些编号的钢筋在两处的单根长度相同?", "options": [{"key": "A", "text": "N2(Φ22 螺纹钢)", "correct": true}, {"key": "B", "text": "N1(Φ22 螺纹钢)", "correct": false}, {"key": "C", "text": "N6(Φ8 圆钢)", "correct": false}, {"key": "D", "text": "N5(Φ12 圆钢)", "correct": true}, {"key": "E", "text": "N8(Φ8 圆钢)", "correct": false}, {"key": "F", "text": "N3(Φ22 螺纹钢)", "correct": false}], "answer": ["A", "D"], "few_sheet_pages": [6, 5, 13, 24, 3, 2], "evidence_pages": [6, 2, 3, 5], "full_set_page_count": 24, "sub_questions": [{"id": "MS-U16-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江隧道III类围岩衬砌配筋竣工图”的钢筋数量表中,N1、N2、N3、N5、N6、N8 的“每根长度”各是多少?按字段 N1、N2、N3、N5、N6、N8 返回,每个字段为数值和单位(m)。", "answer": "{\"N1\": {\"value\": 26.07, \"unit\": \"m\"}, \"N2\": {\"value\": 23.69, \"unit\": \"m\"}, \"N3\": {\"value\": 24.8, \"unit\": \"m\"}, \"N5\": {\"value\": 1.0, \"unit\": \"m\"}, \"N6\": {\"value\": 0.55, \"unit\": \"m\"}, \"N8\": {\"value\": 3.2, \"unit\": \"m\"}}"}, {"id": "MS-U16-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道II类围岩衬砌配筋竣工图”的钢筋数量表中,N1、N2、N3、N5、N6、N8 的“每根长度”各是多少?按字段 N1、N2、N3、N5、N6、N8 返回,每个字段为数值和单位(m)。", "answer": "{\"N1\": {\"value\": 26.57, \"unit\": \"m\"}, \"N2\": {\"value\": 23.69, \"unit\": \"m\"}, \"N3\": {\"value\": 25.0, \"unit\": \"m\"}, \"N5\": {\"value\": 1.0, \"unit\": \"m\"}, \"N6\": {\"value\": 0.65, \"unit\": \"m\"}, \"N8\": {\"value\": 2.68, \"unit\": \"m\"}}"}, {"id": "MS-U16-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道II类围岩复合式衬砌竣工图”附注 4 写明了本图适用的里程。其中只属于下行线的那一段,起止桩号各是多少?按字段 小桩号端、大桩号端 返回,桩号写成 K9+123 这样的格式(大写 K)。", "answer": "{\"小桩号端\": \"K120+735\", \"大桩号端\": \"K120+744\"}"}, {"id": "MS-U16-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江隧道III类围岩复合式衬砌竣工图”附注 4 写明的本图适用里程,起止桩号各是多少?按字段 小桩号端、大桩号端 返回,桩号写成 K9+123 这样的格式(大写 K)。", "answer": "{\"小桩号端\": \"K120+655\", \"大桩号端\": \"K120+735\"}"}, {"id": "MS-U16-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "隧道下行线 K120+740 和 K120+700 两处,各属于哪类衬砌段?按字段 K120+740、K120+700 返回,每个字段从 {明洞, 明暗洞, II类围岩, III类围岩}(II、III 用半角拉丁字母 I,按词表原样返回) 中选。", "answer": "{\"K120+740\": \"II类围岩\", \"K120+700\": \"III类围岩\"}"}]} {"page_01_file_name": "images/MS-U16-04/few_sheet/01.png", "page_02_file_name": "images/MS-U16-04/few_sheet/02.png", "page_03_file_name": "images/MS-U16-04/few_sheet/03.png", "page_04_file_name": "images/MS-U16-04/few_sheet/04.png", "page_05_file_name": "images/MS-U16-04/few_sheet/05.png", "page_06_file_name": "images/MS-U16-04/few_sheet/06.png", "page_07_file_name": "images/MS-U16-04/few_sheet/07.png", "page_08_file_name": "images/MS-U16-04/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U16-04", "set": "U16", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "上行线车辆进洞后沿行车方向行驶,依次经过不同衬砌形式的区段(按本册衬砌竣工图的适用里程)。下列\"前一段 → 紧接的下一段\"中,哪些正确?", "options": [{"key": "A", "text": "明暗洞衬砌 → 明洞衬砌", "correct": false}, {"key": "B", "text": "明暗洞衬砌 → II 类围岩复合式衬砌", "correct": true}, {"key": "C", "text": "明洞衬砌 → II 类围岩复合式衬砌", "correct": false}, {"key": "D", "text": "II 类围岩复合式衬砌 → III 类围岩复合式衬砌", "correct": true}, {"key": "E", "text": "明洞衬砌 → 明暗洞衬砌", "correct": true}, {"key": "F", "text": "明暗洞衬砌 → III 类围岩复合式衬砌", "correct": false}], "answer": ["B", "D", "E"], "few_sheet_pages": [15, 7, 9, 2, 22, 21, 10, 4], "evidence_pages": [21, 10, 9, 4, 2, 7], "full_set_page_count": 24, "sub_questions": [{"id": "MS-U16-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道路面结构竣工图一”四角标注了两条隧道的进口、出口。上行隧道的进口和出口桩号各是多少?按字段 上行进口、上行出口 返回,桩号照图写到小数点后一位,写成 K9+123.4 这样的格式(大写 K)。", "answer": "{\"上行进口\": \"K120+775.8\", \"上行出口\": \"K120+604.2\"}"}, {"id": "MS-U16-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道k120+765~775段明洞工程竣工图”的衬砌断面图上,图面左右两洞是否都画成明洞(无系统锚杆的明洞拱圈)?按字段 左洞、右洞 返回,每个字段从 {明洞, 暗洞} 中选。", "answer": "{\"左洞\": \"明洞\", \"右洞\": \"明洞\"}"}, {"id": "MS-U16-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道k120+765~750段明暗洞工程竣工图”中衬砌断面图的断面桩号,以及图名所示适用范围的小桩号端,各是多少?按字段 断面桩号、小桩号端 返回,桩号写成 K9+123 这样的格式(大写 K)。", "answer": "{\"断面桩号\": \"K120+765\", \"小桩号端\": \"K120+750\"}"}, {"id": "MS-U16-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道II类围岩超前支护竣工图”附注 4 列出了 II 类围岩里程。上行线部分的两段,起止桩号各是多少?按字段 第一段小端、第一段大端、第二段小端、第二段大端 返回,桩号写成 K9+123 这样的格式(大写 K)。", "answer": "{\"第一段小端\": \"K120+615\", \"第一段大端\": \"K120+655\", \"第二段小端\": \"K120+735\", \"第二段大端\": \"K120+750\"}"}, {"id": "MS-U16-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江隧道III类围岩复合式衬砌竣工图”附注 4 写明的本图适用里程,起止桩号各是多少?按字段 小桩号端、大桩号端 返回,桩号写成 K9+123 这样的格式(大写 K)。", "answer": "{\"小桩号端\": \"K120+655\", \"大桩号端\": \"K120+735\"}"}, {"id": "MS-U16-04-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道下行线k120+750~744段明洞工程竣工图”附注 3 说本图数量表的数量只包括哪条线?从 {上行线, 下行线, 上下行线} 中选一个返回。", "answer": "\"下行线\""}, {"id": "MS-U16-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "隧道上行线 K120+757 和 K120+745 两处,各属于哪类衬砌段?按字段 K120+757、K120+745 返回,每个字段从 {明洞, 明暗洞, II类围岩, III类围岩}(II、III 用半角拉丁字母 I,按词表原样返回) 中选。", "answer": "{\"K120+757\": \"明暗洞\", \"K120+745\": \"II类围岩\"}"}]} {"page_01_file_name": "images/MS-U16-05/few_sheet/01.png", "page_02_file_name": "images/MS-U16-05/few_sheet/02.png", "page_03_file_name": "images/MS-U16-05/few_sheet/03.png", "page_04_file_name": "images/MS-U16-05/few_sheet/04.png", "page_05_file_name": "images/MS-U16-05/few_sheet/05.png", "page_06_file_name": "images/MS-U16-05/few_sheet/06.png", "page_07_file_name": "images/MS-U16-05/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U16-05", "set": "U16", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "上行线 K120+744~K120+750 段采用明洞衬砌。关于这一段及其前后衬砌,下列说法哪些正确?", "options": [{"key": "A", "text": "该段明洞衬砌长度 6 m,防水钢筋砼每延米 39.23 m³", "correct": false}, {"key": "B", "text": "上行线该段并不是明洞,而是 II 类围岩复合式衬砌", "correct": true}, {"key": "C", "text": "上行线该段与 K120+700 处衬砌相同,同属 III 类围岩复合式衬砌", "correct": false}, {"key": "D", "text": "下行线同一里程段为明洞", "correct": true}, {"key": "E", "text": "沿桩号增大方向,上行线在该段之后紧接的是明暗洞段", "correct": true}, {"key": "F", "text": "上行线该段的衬砌工程量计入 K120+765~K120+750 明暗洞衬砌竣工图", "correct": false}], "answer": ["B", "D", "E"], "few_sheet_pages": [7, 6, 4, 10, 20, 2, 9], "evidence_pages": [4, 7, 9, 2, 6], "full_set_page_count": 24, "sub_questions": [{"id": "MS-U16-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道II类围岩超前支护竣工图”附注 4 列出了 II 类围岩里程。上行线部分的两段,起止桩号各是多少?按字段 第一段小端、第一段大端、第二段小端、第二段大端 返回,桩号写成 K9+123 这样的格式(大写 K)。", "answer": "{\"第一段小端\": \"K120+615\", \"第一段大端\": \"K120+655\", \"第二段小端\": \"K120+735\", \"第二段大端\": \"K120+750\"}"}, {"id": "MS-U16-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签为“xx隧道…k120+750~744段明洞工程竣工图”的那张图:附注 3 说本图数量表的数量只包括哪条线?数量表中“防水钢筋砼”的每延米数量是多少?按字段 线别、防水钢筋砼每延米 返回;线别从 {上行线, 下行线, 上下行线} 中选,数量为数值和单位(m³)。", "answer": "{\"线别\": \"下行线\", \"防水钢筋砼每延米\": {\"value\": 39.23, \"unit\": \"m³\"}}"}, {"id": "MS-U16-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道k120+765~750段明暗洞工程竣工图”中衬砌断面图的断面桩号,以及图名所示适用范围的小桩号端,各是多少?按字段 断面桩号、小桩号端 返回,桩号写成 K9+123 这样的格式(大写 K)。", "answer": "{\"断面桩号\": \"K120+765\", \"小桩号端\": \"K120+750\"}"}, {"id": "MS-U16-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江隧道III类围岩复合式衬砌竣工图”附注 4 写明的本图适用里程,起止桩号各是多少?按字段 小桩号端、大桩号端 返回,桩号写成 K9+123 这样的格式(大写 K)。", "answer": "{\"小桩号端\": \"K120+655\", \"大桩号端\": \"K120+735\"}"}, {"id": "MS-U16-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道II类围岩复合式衬砌竣工图”附注 4 写明了本图适用的里程。其中只属于上行线的那一段,起止桩号各是多少?按字段 小桩号端、大桩号端 返回,桩号写成 K9+123 这样的格式(大写 K)。", "answer": "{\"小桩号端\": \"K120+735\", \"大桩号端\": \"K120+750\"}"}, {"id": "MS-U16-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "隧道 K120+747 处,上行线和下行线各属于哪类衬砌段?按字段 上行线、下行线 返回,每个字段从 {明洞, 明暗洞, II类围岩, III类围岩}(II、III 用半角拉丁字母 I,按词表原样返回) 中选。", "answer": "{\"上行线\": \"II类围岩\", \"下行线\": \"明洞\"}"}]} {"page_01_file_name": "images/MS-U16-06/few_sheet/01.png", "page_02_file_name": "images/MS-U16-06/few_sheet/02.png", "page_03_file_name": "images/MS-U16-06/few_sheet/03.png", "page_04_file_name": "images/MS-U16-06/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U16-06", "set": "U16", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "上行线隧道进口一端的洞外山侧砼水沟,下列说法哪些正确?", "options": [{"key": "A", "text": "该段水沟设于 K120+775~780", "correct": true}, {"key": "B", "text": "该段水沟位于玉溪口一端", "correct": false}, {"key": "C", "text": "该段水沟长 5 m", "correct": true}, {"key": "D", "text": "该段水沟长 22 m", "correct": false}, {"key": "E", "text": "该段水沟靠近隧道起点 K120+600 一端", "correct": false}, {"key": "F", "text": "该段水沟有一端正好在上行线隧道进口的洞口桩号上", "correct": false}], "answer": ["A", "C"], "few_sheet_pages": [17, 21, 16, 18], "evidence_pages": [16, 18, 21], "full_set_page_count": 24, "sub_questions": [{"id": "MS-U16-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "上行线隧道进口的桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K120+775.8\""}, {"id": "MS-U16-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "上行线隧道出口的桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K120+604.2\""}, {"id": "MS-U16-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "洞外山侧砼水沟图附注所列两段水沟中,里程较大的那段起点桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K120+775\""}, {"id": "MS-U16-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "洞外山侧砼水沟图附注所列两段水沟中,里程较大的那段水沟终点桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K120+780\""}, {"id": "MS-U16-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "洞外山侧砼水沟图附注所给的水沟总长是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 27, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U16-07/few_sheet/01.png", "page_02_file_name": "images/MS-U16-07/few_sheet/02.png", "page_03_file_name": "images/MS-U16-07/few_sheet/03.png", "page_04_file_name": "images/MS-U16-07/few_sheet/04.png", "page_05_file_name": "images/MS-U16-07/few_sheet/05.png", "page_06_file_name": "images/MS-U16-07/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U16-07", "set": "U16", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于这座隧道两条线的行车方向、洞口位置和洞外水沟的布置,下列说法哪些正确?", "options": [{"key": "A", "text": "上行线车辆从元江口一端进洞", "correct": true}, {"key": "B", "text": "隧道起点 K120+600 位于元江口一端", "correct": false}, {"key": "C", "text": "上行线车辆沿桩号增大方向行驶", "correct": false}, {"key": "D", "text": "下行线车辆从玉溪口一端进洞", "correct": true}, {"key": "E", "text": "元江口一端的洞外山侧砼水沟长 5 m", "correct": true}, {"key": "F", "text": "洞外山侧砼水沟较长的一段(22 m)位于玉溪口一端", "correct": true}], "answer": ["A", "D", "E", "F"], "few_sheet_pages": [22, 17, 10, 16, 21, 18], "evidence_pages": [21, 10, 16, 18], "full_set_page_count": 24, "sub_questions": [{"id": "MS-U16-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道路面结构竣工图一”四角标注了隧道起点和两条隧道的进口、出口。隧道起点、上行隧道进口、上行隧道出口、下行隧道进口的桩号各是多少?按字段 隧道起点、上行进口、上行出口、下行进口 返回,照图写全小数,写成 K9+123.4 这样的格式(大写 K)。", "answer": "{\"隧道起点\": \"K120+600\", \"上行进口\": \"K120+775.8\", \"上行出口\": \"K120+604.2\", \"下行进口\": \"K120+604.2\"}"}, {"id": "MS-U16-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江隧道玉溪口洞头支护竣工图”中,洞头支护立面图图名下注明的桩号和线别各是什么?按字段 桩号、线别 返回;桩号写成 K9+123 这样的格式(大写 K),线别从 {上行线, 下行线} 中选。", "answer": "{\"桩号\": \"K120+605\", \"线别\": \"上行线\"}"}, {"id": "MS-U16-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道洞外山侧砼水沟竣工图”附注 2 写明了洞外砼水沟的设置里程。按附注中的书写顺序,两段的起止桩号各是什么(照附注原样的先后)?按字段 第一段起、第一段止、第二段起、第二段止 返回,桩号写成 K9+123 这样的格式(大写 K)。", "answer": "{\"第一段起\": \"K120+605\", \"第一段止\": \"K120+583\", \"第二段起\": \"K120+775\", \"第二段止\": \"K120+780\"}"}, {"id": "MS-U16-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "本册衬砌断面图中,断面下方注明桩号 K120+775 的那段衬砌,附注说其土石方开挖数量见哪一端洞口的边仰坡土石方工程竣工图?返回洞口名称(两个字的地名 + “口”)。", "answer": "\"元江口\""}]} {"page_01_file_name": "images/MS-U16-08/few_sheet/01.png", "page_02_file_name": "images/MS-U16-08/few_sheet/02.png", "page_03_file_name": "images/MS-U16-08/few_sheet/03.png", "page_04_file_name": "images/MS-U16-08/few_sheet/04.png", "page_05_file_name": "images/MS-U16-08/few_sheet/05.png", "page_06_file_name": "images/MS-U16-08/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U16-08", "set": "U16", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "下行线 K120+744~K120+750 段采用明洞衬砌。关于这一段及其前后衬砌,下列说法哪些正确?", "options": [{"key": "A", "text": "该段明洞衬砌长度 6 m,防水钢筋砼每延米 39.23 m³", "correct": true}, {"key": "B", "text": "沿桩号增大方向,下行线在该段之前紧接的是 II 类围岩复合式衬砌段", "correct": true}, {"key": "C", "text": "沿桩号增大方向,下行线在该段之后紧接的是明暗洞段", "correct": true}, {"key": "D", "text": "该段明洞每延米防水钢筋砼数量比 K120+765~K120+775 明洞段少", "correct": true}, {"key": "E", "text": "下行线该段并不是明洞,而是 II 类围岩复合式衬砌", "correct": false}, {"key": "F", "text": "上行线同一里程段也为明洞", "correct": false}], "answer": ["A", "B", "C", "D"], "few_sheet_pages": [24, 10, 7, 11, 4, 9], "evidence_pages": [7, 4, 10, 9], "full_set_page_count": 24, "sub_questions": [{"id": "MS-U16-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签为“xx隧道…k120+750~744段明洞工程竣工图”的那张图:附注 3 说本图数量表的数量只包括哪条线?数量表中的衬砌长度和“防水钢筋砼”每延米数量各是多少?按字段 线别、衬砌长度、防水钢筋砼每延米 返回;线别从 {上行线, 下行线, 上下行线} 中选,长度为数值和单位(m),每延米数量为数值和单位(m³)。", "answer": "{\"线别\": \"下行线\", \"衬砌长度\": {\"value\": 6, \"unit\": \"m\"}, \"防水钢筋砼每延米\": {\"value\": 39.23, \"unit\": \"m³\"}}"}, {"id": "MS-U16-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道II类围岩超前支护竣工图”附注 4 列出了 II 类围岩里程。上行线部分和下行线部分的第二段,起止桩号各是多少?按字段 上行第二段小端、上行第二段大端、下行第二段小端、下行第二段大端 返回,桩号写成 K9+123 这样的格式(大写 K)。", "answer": "{\"上行第二段小端\": \"K120+735\", \"上行第二段大端\": \"K120+750\", \"下行第二段小端\": \"K120+735\", \"下行第二段大端\": \"K120+744\"}"}, {"id": "MS-U16-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道k120+765~775段明洞工程竣工图”的主要工程数量表中,“模筑钢筋砼 防水砼”一栏的每延米数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 68.85, \"unit\": \"m³\"}"}, {"id": "MS-U16-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道k120+765~750段明暗洞工程竣工图”中衬砌断面图的断面桩号,以及图名所示适用范围的小桩号端,各是多少?按字段 断面桩号、小桩号端 返回,桩号写成 K9+123 这样的格式(大写 K)。", "answer": "{\"断面桩号\": \"K120+765\", \"小桩号端\": \"K120+750\"}"}, {"id": "MS-U16-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "隧道 K120+747 处,上行线和下行线各属于哪类衬砌段?下行线 K120+740 处又属于哪类?按字段 上行K120+747、下行K120+747、下行K120+740 返回,每个字段从 {明洞, 明暗洞, II类围岩, III类围岩}(II、III 用半角拉丁字母 I,按词表原样返回) 中选。", "answer": "{\"上行K120+747\": \"II类围岩\", \"下行K120+747\": \"明洞\", \"下行K120+740\": \"II类围岩\"}"}]} {"page_01_file_name": "images/MS-U16-09/few_sheet/01.png", "page_02_file_name": "images/MS-U16-09/few_sheet/02.png", "page_03_file_name": "images/MS-U16-09/few_sheet/03.png", "page_04_file_name": "images/MS-U16-09/few_sheet/04.png", "page_05_file_name": "images/MS-U16-09/few_sheet/05.png", "page_06_file_name": "images/MS-U16-09/few_sheet/06.png", "page_07_file_name": "images/MS-U16-09/few_sheet/07.png", "page_08_file_name": "images/MS-U16-09/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U16-09", "set": "U16", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "从隧道各衬砌断面图上的路面标注看,洞内路面的纵向高低和横坡沿线怎样变化?下列说法哪些正确?", "options": [{"key": "A", "text": "K120+615 与 K120+685 两断面的路面横坡均为 7%,且倾斜方向相同", "correct": true}, {"key": "B", "text": "K120+765 断面的路面横坡为 2.12%", "correct": false}, {"key": "C", "text": "K120+750 断面左右两洞的路面横坡倾斜方向相反", "correct": false}, {"key": "D", "text": "K120+750 断面的路面横坡倾斜方向与 K120+685 断面相反", "correct": true}, {"key": "E", "text": "上行线车辆在洞内总体是上坡行驶", "correct": false}, {"key": "F", "text": "从 K120+615 到 K120+775,两洞路面中线处的高程沿桩号增大方向逐断面升高", "correct": true}], "answer": ["A", "D", "F"], "few_sheet_pages": [2, 6, 7, 22, 9, 15, 10, 21], "evidence_pages": [6, 2, 7, 9, 10, 21], "full_set_page_count": 24, "sub_questions": [{"id": "MS-U16-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道II类围岩复合式衬砌竣工图”的衬砌断面图上:断面桩号是多少?图面左、右两洞路面的高程各是多少?两洞标注的路面横坡是多少?按字段 断面桩号、左洞高程、右洞高程、横坡、左洞低侧、右洞低侧(路面向哪一侧降低,从 {图面左侧, 图面右侧} 中选) 返回;桩号写成 K9+123 这样的格式(大写 K);高程取隧道中线处倒三角 ▽ 上方注的那个数(不是旁边“设计标高”的那个,也不是正三角 △ 旁的数),为数值和单位(m);横坡照图写成 x% 或 x.xx% 的形式。", "answer": "{\"断面桩号\": \"K120+615\", \"左洞高程\": {\"value\": 1585.63, \"unit\": \"m\"}, \"右洞高程\": {\"value\": 1586.22, \"unit\": \"m\"}, \"横坡\": \"7%\", \"左洞低侧\": \"图面左侧\", \"右洞低侧\": \"图面左侧\"}"}, {"id": "MS-U16-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江隧道III类围岩复合式衬砌竣工图”的衬砌断面图上:断面桩号是多少?图面左、右两洞路面的高程各是多少?两洞标注的路面横坡是多少?按字段 断面桩号、左洞高程、右洞高程、横坡、左洞低侧、右洞低侧(路面向哪一侧降低,从 {图面左侧, 图面右侧} 中选) 返回;桩号写成 K9+123 这样的格式(大写 K);高程取隧道中线处倒三角 ▽ 上方注的那个数(不是旁边“设计标高”的那个,也不是正三角 △ 旁的数),为数值和单位(m);横坡照图写成 x% 或 x.xx% 的形式。", "answer": "{\"断面桩号\": \"K120+685\", \"左洞高程\": {\"value\": 1586.38, \"unit\": \"m\"}, \"右洞高程\": {\"value\": 1586.98, \"unit\": \"m\"}, \"横坡\": \"7%\", \"左洞低侧\": \"图面左侧\", \"右洞低侧\": \"图面左侧\"}"}, {"id": "MS-U16-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道k120+765~750段明暗洞工程竣工图”的衬砌断面图上:断面桩号是多少?图面左、右两洞路面的高程各是多少?两洞标注的路面横坡是多少?按字段 断面桩号、左洞高程、右洞高程、横坡 返回;桩号写成 K9+123 这样的格式(大写 K);高程取隧道中线处倒三角 ▽ 上方注的那个数(不是旁边“设计标高”的那个,也不是正三角 △ 旁的数),为数值和单位(m);横坡照图写成 x% 或 x.xx% 的形式。", "answer": "{\"断面桩号\": \"K120+765\", \"左洞高程\": {\"value\": 1587.72, \"unit\": \"m\"}, \"右洞高程\": {\"value\": 1587.42, \"unit\": \"m\"}, \"横坡\": \"3.49%\"}"}, {"id": "MS-U16-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道k120+765~775段明洞工程竣工图”的衬砌断面图上:断面桩号是多少?图面左、右两洞路面的高程各是多少?两洞标注的路面横坡是多少?按字段 断面桩号、左洞高程、右洞高程、横坡 返回;桩号写成 K9+123 这样的格式(大写 K);高程取隧道中线处倒三角 ▽ 上方注的那个数(不是旁边“设计标高”的那个,也不是正三角 △ 旁的数),为数值和单位(m);横坡照图写成 x% 或 x.xx% 的形式。", "answer": "{\"断面桩号\": \"K120+775\", \"左洞高程\": {\"value\": 1587.77, \"unit\": \"m\"}, \"右洞高程\": {\"value\": 1587.59, \"unit\": \"m\"}, \"横坡\": \"2.12%\"}"}, {"id": "MS-U16-09-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道路面结构竣工图一”四角标注了两条隧道的进口、出口。上行隧道的进口和出口桩号各是多少?按字段 上行进口、上行出口 返回,桩号照图写到小数点后一位,写成 K9+123.4 这样的格式(大写 K)。", "answer": "{\"上行进口\": \"K120+775.8\", \"上行出口\": \"K120+604.2\"}"}, {"id": "MS-U16-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "本册衬砌断面图中,断面桩号为 K120+750 的那个断面:图面左、右两洞路面的高程各是多少?两洞标注的路面横坡是多少?两洞路面各向哪一侧降低?按字段 左洞高程、右洞高程、横坡、左洞低侧、右洞低侧 返回;高程取隧道中线处倒三角 ▽ 上方注的那个数(不是旁边“设计标高”的那个,也不是正三角 △ 旁的数),为数值和单位(m);横坡照图写成 x.xx% 的形式;低侧从 {图面左侧, 图面右侧} 中选。", "answer": "{\"左洞高程\": {\"value\": 1587.65, \"unit\": \"m\"}, \"右洞高程\": {\"value\": 1587.17, \"unit\": \"m\"}, \"横坡\": \"5.53%\", \"左洞低侧\": \"图面右侧\", \"右洞低侧\": \"图面右侧\"}"}]} {"page_01_file_name": "images/MS-U16-10/few_sheet/01.png", "page_02_file_name": "images/MS-U16-10/few_sheet/02.png", "page_03_file_name": "images/MS-U16-10/few_sheet/03.png", "page_04_file_name": "images/MS-U16-10/few_sheet/04.png", "page_05_file_name": "images/MS-U16-10/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U16-10", "set": "U16", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "在本册衬砌竣工图覆盖的 K120+615~K120+775 范围内,下行线明洞衬砌段(不含明暗洞段)累计长度是多少 m?", "options": [{"key": "A", "text": "31", "correct": false}, {"key": "B", "text": "10", "correct": false}, {"key": "C", "text": "21", "correct": false}, {"key": "D", "text": "25", "correct": false}, {"key": "E", "text": "16", "correct": true}, {"key": "F", "text": "6", "correct": false}], "answer": ["E"], "few_sheet_pages": [10, 7, 6, 8, 9], "evidence_pages": [7, 9, 10], "full_set_page_count": 24, "sub_questions": [{"id": "MS-U16-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道下行线k120+750~744段明洞工程竣工图”的主要工程数量表中,“衬砌长度”是多少?返回数值和单位(m)。", "answer": "{\"value\": 6, \"unit\": \"m\"}"}, {"id": "MS-U16-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道k120+765~775段明洞工程竣工图”的主要工程数量表中,“衬砌长度”是多少?返回数值和单位(m)。", "answer": "{\"value\": 10, \"unit\": \"m\"}"}, {"id": "MS-U16-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道k120+765~750段明暗洞工程竣工图”的主要工程数量表中,“衬砌长度”是多少?返回数值和单位(m)。", "answer": "{\"value\": 15, \"unit\": \"m\"}"}, {"id": "MS-U16-10-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道II类围岩复合式衬砌竣工图”附注 4 写明了本图适用的里程。其中只属于下行线的那一段,起止桩号各是多少?按字段 小桩号端、大桩号端 返回,桩号写成 K9+123 这样的格式(大写 K)。", "answer": "{\"小桩号端\": \"K120+735\", \"大桩号端\": \"K120+744\"}"}, {"id": "MS-U16-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "隧道下行线 K120+770、K120+757、K120+747 三处,各属于哪类衬砌段?按字段 K120+770、K120+757、K120+747 返回,每个字段从 {明洞, 明暗洞, II类围岩, III类围岩}(II、III 用半角拉丁字母 I,按词表原样返回) 中选。", "answer": "{\"K120+770\": \"明洞\", \"K120+757\": \"明暗洞\", \"K120+747\": \"明洞\"}"}]} {"page_01_file_name": "images/MS-U17-01/few_sheet/01.png", "page_02_file_name": "images/MS-U17-01/few_sheet/02.png", "page_03_file_name": "images/MS-U17-01/few_sheet/03.png", "page_04_file_name": "images/MS-U17-01/few_sheet/04.png", "page_05_file_name": "images/MS-U17-01/few_sheet/05.png", "page_06_file_name": "images/MS-U17-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U17-01", "set": "U17", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "主跨(P7 至 P8)主梁的两个四分点断面和跨中断面上,主梁左侧都布置了主梁振动测点。关于主跨主梁振动及相关测点,下列说法哪些正确?(左、右均指沿桩号增大方向,即由牟家湾立交往支坪立交看)", "options": [{"key": "A", "text": "南引桥设有主梁振动的各断面,主梁左、右两侧都有主梁振动测点", "correct": true}, {"key": "B", "text": "主跨主梁左侧并没有主梁振动测点,这三个断面的主梁振动测点都在右侧", "correct": true}, {"key": "C", "text": "主跨跨中断面的视频图像只布置在主梁右侧", "correct": false}, {"key": "D", "text": "这三个断面每处各有 2 个主梁振动测点", "correct": true}, {"key": "E", "text": "主跨主梁振动由光纤光栅应变计监测", "correct": false}, {"key": "F", "text": "主跨主梁左侧三个断面合计有 3 个主梁振动测点", "correct": false}], "answer": ["A", "B", "D"], "few_sheet_pages": [10, 8, 6, 2, 7, 5], "evidence_pages": [8, 7, 6, 2], "full_set_page_count": 10, "sub_questions": [{"id": "MS-U17-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,主跨(P7 至 P8 之间)三处主梁断面上,中线上方、中线下方的主梁振动测点各合计几个?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 上方、下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"上方\": {\"value\": 0, \"unit\": \"个\"}, \"下方\": {\"value\": 6, \"unit\": \"个\"}}"}, {"id": "MS-U17-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点立面布置图”上,主跨 P7 侧四分点、跨中、P8 侧四分点三处引注框中,主梁振动测点数各是多少?返回 P7侧四分点、跨中、P8侧四分点 三个字段,每个为 {value, unit}(个)。", "answer": "{\"P7侧四分点\": {\"value\": 2, \"unit\": \"个\"}, \"跨中\": {\"value\": 2, \"unit\": \"个\"}, \"P8侧四分点\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U17-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,南引桥主梁上标有主梁振动的断面共几处?这些断面中线上方、中线下方的主梁振动测点各合计几个?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 断面数({value, unit},处)、上方、下方({value, unit},个)三个字段。", "answer": "{\"断面数\": {\"value\": 6, \"unit\": \"处\"}, \"上方\": {\"value\": 12, \"unit\": \"个\"}, \"下方\": {\"value\": 12, \"unit\": \"个\"}}"}, {"id": "MS-U17-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“作用监测测点平面布置图”上,主跨跨中断面处,中线上方、中线下方各有几个视频图像测点?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 视频图像_上方、视频图像_下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"视频图像_上方\": {\"value\": 1, \"unit\": \"个\"}, \"视频图像_下方\": {\"value\": 1, \"unit\": \"个\"}}"}, {"id": "MS-U17-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构监测系统主要传感器数量表”中,光纤光栅应变计的数量是多少?备注栏写的监测内容是什么?返回两个字段:数量({value, unit},个)、监测内容(从 {主梁应变监测, 主梁、主塔振动监测, 主梁竖向位移监测(含基准点)} 中取一项原样返回)。", "answer": "{\"数量\": {\"value\": 56, \"unit\": \"个\"}, \"监测内容\": \"主梁应变监测\"}"}, {"id": "MS-U17-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主跨三处主梁断面上,布置了主梁振动测点的那一侧主梁属于哪一幅?返回该幅的桥梁设计起点桩号(形如 K0+000.000)。", "answer": "\"K0+073.000\""}]} {"page_01_file_name": "images/MS-U17-02/few_sheet/01.png", "page_02_file_name": "images/MS-U17-02/few_sheet/02.png", "page_03_file_name": "images/MS-U17-02/few_sheet/03.png", "page_04_file_name": "images/MS-U17-02/few_sheet/04.png", "page_05_file_name": "images/MS-U17-02/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U17-02", "set": "U17", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "全桥的单向加速度传感器中,布置在右侧(主梁右侧或右侧塔柱)的共有多少个?(左、右均指沿桩号增大方向,即由牟家湾立交往支坪立交看)", "options": [{"key": "A", "text": "14", "correct": false}, {"key": "B", "text": "22", "correct": false}, {"key": "C", "text": "19", "correct": false}, {"key": "D", "text": "18", "correct": false}, {"key": "E", "text": "24", "correct": false}, {"key": "F", "text": "20", "correct": true}], "answer": ["F"], "few_sheet_pages": [7, 6, 2, 8, 4], "evidence_pages": [2, 8, 6], "full_set_page_count": 10, "sub_questions": [{"id": "MS-U17-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构监测系统主要传感器数量表”中,单向加速度传感器的数量是多少?备注栏写的监测内容是什么?返回两个字段:数量({value, unit},个)、监测内容(从 {地震动监测, 主梁、主塔振动监测, 风速风向监测} 中取一项原样返回)。", "answer": "{\"数量\": {\"value\": 38, \"unit\": \"个\"}, \"监测内容\": \"主梁、主塔振动监测\"}"}, {"id": "MS-U17-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,主跨(P7 至 P8 之间)主梁上,中线上方、中线下方的主梁振动测点各合计几个?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 主跨_上方、主跨_下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"主跨_上方\": {\"value\": 0, \"unit\": \"个\"}, \"主跨_下方\": {\"value\": 6, \"unit\": \"个\"}}"}, {"id": "MS-U17-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,北引桥、南引桥主梁上,中线下方的主梁振动测点各合计几个?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 北引桥_下方、南引桥_下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"北引桥_下方\": {\"value\": 2, \"unit\": \"个\"}, \"南引桥_下方\": {\"value\": 12, \"unit\": \"个\"}}"}, {"id": "MS-U17-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,P7、P8 两座主塔的主塔振动测点,画在中线上方塔柱、中线下方塔柱上的各合计几个?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 上方塔柱、下方塔柱 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"上方塔柱\": {\"value\": 4, \"unit\": \"个\"}, \"下方塔柱\": {\"value\": 0, \"unit\": \"个\"}}"}, {"id": "MS-U17-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“作用监测测点平面布置图”上,P7、P8 两座主塔处的地震动测点合计几个?画在中线上方还是下方的塔柱上?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回两个字段:数量({value, unit},个)、所在塔柱(从 {中线上方塔柱, 中线下方塔柱} 中取一项原样返回)。", "answer": "{\"数量\": {\"value\": 2, \"unit\": \"个\"}, \"所在塔柱\": \"中线下方塔柱\"}"}, {"id": "MS-U17-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "全桥布置了主塔振动测点的那一侧塔柱属于哪一幅?返回该幅的桥梁设计起点桩号(形如 K0+000.000)。", "answer": "\"K0+081.000\""}]} {"page_01_file_name": "images/MS-U17-03/few_sheet/01.png", "page_02_file_name": "images/MS-U17-03/few_sheet/02.png", "page_03_file_name": "images/MS-U17-03/few_sheet/03.png", "page_04_file_name": "images/MS-U17-03/few_sheet/04.png", "page_05_file_name": "images/MS-U17-03/few_sheet/05.png", "page_06_file_name": "images/MS-U17-03/few_sheet/06.png", "page_07_file_name": "images/MS-U17-03/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U17-03", "set": "U17", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "北引桥 P5 至 P6 之间的主梁监测断面上,主梁左侧布置了主梁振动测点。关于这一断面及引桥上的其他主梁监测断面,下列说法哪些正确?(左、右均指沿桩号增大方向,即由牟家湾立交往支坪立交看)", "options": [{"key": "A", "text": "该断面的主梁振动由三向加速度传感器监测", "correct": false}, {"key": "B", "text": "该断面主梁左侧并没有主梁振动测点", "correct": false}, {"key": "C", "text": "该断面结构温度测点左、右两侧各 2 个", "correct": true}, {"key": "D", "text": "南引桥 P9 墩旁的主梁监测断面同样设有主梁振动测点", "correct": false}, {"key": "E", "text": "该断面主梁左、右两侧各有 2 个主梁振动测点", "correct": true}, {"key": "F", "text": "该断面也布置了主梁内温湿度测点", "correct": false}], "answer": ["C", "E"], "few_sheet_pages": [7, 5, 8, 2, 3, 4, 6], "evidence_pages": [8, 6, 7, 4, 2], "full_set_page_count": 10, "sub_questions": [{"id": "MS-U17-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,北引桥 P5 至 P6 之间的主梁断面处,中线上方、中线下方各有几个主梁振动测点?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 主梁振动_上方、主梁振动_下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"主梁振动_上方\": {\"value\": 2, \"unit\": \"个\"}, \"主梁振动_下方\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U17-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“作用监测测点平面布置图”上,北引桥 P5 至 P6 之间的主梁断面处,中线上方、中线下方各有几个结构温度测点?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 结构温度_上方、结构温度_下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"结构温度_上方\": {\"value\": 2, \"unit\": \"个\"}, \"结构温度_下方\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U17-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,南引桥 P9 墩旁的主梁断面处,中线上方那个引注框列了几个监测项目?其中主梁应变测点几个?返回 项目数(阿拉伯数字)、主梁应变({value, unit},个)两个字段。", "answer": "{\"项目数\": \"1\", \"主梁应变\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U17-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“环境监测测点平面布置图”上,主梁内温湿度测点全图合计几个?其中在主跨跨中断面的有几个?返回 全图合计、主跨跨中 两个字段,每个为 {value, unit}(个)。", "answer": "{\"全图合计\": {\"value\": 2, \"unit\": \"个\"}, \"主跨跨中\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U17-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构监测系统主要传感器数量表”中,三向加速度传感器的数量是多少?备注栏写的监测内容是什么?返回两个字段:数量({value, unit},个)、监测内容(从 {地震动监测, 主梁、主塔振动监测, 风速风向监测} 中取一项原样返回)。", "answer": "{\"数量\": {\"value\": 2, \"unit\": \"个\"}, \"监测内容\": \"地震动监测\"}"}, {"id": "MS-U17-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北引桥上布置了结构温度测点的那个主梁断面,主梁振动测点两侧合计几个?返回 {value, unit}(个)。", "answer": "{\"value\": 4, \"unit\": \"个\"}"}]} {"page_01_file_name": "images/MS-U17-04/few_sheet/01.png", "page_02_file_name": "images/MS-U17-04/few_sheet/02.png", "page_03_file_name": "images/MS-U17-04/few_sheet/03.png", "page_04_file_name": "images/MS-U17-04/few_sheet/04.png", "page_05_file_name": "images/MS-U17-04/few_sheet/05.png", "page_06_file_name": "images/MS-U17-04/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U17-04", "set": "U17", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "两座主塔处的测点,在立面上有高低(塔顶、桥面、塔底承台),在平面上有左右(左侧或右侧塔柱、主梁左右侧)。下列说法哪些正确?(左、右均指沿桩号增大方向,即由牟家湾立交往支坪立交看)", "options": [{"key": "A", "text": "风速风向仪在塔顶,位于左侧塔柱", "correct": true}, {"key": "B", "text": "支座位移测点在桥面高度,塔处主梁左、右两侧各 2 个", "correct": true}, {"key": "C", "text": "地震动测点在塔底承台处,位于左侧塔柱", "correct": false}, {"key": "D", "text": "主塔的 GNSS 测点在塔底承台处", "correct": false}, {"key": "E", "text": "主塔振动测点在塔顶,位于右侧塔柱", "correct": false}, {"key": "F", "text": "地震动测点在塔顶,位于右侧塔柱", "correct": false}], "answer": ["A", "B"], "few_sheet_pages": [8, 3, 6, 4, 5, 7], "evidence_pages": [5, 6, 7, 8], "full_set_page_count": 10, "sub_questions": [{"id": "MS-U17-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“作用监测测点立面布置图”上,P7 主塔处的风速风向测点和地震动测点各画在什么高度?每个字段从 {塔顶, 桥面, 塔底承台} 中取一项原样返回,字段名固定为 风速风向、地震动。", "answer": "{\"风速风向\": \"塔顶\", \"地震动\": \"塔底承台\"}"}, {"id": "MS-U17-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“作用监测测点平面布置图”上,P7、P8 两座主塔处,风速风向仪(图中引注写作“分速风向”)和地震动测点,各有几个画在中线上方的塔柱上、几个画在中线下方的塔柱上?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回三个字段 风速风向_上方塔柱、风速风向_下方塔柱、地震动_下方塔柱(均为两塔合计),每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"风速风向_上方塔柱\": {\"value\": 2, \"unit\": \"个\"}, \"风速风向_下方塔柱\": {\"value\": 0, \"unit\": \"个\"}, \"地震动_下方塔柱\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U17-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点立面布置图”上,P7 主塔处的 GNSS 变形监测、主塔振动、支座位移测点各画在什么高度?每个字段从 {塔顶, 桥面, 塔底承台} 中取一项原样返回,字段名固定为 GNSS、主塔振动、支座位移。", "answer": "{\"GNSS\": \"塔顶\", \"主塔振动\": \"塔顶\", \"支座位移\": \"桥面\"}"}, {"id": "MS-U17-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,P7 主塔处:主塔振动测点画在中线上方塔柱上的有几个?主梁中线上方、中线下方的支座位移测点各几个?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 主塔振动_上方塔柱、支座位移_上方、支座位移_下方 三个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"主塔振动_上方塔柱\": {\"value\": 2, \"unit\": \"个\"}, \"支座位移_上方\": {\"value\": 2, \"unit\": \"个\"}, \"支座位移_下方\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U17-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "两座主塔处,风速风向仪所在的那一根塔柱位于哪一幅一侧?返回该幅的桥梁设计起点桩号(形如 K0+000.000)。", "answer": "\"K0+081.000\""}]} {"page_01_file_name": "images/MS-U17-05/few_sheet/01.png", "page_02_file_name": "images/MS-U17-05/few_sheet/02.png", "page_03_file_name": "images/MS-U17-05/few_sheet/03.png", "page_04_file_name": "images/MS-U17-05/few_sheet/04.png", "page_05_file_name": "images/MS-U17-05/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U17-05", "set": "U17", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿桩号增大方向(由牟家湾立交往支坪立交),把全桥图上画出的 GNSS 天线所在位置依次排列。下列\"前一处 → 紧接的下一处\"中,哪些正确?", "options": [{"key": "A", "text": "主跨 P8 侧四分点 → P8 主塔塔顶", "correct": true}, {"key": "B", "text": "P7 主塔塔顶 → 北锚碇", "correct": false}, {"key": "C", "text": "北锚碇 → P7 主塔塔顶", "correct": true}, {"key": "D", "text": "P7 主塔塔顶 → 主跨跨中", "correct": false}, {"key": "E", "text": "北锚碇 → 主跨 P7 侧四分点", "correct": false}, {"key": "F", "text": "P8 主塔塔顶 → 南锚碇", "correct": true}], "answer": ["A", "C", "F"], "few_sheet_pages": [8, 6, 2, 4, 10], "evidence_pages": [2, 8, 10], "full_set_page_count": 10, "sub_questions": [{"id": "MS-U17-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构监测系统主要传感器数量表”中,备注写明用于锚碇位移监测的那一项传感器,表中序号是几?返回阿拉伯数字。", "answer": "\"5\""}, {"id": "MS-U17-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,主跨(P7 至 P8 之间)主梁上标有 GNSS 变形监测的断面共几处?P7 主塔处标的 GNSS 变形监测测点几个?全图所有 GNSS 变形监测引注框的测点数合计几个?返回 主跨断面数({value, unit},处)、P7塔处({value, unit},个)、全图合计({value, unit},个)三个字段。", "answer": "{\"主跨断面数\": {\"value\": 3, \"unit\": \"处\"}, \"P7塔处\": {\"value\": 1, \"unit\": \"个\"}, \"全图合计\": {\"value\": 8, \"unit\": \"个\"}}"}, {"id": "MS-U17-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构变化监测测点平面布置图”上,北锚碇、南锚碇处各有几个锚碇位移测点?返回 北锚碇、南锚碇 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"北锚碇\": {\"value\": 2, \"unit\": \"个\"}, \"南锚碇\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U17-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "全桥 GNSS 天线中,用于锚碇位移监测的测点共几个?返回 {value, unit}(个)。", "answer": "{\"value\": 4, \"unit\": \"个\"}"}]} {"page_01_file_name": "images/MS-U17-06/few_sheet/01.png", "page_02_file_name": "images/MS-U17-06/few_sheet/02.png", "page_03_file_name": "images/MS-U17-06/few_sheet/03.png", "page_04_file_name": "images/MS-U17-06/few_sheet/04.png", "page_05_file_name": "images/MS-U17-06/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U17-06", "set": "U17", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "主跨跨中断面上,布置在主梁左侧的各类监测测点合计多少个(不含主梁中线上的测点)?(左、右均指沿桩号增大方向,即由牟家湾立交往支坪立交看)", "options": [{"key": "A", "text": "12", "correct": false}, {"key": "B", "text": "15", "correct": false}, {"key": "C", "text": "13", "correct": true}, {"key": "D", "text": "9", "correct": false}, {"key": "E", "text": "7", "correct": false}, {"key": "F", "text": "14", "correct": false}], "answer": ["C"], "few_sheet_pages": [7, 4, 5, 6, 8], "evidence_pages": [4, 6, 8], "full_set_page_count": 10, "sub_questions": [{"id": "MS-U17-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“环境监测测点平面布置图”上,主跨跨中断面处,中线上方、中线上、中线下方各画了几个测点?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 上方、中线上、下方 三个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"上方\": {\"value\": 1, \"unit\": \"个\"}, \"中线上\": {\"value\": 1, \"unit\": \"个\"}, \"下方\": {\"value\": 1, \"unit\": \"个\"}}"}, {"id": "MS-U17-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“作用监测测点平面布置图”上,主跨跨中断面处,中线上方、中线下方各引注框中的测点数分别合计几个?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 上方、下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"上方\": {\"value\": 6, \"unit\": \"个\"}, \"下方\": {\"value\": 6, \"unit\": \"个\"}}"}, {"id": "MS-U17-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,主跨跨中断面处,中线上方、中线下方各引注框中的测点数分别合计几个?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 上方、下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"上方\": {\"value\": 6, \"unit\": \"个\"}, \"下方\": {\"value\": 8, \"unit\": \"个\"}}"}, {"id": "MS-U17-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“作用监测测点立面布置图”上,主跨跨中处引注框中,风速风向、结构温度、视频图像的测点数各是多少?返回 风速风向、结构温度、视频图像 三个字段,每个为 {value, unit}(个)。", "answer": "{\"风速风向\": {\"value\": 2, \"unit\": \"个\"}, \"结构温度\": {\"value\": 8, \"unit\": \"个\"}, \"视频图像\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U17-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点立面布置图”上,主跨跨中处引注框中,主梁竖向位移、主梁应变、主梁振动的测点数各是多少?返回 主梁竖向位移、主梁应变、主梁振动 三个字段,每个为 {value, unit}(个)。", "answer": "{\"主梁竖向位移\": {\"value\": 2, \"unit\": \"个\"}, \"主梁应变\": {\"value\": 8, \"unit\": \"个\"}, \"主梁振动\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U17-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主跨跨中断面上,测点比另一侧多出主梁振动的那一侧主梁属于哪一幅?返回该幅的桥梁设计起点桩号(形如 K0+000.000)。", "answer": "\"K0+073.000\""}]} {"page_01_file_name": "images/MS-U17-07/few_sheet/01.png", "page_02_file_name": "images/MS-U17-07/few_sheet/02.png", "page_03_file_name": "images/MS-U17-07/few_sheet/03.png", "page_04_file_name": "images/MS-U17-07/few_sheet/04.png", "page_05_file_name": "images/MS-U17-07/few_sheet/05.png", "page_06_file_name": "images/MS-U17-07/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U17-07", "set": "U17", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "两座主塔(P7、P8)处布置了若干测点。下列测点中,哪些只设在左侧塔柱上,右侧塔柱没有?(左、右均指沿桩号增大方向,即由牟家湾立交往支坪立交看)", "options": [{"key": "A", "text": "风速风向", "correct": true}, {"key": "B", "text": "主塔振动", "correct": true}, {"key": "C", "text": "P7 主塔的鞍罩内温湿度", "correct": false}, {"key": "D", "text": "三向加速度传感器所测的项目", "correct": false}, {"key": "E", "text": "地震动", "correct": false}, {"key": "F", "text": "支座位移", "correct": false}], "answer": ["A", "B"], "few_sheet_pages": [8, 10, 4, 7, 2, 6], "evidence_pages": [8, 6, 4, 2], "full_set_page_count": 10, "sub_questions": [{"id": "MS-U17-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,P7、P8 两座主塔处,主塔振动测点各画在哪根塔柱上、各几个?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回三个字段 P7_上方塔柱、P8_上方塔柱、下方塔柱合计(两塔合计),每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"P7_上方塔柱\": {\"value\": 2, \"unit\": \"个\"}, \"P8_上方塔柱\": {\"value\": 2, \"unit\": \"个\"}, \"下方塔柱合计\": {\"value\": 0, \"unit\": \"个\"}}"}, {"id": "MS-U17-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“作用监测测点平面布置图”上,P7、P8 两座主塔处,风速风向仪(图中引注写作“分速风向”)与地震动测点各画在哪根塔柱上?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回三个字段 风速风向_上方塔柱合计、风速风向_下方塔柱合计、地震动_下方塔柱合计(均为两塔合计),每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"风速风向_上方塔柱合计\": {\"value\": 2, \"unit\": \"个\"}, \"风速风向_下方塔柱合计\": {\"value\": 0, \"unit\": \"个\"}, \"地震动_下方塔柱合计\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U17-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构监测系统主要传感器数量表”中,三向加速度传感器的数量是多少?备注栏写的监测内容是什么?返回两个字段:数量({value, unit},个)、监测内容(从 {地震动监测, 主梁、主塔振动监测, 风速风向监测} 中取一项原样返回)。", "answer": "{\"数量\": {\"value\": 2, \"unit\": \"个\"}, \"监测内容\": \"地震动监测\"}"}, {"id": "MS-U17-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“环境监测测点平面布置图”上,P7 主塔处,中线上方、中线下方的塔柱上各有几个鞍罩内温湿度测点?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 上方塔柱、下方塔柱 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"上方塔柱\": {\"value\": 1, \"unit\": \"个\"}, \"下方塔柱\": {\"value\": 1, \"unit\": \"个\"}}"}, {"id": "MS-U17-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,P7 主塔处主梁上,中线上方、中线下方各有几个支座位移测点?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 支座位移_上方、支座位移_下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"支座位移_上方\": {\"value\": 2, \"unit\": \"个\"}, \"支座位移_下方\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U17-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "两座主塔处,布置了主塔振动测点的那一根塔柱位于哪一幅一侧?返回该幅的桥梁设计起点桩号(形如 K0+000.000)。", "answer": "\"K0+081.000\""}]} {"page_01_file_name": "images/MS-U17-08/few_sheet/01.png", "page_02_file_name": "images/MS-U17-08/few_sheet/02.png", "page_03_file_name": "images/MS-U17-08/few_sheet/03.png", "page_04_file_name": "images/MS-U17-08/few_sheet/04.png", "page_05_file_name": "images/MS-U17-08/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U17-08", "set": "U17", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "主跨跨中断面上布置了多类监测测点。下列监测项目中,哪些在主梁左、右两侧都布置了测点?(左、右均指沿桩号增大方向,即由牟家湾立交往支坪立交看)", "options": [{"key": "A", "text": "风速风向", "correct": true}, {"key": "B", "text": "环境温湿度", "correct": false}, {"key": "C", "text": "GNSS变形监测", "correct": true}, {"key": "D", "text": "结构温度", "correct": true}, {"key": "E", "text": "主梁振动", "correct": false}, {"key": "F", "text": "主梁内温湿度", "correct": true}], "answer": ["A", "C", "D", "F"], "few_sheet_pages": [8, 5, 4, 10, 6], "evidence_pages": [4, 6, 8], "full_set_page_count": 10, "sub_questions": [{"id": "MS-U17-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“环境监测测点平面布置图”上,主跨跨中断面处:中线上方、中线下方的主梁内温湿度测点各几个?环境温湿度测点画在哪里?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回三个字段 主梁内温湿度_上方、主梁内温湿度_下方({value, unit},个),环境温湿度位置(从 {中线上方, 中线上, 中线下方} 中取一项原样返回)。", "answer": "{\"主梁内温湿度_上方\": {\"value\": 1, \"unit\": \"个\"}, \"主梁内温湿度_下方\": {\"value\": 1, \"unit\": \"个\"}, \"环境温湿度位置\": \"中线上\"}"}, {"id": "MS-U17-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“作用监测测点平面布置图”上,主跨跨中断面处,中线上方、中线下方各有几个风速风向测点?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 风速风向_上方、风速风向_下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"风速风向_上方\": {\"value\": 1, \"unit\": \"个\"}, \"风速风向_下方\": {\"value\": 1, \"unit\": \"个\"}}"}, {"id": "MS-U17-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“作用监测测点平面布置图”上,主跨跨中断面处,中线上方、中线下方各有几个结构温度测点?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 结构温度_上方、结构温度_下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"结构温度_上方\": {\"value\": 4, \"unit\": \"个\"}, \"结构温度_下方\": {\"value\": 4, \"unit\": \"个\"}}"}, {"id": "MS-U17-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,主跨跨中断面处,中线上方、中线下方各有几个主梁振动测点?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 主梁振动_上方、主梁振动_下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"主梁振动_上方\": {\"value\": 0, \"unit\": \"个\"}, \"主梁振动_下方\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U17-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,主跨跨中断面处,中线上方、中线下方各有几个 GNSS 变形监测测点?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 GNSS_上方、GNSS_下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"GNSS_上方\": {\"value\": 1, \"unit\": \"个\"}, \"GNSS_下方\": {\"value\": 1, \"unit\": \"个\"}}"}, {"id": "MS-U17-08-R6", "role": "read", "tiers": ["full_set"], "question": "“结构响应监测测点立面布置图”上,主跨跨中处引注框中,主梁振动的测点数量是多少?返回 {value, unit}(个)。", "answer": "{\"value\": 2, \"unit\": \"个\"}"}, {"id": "MS-U17-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主跨跨中断面上,布置了主梁振动测点的那一侧主梁属于哪一幅?返回该幅的桥梁设计起点桩号(形如 K0+000.000)。", "answer": "\"K0+073.000\""}]} {"page_01_file_name": "images/MS-U17-09/few_sheet/01.png", "page_02_file_name": "images/MS-U17-09/few_sheet/02.png", "page_03_file_name": "images/MS-U17-09/few_sheet/03.png", "page_04_file_name": "images/MS-U17-09/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U17-09", "set": "U17", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "支坪长江大桥结构监测系统在主跨跨中断面布置的测点,下列说法哪些正确?", "options": [{"key": "A", "text": "该断面的视频图像测点共 3 台", "correct": false}, {"key": "B", "text": "该断面的视频图像测点由高清摄像机采集,共 2 台", "correct": true}, {"key": "C", "text": "该断面的 GNSS 变形监测测点为 1 台", "correct": false}, {"key": "D", "text": "该断面的主梁应变测点共 4 个", "correct": false}, {"key": "E", "text": "该断面的主梁竖向位移测点由压力变送器测量,共 2 个", "correct": true}, {"key": "F", "text": "该断面的主梁振动测点由三向加速度传感器测量", "correct": false}], "answer": ["B", "E"], "few_sheet_pages": [5, 8, 2, 7], "evidence_pages": [2, 5, 7], "full_set_page_count": 10, "sub_questions": [{"id": "MS-U17-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“作用监测测点立面布置图”上,主跨跨中(两塔之间正中)那个测点表里,视频图像的测点数量是多少?返回数值和单位(个)。", "answer": "{\"value\": 2, \"unit\": \"个\"}"}, {"id": "MS-U17-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点立面布置图”上,主跨跨中(两塔之间正中)那个测点表里,GNSS 变形监测、主梁竖向位移、主梁应变的测点数量各是多少?以 JSON 返回三个字段 gnss、vertical_disp、strain,每个字段为数值和单位(个)。", "answer": "{\"gnss\": {\"value\": 2, \"unit\": \"个\"}, \"vertical_disp\": {\"value\": 2, \"unit\": \"个\"}, \"strain\": {\"value\": 8, \"unit\": \"个\"}}"}, {"id": "MS-U17-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构监测系统主要传感器数量表”中,下列三项监测分别由哪一行的传感器承担?返回该行的序号:(1) 备注为“视频监控+车辆空间分布视频图像”的;(2) 备注为“主梁竖向位移监测(含基准点)”的;(3) 备注中含“主梁、主塔振动监测”的。以 JSON 返回三个字段 video、vertical_disp、girder_vibration,每个字段只写序号的阿拉伯数字。", "answer": "{\"video\": \"13\", \"vertical_disp\": \"6\", \"girder_vibration\": \"4\"}"}, {"id": "MS-U17-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“作用监测测点立面布置图”上,牟家湾立交一侧桥端(A1 处)那个测点表里,视频图像的测点数量是多少?返回数值和单位(个)。", "answer": "{\"value\": 3, \"unit\": \"个\"}"}, {"id": "MS-U17-09-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,主跨跨中断面(P7、P8 两塔之间正中的那一个断面)在桥轴线两侧各有测点框。只看其中一侧:主梁应变框里的主梁应变测点数量、GNSS 框里的 GNSS 变形监测测点数量各是多少?以 JSON 返回两个字段 strain、gnss,每个字段为数值和单位(个)。", "answer": "{\"strain\": {\"value\": 4, \"unit\": \"个\"}, \"gnss\": {\"value\": 1, \"unit\": \"个\"}}"}, {"id": "MS-U17-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪长江大桥结构监测系统在主跨跨中断面布置的主梁应变测点,该断面合计共几个?返回数值和单位(个)。", "answer": "{\"value\": 8, \"unit\": \"个\"}"}, {"id": "MS-U17-09-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪长江大桥结构监测系统在主跨跨中断面布置的主梁竖向位移测点,所用的那种传感器全桥共布置多少台(个)?只写阿拉伯数字。按图中记号或文字原样返回一个字符串。", "answer": "\"30\""}]} {"page_01_file_name": "images/MS-U17-10/few_sheet/01.png", "page_02_file_name": "images/MS-U17-10/few_sheet/02.png", "page_03_file_name": "images/MS-U17-10/few_sheet/03.png", "page_04_file_name": "images/MS-U17-10/few_sheet/04.png", "page_05_file_name": "images/MS-U17-10/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U17-10", "set": "U17", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于桥梁的平面走向,以及两处锚碇和主跨跨中若干测点的左右位置,下列说法哪些正确?(左、右均指沿桩号增大方向,即由牟家湾立交往支坪立交看)", "options": [{"key": "A", "text": "北锚碇左、右两个锚室各有 1 个锚碇位移测点", "correct": true}, {"key": "B", "text": "南锚碇左、右两个锚室各有 1 个锚室内温湿度测点", "correct": true}, {"key": "C", "text": "南锚碇只有左侧锚室布置了锚跨索股力测点", "correct": false}, {"key": "D", "text": "北锚碇左、右两个锚室各有 5 个锚跨索股力测点", "correct": true}, {"key": "E", "text": "主跨跨中的环境温湿度测点布置在主梁左侧", "correct": false}, {"key": "F", "text": "南引桥在平面上向右转弯,弯道外侧是桥的左侧", "correct": true}], "answer": ["A", "B", "D", "F"], "few_sheet_pages": [10, 8, 4, 3, 6], "evidence_pages": [10, 8, 4], "full_set_page_count": 10, "sub_questions": [{"id": "MS-U17-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构变化监测测点平面布置图”上,北锚碇中线上方、中线下方两个锚室各有几个锚碇位移测点?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 北锚碇_上方、北锚碇_下方 两个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"北锚碇_上方\": {\"value\": 1, \"unit\": \"个\"}, \"北锚碇_下方\": {\"value\": 1, \"unit\": \"个\"}}"}, {"id": "MS-U17-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“结构响应监测测点平面布置图”上,北锚碇上方、下方两锚室和南锚碇中线下方锚室,各有几个锚跨索股力测点?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回 北锚碇_上方、北锚碇_下方、南锚碇_下方 三个字段,每个字段为 {value, unit}(个),没有测点写 0。", "answer": "{\"北锚碇_上方\": {\"value\": 5, \"unit\": \"个\"}, \"北锚碇_下方\": {\"value\": 5, \"unit\": \"个\"}, \"南锚碇_下方\": {\"value\": 5, \"unit\": \"个\"}}"}, {"id": "MS-U17-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“环境监测测点平面布置图”上,南锚碇中线上方、中线下方两锚室各有几个锚室内温湿度测点?主跨跨中的环境温湿度测点画在哪里?“中线上方”“中线下方”指图面上道路中线的上侧、下侧(按图面方位,不换算左右)。返回三个字段 南锚碇_上方、南锚碇_下方({value, unit},个),环境温湿度位置(从 {中线上方, 中线上, 中线下方} 中取一项原样返回)。", "answer": "{\"南锚碇_上方\": {\"value\": 1, \"unit\": \"个\"}, \"南锚碇_下方\": {\"value\": 1, \"unit\": \"个\"}, \"环境温湿度位置\": \"中线上\"}"}, {"id": "MS-U17-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "南引桥平面弯道的外侧那一幅,是哪一幅?返回该幅的桥梁设计起点桩号(形如 K0+000.000)。", "answer": "\"K0+081.000\""}]} {"page_01_file_name": "images/MS-U18-01/few_sheet/01.png", "page_02_file_name": "images/MS-U18-01/few_sheet/02.png", "page_03_file_name": "images/MS-U18-01/few_sheet/03.png", "page_04_file_name": "images/MS-U18-01/few_sheet/04.png", "page_05_file_name": "images/MS-U18-01/few_sheet/05.png", "page_06_file_name": "images/MS-U18-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U18-01", "set": "U18", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "6号墩的四根墩柱顶部由一道盖梁连成整体,梁体支座设在盖梁顶面。关于这道盖梁及相邻桥墩的构造,下列说法哪些正确?", "options": [{"key": "A", "text": "6号墩盖梁全长 24900 mm,比5号墩盖梁长", "correct": true}, {"key": "B", "text": "6号墩有一根墩柱立于 9000×3000 的双桩承台上", "correct": false}, {"key": "C", "text": "4号墩也设有同样高 2000 mm 的盖梁", "correct": false}, {"key": "D", "text": "该墩处现浇箱梁连续通过,纵向预应力钢束不在该墩锚固", "correct": true}, {"key": "E", "text": "6号墩并没有盖梁,墩柱顶直接设支座", "correct": false}, {"key": "F", "text": "6号墩盖梁比5号墩盖梁高", "correct": false}], "answer": ["A", "D"], "few_sheet_pages": [27, 25, 14, 5, 12, 26], "evidence_pages": [27, 26, 14, 25], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U18-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,5号墩和6号墩\"桥墩横立面\"上盖梁(H0 至 H1)的高度各是多少?没有盖梁填 0。以 JSON 返回两个字段 P5、P6,每个字段为数值和单位(mm)。", "answer": "{\"P5\": {\"value\": 2000, \"unit\": \"mm\"}, \"P6\": {\"value\": 2000, \"unit\": \"mm\"}}"}, {"id": "MS-U18-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,5号墩和6号墩 3-3 平面上标注的盖梁总长各是多少?以 JSON 返回两个字段 P5、P6,每个字段为数值和单位(mm)。", "answer": "{\"P5\": {\"value\": 24500, \"unit\": \"mm\"}, \"P6\": {\"value\": 24900, \"unit\": \"mm\"}}"}, {"id": "MS-U18-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,4号墩的\"桥墩横立面\"上,墩柱顶(H1)到梁底支座之间的盖梁高度是多少?没有盖梁填 0。返回数值和单位(mm)。", "answer": "{\"value\": 0, \"unit\": \"mm\"}"}, {"id": "MS-U18-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"支坪立交主线2号桥箱梁纵向预应力钢束立面布置(2×35m)\"中,N1、N2、N3 钢束两端的张拉锚固点分别位于哪两根墩台轴线处?以 JSON 返回两个字段 left、right(沿图面从左到右),各为轴号的阿拉伯数字(例如 8 号轴返回 8)。", "answer": "{\"left\": \"5\", \"right\": \"7\"}"}, {"id": "MS-U18-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,6号墩 2-2 平面所示墩柱下承台的平面尺寸是多少?以 JSON 返回两个字段 along(顺桥向)、across(横桥向),每个字段为数值和单位(mm)。", "answer": "{\"along\": {\"value\": 3200, \"unit\": \"mm\"}, \"across\": {\"value\": 3200, \"unit\": \"mm\"}}"}, {"id": "MS-U18-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥中,立在 9000×3000 双桩承台上的那根墩柱,属于几号墩?返回墩号的阿拉伯数字(例如 8号墩 返回 8)。", "answer": "\"5\""}, {"id": "MS-U18-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥中,盖梁总长标注为 24900 mm 的那个桥墩是几号墩?返回墩号的阿拉伯数字(例如 8号墩 返回 8)。", "answer": "\"6\""}]} {"page_01_file_name": "images/MS-U18-02/few_sheet/01.png", "page_02_file_name": "images/MS-U18-02/few_sheet/02.png", "page_03_file_name": "images/MS-U18-02/few_sheet/03.png", "page_04_file_name": "images/MS-U18-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U18-02", "set": "U18", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "主线2号桥第一联钢箱梁中跨径最大的那一孔,关于这一孔两端桥墩的下部结构,下列说法哪些正确?", "options": [{"key": "A", "text": "大桩号一端的桥墩有 4 根柱,每柱下为 3200×3200 的承台和 1 根 φ2000 桩", "correct": true}, {"key": "B", "text": "小桩号一端的桥墩为双柱,每根柱下一个 3000×6000 的承台,各设 2 根 φ1500 桩", "correct": true}, {"key": "C", "text": "大桩号一端的桥墩,相邻柱中心距自左至右为 7500、5500、6000 mm", "correct": true}, {"key": "D", "text": "小桩号一端的桥墩,承台厚 3000 mm", "correct": false}, {"key": "E", "text": "大桩号一端的桥墩,承台厚 3000 mm", "correct": true}, {"key": "F", "text": "小桩号一端的桥墩为墙式墩身,横桥向宽 8600 mm,每个承台下 3 根 φ1500 桩", "correct": false}], "answer": ["A", "B", "C", "E"], "few_sheet_pages": [2, 24, 23, 25], "evidence_pages": [2, 24, 25], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U18-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交主线2号桥桥墩及基础一般构造图”中附注写明适用于 3#轴的那一张:桥墩横立面上有几根立柱?每个承台下几根桩、桩径多少?2—2 平面上每个承台的两边边长各是多少?横立面上承台的厚度(竖向尺寸)是多少?以 JSON 返回六个字段:columns(数值和单位 根)、piles_per_cap(数值和单位 根)、pile_dia(数值和单位 mm)、cap_long、cap_short(承台平面较长边、较短边,数值和单位 mm)、cap_thickness(数值和单位 mm)。", "answer": "{\"columns\": {\"value\": 2, \"unit\": \"根\"}, \"piles_per_cap\": {\"value\": 2, \"unit\": \"根\"}, \"pile_dia\": {\"value\": 1500, \"unit\": \"mm\"}, \"cap_long\": {\"value\": 6000, \"unit\": \"mm\"}, \"cap_short\": {\"value\": 3000, \"unit\": \"mm\"}, \"cap_thickness\": {\"value\": 2500, \"unit\": \"mm\"}}"}, {"id": "MS-U18-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交主线2号桥桥墩及基础一般构造图”中附注写明适用于 4#轴的那一张:桥墩横立面上有几根立柱?每根柱下的承台平面尺寸(2—2 上的边长)是多少?每个承台下几根桩、桩径多少?横立面上承台的厚度(竖向尺寸)是多少?以 JSON 返回五个字段:columns(数值和单位 根)、cap_side(承台平面边长,数值和单位 mm)、piles_per_cap(数值和单位 根)、pile_dia(数值和单位 mm)、cap_thickness(数值和单位 mm)。", "answer": "{\"columns\": {\"value\": 4, \"unit\": \"根\"}, \"cap_side\": {\"value\": 3200, \"unit\": \"mm\"}, \"piles_per_cap\": {\"value\": 1, \"unit\": \"根\"}, \"pile_dia\": {\"value\": 2000, \"unit\": \"mm\"}, \"cap_thickness\": {\"value\": 3000, \"unit\": \"mm\"}}"}, {"id": "MS-U18-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交主线2号桥桥墩及基础一般构造图”中附注写明适用于 4#轴的那一张:桥墩横立面顶部尺寸线上,相邻立柱中心距自左至右依次是多少?以 JSON 返回三个字段 s1、s2、s3(自左至右),每个字段为数值和单位(mm)。", "answer": "{\"s1\": {\"value\": 7500, \"unit\": \"mm\"}, \"s2\": {\"value\": 5500, \"unit\": \"mm\"}, \"s3\": {\"value\": 6000, \"unit\": \"mm\"}}"}, {"id": "MS-U18-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交主线2号桥桥墩及基础一般构造图”中附注写明适用于 2#轴的那一张:桥墩横立面上墩身的横桥向宽度是多少?承台下共几根桩、桩径多少?以 JSON 返回三个字段:pier_width(数值和单位 mm)、piles(数值和单位 根)、pile_dia(数值和单位 mm)。", "answer": "{\"pier_width\": {\"value\": 8600, \"unit\": \"mm\"}, \"piles\": {\"value\": 3, \"unit\": \"根\"}, \"pile_dia\": {\"value\": 1500, \"unit\": \"mm\"}}"}, {"id": "MS-U18-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥第一联钢箱梁中跨径最大的那一孔,小桩号一端和大桩号一端的桥墩各是几号?以 JSON 返回两个字段 small_end、large_end,每个字段只写墩号的阿拉伯数字(图中圆圈内的数字)。", "answer": "{\"small_end\": \"3\", \"large_end\": \"4\"}"}, {"id": "MS-U18-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥第一联钢箱梁中跨径最大的那一孔,小桩号一端桥墩的承台厚度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2500, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U18-03/few_sheet/01.png", "page_02_file_name": "images/MS-U18-03/few_sheet/02.png", "page_03_file_name": "images/MS-U18-03/few_sheet/03.png", "page_04_file_name": "images/MS-U18-03/few_sheet/04.png", "page_05_file_name": "images/MS-U18-03/few_sheet/05.png", "page_06_file_name": "images/MS-U18-03/few_sheet/06.png", "page_07_file_name": "images/MS-U18-03/few_sheet/07.png", "page_08_file_name": "images/MS-U18-03/few_sheet/08.png", "page_09_file_name": "images/MS-U18-03/few_sheet/09.png", "page_10_file_name": "images/MS-U18-03/few_sheet/10.png", "id": "MS-U18-03", "set": "U18", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "主线2号桥全桥(六个桥墩和两端桥台)的基桩一共有多少根?", "options": [{"key": "A", "text": "54", "correct": false}, {"key": "B", "text": "56", "correct": true}, {"key": "C", "text": "55", "correct": false}, {"key": "D", "text": "28", "correct": false}, {"key": "E", "text": "47", "correct": false}, {"key": "F", "text": "42", "correct": false}], "answer": ["B"], "few_sheet_pages": [31, 22, 24, 30, 28, 29, 25, 27, 26, 23], "evidence_pages": [22, 23, 24, 25, 26, 27, 29, 31], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U18-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,1号墩、2号墩、3号墩下各有几根基桩?以 JSON 返回三个字段 P1、P2、P3,每个字段为数值和单位(根)。", "answer": "{\"P1\": {\"value\": 5, \"unit\": \"根\"}, \"P2\": {\"value\": 6, \"unit\": \"根\"}, \"P3\": {\"value\": 4, \"unit\": \"根\"}}"}, {"id": "MS-U18-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,4号墩、5号墩、6号墩下各有几根基桩?以 JSON 返回三个字段 P4、P5、P6,每个字段为数值和单位(根)。", "answer": "{\"P4\": {\"value\": 4, \"unit\": \"根\"}, \"P5\": {\"value\": 5, \"unit\": \"根\"}, \"P6\": {\"value\": 4, \"unit\": \"根\"}}"}, {"id": "MS-U18-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥台一般构造图的\"桥台平面\"中,0#桥台下共有几根基桩?返回数值和单位(根)。", "answer": "{\"value\": 14, \"unit\": \"根\"}"}, {"id": "MS-U18-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥台一般构造图的\"桥台平面\"中,7#桥台下共有几根基桩?返回数值和单位(根)。", "answer": "{\"value\": 14, \"unit\": \"根\"}"}, {"id": "MS-U18-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥台一般构造图的\"桥台正立面\"(0#桥台)中,承台下画出了几根桩?返回数值和单位(根)。", "answer": "{\"value\": 7, \"unit\": \"根\"}"}, {"id": "MS-U18-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥5号墩的四根墩柱中,立在 9000×3000 承台上的那一根墩柱,其下有几根桩?返回数值和单位(根)。", "answer": "{\"value\": 2, \"unit\": \"根\"}"}, {"id": "MS-U18-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥1号墩由一道墙式墩身和两根独立方柱组成。这两根方柱下的桩合计几根?返回数值和单位(根)。", "answer": "{\"value\": 2, \"unit\": \"根\"}"}]} {"page_01_file_name": "images/MS-U18-04/few_sheet/01.png", "page_02_file_name": "images/MS-U18-04/few_sheet/02.png", "page_03_file_name": "images/MS-U18-04/few_sheet/03.png", "page_04_file_name": "images/MS-U18-04/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U18-04", "set": "U18", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "主线2号桥第二联所在的墩台(5 号墩至 7 号台)顶上的支座,下列说法哪些正确?", "options": [{"key": "A", "text": "7 号台台顶相邻支座的最大中距为 7000 mm", "correct": false}, {"key": "B", "text": "5 号墩至 7 号台各墩台顶上的支座一共 18 个", "correct": true}, {"key": "C", "text": "7 号台台顶的支座共 6 个", "correct": true}, {"key": "D", "text": "5 号墩至 7 号台各墩台顶上的支座一共 14 个", "correct": false}, {"key": "E", "text": "5 号墩墩顶的支座共 6 个", "correct": false}, {"key": "F", "text": "5 号墩墩顶的支座共 4 个", "correct": false}], "answer": ["B", "C"], "few_sheet_pages": [26, 27, 3, 11], "evidence_pages": [3, 11, 26], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U18-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥第二联的起止两端各是哪一号墩台?只返回两个编号数字。返回两个墩台编号数字,顺序不限。", "answer": "[\"5\", \"7\"]"}, {"id": "MS-U18-04-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "5 号桥墩墩顶按顺桥向侧视,左侧和右侧分别支承的是哪种梁?返回 左、右 两个字段,每个字段按图中文字原样书写。", "answer": "{\"左\": \"钢箱梁\", \"右\": \"砼箱梁\"}"}, {"id": "MS-U18-04-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥第一联的起止两端各是哪一号墩台?只返回两个编号数字。返回两个墩台编号数字,顺序不限。", "answer": "[\"0\", \"5\"]"}, {"id": "MS-U18-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "5 号桥墩一般构造图的桥墩横立面中,盖梁顶上共画了几个支座?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 4, \"unit\": \"个\"}"}, {"id": "MS-U18-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "第二联现浇箱梁底平面中,0、1、2 三条桥梁轴线处的支座中心线上各画了几个支座?返回 0轴、1轴、2轴 三个字段,每个字段为 {value, unit}。", "answer": "{\"0轴\": {\"value\": 4, \"unit\": \"个\"}, \"1轴\": {\"value\": 4, \"unit\": \"个\"}, \"2轴\": {\"value\": 6, \"unit\": \"个\"}}"}, {"id": "MS-U18-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "5 号桥墩一般构造图的 1-1 侧视图中,墩顶共画了几个支座?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 2, \"unit\": \"个\"}"}]} {"page_01_file_name": "images/MS-U18-05/few_sheet/01.png", "page_02_file_name": "images/MS-U18-05/few_sheet/02.png", "page_03_file_name": "images/MS-U18-05/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U18-05", "set": "U18", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "主线2号桥两端桥台中,与 160 型伸缩缝相接的那一座,关于其台帽支座与桩基布置,下列说法哪些正确?", "options": [{"key": "A", "text": "承台下同排相邻两桩的中心距为 4083 mm", "correct": false}, {"key": "B", "text": "相邻支座之间的最小横向间距为 3900 mm", "correct": false}, {"key": "C", "text": "居中两个支座的横向中心距为 6900 mm", "correct": false}, {"key": "D", "text": "台帽上共设 6 个支座", "correct": false}, {"key": "E", "text": "相邻支座之间的最大横向间距为 5700 mm", "correct": false}, {"key": "F", "text": "承台下同排相邻两桩的中心距为 4250 mm", "correct": true}], "answer": ["F"], "few_sheet_pages": [2, 30, 28], "evidence_pages": [2, 28], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U18-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥台一般构造图中,0#桥台的\"桥台正立面\"上,承台下同一排相邻两根桩的中心距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 4250, \"unit\": \"mm\"}"}, {"id": "MS-U18-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥台一般构造图中,0#桥台的\"桥台正立面\"上,台帽顶面共画了几个支座?返回数值和单位(个)。", "answer": "{\"value\": 4, \"unit\": \"个\"}"}, {"id": "MS-U18-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥台一般构造图中,0#桥台的\"桥台正立面\"上,自左起第 1、2 个支座之间,道路中心线两侧最靠近中心线的两个支座之间,自右起第 1、2 个支座之间,横向中心距各是多少?以 JSON 返回三个字段 左起第1至2、中心线两侧、右起第1至2,每个字段为数值和单位(mm)。", "answer": "{\"左起第1至2\": {\"value\": 6900, \"unit\": \"mm\"}, \"中心线两侧\": {\"value\": 7500, \"unit\": \"mm\"}, \"右起第1至2\": {\"value\": 6900, \"unit\": \"mm\"}}"}, {"id": "MS-U18-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥台一般构造图中,7#桥台的\"桥台正立面\"上,承台下同一排相邻两根桩的中心距是多少、台帽顶面共画了几个支座?以 JSON 返回两个字段 桩中心距(mm)、支座个数(个),每个字段为数值和单位。", "answer": "{\"桩中心距\": {\"value\": 4083, \"unit\": \"mm\"}, \"支座个数\": {\"value\": 6, \"unit\": \"个\"}}"}, {"id": "MS-U18-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥台一般构造图中,7#桥台的\"桥台正立面\"上,自左起第 1、2 个支座之间,道路设计中心线两侧最靠近中心线的两个支座之间,横向中心距各是多少?以 JSON 返回两个字段 左起第1至2、中心线两侧,每个字段为数值和单位(mm)。", "answer": "{\"左起第1至2\": {\"value\": 3900, \"unit\": \"mm\"}, \"中心线两侧\": {\"value\": 5700, \"unit\": \"mm\"}}"}, {"id": "MS-U18-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥上设 160 型伸缩缝的位置,分别在哪两根墩台轴线处?以 JSON 列表返回两个轴号,各为阿拉伯数字字符串(例如 ⑨ 号轴返回 \"9\"),顺序不限。", "answer": "[\"0\", \"5\"]"}]} {"page_01_file_name": "images/MS-U18-06/few_sheet/01.png", "page_02_file_name": "images/MS-U18-06/few_sheet/02.png", "page_03_file_name": "images/MS-U18-06/few_sheet/03.png", "page_04_file_name": "images/MS-U18-06/few_sheet/04.png", "page_05_file_name": "images/MS-U18-06/few_sheet/05.png", "page_06_file_name": "images/MS-U18-06/few_sheet/06.png", "page_07_file_name": "images/MS-U18-06/few_sheet/07.png", "page_08_file_name": "images/MS-U18-06/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U18-06", "set": "U18", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "第一联钢箱梁(含两端)一共由多少个支座支承?", "options": [{"key": "A", "text": "24", "correct": false}, {"key": "B", "text": "15", "correct": false}, {"key": "C", "text": "23", "correct": false}, {"key": "D", "text": "21", "correct": false}, {"key": "E", "text": "19", "correct": true}, {"key": "F", "text": "18", "correct": false}], "answer": ["E"], "few_sheet_pages": [29, 25, 23, 31, 22, 24, 26, 12], "evidence_pages": [22, 23, 24, 25, 26, 29], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U18-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥台一般构造图的\"桥台平面\"中,0#桥台台帽上布置了几个支座垫石?返回数值和单位(个)。", "answer": "{\"value\": 4, \"unit\": \"个\"}"}, {"id": "MS-U18-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥台一般构造图的\"桥台平面\"中,7#桥台台帽上布置了几个支座垫石?返回数值和单位(个)。", "answer": "{\"value\": 6, \"unit\": \"个\"}"}, {"id": "MS-U18-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图的\"桥墩横立面\"中,1号墩、2号墩、3号墩的墩顶各画了几个支座?以 JSON 返回三个字段 P1、P2、P3,每个字段为数值和单位(个)。", "answer": "{\"P1\": {\"value\": 3, \"unit\": \"个\"}, \"P2\": {\"value\": 2, \"unit\": \"个\"}, \"P3\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U18-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图的\"桥墩横立面\"中,4号墩的柱顶共画了几个支座?返回数值和单位(个)。", "answer": "{\"value\": 4, \"unit\": \"个\"}"}, {"id": "MS-U18-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥现浇箱梁一般构造图的 1-1 断面中,梁底画了几个支座?返回数值和单位(个)。", "answer": "{\"value\": 4, \"unit\": \"个\"}"}, {"id": "MS-U18-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥第一联钢箱梁的两端,分别支承在几号轴线的墩台上?以 JSON 返回两个字段 start、end,各为轴号的阿拉伯数字(例如 8 号轴返回 8)。", "answer": "{\"start\": \"0\", \"end\": \"5\"}"}, {"id": "MS-U18-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥钢箱梁与现浇箱梁在一个桥墩的盖梁上分界,盖梁顶顺桥向两侧各设一排支座。其中支承钢箱梁的那一排有几个支座?返回数值和单位(个)。", "answer": "{\"value\": 4, \"unit\": \"个\"}"}]} {"page_01_file_name": "images/MS-U18-07/few_sheet/01.png", "page_02_file_name": "images/MS-U18-07/few_sheet/02.png", "page_03_file_name": "images/MS-U18-07/few_sheet/03.png", "page_04_file_name": "images/MS-U18-07/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U18-07", "set": "U18", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "主线2号桥 5 号桥墩,关于其横立面上所注各标高位置之间的竖向距离及各柱下的桩,下列说法哪些正确?", "options": [{"key": "A", "text": "H1 与 H2 两个标高位置之间的竖向距离为 3.0 m", "correct": false}, {"key": "B", "text": "H1 与 H2 两个标高位置之间的竖向距离为 2.0 m", "correct": false}, {"key": "C", "text": "a 柱一侧 H1 与 H4 两个标高位置之间的竖向距离为 34.5 m", "correct": false}, {"key": "D", "text": "b 柱下的桩长为 18.0 m", "correct": true}, {"key": "E", "text": "a 柱一侧 H1 与 H4 两个标高位置之间的竖向距离为 22.0 m", "correct": true}, {"key": "F", "text": "c 柱下的桩长为 21.0 m", "correct": true}], "answer": ["D", "E", "F"], "few_sheet_pages": [7, 26, 6, 27], "evidence_pages": [7, 26], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U18-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "5 号桥墩 H1 与 H2 两个标高位置之间的那一段,图上标注的是什么?按图中标注原样返回。", "answer": "\"DL\""}, {"id": "MS-U18-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "5 号桥墩 H3 与 H4 两个标高位置之间的那一段,图上标注的是什么?按图中标注原样返回。", "answer": "\"ZL\""}, {"id": "MS-U18-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "5#轴桥墩地质横断面图中,最左边一根墩柱的柱高是多少 mm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 6500, \"unit\": \"mm\"}"}, {"id": "MS-U18-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "5#轴桥墩地质横断面图中,最左边一根桩的桩长是多少 mm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 12500, \"unit\": \"mm\"}"}, {"id": "MS-U18-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "5 号桥墩横立面中,a 柱下承台的竖向厚度是多少 mm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 3000, \"unit\": \"mm\"}"}, {"id": "MS-U18-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "5#轴桥墩地质横断面图中,盖梁的高度是多少 mm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 2000, \"unit\": \"mm\"}"}, {"id": "MS-U18-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "5#轴桥墩地质横断面图中,最右边组合承台下左边那根 φ1500 桩的桩长是多少 mm?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 25000, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U18-08/few_sheet/01.png", "page_02_file_name": "images/MS-U18-08/few_sheet/02.png", "page_03_file_name": "images/MS-U18-08/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U18-08", "set": "U18", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "主线2号桥现浇箱梁那一联中间的那座桥墩,关于其盖梁与墩柱布置,下列说法哪些正确?", "options": [{"key": "A", "text": "盖梁横桥向全长 24900 mm", "correct": true}, {"key": "B", "text": "盖梁横桥向全长 24500 mm", "correct": false}, {"key": "C", "text": "四根墩柱下均为 3200×3200 的独立承台,各接 1 根 φ2000 桩", "correct": true}, {"key": "D", "text": "最左侧墩柱中心距盖梁左端 2000 mm", "correct": false}, {"key": "E", "text": "盖梁顺桥向宽 2900 mm", "correct": false}, {"key": "F", "text": "相邻墩柱中心距自左至右为 6750、7250、7500 mm", "correct": true}], "answer": ["A", "C", "F"], "few_sheet_pages": [26, 27, 2], "evidence_pages": [2, 27], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U18-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,6号墩(6#轴)的 3—3 平面上:盖梁横桥向全长、盖梁顺桥向宽度、最左侧墩柱中心至盖梁左端的距离各是多少?以 JSON 返回三个字段 全长、宽度、左柱至左端,每个字段为数值和单位(mm)。", "answer": "{\"全长\": {\"value\": 24900, \"unit\": \"mm\"}, \"宽度\": {\"value\": 2000, \"unit\": \"mm\"}, \"左柱至左端\": {\"value\": 1400, \"unit\": \"mm\"}}"}, {"id": "MS-U18-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,6号墩(6#轴)的\"桥墩横立面\"上,相邻墩柱中心之间的间距从 a 柱起依次是多少?以 JSON 返回三个字段 ab、bc、cd,每个字段为数值和单位(mm)。", "answer": "{\"ab\": {\"value\": 6750, \"unit\": \"mm\"}, \"bc\": {\"value\": 7250, \"unit\": \"mm\"}, \"cd\": {\"value\": 7500, \"unit\": \"mm\"}}"}, {"id": "MS-U18-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,6号墩(6#轴)的\"桥墩横立面\"上,四根墩柱下的基桩合计几根、桩径是多少?以 JSON 返回两个字段 桩数(根)、桩径(mm),每个字段为数值和单位。", "answer": "{\"桩数\": {\"value\": 4, \"unit\": \"根\"}, \"桩径\": {\"value\": 2000, \"unit\": \"mm\"}}"}, {"id": "MS-U18-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,6号墩(6#轴)2—2 平面所示墩柱下承台的平面尺寸是多少?以 JSON 返回两个字段 顺桥向、横桥向,每个字段为数值和单位(mm)。", "answer": "{\"顺桥向\": {\"value\": 3200, \"unit\": \"mm\"}, \"横桥向\": {\"value\": 3200, \"unit\": \"mm\"}}"}, {"id": "MS-U18-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,5号墩(5#轴)的 3—3 平面上:盖梁横桥向全长、盖梁顺桥向宽度、最左侧墩柱中心至盖梁左端的距离各是多少?以 JSON 返回三个字段 全长、宽度、左柱至左端,每个字段为数值和单位(mm)。", "answer": "{\"全长\": {\"value\": 24500, \"unit\": \"mm\"}, \"宽度\": {\"value\": 2900, \"unit\": \"mm\"}, \"左柱至左端\": {\"value\": 2000, \"unit\": \"mm\"}}"}, {"id": "MS-U18-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥现浇箱梁那一联中间的那座桥墩是几号墩?返回墩号的阿拉伯数字(例如 8号墩 返回 8)。", "answer": "\"6\""}]} {"page_01_file_name": "images/MS-U18-09/few_sheet/01.png", "page_02_file_name": "images/MS-U18-09/few_sheet/02.png", "page_03_file_name": "images/MS-U18-09/few_sheet/03.png", "page_04_file_name": "images/MS-U18-09/few_sheet/04.png", "page_05_file_name": "images/MS-U18-09/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U18-09", "set": "U18", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "主线2号桥的墩台基础与地下既有或在建构筑物在空间上相互穿插。关于两端桥台和5号墩处的上下、内外关系,下列说法哪些正确?", "options": [{"key": "A", "text": "栀花大道综合管廊从7号台承台正下方的桩间穿过", "correct": false}, {"key": "B", "text": "0号台同一排桩的桩底高程都相同", "correct": false}, {"key": "C", "text": "5号墩处的在建管廊从两个 φ2000 单桩承台之间穿过", "correct": true}, {"key": "D", "text": "5号墩处的现状箱涵位于双桩承台之下、两根 φ1500 桩之间", "correct": true}, {"key": "E", "text": "0号台承台外侧的F线地下通道,其路面高程低于0号台承台底面", "correct": true}, {"key": "F", "text": "7号台的桩底比0号台的承台底面还低", "correct": false}], "answer": ["C", "D", "E"], "few_sheet_pages": [7, 28, 6, 8, 26], "evidence_pages": [6, 7, 8], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U18-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥地质横断面图(0#桥台处)中,桥台承台底面的高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 242.152, \"unit\": \"m\"}"}, {"id": "MS-U18-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥地质横断面图(0#桥台处)中,承台下最左一根桩和最右一根桩的桩底高程各是多少?以 JSON 返回两个字段 leftmost、rightmost,每个字段为数值和单位(m)。", "answer": "{\"leftmost\": {\"value\": 232.652, \"unit\": \"m\"}, \"rightmost\": {\"value\": 231.152, \"unit\": \"m\"}}"}, {"id": "MS-U18-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥地质横断面图(0#桥台处)中,承台外侧的地下通道内,FK0+460.000 处标注的路面高程 H 是多少?返回数值和单位(m)。", "answer": "{\"value\": 237.451, \"unit\": \"m\"}"}, {"id": "MS-U18-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥地质横断面图(7#桥台处)中,承台下基桩的桩底高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 244.102, \"unit\": \"m\"}"}, {"id": "MS-U18-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥5号墩处的在建管廊,左右两侧紧邻的各是一个墩柱承台。这两个承台下的桩径各是多少?以 JSON 返回两个字段 left、right,每个字段为数值和单位(mm)。", "answer": "{\"left\": {\"value\": 2000, \"unit\": \"mm\"}, \"right\": {\"value\": 2000, \"unit\": \"mm\"}}"}, {"id": "MS-U18-09-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥5号墩处的现状箱涵,正上方是哪个承台?返回该承台下的桩数(根)和桩径(mm),以 JSON 返回两个字段 count、diameter,每个字段为数值和单位。", "answer": "{\"count\": {\"value\": 2, \"unit\": \"根\"}, \"diameter\": {\"value\": 1500, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U18-10/few_sheet/01.png", "page_02_file_name": "images/MS-U18-10/few_sheet/02.png", "page_03_file_name": "images/MS-U18-10/few_sheet/03.png", "page_04_file_name": "images/MS-U18-10/few_sheet/04.png", "page_05_file_name": "images/MS-U18-10/few_sheet/05.png", "page_06_file_name": "images/MS-U18-10/few_sheet/06.png", "page_07_file_name": "images/MS-U18-10/few_sheet/07.png", "page_08_file_name": "images/MS-U18-10/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U18-10", "set": "U18", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "主线2号桥的六个桥墩中,哪些桥墩的基桩同时用了两种不同的桩径?", "options": [{"key": "A", "text": "6号墩", "correct": false}, {"key": "B", "text": "3号墩", "correct": false}, {"key": "C", "text": "4号墩", "correct": false}, {"key": "D", "text": "2号墩", "correct": false}, {"key": "E", "text": "1号墩", "correct": true}, {"key": "F", "text": "5号墩", "correct": true}], "answer": ["E", "F"], "few_sheet_pages": [24, 5, 27, 25, 4, 26, 23, 22], "evidence_pages": [22, 23, 24, 25, 26, 27], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U18-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,1号墩(1#轴)的全部基桩里,桩径 φ1500 和 φ2000 的各有几根?以 JSON 返回两个字段 D1500、D2000,每个字段为数值和单位(根);该桩径没有时填 0。", "answer": "{\"D1500\": {\"value\": 3, \"unit\": \"根\"}, \"D2000\": {\"value\": 2, \"unit\": \"根\"}}"}, {"id": "MS-U18-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,5号墩(5#轴)的全部基桩里,桩径 φ1500 和 φ2000 的各有几根?以 JSON 返回两个字段 D1500、D2000,每个字段为数值和单位(根);该桩径没有时填 0。", "answer": "{\"D1500\": {\"value\": 2, \"unit\": \"根\"}, \"D2000\": {\"value\": 3, \"unit\": \"根\"}}"}, {"id": "MS-U18-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,2号墩(2#轴)的全部基桩里,桩径 φ1500 和 φ2000 的各有几根?以 JSON 返回两个字段 D1500、D2000,每个字段为数值和单位(根);该桩径没有时填 0。", "answer": "{\"D1500\": {\"value\": 6, \"unit\": \"根\"}, \"D2000\": {\"value\": 0, \"unit\": \"根\"}}"}, {"id": "MS-U18-10-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,3号墩(3#轴)的全部基桩里,桩径 φ1500 和 φ2000 的各有几根?以 JSON 返回两个字段 D1500、D2000,每个字段为数值和单位(根);该桩径没有时填 0。", "answer": "{\"D1500\": {\"value\": 4, \"unit\": \"根\"}, \"D2000\": {\"value\": 0, \"unit\": \"根\"}}"}, {"id": "MS-U18-10-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,4号墩(4#轴)的全部基桩里,桩径 φ1500 和 φ2000 的各有几根?以 JSON 返回两个字段 D1500、D2000,每个字段为数值和单位(根);该桩径没有时填 0。", "answer": "{\"D1500\": {\"value\": 0, \"unit\": \"根\"}, \"D2000\": {\"value\": 4, \"unit\": \"根\"}}"}, {"id": "MS-U18-10-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,6号墩(6#轴)的全部基桩里,桩径 φ1500 和 φ2000 的各有几根?以 JSON 返回两个字段 D1500、D2000,每个字段为数值和单位(根);该桩径没有时填 0。", "answer": "{\"D1500\": {\"value\": 0, \"unit\": \"根\"}, \"D2000\": {\"value\": 4, \"unit\": \"根\"}}"}, {"id": "MS-U18-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥的桥墩中,有一个桥墩的其中一根墩柱立在 9000×3000 的双桩承台上,其余墩柱各立在单桩承台上。这个桥墩是几号墩?返回墩号的阿拉伯数字(例如 8号墩 返回 8)。", "answer": "\"5\""}]} {"page_01_file_name": "images/MS-U18-11/few_sheet/01.png", "page_02_file_name": "images/MS-U18-11/few_sheet/02.png", "page_03_file_name": "images/MS-U18-11/few_sheet/03.png", "page_04_file_name": "images/MS-U18-11/few_sheet/04.png", "page_05_file_name": "images/MS-U18-11/few_sheet/05.png", "page_06_file_name": "images/MS-U18-11/few_sheet/06.png", "page_07_file_name": "images/MS-U18-11/few_sheet/07.png", "page_08_file_name": "images/MS-U18-11/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U18-11", "set": "U18", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿桩号增大方向(由0#台往7#台),主线2号桥各桥墩的下部结构形式依次变化。下列\"前一墩 → 紧接的下一墩\"中,哪些正确?", "options": [{"key": "A", "text": "两根独立方柱、各立于双桩承台 → 带盖梁的四柱墩、钢箱梁与现浇箱梁在此分界", "correct": false}, {"key": "B", "text": "四根独立方柱、柱顶直接设支座(无盖梁) → 带盖梁的四柱墩、钢箱梁与现浇箱梁在此分界", "correct": true}, {"key": "C", "text": "带盖梁的四柱墩、各柱均为单桩 → 带盖梁的四柱墩、钢箱梁与现浇箱梁在此分界", "correct": false}, {"key": "D", "text": "一道斜置墙式墩加两根独立方柱 → 两根独立方柱、各立于双桩承台", "correct": false}, {"key": "E", "text": "两道斜置墙式墩 → 两根独立方柱、各立于双桩承台", "correct": true}, {"key": "F", "text": "一道斜置墙式墩加两根独立方柱 → 两道斜置墙式墩", "correct": true}], "answer": ["B", "E", "F"], "few_sheet_pages": [24, 22, 26, 4, 23, 5, 27, 25], "evidence_pages": [22, 23, 24, 25, 26, 27], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U18-11-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,1号墩的\"桥墩横立面\"上,8600 宽的墙式墩身有几个、独立方柱有几根?以 JSON 返回两个字段 wall(个)、column(根),每个字段为数值和单位;没有的填 0。", "answer": "{\"wall\": {\"value\": 1, \"unit\": \"个\"}, \"column\": {\"value\": 2, \"unit\": \"根\"}}"}, {"id": "MS-U18-11-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,2号墩的\"桥墩横立面\"上,8600 宽的墙式墩身有几个、独立方柱有几根?以 JSON 返回两个字段 wall(个)、column(根),每个字段为数值和单位;没有的填 0。", "answer": "{\"wall\": {\"value\": 2, \"unit\": \"个\"}, \"column\": {\"value\": 0, \"unit\": \"根\"}}"}, {"id": "MS-U18-11-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,3号墩的\"桥墩横立面\"上,8600 宽的墙式墩身有几个、独立方柱有几根、每根方柱下的承台设几根桩?以 JSON 返回三个字段 wall(个)、column(根)、piles_per_cap(根),每个字段为数值和单位;没有的填 0。", "answer": "{\"wall\": {\"value\": 0, \"unit\": \"个\"}, \"column\": {\"value\": 2, \"unit\": \"根\"}, \"piles_per_cap\": {\"value\": 2, \"unit\": \"根\"}}"}, {"id": "MS-U18-11-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,4号墩有几根墩柱?4号墩和5号墩柱顶的盖梁高度各是多少(没有盖梁填 0)?以 JSON 返回三个字段 P4_column(根)、P4_capbeam(mm)、P5_capbeam(mm),每个字段为数值和单位。", "answer": "{\"P4_column\": {\"value\": 4, \"unit\": \"根\"}, \"P4_capbeam\": {\"value\": 0, \"unit\": \"mm\"}, \"P5_capbeam\": {\"value\": 2000, \"unit\": \"mm\"}}"}, {"id": "MS-U18-11-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥的钢箱梁一联在某个桥墩处结束,其后接现浇混凝土箱梁。这个桥墩是几号墩?返回墩号的阿拉伯数字(例如 8号墩 返回 8)。", "answer": "\"5\""}, {"id": "MS-U18-11-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥的桥墩中,四根墩柱顶设盖梁、且四根墩柱各自只立在一根桩上的是几号墩?返回墩号的阿拉伯数字(例如 8号墩 返回 8)。", "answer": "\"6\""}]} {"page_01_file_name": "images/MS-U18-12/few_sheet/01.png", "page_02_file_name": "images/MS-U18-12/few_sheet/02.png", "page_03_file_name": "images/MS-U18-12/few_sheet/03.png", "page_04_file_name": "images/MS-U18-12/few_sheet/04.png", "page_05_file_name": "images/MS-U18-12/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U18-12", "set": "U18", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "主线2号桥在两端桥台和两联交界处设伸缩缝。关于这些位置梁端支座中心线相对于该处墩台轴线的位置,下列说法哪些正确?", "options": [{"key": "A", "text": "5号墩处,钢箱梁支座中心线位于5号轴线靠0号台一侧 850 mm", "correct": true}, {"key": "B", "text": "5号墩处钢箱梁与现浇箱梁的支座中心线重合,都落在5号轴线上", "correct": false}, {"key": "C", "text": "0号台与7号台处,支座中心线距各自桥台轴线的距离相同", "correct": true}, {"key": "D", "text": "5号墩处,现浇箱梁支座中心线位于5号轴线靠7号台一侧 850 mm", "correct": true}, {"key": "E", "text": "7号台处,现浇箱梁支座中心线距7号轴线 850 mm", "correct": false}, {"key": "F", "text": "0号台处,钢箱梁支座中心线位于0号轴线靠桥跨一侧 650 mm", "correct": true}], "answer": ["A", "C", "D", "F"], "few_sheet_pages": [26, 14, 15, 21, 10], "evidence_pages": [21, 14, 26], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U18-12-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥钢箱梁一般构造图(一)的\"立面布置图(一)\"中,⓪ 轴线到梁端支撑线的距离是多少?返回数值和单位(mm)。", "answer": "{\"value\": 650, \"unit\": \"mm\"}"}, {"id": "MS-U18-12-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥钢箱梁一般构造图(一)的\"立面布置图(三)\"中,⑤ 轴线到梁端支撑线的距离是多少?返回数值和单位(mm)。", "answer": "{\"value\": 850, \"unit\": \"mm\"}"}, {"id": "MS-U18-12-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"支坪立交主线2号桥箱梁纵向预应力钢束立面布置(2×35m)\"中,⑦ 轴一端:⑦ 轴线到梁端的距离、梁端到理论支承线的距离各是多少?以 JSON 返回两个字段 axis_to_end、end_to_support,每个字段为数值和单位(mm)。", "answer": "{\"axis_to_end\": {\"value\": 50, \"unit\": \"mm\"}, \"end_to_support\": {\"value\": 600, \"unit\": \"mm\"}}"}, {"id": "MS-U18-12-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"支坪立交主线2号桥箱梁纵向预应力钢束立面布置(2×35m)\"中,⑤ 轴一端:⑤ 轴线到梁端的距离、梁端到理论支承线的距离各是多少?以 JSON 返回两个字段 axis_to_end、end_to_support,每个字段为数值和单位(mm)。", "answer": "{\"axis_to_end\": {\"value\": 50, \"unit\": \"mm\"}, \"end_to_support\": {\"value\": 800, \"unit\": \"mm\"}}"}, {"id": "MS-U18-12-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,5号墩 2-2 断面上,钢箱梁一侧和砼箱梁一侧的支座中心各距盖梁中心线多少?以 JSON 返回两个字段 steel、concrete,每个字段为数值和单位(mm)。", "answer": "{\"steel\": {\"value\": 850, \"unit\": \"mm\"}, \"concrete\": {\"value\": 850, \"unit\": \"mm\"}}"}, {"id": "MS-U18-12-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥5号墩处两联梁体交界。以 5 号轴线为零点、朝 7 号台方向为正,钢箱梁的支座中心线和现浇箱梁的支座中心线各位于多少?以 JSON 返回两个字段 steel、concrete,每个字段为带正负号的数值和单位(mm)。", "answer": "{\"steel\": {\"value\": -850, \"unit\": \"mm\"}, \"concrete\": {\"value\": 850, \"unit\": \"mm\"}}"}, {"id": "MS-U18-12-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥7号台处,梁体支座中心线到7号轴线的距离是多少?返回数值和单位(mm)。", "answer": "{\"value\": 650, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U18-13/few_sheet/01.png", "page_02_file_name": "images/MS-U18-13/few_sheet/02.png", "page_03_file_name": "images/MS-U18-13/few_sheet/03.png", "page_04_file_name": "images/MS-U18-13/few_sheet/04.png", "page_05_file_name": "images/MS-U18-13/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U18-13", "set": "U18", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "4号墩的四根墩柱顶部由一道盖梁连成整体,钢箱梁支座设在盖梁顶面。关于这道盖梁及相邻桥墩的构造,下列说法哪些正确?", "options": [{"key": "A", "text": "5号墩的盖梁比6号墩的盖梁短", "correct": true}, {"key": "B", "text": "5号墩盖梁下的四根墩柱都是单根 φ2000 桩", "correct": false}, {"key": "C", "text": "6号墩盖梁上支承的是钢箱梁", "correct": false}, {"key": "D", "text": "4号墩墩柱中心间距依次为 7500、5500、6000 mm,与6号墩的柱距不同", "correct": true}, {"key": "E", "text": "该盖梁高 2000 mm", "correct": false}, {"key": "F", "text": "4号墩并没有盖梁,四根墩柱顶直接设支座支承钢箱梁", "correct": true}], "answer": ["A", "D", "F"], "few_sheet_pages": [4, 27, 26, 5, 25], "evidence_pages": [25, 26, 27], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U18-13-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,4号墩的\"桥墩横立面\"上,墩柱顶(H1)到梁底支座之间的盖梁高度是多少?没有盖梁填 0。返回数值和单位(mm)。", "answer": "{\"value\": 0, \"unit\": \"mm\"}"}, {"id": "MS-U18-13-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,4号墩\"桥墩横立面\"上相邻墩柱中心之间的间距,从 a 柱起依次是多少?以 JSON 返回三个字段 ab、bc、cd,每个字段为数值和单位(mm)。", "answer": "{\"ab\": {\"value\": 7500, \"unit\": \"mm\"}, \"bc\": {\"value\": 5500, \"unit\": \"mm\"}, \"cd\": {\"value\": 6000, \"unit\": \"mm\"}}"}, {"id": "MS-U18-13-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,6号墩\"桥墩横立面\"上相邻墩柱中心之间的间距,从 a 柱起依次是多少?以 JSON 返回三个字段 ab、bc、cd,每个字段为数值和单位(mm)。", "answer": "{\"ab\": {\"value\": 6750, \"unit\": \"mm\"}, \"bc\": {\"value\": 7250, \"unit\": \"mm\"}, \"cd\": {\"value\": 7500, \"unit\": \"mm\"}}"}, {"id": "MS-U18-13-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,5号墩和6号墩 3-3 平面上标注的盖梁总长各是多少?以 JSON 返回两个字段 P5、P6,每个字段为数值和单位(mm)。", "answer": "{\"P5\": {\"value\": 24500, \"unit\": \"mm\"}, \"P6\": {\"value\": 24900, \"unit\": \"mm\"}}"}, {"id": "MS-U18-13-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线2号桥桥墩及基础一般构造图中,5号墩\"桥墩横立面\"上盖梁(H0 至 H1)的高度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2000, \"unit\": \"mm\"}"}, {"id": "MS-U18-13-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥中,盖梁总长 24500 mm 的那个桥墩,其盖梁下各墩柱的基桩里共有几根 φ1500 桩?返回数值和单位(根);没有填 0。", "answer": "{\"value\": 2, \"unit\": \"根\"}"}, {"id": "MS-U18-13-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线2号桥的钢箱梁一联在某个桥墩处结束,其后接现浇混凝土箱梁。这个桥墩是几号墩?返回墩号的阿拉伯数字(例如 8号墩 返回 8)。", "answer": "\"5\""}]} {"page_01_file_name": "images/MS-U19-01/few_sheet/01.png", "page_02_file_name": "images/MS-U19-01/few_sheet/02.png", "page_03_file_name": "images/MS-U19-01/few_sheet/03.png", "page_04_file_name": "images/MS-U19-01/few_sheet/04.png", "page_05_file_name": "images/MS-U19-01/few_sheet/05.png", "page_06_file_name": "images/MS-U19-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U19-01", "set": "U19", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "第一联左幅第1跨(A1 至 P2)箱梁在平面上向左弯曲。关于这一跨的弯曲和相应的钢束,下列说法哪些正确?", "options": [{"key": "A", "text": "同一编号钢束中,右侧腹板线钢束的张拉长度最短", "correct": false}, {"key": "B", "text": "A1 端右侧腹板两束的平弯角与左侧腹板两束不同", "correct": true}, {"key": "C", "text": "同一编号钢束中,左侧腹板线钢束的张拉长度最短", "correct": true}, {"key": "D", "text": "第1跨右侧悬臂端部比左侧悬臂端部长 33.5 cm", "correct": true}, {"key": "E", "text": "第1跨左、右两侧梁长相等,这一跨并没有弯曲", "correct": false}, {"key": "F", "text": "A1 端中腹板两束的平弯角都是 1.9°", "correct": false}], "answer": ["B", "C", "D"], "few_sheet_pages": [21, 22, 11, 20, 15, 16], "evidence_pages": [11, 20, 15, 22], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U19-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁一般构造图中的“箱梁梁长长度表”里,第1跨的左侧悬臂端部 La、右侧悬臂端部 Ld 各是多少?返回 JSON 对象,字段名固定为 La、Ld,每个字段为 {value, unit},单位 cm。", "answer": "{\"La\": {\"value\": 4457.9, \"unit\": \"cm\"}, \"Ld\": {\"value\": 4491.4, \"unit\": \"cm\"}}"}, {"id": "MS-U19-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中的“钢束平弯示意(起始端)”上,中腹板两束钢束的平弯角 a 各是多少?返回 JSON 对象,字段名固定为 图面上方那束、图面下方那束,平弯角按图上数字原样写成字符串,不带度号(形如 \"0.5\")。", "answer": "{\"图面上方那束\": \"2\", \"图面下方那束\": \"1.8\"}"}, {"id": "MS-U19-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中的“钢束平弯示意(终止端)”上,中腹板两束钢束的平弯角 a 各是多少?返回 JSON 对象,字段名固定为 图面上方那束、图面下方那束,平弯角按图上数字原样写成字符串,不带度号(形如 \"0.5\")。", "answer": "{\"图面上方那束\": \"1.9\", \"图面下方那束\": \"1.9\"}"}, {"id": "MS-U19-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中的“箱梁预应力钢束明细表”里,钢束编号 F1 的左侧腹板线、中腹板、右侧腹板线三行,张拉长度各是多少?返回 JSON 对象,字段名固定为 左侧腹板线、中腹板、右侧腹板线,每个字段为 {value, unit},单位 m。", "answer": "{\"左侧腹板线\": {\"value\": 134.329, \"unit\": \"m\"}, \"中腹板\": {\"value\": 134.453, \"unit\": \"m\"}, \"右侧腹板线\": {\"value\": 134.585, \"unit\": \"m\"}}"}, {"id": "MS-U19-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中的“钢束平弯示意(起始端)”上,图面最上方、最下方两块腹板内各两束钢束的平弯角 a 各是多少(“靠梁边”指离箱梁边缘较近的那一束,“靠箱室”指另一束)?返回 JSON 对象,字段名固定为 上方靠梁边、上方靠箱室、下方靠梁边、下方靠箱室,平弯角按图上数字原样写成字符串,不带度号(形如 \"0.5\")。", "answer": "{\"上方靠梁边\": \"0.3\", \"上方靠箱室\": \"0.1\", \"下方靠梁边\": \"0.2\", \"下方靠箱室\": \"0.4\"}"}, {"id": "MS-U19-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "第一联左幅 A1 端锚固区,路线前进方向左侧腹板、右侧腹板内各两束钢束的平弯角各是多少(“靠梁边”指离箱梁边缘较近的那一束,“靠箱室”指另一束)?返回 JSON 对象,字段名固定为 左侧靠梁边、左侧靠箱室、右侧靠梁边、右侧靠箱室,平弯角按图上数字原样写成字符串,不带度号(形如 \"0.5\")。", "answer": "{\"左侧靠梁边\": \"0.3\", \"左侧靠箱室\": \"0.1\", \"右侧靠梁边\": \"0.2\", \"右侧靠箱室\": \"0.4\"}"}]} {"page_01_file_name": "images/MS-U19-02/few_sheet/01.png", "page_02_file_name": "images/MS-U19-02/few_sheet/02.png", "page_03_file_name": "images/MS-U19-02/few_sheet/03.png", "page_04_file_name": "images/MS-U19-02/few_sheet/04.png", "page_05_file_name": "images/MS-U19-02/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U19-02", "set": "U19", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿桥长从 A1 到 P4,记录某一层腹板钢束中心距箱梁底缘的高度:A1 锚固点 → 第1跨跨中水平段 → P2 墩顶水平段 → 第2跨跨中 → P3 墩顶 → 第3跨跨中 → P4 锚固点(cm)。下列序列中,哪些与 F1–F4 中某一层钢束一致?", "options": [{"key": "A", "text": "60-20-170-20-170-20-60", "correct": true}, {"key": "B", "text": "110-40-190-40-190-40-160", "correct": false}, {"key": "C", "text": "60-20-190-20-190-20-60", "correct": false}, {"key": "D", "text": "160-60-210-60-210-60-160", "correct": true}, {"key": "E", "text": "210-80-230-80-230-80-210", "correct": true}, {"key": "F", "text": "210-80-210-80-210-80-210", "correct": false}], "answer": ["A", "D", "E"], "few_sheet_pages": [19, 13, 12, 15, 14], "evidence_pages": [12, 13, 14], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U19-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中,“第1跨腹板钢束立面布置”下方的F1、F2、F3、F4 四个钢束大样上,各层钢束依次在 A1 端锚固点、第1跨跨中水平段、P2 墩顶水平段处距箱梁底缘线的高度是多少?返回 JSON 对象,字段名固定为 F1、F2、F3、F4,每个字段写成按上述顺序、用半角连字符连接的三个数(cm,不带单位),形如 \"100-50-120\"。", "answer": "{\"F1\": \"210-80-230\", \"F2\": \"160-60-210\", \"F3\": \"110-40-190\", \"F4\": \"60-20-170\"}"}, {"id": "MS-U19-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中,“第2跨腹板钢束立面布置”下方的F1、F2、F3、F4 四个钢束大样上,各层钢束依次在 P2 墩顶水平段、第2跨跨中水平段、P3 墩顶水平段处距箱梁底缘线的高度是多少?返回 JSON 对象,字段名固定为 F1、F2、F3、F4,每个字段写成按上述顺序、用半角连字符连接的三个数(cm,不带单位),形如 \"100-50-120\"。", "answer": "{\"F1\": \"230-80-230\", \"F2\": \"210-60-210\", \"F3\": \"190-40-190\", \"F4\": \"170-20-170\"}"}, {"id": "MS-U19-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中,“第3跨腹板钢束立面布置”下方的F1、F2、F3、F4 四个钢束大样上,各层钢束依次在 P3 墩顶水平段、第3跨跨中水平段、P4 端锚固点处距箱梁底缘线的高度是多少?返回 JSON 对象,字段名固定为 F1、F2、F3、F4,每个字段写成按上述顺序、用半角连字符连接的三个数(cm,不带单位),形如 \"100-50-120\"。", "answer": "{\"F1\": \"230-80-210\", \"F2\": \"210-60-160\", \"F3\": \"190-40-110\", \"F4\": \"170-20-60\"}"}, {"id": "MS-U19-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "第一联左幅腹板纵向钢束中,在 P2 墩顶水平段距箱梁底缘 190 cm 的那一层,在 P4 端锚固点距箱梁底缘多少?返回数值和单位(cm)。", "answer": "{\"value\": 110, \"unit\": \"cm\"}"}, {"id": "MS-U19-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "第一联左幅腹板纵向钢束中,跨中水平段距箱梁底缘 20 cm 的那一层,在 P3 墩顶水平段处距箱梁底缘多少?返回数值和单位(cm)。", "answer": "{\"value\": 170, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U19-03/few_sheet/01.png", "page_02_file_name": "images/MS-U19-03/few_sheet/02.png", "page_03_file_name": "images/MS-U19-03/few_sheet/03.png", "page_04_file_name": "images/MS-U19-03/few_sheet/04.png", "page_05_file_name": "images/MS-U19-03/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U19-03", "set": "U19", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "A1 端锚固区,每束钢束在平面上从锚固点斜向并拢(两处平弯之间的斜向过渡段),在立面上则从锚固点斜向下行、再经 R=1000 cm 的竖弯圆曲线转为水平。下列钢束中,哪些的竖弯圆曲线段完全落在其平面斜向过渡段之内?(距离均从锚固点量起)", "options": [{"key": "A", "text": "中腹板的 F3", "correct": false}, {"key": "B", "text": "左侧腹板靠梁边那一束的 F4", "correct": false}, {"key": "C", "text": "中腹板的 F4", "correct": true}, {"key": "D", "text": "左侧腹板靠箱室那一束的 F4", "correct": true}, {"key": "E", "text": "中腹板的 F1", "correct": false}, {"key": "F", "text": "左侧腹板靠箱室那一束的 F3", "correct": true}], "answer": ["C", "D", "F"], "few_sheet_pages": [20, 14, 12, 21, 15], "evidence_pages": [12, 20, 15], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U19-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中,“第1跨腹板钢束立面布置”下方的“F4钢束大样”上,A1 端那道 R=1000 的竖弯圆曲线段,其起点和终点距钢束锚固点的水平距离(沿路线设计线展开)各是多少?返回 JSON 对象,字段名固定为 起点、终点,每个字段为 {value, unit},单位 cm。", "answer": "{\"起点\": {\"value\": 315.5, \"unit\": \"cm\"}, \"终点\": {\"value\": 423.2, \"unit\": \"cm\"}}"}, {"id": "MS-U19-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中,“第1跨腹板钢束立面布置”下方的“F3钢束大样”上,A1 端那道 R=1000 的竖弯圆曲线段,其起点和终点距钢束锚固点的水平距离(沿路线设计线展开)各是多少?返回 JSON 对象,字段名固定为 起点、终点,每个字段为 {value, unit},单位 cm。", "answer": "{\"起点\": {\"value\": 592.5, \"unit\": \"cm\"}, \"终点\": {\"value\": 700.2, \"unit\": \"cm\"}}"}, {"id": "MS-U19-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中,“第1跨腹板钢束立面布置”下方的“F1钢束大样”上,A1 端从钢束锚固点到 R=1000 竖弯圆曲线起点的水平距离(沿路线设计线展开)是多少?返回数值和单位(cm)。", "answer": "{\"value\": 1146.3, \"unit\": \"cm\"}"}, {"id": "MS-U19-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中的“钢束平弯示意(起始端)”上,中腹板钢束在两处平弯之间的平面斜向过渡段,其起点和终点距钢束锚固点各多少?返回 JSON 对象,字段名固定为 起点、终点,每个字段为 {value, unit},单位 cm。", "answer": "{\"起点\": {\"value\": 200, \"unit\": \"cm\"}, \"终点\": {\"value\": 500, \"unit\": \"cm\"}}"}, {"id": "MS-U19-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中的“钢束平弯示意(起始端)”上,图面最上方有两排水平尺寸线。每排最右边那一段尺寸各是多少?返回 JSON 对象,字段名固定为 上排、下排,每个字段为 {value, unit},单位 cm。", "answer": "{\"上排\": {\"value\": 120, \"unit\": \"cm\"}, \"下排\": {\"value\": 770, \"unit\": \"cm\"}}"}, {"id": "MS-U19-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "A1 端锚固区,左侧腹板中靠梁边的那一束钢束,在平面上两处平弯之间的斜向过渡段,其起点和终点距钢束锚固点各多少?返回 JSON 对象,字段名固定为 起点、终点,每个字段为 {value, unit},单位 cm。", "answer": "{\"起点\": {\"value\": 130, \"unit\": \"cm\"}, \"终点\": {\"value\": 250, \"unit\": \"cm\"}}"}, {"id": "MS-U19-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "A1 端锚固区,左侧腹板中靠箱室的那一束钢束,在平面上两处平弯之间的斜向过渡段,其起点和终点距钢束锚固点各多少?返回 JSON 对象,字段名固定为 起点、终点,每个字段为 {value, unit},单位 cm。", "answer": "{\"起点\": {\"value\": 130, \"unit\": \"cm\"}, \"终点\": {\"value\": 900, \"unit\": \"cm\"}}"}]} {"page_01_file_name": "images/MS-U19-04/few_sheet/01.png", "page_02_file_name": "images/MS-U19-04/few_sheet/02.png", "page_03_file_name": "images/MS-U19-04/few_sheet/03.png", "page_04_file_name": "images/MS-U19-04/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U19-04", "set": "U19", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "北引桥第一联左幅纵向预应力钢束布置图第2跨的 B—B 断面所在位置,该处箱梁横断面的尺寸,下列说法哪些正确?", "options": [{"key": "A", "text": "底板厚度(不计承托)为 25 cm", "correct": true}, {"key": "B", "text": "中腹板与边腹板之间的箱室底宽(两腹板内侧面之间)为 335 cm", "correct": false}, {"key": "C", "text": "顶板厚度(不计承托)为 30 cm", "correct": true}, {"key": "D", "text": "底板厚度(不计承托)为 55 cm", "correct": false}, {"key": "E", "text": "中腹板中心线至边腹板中心线的横向距离为 445 cm", "correct": false}, {"key": "F", "text": "中腹板与边腹板之间的箱室底宽(两腹板内侧面之间)为 425 cm", "correct": true}], "answer": ["A", "C", "F"], "few_sheet_pages": [7, 13, 2, 18], "evidence_pages": [2, 7, 13], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U19-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "纵向预应力钢束布置图第2跨腹板钢束立面中,位于该跨跨中的剖切线是哪个字母?只返回一个大写字母。", "answer": "\"B\""}, {"id": "MS-U19-04-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "给出箱梁断面构造尺寸的那套剖面中,位于第2跨跨中的剖切线是哪个字母?只返回一个大写字母。", "answer": "\"D\""}, {"id": "MS-U19-04-R1", "role": "read", "tiers": ["full_set"], "question": "一般构造图 D—D 断面底部尺寸中,中腹板与边腹板之间的箱室宽度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 425, \"unit\": \"cm\"}"}, {"id": "MS-U19-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "一般构造图 B—B 断面底部尺寸中,中腹板与边腹板之间的箱室宽度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 335, \"unit\": \"cm\"}"}, {"id": "MS-U19-04-R3", "role": "read", "tiers": ["full_set"], "question": "一般构造图 C—C 断面底部尺寸中,中腹板与边腹板之间的箱室宽度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 365, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U19-05/few_sheet/01.png", "page_02_file_name": "images/MS-U19-05/few_sheet/02.png", "page_03_file_name": "images/MS-U19-05/few_sheet/03.png", "page_04_file_name": "images/MS-U19-05/few_sheet/04.png", "page_05_file_name": "images/MS-U19-05/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U19-05", "set": "U19", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "第一联左幅两端锚固区,每块腹板内的两束钢束都在平面上有 R=1000 cm 的平弯。下列平弯中,哪些平弯角小于 0.3°?(\"靠梁边\"指离箱梁边缘较近的那一束)", "options": [{"key": "A", "text": "A1 端,左侧腹板靠箱室那一束", "correct": true}, {"key": "B", "text": "A1 端,右侧腹板靠箱室那一束", "correct": false}, {"key": "C", "text": "P4 端,左侧腹板靠箱室那一束", "correct": false}, {"key": "D", "text": "P4 端,中腹板下面那一束", "correct": false}, {"key": "E", "text": "A1 端,右侧腹板靠梁边那一束", "correct": true}, {"key": "F", "text": "A1 端,左侧腹板靠梁边那一束", "correct": false}], "answer": ["A", "E"], "few_sheet_pages": [16, 11, 15, 20, 21], "evidence_pages": [20, 21, 15], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U19-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中的“钢束平弯示意(起始端)”上,图面最上方那块腹板内两束钢束的平弯角 a 各是多少(“靠梁边”指离箱梁边缘较近的那一束,“靠箱室”指另一束)?返回 JSON 对象,字段名固定为 靠梁边、靠箱室,平弯角按图上数字原样写成字符串,不带度号(形如 \"0.5\")。", "answer": "{\"靠梁边\": \"0.3\", \"靠箱室\": \"0.1\"}"}, {"id": "MS-U19-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中的“钢束平弯示意(起始端)”上,图面最下方那块腹板内两束钢束的平弯角 a 各是多少(“靠梁边”指离箱梁边缘较近的那一束,“靠箱室”指另一束)?返回 JSON 对象,字段名固定为 靠梁边、靠箱室,平弯角按图上数字原样写成字符串,不带度号(形如 \"0.5\")。", "answer": "{\"靠梁边\": \"0.2\", \"靠箱室\": \"0.4\"}"}, {"id": "MS-U19-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中的“钢束平弯示意(终止端)”上,图面最上方那块腹板中靠箱室的那一束、最下方那块腹板中靠箱室的那一束、中腹板中图面下方的那一束,平弯角 a 各是多少?返回 JSON 对象,字段名固定为 上方靠箱室、下方靠箱室、中腹板下束,平弯角按图上数字原样写成字符串,不带度号(形如 \"0.5\")。", "answer": "{\"上方靠箱室\": \"0.3\", \"下方靠箱室\": \"0.3\", \"中腹板下束\": \"1.9\"}"}, {"id": "MS-U19-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中的“第1跨腹板钢束布置图”上,标注“路线设计线”的那条线位于箱梁平面图形的上侧还是下侧?返回 上侧 或 下侧。", "answer": "\"下侧\""}, {"id": "MS-U19-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "第一联左幅 A1 端锚固区,路线前进方向左侧腹板内两束钢束的平弯角各是多少(“靠梁边”指离箱梁边缘较近的那一束,“靠箱室”指另一束)?返回 JSON 对象,字段名固定为 靠梁边、靠箱室,平弯角按图上数字原样写成字符串,不带度号(形如 \"0.5\")。", "answer": "{\"靠梁边\": \"0.3\", \"靠箱室\": \"0.1\"}"}, {"id": "MS-U19-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "第一联左幅 A1 端锚固区,路线前进方向右侧腹板内两束钢束的平弯角各是多少(“靠梁边”指离箱梁边缘较近的那一束,“靠箱室”指另一束)?返回 JSON 对象,字段名固定为 靠梁边、靠箱室,平弯角按图上数字原样写成字符串,不带度号(形如 \"0.5\")。", "answer": "{\"靠梁边\": \"0.2\", \"靠箱室\": \"0.4\"}"}]} {"page_01_file_name": "images/MS-U19-06/few_sheet/01.png", "page_02_file_name": "images/MS-U19-06/few_sheet/02.png", "page_03_file_name": "images/MS-U19-06/few_sheet/03.png", "page_04_file_name": "images/MS-U19-06/few_sheet/04.png", "page_05_file_name": "images/MS-U19-06/few_sheet/05.png", "page_06_file_name": "images/MS-U19-06/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U19-06", "set": "U19", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "第一联左幅第3跨(P3 至 P4)箱梁在平面上向右弯曲。关于这一跨的弯曲和 P4 端钢束,下列说法哪些正确?", "options": [{"key": "A", "text": "第3跨右侧悬臂端部比左侧长 33.5 cm", "correct": false}, {"key": "B", "text": "第3跨左、右两侧梁长都是 4488 cm,这一跨并没有弯曲", "correct": true}, {"key": "C", "text": "P4 端左、右两侧腹板钢束的平弯角都是 0.3°", "correct": true}, {"key": "D", "text": "P4 端右侧腹板钢束的平弯角比左侧大", "correct": false}, {"key": "E", "text": "F1 在 P4 端锚固点距箱梁底缘 210 cm,与 A1 端相同", "correct": true}, {"key": "F", "text": "P4 端钢束的平弯半径与 A1 端不同", "correct": false}], "answer": ["B", "C", "E"], "few_sheet_pages": [20, 13, 14, 11, 21, 12], "evidence_pages": [11, 21, 14, 12], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U19-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁一般构造图中的“箱梁梁长长度表”里,第3跨四项长度(左侧悬臂端部 La、左侧底板端部 Lb、右侧底板端部 Lc、右侧悬臂端部 Ld)各是多少?返回 JSON 对象,字段名固定为 La、Lb、Lc、Ld,每个字段为 {value, unit},单位 cm。", "answer": "{\"La\": {\"value\": 4488, \"unit\": \"cm\"}, \"Lb\": {\"value\": 4488, \"unit\": \"cm\"}, \"Lc\": {\"value\": 4488, \"unit\": \"cm\"}, \"Ld\": {\"value\": 4488, \"unit\": \"cm\"}}"}, {"id": "MS-U19-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁一般构造图中的“箱梁梁长长度表”里,第1跨的左侧悬臂端部 La、右侧悬臂端部 Ld 各是多少?返回 JSON 对象,字段名固定为 La、Ld,每个字段为 {value, unit},单位 cm。", "answer": "{\"La\": {\"value\": 4457.9, \"unit\": \"cm\"}, \"Ld\": {\"value\": 4491.4, \"unit\": \"cm\"}}"}, {"id": "MS-U19-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中的“钢束平弯示意(终止端)”上,图面最上方、最下方两块腹板内各两束钢束的平弯角 a 各是多少(“靠梁边”指离箱梁边缘较近的那一束,“靠箱室”指另一束)?返回 JSON 对象,字段名固定为 上方靠梁边、上方靠箱室、下方靠梁边、下方靠箱室,平弯角按图上数字原样写成字符串,不带度号(形如 \"0.5\")。", "answer": "{\"上方靠梁边\": \"0.3\", \"上方靠箱室\": \"0.3\", \"下方靠梁边\": \"0.3\", \"下方靠箱室\": \"0.3\"}"}, {"id": "MS-U19-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中的“钢束平弯示意(起始端)”和“钢束平弯示意(终止端)”两图上,边腹板钢束标注的平弯半径 R 各是多少?返回 JSON 对象,字段名固定为 起始端、终止端,每个字段为 {value, unit},单位 cm。", "answer": "{\"起始端\": {\"value\": 1000, \"unit\": \"cm\"}, \"终止端\": {\"value\": 1000, \"unit\": \"cm\"}}"}, {"id": "MS-U19-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中,“第3跨腹板钢束立面布置”下方的“F1钢束大样”上,P4 端锚固点距箱梁底缘线的高度是多少?返回数值和单位(cm)。", "answer": "{\"value\": 210, \"unit\": \"cm\"}"}, {"id": "MS-U19-06-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中的“钢束平弯示意(起始端)”上,图面最上方、最下方两块腹板内各两束钢束的平弯角 a 各是多少(“靠梁边”指离箱梁边缘较近的那一束,“靠箱室”指另一束)?返回 JSON 对象,字段名固定为 上方靠梁边、上方靠箱室、下方靠梁边、下方靠箱室,平弯角按图上数字原样写成字符串,不带度号(形如 \"0.5\")。", "answer": "{\"上方靠梁边\": \"0.3\", \"上方靠箱室\": \"0.1\", \"下方靠梁边\": \"0.2\", \"下方靠箱室\": \"0.4\"}"}, {"id": "MS-U19-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "第一联左幅腹板纵向钢束中,在 P3 墩顶水平段距箱梁底缘 230 cm 的那一层,在 A1 端锚固点距箱梁底缘多少?返回数值和单位(cm)。", "answer": "{\"value\": 210, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U19-07/few_sheet/01.png", "page_02_file_name": "images/MS-U19-07/few_sheet/02.png", "page_03_file_name": "images/MS-U19-07/few_sheet/03.png", "page_04_file_name": "images/MS-U19-07/few_sheet/04.png", "page_05_file_name": "images/MS-U19-07/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U19-07", "set": "U19", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "F3 钢束从 A1 到 P4 全长上,所有 R=1000 cm 竖弯圆曲线段的水平投影长度合计是多少(cm)?", "options": [{"key": "A", "text": "413.3", "correct": false}, {"key": "B", "text": "1222.4", "correct": false}, {"key": "C", "text": "1528.0", "correct": false}, {"key": "D", "text": "826.6", "correct": false}, {"key": "E", "text": "1437.8", "correct": true}, {"key": "F", "text": "1330.1", "correct": false}], "answer": ["E"], "few_sheet_pages": [19, 13, 12, 14, 20], "evidence_pages": [12, 13, 14], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U19-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中,“第1跨腹板钢束立面布置”下方的“F3钢束大样”上,标注 R=1000 的竖弯圆曲线段共有几处?其中 A1 锚固端那一段、靠 P2 墩顶的各段,水平投影长度各是多少?返回 JSON 对象,字段名固定为 段数、A1端每段、墩顶侧每段,每个字段为 {value, unit}(段数单位“处”,长度单位 cm)。", "answer": "{\"段数\": {\"value\": 3, \"unit\": \"处\"}, \"A1端每段\": {\"value\": 107.7, \"unit\": \"cm\"}, \"墩顶侧每段\": {\"value\": 152.8, \"unit\": \"cm\"}}"}, {"id": "MS-U19-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中,“第2跨腹板钢束立面布置”下方的“F3钢束大样”上,标注 R=1000 的竖弯圆曲线段共有几处?每段水平投影长度是多少?返回 JSON 对象,字段名固定为 段数、每段,每个字段为 {value, unit}(段数单位“处”,长度单位 cm)。", "answer": "{\"段数\": {\"value\": 4, \"unit\": \"处\"}, \"每段\": {\"value\": 152.8, \"unit\": \"cm\"}}"}, {"id": "MS-U19-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北引桥第一联左幅主梁纵向预应力钢束布置图中,“第3跨腹板钢束立面布置”下方的“F3钢束大样”上,标注 R=1000 的竖弯圆曲线段共有几处?其中 P4 锚固端那一段、靠 P3 墩顶的各段,水平投影长度各是多少?返回 JSON 对象,字段名固定为 段数、P4端每段、墩顶侧每段,每个字段为 {value, unit}(段数单位“处”,长度单位 cm)。", "answer": "{\"段数\": {\"value\": 3, \"unit\": \"处\"}, \"P4端每段\": {\"value\": 107.7, \"unit\": \"cm\"}, \"墩顶侧每段\": {\"value\": 152.8, \"unit\": \"cm\"}}"}, {"id": "MS-U19-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "第一联左幅 F3 钢束从 A1 到 P4 全长上,位于墩顶两侧的 R=1000 cm 竖弯圆曲线段共有几处?每段水平投影长度是多少?返回 JSON 对象,字段名固定为 段数、每段,每个字段为 {value, unit}(段数单位“处”,长度单位 cm)。", "answer": "{\"段数\": {\"value\": 8, \"unit\": \"处\"}, \"每段\": {\"value\": 152.8, \"unit\": \"cm\"}}"}, {"id": "MS-U19-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "第一联左幅 F3 钢束在 A1、P4 两端锚固区的 R=1000 cm 竖弯圆曲线段共有几处?每段水平投影长度是多少?返回 JSON 对象,字段名固定为 段数、每段,每个字段为 {value, unit}(段数单位“处”,长度单位 cm)。", "answer": "{\"段数\": {\"value\": 2, \"unit\": \"处\"}, \"每段\": {\"value\": 107.7, \"unit\": \"cm\"}}"}]} {"page_01_file_name": "images/MS-U20-01/few_sheet/01.png", "page_02_file_name": "images/MS-U20-01/few_sheet/02.png", "page_03_file_name": "images/MS-U20-01/few_sheet/03.png", "page_04_file_name": "images/MS-U20-01/few_sheet/04.png", "page_05_file_name": "images/MS-U20-01/few_sheet/05.png", "page_06_file_name": "images/MS-U20-01/few_sheet/06.png", "page_07_file_name": "images/MS-U20-01/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U20-01", "set": "U20", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "本单元的截排水沟渠、植草沟和雨水预处理构筑物中,哪些在沟(池、井)口边缘设置了栏杆?", "options": [{"key": "A", "text": "雨水明渠(B×H=1.2×1.2 m)", "correct": true}, {"key": "B", "text": "雨水明渠(B×H=1.0×1.0 m)", "correct": true}, {"key": "C", "text": "雨水明沟(B×H=0.6×0.8 m)", "correct": false}, {"key": "D", "text": "截水沟接雨水管道处的沉砂池", "correct": true}, {"key": "E", "text": "植草沟", "correct": false}, {"key": "F", "text": "雨水回用设施前的预处理井", "correct": true}], "answer": ["A", "B", "D", "F"], "few_sheet_pages": [19, 21, 22, 32, 30, 31, 20], "evidence_pages": [19, 20, 21, 31, 32], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U20-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“截排水沟大样图(一)”上,在沟(渠)口两侧画有栏杆的断面,各自图名下的 B×H 是多少?按 B 从小到大,以字段 第一个B、第一个H、第二个B、第二个H 返回,每个字段为数值和单位(m);只有一个这样的断面时,第二个B、第二个H 填 0 m。", "answer": "{\"第一个B\": {\"value\": 1.2, \"unit\": \"m\"}, \"第一个H\": {\"value\": 1.2, \"unit\": \"m\"}, \"第二个B\": {\"value\": 0, \"unit\": \"m\"}, \"第二个H\": {\"value\": 0, \"unit\": \"m\"}}"}, {"id": "MS-U20-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“截排水沟大样图(二)”上,在沟(渠)口两侧画有栏杆的断面,各自图名下的 B×H 是多少?按 B 从小到大,以字段 第一个B、第一个H、第二个B、第二个H 返回,每个字段为数值和单位(m);只有一个这样的断面时,第二个B、第二个H 填 0 m。", "answer": "{\"第一个B\": {\"value\": 1.0, \"unit\": \"m\"}, \"第一个H\": {\"value\": 1.0, \"unit\": \"m\"}, \"第二个B\": {\"value\": 1.2, \"unit\": \"m\"}, \"第二个H\": {\"value\": 1.5, \"unit\": \"m\"}}"}, {"id": "MS-U20-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“植草沟大样图”的说明中,要求在植草沟沟边设置的是什么?从 {栏杆, 安全警示牌, 防护网, 围栏} 中选一个返回。", "answer": "\"安全警示牌\""}, {"id": "MS-U20-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“事故池大样图”的主要材料表中,“围栏”一项的数量是多少?返回数值和单位(m)。", "answer": "{\"value\": 170, \"unit\": \"m\"}"}, {"id": "MS-U20-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "用于截水沟与雨水管道连接的那种沉砂池,其 1-1 剖面上,池口两侧竖向立起的构件引注是什么?从 {栏杆, 拦污栅, 警示标牌, 防坠网} 中选一个返回。", "answer": "\"栏杆\""}, {"id": "MS-U20-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "用于雨水回用设施前预处理的那种井,其平面图左上角同一条引线下注了两行文字。上面一行是什么?从 {栏杆(带门), 玻璃钢格栅板, 提篮格栅井, 沉砂池及浮渣池} 中选一个返回。", "answer": "\"栏杆(带门)\""}]} {"page_01_file_name": "images/MS-U20-02/few_sheet/01.png", "page_02_file_name": "images/MS-U20-02/few_sheet/02.png", "page_03_file_name": "images/MS-U20-02/few_sheet/03.png", "page_04_file_name": "images/MS-U20-02/few_sheet/04.png", "page_05_file_name": "images/MS-U20-02/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U20-02", "set": "U20", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "车行道旁的雨水边沟有三种规格(各自的 B-B 剖面),三种边沟沟内净过水断面面积合计是多少(m²)?", "options": [{"key": "A", "text": "0.75", "correct": false}, {"key": "B", "text": "0.98", "correct": false}, {"key": "C", "text": "0.46", "correct": false}, {"key": "D", "text": "0.36", "correct": false}, {"key": "E", "text": "0.66", "correct": true}, {"key": "F", "text": "0.5", "correct": false}], "answer": ["E"], "few_sheet_pages": [24, 20, 25, 22, 26], "evidence_pages": [24, 25, 26], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U20-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“雨水边沟大样图(一)”的 B-B 剖面图上,边沟沟内净宽和净高各是多少?按字段 净宽、净高 返回,每个字段为数值和单位(mm)。", "answer": "{\"净宽\": {\"value\": 400, \"unit\": \"mm\"}, \"净高\": {\"value\": 400, \"unit\": \"mm\"}}"}, {"id": "MS-U20-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“雨水边沟大样图(二)”的 B-B 剖面图上,边沟沟内净宽和净高各是多少?按字段 净宽、净高 返回,每个字段为数值和单位(mm)。", "answer": "{\"净宽\": {\"value\": 400, \"unit\": \"mm\"}, \"净高\": {\"value\": 500, \"unit\": \"mm\"}}"}, {"id": "MS-U20-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "车行道旁的雨水边沟有三种规格,其中一种在它的大样图上没有印 B×H 文字。按这种边沟 B-B 剖面的图示尺寸,沟内净宽和净高各是多少?按字段 净宽、净高 返回,每个字段为数值和单位(mm)。", "answer": "{\"净宽\": {\"value\": 500, \"unit\": \"mm\"}, \"净高\": {\"value\": 600, \"unit\": \"mm\"}}"}, {"id": "MS-U20-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“非车行道排水暗沟大样图”上,“雨水边沟断面图”图名下列出了三种 B×H。按列出的顺序,各自的 B 和 H 是多少?按字段 第1种B、第1种H、第2种B、第2种H、第3种B、第3种H 返回,每个字段为数值和单位(m)。", "answer": "{\"第1种B\": {\"value\": 0.4, \"unit\": \"m\"}, \"第1种H\": {\"value\": 0.5, \"unit\": \"m\"}, \"第2种B\": {\"value\": 0.5, \"unit\": \"m\"}, \"第2种H\": {\"value\": 0.6, \"unit\": \"m\"}, \"第3种B\": {\"value\": 0.6, \"unit\": \"m\"}, \"第3种H\": {\"value\": 0.8, \"unit\": \"m\"}}"}, {"id": "MS-U20-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“截排水沟大样图(一)”上,BXH=0.5x0.6m 的雨水明沟断面,沟底宽、沟口宽和沟深各是多少?按字段 底宽、口宽、沟深 返回,每个字段为数值和单位(mm)。", "answer": "{\"底宽\": {\"value\": 500, \"unit\": \"mm\"}, \"口宽\": {\"value\": 800, \"unit\": \"mm\"}, \"沟深\": {\"value\": 600, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U20-03/few_sheet/01.png", "page_02_file_name": "images/MS-U20-03/few_sheet/02.png", "page_03_file_name": "images/MS-U20-03/few_sheet/03.png", "page_04_file_name": "images/MS-U20-03/few_sheet/04.png", "page_05_file_name": "images/MS-U20-03/few_sheet/05.png", "page_06_file_name": "images/MS-U20-03/few_sheet/06.png", "page_07_file_name": "images/MS-U20-03/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U20-03", "set": "U20", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于本单元各雨水构筑物中进水、出水管渠的方位和水流走向,下列说法哪些正确?", "options": [{"key": "A", "text": "陡坡铸铁管:铸铁管的弯头应尽量靠近坡顶的上游井", "correct": false}, {"key": "B", "text": "事故池:DN900 溢水管和 DN400 排空管从同一端池壁引出,溢水管在上,排空管从该端集水坑底部引出", "correct": true}, {"key": "C", "text": "事故池:池底以 0.005 的坡度坡向 DN800 进水钢管接入的一端", "correct": false}, {"key": "D", "text": "沉砂池(图示做法):两条进水明渠从池的左右两侧相对接入,出水管从与之垂直的另一侧引出", "correct": true}, {"key": "E", "text": "预处理井:进水管和出水管从井的同一侧接入、引出", "correct": false}, {"key": "F", "text": "车行道下排水边沟转暗管的检查井:暗管从井室朝人行道(检修道)一侧引出", "correct": false}], "answer": ["B", "D"], "few_sheet_pages": [29, 17, 19, 23, 24, 31, 30], "evidence_pages": [30, 31, 19, 23, 29], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U20-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“事故池大样图”的平面图(图面左右方向)上,DN800 钢管(材料表第 2 项)、DN900 溢水管、DN400 排空管各在池的哪一端接入或引出?按字段 DN800、DN900、DN400 返回,每个字段从 {左端, 右端} 中选。", "answer": "{\"DN800\": \"左端\", \"DN900\": \"右端\", \"DN400\": \"右端\"}"}, {"id": "MS-U20-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“事故池大样图”的剖面图上:池底找坡 0.005 的箭头指向哪一端(从 {左端, 右端} 中选)?DN900 溢水管处标注的标高、集水坑坑底标高各是多少?按字段 找坡指向、溢水管标高、集水坑底标高 返回,标高为数值和单位(m)。", "answer": "{\"找坡指向\": \"右端\", \"溢水管标高\": {\"value\": -1.4, \"unit\": \"m\"}, \"集水坑底标高\": {\"value\": -3.75, \"unit\": \"m\"}}"}, {"id": "MS-U20-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“预处理井大样图”的平面图(图面上下左右)上,进水管和出水管分别从井的哪一侧接入、引出?按字段 进水管、出水管 返回,每个字段从 {上侧, 下侧, 左侧, 右侧} 中选。", "answer": "{\"进水管\": \"上侧\", \"出水管\": \"下侧\"}"}, {"id": "MS-U20-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“沉砂井大样图”的沉砂池平面图(图面上下左右)上,进水明渠从哪两侧接入,出水管从哪一侧引出?按字段 进水明渠、出水管 返回;进水明渠从 {左右两侧, 上下两侧, 仅左侧, 仅右侧} 中选,出水管从 {上侧, 下侧, 左侧, 右侧} 中选。", "answer": "{\"进水明渠\": \"左右两侧\", \"出水管\": \"上侧\"}"}, {"id": "MS-U20-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“陡坡铸铁管安装大样图”的说明中,铸铁管的下游弯头应尽量靠近什么?从 {消能井, 上游检查井, 镇墩, 管卡} 中选一个返回。", "answer": "\"消能井\""}, {"id": "MS-U20-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "车行道下排水边沟转接暗管的检查井,在其竖向剖面上,暗管从井室引出的那一侧,井室外侧上方对应的是哪一部分?从 {沥青铺装层, 检修道(人行道), 排水边沟, 雨水篦} 中选一个返回。", "answer": "\"沥青铺装层\""}]} {"page_01_file_name": "images/MS-U20-04/few_sheet/01.png", "page_02_file_name": "images/MS-U20-04/few_sheet/02.png", "page_03_file_name": "images/MS-U20-04/few_sheet/03.png", "page_04_file_name": "images/MS-U20-04/few_sheet/04.png", "page_05_file_name": "images/MS-U20-04/few_sheet/05.png", "page_06_file_name": "images/MS-U20-04/few_sheet/06.png", "page_07_file_name": "images/MS-U20-04/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U20-04", "set": "U20", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "本单元给出的雨水明沟、雨水明渠(截排水沟)和车行道旁的雨水边沟,按沟内净过水断面面积(按图示净尺寸计)从小到大排序。下列\"前一种 → 紧接的后一种\"中,哪些正确?", "options": [{"key": "A", "text": "雨水明渠 B×H=1.0×1.0 m → 雨水明渠 B×H=1.2×1.2 m", "correct": true}, {"key": "B", "text": "雨水边沟 B×H=0.5×0.6 m → 雨水明沟 B×H=0.5×0.6 m", "correct": true}, {"key": "C", "text": "雨水明沟 B×H=0.6×0.8 m → 雨水明渠 B×H=1.2×1.2 m", "correct": false}, {"key": "D", "text": "雨水明沟 B×H=0.5×0.6 m → 雨水边沟 B×H=0.5×0.6 m", "correct": false}, {"key": "E", "text": "雨水边沟 B×H=0.4×0.4 m → 雨水边沟 B×H=0.5×0.6 m", "correct": false}, {"key": "F", "text": "雨水明沟 B×H=0.6×0.8 m → 雨水明渠 B×H=1.0×1.0 m", "correct": true}], "answer": ["A", "B", "F"], "few_sheet_pages": [20, 21, 26, 25, 32, 22, 24], "evidence_pages": [20, 21, 24, 25, 26], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U20-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "标注 B×H=0.5×0.6 m 的那种雨水明沟(梯形断面),沟底宽、沟口宽和沟深各是多少?按字段 底宽、口宽、沟深 返回,每个字段为数值和单位(mm)。", "answer": "{\"底宽\": {\"value\": 500, \"unit\": \"mm\"}, \"口宽\": {\"value\": 800, \"unit\": \"mm\"}, \"沟深\": {\"value\": 600, \"unit\": \"mm\"}}"}, {"id": "MS-U20-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“截排水沟大样图(一)”上,BXH=0.6x0.8m 的雨水明沟断面和 BXH=1.2x1.2m 的雨水明渠断面,沟(渠)底宽、口宽和深度各是多少?按字段 明沟底宽、明沟口宽、明沟深、明渠底宽、明渠口宽、明渠深 返回,每个字段为数值和单位(mm)。", "answer": "{\"明沟底宽\": {\"value\": 600, \"unit\": \"mm\"}, \"明沟口宽\": {\"value\": 1000, \"unit\": \"mm\"}, \"明沟深\": {\"value\": 800, \"unit\": \"mm\"}, \"明渠底宽\": {\"value\": 1200, \"unit\": \"mm\"}, \"明渠口宽\": {\"value\": 2400, \"unit\": \"mm\"}, \"明渠深\": {\"value\": 1200, \"unit\": \"mm\"}}"}, {"id": "MS-U20-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“截排水沟大样图(二)”上,BXH=1.0x1.0m 和 BXH=1.2x1.5m 两个雨水明渠断面,渠底宽、渠口宽和渠深各是多少?按字段 甲底宽、甲口宽、甲深、乙底宽、乙口宽、乙深 返回(甲为 1.0x1.0m,乙为 1.2x1.5m),每个字段为数值和单位(mm)。", "answer": "{\"甲底宽\": {\"value\": 1000, \"unit\": \"mm\"}, \"甲口宽\": {\"value\": 2000, \"unit\": \"mm\"}, \"甲深\": {\"value\": 1000, \"unit\": \"mm\"}, \"乙底宽\": {\"value\": 1200, \"unit\": \"mm\"}, \"乙口宽\": {\"value\": 2700, \"unit\": \"mm\"}, \"乙深\": {\"value\": 1500, \"unit\": \"mm\"}}"}, {"id": "MS-U20-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“雨水边沟大样图(一)”的 B-B 剖面图上,边沟沟内净宽和净高各是多少?按字段 净宽、净高 返回,每个字段为数值和单位(mm)。", "answer": "{\"净宽\": {\"value\": 400, \"unit\": \"mm\"}, \"净高\": {\"value\": 400, \"unit\": \"mm\"}}"}, {"id": "MS-U20-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“雨水边沟大样图(二)”的 B-B 剖面图上,边沟沟内净宽和净高各是多少?按字段 净宽、净高 返回,每个字段为数值和单位(mm)。", "answer": "{\"净宽\": {\"value\": 400, \"unit\": \"mm\"}, \"净高\": {\"value\": 500, \"unit\": \"mm\"}}"}, {"id": "MS-U20-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“雨水边沟大样图(三)”的 B-B 剖面图上,边沟沟内净宽和净高各是多少?按字段 净宽、净高 返回,每个字段为数值和单位(mm)。", "answer": "{\"净宽\": {\"value\": 500, \"unit\": \"mm\"}, \"净高\": {\"value\": 600, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U20-05/few_sheet/01.png", "page_02_file_name": "images/MS-U20-05/few_sheet/02.png", "page_03_file_name": "images/MS-U20-05/few_sheet/03.png", "page_04_file_name": "images/MS-U20-05/few_sheet/04.png", "page_05_file_name": "images/MS-U20-05/few_sheet/05.png", "page_06_file_name": "images/MS-U20-05/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U20-05", "set": "U20", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "雨水回用设施前的预处理井里装有两套提篮格栅,两套格栅的栅条间距相同。关于这两套格栅及本单元其他拦截设施的间距,下列说法哪些正确?", "options": [{"key": "A", "text": "两套格栅的间距并不相同,分别为 20 mm 和 5 mm", "correct": true}, {"key": "B", "text": "沉砂池出水管口格栅的栅条净距为 40 mm,介于预处理井两套格栅的间距之间", "correct": false}, {"key": "C", "text": "检查井防坠网网目边长的上限(10 cm)与沉砂池顶部拦污栅的钢筋间距相同", "correct": true}, {"key": "D", "text": "事故池的检修孔不设防坠网", "correct": false}, {"key": "E", "text": "两套格栅的间距均为 20 mm", "correct": false}, {"key": "F", "text": "沉砂池顶部拦污栅的钢筋纵、横间距为 100 mm,比预处理井两套格栅的间距都大", "correct": true}], "answer": ["A", "C", "F"], "few_sheet_pages": [30, 17, 19, 18, 31, 23], "evidence_pages": [31, 19, 18, 30], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U20-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "雨水回用设施前的预处理井里有两套提篮格栅(设备材料表编号①、②)。两套格栅的格栅间距各是多少?按字段 ①、② 返回,每个字段为数值和单位(mm)。", "answer": "{\"①\": {\"value\": 20, \"unit\": \"mm\"}, \"②\": {\"value\": 5, \"unit\": \"mm\"}}"}, {"id": "MS-U20-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“沉砂井大样图”上,沉砂池顶部布置的拦污栅,钢筋的纵、横间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 100, \"unit\": \"mm\"}"}, {"id": "MS-U20-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“沉砂井大样图”的 3-3 剖面图(出水管口格栅)上,相邻两根栅条之间的净距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 40, \"unit\": \"mm\"}"}, {"id": "MS-U20-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“防坠网大样图”的说明中,防坠网的网目边长上限是多少?返回数值和单位(cm)。", "answer": "{\"value\": 10, \"unit\": \"cm\"}"}, {"id": "MS-U20-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“事故池大样图”的平面图上,两个检修孔的引注括号里注明附带什么设施?从 {防坠网, 爬梯, 通气管, 格栅} 中选一个返回。", "answer": "\"防坠网\""}]} {"page_01_file_name": "images/MS-U20-06/few_sheet/01.png", "page_02_file_name": "images/MS-U20-06/few_sheet/02.png", "page_03_file_name": "images/MS-U20-06/few_sheet/03.png", "page_04_file_name": "images/MS-U20-06/few_sheet/04.png", "page_05_file_name": "images/MS-U20-06/few_sheet/05.png", "page_06_file_name": "images/MS-U20-06/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U20-06", "set": "U20", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "雨水回用设施前的预处理井里装有两套提篮格栅,两套格栅的进水管管径和设计流量都相同。关于这两套格栅及本单元其他拦截设施,下列说法哪些正确?", "options": [{"key": "A", "text": "两套格栅的进水管管径并不相同", "correct": false}, {"key": "B", "text": "两套格栅的进水管管径均为 400 mm,设计流量均为 300 L/s", "correct": true}, {"key": "C", "text": "事故池的溢水管与预处理井格栅的进水管管径相同", "correct": false}, {"key": "D", "text": "沉砂池顶部拦污栅表面预留 1.0 m×1.0 m 的进人孔", "correct": false}, {"key": "E", "text": "检查井防坠网的承重要求不低于 150 kg", "correct": false}, {"key": "F", "text": "沉砂池出水管口格栅的栅条宽 10 mm", "correct": true}], "answer": ["B", "F"], "few_sheet_pages": [18, 30, 19, 23, 17, 31], "evidence_pages": [31, 30, 19, 18], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U20-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "雨水回用设施前的预处理井里有两套提篮格栅(设备材料表编号①、②)。两套格栅各自的进水管管径和设计流量是多少?按字段 ①管径、②管径、①流量、②流量 返回;管径为数值和单位(mm),流量只写以 L/s 计的数字(形如 120)。", "answer": "{\"①管径\": {\"value\": 400, \"unit\": \"mm\"}, \"②管径\": {\"value\": 400, \"unit\": \"mm\"}, \"①流量\": \"300\", \"②流量\": \"300\"}"}, {"id": "MS-U20-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“事故池大样图”上,溢水管的管径是多少?返回数值和单位(mm),DN 值按 mm 计。", "answer": "{\"value\": 900, \"unit\": \"mm\"}"}, {"id": "MS-U20-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“事故池大样图”上,排空管的管径是多少?返回数值和单位(mm),DN 值按 mm 计。", "answer": "{\"value\": 400, \"unit\": \"mm\"}"}, {"id": "MS-U20-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“沉砂井大样图”的 3-3 剖面图(出水管口格栅)上,每根栅条的宽度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 10, \"unit\": \"mm\"}"}, {"id": "MS-U20-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“沉砂井大样图”的沉砂池平面图上,拦污栅表面预留的进人孔尺寸是多少?按字段 长、宽 返回,每个字段为数值和单位(m)。", "answer": "{\"长\": {\"value\": 0.8, \"unit\": \"m\"}, \"宽\": {\"value\": 0.8, \"unit\": \"m\"}}"}, {"id": "MS-U20-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“防坠网大样图”的说明中,防坠网的承重要求下限,以及验收时放入网中的重物质量,各是多少?按字段 承重下限、验收重物 返回,每个字段为数值和单位(kg)。", "answer": "{\"承重下限\": {\"value\": 300, \"unit\": \"kg\"}, \"验收重物\": {\"value\": 150, \"unit\": \"kg\"}}"}]} {"page_01_file_name": "images/MS-U20-07/few_sheet/01.png", "page_02_file_name": "images/MS-U20-07/few_sheet/02.png", "page_03_file_name": "images/MS-U20-07/few_sheet/03.png", "page_04_file_name": "images/MS-U20-07/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U20-07", "set": "U20", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "关于栀花大道的路基压实度及其下排水管沟槽回填的压实度要求,下列说法哪些正确?", "options": [{"key": "A", "text": "栀花大道零填及挖方路基,路床顶面以下 0~0.3 m 的压实度要求为 96%", "correct": false}, {"key": "B", "text": "钢筋混凝土管沟槽顶部的原土分层回填,在栀花大道填方路基路床顶面以下 0.8~1.5 m 范围内,压实度要求为 93%", "correct": true}, {"key": "C", "text": "钢筋混凝土管沟槽中,管顶以上正对管道的回填区压实度要求为 ≥90%", "correct": false}, {"key": "D", "text": "钢筋混凝土管沟槽中,管道两侧(管顶以下)回填区压实度要求为 ≥95%", "correct": false}, {"key": "E", "text": "栀花大道填方路基,路床顶面以下大于 1.5 m 处的压实度要求为 91%", "correct": false}, {"key": "F", "text": "栀花大道填方路基,路床顶面以下 0~0.8 m 的压实度要求为 95%", "correct": true}], "answer": ["B", "F"], "few_sheet_pages": [10, 16, 15, 28], "evidence_pages": [10, 15, 16], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U20-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "栀花大道的道路等级是什么?按图中用词原样返回(形如 城市次干路)。", "answer": "\"城市主干路\""}, {"id": "MS-U20-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "钢筋混凝土管沟槽开挖断面图(一)(120° 混凝土基础)中,管顶以上、正对管道的回填区所标压实度下限是多少?只返回数字,不带 % 号(形如 70)。", "answer": "\"85\""}, {"id": "MS-U20-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "路基压实度表中,填方路基、路床顶面以下 0~0.8 m、主干路一栏的压实度是多少?只返回数字,不带 % 号(形如 70)。", "answer": "\"95\""}, {"id": "MS-U20-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "钢筋混凝土管沟槽开挖断面图(一)(120° 混凝土基础)中,管道两侧(管顶以下)回填区所标压实度下限是多少?只返回数字,不带 % 号(形如 70)。", "answer": "\"90\""}, {"id": "MS-U20-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "路基压实度表中,填方路基、路床顶面以下 0~0.8 m、快速路一栏的压实度是多少?只返回数字,不带 % 号(形如 70)。", "answer": "\"96\""}]} {"page_01_file_name": "images/MS-U20-08/few_sheet/01.png", "page_02_file_name": "images/MS-U20-08/few_sheet/02.png", "page_03_file_name": "images/MS-U20-08/few_sheet/03.png", "page_04_file_name": "images/MS-U20-08/few_sheet/04.png", "page_05_file_name": "images/MS-U20-08/few_sheet/05.png", "page_06_file_name": "images/MS-U20-08/few_sheet/06.png", "page_07_file_name": "images/MS-U20-08/few_sheet/07.png", "page_08_file_name": "images/MS-U20-08/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U20-08", "set": "U20", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "雨水在进入下游管道之前,有的构筑物内部自带沉砂(沉砂坑或沉砂池)。下列构筑物中,哪些本身设有这种沉砂空间?", "options": [{"key": "A", "text": "雨水明渠", "correct": false}, {"key": "B", "text": "事故池", "correct": false}, {"key": "C", "text": "雨水回用设施前的预处理井", "correct": true}, {"key": "D", "text": "植草沟", "correct": false}, {"key": "E", "text": "车行道下排水边沟转接暗管的检查井", "correct": true}, {"key": "F", "text": "埋深大于 5.1 m 的钢筋混凝土深型检查井", "correct": false}], "answer": ["C", "E"], "few_sheet_pages": [23, 30, 32, 22, 24, 31, 17, 21], "evidence_pages": [23, 31, 30, 17, 32, 21], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U20-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "位于车行道下、把排水边沟的水转入暗管的那种检查井,井室内暗管管底以下还有一段空间。这段空间在剖面图上的引注名称和深度各是什么?按字段 名称、深度 返回;名称从 {沉砂坑, 集水坑, 流槽, 消能井} 中选,深度为数值和单位(mm)。", "answer": "{\"名称\": \"沉砂坑\", \"深度\": {\"value\": 400, \"unit\": \"mm\"}}"}, {"id": "MS-U20-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“预处理井大样图”的平面图上,两个提篮格栅井下方、占井内中下部的那一格池子,图中标注的名称是什么?从 {沉砂池及浮渣池, 蓄水池, 提篮格栅井, 消能井} 中选一个返回。", "answer": "\"沉砂池及浮渣池\""}, {"id": "MS-U20-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“事故池大样图”上:说明中写明的沉砂池(带格栅网)设在哪里?剖面图上池底最低处集水坑的坑底标高是多少?按字段 沉砂池位置、集水坑底标高 返回;沉砂池位置从 {事故池内集水坑处, 事故池前管网末端, 排空管闸阀井内, 溢水管出口处} 中选,标高为数值和单位(m)。", "answer": "{\"沉砂池位置\": \"事故池前管网末端\", \"集水坑底标高\": {\"value\": -3.75, \"unit\": \"m\"}}"}, {"id": "MS-U20-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“钢筋混凝土检查井大样图”的 2-2 剖面图上,井底管道下半圈周围那部分构造的引注名称是什么?从 {低流水槽, 沉砂坑, 集水坑, 踏步} 中选一个返回。", "answer": "\"低流水槽\""}, {"id": "MS-U20-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“植草沟大样图”的断面结构层引注中,种植土和砾石的厚度各是多少?按字段 种植土、砾石 返回,每个字段为数值和单位(mm)。", "answer": "{\"种植土\": {\"value\": 250, \"unit\": \"mm\"}, \"砾石\": {\"value\": 100, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U20-09/few_sheet/01.png", "page_02_file_name": "images/MS-U20-09/few_sheet/02.png", "page_03_file_name": "images/MS-U20-09/few_sheet/03.png", "page_04_file_name": "images/MS-U20-09/few_sheet/04.png", "page_05_file_name": "images/MS-U20-09/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U20-09", "set": "U20", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "本单元给出了钢筋混凝土管、塑料管(含覆土≥6 m 的做法)和金属管的沟槽回填要求。关于沟槽内各部位(管底、管侧、管顶上方)的上下分层和压实度,下列说法哪些正确?", "options": [{"key": "A", "text": "金属管沟槽:管顶正上方回填层厚度 ≥400 mm,压实度 ≥85%,其两侧 ≥90%", "correct": true}, {"key": "B", "text": "一般塑料管沟槽:管底中粗砂垫层的压实度要求 ≥95%", "correct": false}, {"key": "C", "text": "覆土≥6 m 的塑料管沟槽:管底垫层的压实度要求比一般塑料管更高", "correct": false}, {"key": "D", "text": "覆土≥6 m 的塑料管沟槽:在管顶以上 500 mm 厚砂砾石层与原土回填之间,加设 1.5 m 厚 5.5% 水泥稳定级配碎石基层", "correct": true}, {"key": "E", "text": "钢筋混凝土管沟槽(120°混凝土基础):管道两侧至管顶高度内回填 ≥90%,管顶以上 500 mm 的管宽范围内 ≥85%", "correct": true}, {"key": "F", "text": "金属管沟槽:管底以下素土垫层的压实度要求与管道两侧胸腔回填相同,均为 ≥95%", "correct": true}], "answer": ["A", "D", "E", "F"], "few_sheet_pages": [15, 20, 28, 16, 33], "evidence_pages": [15, 16, 28], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U20-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“金属管道沟槽开挖断面图”上:管底以下素土垫层、管道两侧胸腔回填、管顶正上方回填、管顶上方两侧回填各自的压实度,以及管顶以上那一层回填的厚度下限,各是多少?按字段 素土垫层、胸腔、管顶正上方、管顶两侧、管顶层厚度 返回;压实度只写图中“≥”后面的数字,不带 ≥ 和 %(形如 92);厚度为数值和单位(mm)。", "answer": "{\"素土垫层\": \"95\", \"胸腔\": \"95\", \"管顶正上方\": \"85\", \"管顶两侧\": \"90\", \"管顶层厚度\": {\"value\": 400, \"unit\": \"mm\"}}"}, {"id": "MS-U20-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“排水管道沟槽开挖断面图”中的“塑料管沟槽开挖断面图”(不是覆土≥6.0m 的那张)上,最下面的中、粗砂垫层的压实度是多少?压实度只写图中“≥”后面的数字,不带 ≥ 和 %(形如 92)。", "answer": "\"90\""}, {"id": "MS-U20-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“排水管道沟槽开挖断面图”中的“塑料管沟槽开挖断面图(覆土≥6.0m)”上,最下面的中、粗砂垫层的压实度,以及管道埋深≥6.0m 时加设的水泥稳定级配碎石基层的厚度和水泥剂量,各是多少?按字段 垫层压实度、基层厚度、水泥剂量 返回;压实度只写图中“≥”后面的数字,不带 ≥ 和 %(形如 92);基层厚度为数值和单位(m);水泥剂量只写百分数的数字(形如 4.0)。", "answer": "{\"垫层压实度\": \"85\", \"基层厚度\": {\"value\": 1.5, \"unit\": \"m\"}, \"水泥剂量\": \"5.5\"}"}, {"id": "MS-U20-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“排水管道沟槽开挖断面图”中的“钢筋混凝土管沟槽开挖断面图(一)(120°混凝土基础)”上,管道两侧回填、管顶以上管宽范围内回填的压实度,以及管顶以上那一层的厚度,各是多少?按字段 管侧、管顶以上、管顶层厚度 返回;压实度只写图中“≥”后面的数字,不带 ≥ 和 %(形如 92);厚度为数值和单位(mm)。", "answer": "{\"管侧\": \"90\", \"管顶以上\": \"85\", \"管顶层厚度\": {\"value\": 500, \"unit\": \"mm\"}}"}, {"id": "MS-U20-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "一般做法(非覆土≥6 m)的塑料排水管沟槽中,在最下面的垫层之上、直接托住管底的那一层中、粗砂,压实度是多少?压实度只写图中“≥”后面的数字,不带 ≥ 和 %(形如 92)。", "answer": "\"95\""}]} {"page_01_file_name": "images/MS-U21-01/few_sheet/01.png", "page_02_file_name": "images/MS-U21-01/few_sheet/02.png", "page_03_file_name": "images/MS-U21-01/few_sheet/03.png", "page_04_file_name": "images/MS-U21-01/few_sheet/04.png", "page_05_file_name": "images/MS-U21-01/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U21-01", "set": "U21", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "把主线3号桥两端桥台基础的顶面和底面,以及桥下还建G348 与主线交叉处的路面,按高程由高到低排成一列。下列\"前一项 → 紧接的下一项\"中,哪些正确?", "options": [{"key": "A", "text": "还建G348 路面(与主线交叉处) → 0#桥台基础底面", "correct": true}, {"key": "B", "text": "0#桥台基础顶面 → 1#桥台基础顶面", "correct": false}, {"key": "C", "text": "1#桥台基础顶面 → 还建G348 路面(与主线交叉处)", "correct": false}, {"key": "D", "text": "1#桥台基础顶面 → 0#桥台基础顶面", "correct": true}, {"key": "E", "text": "还建G348 路面(与主线交叉处) → 1#桥台基础底面", "correct": false}, {"key": "F", "text": "0#桥台基础顶面 → 还建G348 路面(与主线交叉处)", "correct": true}], "answer": ["A", "D", "F"], "few_sheet_pages": [5, 13, 3, 6, 14], "evidence_pages": [3, 5, 6], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U21-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"主线3号桥0#轴桥台、匝道C线桥0#桥台和匝道D线桥1#桥台地质横断面图\"中,主线3号桥0#轴桥台基础的顶面和底面高程各是多少?以 JSON 返回两个字段 top、bottom,每个字段为数值和单位(m)。", "answer": "{\"top\": {\"value\": 246.977, \"unit\": \"m\"}, \"bottom\": {\"value\": 245.477, \"unit\": \"m\"}}"}, {"id": "MS-U21-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"主线3号桥1#轴桥台、匝道C线桥1#桥台和匝道D线桥0#桥台地质横断面图\"中,主线3号桥1#轴桥台基础(承台)的顶面和底面高程各是多少?以 JSON 返回两个字段 top、bottom,每个字段为数值和单位(m)。", "answer": "{\"top\": {\"value\": 247.268, \"unit\": \"m\"}, \"bottom\": {\"value\": 244.968, \"unit\": \"m\"}}"}, {"id": "MS-U21-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"主线3号桥立面布置\"图顶部,与主线交叉处的标注中,还建G348 的 Hs下 是多少?返回数值和单位(m)。", "answer": "{\"value\": 246.902, \"unit\": \"m\"}"}, {"id": "MS-U21-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"主线3号桥0#轴桥台、匝道C线桥0#桥台和匝道D线桥1#桥台地质横断面图\"中,与主线桥台并排的匝道C线桥0#桥台、匝道D线桥1#桥台,基础顶面高程各是多少?以 JSON 返回两个字段 C0、D1,每个字段为数值和单位(m)。", "answer": "{\"C0\": {\"value\": 247.267, \"unit\": \"m\"}, \"D1\": {\"value\": 246.805, \"unit\": \"m\"}}"}, {"id": "MS-U21-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥两端的桥台中,基础底面高程为 244.968 m 的那一座,其基础顶面高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 247.268, \"unit\": \"m\"}"}, {"id": "MS-U21-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥桥下的还建G348,在与主线交叉处的路面高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 246.902, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U21-02/few_sheet/01.png", "page_02_file_name": "images/MS-U21-02/few_sheet/02.png", "page_03_file_name": "images/MS-U21-02/few_sheet/03.png", "page_04_file_name": "images/MS-U21-02/few_sheet/04.png", "page_05_file_name": "images/MS-U21-02/few_sheet/05.png", "page_06_file_name": "images/MS-U21-02/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U21-02", "set": "U21", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "主线3号桥两端各有一座桥台。下列构造项目中,哪些在两座桥台之间不相同?", "options": [{"key": "A", "text": "支座组合高度", "correct": false}, {"key": "B", "text": "前墙朝桥跨一侧的墙面坡度", "correct": true}, {"key": "C", "text": "基础形式", "correct": true}, {"key": "D", "text": "最下部基础块体的厚度", "correct": true}, {"key": "E", "text": "支座垫石的个数", "correct": false}, {"key": "F", "text": "桥台沿路线方向的长度(桥梁轴线至桥台尾端)", "correct": true}], "answer": ["B", "C", "D", "F"], "few_sheet_pages": [12, 4, 13, 15, 14, 7], "evidence_pages": [12, 13, 14, 15], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U21-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,0#桥台的\"桥台侧立面\"上:最底层基础块体(扩大基础或承台)的厚度、桥梁轴线(⓪ 轴)到台尾的长度各是多少?\"桥台平面\"上台帽布置了几个支座垫石?以 JSON 返回三个字段 base_thickness(mm)、axis_to_tail(mm)、pads(个),每个字段为数值和单位。", "answer": "{\"base_thickness\": {\"value\": 1500, \"unit\": \"mm\"}, \"axis_to_tail\": {\"value\": 6000, \"unit\": \"mm\"}, \"pads\": {\"value\": 6, \"unit\": \"个\"}}"}, {"id": "MS-U21-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,1#桥台的\"桥台侧立面\"上:最底层基础块体(扩大基础或承台)的厚度、桥梁轴线(① 轴)到台尾的长度各是多少?\"桥台平面\"上台帽布置了几个支座垫石?以 JSON 返回三个字段 base_thickness(mm)、axis_to_tail(mm)、pads(个),每个字段为数值和单位。", "answer": "{\"base_thickness\": {\"value\": 2300, \"unit\": \"mm\"}, \"axis_to_tail\": {\"value\": 5000, \"unit\": \"mm\"}, \"pads\": {\"value\": 6, \"unit\": \"个\"}}"}, {"id": "MS-U21-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,0#桥台和 1#桥台的基础下各设几根桩(\"桥台平面\"和\"桥台侧立面\"合看;不设桩填 0)?以 JSON 返回两个字段 T0、T1,每个字段为数值和单位(根)。", "answer": "{\"T0\": {\"value\": 0, \"unit\": \"根\"}, \"T1\": {\"value\": 14, \"unit\": \"根\"}}"}, {"id": "MS-U21-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图的\"桥台侧立面\"中,0#桥台和 1#桥台的前墙朝桥跨(箱梁)一侧的墙面坡率各是多少?按图中写法返回形如 1:n 的字符串;墙面竖直的返回 1:0。以 JSON 返回两个字段 T0、T1。", "answer": "{\"T0\": \"1:0.1\", \"T1\": \"1:0\"}"}, {"id": "MS-U21-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图的附注中,0#桥台和 1#桥台的支座组合高度各是多少?以 JSON 返回两个字段 T0、T1,每个字段为数值和单位(mm)。", "answer": "{\"T0\": {\"value\": 300, \"unit\": \"mm\"}, \"T1\": {\"value\": 300, \"unit\": \"mm\"}}"}, {"id": "MS-U21-02-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥标准横断面图中,桥台基础承台的厚度是多少、承台下画了几根桩?以 JSON 返回两个字段 thickness(mm)、piles(根),每个字段为数值和单位。", "answer": "{\"thickness\": {\"value\": 2300, \"unit\": \"mm\"}, \"piles\": {\"value\": 7, \"unit\": \"根\"}}"}, {"id": "MS-U21-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥两座桥台中,桥梁轴线到台尾长 5000 mm 的那一座,其最底层基础块体(扩大基础或承台)的厚度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2300, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U21-03/few_sheet/01.png", "page_02_file_name": "images/MS-U21-03/few_sheet/02.png", "page_03_file_name": "images/MS-U21-03/few_sheet/03.png", "page_04_file_name": "images/MS-U21-03/few_sheet/04.png", "page_05_file_name": "images/MS-U21-03/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U21-03", "set": "U21", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "主线3号桥1#桥台下的桩基础,桩长是多少?关于1#桥台的基础,下列说法哪些正确?", "options": [{"key": "A", "text": "1#桥台前后两排桩沿路线方向的中心距为 4163 mm", "correct": false}, {"key": "B", "text": "1#桥台基础厚 1.5 m", "correct": false}, {"key": "C", "text": "1#桥台下没有桩,采用扩大基础", "correct": false}, {"key": "D", "text": "1#桥台共 14 根桩", "correct": true}, {"key": "E", "text": "1#桥台基础底面高程为 245.477 m", "correct": false}, {"key": "F", "text": "1#桥台有桩长 10.5 m 的桩", "correct": true}], "answer": ["D", "F"], "few_sheet_pages": [4, 6, 15, 14, 12], "evidence_pages": [6, 14, 15], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U21-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,1#桥台承台下共有几根桩(\"桥台平面\"和\"桥台正立面\"合看)、承台厚度是多少?以 JSON 返回两个字段 piles(根)、thickness(mm),每个字段为数值和单位。", "answer": "{\"piles\": {\"value\": 14, \"unit\": \"根\"}, \"thickness\": {\"value\": 2300, \"unit\": \"mm\"}}"}, {"id": "MS-U21-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"主线3号桥1#轴桥台、匝道C线桥1#桥台和匝道D线桥0#桥台地质横断面图\"中,主线3号桥1#轴桥台下所画各桩的桩长,最长和最短各是多少?以 JSON 返回两个字段 longest、shortest,每个字段为数值和单位(mm)。", "answer": "{\"longest\": {\"value\": 10500, \"unit\": \"mm\"}, \"shortest\": {\"value\": 6000, \"unit\": \"mm\"}}"}, {"id": "MS-U21-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"主线3号桥1#轴桥台、匝道C线桥1#桥台和匝道D线桥0#桥台地质横断面图\"中,主线3号桥1#轴桥台基础(承台)底面的高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 244.968, \"unit\": \"m\"}"}, {"id": "MS-U21-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,1#桥台的桩:\"桥台正立面\"上横桥向相邻桩的中心距、\"桥台侧立面\"上前后两排桩沿路线方向的中心距各是多少?以 JSON 返回两个字段 across、along,每个字段为数值和单位(mm)。", "answer": "{\"across\": {\"value\": 4163, \"unit\": \"mm\"}, \"along\": {\"value\": 4400, \"unit\": \"mm\"}}"}, {"id": "MS-U21-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,0#桥台\"桥台正立面\"最下部基础块体的厚度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1500, \"unit\": \"mm\"}"}, {"id": "MS-U21-03-R6", "role": "read", "tiers": ["full_set"], "question": "\"主线3号桥0#轴桥台、匝道C线桥0#桥台和匝道D线桥1#桥台地质横断面图\"中,主线3号桥0#轴桥台基础底面的高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 245.477, \"unit\": \"m\"}"}, {"id": "MS-U21-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥两端的桥台中,基础底面高程为 244.968 m 的那一座,基础下共有几根桩?返回数值和单位(根)。", "answer": "{\"value\": 14, \"unit\": \"根\"}"}]} {"page_01_file_name": "images/MS-U21-04/few_sheet/01.png", "page_02_file_name": "images/MS-U21-04/few_sheet/02.png", "page_03_file_name": "images/MS-U21-04/few_sheet/03.png", "page_04_file_name": "images/MS-U21-04/few_sheet/04.png", "page_05_file_name": "images/MS-U21-04/few_sheet/05.png", "page_06_file_name": "images/MS-U21-04/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U21-04", "set": "U21", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "主线3号桥现浇箱梁由左右两幅组成。关于两幅箱梁的横向布置、相互连接和支承位置,下列说法哪些正确?", "options": [{"key": "A", "text": "两幅箱梁的底板在全梁长范围内连成一体", "correct": false}, {"key": "B", "text": "支座中心线与桥梁轴线重合", "correct": false}, {"key": "C", "text": "两幅之间的后浇段宽 500 mm,沿道路设计中心线纵向布置", "correct": true}, {"key": "D", "text": "跨中等截面段,两幅之间只靠翼缘板处的后浇段相连,底板之间断开", "correct": true}, {"key": "E", "text": "每幅箱梁为单箱双室", "correct": true}, {"key": "F", "text": "每幅箱梁每端由 3 个支座支承", "correct": true}], "answer": ["C", "D", "E", "F"], "few_sheet_pages": [7, 10, 8, 12, 9, 4], "evidence_pages": [7, 8, 9, 10], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U21-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图的 3-3 断面中,一幅箱梁内有几个箱室?两幅之间\"翼缘后浇段\"的宽度是多少?以 JSON 返回两个字段 cells(个)、joint(mm),每个字段为数值和单位。", "answer": "{\"cells\": {\"value\": 2, \"unit\": \"个\"}, \"joint\": {\"value\": 500, \"unit\": \"mm\"}}"}, {"id": "MS-U21-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图的\"底平面\"中,两幅箱梁之间用实线围出的中间矩形区域,横向总宽是多少?图顶部纵向分段标注中,梁端到该矩形端边的那一段是多少?以 JSON 返回两个字段 rect_width、end_distance,每个字段为数值和单位(mm)。", "answer": "{\"rect_width\": {\"value\": 4500, \"unit\": \"mm\"}, \"end_distance\": {\"value\": 1500, \"unit\": \"mm\"}}"}, {"id": "MS-U21-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图的\"顶平面\"中,\"翼缘后浇段\"处的横向分段标注依次是多少(三段)?以 JSON 返回三个字段 left、joint、right,每个字段为数值和单位(mm)。", "answer": "{\"left\": {\"value\": 2000, \"unit\": \"mm\"}, \"joint\": {\"value\": 500, \"unit\": \"mm\"}, \"right\": {\"value\": 2000, \"unit\": \"mm\"}}"}, {"id": "MS-U21-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图的 1-1 断面中,梁底一共画了几个支座?返回数值和单位(个)。", "answer": "{\"value\": 6, \"unit\": \"个\"}"}, {"id": "MS-U21-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图的\"立面\"中,⓪ 轴一端:桥梁轴线到梁端、梁端到支座中心线的距离各是多少?以 JSON 返回两个字段 axis_to_end、end_to_bearing,每个字段为数值和单位(mm)。", "answer": "{\"axis_to_end\": {\"value\": 50, \"unit\": \"mm\"}, \"end_to_bearing\": {\"value\": 600, \"unit\": \"mm\"}}"}, {"id": "MS-U21-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥现浇箱梁由左右两幅组成。其中一幅在一个梁端由几个支座支承?返回数值和单位(个)。", "answer": "{\"value\": 3, \"unit\": \"个\"}"}, {"id": "MS-U21-04-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥现浇箱梁在桥台处的支座中心线,距该处桥梁轴线多少?返回数值和单位(mm)。", "answer": "{\"value\": 650, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U21-05/few_sheet/01.png", "page_02_file_name": "images/MS-U21-05/few_sheet/02.png", "page_03_file_name": "images/MS-U21-05/few_sheet/03.png", "page_04_file_name": "images/MS-U21-05/few_sheet/04.png", "page_05_file_name": "images/MS-U21-05/few_sheet/05.png", "page_06_file_name": "images/MS-U21-05/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U21-05", "set": "U21", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "主线3号桥两端轴线处,各有匝道C线桥、匝道D线桥的桥台与主线桥台并排。沿主线由九龙坡往泸州方向看,关于三座桥的走向与高低变化,下列说法哪些正确?", "options": [{"key": "A", "text": "往泸州方向,主线桥面逐渐降低", "correct": true}, {"key": "B", "text": "主线1#桥台下,靠匝道C线一侧的桩比靠匝道D线一侧的桩长", "correct": false}, {"key": "C", "text": "往泸州方向,匝道D线桥面逐渐降低", "correct": false}, {"key": "D", "text": "匝道C线桥的桩号增大方向与主线相同", "correct": true}, {"key": "E", "text": "匝道D线桥的桩号增大方向与主线相同", "correct": false}, {"key": "F", "text": "匝道D线桥的0#桥台位于主线泸州一端", "correct": true}], "answer": ["A", "D", "F"], "few_sheet_pages": [4, 5, 3, 7, 2, 6], "evidence_pages": [2, 3, 5, 6], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U21-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"主线3号桥0#轴桥台、匝道C线桥0#桥台和匝道D线桥1#桥台地质横断面图\"上,匝道C线和匝道D线各自标注的桩号是多少?以 JSON 返回两个字段 C、D,去掉线路名,按图中写法、形如 K0+123.456 的字符串。", "answer": "{\"C\": \"K0+217.966\", \"D\": \"K0+043.655\"}"}, {"id": "MS-U21-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"主线3号桥1#轴桥台、匝道C线桥1#桥台和匝道D线桥0#桥台地质横断面图\"上,匝道C线和匝道D线各自标注的桩号是多少?以 JSON 返回两个字段 C、D,去掉线路名,按图中写法、形如 K0+123.456 的字符串。", "answer": "{\"C\": \"K0+252.966\", \"D\": \"K0+008.655\"}"}, {"id": "MS-U21-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥的两张桥台地质横断面图(主线0#轴处、主线1#轴处)上,匝道D线标注的桥面高程 Hs 各是多少?以 JSON 返回两个字段 at_axis0、at_axis1,每个字段为数值和单位(m)。", "answer": "{\"at_axis0\": {\"value\": 257.385, \"unit\": \"m\"}, \"at_axis1\": {\"value\": 257.956, \"unit\": \"m\"}}"}, {"id": "MS-U21-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥的两张桥台地质横断面图(主线0#轴处、主线1#轴处)上,主线标注的桥面高程 Hs 各是多少?以 JSON 返回两个字段 at_axis0、at_axis1,每个字段为数值和单位(m)。", "answer": "{\"at_axis0\": {\"value\": 258.557, \"unit\": \"m\"}, \"at_axis1\": {\"value\": 258.348, \"unit\": \"m\"}}"}, {"id": "MS-U21-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"主线3号桥1#轴桥台、匝道C线桥1#桥台和匝道D线桥0#桥台地质横断面图\"中,主线3号桥1#轴桥台下所画的一排桩里,靠匝道D线桥一侧最外一根和靠匝道C线桥一侧最外一根的桩长各是多少?以 JSON 返回两个字段 D_side、C_side,每个字段为数值和单位(mm)。", "answer": "{\"D_side\": {\"value\": 10500, \"unit\": \"mm\"}, \"C_side\": {\"value\": 6000, \"unit\": \"mm\"}}"}, {"id": "MS-U21-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥两端的桥台轴线中,靠泸州一端的那一根,主线桩号是多少?按 K数字+数字 的形式返回(含三位小数)。", "answer": "\"K2+894.773\""}, {"id": "MS-U21-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "匝道D线桥0#桥台与主线3号桥的一个桥台并排。这座主线桥台所在轴线的主线桩号是多少?按 K数字+数字 的形式返回(含三位小数)。", "answer": "\"K2+894.773\""}]} {"page_01_file_name": "images/MS-U21-06/few_sheet/01.png", "page_02_file_name": "images/MS-U21-06/few_sheet/02.png", "page_03_file_name": "images/MS-U21-06/few_sheet/03.png", "page_04_file_name": "images/MS-U21-06/few_sheet/04.png", "page_05_file_name": "images/MS-U21-06/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U21-06", "set": "U21", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "主线3号桥现浇箱梁沿纵向分为梁端实心段、渐变段和跨中等截面段。与跨中等截面段相比,箱梁在渐变段起点处哪些尺寸更大?", "options": [{"key": "A", "text": "桥面全宽", "correct": false}, {"key": "B", "text": "底板厚度", "correct": true}, {"key": "C", "text": "单个箱室的宽度", "correct": false}, {"key": "D", "text": "翼缘板悬臂长度", "correct": false}, {"key": "E", "text": "腹板厚度", "correct": true}, {"key": "F", "text": "顶板厚度", "correct": true}], "answer": ["B", "E", "F"], "few_sheet_pages": [12, 8, 4, 7, 10], "evidence_pages": [7, 8, 10], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U21-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图的\"立面\"中,⓪ 轴梁端处梁高 1900 的竖向分段标注里,顶板厚和底板厚各是多少?以 JSON 返回两个字段 top、bottom,每个字段为数值和单位(mm)。", "answer": "{\"top\": {\"value\": 500, \"unit\": \"mm\"}, \"bottom\": {\"value\": 470, \"unit\": \"mm\"}}"}, {"id": "MS-U21-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图的\"立面\"中,跨中 3-3 剖切处梁高 1900 的竖向分段标注里,顶板厚和底板厚各是多少?以 JSON 返回两个字段 top、bottom,每个字段为数值和单位(mm)。", "answer": "{\"top\": {\"value\": 250, \"unit\": \"mm\"}, \"bottom\": {\"value\": 220, \"unit\": \"mm\"}}"}, {"id": "MS-U21-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图的 2-2 断面中,一幅箱梁的边腹板厚度、单个箱室的宽度标注、翼缘板悬臂长度各是多少?以 JSON 返回三个字段 web、cell、flange,每个字段为数值和单位(mm)。", "answer": "{\"web\": {\"value\": 900, \"unit\": \"mm\"}, \"cell\": {\"value\": 3600, \"unit\": \"mm\"}, \"flange\": {\"value\": 2500, \"unit\": \"mm\"}}"}, {"id": "MS-U21-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图的 3-3 断面中,一幅箱梁的边腹板厚度、单个箱室的宽度标注、翼缘板悬臂长度各是多少?以 JSON 返回三个字段 web、cell、flange,每个字段为数值和单位(mm)。", "answer": "{\"web\": {\"value\": 500, \"unit\": \"mm\"}, \"cell\": {\"value\": 4000, \"unit\": \"mm\"}, \"flange\": {\"value\": 2500, \"unit\": \"mm\"}}"}, {"id": "MS-U21-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图中,\"顶平面\"梁端处和 3-3 断面上标注的桥面全宽各是多少?以 JSON 返回两个字段 plan_end、section_33,每个字段为数值和单位(mm)。", "answer": "{\"plan_end\": {\"value\": 27500, \"unit\": \"mm\"}, \"section_33\": {\"value\": 27500, \"unit\": \"mm\"}}"}, {"id": "MS-U21-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥现浇箱梁在距梁端 1500 mm 处由梁端实心段进入渐变段。这一位置的横断面上,一幅箱梁的边腹板厚度和单个箱室的宽度标注各是多少?以 JSON 返回两个字段 web、cell,每个字段为数值和单位(mm)。", "answer": "{\"web\": {\"value\": 900, \"unit\": \"mm\"}, \"cell\": {\"value\": 3600, \"unit\": \"mm\"}}"}, {"id": "MS-U21-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥现浇箱梁在距梁端 1500 mm 处由梁端实心段进入渐变段。这一位置在立面上对应的剖切号是几?返回剖切号的阿拉伯数字(例如 6—6 返回 6)。", "answer": "\"2\""}]} {"page_01_file_name": "images/MS-U21-07/few_sheet/01.png", "page_02_file_name": "images/MS-U21-07/few_sheet/02.png", "page_03_file_name": "images/MS-U21-07/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U21-07", "set": "U21", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "主线3号桥现浇箱梁在跨中位置的横截面,下列说法哪些正确?", "options": [{"key": "A", "text": "两箱室之间的中腹板厚 900 mm", "correct": false}, {"key": "B", "text": "箱室底部两角设 250×250 的倒角", "correct": true}, {"key": "C", "text": "外侧腹板内缘至中腹板中线的距离为 3600 mm", "correct": false}, {"key": "D", "text": "外侧腹板厚 500 mm", "correct": true}, {"key": "E", "text": "左右两幅之间以横梁后浇段相连", "correct": false}, {"key": "F", "text": "箱室顶部两角设 250×250 的倒角", "correct": false}], "answer": ["B", "D"], "few_sheet_pages": [8, 10, 7], "evidence_pages": [7, 10], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U21-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图的 3—3 截面上:外侧腹板厚度、两箱室之间的中腹板厚度、外侧腹板内缘至中腹板中线的距离各是多少?以 JSON 返回三个字段 外侧腹板、中腹板、内缘至中线,每个字段为数值和单位(mm)。", "answer": "{\"外侧腹板\": {\"value\": 500, \"unit\": \"mm\"}, \"中腹板\": {\"value\": 500, \"unit\": \"mm\"}, \"内缘至中线\": {\"value\": 4000, \"unit\": \"mm\"}}"}, {"id": "MS-U21-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图的 3—3 截面上,箱室底部两角倒角的水平边长和竖直边长、箱室顶部两角倒角的水平边长各是多少?以 JSON 返回三个字段 底角水平、底角竖直、顶角水平,每个字段为数值和单位(mm)。", "answer": "{\"底角水平\": {\"value\": 250, \"unit\": \"mm\"}, \"底角竖直\": {\"value\": 250, \"unit\": \"mm\"}, \"顶角水平\": {\"value\": 750, \"unit\": \"mm\"}}"}, {"id": "MS-U21-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图的 2—2 截面上,中腹板厚度、外侧腹板内缘至中腹板中线的距离各是多少?以 JSON 返回两个字段 中腹板、内缘至中线,每个字段为数值和单位(mm)。", "answer": "{\"中腹板\": {\"value\": 900, \"unit\": \"mm\"}, \"内缘至中线\": {\"value\": 3600, \"unit\": \"mm\"}}"}, {"id": "MS-U21-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥现浇箱梁一般构造图的 1—1、2—2、3—3 三个截面上,左右两幅之间中线处的后浇段各标注为哪一种?每个字段只从\"横梁后浇段、翼缘后浇段\"中选一个。以 JSON 返回三个字段 1—1、2—2、3—3。", "answer": "{\"1—1\": \"横梁后浇段\", \"2—2\": \"横梁后浇段\", \"3—3\": \"翼缘后浇段\"}"}, {"id": "MS-U21-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥现浇箱梁在跨中位置的横截面,是哪一个剖面编号?只返回剖面编号本身(形如 \"5—5\")。", "answer": "\"3—3\""}]} {"page_01_file_name": "images/MS-U21-08/few_sheet/01.png", "page_02_file_name": "images/MS-U21-08/few_sheet/02.png", "page_03_file_name": "images/MS-U21-08/few_sheet/03.png", "page_04_file_name": "images/MS-U21-08/few_sheet/04.png", "page_05_file_name": "images/MS-U21-08/few_sheet/05.png", "page_06_file_name": "images/MS-U21-08/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U21-08", "set": "U21", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "主线3号桥两座桥台最下部的基础块体(不计桩和垫层),混凝土体积合计约多少 m³?", "options": [{"key": "A", "text": "650.40", "correct": false}, {"key": "B", "text": "811.28", "correct": true}, {"key": "C", "text": "754.62", "correct": false}, {"key": "D", "text": "797.36", "correct": false}, {"key": "E", "text": "695.86", "correct": false}, {"key": "F", "text": "852.69", "correct": false}], "answer": ["B"], "few_sheet_pages": [4, 12, 13, 15, 14, 2], "evidence_pages": [12, 13, 14, 15], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U21-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,0#桥台\"桥台正立面\"最下部基础块体的横桥向宽度和厚度各是多少?以 JSON 返回两个字段 width、thickness,每个字段为数值和单位(mm)。", "answer": "{\"width\": {\"value\": 27980, \"unit\": \"mm\"}, \"thickness\": {\"value\": 1500, \"unit\": \"mm\"}}"}, {"id": "MS-U21-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,0#桥台\"桥台侧立面\"最下部基础块体沿路线方向的全长是多少?返回数值和单位(mm)。", "answer": "{\"value\": 8750, \"unit\": \"mm\"}"}, {"id": "MS-U21-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,1#桥台\"桥台正立面\"最下部基础块体(承台)的横桥向宽度和厚度各是多少?以 JSON 返回两个字段 width、thickness,每个字段为数值和单位(mm)。", "answer": "{\"width\": {\"value\": 27980, \"unit\": \"mm\"}, \"thickness\": {\"value\": 2300, \"unit\": \"mm\"}}"}, {"id": "MS-U21-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,1#桥台\"桥台侧立面\"最下部基础块体(承台)沿路线方向的全长是多少?返回数值和单位(mm)。", "answer": "{\"value\": 6900, \"unit\": \"mm\"}"}, {"id": "MS-U21-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,0#桥台\"桥台侧立面\"上:基础块体底部分段尺寸中最长的一段、顶部桥梁轴线(⓪ 轴)到台尾的长度各是多少?以 JSON 返回两个字段 longest_segment、axis_to_tail,每个字段为数值和单位(mm)。", "answer": "{\"longest_segment\": {\"value\": 7400, \"unit\": \"mm\"}, \"axis_to_tail\": {\"value\": 6000, \"unit\": \"mm\"}}"}, {"id": "MS-U21-08-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,1#桥台\"桥台正立面\"顶部标注的总宽、\"桥台侧立面\"上前后两排桩中心距各是多少?以 JSON 返回两个字段 top_width、pile_rows,每个字段为数值和单位(mm)。", "answer": "{\"top_width\": {\"value\": 27500, \"unit\": \"mm\"}, \"pile_rows\": {\"value\": 4400, \"unit\": \"mm\"}}"}, {"id": "MS-U21-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥两座桥台中,最下部基础块体厚 1500 mm 的那一座,其基础块体沿路线方向的全长是多少?返回数值和单位(mm)。", "answer": "{\"value\": 8750, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U21-09/few_sheet/01.png", "page_02_file_name": "images/MS-U21-09/few_sheet/02.png", "page_03_file_name": "images/MS-U21-09/few_sheet/03.png", "page_04_file_name": "images/MS-U21-09/few_sheet/04.png", "page_05_file_name": "images/MS-U21-09/few_sheet/05.png", "page_06_file_name": "images/MS-U21-09/few_sheet/06.png", "page_07_file_name": "images/MS-U21-09/few_sheet/07.png", "page_08_file_name": "images/MS-U21-09/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U21-09", "set": "U21", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "主线3号桥0#桥台下的桩基础,桩长是多少?关于0#桥台的基础,下列说法哪些正确?", "options": [{"key": "A", "text": "0#桥台基础厚 2.3 m", "correct": false}, {"key": "B", "text": "0#桥台共 14 根桩", "correct": false}, {"key": "C", "text": "0#桥台下没有桩,采用扩大基础", "correct": true}, {"key": "D", "text": "0#桥台桩长 10.5 m", "correct": false}, {"key": "E", "text": "0#桥台基础底面高程为 245.477 m", "correct": true}, {"key": "F", "text": "0#桥台桩长 11.7 m", "correct": false}], "answer": ["C", "E"], "few_sheet_pages": [12, 5, 4, 13, 7, 6, 15, 14], "evidence_pages": [5, 6, 12, 13, 14, 15], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U21-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,0#桥台的\"桥台正立面\"和\"桥台侧立面\"上,最下部基础块体之下共画了几根桩?不设桩填 0。返回数值和单位(根)。", "answer": "{\"value\": 0, \"unit\": \"根\"}"}, {"id": "MS-U21-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"主线3号桥0#轴桥台、匝道C线桥0#桥台和匝道D线桥1#桥台地质横断面图\"中,主线3号桥0#轴桥台基础底面的高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 245.477, \"unit\": \"m\"}"}, {"id": "MS-U21-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"主线3号桥1#轴桥台、匝道C线桥1#桥台和匝道D线桥0#桥台地质横断面图\"中,匝道D线桥0#桥台下的桩长是多少?返回数值和单位(mm)。", "answer": "{\"value\": 11700, \"unit\": \"mm\"}"}, {"id": "MS-U21-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "\"主线3号桥1#轴桥台、匝道C线桥1#桥台和匝道D线桥0#桥台地质横断面图\"中,主线3号桥1#轴桥台下所画各桩中最长的桩长是多少?返回数值和单位(mm)。", "answer": "{\"value\": 10500, \"unit\": \"mm\"}"}, {"id": "MS-U21-09-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交主线3号桥桥台一般构造图中,1#桥台承台下共有几根桩、承台厚度是多少?以 JSON 返回两个字段 piles(根)、thickness(mm),每个字段为数值和单位。", "answer": "{\"piles\": {\"value\": 14, \"unit\": \"根\"}, \"thickness\": {\"value\": 2300, \"unit\": \"mm\"}}"}, {"id": "MS-U21-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线3号桥0#桥台最下部基础块体的厚度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1500, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U22-01/few_sheet/01.png", "page_02_file_name": "images/MS-U22-01/few_sheet/02.png", "page_03_file_name": "images/MS-U22-01/few_sheet/03.png", "page_04_file_name": "images/MS-U22-01/few_sheet/04.png", "page_05_file_name": "images/MS-U22-01/few_sheet/05.png", "page_06_file_name": "images/MS-U22-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U22-01", "set": "U22", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "匝道 F 线车行地通道沿线有多条道路从其上方跨越。下列道路中,哪些从地通道上方跨越,且跨越处该道路的路面高程比地通道该处路面设计高程高出 10 m 以上?", "options": [{"key": "A", "text": "远期匝道 G 线", "correct": false}, {"key": "B", "text": "还建道路 2", "correct": false}, {"key": "C", "text": "匝道 B 线", "correct": false}, {"key": "D", "text": "现状栀花大道", "correct": false}, {"key": "E", "text": "远期匝道 E 线", "correct": true}, {"key": "F", "text": "远期主线(桥梁左、右幅)", "correct": true}], "answer": ["E", "F"], "few_sheet_pages": [1, 14, 5, 4, 3, 2], "evidence_pages": [3, 4, 2, 1], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U22-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道F线车行地通道地质横断面图(一)”上:远期匝道E线标注的路面高程 Hs、地通道路面设计高程 H、右侧“匝道B线”标注的高程范围的上限值,各是多少?以 JSON 返回三个字段 E_line、tunnel、B_line_max,每个为数值和单位(m)。", "answer": "{\"E_line\": {\"value\": 251.326, \"unit\": \"m\"}, \"tunnel\": {\"value\": 237.451, \"unit\": \"m\"}, \"B_line_max\": {\"value\": 245.6, \"unit\": \"m\"}}"}, {"id": "MS-U22-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道F线车行地通道地质横断面图(三)”上:远期匝道G线标注的路面高程 Hs、地通道路面设计高程 H,各是多少?以 JSON 返回两个字段 G_line、tunnel,每个为数值和单位(m)。", "answer": "{\"G_line\": {\"value\": 245.462, \"unit\": \"m\"}, \"tunnel\": {\"value\": 236.079, \"unit\": \"m\"}}"}, {"id": "MS-U22-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道F线车行地通道立面图”上:现状栀花大道标注的 H 值、远期主线桥梁(左、右幅)各处所标 H 值中的最小值、下方设计高程栏中桩号 K0+520 的设计高程、设计起点高程 Hs,各是多少?以 JSON 返回四个字段 zhihua、bridge_min、at_520、start,每个为数值和单位(m)。", "answer": "{\"zhihua\": {\"value\": 245.562, \"unit\": \"m\"}, \"bridge_min\": {\"value\": 256.48, \"unit\": \"m\"}, \"at_520\": {\"value\": 235.874, \"unit\": \"m\"}, \"start\": {\"value\": 238.463, \"unit\": \"m\"}}"}, {"id": "MS-U22-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "在地通道桩号 FK0+500 处从地通道上方跨越的那条远期匝道,跨越处标注的路面高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 245.462, \"unit\": \"m\"}"}, {"id": "MS-U22-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "在地通道桩号 FK0+460 处从地通道上方跨越的那条远期匝道,跨越处标注的路面高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 251.326, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U22-02/few_sheet/01.png", "page_02_file_name": "images/MS-U22-02/few_sheet/02.png", "page_03_file_name": "images/MS-U22-02/few_sheet/03.png", "page_04_file_name": "images/MS-U22-02/few_sheet/04.png", "page_05_file_name": "images/MS-U22-02/few_sheet/05.png", "page_06_file_name": "images/MS-U22-02/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U22-02", "set": "U22", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "车行地通道的排水和附属构造中,下列哪些是沿地通道纵向每隔 10 m 设置一处(一个)的?", "options": [{"key": "A", "text": "雨水口", "correct": true}, {"key": "B", "text": "地通道两侧路基回填过渡段", "correct": false}, {"key": "C", "text": "电缆沟内的泄水孔", "correct": false}, {"key": "D", "text": "结构变形缝", "correct": false}, {"key": "E", "text": "侧墙处的横向排水管(φ100 PRT 导水管)", "correct": true}, {"key": "F", "text": "排水沟上的铸铁雨水箅", "correct": true}], "answer": ["A", "E", "F"], "few_sheet_pages": [12, 9, 8, 2, 14, 11], "evidence_pages": [8, 12, 2, 14], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U22-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行地通道结构防排水图”的说明中:横向排水管沿地通道纵向的间距、电缆沟内泄水孔的间距,各是多少?以 JSON 返回两个字段 transverse_pipe、cable_drain,每个为数值和单位(m 或 mm 均可,须与数值对应)。", "answer": "{\"transverse_pipe\": {\"value\": 10, \"unit\": \"m\"}, \"cable_drain\": {\"value\": 5000, \"unit\": \"mm\"}}"}, {"id": "MS-U22-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“地通道排水沟及电缆沟构造图”的说明中:雨水箅、雨水口各是每隔多长设置一个?以 JSON 返回两个字段 grate、inlet,每个为数值和单位(m)。", "answer": "{\"grate\": {\"value\": 10, \"unit\": \"m\"}, \"inlet\": {\"value\": 10, \"unit\": \"m\"}}"}, {"id": "MS-U22-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道F线车行地通道立面图”下方沿纵向的分段尺寸中(各变形缝之间的结构节段长度),最短的一段是多长?返回数值和单位(mm)。", "answer": "{\"value\": 15000, \"unit\": \"mm\"}"}, {"id": "MS-U22-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“地通道开挖回填示意图”的说明中,地通道两侧路基回填所设过渡段的范围长度是多少?返回数值和单位(m)。", "answer": "{\"value\": 10, \"unit\": \"m\"}"}, {"id": "MS-U22-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "地通道电缆沟内通向排水沟的泄水孔,沿纵向的间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 5000, \"unit\": \"mm\"}"}, {"id": "MS-U22-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "地通道中管径为 φ100 的横向排水管,沿地通道纵向的间距是多少?返回数值和单位(m)。", "answer": "{\"value\": 10, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U22-03/few_sheet/01.png", "page_02_file_name": "images/MS-U22-03/few_sheet/02.png", "page_03_file_name": "images/MS-U22-03/few_sheet/03.png", "page_04_file_name": "images/MS-U22-03/few_sheet/04.png", "page_05_file_name": "images/MS-U22-03/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U22-03", "set": "U22", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "分别对拱形断面段和箱形断面段,计算顶部(拱顶 / 顶板处)从顶板外最上层防护层顶面到洞内顶面饰面层表面的总厚度(含主体结构)。下列哪一项正确?", "options": [{"key": "A", "text": "拱形段 896 mm;箱形段 1296 mm", "correct": false}, {"key": "B", "text": "拱形段 897 mm;箱形段 1297 mm", "correct": true}, {"key": "C", "text": "拱形段 886 mm;箱形段 1286 mm", "correct": false}, {"key": "D", "text": "拱形段 957 mm;箱形段 1357 mm", "correct": false}, {"key": "E", "text": "拱形段 811 mm;箱形段 1211 mm", "correct": false}, {"key": "F", "text": "拱形段 1297 mm;箱形段 897 mm", "correct": false}], "answer": ["B"], "few_sheet_pages": [7, 13, 5, 6, 9], "evidence_pages": [5, 6, 13], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U22-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道F线地通道一般构造图(一)”上:顶部竖向尺寸标注的主体结构厚度,以及顶板外侧层次引线中页岩砖(按顶板处)、防水卷材、防水涂料、M20 水泥砂浆抹平层的厚度,各是多少?以 JSON 返回五个字段 structure、brick、membrane、coating、mortar,每个为数值和单位(mm)。", "answer": "{\"structure\": {\"value\": 800, \"unit\": \"mm\"}, \"brick\": {\"value\": 60, \"unit\": \"mm\"}, \"membrane\": {\"value\": 4, \"unit\": \"mm\"}, \"coating\": {\"value\": 2, \"unit\": \"mm\"}, \"mortar\": {\"value\": 20, \"unit\": \"mm\"}}"}, {"id": "MS-U22-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道F线地通道一般构造图(二)”上,顶部竖向尺寸标注的顶板主体结构厚度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1200, \"unit\": \"mm\"}"}, {"id": "MS-U22-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“地通道内部装饰图”的“A大样图”上,防火涂料和隧道面漆的厚度各是多少?以 JSON 返回两个字段 fireproof、paint,每个为数值和单位(mm)。", "answer": "{\"fireproof\": {\"value\": 10, \"unit\": \"mm\"}, \"paint\": {\"value\": 1, \"unit\": \"mm\"}}"}, {"id": "MS-U22-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道F线地通道一般构造图(一)”的层次引线中,侧墙处页岩砖的厚度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 120, \"unit\": \"mm\"}"}, {"id": "MS-U22-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "车行地通道拱形断面段,拱顶处主体结构的厚度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 800, \"unit\": \"mm\"}"}, {"id": "MS-U22-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "车行地通道箱形断面段,顶板主体结构的厚度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1200, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U22-04/few_sheet/01.png", "page_02_file_name": "images/MS-U22-04/few_sheet/02.png", "page_03_file_name": "images/MS-U22-04/few_sheet/03.png", "page_04_file_name": "images/MS-U22-04/few_sheet/04.png", "page_05_file_name": "images/MS-U22-04/few_sheet/05.png", "page_06_file_name": "images/MS-U22-04/few_sheet/06.png", "page_07_file_name": "images/MS-U22-04/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U22-04", "set": "U22", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "车行地通道底板下设置的抗浮锚杆,长度和布置间距是多少?下列说法哪些正确?", "options": [{"key": "A", "text": "底板下的 C20 混凝土垫层厚 50 mm", "correct": false}, {"key": "B", "text": "最后一个结构节段(19 m)的底板下另做级配碎石换填和浆砌片石换填", "correct": true}, {"key": "C", "text": "地基处理示意中,结构下铺 1.0 m 厚级配碎石,每侧比结构宽出 500 mm", "correct": true}, {"key": "D", "text": "地通道底板下并没有设置锚杆", "correct": true}, {"key": "E", "text": "锚杆长 4.0 m,按 2.0 m × 2.0 m 布置", "correct": false}, {"key": "F", "text": "地基承载力要求:拱形断面段不小于 220 kPa,箱形断面段不小于 180 kPa", "correct": true}], "answer": ["B", "C", "D", "F"], "few_sheet_pages": [14, 5, 4, 15, 6, 2, 3], "evidence_pages": [15, 6, 3, 5, 2], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U22-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道F线车行地通道地质横断面图(一)”上,顺层坡面所设挂网锚杆的长度 L 和布置间距各是多少?以 JSON 返回三个字段:L(锚杆长度)、a 和 b(间距按图注“a×b”的顺序),每个字段为数值和单位(m)。", "answer": "{\"L\": {\"value\": 4.0, \"unit\": \"m\"}, \"a\": {\"value\": 2.0, \"unit\": \"m\"}, \"b\": {\"value\": 2.0, \"unit\": \"m\"}}"}, {"id": "MS-U22-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“地通道地基处理大样图”的“地基处理示意(一)”上,结构底下所铺级配碎石的厚度,以及级配碎石顶面每侧比结构宽出的宽度,各是多少?以 JSON 返回两个字段 thickness、widen,每个为数值和单位(m 或 mm,须与数值对应)。", "answer": "{\"thickness\": {\"value\": 1.0, \"unit\": \"m\"}, \"widen\": {\"value\": 500, \"unit\": \"mm\"}}"}, {"id": "MS-U22-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道F线地通道一般构造图(一)”和“(二)”的说明中,地通道基础地基承载力的下限各是多少?以 JSON 返回两个字段 sheet1、sheet2,只写数值(单位 kPa,写成字符串)。", "answer": "{\"sheet1\": \"220\", \"sheet2\": \"180\"}"}, {"id": "MS-U22-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道F线地通道一般构造图(二)”上,底板下的层次引线自主体结构往下依次列了几层?这些层的厚度依次是多少?以 JSON 返回四个字段:n_layers(只写阿拉伯数字,字符串)、t1、t2、t3(t1 紧接主体结构,各为数值和单位 mm)。", "answer": "{\"n_layers\": \"3\", \"t1\": {\"value\": 50, \"unit\": \"mm\"}, \"t2\": {\"value\": 4, \"unit\": \"mm\"}, \"t3\": {\"value\": 100, \"unit\": \"mm\"}}"}, {"id": "MS-U22-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "车行地通道底板下另做级配碎石换填和浆砌片石换填的那一段结构节段,长度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 19000, \"unit\": \"mm\"}"}, {"id": "MS-U22-04-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "车行地通道拱形断面段,基础地基承载力的下限是多少?只写数值(单位 kPa,写成字符串)。按图中记号或文字原样返回一个字符串。", "answer": "\"220\""}, {"id": "MS-U22-04-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "地通道工程中设有挂网锚杆的那一段基坑坡面,坡率是多少?按图中写法返回形如 1:n 的字符串。", "answer": "\"1:0.75\""}]} {"page_01_file_name": "images/MS-U22-05/few_sheet/01.png", "page_02_file_name": "images/MS-U22-05/few_sheet/02.png", "page_03_file_name": "images/MS-U22-05/few_sheet/03.png", "page_04_file_name": "images/MS-U22-05/few_sheet/04.png", "page_05_file_name": "images/MS-U22-05/few_sheet/05.png", "page_06_file_name": "images/MS-U22-05/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U22-05", "set": "U22", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于车行地通道内路面积水的汇流方向,下列说法哪些正确?", "options": [{"key": "A", "text": "起点洞口一侧的 −4.40% 坡段内,排水沟中的水沿桩号增大方向流(流向洞内)", "correct": true}, {"key": "B", "text": "路面为单向 2% 横坡,横向排向一侧", "correct": true}, {"key": "C", "text": "侧墙纵向盲管收集的水经横向排水管导入纵向排水沟", "correct": true}, {"key": "D", "text": "路面自中线向两侧为双向横坡", "correct": false}, {"key": "E", "text": "电缆沟内的积水经泄水孔排入侧墙纵向盲管", "correct": false}, {"key": "F", "text": "终点洞口一侧的 +4.85% 坡段内,排水沟中的水沿桩号增大方向流出终点洞口", "correct": false}], "answer": ["A", "B", "C"], "few_sheet_pages": [8, 2, 6, 11, 12, 9], "evidence_pages": [6, 2, 12, 8], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U22-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道F线地通道一般构造图(二)”的断面图上,车道路面标注了几个横坡箭头?横坡值是多少?以 JSON 返回两个字段:n_arrows(数值和单位 个)、slope(按图中写法,形如 3%)。", "answer": "{\"n_arrows\": {\"value\": 1, \"unit\": \"个\"}, \"slope\": \"2%\"}"}, {"id": "MS-U22-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交匝道F线车行地通道立面图”下方设计高程栏中,桩号 K0+440、K0+460、K0+540、K0+560 的设计高程各是多少?以 JSON 返回四个字段 at_440、at_460、at_540、at_560,每个为数值和单位(m)。", "answer": "{\"at_440\": {\"value\": 238.331, \"unit\": \"m\"}, \"at_460\": {\"value\": 237.451, \"unit\": \"m\"}, \"at_540\": {\"value\": 236.002, \"unit\": \"m\"}, \"at_560\": {\"value\": 236.464, \"unit\": \"m\"}}"}, {"id": "MS-U22-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "车行地通道洞内车道路面的横坡是多少?按图中写法返回(形如 3%)。", "answer": "\"2%\""}, {"id": "MS-U22-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "车行地通道纵断面上,由下坡转为上坡的那个变坡点桩号是多少?返回形如 K0+100.000 的桩号。", "answer": "\"K0+525.000\""}]} {"page_01_file_name": "images/MS-U22-06/few_sheet/01.png", "page_02_file_name": "images/MS-U22-06/few_sheet/02.png", "page_03_file_name": "images/MS-U22-06/few_sheet/03.png", "page_04_file_name": "images/MS-U22-06/few_sheet/04.png", "page_05_file_name": "images/MS-U22-06/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U22-06", "set": "U22", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿竖直方向自上而下看车行地通道:顶板外的防水防护层 → 顶板 → 洞内顶面饰面 → 车道路面结构。下列\"上一层 → 紧接的下一层\"中,哪些与图纸一致?", "options": [{"key": "A", "text": "水性聚合物沥青类防水涂料 → M20 水泥砂浆抹平层", "correct": true}, {"key": "B", "text": "高聚物改性沥青防水卷材 → M20 水泥砂浆抹平层", "correct": false}, {"key": "C", "text": "隧道面漆 → 隧道专用防火涂料", "correct": false}, {"key": "D", "text": "顶板主体结构 → 隧道面漆", "correct": false}, {"key": "E", "text": "路面基层 C35 混凝土 → C20 砼填充", "correct": true}, {"key": "F", "text": "改性沥青玛蹄脂碎石 SMA13 上面层 → 路面基层 C35 混凝土", "correct": false}], "answer": ["A", "E"], "few_sheet_pages": [10, 13, 11, 9, 8], "evidence_pages": [8, 13, 10], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U22-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行地通道结构防排水图”的“地通道结构防排水布置图”上,顶板外侧的层次引线自上而下列出主体结构以上的各层;按顶板处取值,这些层的厚度自上而下依次是多少?以 JSON 返回四个字段 t1~t4(t1 为最上层),每个为数值和单位(mm)。", "answer": "{\"t1\": {\"value\": 60, \"unit\": \"mm\"}, \"t2\": {\"value\": 4, \"unit\": \"mm\"}, \"t3\": {\"value\": 2, \"unit\": \"mm\"}, \"t4\": {\"value\": 20, \"unit\": \"mm\"}}"}, {"id": "MS-U22-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "地通道顶板外侧防水构造中,高聚物改性沥青防水卷材、水性聚合物沥青类防水涂料、M20 水泥砂浆找平层的厚度各是多少?以 JSON 返回三个字段 membrane、coating、mortar,每个为数值和单位(mm)。", "answer": "{\"membrane\": {\"value\": 4, \"unit\": \"mm\"}, \"coating\": {\"value\": 2, \"unit\": \"mm\"}, \"mortar\": {\"value\": 20, \"unit\": \"mm\"}}"}, {"id": "MS-U22-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“地通道内部装饰图”的“A大样图”上,引线自“结构”起依次列出的结构以外各层的厚度依次是多少?以 JSON 返回两个字段 t1、t2(t1 紧接结构),每个为数值和单位(mm)。", "answer": "{\"t1\": {\"value\": 10, \"unit\": \"mm\"}, \"t2\": {\"value\": 1, \"unit\": \"mm\"}}"}, {"id": "MS-U22-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "车行地通道洞内顶面饰面中,隧道专用防火涂料层和隧道面漆的厚度各是多少?以 JSON 返回两个字段 fireproof、paint,每个为数值和单位(mm)。", "answer": "{\"fireproof\": {\"value\": 10, \"unit\": \"mm\"}, \"paint\": {\"value\": 1, \"unit\": \"mm\"}}"}, {"id": "MS-U22-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“车行地通道路面结构图”的“地通道路面断面图”上,C20 砼填充以上的各路面层厚度自上而下依次是多少?以 JSON 返回三个字段 t1~t3(t1 为最上层),每个为数值和单位(mm)。", "answer": "{\"t1\": {\"value\": 40, \"unit\": \"mm\"}, \"t2\": {\"value\": 60, \"unit\": \"mm\"}, \"t3\": {\"value\": 240, \"unit\": \"mm\"}}"}, {"id": "MS-U22-06-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "车行地通道洞内路面中,AC-20 下面层和 C35 混凝土路面基层的厚度各是多少?以 JSON 返回两个字段 ac20、c35,每个为数值和单位(mm)。", "answer": "{\"ac20\": {\"value\": 60, \"unit\": \"mm\"}, \"c35\": {\"value\": 240, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U22-07/few_sheet/01.png", "page_02_file_name": "images/MS-U22-07/few_sheet/02.png", "page_03_file_name": "images/MS-U22-07/few_sheet/03.png", "page_04_file_name": "images/MS-U22-07/few_sheet/04.png", "page_05_file_name": "images/MS-U22-07/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U22-07", "set": "U22", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "车行地通道基坑顺层坡面上设置的挂网锚杆,长度和布置间距是多少?下列说法哪些正确?", "options": [{"key": "A", "text": "锚杆长 4.0 m,按 2.0 m × 2.0 m 布置", "correct": true}, {"key": "B", "text": "设锚杆的坡面按土层坡率放坡", "correct": false}, {"key": "C", "text": "图中并没有设置锚杆", "correct": false}, {"key": "D", "text": "设锚杆的坡面段从地通道设计起点起,到第一道结构变形缝为止", "correct": true}, {"key": "E", "text": "该坡面段范围内,地通道路面沿桩号增大方向为上坡", "correct": false}, {"key": "F", "text": "设锚杆的坡面段位于终点洞口一侧的最后一个结构节段", "correct": false}], "answer": ["A", "D"], "few_sheet_pages": [14, 15, 2, 4, 3], "evidence_pages": [3, 2, 14], "full_set_page_count": 15, "sub_questions": [{"id": "MS-U22-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道F线车行地通道地质横断面图(一)上,顺层坡面所设挂网锚杆的长度 L 和布置间距各是多少?以 JSON 返回三个字段:L(锚杆长度)、a 和 b(间距按图注“a×b”的顺序),每个字段为数值和单位(m)。", "answer": "{\"L\": {\"value\": 4.0, \"unit\": \"m\"}, \"a\": {\"value\": 2.0, \"unit\": \"m\"}, \"b\": {\"value\": 2.0, \"unit\": \"m\"}}"}, {"id": "MS-U22-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道F线车行地通道地质横断面图(一)上,顺层坡面注明的桩号范围,起点和终点桩号各是多少?以 JSON 返回两个字段 start、end,按图中写法、形如 K0+100 的字符串。", "answer": "{\"start\": \"K0+437\", \"end\": \"K0+462\"}"}, {"id": "MS-U22-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道F线车行地通道立面图上,设计起点和设计终点的桩号各是多少?以 JSON 返回两个字段 start、end,去掉线路字母前缀,保留图中的两位小数,形如 K0+100.00 的字符串。", "answer": "{\"start\": \"K0+437.00\", \"end\": \"K0+559.00\"}"}, {"id": "MS-U22-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "车行地通道沿纵向分成若干结构节段。位于设计起点一端的第一个结构节段,长度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 25000, \"unit\": \"mm\"}"}, {"id": "MS-U22-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支坪立交匝道F线车行地通道立面图下方的纵断面栏中,桩号 K0+440 和 K0+460 处的设计高程各是多少?以 JSON 返回两个字段 at_440、at_460,每个为数值和单位(m)。", "answer": "{\"at_440\": {\"value\": 238.331, \"unit\": \"m\"}, \"at_460\": {\"value\": 237.451, \"unit\": \"m\"}}"}, {"id": "MS-U22-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "车行地通道基坑中,设有挂网锚杆的那一段坡面,坡率是多少?按图中写法返回形如 1:n 的字符串。", "answer": "\"1:0.75\""}, {"id": "MS-U22-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "地通道开挖回填示意图的说明中,土层的开挖临时坡率是多少?按图中写法返回形如 1:n 的字符串。", "answer": "\"1:1.5\""}]} {"page_01_file_name": "images/MS-U23-01/few_sheet/01.png", "page_02_file_name": "images/MS-U23-01/few_sheet/02.png", "page_03_file_name": "images/MS-U23-01/few_sheet/03.png", "page_04_file_name": "images/MS-U23-01/few_sheet/04.png", "page_05_file_name": "images/MS-U23-01/few_sheet/05.png", "page_06_file_name": "images/MS-U23-01/few_sheet/06.png", "page_07_file_name": "images/MS-U23-01/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U23-01", "set": "U23", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "远期涡轮形立交中,下列立体交叉处,哪些在交叉点上方道路与下方道路的设计高程之差超过 10 m?", "options": [{"key": "A", "text": "主线跨匝道F线处", "correct": true}, {"key": "B", "text": "匝道H线跨匝道E线处", "correct": false}, {"key": "C", "text": "栀花大道跨匝道F线处", "correct": false}, {"key": "D", "text": "主线跨匝道G线处", "correct": true}, {"key": "E", "text": "匝道E线跨匝道F线处", "correct": true}, {"key": "F", "text": "匝道D线跨匝道F线处", "correct": true}], "answer": ["A", "D", "E", "F"], "few_sheet_pages": [25, 18, 27, 31, 29, 19, 20], "evidence_pages": [25, 27, 31, 29, 20], "full_set_page_count": 32, "sub_questions": [{"id": "MS-U23-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期D线)”上,标注“匝道D线上跨匝道F线”的那处交叉,H上 和 H下 各是多少?按字段 H上、H下 返回,每个字段为数值和单位(m)。", "answer": "{\"H上\": {\"value\": 251.315, \"unit\": \"m\"}, \"H下\": {\"value\": 236.485, \"unit\": \"m\"}}"}, {"id": "MS-U23-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期E线)”上,标注“匝道E线上跨匝道F线”的那处交叉,H上 和 H下 各是多少?按字段 H上、H下 返回,每个字段为数值和单位(m)。", "answer": "{\"H上\": {\"value\": 251.165, \"unit\": \"m\"}, \"H下\": {\"value\": 237.546, \"unit\": \"m\"}}"}, {"id": "MS-U23-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期H线)”上,标注“匝道H线上跨匝道E线”的那处交叉,H上 和 H下 各是多少?按字段 H上、H下 返回,每个字段为数值和单位(m)。", "answer": "{\"H上\": {\"value\": 252.389, \"unit\": \"m\"}, \"H下\": {\"value\": 243.194, \"unit\": \"m\"}}"}, {"id": "MS-U23-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期G线)”上,标注“主线上跨匝道G线”的那处交叉,H上 和 H下 各是多少?按字段 H上、H下 返回,每个字段为数值和单位(m)。", "answer": "{\"H上\": {\"value\": 256.18, \"unit\": \"m\"}, \"H下\": {\"value\": 246.146, \"unit\": \"m\"}}"}, {"id": "MS-U23-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(近期F线)”上,标注“匝道F线下穿主线”的那处交叉,H上 和 H下 各是多少?按字段 H上、H下 返回,每个字段为数值和单位(m)。", "answer": "{\"H上\": {\"value\": 255.734, \"unit\": \"m\"}, \"H下\": {\"value\": 236.346, \"unit\": \"m\"}}"}, {"id": "MS-U23-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "远期方案中,匝道F线与栀花大道立体交叉。交叉点处,栀花大道和匝道F线的设计高程各是多少?按字段 栀花大道、F线 返回,每个字段为数值和单位(m)。", "answer": "{\"栀花大道\": {\"value\": 245.553, \"unit\": \"m\"}, \"F线\": {\"value\": 235.872, \"unit\": \"m\"}}"}]} {"page_01_file_name": "images/MS-U23-02/few_sheet/01.png", "page_02_file_name": "images/MS-U23-02/few_sheet/02.png", "page_03_file_name": "images/MS-U23-02/few_sheet/03.png", "page_04_file_name": "images/MS-U23-02/few_sheet/04.png", "page_05_file_name": "images/MS-U23-02/few_sheet/05.png", "page_06_file_name": "images/MS-U23-02/few_sheet/06.png", "page_07_file_name": "images/MS-U23-02/few_sheet/07.png", "page_08_file_name": "images/MS-U23-02/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U23-02", "set": "U23", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "远期涡轮形立交建成后,下列匝道中,哪些有一端(起点或终点)直接接到栀花大道上,而不只是从栀花大道上方或下方跨过?", "options": [{"key": "A", "text": "匝道B线", "correct": true}, {"key": "B", "text": "匝道A线", "correct": false}, {"key": "C", "text": "匝道G线", "correct": true}, {"key": "D", "text": "匝道H线", "correct": false}, {"key": "E", "text": "匝道C线", "correct": true}, {"key": "F", "text": "匝道D线", "correct": false}], "answer": ["A", "C", "E"], "few_sheet_pages": [16, 25, 21, 12, 18, 29, 23, 31], "evidence_pages": [16, 23, 29, 31, 25, 21], "full_set_page_count": 32, "sub_questions": [{"id": "MS-U23-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(近期B线)”上,匝道B线设计起点和设计终点旁的箭头注字各指向哪个地点?从 {栀花大道, 牟家湾立交, 绕城渝泸互通立交, 珞璜, 龙华镇} 中选,按字段 起点、终点 返回。", "answer": "{\"起点\": \"牟家湾立交\", \"终点\": \"栀花大道\"}"}, {"id": "MS-U23-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期C线)”上,匝道C线设计起点旁的箭头注字指向哪个地点?从 {栀花大道, 牟家湾立交, 绕城渝泸互通立交, 珞璜, 龙华镇} 中选一个返回。", "answer": "\"栀花大道\""}, {"id": "MS-U23-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期G线)”上,匝道G线设计起点和设计终点旁的箭头注字各指向哪个地点?从 {栀花大道, 牟家湾立交, 绕城渝泸互通立交, 珞璜, 龙华镇} 中选,按字段 起点、终点 返回。", "answer": "{\"起点\": \"绕城渝泸互通立交\", \"终点\": \"栀花大道\"}"}, {"id": "MS-U23-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期H线)”上,匝道H线设计起点和设计终点旁的箭头注字各指向哪个地点?从 {栀花大道, 牟家湾立交, 绕城渝泸互通立交, 珞璜, 龙华镇} 中选,按字段 起点、终点 返回。", "answer": "{\"起点\": \"龙华镇\", \"终点\": \"牟家湾立交\"}"}, {"id": "MS-U23-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(近期D线)”上,匝道D线设计起点和设计终点旁的箭头注字各指向哪个地点?从 {栀花大道, 牟家湾立交, 绕城渝泸互通立交, 珞璜, 龙华镇} 中选,按字段 起点、终点 返回。", "answer": "{\"起点\": \"绕城渝泸互通立交\", \"终点\": \"栀花大道\"}"}, {"id": "MS-U23-02-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期A线)”上,匝道A线设计起点和设计终点旁的箭头注字各指向哪个地点?从 {栀花大道, 牟家湾立交, 绕城渝泸互通立交, 珞璜, 龙华镇} 中选,按字段 起点、终点 返回。", "answer": "{\"起点\": \"珞璜\", \"终点\": \"牟家湾立交\"}"}, {"id": "MS-U23-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "远期涡轮形立交建成后的匝道D线,设计起点和设计终点旁的箭头注字各指向哪个地点?从 {栀花大道, 牟家湾立交, 绕城渝泸互通立交, 珞璜, 龙华镇} 中选,按字段 起点、终点 返回。", "answer": "{\"起点\": \"绕城渝泸互通立交\", \"终点\": \"珞璜\"}"}]} {"page_01_file_name": "images/MS-U23-03/few_sheet/01.png", "page_02_file_name": "images/MS-U23-03/few_sheet/02.png", "page_03_file_name": "images/MS-U23-03/few_sheet/03.png", "page_04_file_name": "images/MS-U23-03/few_sheet/04.png", "page_05_file_name": "images/MS-U23-03/few_sheet/05.png", "page_06_file_name": "images/MS-U23-03/few_sheet/06.png", "page_07_file_name": "images/MS-U23-03/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U23-03", "set": "U23", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "远期涡轮形立交中,车辆沿各匝道桩号增大方向行驶。关于各匝道的去向和沿途上下坡,下列说法哪些正确?", "options": [{"key": "A", "text": "匝道H线由龙华镇驶往牟家湾立交,全程一路上坡", "correct": false}, {"key": "B", "text": "匝道A线由牟家湾立交驶往珞璜,全程一路下坡", "correct": false}, {"key": "C", "text": "匝道D线由珞璜驶往绕城渝泸互通立交,全程一路上坡", "correct": false}, {"key": "D", "text": "匝道G线由绕城渝泸互通立交驶往栀花大道,先下坡、后上坡", "correct": true}, {"key": "E", "text": "匝道E线由栀花大道驶往绕城渝泸互通立交,全程一路上坡", "correct": true}, {"key": "F", "text": "匝道D线由绕城渝泸互通立交驶出后先短暂上坡,再转为下坡", "correct": false}], "answer": ["D", "E"], "few_sheet_pages": [29, 18, 31, 25, 21, 15, 27], "evidence_pages": [27, 25, 29, 31, 21], "full_set_page_count": 32, "sub_questions": [{"id": "MS-U23-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期E线)”下方坡度/坡长栏中,从起点到终点各段坡的坡度各是多少?按字段 第1段…第5段 返回;坡度按图中写法返回字符串(带百分号;下坡带负号,上坡不加正号;保留两位小数,形如 -1.20%)。", "answer": "{\"第1段\": \"2.81%\", \"第2段\": \"5.00%\", \"第3段\": \"0.40%\", \"第4段\": \"5.00%\", \"第5段\": \"0.80%\"}"}, {"id": "MS-U23-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期G线)”下方坡度/坡长栏中,从起点到终点各段坡的坡度各是多少?按字段 第1段…第6段 返回;坡度按图中写法返回字符串(带百分号;下坡带负号,上坡不加正号;保留两位小数,形如 -1.20%)。", "answer": "{\"第1段\": \"-0.80%\", \"第2段\": \"-3.00%\", \"第3段\": \"-0.40%\", \"第4段\": \"-3.50%\", \"第5段\": \"2.81%\", \"第6段\": \"0.90%\"}"}, {"id": "MS-U23-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期H线)”下方坡度/坡长栏中,从起点数第 3 段坡的坡度是多少?坡度按图中写法返回字符串(带百分号;下坡带负号,上坡不加正号;保留两位小数,形如 -1.20%)。", "answer": "\"-4.70%\""}, {"id": "MS-U23-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期D线)”上,匝道D线设计起点和设计终点旁的箭头注字各指向哪个地点(从 {栀花大道, 牟家湾立交, 绕城渝泸互通立交, 珞璜, 龙华镇} 中选),以及下方坡度/坡长栏中第 1 段坡的坡度是多少?按字段 起点、终点、第1段 返回;坡度按图中写法返回字符串(带百分号;下坡带负号,上坡不加正号;保留两位小数,形如 -1.20%)。", "answer": "{\"起点\": \"绕城渝泸互通立交\", \"终点\": \"珞璜\", \"第1段\": \"-3.35%\"}"}, {"id": "MS-U23-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(近期D线)”下方坡度/坡长栏中,从起点数第 1 段坡的坡度是多少?坡度按图中写法返回字符串(带百分号;下坡带负号,上坡不加正号;保留两位小数,形如 -1.20%)。", "answer": "\"0.60%\""}, {"id": "MS-U23-03-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期A线)”上,匝道A线设计起点和设计终点旁的箭头注字各指向哪个地点?从 {栀花大道, 牟家湾立交, 绕城渝泸互通立交, 珞璜, 龙华镇} 中选,按字段 起点、终点 返回。", "answer": "{\"起点\": \"珞璜\", \"终点\": \"牟家湾立交\"}"}, {"id": "MS-U23-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "远期涡轮形立交中的匝道E线和匝道G线,设计起点和设计终点旁的箭头注字各指向哪个地点?从 {栀花大道, 牟家湾立交, 绕城渝泸互通立交, 珞璜, 龙华镇} 中选,按字段 E起点、E终点、G起点、G终点 返回。", "answer": "{\"E起点\": \"栀花大道\", \"E终点\": \"绕城渝泸互通立交\", \"G起点\": \"绕城渝泸互通立交\", \"G终点\": \"栀花大道\"}"}]} {"page_01_file_name": "images/MS-U23-04/few_sheet/01.png", "page_02_file_name": "images/MS-U23-04/few_sheet/02.png", "page_03_file_name": "images/MS-U23-04/few_sheet/03.png", "page_04_file_name": "images/MS-U23-04/few_sheet/04.png", "page_05_file_name": "images/MS-U23-04/few_sheet/05.png", "page_06_file_name": "images/MS-U23-04/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U23-04", "set": "U23", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿匝道F线桩号增大方向(由牟家湾立交往栀花大道),远期方案中F线先后从多条道路下方穿过。下列\"前一处 → 紧接的下一处\"中,哪些正确?", "options": [{"key": "A", "text": "从主线下方穿过 → 从栀花大道下方穿过", "correct": false}, {"key": "B", "text": "从主线下方穿过 → 从匝道G线下方穿过", "correct": true}, {"key": "C", "text": "从匝道E线下方穿过 → 从主线下方穿过", "correct": true}, {"key": "D", "text": "从匝道E线下方穿过 → 从匝道G线下方穿过", "correct": false}, {"key": "E", "text": "从匝道D线下方穿过 → 从栀花大道下方穿过", "correct": false}, {"key": "F", "text": "从栀花大道下方穿过 → 从匝道D线下方穿过", "correct": true}], "answer": ["B", "C", "F"], "few_sheet_pages": [23, 29, 15, 27, 20, 25], "evidence_pages": [20, 27, 29, 25], "full_set_page_count": 32, "sub_questions": [{"id": "MS-U23-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期E线)”上,标注“匝道E线上跨匝道F线”的那处交叉,交叉点在匝道F线上的桩号是多少?按图中写法返回,形如 K0+100.000。", "answer": "\"K0+457.845\""}, {"id": "MS-U23-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(近期F线)”上有两处交叉标注:“匝道F线下穿主线”和“匝道F线下穿栀花大道”。这两处交叉点在匝道F线上的桩号各是多少?按字段 主线、栀花大道 返回,按图中写法返回字符串,形如 K0+100.000(保留三位小数)。", "answer": "{\"主线\": \"K0+488.564\", \"栀花大道\": \"K0+521.914\"}"}, {"id": "MS-U23-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期D线)”上,标注“匝道D线上跨匝道F线”的那处交叉,交叉点在匝道F线上的桩号是多少?按图中写法返回,形如 K0+100.000。", "answer": "\"K0+560.670\""}, {"id": "MS-U23-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "远期方案中,匝道G线(含其环形段)两次从匝道F线上方跨过。这两处交叉点在匝道F线上的桩号各是多少?按F线桩号从小到大,以字段 第一处、第二处 返回,按图中写法返回字符串,形如 K0+100.000(保留三位小数)。", "answer": "{\"第一处\": \"K0+501.090\", \"第二处\": \"K0+509.334\"}"}]} {"page_01_file_name": "images/MS-U23-05/few_sheet/01.png", "page_02_file_name": "images/MS-U23-05/few_sheet/02.png", "page_03_file_name": "images/MS-U23-05/few_sheet/03.png", "page_04_file_name": "images/MS-U23-05/few_sheet/04.png", "page_05_file_name": "images/MS-U23-05/few_sheet/05.png", "page_06_file_name": "images/MS-U23-05/few_sheet/06.png", "page_07_file_name": "images/MS-U23-05/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U23-05", "set": "U23", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "远期方案中,匝道F线从栀花大道上方跨过。关于这处交叉及F线沿线的其他交叉,下列说法哪些正确?", "options": [{"key": "A", "text": "该交叉处的栀花大道桩号,比匝道H线跨过栀花大道处的栀花大道桩号大", "correct": false}, {"key": "B", "text": "F线在该处并不在栀花大道上方,而是从栀花大道下方穿过", "correct": true}, {"key": "C", "text": "沿F线桩号增大方向,匝道D线跨过F线的位置在F线与栀花大道交叉处之前", "correct": false}, {"key": "D", "text": "该交叉处与匝道G线跨过栀花大道处,在栀花大道上是同一位置", "correct": false}, {"key": "E", "text": "沿F线桩号增大方向,F线先从匝道E线下方穿过,再到达与栀花大道的交叉处", "correct": true}, {"key": "F", "text": "该处F线比栀花大道高 9.681 m", "correct": false}], "answer": ["B", "E"], "few_sheet_pages": [21, 25, 27, 20, 31, 29, 23], "evidence_pages": [20, 27, 29, 25, 31], "full_set_page_count": 32, "sub_questions": [{"id": "MS-U23-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "远期方案中,匝道F线与栀花大道立体交叉。交叉点处,栀花大道和匝道F线的设计高程各是多少?按字段 栀花大道、F线 返回,每个字段为数值和单位(m)。", "answer": "{\"栀花大道\": {\"value\": 245.553, \"unit\": \"m\"}, \"F线\": {\"value\": 235.872, \"unit\": \"m\"}}"}, {"id": "MS-U23-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(近期F线)”上,匝道F线与栀花大道交叉处的标注里,交叉点在栀花大道上和在匝道F线上的桩号各是多少?按字段 栀花大道、F线 返回,按图中写法返回字符串,形如 K0+100.000(保留三位小数)。", "answer": "{\"栀花大道\": \"K0+390.336\", \"F线\": \"K0+521.914\"}"}, {"id": "MS-U23-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期H线)”上,标注“匝道H线上跨栀花大道”的那处交叉,交叉点在栀花大道上的桩号是多少?按图中写法返回,形如 K0+100.000。", "answer": "\"K0+597.015\""}, {"id": "MS-U23-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期E线)”上,标注“匝道E线上跨匝道F线”的那处交叉,交叉点在匝道F线上的桩号是多少?按图中写法返回,形如 K0+100.000。", "answer": "\"K0+457.845\""}, {"id": "MS-U23-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期G线)”上,标注“匝道G线上跨栀花大道”的那处交叉,交叉点在栀花大道上的桩号是多少?按图中写法返回,形如 K0+100.000。", "answer": "\"K0+361.897\""}, {"id": "MS-U23-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期D线)”上,标注“匝道D线上跨匝道F线”的那处交叉,交叉点在匝道F线上的桩号是多少?按图中写法返回,形如 K0+100.000。", "answer": "\"K0+560.670\""}]} {"page_01_file_name": "images/MS-U23-06/few_sheet/01.png", "page_02_file_name": "images/MS-U23-06/few_sheet/02.png", "page_03_file_name": "images/MS-U23-06/few_sheet/03.png", "page_04_file_name": "images/MS-U23-06/few_sheet/04.png", "page_05_file_name": "images/MS-U23-06/few_sheet/05.png", "page_06_file_name": "images/MS-U23-06/few_sheet/06.png", "page_07_file_name": "images/MS-U23-06/few_sheet/07.png", "page_08_file_name": "images/MS-U23-06/few_sheet/08.png", "page_09_file_name": "images/MS-U23-06/few_sheet/09.png", "page_10_file_name": "images/MS-U23-06/few_sheet/10.png", "id": "MS-U23-06", "set": "U23", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "远期涡轮形立交的全部匝道(A~H 线,含近期已建并保留的 B、F 线)中,纵坡绝对值不小于 5% 的各坡段,坡长合计是多少(m)?", "options": [{"key": "A", "text": "977.564", "correct": false}, {"key": "B", "text": "1094.910", "correct": false}, {"key": "C", "text": "688.782", "correct": false}, {"key": "D", "text": "851.644", "correct": true}, {"key": "E", "text": "570.324", "correct": false}, {"key": "F", "text": "262.608", "correct": false}], "answer": ["D"], "few_sheet_pages": [23, 16, 29, 14, 21, 17, 31, 25, 27, 20], "evidence_pages": [16, 20, 21, 23, 25, 27, 29, 31], "full_set_page_count": 32, "sub_questions": [{"id": "MS-U23-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期A线)”下方坡度/坡长栏中,从起点数第 1 段坡的坡度和坡长各是多少?按字段 坡度、坡长 返回;坡度按图中写法返回字符串(带百分号;下坡带负号,上坡不加正号;保留两位小数,形如 -1.20%),坡长为数值和单位(m)。", "answer": "{\"坡度\": \"5.30%\", \"坡长\": {\"value\": 144.15, \"unit\": \"m\"}}"}, {"id": "MS-U23-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期C线)”下方坡度/坡长栏中,从起点数第 2 段坡的坡度和坡长各是多少?按字段 坡度、坡长 返回;坡度按图中写法返回字符串(带百分号;下坡带负号,上坡不加正号;保留两位小数,形如 -1.20%),坡长为数值和单位(m)。", "answer": "{\"坡度\": \"-5.40%\", \"坡长\": {\"value\": 118.458, \"unit\": \"m\"}}"}, {"id": "MS-U23-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期E线)”下方坡度/坡长栏中,从起点数第 2 段和第 4 段坡的坡度和坡长各是多少?按字段 第2段坡度、第2段坡长、第4段坡度、第4段坡长 返回;坡度按图中写法返回字符串(带百分号;下坡带负号,上坡不加正号;保留两位小数,形如 -1.20%),坡长为数值和单位(m)。", "answer": "{\"第2段坡度\": \"5.00%\", \"第2段坡长\": {\"value\": 165.0, \"unit\": \"m\"}, \"第4段坡度\": \"5.00%\", \"第4段坡长\": {\"value\": 261.174, \"unit\": \"m\"}}"}, {"id": "MS-U23-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "远期涡轮形立交中的匝道F线,纵断面上从起点数第 4 段坡的坡度和坡长各是多少?按字段 坡度、坡长 返回;坡度按图中写法返回字符串(带百分号;下坡带负号,上坡不加正号;保留两位小数,形如 -1.20%),坡长为数值和单位(m)。", "answer": "{\"坡度\": \"-5.00%\", \"坡长\": {\"value\": 162.862, \"unit\": \"m\"}}"}, {"id": "MS-U23-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期D线)”下方坡度/坡长栏中,从起点数第 2 段坡的坡度和坡长各是多少?按字段 坡度、坡长 返回;坡度按图中写法返回字符串(带百分号;下坡带负号,上坡不加正号;保留两位小数,形如 -1.20%),坡长为数值和单位(m)。", "answer": "{\"坡度\": \"-4.95%\", \"坡长\": {\"value\": 243.266, \"unit\": \"m\"}}"}, {"id": "MS-U23-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(近期C线)”下方坡度/坡长栏中,从起点数第 2 段坡的坡度和坡长各是多少?按字段 坡度、坡长 返回;坡度按图中写法返回字符串(带百分号;下坡带负号,上坡不加正号;保留两位小数,形如 -1.20%),坡长为数值和单位(m)。", "answer": "{\"坡度\": \"6.00%\", \"坡长\": {\"value\": 125.92, \"unit\": \"m\"}}"}]} {"page_01_file_name": "images/MS-U23-07/few_sheet/01.png", "page_02_file_name": "images/MS-U23-07/few_sheet/02.png", "page_03_file_name": "images/MS-U23-07/few_sheet/03.png", "page_04_file_name": "images/MS-U23-07/few_sheet/04.png", "page_05_file_name": "images/MS-U23-07/few_sheet/05.png", "page_06_file_name": "images/MS-U23-07/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U23-07", "set": "U23", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "远期方案中,匝道H线从栀花大道上方跨过。关于这处交叉及栀花大道上的其他交叉,下列说法哪些正确?", "options": [{"key": "A", "text": "匝道G线也从栀花大道上方跨过,且G线高出栀花大道的值比H线小", "correct": true}, {"key": "B", "text": "匝道E线跨过栀花大道处,E线高出栀花大道的值比H线大", "correct": false}, {"key": "C", "text": "该交叉处的栀花大道桩号,比匝道E线跨过栀花大道处的栀花大道桩号小", "correct": false}, {"key": "D", "text": "H线在该处并不在栀花大道上方,而是从栀花大道下方穿过", "correct": false}, {"key": "E", "text": "该处H线比栀花大道高 10.141 m", "correct": true}, {"key": "F", "text": "该交叉处的栀花大道桩号,比匝道F线与栀花大道交叉处的栀花大道桩号大", "correct": true}], "answer": ["A", "E", "F"], "few_sheet_pages": [31, 20, 27, 29, 15, 25], "evidence_pages": [31, 20, 27, 29], "full_set_page_count": 32, "sub_questions": [{"id": "MS-U23-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "远期方案中,匝道H线与栀花大道立体交叉。交叉点处,匝道H线和栀花大道的设计高程各是多少?按字段 H线、栀花大道 返回,每个字段为数值和单位(m)。", "answer": "{\"H线\": {\"value\": 249.886, \"unit\": \"m\"}, \"栀花大道\": {\"value\": 239.745, \"unit\": \"m\"}}"}, {"id": "MS-U23-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期H线)”上,匝道H线与栀花大道交叉处的标注里,交叉点在栀花大道上的桩号是多少?按图中写法返回,形如 K0+100.000。", "answer": "\"K0+597.015\""}, {"id": "MS-U23-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(近期F线)”上,匝道F线与栀花大道交叉处的标注里,交叉点在栀花大道上的桩号是多少?按图中写法返回,形如 K0+100.000。", "answer": "\"K0+390.336\""}, {"id": "MS-U23-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期E线)”上,标注“匝道E线上跨栀花大道”的那处交叉,E线和栀花大道的设计高程、以及交叉点在栀花大道上的桩号各是多少?按字段 E线、栀花大道、栀花大道桩号 返回;前两个字段为数值和单位(m),桩号按图中写法返回字符串,形如 K0+100.000(保留三位小数)。", "answer": "{\"E线\": {\"value\": 257.673, \"unit\": \"m\"}, \"栀花大道\": {\"value\": 248.925, \"unit\": \"m\"}, \"栀花大道桩号\": \"K0+261.494\"}"}, {"id": "MS-U23-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期G线)”上,标注“匝道G线上跨栀花大道”的那处交叉,G线和栀花大道的设计高程各是多少?按字段 G线、栀花大道 返回,每个字段为数值和单位(m)。", "answer": "{\"G线\": {\"value\": 254.517, \"unit\": \"m\"}, \"栀花大道\": {\"value\": 246.352, \"unit\": \"m\"}}"}]} {"page_01_file_name": "images/MS-U23-08/few_sheet/01.png", "page_02_file_name": "images/MS-U23-08/few_sheet/02.png", "page_03_file_name": "images/MS-U23-08/few_sheet/03.png", "page_04_file_name": "images/MS-U23-08/few_sheet/04.png", "page_05_file_name": "images/MS-U23-08/few_sheet/05.png", "page_06_file_name": "images/MS-U23-08/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U23-08", "set": "U23", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿主线桩号增大方向,主线在支坪立交范围内(远期方案)先后从多条道路上方跨过。下列\"前一处 → 紧接的下一处\"中,哪些正确?", "options": [{"key": "A", "text": "跨过匝道E线 → 跨过匝道F线", "correct": true}, {"key": "B", "text": "跨过匝道E线 → 跨过匝道G线", "correct": false}, {"key": "C", "text": "跨过匝道F线 → 跨过匝道G线", "correct": true}, {"key": "D", "text": "跨过匝道F线 → 跨过栀花大道", "correct": false}, {"key": "E", "text": "跨过栀花大道 → 跨过匝道G线", "correct": false}, {"key": "F", "text": "跨过匝道G线 → 跨过匝道F线", "correct": false}], "answer": ["A", "C"], "few_sheet_pages": [19, 20, 11, 29, 16, 27], "evidence_pages": [27, 20, 29, 11], "full_set_page_count": 32, "sub_questions": [{"id": "MS-U23-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(远期E线)”上,标注“主线上跨匝道E线”的那处交叉,交叉点在主线上的桩号是多少?按图中写法返回,形如 K1+100.000。", "answer": "\"K2+308.599\""}, {"id": "MS-U23-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“支坪立交推荐方案匝道纵断面图(近期F线)”上,标注“匝道F线下穿主线”的那处交叉,交叉点在主线上的桩号是多少?按图中写法返回,形如 K1+100.000。", "answer": "\"K2+497.957\""}, {"id": "MS-U23-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“栀花大道纵断面图(现状)”上,标注“主线上跨栀花大道”的那处交叉,交叉点在主线上的桩号是多少?按图中写法返回,形如 K1+100.000。", "answer": "\"K2+575.166\""}, {"id": "MS-U23-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "远期方案中,主线从匝道G线上方跨过。该交叉点在主线上的桩号是多少?按图中写法返回,形如 K1+100.000。", "answer": "\"K2+525.809\""}]} {"page_01_file_name": "images/MS-U24-01/few_sheet/01.png", "page_02_file_name": "images/MS-U24-01/few_sheet/02.png", "page_03_file_name": "images/MS-U24-01/few_sheet/03.png", "page_04_file_name": "images/MS-U24-01/few_sheet/04.png", "page_05_file_name": "images/MS-U24-01/few_sheet/05.png", "page_06_file_name": "images/MS-U24-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U24-01", "set": "U24", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于两端洞口仰坡坡顶截水沟、明洞顶排水沟以及洞内积水的流向,下列说法哪些正确?", "options": [{"key": "A", "text": "洞内路面纵坡使洞内积水流向玉溪口一端", "correct": true}, {"key": "B", "text": "元江端明洞顶回填层排水沟由端墙一侧沿仰坡坡脚流向河侧,最后接入练江河", "correct": true}, {"key": "C", "text": "元江端仰坡坡顶截水沟的水全部排入练江河", "correct": false}, {"key": "D", "text": "玉溪端仰坡坡顶截水沟的水从两头分别排入练江河", "correct": true}, {"key": "E", "text": "玉溪端仰坡坡顶截水沟有一头接入天然水沟", "correct": false}, {"key": "F", "text": "元江端坡顶截水沟排入练江河的那一头,在下行线隧道一侧", "correct": true}], "answer": ["A", "B", "D", "F"], "few_sheet_pages": [19, 6, 14, 22, 23, 30], "evidence_pages": [22, 23, 6, 19], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U24-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道玉溪端仰坡工程平面竣工图”上,坡顶截水沟两端注明的去向各是什么?每个字段从 {练江河, 天然水沟} 中选一个,按字段 图面右上端、图面左下端 返回。", "answer": "{\"图面右上端\": \"练江河\", \"图面左下端\": \"练江河\"}"}, {"id": "MS-U24-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道元江端仰坡开挖平面竣工图”(画有坡顶截水沟的那张)上,坡顶截水沟两端注明的去向各是什么?每个字段从 {练江河, 天然水沟} 中选一个,按字段 图面左上端、图面右下端 返回。", "answer": "{\"图面左上端\": \"练江河\", \"图面右下端\": \"天然水沟\"}"}, {"id": "MS-U24-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道元江端明洞顶回填层排水沟竣工图”的回填层顶水沟平面图上,顺着图中\"水流方向\"箭头,最下游的那一段排水沟,长度标注是多少?返回数值和单位(cm)。", "answer": "{\"value\": 755, \"unit\": \"cm\"}"}, {"id": "MS-U24-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江xx隧道上行线纵断面竣工图”的\"隧道路面内边缘线标高\"栏中,里程 K120+605 和 K120+775 处的标高各是多少?按字段 K120+605、K120+775 返回,每个字段为数值和单位(m)。", "answer": "{\"K120+605\": {\"value\": 1585.84, \"unit\": \"m\"}, \"K120+775\": {\"value\": 1587.68, \"unit\": \"m\"}}"}, {"id": "MS-U24-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "元江端仰坡的坡顶截水沟,靠下行线隧道一侧的一端和靠上行线隧道一侧的一端,水各排往何处?每个字段从 {练江河, 天然水沟} 中选一个,按字段 下行线一侧、上行线一侧 返回。", "answer": "{\"下行线一侧\": \"练江河\", \"上行线一侧\": \"天然水沟\"}"}, {"id": "MS-U24-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "隧道玉溪口一端的洞口桩号是多少?按 K数字+数字 的形式返回。", "answer": "\"K120+605\""}]} {"page_01_file_name": "images/MS-U24-02/few_sheet/01.png", "page_02_file_name": "images/MS-U24-02/few_sheet/02.png", "page_03_file_name": "images/MS-U24-02/few_sheet/03.png", "page_04_file_name": "images/MS-U24-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U24-02", "set": "U24", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "隧道所设各处沉降缝,按上、下行线纵断面所示的衬砌分段,下列说法哪些正确?", "options": [{"key": "A", "text": "上行线 III 类衬砌段的两端都设有沉降缝", "correct": true}, {"key": "B", "text": "上行线有 3 处沉降缝恰好位于衬砌形式的分界点上", "correct": true}, {"key": "C", "text": "上行线明暗洞与明洞的分界处设有沉降缝", "correct": false}, {"key": "D", "text": "下行线紧接 III 类衬砌之后的那段 II 类衬砌,两端都设有沉降缝", "correct": true}, {"key": "E", "text": "上行线紧接 III 类衬砌之后的那段 II 类衬砌,两端都设有沉降缝", "correct": false}, {"key": "F", "text": "下行线有 3 处沉降缝恰好位于衬砌形式的分界点上", "correct": false}], "answer": ["A", "B", "D"], "few_sheet_pages": [28, 27, 19, 20], "evidence_pages": [19, 20, 27, 28], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U24-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "上行线隧道中长度为 15 m 的那段 II 类衬砌,起止桩号是什么?返回两个端点,按图中写法返回桩号(小写 k,形如 k120+600)", "answer": "[\"k120+735\", \"k120+750\"]"}, {"id": "MS-U24-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "下行线隧道中长度为 9 m 的那段 II 类衬砌,起止桩号是什么?返回两个端点,按图中写法返回桩号(小写 k,形如 k120+600)", "answer": "[\"k120+735\", \"k120+744\"]"}, {"id": "MS-U24-02-D1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "按上行线纵断面所示的衬砌分段,'明暗洞'段的起止桩号是什么?返回两个端点,按图中写法返回桩号(小写 k,形如 k120+600)", "answer": "[\"k120+750\", \"k120+765\"]"}, {"id": "MS-U24-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "沉降缝施工缝伸缩缝工程竣工图附注 2 所列沉降缝位置中,最后一处的桩号是什么?按图中写法返回桩号(小写 k,形如 k120+600)", "answer": "\"k120+744\""}]} {"page_01_file_name": "images/MS-U24-03/few_sheet/01.png", "page_02_file_name": "images/MS-U24-03/few_sheet/02.png", "page_03_file_name": "images/MS-U24-03/few_sheet/03.png", "page_04_file_name": "images/MS-U24-03/few_sheet/04.png", "page_05_file_name": "images/MS-U24-03/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U24-03", "set": "U24", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "隧道两端洞口用 7.5 号浆砌片(块)石砌筑的各项工程,砌体方量合计是多少(m³)?", "options": [{"key": "A", "text": "819.22", "correct": true}, {"key": "B", "text": "766.26", "correct": false}, {"key": "C", "text": "833.45", "correct": false}, {"key": "D", "text": "278.50", "correct": false}, {"key": "E", "text": "439.32", "correct": false}, {"key": "F", "text": "540.72", "correct": false}], "answer": ["A"], "few_sheet_pages": [6, 11, 3, 2, 12], "evidence_pages": [2, 6, 11], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U24-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道元江口洞门竣工图(三)”的主要工程数量表中,翼墙和坡顶截水沟的数量各是多少?按字段 翼墙、坡顶截水沟 返回,每个字段为数值和单位(m³)。", "answer": "{\"翼墙\": {\"value\": 102.8, \"unit\": \"m³\"}, \"坡顶截水沟\": {\"value\": 122.74, \"unit\": \"m³\"}}"}, {"id": "MS-U24-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道玉溪口洞门竣工图(三)”的主要工程数量表中,翼墙和坡顶截水沟的数量各是多少?按字段 翼墙、坡顶截水沟 返回,每个字段为数值和单位(m³)。", "answer": "{\"翼墙\": {\"value\": 336.52, \"unit\": \"m³\"}, \"坡顶截水沟\": {\"value\": 204.2, \"unit\": \"m³\"}}"}, {"id": "MS-U24-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道元江口洞门竣工图(三)”和“xx隧道玉溪口洞门竣工图(三)”两张图的主要工程数量表中,洞外水沟的数量各是多少?按字段 元江口、玉溪口 返回,每个字段为数值和单位(m³)。", "answer": "{\"元江口\": {\"value\": 9.02, \"unit\": \"m³\"}, \"玉溪口\": {\"value\": 5.21, \"unit\": \"m³\"}}"}, {"id": "MS-U24-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "隧道元江口一端,明洞顶回填层上、沿仰坡底脚砌筑的那条排水沟,M7.5 浆砌片石的方量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 52.96, \"unit\": \"m³\"}"}]} {"page_01_file_name": "images/MS-U24-04/few_sheet/01.png", "page_02_file_name": "images/MS-U24-04/few_sheet/02.png", "page_03_file_name": "images/MS-U24-04/few_sheet/03.png", "page_04_file_name": "images/MS-U24-04/few_sheet/04.png", "page_05_file_name": "images/MS-U24-04/few_sheet/05.png", "page_06_file_name": "images/MS-U24-04/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U24-04", "set": "U24", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "下行线在元江口一端,II 类衬砌与明洞之间还夹有一段明暗洞。关于这段明暗洞及其前后衬砌,下列说法哪些正确?", "options": [{"key": "A", "text": "下行线出口一端的明洞长 10 m", "correct": false}, {"key": "B", "text": "明洞顶山体小导管压浆的范围,在下行线上跨在 II 类衬砌与明洞的分界上", "correct": false}, {"key": "C", "text": "这段明暗洞长 15 m", "correct": false}, {"key": "D", "text": "下行线 III 类衬砌之后的那段 II 类衬砌长 9 m,比上行线对应的 II 类段短 6 m", "correct": true}, {"key": "E", "text": "下行线 II 类衬砌与明洞的分界处设有沉降缝", "correct": true}, {"key": "F", "text": "下行线并没有这样一段明暗洞:II 类衬砌之后直接接明洞,一直到出口洞门", "correct": true}], "answer": ["D", "E", "F"], "few_sheet_pages": [5, 27, 20, 17, 19, 8], "evidence_pages": [19, 20, 27, 8], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U24-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道下行线纵断面竣工图”的衬砌栏\"形式\"一行中,III 类衬砌之后(往元江口方向)依次还有 3 段,各段的形式是什么?每段从 {II, III, 明暗洞, 明洞, 洞门} 中选一个原样返回,按字段 第1段、第2段、第3段 返回。", "answer": "{\"第1段\": \"II\", \"第2段\": \"明洞\", \"第3段\": \"洞门\"}"}, {"id": "MS-U24-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道下行线纵断面竣工图”的衬砌栏中,III 类衬砌之后紧接的 II 类段,以及元江口一端的明洞段,长度各是多少?按字段 II类段、明洞段 返回,每个字段为数值和单位(m)。", "answer": "{\"II类段\": {\"value\": 9, \"unit\": \"m\"}, \"明洞段\": {\"value\": 31, \"unit\": \"m\"}}"}, {"id": "MS-U24-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江xx隧道上行线纵断面竣工图”的衬砌栏中,III 类衬砌之后紧接的那段 II 类衬砌长度是多少?返回数值和单位(m)。", "answer": "{\"value\": 15, \"unit\": \"m\"}"}, {"id": "MS-U24-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江xx隧道上行线纵断面竣工图”的衬砌栏中,明暗洞段的长度,以及元江口一端明洞段的长度各是多少?按字段 明暗洞段、明洞段 返回,每个字段为数值和单位(m)。", "answer": "{\"明暗洞段\": {\"value\": 15, \"unit\": \"m\"}, \"明洞段\": {\"value\": 10, \"unit\": \"m\"}}"}, {"id": "MS-U24-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道沉降缝施工缝伸缩缝工程竣工图”的附注所列沉降缝桩号中,最大的那一处是多少?按 K数字+数字 的形式返回。", "answer": "\"K120+744\""}, {"id": "MS-U24-04-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签名称以压浆起止桩号开头、以“明洞顶山体小导管压浆竣工图”结尾的那张图上,压浆范围的起点和终点桩号各是多少?按字段 小桩号、大桩号 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"小桩号\": \"K120+750\", \"大桩号\": \"K120+765\"}"}, {"id": "MS-U24-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "下行线在元江口一端,衬砌由 II 类变为明洞处的桩号是多少?按 K数字+数字 的形式返回。", "answer": "\"K120+744\""}]} {"page_01_file_name": "images/MS-U24-05/few_sheet/01.png", "page_02_file_name": "images/MS-U24-05/few_sheet/02.png", "page_03_file_name": "images/MS-U24-05/few_sheet/03.png", "page_04_file_name": "images/MS-U24-05/few_sheet/04.png", "page_05_file_name": "images/MS-U24-05/few_sheet/05.png", "page_06_file_name": "images/MS-U24-05/few_sheet/06.png", "page_07_file_name": "images/MS-U24-05/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U24-05", "set": "U24", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于两条隧道各自的行车方向、洞内纵坡和设施位置,下列说法哪些正确?", "options": [{"key": "A", "text": "元江口洞门处的路面设计高程比玉溪口洞门处低", "correct": false}, {"key": "B", "text": "上行线和下行线的照明控制箱都设在两洞之间的中墙一侧", "correct": false}, {"key": "C", "text": "两条隧道的车辆都是从玉溪口一端进洞", "correct": false}, {"key": "D", "text": "上行线车辆在洞内一路上坡行驶", "correct": false}, {"key": "E", "text": "上行线车辆从元江口一端进洞,朝玉溪口方向行驶", "correct": true}, {"key": "F", "text": "下行线车辆从玉溪口一端进洞,在洞内一路上坡行驶", "correct": true}], "answer": ["E", "F"], "few_sheet_pages": [10, 31, 20, 19, 12, 3, 1], "evidence_pages": [19, 20, 3, 12, 31], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U24-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江xx隧道上行线纵断面竣工图”两端注字中,隧道进口和隧道出口的桩号各是多少?按字段 进口、出口 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"进口\": \"K120+775\", \"出口\": \"K120+605\"}"}, {"id": "MS-U24-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道下行线纵断面竣工图”两端注字中,隧道进口和隧道出口的桩号各是多少?按字段 进口、出口 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"进口\": \"K120+605\", \"出口\": \"K120+775\"}"}, {"id": "MS-U24-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道元江口洞门竣工图(一)”立面图上,下行隧道和上行隧道行车道中线处各标注的路面高程(三角符号上方的数字)是多少?按字段 下行隧道、上行隧道 返回,每个字段为数值和单位(m)。", "answer": "{\"下行隧道\": {\"value\": 1587.77, \"unit\": \"m\"}, \"上行隧道\": {\"value\": 1587.59, \"unit\": \"m\"}}"}, {"id": "MS-U24-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道玉溪口洞门竣工图(一)”立面图上,左、右两洞路面处带三角符号的高程标注各是多少?按图面左右,以字段 左洞、右洞 返回,每个字段为数值和单位(m)。", "answer": "{\"左洞\": {\"value\": 1585.521, \"unit\": \"m\"}, \"右洞\": {\"value\": 1586.114, \"unit\": \"m\"}}"}, {"id": "MS-U24-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道照明控制箱及预埋管布置竣工图”的附注中,上行线和下行线的照明控制箱各设在哪一侧?每个字段从 {中墙侧, 边墙侧} 中选一个原样返回,按字段 上行线、下行线 返回。", "answer": "{\"上行线\": \"边墙侧\", \"下行线\": \"中墙侧\"}"}, {"id": "MS-U24-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "上行线车辆进洞的那一端洞门,上行隧道行车道中线处标注的路面高程(三角符号上方的数字)是多少?返回数值和单位(m)。", "answer": "{\"value\": 1587.59, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U24-06/few_sheet/01.png", "page_02_file_name": "images/MS-U24-06/few_sheet/02.png", "page_03_file_name": "images/MS-U24-06/few_sheet/03.png", "page_04_file_name": "images/MS-U24-06/few_sheet/04.png", "page_05_file_name": "images/MS-U24-06/few_sheet/05.png", "page_06_file_name": "images/MS-U24-06/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U24-06", "set": "U24", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "上行线在元江口一端,II 类衬砌与明洞之间夹有一段明暗洞。关于这段明暗洞及其前后衬砌,下列说法哪些正确?", "options": [{"key": "A", "text": "明洞顶山体小导管压浆的范围,与这段明暗洞的起止桩号相同", "correct": true}, {"key": "B", "text": "这段明暗洞的长度与下行线同一端的明洞长度相同", "correct": false}, {"key": "C", "text": "沉降缝所列桩号中,有一处正落在这段明暗洞与 II 类衬砌的分界上", "correct": false}, {"key": "D", "text": "上行线这一端的 II 类衬砌(III 类之后)比下行线对应的 II 类段短", "correct": false}, {"key": "E", "text": "上行线并没有这样一段明暗洞:II 类衬砌之后直接接明洞", "correct": false}, {"key": "F", "text": "这段明暗洞长 15 m", "correct": true}], "answer": ["A", "F"], "few_sheet_pages": [8, 19, 17, 27, 24, 20], "evidence_pages": [19, 20, 8, 27], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U24-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江xx隧道上行线纵断面竣工图”的衬砌栏中,III 类衬砌之后紧接的 II 类段,以及其后的明暗洞段,长度各是多少?按字段 II类段、明暗洞段 返回,每个字段为数值和单位(m)。", "answer": "{\"II类段\": {\"value\": 15, \"unit\": \"m\"}, \"明暗洞段\": {\"value\": 15, \"unit\": \"m\"}}"}, {"id": "MS-U24-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道下行线纵断面竣工图”的衬砌栏中,III 类衬砌之后紧接的 II 类段,以及元江口一端的明洞段,长度各是多少?按字段 II类段、明洞段 返回,每个字段为数值和单位(m)。", "answer": "{\"II类段\": {\"value\": 9, \"unit\": \"m\"}, \"明洞段\": {\"value\": 31, \"unit\": \"m\"}}"}, {"id": "MS-U24-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "图签名称以压浆起止桩号开头、以“明洞顶山体小导管压浆竣工图”结尾的那张图上,压浆范围的起点和终点桩号各是多少?按字段 小桩号、大桩号 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"小桩号\": \"K120+750\", \"大桩号\": \"K120+765\"}"}, {"id": "MS-U24-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道沉降缝施工缝伸缩缝工程竣工图”的附注中,沉降缝所设桩号里大于 K120+700 的共 2 处,按桩号从小到大以字段 第1处、第2处 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"第1处\": \"K120+735\", \"第2处\": \"K120+744\"}"}, {"id": "MS-U24-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "上行线在元江口一端那段明暗洞,起点和终点桩号各是多少?按字段 小桩号、大桩号 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"小桩号\": \"K120+750\", \"大桩号\": \"K120+765\"}"}]} {"page_01_file_name": "images/MS-U24-07/few_sheet/01.png", "page_02_file_name": "images/MS-U24-07/few_sheet/02.png", "page_03_file_name": "images/MS-U24-07/few_sheet/03.png", "page_04_file_name": "images/MS-U24-07/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U24-07", "set": "U24", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "玉溪端仰坡的各条开挖轴中,测中线所经过的那一条,下列说法哪些正确?", "options": [{"key": "A", "text": "沿该轴,仰坡开挖线与地面线交点的标高为 1611.693 m", "correct": true}, {"key": "B", "text": "该轴在 k120+615 线上的起点比 O 点低 5.840 m", "correct": false}, {"key": "C", "text": "沿该轴,仰坡开挖线与地面线的交点比起点高 18.193 m", "correct": false}, {"key": "D", "text": "该轴在 k120+615 线上的起点标高为 1600.109 m", "correct": true}, {"key": "E", "text": "沿该轴,仰坡开挖线与地面线交点的标高为 1614.143 m", "correct": false}, {"key": "F", "text": "沿该轴,仰坡开挖线与地面线的交点比起点高 11.334 m", "correct": false}], "answer": ["A", "D"], "few_sheet_pages": [21, 14, 23, 22], "evidence_pages": [14, 22], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U24-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "玉溪端仰坡的测中线经过 k120+615 线上的哪一个开挖轴起点?按图中字母原样返回(形如 X)。", "answer": "\"K\""}, {"id": "MS-U24-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "玉溪端仰坡正面部分开挖轴断面图中,K′ 点的标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1611.693, \"unit\": \"m\"}"}, {"id": "MS-U24-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "玉溪端仰坡正面部分开挖轴断面图中,k120+615 竖线上 K 点的标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1600.109, \"unit\": \"m\"}"}, {"id": "MS-U24-07-R3", "role": "read", "tiers": ["full_set"], "question": "玉溪口 k120+597~615 段开挖横断面图中,k120+615 断面左侧边坡开挖线与地面线交点的标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1617.365, \"unit\": \"m\"}"}, {"id": "MS-U24-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "玉溪端仰坡正面部分开挖轴断面图中,k120+615 竖线底部拱顶开挖线的标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1593.5, \"unit\": \"m\"}"}, {"id": "MS-U24-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "玉溪端仰坡正面部分开挖轴断面图中,J′ 点的标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1614.143, \"unit\": \"m\"}"}, {"id": "MS-U24-07-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "玉溪端仰坡正面部分开挖轴断面图中,k120+615 竖线上 J 点的标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1602.809, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U24-08/few_sheet/01.png", "page_02_file_name": "images/MS-U24-08/few_sheet/02.png", "page_03_file_name": "images/MS-U24-08/few_sheet/03.png", "page_04_file_name": "images/MS-U24-08/few_sheet/04.png", "page_05_file_name": "images/MS-U24-08/few_sheet/05.png", "page_06_file_name": "images/MS-U24-08/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U24-08", "set": "U24", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "隧道两端洞口的仰坡、边坡开挖,石方合计是多少(m³)?", "options": [{"key": "A", "text": "15765", "correct": false}, {"key": "B", "text": "6141", "correct": false}, {"key": "C", "text": "16866", "correct": false}, {"key": "D", "text": "9481", "correct": false}, {"key": "E", "text": "20876", "correct": true}, {"key": "F", "text": "5471", "correct": false}], "answer": ["E"], "few_sheet_pages": [9, 15, 25, 21, 26, 14], "evidence_pages": [14, 15, 25, 26], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U24-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江隧道玉溪口k120+597~615段开挖横断面竣工图”的主要工程数量表中,石方数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 4010, \"unit\": \"m³\"}"}, {"id": "MS-U24-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道元江口下行线边坡开挖横断面竣工图”的主要工程数量表中,石方数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 11395, \"unit\": \"m³\"}"}, {"id": "MS-U24-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道玉溪端仰坡开挖轴断面竣工图二”的主要工程数量表中,石方数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 1101, \"unit\": \"m³\"}"}, {"id": "MS-U24-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道元江口上行线仰坡开挖横断面竣工图”的主要工程数量表中,石方数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 4370, \"unit\": \"m³\"}"}, {"id": "MS-U24-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道元江口下行线边坡开挖横断面竣工图”的主要工程数量表中,土方数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 1168, \"unit\": \"m³\"}"}, {"id": "MS-U24-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "隧道元江口一端,上行线和下行线两洞的仰坡开挖,石方一共是多少?返回数值和单位(m³)。", "answer": "{\"value\": 4370, \"unit\": \"m³\"}"}, {"id": "MS-U24-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "隧道玉溪口一端,仰坡正面和圆面两部分的开挖,石方一共是多少?返回数值和单位(m³)。", "answer": "{\"value\": 1101, \"unit\": \"m³\"}"}]} {"page_01_file_name": "images/MS-U24-09/few_sheet/01.png", "page_02_file_name": "images/MS-U24-09/few_sheet/02.png", "page_03_file_name": "images/MS-U24-09/few_sheet/03.png", "page_04_file_name": "images/MS-U24-09/few_sheet/04.png", "page_05_file_name": "images/MS-U24-09/few_sheet/05.png", "page_06_file_name": "images/MS-U24-09/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U24-09", "set": "U24", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "隧道洞内下列各衬砌形式分界处中,哪些位置既设有沉降缝,又设有环向盲沟?", "options": [{"key": "A", "text": "玉溪口洞门与明洞的分界", "correct": false}, {"key": "B", "text": "下行线玉溪口一端明洞与 II 类衬砌的分界", "correct": true}, {"key": "C", "text": "III 类与 II 类衬砌的分界(靠元江口一端)", "correct": false}, {"key": "D", "text": "上行线明暗洞与明洞的分界", "correct": false}, {"key": "E", "text": "下行线 II 类衬砌与明洞的分界(靠元江口一端)", "correct": false}, {"key": "F", "text": "II 类与 III 类衬砌的分界(靠玉溪口一端)", "correct": true}], "answer": ["B", "F"], "few_sheet_pages": [28, 20, 19, 17, 27, 31], "evidence_pages": [19, 20, 27, 28], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U24-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道沉降缝施工缝伸缩缝工程竣工图”的附注中,沉降缝设在哪几处桩号?附注共列 4 处,按附注书写顺序以字段 第1处、第2处、第3处、第4处 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"第1处\": \"K120+615\", \"第2处\": \"K120+655\", \"第3处\": \"K120+735\", \"第4处\": \"K120+744\"}"}, {"id": "MS-U24-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道防、排水及洞内水沟电缆槽竣工图”的附注列出了设置环向盲沟的各处桩号。其中桩号大于 K120+700 的共 3 处,按桩号从小到大以字段 第1处、第2处、第3处 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"第1处\": \"K120+740\", \"第2处\": \"K120+765\", \"第3处\": \"K120+775\"}"}, {"id": "MS-U24-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道防、排水及洞内水沟电缆槽竣工图”的附注列出了设置环向盲沟的各处桩号。其中桩号在 K120+600 至 K120+620 之间(含两端)的共 3 处,按桩号从小到大以字段 第1处、第2处、第3处 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"第1处\": \"K120+605\", \"第2处\": \"K120+610\", \"第3处\": \"K120+615\"}"}, {"id": "MS-U24-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道防、排水及洞内水沟电缆槽竣工图”的附注列出了设置环向盲沟的各处桩号。其中桩号在 K120+650 至 K120+700 之间的那一处是多少?按 K数字+数字 的形式返回。", "answer": "\"K120+655\""}, {"id": "MS-U24-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "下行线车辆从玉溪口一端进洞后,洞内衬砌依次由明洞变为 II 类、由 II 类变为 III 类、再由 III 类变回 II 类。这三处变化点的桩号各是多少?按字段 明洞变II、II变III、III变II 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"明洞变II\": \"K120+615\", \"II变III\": \"K120+655\", \"III变II\": \"K120+735\"}"}, {"id": "MS-U24-09-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "以下三处衬砌形式变化点的桩号各是多少:下行线在元江口一端由 II 类衬砌变为明洞处;上行线由明暗洞变为明洞处;玉溪口一端洞门与明洞相接处。按字段 下行线II变明洞、上行线明暗洞变明洞、玉溪口洞门接明洞 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"下行线II变明洞\": \"K120+744\", \"上行线明暗洞变明洞\": \"K120+765\", \"玉溪口洞门接明洞\": \"K120+605\"}"}]} {"page_01_file_name": "images/MS-U24-10/few_sheet/01.png", "page_02_file_name": "images/MS-U24-10/few_sheet/02.png", "page_03_file_name": "images/MS-U24-10/few_sheet/03.png", "page_04_file_name": "images/MS-U24-10/few_sheet/04.png", "page_05_file_name": "images/MS-U24-10/few_sheet/05.png", "page_06_file_name": "images/MS-U24-10/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U24-10", "set": "U24", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿下行线行车方向,从 III 类衬砌段结束处起到出洞为止,只看沉降缝、环向盲沟、照明控制箱和衬砌形式分界这几类位置。下列\"前一处 → 紧接的下一处\"中,哪些正确?", "options": [{"key": "A", "text": "III 类与 II 类衬砌分界处的沉降缝 → 一道环向盲沟", "correct": true}, {"key": "B", "text": "照明控制箱 → II 类衬砌与明洞分界处的沉降缝", "correct": false}, {"key": "C", "text": "II 类衬砌与明洞分界处的沉降缝 → 照明控制箱", "correct": true}, {"key": "D", "text": "一道环向盲沟 → II 类衬砌与明洞分界处的沉降缝", "correct": true}, {"key": "E", "text": "照明控制箱 → 出口洞门", "correct": false}, {"key": "F", "text": "III 类与 II 类衬砌分界处的沉降缝 → II 类衬砌与明洞分界处的沉降缝", "correct": false}], "answer": ["A", "C", "D"], "few_sheet_pages": [19, 18, 28, 31, 20, 27], "evidence_pages": [20, 27, 28, 31], "full_set_page_count": 31, "sub_questions": [{"id": "MS-U24-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道沉降缝施工缝伸缩缝工程竣工图”的附注中,沉降缝所设桩号里大于 K120+700 的共 2 处,按桩号从小到大以字段 第1处、第2处 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"第1处\": \"K120+735\", \"第2处\": \"K120+744\"}"}, {"id": "MS-U24-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道防、排水及洞内水沟电缆槽竣工图”的附注列出了设置环向盲沟的各处桩号。其中桩号大于 K120+700 的共 3 处,按桩号从小到大以字段 第1处、第2处、第3处 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"第1处\": \"K120+740\", \"第2处\": \"K120+765\", \"第3处\": \"K120+775\"}"}, {"id": "MS-U24-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“xx隧道照明控制箱及预埋管布置竣工图”的附注中,下行线照明控制箱设在两处桩号,其中较大的那一处是多少?按 K数字+数字 的形式返回。", "answer": "\"K120+760\""}, {"id": "MS-U24-10-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“练江xx隧道上行线纵断面竣工图”的衬砌栏中,III 类衬砌之后紧接的那段 II 类衬砌长度是多少?返回数值和单位(m)。", "answer": "{\"value\": 15, \"unit\": \"m\"}"}, {"id": "MS-U24-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "下行线洞内衬砌由 III 类变为 II 类、再由 II 类变为明洞,这两处变化点的桩号各是多少?按字段 III变II、II变明洞 返回,每个字段为形如 K120+123 的字符串(大写 K,整数米,不带小数)。", "answer": "{\"III变II\": \"K120+735\", \"II变明洞\": \"K120+744\"}"}, {"id": "MS-U24-10-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "沿下行线行车方向,车辆驶出隧道处的隧道出口桩号是多少?按 K数字+数字 的形式返回。", "answer": "\"K120+775\""}]} {"page_01_file_name": "images/MS-U25-01/few_sheet/01.png", "page_02_file_name": "images/MS-U25-01/few_sheet/02.png", "page_03_file_name": "images/MS-U25-01/few_sheet/03.png", "page_04_file_name": "images/MS-U25-01/few_sheet/04.png", "page_05_file_name": "images/MS-U25-01/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U25-01", "set": "U25", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "主梁在桥塔横梁处相对横梁的移动,由主桥支座、抗风支座和纵向阻尼器分别允许或约束。关于各装置的活动方向和量值,下列说法哪些正确?", "options": [{"key": "A", "text": "主桥支座顺桥向可移动 ±600 mm,横桥向也可移动 ±50 mm", "correct": true}, {"key": "B", "text": "抗风支座竖向可移动 ±600 mm", "correct": false}, {"key": "C", "text": "纵向阻尼器的最大行程与两种支座的顺桥向位移量相同,均为 ±600 mm", "correct": false}, {"key": "D", "text": "主桥支座只能顺桥向移动,横桥向是固定的", "correct": false}, {"key": "E", "text": "抗风支座承受横桥向力(2000 kN),顺桥向可移动 ±600 mm", "correct": true}, {"key": "F", "text": "抗风支座与主桥支座的设计转角不同", "correct": false}], "answer": ["A", "E"], "few_sheet_pages": [3, 5, 1, 2, 4], "evidence_pages": [1, 2, 5], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U25-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁拉压支座构造图”的附注中,设计顺桥向位移量和横桥向位移量各是多少(取 ± 后的数值)?返回 顺桥向、横桥向 两个字段,每个字段为 {value, unit}(mm)。", "answer": "{\"顺桥向\": {\"value\": 600, \"unit\": \"mm\"}, \"横桥向\": {\"value\": 50, \"unit\": \"mm\"}}"}, {"id": "MS-U25-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁抗风支座构造图”的附注中,设计顺桥向位移量和竖向位移量各是多少(取 ± 后的数值)?返回 顺桥向、竖向 两个字段,每个字段为 {value, unit}(mm)。", "answer": "{\"顺桥向\": {\"value\": 600, \"unit\": \"mm\"}, \"竖向\": {\"value\": 50, \"unit\": \"mm\"}}"}, {"id": "MS-U25-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁抗风支座构造图”的附注中,支座侧向承载力是多少 kN?只返回阿拉伯数字(不写单位)。", "answer": "\"2000\""}, {"id": "MS-U25-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁拉压支座构造图”和“桥梁抗风支座构造图”的附注中,设计转角各是多少 rad?只返回数字(不写单位),字段名固定为 拉压支座、抗风支座。", "answer": "{\"拉压支座\": \"0.02\", \"抗风支座\": \"0.02\"}"}, {"id": "MS-U25-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“阻尼器参数表”中,最大行程是多少(取 ± 后的数值)?返回数值和单位(mm)。", "answer": "{\"value\": 650, \"unit\": \"mm\"}"}, {"id": "MS-U25-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥塔横梁处两种支座中:横桥向可移动 ±50 mm 的那种,竖向承载力是多少 kN;竖向可移动 ±50 mm 的那种,侧向承载力是多少 kN?只返回阿拉伯数字(不写单位),字段名固定为 横桥向50、竖向50。", "answer": "{\"横桥向50\": \"7000\", \"竖向50\": \"2000\"}"}]} {"page_01_file_name": "images/MS-U25-02/few_sheet/01.png", "page_02_file_name": "images/MS-U25-02/few_sheet/02.png", "page_03_file_name": "images/MS-U25-02/few_sheet/03.png", "page_04_file_name": "images/MS-U25-02/few_sheet/04.png", "page_05_file_name": "images/MS-U25-02/few_sheet/05.png", "page_06_file_name": "images/MS-U25-02/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U25-02", "set": "U25", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于桥塔横梁处各装置的位置和朝向,下列说法哪些正确?", "options": [{"key": "A", "text": "纵向阻尼器沿顺桥向布置,主梁底面一端伸向主桥侧、超出横梁边缘", "correct": true}, {"key": "B", "text": "主桥支座上支座板的长边(1900 mm)沿顺桥向", "correct": true}, {"key": "C", "text": "主梁底面一端连接件的长边(1440 mm)沿横桥向布置", "correct": false}, {"key": "D", "text": "阻尼器两端连接件中,1240×880 的那个锚入下方混凝土,1440×880 的那个向上栓接在主梁底面", "correct": true}, {"key": "E", "text": "纵向阻尼器位于主桥支座外侧(离桥梁中心线更远)", "correct": false}, {"key": "F", "text": "抗风支座横桥向受力,装在抗风挡块朝向桥梁中心线的竖直侧面上", "correct": true}], "answer": ["A", "B", "D", "F"], "few_sheet_pages": [5, 3, 2, 1, 4, 6], "evidence_pages": [4, 5, 2, 1], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U25-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“半平面布置图”上,主桥纵向阻尼器两端连接件之间的顺桥向尺寸是多少;阻尼器从横梁向哪一侧伸出?返回 两端间距、伸出侧 两个字段;两端间距为 {value, unit}(cm),伸出侧从 {主桥侧, 引桥侧} 中取一项。", "answer": "{\"两端间距\": {\"value\": 550, \"unit\": \"cm\"}, \"伸出侧\": \"主桥侧\"}"}, {"id": "MS-U25-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“半平面布置图”上,主桥侧那一排中,从桥塔中心线往塔柱方向依次标注了名称的装置是哪几种?返回 第1、第2、第3 三个字段,每个字段从 {抗风挡块, 主桥纵向阻尼器, 主桥支座, 引桥支座} 中取一项原样返回。", "answer": "{\"第1\": \"抗风挡块\", \"第2\": \"主桥纵向阻尼器\", \"第3\": \"主桥支座\"}"}, {"id": "MS-U25-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁拉压支座构造图”上,“支座纵桥向布置图”和“支座横桥向布置图”中支座的最外轮廓总尺寸各是多少?返回 纵桥向、横桥向 两个字段,每个字段为 {value, unit}(mm)。", "answer": "{\"纵桥向\": {\"value\": 1900, \"unit\": \"mm\"}, \"横桥向\": {\"value\": 1210, \"unit\": \"mm\"}}"}, {"id": "MS-U25-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "纵向阻尼器两端连接件中,用锚栓向下锚入混凝土的那一端,连接板平面长边是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1240, \"unit\": \"mm\"}"}, {"id": "MS-U25-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "纵向阻尼器向上栓接在主梁底面的那一端连接件,沿阻尼器轴线方向的平面尺寸是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1440, \"unit\": \"mm\"}"}, {"id": "MS-U25-02-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "侧向承载力 2000 kN 的支座,安装在桥塔横梁上的哪种构件上?从 {抗风挡块, 阻尼器垫石, 引桥支座垫石, 塔柱} 中选一项原样返回。", "answer": "\"抗风挡块\""}]} {"page_01_file_name": "images/MS-U25-03/few_sheet/01.png", "page_02_file_name": "images/MS-U25-03/few_sheet/02.png", "page_03_file_name": "images/MS-U25-03/few_sheet/03.png", "page_04_file_name": "images/MS-U25-03/few_sheet/04.png", "page_05_file_name": "images/MS-U25-03/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U25-03", "set": "U25", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "纵向阻尼器在桥塔横梁一端的连接件,其锚板厚多少、如何设置?下列说法哪些正确?", "options": [{"key": "A", "text": "每个连接件用 14 根 M64 锚栓", "correct": true}, {"key": "B", "text": "全桥这种锚板共 8 块", "correct": false}, {"key": "C", "text": "锚板单件重 342.637 kg", "correct": false}, {"key": "D", "text": "锚板厚 20 mm,位于底板下方", "correct": true}, {"key": "E", "text": "锚栓采用\"螺栓 + 套筒 + 螺杆 + 端头螺母\"的构造", "correct": true}, {"key": "F", "text": "该连接件没有锚板", "correct": false}], "answer": ["A", "D", "E"], "few_sheet_pages": [8, 7, 5, 1, 6], "evidence_pages": [6, 8, 5], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U25-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“阻尼器桥塔连接件立面布置图”上:锚板和底板的编号各是什么;连接件底部两层板,上层和下层的厚度各是多少?返回 锚板、底板、上层厚、下层厚 四个字段;编号按图中原样写(形如 N9,带撇号的写成 N9′),厚度为 {value, unit}(mm)。", "answer": "{\"锚板\": \"N3\", \"底板\": \"N2\", \"上层厚\": {\"value\": 40, \"unit\": \"mm\"}, \"下层厚\": {\"value\": 20, \"unit\": \"mm\"}}"}, {"id": "MS-U25-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“永磁式电涡流阻尼器连接件工程数量表(4台)”中,N3 的全桥件数和单件重各是多少?返回 全桥件数、单件重 两个字段;件数为阿拉伯数字,单件重为 {value, unit}(kg)。", "answer": "{\"全桥件数\": \"4\", \"单件重\": {\"value\": 171.318, \"unit\": \"kg\"}}"}, {"id": "MS-U25-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“永磁式电涡流阻尼器连接件工程数量表(4台)”中,N2 的单件重是多少?返回数值和单位(kg)。", "answer": "{\"value\": 342.637, \"unit\": \"kg\"}"}, {"id": "MS-U25-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”(附有“阻尼器参数表”的那张)附注中,阻尼器连接件与桥墩连接所用 M64 锚栓的根数是多少?返回数值和单位(根)。", "answer": "{\"value\": 14, \"unit\": \"根\"}"}, {"id": "MS-U25-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "纵向阻尼器桥塔横梁一端的连接件中,位于底板正下方的那块板,单件重多少?返回数值和单位(kg)。", "answer": "{\"value\": 171.318, \"unit\": \"kg\"}"}]} {"page_01_file_name": "images/MS-U25-04/few_sheet/01.png", "page_02_file_name": "images/MS-U25-04/few_sheet/02.png", "page_03_file_name": "images/MS-U25-04/few_sheet/03.png", "page_04_file_name": "images/MS-U25-04/few_sheet/04.png", "page_05_file_name": "images/MS-U25-04/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U25-04", "set": "U25", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "一座桥塔横梁上,主桥支座的下支座板与纵向阻尼器的桥塔端连接件,锚固到横梁(经各自垫石)所用的螺栓和锚栓一共多少根?", "options": [{"key": "A", "text": "52", "correct": false}, {"key": "B", "text": "64", "correct": false}, {"key": "C", "text": "72", "correct": false}, {"key": "D", "text": "22", "correct": false}, {"key": "E", "text": "44", "correct": true}, {"key": "F", "text": "88", "correct": false}], "answer": ["E"], "few_sheet_pages": [5, 1, 7, 2, 4], "evidence_pages": [1, 4, 5], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U25-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁拉压支座构造图”的附注中,下支座板用几个高强度螺栓与支承垫石上的钢套筒连接?返回数值和单位(个)。", "answer": "{\"value\": 8, \"unit\": \"个\"}"}, {"id": "MS-U25-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁拉压支座构造图”的附注中,上支座板用几个高强度螺栓与加劲梁上的垫板连接?返回数值和单位(个)。", "answer": "{\"value\": 18, \"unit\": \"个\"}"}, {"id": "MS-U25-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”(附有“阻尼器参数表”的那张)附注中,阻尼器连接件与桥墩、与钢梁各用几根 M64 紧固件?返回 与桥墩、与钢梁 两个字段,每个字段为 {value, unit}(根)。", "answer": "{\"与桥墩\": {\"value\": 14, \"unit\": \"根\"}, \"与钢梁\": {\"value\": 14, \"unit\": \"根\"}}"}, {"id": "MS-U25-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“半平面布置图”上,画出并标注了几个主桥支座、几台主桥纵向阻尼器?返回 主桥支座、阻尼器 两个字段,均为阿拉伯数字。", "answer": "{\"主桥支座\": \"1\", \"阻尼器\": \"1\"}"}, {"id": "MS-U25-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁抗风支座构造图”的“抗风支座明细表”中,“连接螺栓”的数量是多少?返回数值和单位(个)。", "answer": "{\"value\": 4, \"unit\": \"个\"}"}, {"id": "MS-U25-04-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“阻尼器参数表”中,阻尼器数量是多少?返回数值和单位(套)。", "answer": "{\"value\": 4, \"unit\": \"套\"}"}, {"id": "MS-U25-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "一座桥塔的横梁上,共有几个主桥支座、几台纵向阻尼器?返回 主桥支座、阻尼器 两个字段,均为阿拉伯数字。", "answer": "{\"主桥支座\": \"2\", \"阻尼器\": \"2\"}"}]} {"page_01_file_name": "images/MS-U25-05/few_sheet/01.png", "page_02_file_name": "images/MS-U25-05/few_sheet/02.png", "page_03_file_name": "images/MS-U25-05/few_sheet/03.png", "page_04_file_name": "images/MS-U25-05/few_sheet/04.png", "page_05_file_name": "images/MS-U25-05/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U25-05", "set": "U25", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "一台纵向阻尼器桥塔横梁一端的连接件,所用 Q355 钢板(不计销轴、螺栓、锚栓)共重多少 kg?", "options": [{"key": "A", "text": "823.523", "correct": false}, {"key": "B", "text": "1096.301", "correct": false}, {"key": "C", "text": "1023.253", "correct": false}, {"key": "D", "text": "2091.142", "correct": false}, {"key": "E", "text": "994.841", "correct": true}, {"key": "F", "text": "966.429", "correct": false}], "answer": ["E"], "few_sheet_pages": [4, 8, 6, 7, 5], "evidence_pages": [8, 6, 7], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U25-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“阻尼器桥塔连接件立面布置图”上,标注为耳板、底板、锚板、贴板的板件,以及高 290 mm、高 190 mm 的两种肋板,编号各是什么?按图中编号原样返回(形如 N9,带撇号的写成 N9′),字段名固定为 耳板、底板、锚板、贴板、肋板290、肋板190。", "answer": "{\"耳板\": \"N1\", \"底板\": \"N2\", \"锚板\": \"N3\", \"贴板\": \"N4\", \"肋板290\": \"N5\", \"肋板190\": \"N5′\"}"}, {"id": "MS-U25-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“永磁式电涡流阻尼器连接件工程数量表(4台)”中,N1、N2、N3、N4、N5、N5′ 的单件重各是多少?返回 N1、N2、N3、N4、N5、N5′ 六个字段,每个字段为 {value, unit}(kg)。", "answer": "{\"N1\": {\"value\": 202.059, \"unit\": \"kg\"}, \"N2\": {\"value\": 342.637, \"unit\": \"kg\"}, \"N3\": {\"value\": 171.318, \"unit\": \"kg\"}, \"N4\": {\"value\": 7.103, \"unit\": \"kg\"}, \"N5\": {\"value\": 9.106, \"unit\": \"kg\"}, \"N5′\": {\"value\": 5.966, \"unit\": \"kg\"}}"}, {"id": "MS-U25-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“永磁式电涡流阻尼器连接件工程数量表(4台)”中,N1、N2、N3、N4、N5、N5′ 的“每处件数”各是多少?返回 N1、N2、N3、N4、N5、N5′ 六个字段,均为阿拉伯数字。", "answer": "{\"N1\": \"2\", \"N2\": \"1\", \"N3\": \"1\", \"N4\": \"4\", \"N5\": \"4\", \"N5′\": \"2\"}"}, {"id": "MS-U25-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“永磁式电涡流阻尼器连接件工程数量表(4台)”中,N4 的全桥件数是多少?返回阿拉伯数字。", "answer": "\"32\""}, {"id": "MS-U25-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“永磁式电涡流阻尼器连接件工程数量表(4台)”底部合计栏中,Q355 的合计重量是多少?返回数值和单位(kg)。", "answer": "{\"value\": 8364.57, \"unit\": \"kg\"}"}, {"id": "MS-U25-05-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“阻尼器梁底连接件立面布置图”上,标注为顶板、耳板的板件编号各是什么?按图中编号原样返回(形如 N9,带撇号的写成 N9′),字段名固定为 顶板、耳板。", "answer": "{\"顶板\": \"N7\", \"耳板\": \"N6\"}"}, {"id": "MS-U25-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "纵向阻尼器桥塔横梁一端的一个连接件中,Q355 钢板共有几块?返回数值和单位(块)。", "answer": "{\"value\": 14, \"unit\": \"块\"}"}]} {"page_01_file_name": "images/MS-U25-06/few_sheet/01.png", "page_02_file_name": "images/MS-U25-06/few_sheet/02.png", "page_03_file_name": "images/MS-U25-06/few_sheet/03.png", "page_04_file_name": "images/MS-U25-06/few_sheet/04.png", "page_05_file_name": "images/MS-U25-06/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U25-06", "set": "U25", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "纵向阻尼器在主梁底面一端的连接件,其锚板厚多少、如何设置?下列说法哪些正确?", "options": [{"key": "A", "text": "顶板上的螺栓排成 6 + 2 + 6 三排", "correct": false}, {"key": "B", "text": "该连接件没有锚板,顶板直接用螺栓连在钢梁上", "correct": true}, {"key": "C", "text": "锚板厚 20 mm", "correct": false}, {"key": "D", "text": "锚板与顶板平面尺寸相同,均为 1440×880 mm", "correct": false}, {"key": "E", "text": "该连接件的平面尺寸与桥塔横梁一端的连接件相同", "correct": false}, {"key": "F", "text": "顶板平面 1440×880 mm、厚 40 mm", "correct": true}], "answer": ["B", "F"], "few_sheet_pages": [7, 6, 1, 8, 5], "evidence_pages": [7, 6, 8], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U25-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“阻尼器梁底连接件立面布置图”及其 B-B 平面上,顶板的平面长、宽和厚度各是多少?返回 长、宽、厚 三个字段,每个字段为 {value, unit}(mm)。", "answer": "{\"长\": {\"value\": 1440, \"unit\": \"mm\"}, \"宽\": {\"value\": 880, \"unit\": \"mm\"}, \"厚\": {\"value\": 40, \"unit\": \"mm\"}}"}, {"id": "MS-U25-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“阻尼器梁底连接件立面布置图”的 B-B 平面上,顶板上的螺栓孔分成几排、每排几个?返回 排数、每排个数 两个字段,均为阿拉伯数字。", "answer": "{\"排数\": \"2\", \"每排个数\": \"7\"}"}, {"id": "MS-U25-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“阻尼器桥塔连接件立面布置图”上,锚板的厚度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 20, \"unit\": \"mm\"}"}, {"id": "MS-U25-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“阻尼器桥塔连接件立面布置图”的 B-B 平面上,连接板平面长度是多少;螺栓孔各排个数(上、中、下)各是多少?返回 平面长度、上排、中排、下排 四个字段;平面长度为 {value, unit}(mm),个数为阿拉伯数字。", "answer": "{\"平面长度\": {\"value\": 1240, \"unit\": \"mm\"}, \"上排\": \"6\", \"中排\": \"2\", \"下排\": \"6\"}"}, {"id": "MS-U25-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "纵向阻尼器连接件中,规格为 1240×880×20 的锚板,全桥共有几块?返回数值和单位(块)。", "answer": "{\"value\": 4, \"unit\": \"块\"}"}, {"id": "MS-U25-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "纵向阻尼器主梁底面一端的连接件中,直接用螺栓连到钢梁上的那块板,厚度是多少?返回数值和单位(mm)。", "answer": "{\"value\": 40, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U25-07/few_sheet/01.png", "page_02_file_name": "images/MS-U25-07/few_sheet/02.png", "page_03_file_name": "images/MS-U25-07/few_sheet/03.png", "page_04_file_name": "images/MS-U25-07/few_sheet/04.png", "page_05_file_name": "images/MS-U25-07/few_sheet/05.png", "page_06_file_name": "images/MS-U25-07/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U25-07", "set": "U25", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "在桥塔横梁上、主梁下方(主桥侧)一排,沿横桥向从桥梁中心线往塔柱方向,依次布置着几种装置。下列\"前一个 → 紧接的下一个\"中,哪些正确?", "options": [{"key": "A", "text": "竖向承载力 7000 kN 的支座 → 最大阻尼力 3000 kN 的装置", "correct": false}, {"key": "B", "text": "侧向承载力 2000 kN 的支座 → 最大阻尼力 3000 kN 的装置", "correct": true}, {"key": "C", "text": "侧向承载力 2000 kN 的支座 → 竖向承载力 7000 kN 的支座", "correct": false}, {"key": "D", "text": "桥梁中心线 → 侧向承载力 2000 kN 的支座", "correct": true}, {"key": "E", "text": "竖向承载力 7000 kN 的支座 → 桥塔塔柱", "correct": true}, {"key": "F", "text": "最大阻尼力 3000 kN 的装置 → 竖向承载力 7000 kN 的支座", "correct": true}], "answer": ["B", "D", "E", "F"], "few_sheet_pages": [5, 4, 6, 3, 2, 1], "evidence_pages": [4, 1, 2, 5], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U25-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“半平面布置图”上,主桥侧那一排中,从桥塔中心线往塔柱方向依次标注了名称的装置是哪几种?返回 第1、第2、第3、第4 四个字段,每个字段从 {抗风挡块, 主桥纵向阻尼器, 主桥支座, 引桥支座, 无} 中取一项原样返回;不足四个时,其余字段填“无”。", "answer": "{\"第1\": \"抗风挡块\", \"第2\": \"主桥纵向阻尼器\", \"第3\": \"主桥支座\", \"第4\": \"无\"}"}, {"id": "MS-U25-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁拉压支座构造图”的附注中,支座竖向承载力是多少 kN?只返回阿拉伯数字(不写单位)。", "answer": "\"7000\""}, {"id": "MS-U25-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁抗风支座构造图”的附注中,支座侧向承载力是多少 kN?只返回阿拉伯数字(不写单位)。", "answer": "\"2000\""}, {"id": "MS-U25-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“阻尼器参数表”中,最大阻尼力是多少 kN?只返回阿拉伯数字(不写单位)。", "answer": "\"3000\""}, {"id": "MS-U25-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "竖向承载力 7000 kN 的支座,在桥塔横梁装置布置图上标注的名称是什么?从 {抗风挡块, 主桥纵向阻尼器, 主桥支座, 引桥支座} 中选一项原样返回。", "answer": "\"主桥支座\""}, {"id": "MS-U25-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "侧向承载力 2000 kN 的支座,安装在桥塔横梁上的哪种构件上?从 {抗风挡块, 阻尼器垫石, 引桥支座垫石, 塔柱} 中选一项原样返回。", "answer": "\"抗风挡块\""}, {"id": "MS-U25-07-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "最大阻尼力 3000 kN 的装置,中心到桥塔中心线的横桥向距离是多少?返回数值和单位(cm)。", "answer": "{\"value\": 680, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U25-08/few_sheet/01.png", "page_02_file_name": "images/MS-U25-08/few_sheet/02.png", "page_03_file_name": "images/MS-U25-08/few_sheet/03.png", "page_04_file_name": "images/MS-U25-08/few_sheet/04.png", "page_05_file_name": "images/MS-U25-08/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U25-08", "set": "U25", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "纵向阻尼器两端各有一个连接件,一端在桥塔横梁上,一端在主梁底面。下列板件中,哪些只在桥塔横梁一端的连接件上设置?", "options": [{"key": "A", "text": "贴板", "correct": false}, {"key": "B", "text": "耳板", "correct": false}, {"key": "C", "text": "高 190 mm 的短肋板", "correct": true}, {"key": "D", "text": "顶板", "correct": false}, {"key": "E", "text": "销轴", "correct": false}, {"key": "F", "text": "锚板", "correct": true}], "answer": ["C", "F"], "few_sheet_pages": [8, 6, 1, 5, 7], "evidence_pages": [6, 7, 8], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U25-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“阻尼器桥塔连接件立面布置图”上,标注为锚板、耳板、贴板的板件,以及高 190 mm 的那块肋板,编号各是什么?按图中编号原样返回(形如 N9,带撇号的写成 N9′),字段名固定为 锚板、耳板、贴板、肋板190。", "answer": "{\"锚板\": \"N3\", \"耳板\": \"N1\", \"贴板\": \"N4\", \"肋板190\": \"N5′\"}"}, {"id": "MS-U25-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“阻尼器梁底连接件立面布置图”上,标注为顶板、耳板、贴板的板件编号各是什么;图中最短的那块肋板高多少?返回 顶板、耳板、贴板、最短肋板高 四个字段;编号按图中原样写(形如 N9,带撇号的写成 N9′),高度为 {value, unit}(mm)。", "answer": "{\"顶板\": \"N7\", \"耳板\": \"N6\", \"贴板\": \"N4\", \"最短肋板高\": {\"value\": 400, \"unit\": \"mm\"}}"}, {"id": "MS-U25-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”的“永磁式电涡流阻尼器连接件工程数量表(4台)”中,规格为销轴的那一项全桥件数是多少?表名里的阻尼器台数是多少?均返回阿拉伯数字,字段名固定为 销轴全桥件数、台数。", "answer": "{\"销轴全桥件数\": \"8\", \"台数\": \"4\"}"}, {"id": "MS-U25-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "纵向阻尼器连接件中的锚板、顶板、贴板,全桥各有多少块?返回 锚板、顶板、贴板 三个字段,每个字段为 {value, unit}(块)。", "answer": "{\"锚板\": {\"value\": 4, \"unit\": \"块\"}, \"顶板\": {\"value\": 4, \"unit\": \"块\"}, \"贴板\": {\"value\": 32, \"unit\": \"块\"}}"}]} {"page_01_file_name": "images/MS-U25-09/few_sheet/01.png", "page_02_file_name": "images/MS-U25-09/few_sheet/02.png", "page_03_file_name": "images/MS-U25-09/few_sheet/03.png", "page_04_file_name": "images/MS-U25-09/few_sheet/04.png", "page_05_file_name": "images/MS-U25-09/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U25-09", "set": "U25", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "主梁与桥塔横梁之间的主桥支座、抗风支座和纵向阻尼器,各自都要分别连到钢梁和混凝土上。下列连接中,哪些是连到混凝土(垫石或横梁)一侧的?", "options": [{"key": "A", "text": "4 根 M30 连接螺栓的连接", "correct": false}, {"key": "B", "text": "8 根 M48 高强度螺栓的连接", "correct": true}, {"key": "C", "text": "14 根 M64 锚栓的连接", "correct": true}, {"key": "D", "text": "18 根 M36 高强度螺栓的连接", "correct": false}, {"key": "E", "text": "14 根 M64 高强螺栓的连接", "correct": false}, {"key": "F", "text": "抗风支座上采用焊接的那一处连接", "correct": true}], "answer": ["B", "C", "F"], "few_sheet_pages": [2, 8, 4, 1, 5], "evidence_pages": [1, 2, 5], "full_set_page_count": 8, "sub_questions": [{"id": "MS-U25-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁拉压支座构造图”的附注中,下支座板和上支座板各用什么规格的高强度螺栓连接?只写公称直径(形如 M20),字段名固定为 下支座板、上支座板。", "answer": "{\"下支座板\": \"M48\", \"上支座板\": \"M36\"}"}, {"id": "MS-U25-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁抗风支座构造图”的“抗风支座明细表”中,“连接螺栓”的公称直径和数量各是多少?返回 规格、数量 两个字段;规格只写公称直径(形如 M20),数量为 {value, unit}(个)。", "answer": "{\"规格\": \"M30\", \"数量\": {\"value\": 4, \"unit\": \"个\"}}"}, {"id": "MS-U25-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁抗风支座构造图”的附注中,抗风支座与钢箱梁、垫板与支座垫石上的预埋钢板,各采用什么连接方式?每个字段从 {螺栓联接, 焊接, 锚栓连接} 中取一项原样返回,字段名固定为 支座与钢箱梁、垫板与预埋钢板。", "answer": "{\"支座与钢箱梁\": \"螺栓联接\", \"垫板与预埋钢板\": \"焊接\"}"}, {"id": "MS-U25-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“阻尼器布置图”(附有“阻尼器参数表”的那张)附注中,阻尼器连接件与钢梁、与桥墩各采用什么连接?每个字段从 {螺栓, 锚栓, 焊接} 中取一项原样返回,字段名固定为 与钢梁、与桥墩。", "answer": "{\"与钢梁\": \"螺栓\", \"与桥墩\": \"锚栓\"}"}, {"id": "MS-U25-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主桥支座连到支承垫石(混凝土)一侧的那块支座板,在支座明细表里的序号是多少?只返回阿拉伯数字。", "answer": "\"29\""}]} {"page_01_file_name": "images/MS-U26-01/few_sheet/01.png", "page_02_file_name": "images/MS-U26-01/few_sheet/02.png", "page_03_file_name": "images/MS-U26-01/few_sheet/03.png", "page_04_file_name": "images/MS-U26-01/few_sheet/04.png", "page_05_file_name": "images/MS-U26-01/few_sheet/05.png", "page_06_file_name": "images/MS-U26-01/few_sheet/06.png", "page_07_file_name": "images/MS-U26-01/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U26-01", "set": "U26", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "全桥各类索夹中,哪些类型所挂的吊索全部为 5-109 型、且单套索夹重量超过 2500 kg?", "options": [{"key": "A", "text": "SJ5", "correct": false}, {"key": "B", "text": "SJ3", "correct": true}, {"key": "C", "text": "SJ2", "correct": true}, {"key": "D", "text": "SJ1", "correct": false}, {"key": "E", "text": "SJ4", "correct": false}, {"key": "F", "text": "SJ6", "correct": false}], "answer": ["B", "C"], "few_sheet_pages": [12, 15, 2, 17, 1, 14, 13], "evidence_pages": [1, 2, 13, 14, 15], "full_set_page_count": 21, "sub_questions": [{"id": "MS-U26-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“吊索类型及长度”表里,以数字编号的吊索(不计 A1、A2)中,型号为 5-139 的共有几个编号?返回数值和单位(个)。", "answer": "{\"value\": 3, \"unit\": \"个\"}"}, {"id": "MS-U26-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“吊索类型及长度”表里,1 号、27 号、53 号 吊索的吊索型号各是什么?以 JSON 返回字段 \"1\"、\"27\"、\"53\",每个字段按表中写法原样返回型号(形如 5-999)。", "answer": "{\"1\": \"5-139\", \"27\": \"5-139\", \"53\": \"5-139\"}"}, {"id": "MS-U26-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "下列吊索分别挂在哪一类索夹上?1 号、27 号、53 号。以 JSON 返回字段 \"1\"、\"27\"、\"53\",每个字段按图中索夹类型编号原样返回(形如 SJ9)。", "answer": "{\"1\": \"SJ1\", \"27\": \"SJ5\", \"53\": \"SJ1\"}"}, {"id": "MS-U26-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中适用于索夹 SJ2 的那一张,注中写明的单套重量是多少?返回数值和单位(kg)。", "answer": "{\"value\": 2971.49, \"unit\": \"kg\"}"}, {"id": "MS-U26-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中适用于索夹 SJ3 的那一张,注中写明的单套重量是多少?返回数值和单位(kg)。", "answer": "{\"value\": 2525.32, \"unit\": \"kg\"}"}, {"id": "MS-U26-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中适用于索夹 SJ4 的那一张,注中写明的单套重量是多少?返回数值和单位(kg)。", "answer": "{\"value\": 2078.18, \"unit\": \"kg\"}"}, {"id": "MS-U26-01-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索及索夹总体布置图的索夹数量表中,SJ6 的“类型说明”是什么?从下列三项中选一项,按所列文字原样返回:有吊索索夹、无吊索索夹、靠近索鞍处密闭索夹,与缆套配合使用。", "answer": "\"无吊索索夹\""}]} {"page_01_file_name": "images/MS-U26-02/few_sheet/01.png", "page_02_file_name": "images/MS-U26-02/few_sheet/02.png", "page_03_file_name": "images/MS-U26-02/few_sheet/03.png", "page_04_file_name": "images/MS-U26-02/few_sheet/04.png", "page_05_file_name": "images/MS-U26-02/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U26-02", "set": "U26", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于跨中吊点处吊索的空间布置,下列说法哪些正确?", "options": [{"key": "A", "text": "斜吊索与竖直吊索同为 5-139 型,单根长 7.5305 m", "correct": true}, {"key": "B", "text": "跨中吊点除竖直吊索外,另有两根斜吊索自索夹向两侧斜向下连到加劲梁", "correct": true}, {"key": "C", "text": "两根斜吊索的轴线与竖直方向的夹角均为 40.234°", "correct": false}, {"key": "D", "text": "斜吊索 A1 偏向牟家湾立交一侧,A2 偏向支坪立交一侧", "correct": true}, {"key": "E", "text": "两根斜吊索的轴线与竖直方向的夹角均为 49.766°", "correct": true}, {"key": "F", "text": "斜吊索自索夹向两侧斜向上伸出,锚在两侧主缆上", "correct": false}], "answer": ["A", "B", "D", "E"], "few_sheet_pages": [21, 1, 12, 16, 2], "evidence_pages": [1, 2, 16], "full_set_page_count": 21, "sub_questions": [{"id": "MS-U26-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“吊索类型及长度”表里,A1、A2、27 号 吊索的吊索型号各是什么?以 JSON 返回字段 \"A1\"、\"A2\"、\"27\",每个字段按表中写法原样返回型号(形如 5-999)。", "answer": "{\"A1\": \"5-139\", \"A2\": \"5-139\", \"27\": \"5-139\"}"}, {"id": "MS-U26-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“吊索类型及长度”表里,A1、A2 吊索的长度各是多少?以 JSON 返回两个字段 A1、A2,每个字段为 {value, unit},单位 m。", "answer": "{\"A1\": {\"value\": 7.5305, \"unit\": \"m\"}, \"A2\": {\"value\": 7.5305, \"unit\": \"m\"}}"}, {"id": "MS-U26-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中的“索夹SJ5立面图”上,耳板下方左右两段角度标注各是多少度?以 JSON 返回两个字段 左、右,每个字段按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "{\"左\": \"49.766\", \"右\": \"49.766\"}"}, {"id": "MS-U26-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "跨中吊点处的斜吊索,其轴线与竖直线的夹角是多少度?按图上写法返回角度数值字符串,不带度号(形如 \"1.5\")。", "answer": "\"49.766\""}, {"id": "MS-U26-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "跨中吊点处的两根斜吊索 A1、A2:(1) A1 一端连在索夹上,另一端连在哪个构件上?(2) A1、A2 各自从索夹往另一端,偏向哪一侧?以 JSON 返回三个字段 A1另一端、A1偏向、A2偏向;第一个字段从 加劲梁、主缆、桥塔、散索鞍 中选一项,后两个字段从 牟家湾立交一侧、支坪立交一侧 中选一项,均按所列文字原样返回。", "answer": "{\"A1另一端\": \"加劲梁\", \"A1偏向\": \"牟家湾立交一侧\", \"A2偏向\": \"支坪立交一侧\"}"}]} {"page_01_file_name": "images/MS-U26-03/few_sheet/01.png", "page_02_file_name": "images/MS-U26-03/few_sheet/02.png", "page_03_file_name": "images/MS-U26-03/few_sheet/03.png", "page_04_file_name": "images/MS-U26-03/few_sheet/04.png", "page_05_file_name": "images/MS-U26-03/few_sheet/05.png", "page_06_file_name": "images/MS-U26-03/few_sheet/06.png", "page_07_file_name": "images/MS-U26-03/few_sheet/07.png", "page_08_file_name": "images/MS-U26-03/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U26-03", "set": "U26", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于中跨吊点处吊索、索夹与主缆检修道的相对位置,下列说法哪些正确?", "options": [{"key": "A", "text": "同一吊点的两根吊索沿顺桥向前后布置,分别挂在索夹耳板上相距 480 mm 的两个销孔上", "correct": true}, {"key": "B", "text": "SJ4 索夹中心到耳板两销孔连线的距离与 SJ1–SJ3 相同,均为 900 mm", "correct": false}, {"key": "C", "text": "同一吊点的两根吊索沿横桥向左右并排", "correct": false}, {"key": "D", "text": "主缆检修道栏杆立柱竖直立在索夹上,用索夹出厂时预留的 M30 螺孔固定", "correct": true}, {"key": "E", "text": "吊索下端经下锚头和销轴连在加劲梁顶面的锚板上,锚板下方对应吊点横梁", "correct": true}, {"key": "F", "text": "主缆检修道栏杆立柱垂直于主缆轴线安装", "correct": false}], "answer": ["A", "D", "E"], "few_sheet_pages": [13, 17, 12, 14, 20, 15, 2, 19], "evidence_pages": [2, 12, 13, 14, 15, 20], "full_set_page_count": 21, "sub_questions": [{"id": "MS-U26-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图的立面图中,同一索夹下两根吊索之间标注的间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 480, \"unit\": \"mm\"}"}, {"id": "MS-U26-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中的“索夹SJ2立面图”上,耳板两个销孔中心之间的距离是多少?返回数值和单位(mm)。", "answer": "{\"value\": 480, \"unit\": \"mm\"}"}, {"id": "MS-U26-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中适用于索夹 SJ2 的那一张,注中写明的主缆检修道栏杆立柱预留螺孔,数量和螺纹规格各是什么?以 JSON 返回两个字段 数量、规格;数量为 {value, unit},单位 个;规格按图中写法(形如 M99)。", "answer": "{\"数量\": {\"value\": 2, \"unit\": \"个\"}, \"规格\": \"M30\"}"}, {"id": "MS-U26-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中的“索夹SJ4立面图”上,索夹中心到耳板两销孔连线的距离标注为多少?返回数值和单位(mm)。", "answer": "{\"value\": 800, \"unit\": \"mm\"}"}, {"id": "MS-U26-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "同一吊点的两根吊索,沿哪个方向前后(或左右)排列?两者间距是多少?以 JSON 返回两个字段 方向、间距;方向从 顺桥向、横桥向 中选一项原样返回,间距为 {value, unit},单位 mm。", "answer": "{\"方向\": \"顺桥向\", \"间距\": {\"value\": 480, \"unit\": \"mm\"}}"}, {"id": "MS-U26-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "吊索下端:(1) 下锚头通过销轴连在哪个构件上?(2) 该构件正下方对应加劲梁内的哪个构件?以 JSON 返回两个字段 下锚头连接、正下方,每个字段从 锚板、销轴、吊点横梁、减震架、索夹 中选一项原样返回。", "answer": "{\"下锚头连接\": \"锚板\", \"正下方\": \"吊点横梁\"}"}, {"id": "MS-U26-03-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主缆检修道的栏杆立柱:(1) 立柱的方向是什么?(2) 立柱下端固定在哪个构件上?以 JSON 返回两个字段 方向、固定于;方向从 竖直、垂直于主缆轴线 中选一项,固定于从 索夹、主缆、检修道支架、扶手绳 中选一项,均按所列文字原样返回。", "answer": "{\"方向\": \"竖直\", \"固定于\": \"索夹\"}"}]} {"page_01_file_name": "images/MS-U26-04/few_sheet/01.png", "page_02_file_name": "images/MS-U26-04/few_sheet/02.png", "page_03_file_name": "images/MS-U26-04/few_sheet/03.png", "page_04_file_name": "images/MS-U26-04/few_sheet/04.png", "page_05_file_name": "images/MS-U26-04/few_sheet/05.png", "page_06_file_name": "images/MS-U26-04/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U26-04", "set": "U26", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "全桥最长的那几根吊索,其锚具中所设向心关节轴承的型号是什么?下列说法哪些正确?", "options": [{"key": "A", "text": "这些吊索的上锚具总长 1447 mm", "correct": true}, {"key": "B", "text": "这些吊索为 5-139 型,挂在 SJ1 索夹上", "correct": true}, {"key": "C", "text": "这些吊索的锚具不设关节轴承", "correct": true}, {"key": "D", "text": "型号为 GE100ET-2RS", "correct": false}, {"key": "E", "text": "型号为 GE140XTL-2RS/X", "correct": false}, {"key": "F", "text": "这些吊索的下锚具总长 1436 mm", "correct": false}], "answer": ["A", "B", "C"], "few_sheet_pages": [9, 2, 1, 6, 5, 7], "evidence_pages": [1, 2, 5, 6], "full_set_page_count": 21, "sub_questions": [{"id": "MS-U26-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“吊索类型及长度”表里,1 号吊索的型号、长度,53 号吊索的长度各是多少?以 JSON 返回三个字段 1号型号、1号长度、53号长度;型号按表中写法(形如 5-999),长度为 {value, unit},单位 m。", "answer": "{\"1号型号\": \"5-139\", \"1号长度\": {\"value\": 90.5319, \"unit\": \"m\"}, \"53号长度\": {\"value\": 90.5319, \"unit\": \"m\"}}"}, {"id": "MS-U26-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索及索夹总体布置图的注中,采用关节轴承吊索的吊索编号范围是从几号到几号?以 JSON 返回两个字段 起、止,每个字段为编号的阿拉伯数字字符串(形如 \"9\")。", "answer": "{\"起\": \"17\", \"止\": \"37\"}"}, {"id": "MS-U26-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“5-139吊索上锚具总装图”上,锚具总长标注为多少?返回数值和单位(mm)。", "answer": "{\"value\": 1447, \"unit\": \"mm\"}"}, {"id": "MS-U26-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“5-139吊索下锚具总装图”上,锚具总长标注为多少?返回数值和单位(mm)。", "answer": "{\"value\": 1431, \"unit\": \"mm\"}"}, {"id": "MS-U26-04-R5", "role": "read", "tiers": ["full_set"], "question": "主桥吊索一般构造及总成图中的“5-139关节轴承普通吊索下锚具总图”上,锚具总长标注为多少?返回数值和单位(mm)。", "answer": "{\"value\": 1436, \"unit\": \"mm\"}"}, {"id": "MS-U26-04-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“5-139关节轴承普通吊索上锚具总图”材料表里,自润滑向心关节轴承的型号是什么?按表中写法原样返回(形如 GE999XX-2RS)。", "answer": "\"GE140XTL-2RS/X\""}, {"id": "MS-U26-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "下列吊索分别挂在哪一类索夹上?1 号、53 号。以 JSON 返回字段 \"1\"、\"53\",每个字段按图中索夹类型编号原样返回(形如 SJ9)。", "answer": "{\"1\": \"SJ1\", \"53\": \"SJ1\"}"}]} {"page_01_file_name": "images/MS-U26-05/few_sheet/01.png", "page_02_file_name": "images/MS-U26-05/few_sheet/02.png", "page_03_file_name": "images/MS-U26-05/few_sheet/03.png", "page_04_file_name": "images/MS-U26-05/few_sheet/04.png", "page_05_file_name": "images/MS-U26-05/few_sheet/05.png", "page_06_file_name": "images/MS-U26-05/few_sheet/06.png", "page_07_file_name": "images/MS-U26-05/few_sheet/07.png", "page_08_file_name": "images/MS-U26-05/few_sheet/08.png", "page_09_file_name": "images/MS-U26-05/few_sheet/09.png", "page_10_file_name": null, "id": "MS-U26-05", "set": "U26", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿中跨主缆从桥塔塔顶往跨中,依次布置不同类型的索夹。下列\"前一类索夹(索夹全长,mm)→ 紧接的下一类索夹(索夹全长,mm)\"中,哪些正确?", "options": [{"key": "A", "text": "SJ2(1560) → SJ4(1080)", "correct": false}, {"key": "B", "text": "SJ7(700) → SJ1(1760)", "correct": true}, {"key": "C", "text": "SJ4(1080) → SJ5(2420)", "correct": false}, {"key": "D", "text": "SJ3(1300) → SJ4(1080)", "correct": true}, {"key": "E", "text": "SJ4(1080) → SJ3(1300)", "correct": false}, {"key": "F", "text": "SJ1(1760) → SJ2(1560)", "correct": true}], "answer": ["B", "D", "F"], "few_sheet_pages": [13, 12, 21, 15, 17, 18, 16, 14, 1], "evidence_pages": [1, 12, 13, 14, 15, 16, 18], "full_set_page_count": 21, "sub_questions": [{"id": "MS-U26-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中,索夹SJ7立面图、索夹SJ1立面图上标注的索夹全长各是多少?以 JSON 返回两个字段 SJ7、SJ1,每个字段为 {value, unit},单位 mm(取名义值,不计公差)。", "answer": "{\"SJ7\": {\"value\": 700, \"unit\": \"mm\"}, \"SJ1\": {\"value\": 1760, \"unit\": \"mm\"}}"}, {"id": "MS-U26-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中,索夹SJ2立面图、索夹SJ3立面图上标注的索夹全长各是多少?以 JSON 返回两个字段 SJ2、SJ3,每个字段为 {value, unit},单位 mm(取名义值,不计公差)。", "answer": "{\"SJ2\": {\"value\": 1560, \"unit\": \"mm\"}, \"SJ3\": {\"value\": 1300, \"unit\": \"mm\"}}"}, {"id": "MS-U26-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中,索夹SJ4立面图、索夹SJ5立面图上标注的索夹全长各是多少?以 JSON 返回两个字段 SJ4、SJ5,每个字段为 {value, unit},单位 mm(取名义值,不计公差)。", "answer": "{\"SJ4\": {\"value\": 1080, \"unit\": \"mm\"}, \"SJ5\": {\"value\": 2640, \"unit\": \"mm\"}}"}, {"id": "MS-U26-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中索夹SJ5立面图上,顶部螺栓间距链的总尺寸(形如 n×间距=总长 的那一道)是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2420, \"unit\": \"mm\"}"}, {"id": "MS-U26-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "沿中跨主缆从桥塔塔顶往跨中,依次布置不同类型的索夹。塔顶处第一类、紧接其后的第二类、再往后的第三类索夹各是什么?以 JSON 返回三个字段 第1类、第2类、第3类,每个字段按图中索夹类型编号原样返回(形如 SJ9)。", "answer": "{\"第1类\": \"SJ7\", \"第2类\": \"SJ1\", \"第3类\": \"SJ2\"}"}, {"id": "MS-U26-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "沿中跨主缆从桥塔塔顶往跨中,依次布置不同类型的索夹。紧接在 SJ2 之后、SJ3 之后、SJ4 之后(往跨中方向)的索夹各是哪一类?以 JSON 返回三个字段 SJ2之后、SJ3之后、SJ4之后,每个字段按图中索夹类型编号原样返回(形如 SJ9)。", "answer": "{\"SJ2之后\": \"SJ3\", \"SJ3之后\": \"SJ4\", \"SJ4之后\": \"SJ5\"}"}]} {"page_01_file_name": "images/MS-U26-06/few_sheet/01.png", "page_02_file_name": "images/MS-U26-06/few_sheet/02.png", "page_03_file_name": "images/MS-U26-06/few_sheet/03.png", "page_04_file_name": "images/MS-U26-06/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U26-06", "set": "U26", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "编号为 1 的吊索,其下端锚具(每套),下列说法哪些正确?", "options": [{"key": "A", "text": "吊索分丝板单重 8.99 kg", "correct": false}, {"key": "B", "text": "设有 GE140XTL-2RS/X 自润滑向心关节轴承", "correct": false}, {"key": "C", "text": "下销轴单重 30.4 kg", "correct": false}, {"key": "D", "text": "下耳板单重 173.5 kg", "correct": true}, {"key": "E", "text": "吊索密封罩单重 19.5 kg", "correct": false}, {"key": "F", "text": "锚具总长 1431 mm", "correct": true}], "answer": ["D", "F"], "few_sheet_pages": [10, 1, 6, 2], "evidence_pages": [1, 2, 6], "full_set_page_count": 21, "sub_questions": [{"id": "MS-U26-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主桥吊索一般构造及总成图”中的“吊索类型及长度”表里,吊索编号 1 的吊索型号和吊索长度各是多少?以 JSON 返回两个字段:type(按表中写法原样返回型号,形如 \"5-91\")、length(数值和单位 m)。", "answer": "{\"type\": \"5-139\", \"length\": {\"value\": 90.5319, \"unit\": \"m\"}}"}, {"id": "MS-U26-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主桥吊索及索夹总体布置图”的附注中,吊索按长度分为无关节轴承和采用关节轴承两类,分界长度是多少?返回数值和单位(m)。", "answer": "{\"value\": 20, \"unit\": \"m\"}"}, {"id": "MS-U26-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“5-139吊索下锚具总装图”上:明细表中分丝板、下销轴、下耳板、密封罩的单重各是多少?锚具总长尺寸是多少?以 JSON 返回五个字段:splitter、pin、ear_plate、cover(数值和单位 kg)、total_length(数值和单位 mm)。", "answer": "{\"splitter\": {\"value\": 0.51, \"unit\": \"kg\"}, \"pin\": {\"value\": 26.2, \"unit\": \"kg\"}, \"ear_plate\": {\"value\": 173.5, \"unit\": \"kg\"}, \"cover\": {\"value\": 11.5, \"unit\": \"kg\"}, \"total_length\": {\"value\": 1431, \"unit\": \"mm\"}}"}, {"id": "MS-U26-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“5-139关节轴承普通吊索下锚具总图”的明细表中:下销轴、密封罩的单重各是多少?自润滑向心关节轴承备注的型号是什么?以 JSON 返回三个字段:pin、cover(数值和单位 kg)、bearing(按表中写法原样返回型号)。", "answer": "{\"pin\": {\"value\": 30.4, \"unit\": \"kg\"}, \"cover\": {\"value\": 19.5, \"unit\": \"kg\"}, \"bearing\": \"GE140XTL-2RS/X\"}"}, {"id": "MS-U26-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“5-139吊索下锚具总装图”的明细表中,套筒的单重是多少?返回数值和单位(kg)。", "answer": "{\"value\": 8.99, \"unit\": \"kg\"}"}, {"id": "MS-U26-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "编号为 1 的吊索,其下端锚具(每套)中下销轴的单重是多少?返回数值和单位(kg)。", "answer": "{\"value\": 26.2, \"unit\": \"kg\"}"}]} {"page_01_file_name": "images/MS-U26-07/few_sheet/01.png", "page_02_file_name": "images/MS-U26-07/few_sheet/02.png", "page_03_file_name": "images/MS-U26-07/few_sheet/03.png", "page_04_file_name": "images/MS-U26-07/few_sheet/04.png", "page_05_file_name": "images/MS-U26-07/few_sheet/05.png", "page_06_file_name": "images/MS-U26-07/few_sheet/06.png", "page_07_file_name": "images/MS-U26-07/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U26-07", "set": "U26", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "全桥最短的那根吊索,其锚具中所设向心关节轴承的型号是什么?下列说法哪些正确?", "options": [{"key": "A", "text": "该吊索的上锚具总长 1447 mm", "correct": false}, {"key": "B", "text": "型号为 GE100ET-2RS", "correct": false}, {"key": "C", "text": "该吊索的锚具不设关节轴承", "correct": false}, {"key": "D", "text": "该吊索为 5-109 型", "correct": false}, {"key": "E", "text": "上、下锚具都设有 GE140XTL-2RS/X 自润滑向心关节轴承", "correct": true}, {"key": "F", "text": "该吊索挂在跨中的 SJ5 索夹上", "correct": true}], "answer": ["E", "F"], "few_sheet_pages": [5, 10, 2, 1, 9, 11, 7], "evidence_pages": [1, 2, 7, 9, 10], "full_set_page_count": 21, "sub_questions": [{"id": "MS-U26-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“吊索类型及长度”表里,27 号吊索的型号和长度各是什么?以 JSON 返回两个字段 型号、长度;型号按表中写法(形如 5-999),长度为 {value, unit},单位 m。", "answer": "{\"型号\": \"5-139\", \"长度\": {\"value\": 4.9976, \"unit\": \"m\"}}"}, {"id": "MS-U26-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索及索夹总体布置图的注中,采用关节轴承吊索的吊索编号范围是从几号到几号?以 JSON 返回两个字段 起、止,每个字段为编号的阿拉伯数字字符串(形如 \"9\")。", "answer": "{\"起\": \"17\", \"止\": \"37\"}"}, {"id": "MS-U26-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“5-139关节轴承普通吊索上锚具总图”材料表里,自润滑向心关节轴承的型号是什么?按表中写法原样返回(形如 GE999XX-2RS)。", "answer": "\"GE140XTL-2RS/X\""}, {"id": "MS-U26-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“5-139关节轴承普通吊索下锚具总图”材料表里,自润滑向心关节轴承的型号是什么?按表中写法原样返回(形如 GE999XX-2RS)。", "answer": "\"GE140XTL-2RS/X\""}, {"id": "MS-U26-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“5-139关节轴承普通吊索上锚具总图”上,锚具总长标注为多少?返回数值和单位(mm)。", "answer": "{\"value\": 1452, \"unit\": \"mm\"}"}, {"id": "MS-U26-07-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“5-109关节轴承吊索上锚具总装图”材料表里,向心关节轴承的型号是什么?按表中写法原样返回(形如 GE999XX-2RS)。", "answer": "\"GE100ET-2RS\""}, {"id": "MS-U26-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "27 号吊索挂在哪一类索夹上?按图中索夹类型编号原样返回(形如 SJ9)。", "answer": "\"SJ5\""}]} {"page_01_file_name": "images/MS-U26-08/few_sheet/01.png", "page_02_file_name": "images/MS-U26-08/few_sheet/02.png", "page_03_file_name": "images/MS-U26-08/few_sheet/03.png", "page_04_file_name": "images/MS-U26-08/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U26-08", "set": "U26", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "支坪主桥 27 号吊索的上锚具,下列说法哪些正确?", "options": [{"key": "A", "text": "上销轴直径为 130 mm", "correct": false}, {"key": "B", "text": "上销轴直径为 140 mm", "correct": true}, {"key": "C", "text": "明细表中列有自润滑向心关节轴承 GE140XTL-2RS/X", "correct": true}, {"key": "D", "text": "上销轴与耳板孔的配合为 H8/f8", "correct": false}, {"key": "E", "text": "耳板端面至上销轴中心线的距离为 180 mm", "correct": false}, {"key": "F", "text": "上销轴外套 ZCuSn5Pb5Zn5+SL1 衬套", "correct": false}], "answer": ["B", "C"], "few_sheet_pages": [1, 2, 9, 5], "evidence_pages": [1, 2, 5, 9], "full_set_page_count": 21, "sub_questions": [{"id": "MS-U26-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "编号 20~38 的吊索中,型号为 5-139 的是几号吊索?按图中编号原样返回(形如 12)。", "answer": "\"27\""}, {"id": "MS-U26-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "采用关节轴承的吊索,编号范围起止各是几号?只返回两个编号数字。", "answer": "[\"17\", \"37\"]"}, {"id": "MS-U26-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "5-139关节轴承普通吊索上锚具总图中,上销轴(明细表件 2)的直径是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 140, \"unit\": \"mm\"}"}, {"id": "MS-U26-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "5-139吊索上锚具总装图中,上销轴(明细表件 2)的直径是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 130, \"unit\": \"mm\"}"}, {"id": "MS-U26-08-R3", "role": "read", "tiers": ["full_set"], "question": "5-109关节轴承吊索上锚具总装图中,销轴(明细表件 2)的直径是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 100, \"unit\": \"mm\"}"}, {"id": "MS-U26-08-R4", "role": "read", "tiers": ["full_set"], "question": "5-109关节轴承吊索上锚具总装图中,向心关节轴承(明细表件 15)外圈标注的直径是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 150, \"unit\": \"mm\"}"}, {"id": "MS-U26-08-R5", "role": "read", "tiers": ["full_set"], "question": "5-109吊索上锚具总装图中,上销轴(明细表件 2)的直径是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 105, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U26-09/few_sheet/01.png", "page_02_file_name": "images/MS-U26-09/few_sheet/02.png", "page_03_file_name": "images/MS-U26-09/few_sheet/03.png", "page_04_file_name": "images/MS-U26-09/few_sheet/04.png", "page_05_file_name": "images/MS-U26-09/few_sheet/05.png", "page_06_file_name": "images/MS-U26-09/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U26-09", "set": "U26", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "全桥挂 5-139 型吊索的各类索夹,合计重量是多少 kg?", "options": [{"key": "A", "text": "18083.78", "correct": false}, {"key": "B", "text": "11203.96", "correct": false}, {"key": "C", "text": "24963.60", "correct": true}, {"key": "D", "text": "23126.24", "correct": false}, {"key": "E", "text": "13759.64", "correct": false}, {"key": "F", "text": "36932.04", "correct": false}], "answer": ["C"], "few_sheet_pages": [18, 16, 12, 2, 1, 13], "evidence_pages": [1, 2, 12, 16], "full_set_page_count": 21, "sub_questions": [{"id": "MS-U26-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中适用于索夹 SJ1 的那一张,注中写明的单套重量和全桥套数各是多少?以 JSON 返回两个字段 单套重量、全桥套数,每个字段为 {value, unit};重量单位 kg,套数单位 套。", "answer": "{\"单套重量\": {\"value\": 3439.91, \"unit\": \"kg\"}, \"全桥套数\": {\"value\": 4, \"unit\": \"套\"}}"}, {"id": "MS-U26-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中适用于索夹 SJ5 的那一张,注中写明的单套重量和全桥套数各是多少?以 JSON 返回两个字段 单套重量、全桥套数,每个字段为 {value, unit};重量单位 kg,套数单位 套。", "answer": "{\"单套重量\": {\"value\": 5601.98, \"unit\": \"kg\"}, \"全桥套数\": {\"value\": 2, \"unit\": \"套\"}}"}, {"id": "MS-U26-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“吊索类型及长度”表里,1 号、27 号、53 号 吊索的吊索型号各是什么?以 JSON 返回字段 \"1\"、\"27\"、\"53\",每个字段按表中写法原样返回型号(形如 5-999)。", "answer": "{\"1\": \"5-139\", \"27\": \"5-139\", \"53\": \"5-139\"}"}, {"id": "MS-U26-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“吊索类型及长度”表里,以数字编号的吊索(不计 A1、A2)中,型号为 5-139 的共有几个编号?返回数值和单位(个)。", "answer": "{\"value\": 3, \"unit\": \"个\"}"}, {"id": "MS-U26-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "下列吊索分别挂在哪一类索夹上?1 号、27 号、53 号。以 JSON 返回字段 \"1\"、\"27\"、\"53\",每个字段按图中索夹类型编号原样返回(形如 SJ9)。", "answer": "{\"1\": \"SJ1\", \"27\": \"SJ5\", \"53\": \"SJ1\"}"}, {"id": "MS-U26-09-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中适用于索夹 SJ7 的那一张,注中写明的单套重量和全桥套数各是多少?以 JSON 返回两个字段 单套重量、全桥套数,每个字段为 {value, unit};重量单位 kg,套数单位 套。", "answer": "{\"单套重量\": {\"value\": 997.37, \"unit\": \"kg\"}, \"全桥套数\": {\"value\": 12, \"unit\": \"套\"}}"}, {"id": "MS-U26-09-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥索夹一般构造图中索夹 SJ1 那一张的材料表里,“索夹SJ1-上半”“索夹SJ1-下半”的单重各是多少?以 JSON 返回两个字段 上半、下半,每个字段为 {value, unit},单位 kg。", "answer": "{\"上半\": {\"value\": 1177.63, \"unit\": \"kg\"}, \"下半\": {\"value\": 1999.8, \"unit\": \"kg\"}}"}]} {"page_01_file_name": "images/MS-U26-10/few_sheet/01.png", "page_02_file_name": "images/MS-U26-10/few_sheet/02.png", "page_03_file_name": "images/MS-U26-10/few_sheet/03.png", "page_04_file_name": "images/MS-U26-10/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U26-10", "set": "U26", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "支坪主桥主缆检修道的三道扶手绳,与索夹上栏杆立柱预留螺孔(2-M30)的中心在立面上沿垂直于主缆轴线方向的距离,下列说法哪些正确?", "options": [{"key": "A", "text": "最上一道扶手绳与预留螺孔中心相距 1350 mm", "correct": true}, {"key": "B", "text": "最上一道扶手绳与预留螺孔中心相距 1700 mm", "correct": false}, {"key": "C", "text": "中间一道扶手绳与预留螺孔中心相距 625 mm", "correct": false}, {"key": "D", "text": "最下一道扶手绳与预留螺孔中心相距 550 mm", "correct": true}, {"key": "E", "text": "中间一道扶手绳与预留螺孔中心相距 1300 mm", "correct": false}, {"key": "F", "text": "最下一道扶手绳与预留螺孔中心相距 575 mm", "correct": false}], "answer": ["A", "D"], "few_sheet_pages": [20, 2, 19, 12], "evidence_pages": [12, 20], "full_set_page_count": 21, "sub_questions": [{"id": "MS-U26-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主缆检修道扶手绳旁的尺寸 72.5,一端落在最下一道扶手绳上,另一端落在哪条线上?按图中文字原样返回该线的名称(形如 加劲梁顶面)。", "answer": "\"主缆中心线\""}, {"id": "MS-U26-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主缆检修道 C 大样中,扶手绳旁尺寸链最靠近索夹的那一段,标注数值是多少?按图注单位作答。以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 72.5, \"unit\": \"cm\"}"}, {"id": "MS-U26-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主缆检修道 C 大样中,最下一道与中间一道扶手绳之间的间距是多少?按图注单位作答。以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 40, \"unit\": \"cm\"}"}, {"id": "MS-U26-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "索夹SJ1立面图中,2-M30-7H深50 螺孔中心到主缆中心线的距离是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 175, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U26-11/few_sheet/01.png", "page_02_file_name": "images/MS-U26-11/few_sheet/02.png", "page_03_file_name": "images/MS-U26-11/few_sheet/03.png", "page_04_file_name": "images/MS-U26-11/few_sheet/04.png", "page_05_file_name": "images/MS-U26-11/few_sheet/05.png", "page_06_file_name": "images/MS-U26-11/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U26-11", "set": "U26", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "一根主缆上,靠牟家湾侧桥塔、吊索最长的那个吊点处,所有吊索两端锚具(上锚具与下锚具)合计重量是多少 kg?", "options": [{"key": "A", "text": "1199.28", "correct": true}, {"key": "B", "text": "615.50", "correct": false}, {"key": "C", "text": "599.64", "correct": false}, {"key": "D", "text": "718.00", "correct": false}, {"key": "E", "text": "2398.56", "correct": false}, {"key": "F", "text": "1231.00", "correct": false}], "answer": ["A"], "few_sheet_pages": [9, 3, 1, 6, 5, 2], "evidence_pages": [1, 2, 5, 6], "full_set_page_count": 21, "sub_questions": [{"id": "MS-U26-11-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“5-139吊索上锚具总装图”材料表里,单套锚具的总重是多少?返回数值和单位(kg)。", "answer": "{\"value\": 307.75, \"unit\": \"kg\"}"}, {"id": "MS-U26-11-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“5-139吊索下锚具总装图”材料表里,单套锚具的总重是多少?返回数值和单位(kg)。", "answer": "{\"value\": 291.89, \"unit\": \"kg\"}"}, {"id": "MS-U26-11-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图的立面图中,同一个索夹下挂着几根吊索?返回数值和单位(根)。", "answer": "{\"value\": 2, \"unit\": \"根\"}"}, {"id": "MS-U26-11-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索及索夹总体布置图的注中,采用关节轴承吊索的吊索编号范围是从几号到几号?以 JSON 返回两个字段 起、止,每个字段为编号的阿拉伯数字字符串(形如 \"9\")。", "answer": "{\"起\": \"17\", \"止\": \"37\"}"}, {"id": "MS-U26-11-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "一根主缆上,靠牟家湾侧桥塔、吊索最长的那个吊点,其吊索编号、吊索型号和吊索长度各是什么?以 JSON 返回三个字段 编号、型号、长度;编号为阿拉伯数字字符串(形如 \"9\"),型号按表中写法(形如 5-999),长度为 {value, unit},单位 m。", "answer": "{\"编号\": \"1\", \"型号\": \"5-139\", \"长度\": {\"value\": 90.5319, \"unit\": \"m\"}}"}, {"id": "MS-U26-11-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中,“5-139吊索上锚具总装图”材料表里上耳板的单重、“5-139吊索下锚具总装图”材料表里下耳板的单重各是多少?以 JSON 返回两个字段 上耳板、下耳板,每个字段为 {value, unit},单位 kg。", "answer": "{\"上耳板\": {\"value\": 185.5, \"unit\": \"kg\"}, \"下耳板\": {\"value\": 173.5, \"unit\": \"kg\"}}"}]} {"page_01_file_name": "images/MS-U26-12/few_sheet/01.png", "page_02_file_name": "images/MS-U26-12/few_sheet/02.png", "page_03_file_name": "images/MS-U26-12/few_sheet/03.png", "page_04_file_name": "images/MS-U26-12/few_sheet/04.png", "page_05_file_name": "images/MS-U26-12/few_sheet/05.png", "page_06_file_name": "images/MS-U26-12/few_sheet/06.png", "page_07_file_name": "images/MS-U26-12/few_sheet/07.png", "page_08_file_name": "images/MS-U26-12/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U26-12", "set": "U26", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "下列编号的吊索中,哪些吊索的下锚具(锚固在加劲梁一端)总长超过 1435 mm?", "options": [{"key": "A", "text": "1 号吊索", "correct": false}, {"key": "B", "text": "27 号吊索", "correct": true}, {"key": "C", "text": "40 号吊索", "correct": true}, {"key": "D", "text": "17 号吊索", "correct": false}, {"key": "E", "text": "37 号吊索", "correct": false}, {"key": "F", "text": "16 号吊索", "correct": true}], "answer": ["B", "C", "F"], "few_sheet_pages": [8, 6, 9, 3, 2, 10, 4, 1], "evidence_pages": [1, 2, 4, 6, 8, 10], "full_set_page_count": 21, "sub_questions": [{"id": "MS-U26-12-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“吊索类型及长度”表里,1 号、16 号、27 号 吊索的吊索型号各是什么?以 JSON 返回字段 \"1\"、\"16\"、\"27\",每个字段按表中写法原样返回型号(形如 5-999)。", "answer": "{\"1\": \"5-139\", \"16\": \"5-109\", \"27\": \"5-139\"}"}, {"id": "MS-U26-12-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“吊索类型及长度”表里,17 号、37 号、40 号 吊索的吊索型号各是什么?以 JSON 返回字段 \"17\"、\"37\"、\"40\",每个字段按表中写法原样返回型号(形如 5-999)。", "answer": "{\"17\": \"5-109\", \"37\": \"5-109\", \"40\": \"5-109\"}"}, {"id": "MS-U26-12-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索及索夹总体布置图的注中,采用关节轴承吊索的吊索编号范围是从几号到几号?以 JSON 返回两个字段 起、止,每个字段为编号的阿拉伯数字字符串(形如 \"9\")。", "answer": "{\"起\": \"17\", \"止\": \"37\"}"}, {"id": "MS-U26-12-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“5-109吊索下锚具总装图”上,锚具总长标注为多少?返回数值和单位(mm)。", "answer": "{\"value\": 1482, \"unit\": \"mm\"}"}, {"id": "MS-U26-12-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“5-109关节轴承吊索下锚具总装图”上,锚具总长标注为多少?返回数值和单位(mm)。", "answer": "{\"value\": 1297, \"unit\": \"mm\"}"}, {"id": "MS-U26-12-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主桥吊索一般构造及总成图中的“5-139关节轴承普通吊索上锚具总图”上,锚具总长标注为多少?返回数值和单位(mm)。", "answer": "{\"value\": 1452, \"unit\": \"mm\"}"}, {"id": "MS-U26-12-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "1 号吊索和 27 号吊索,各自的下锚具(锚固在加劲梁一端)总长是多少?以 JSON 返回两个字段 \"1\"、\"27\",每个字段为 {value, unit},单位 mm。", "answer": "{\"1\": {\"value\": 1431, \"unit\": \"mm\"}, \"27\": {\"value\": 1436, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U26-13/few_sheet/01.png", "page_02_file_name": "images/MS-U26-13/few_sheet/02.png", "page_03_file_name": "images/MS-U26-13/few_sheet/03.png", "page_04_file_name": "images/MS-U26-13/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U26-13", "set": "U26", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "编号为 20 的吊索,其下端锚具(每套),下列说法哪些正确?", "options": [{"key": "A", "text": "设有 GE100ET-2RS 向心关节轴承", "correct": true}, {"key": "B", "text": "吊索下锚杯单重 73.7 kg", "correct": true}, {"key": "C", "text": "吊索处密封压环单重 11.8 kg", "correct": false}, {"key": "D", "text": "连接筒单重 9.22 kg", "correct": false}, {"key": "E", "text": "密封罩单重 16.7 kg", "correct": true}, {"key": "F", "text": "销轴材料为 40CrNiMoA 锻钢", "correct": false}], "answer": ["A", "B", "E"], "few_sheet_pages": [4, 8, 2, 1], "evidence_pages": [1, 2, 8], "full_set_page_count": 21, "sub_questions": [{"id": "MS-U26-13-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主桥吊索一般构造及总成图”中的“吊索类型及长度”表里,吊索编号 20 的吊索型号和吊索长度各是多少?以 JSON 返回两个字段:type(按表中写法原样返回型号,形如 \"5-91\")、length(数值和单位 m)。", "answer": "{\"type\": \"5-109\", \"length\": {\"value\": 11.3221, \"unit\": \"m\"}}"}, {"id": "MS-U26-13-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“主桥吊索及索夹总体布置图”的附注中,吊索按长度分为无关节轴承和采用关节轴承两类,分界长度是多少?返回数值和单位(m)。", "answer": "{\"value\": 20, \"unit\": \"m\"}"}, {"id": "MS-U26-13-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“5-109关节轴承吊索下锚具总装图”的明细表中:向心关节轴承备注的型号是什么?吊索下锚杯、吊索处密封压环、连接筒、密封罩的单重各是多少?销轴的材料钢号是什么?以 JSON 返回六个字段:bearing(按表中写法原样返回型号)、anchor_cup、seal_ring、connector、cover(数值和单位 kg)、pin_steel(只写钢号,不含“锻钢”二字,形如 \"20CrMo\")。", "answer": "{\"bearing\": \"GE100ET-2RS\", \"anchor_cup\": {\"value\": 73.7, \"unit\": \"kg\"}, \"seal_ring\": {\"value\": 1.1, \"unit\": \"kg\"}, \"connector\": {\"value\": 11.8, \"unit\": \"kg\"}, \"cover\": {\"value\": 16.7, \"unit\": \"kg\"}, \"pin_steel\": \"40Cr\"}"}, {"id": "MS-U26-13-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“5-109吊索下锚具总装图”的明细表中:连接筒的单重是多少?下销轴的材料钢号是什么?以 JSON 返回两个字段:connector(数值和单位 kg)、pin_steel(只写钢号,不含“锻钢”二字,形如 \"20CrMo\")。", "answer": "{\"connector\": {\"value\": 9.22, \"unit\": \"kg\"}, \"pin_steel\": \"40CrNiMoA\"}"}, {"id": "MS-U26-13-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "编号为 20 的吊索,其下端锚具(每套)中分丝板的单重是多少?返回数值和单位(kg)。", "answer": "{\"value\": 0.24, \"unit\": \"kg\"}"}]} {"page_01_file_name": "images/MS-U27-01/few_sheet/01.png", "page_02_file_name": "images/MS-U27-01/few_sheet/02.png", "page_03_file_name": "images/MS-U27-01/few_sheet/03.png", "page_04_file_name": "images/MS-U27-01/few_sheet/04.png", "page_05_file_name": "images/MS-U27-01/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U27-01", "set": "U27", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "东、西两座景观天桥共 7 根钻孔灌注桩。下列桩中,哪些桩的桩长(桩顶标高至桩底标高)超过 20 m?", "options": [{"key": "A", "text": "NA-4", "correct": true}, {"key": "B", "text": "NA-1", "correct": true}, {"key": "C", "text": "NA-3", "correct": true}, {"key": "D", "text": "NA-2", "correct": false}, {"key": "E", "text": "NB-1", "correct": false}, {"key": "F", "text": "NB-3", "correct": false}], "answer": ["A", "B", "C"], "few_sheet_pages": [3, 2, 1, 4, 5], "evidence_pages": [5, 2, 3], "full_set_page_count": 20, "sub_questions": [{"id": "MS-U27-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁立面图”(适用于西侧景观天桥,图签“景观天桥桥型布置图”)上,桩顶标高、北端(图左“北⇦”一侧)两根桩中靠左那根的桩底标高、南端两根桩的暂定桩底标高各是多少?按字段 桩顶标高、北端左桩桩底、南端桩底 返回,每个字段为数值和单位(m)。", "answer": "{\"桩顶标高\": {\"value\": 3.1, \"unit\": \"m\"}, \"北端左桩桩底\": {\"value\": -17.9, \"unit\": \"m\"}, \"南端桩底\": {\"value\": -18.2, \"unit\": \"m\"}}"}, {"id": "MS-U27-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁立面图”(适用于西侧景观天桥,图签“景观天桥桥型布置图”)上,北端(图左“北⇦”一侧)两根桩中靠右那根的桩底标高是多少?返回数值和单位(m)。", "answer": "{\"value\": -16.1, \"unit\": \"m\"}"}, {"id": "MS-U27-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁立面图”(适用于东侧景观天桥,图签“景观天桥桥型布置图”)上,北端(图左“北⇦”一侧)桩的桩顶标高和暂定桩底标高、南端桩的桩顶标高和暂定桩底标高各是多少?按字段 北端桩顶、北端桩底、南端桩顶、南端桩底 返回,每个字段为数值和单位(m)。", "answer": "{\"北端桩顶\": {\"value\": 2.6, \"unit\": \"m\"}, \"北端桩底\": {\"value\": -12.4, \"unit\": \"m\"}, \"南端桩顶\": {\"value\": 3.1, \"unit\": \"m\"}, \"南端桩底\": {\"value\": -6.9, \"unit\": \"m\"}}"}, {"id": "MS-U27-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁立面图”(适用于东侧景观天桥,图签“景观天桥桥型布置图”)上,北端承台的顶面标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 5.1, \"unit\": \"m\"}"}, {"id": "MS-U27-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "编号为 NA-1 的钻孔灌注桩,桩底标高是多少?返回数值和单位(m)。", "answer": "{\"value\": -17.9, \"unit\": \"m\"}"}, {"id": "MS-U27-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "编号为 NA-3、NA-4 的两根钻孔灌注桩,桩底标高各是多少?按字段 NA-3、NA-4 返回,每个字段为数值和单位(m)。", "answer": "{\"NA-3\": {\"value\": -18.2, \"unit\": \"m\"}, \"NA-4\": {\"value\": -18.2, \"unit\": \"m\"}}"}, {"id": "MS-U27-01-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "编号为 NB-1、NB-3 的两根钻孔灌注桩,桩底标高各是多少?按字段 NB-1、NB-3 返回,每个字段为数值和单位(m)。", "answer": "{\"NB-1\": {\"value\": -12.4, \"unit\": \"m\"}, \"NB-3\": {\"value\": -6.9, \"unit\": \"m\"}}"}]} {"page_01_file_name": "images/MS-U27-02/few_sheet/01.png", "page_02_file_name": "images/MS-U27-02/few_sheet/02.png", "page_03_file_name": "images/MS-U27-02/few_sheet/03.png", "page_04_file_name": "images/MS-U27-02/few_sheet/04.png", "page_05_file_name": "images/MS-U27-02/few_sheet/05.png", "page_06_file_name": "images/MS-U27-02/few_sheet/06.png", "page_07_file_name": "images/MS-U27-02/few_sheet/07.png", "page_08_file_name": "images/MS-U27-02/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U27-02", "set": "U27", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于东侧景观天桥钢箱梁的平面形状和两端端部的方位,下列说法哪些正确?", "options": [{"key": "A", "text": "西侧景观天桥的钢箱梁北端同样为斜端", "correct": false}, {"key": "B", "text": "东侧挑梁底板比西侧挑梁底板长", "correct": false}, {"key": "C", "text": "钢箱梁北端为斜端,南端为正交端", "correct": true}, {"key": "D", "text": "东侧腹板比西侧腹板长", "correct": false}, {"key": "E", "text": "北端斜端处,西侧边缘比东侧边缘更向北伸出", "correct": true}, {"key": "F", "text": "北端斜交段的横隔板,自梁端向跨中与横桥向的夹角逐道减小,第四道起为 0°", "correct": true}], "answer": ["C", "E", "F"], "few_sheet_pages": [14, 7, 10, 6, 12, 11, 16, 9], "evidence_pages": [7, 6, 9, 11, 12, 16], "full_set_page_count": 20, "sub_questions": [{"id": "MS-U27-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“腹板FB立面示意图”中,FB1 和 FB2 的长度各是多少?按字段 FB1、FB2 返回,每个字段为数值和单位(mm)。", "answer": "{\"FB1\": {\"value\": 38714, \"unit\": \"mm\"}, \"FB2\": {\"value\": 37119, \"unit\": \"mm\"}}"}, {"id": "MS-U27-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“挑梁底板GF平面示意图”中,GF1 和 GF2 较长一边的长度各是多少?按字段 GF1、GF2 返回,每个字段为数值和单位(mm)。", "answer": "{\"GF1\": {\"value\": 39714, \"unit\": \"mm\"}, \"GF2\": {\"value\": 37112, \"unit\": \"mm\"}}"}, {"id": "MS-U27-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“隔板参数表”(适用于东侧景观天桥)中,GA1、GA2、GA3 的 a 各是多少?按字段 GA1、GA2、GA3 返回,只写表中数字,不带单位或“°”。", "answer": "{\"GA1\": \"38.79\", \"GA2\": \"28.184\", \"GA3\": \"14.998\"}"}, {"id": "MS-U27-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“隔板参数表”(适用于东侧景观天桥)中,GA4 和 GA12 的 a 各是多少?按字段 GA4、GA12 返回,只写表中数字,不带单位或“°”。", "answer": "{\"GA4\": \"0\", \"GA12\": \"0\"}"}, {"id": "MS-U27-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“钢梁立面”(适用于东侧景观天桥的景观天桥钢箱梁一般构造图)上,自左端起前四道主梁横隔板的编号依次是什么?按字段 第1道、第2道、第3道、第4道 返回,编号按图中原样写(形如 GA5)。", "answer": "{\"第1道\": \"GA1\", \"第2道\": \"GA2\", \"第3道\": \"GA3\", \"第4道\": \"GA4\"}"}, {"id": "MS-U27-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥钢箱梁北端梁端和南端梁端的第一道主梁横隔板,编号各是什么?按字段 北端、南端 返回,编号按图中原样写(形如 GA5)。", "answer": "{\"北端\": \"GA1\", \"南端\": \"GA12\"}"}, {"id": "MS-U27-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥钢箱梁的东侧腹板、西侧腹板、东侧挑梁底板、西侧挑梁底板,长度各是多少(挑梁底板取较长一边)?按字段 东侧腹板、西侧腹板、东侧挑梁底板、西侧挑梁底板 返回,每个字段为数值和单位(mm)。", "answer": "{\"东侧腹板\": {\"value\": 37119, \"unit\": \"mm\"}, \"西侧腹板\": {\"value\": 38714, \"unit\": \"mm\"}, \"东侧挑梁底板\": {\"value\": 37112, \"unit\": \"mm\"}, \"西侧挑梁底板\": {\"value\": 39714, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U27-03/few_sheet/01.png", "page_02_file_name": "images/MS-U27-03/few_sheet/02.png", "page_03_file_name": "images/MS-U27-03/few_sheet/03.png", "page_04_file_name": "images/MS-U27-03/few_sheet/04.png", "page_05_file_name": "images/MS-U27-03/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U27-03", "set": "U27", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "东侧景观天桥中跨内(北、南两处斜腿与主梁交汇处之间)位于跨中以北的主梁横隔板中,哪些比标准横隔板(高 550 mm)更高?", "options": [{"key": "A", "text": "GA7", "correct": true}, {"key": "B", "text": "GA8", "correct": true}, {"key": "C", "text": "GA9", "correct": false}, {"key": "D", "text": "GA10", "correct": false}, {"key": "E", "text": "GA3", "correct": false}, {"key": "F", "text": "GA12", "correct": false}], "answer": ["A", "B"], "few_sheet_pages": [6, 15, 16, 19, 7], "evidence_pages": [7, 16, 19], "full_set_page_count": 20, "sub_questions": [{"id": "MS-U27-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“隔板参数表”(适用于东侧景观天桥)中,GA7、GA8、GA9 的高 H 各是多少?按字段 GA7、GA8、GA9 返回,每个字段为数值和单位(mm)。", "answer": "{\"GA7\": {\"value\": 900, \"unit\": \"mm\"}, \"GA8\": {\"value\": 628, \"unit\": \"mm\"}, \"GA9\": {\"value\": 579, \"unit\": \"mm\"}}"}, {"id": "MS-U27-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“隔板参数表”(适用于东侧景观天桥)中,GA10、GA3、GA12 的高 H 各是多少?按字段 GA10、GA3、GA12 返回,每个字段为数值和单位(mm)。", "answer": "{\"GA10\": {\"value\": 780, \"unit\": \"mm\"}, \"GA3\": {\"value\": 550, \"unit\": \"mm\"}, \"GA12\": {\"value\": 500, \"unit\": \"mm\"}}"}, {"id": "MS-U27-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“钢梁立面”(适用于东侧景观天桥的景观天桥钢箱梁一般构造图)上,GA6 右边紧接的两道主梁横隔板(自左向右)和 GA11 左边紧接的两道主梁横隔板(自右向左),编号依次是什么?按字段 GA6右1、GA6右2、GA11左1、GA11左2 返回,编号按图中原样写(形如 GA5)。", "answer": "{\"GA6右1\": \"GA7\", \"GA6右2\": \"GA8\", \"GA11左1\": \"GA10\", \"GA11左2\": \"GA9\"}"}, {"id": "MS-U27-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“隔板参数表”(适用于西侧景观天桥)中,GA7、GA8 的高 H 各是多少?按字段 GA7、GA8 返回,每个字段为数值和单位(mm)。", "answer": "{\"GA7\": {\"value\": 581, \"unit\": \"mm\"}, \"GA8\": {\"value\": 786, \"unit\": \"mm\"}}"}, {"id": "MS-U27-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥上,北侧斜腿与主梁交汇处那道横隔板往南紧接的两道主梁横隔板,高各是多少?按字段 第1道、第2道 返回,每个字段为数值和单位(mm)。", "answer": "{\"第1道\": {\"value\": 900, \"unit\": \"mm\"}, \"第2道\": {\"value\": 628, \"unit\": \"mm\"}}"}, {"id": "MS-U27-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥上,南侧斜腿与主梁交汇处那道横隔板往北紧接的两道主梁横隔板,高各是多少?按字段 第1道、第2道 返回,每个字段为数值和单位(mm)。", "answer": "{\"第1道\": {\"value\": 780, \"unit\": \"mm\"}, \"第2道\": {\"value\": 579, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U27-04/few_sheet/01.png", "page_02_file_name": "images/MS-U27-04/few_sheet/02.png", "page_03_file_name": "images/MS-U27-04/few_sheet/03.png", "page_04_file_name": "images/MS-U27-04/few_sheet/04.png", "page_05_file_name": "images/MS-U27-04/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U27-04", "set": "U27", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿西侧景观天桥由北向南,在北、南两处斜腿与主梁交汇处之间,主梁横隔板的高度先降后升。下列\"前一道 → 紧接的下一道\"(mm)中,哪些正确?", "options": [{"key": "A", "text": "629 → 581", "correct": false}, {"key": "B", "text": "581 → 786", "correct": true}, {"key": "C", "text": "786 → 581", "correct": false}, {"key": "D", "text": "903 → 629", "correct": true}, {"key": "E", "text": "900 → 628", "correct": false}, {"key": "F", "text": "903 → 550", "correct": false}], "answer": ["B", "D"], "few_sheet_pages": [16, 7, 17, 6, 15], "evidence_pages": [6, 15, 17], "full_set_page_count": 20, "sub_questions": [{"id": "MS-U27-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“隔板参数表”(适用于西侧景观天桥)中,GA5、GA6、GA2 的高 H 各是多少?按字段 GA5、GA6、GA2 返回,每个字段为数值和单位(mm)。", "answer": "{\"GA5\": {\"value\": 903, \"unit\": \"mm\"}, \"GA6\": {\"value\": 629, \"unit\": \"mm\"}, \"GA2\": {\"value\": 550, \"unit\": \"mm\"}}"}, {"id": "MS-U27-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“隔板参数表”(适用于西侧景观天桥)中,GA7、GA8 的高 H 各是多少?按字段 GA7、GA8 返回,每个字段为数值和单位(mm)。", "answer": "{\"GA7\": {\"value\": 581, \"unit\": \"mm\"}, \"GA8\": {\"value\": 786, \"unit\": \"mm\"}}"}, {"id": "MS-U27-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“钢梁立面”(适用于西侧景观天桥的景观天桥钢箱梁一般构造图)上,GA4 右边紧接的三道主梁横隔板,自左向右编号依次是什么?按字段 第1道、第2道、第3道 返回,编号按图中原样写(形如 GA5)。", "answer": "{\"第1道\": \"GA5\", \"第2道\": \"GA6\", \"第3道\": \"GA2\"}"}, {"id": "MS-U27-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“钢梁立面”(适用于西侧景观天桥的景观天桥钢箱梁一般构造图)上,GA9 左边紧接的三道主梁横隔板,自右向左编号依次是什么?按字段 第1道、第2道、第3道 返回,编号按图中原样写(形如 GA5)。", "answer": "{\"第1道\": \"GA8\", \"第2道\": \"GA7\", \"第3道\": \"GA2\"}"}, {"id": "MS-U27-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“隔板参数表”(适用于东侧景观天桥)中,GA7、GA8 的高 H 各是多少?按字段 GA7、GA8 返回,每个字段为数值和单位(mm)。", "answer": "{\"GA7\": {\"value\": 900, \"unit\": \"mm\"}, \"GA8\": {\"value\": 628, \"unit\": \"mm\"}}"}, {"id": "MS-U27-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "西侧景观天桥上,北侧斜腿与主梁交汇处那道横隔板往南紧接的一道主梁横隔板,高是多少?返回数值和单位(mm)。", "answer": "{\"value\": 903, \"unit\": \"mm\"}"}, {"id": "MS-U27-04-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "西侧景观天桥上,南侧斜腿与主梁交汇处那道横隔板往北紧接的一道主梁横隔板,高是多少?返回数值和单位(mm)。", "answer": "{\"value\": 786, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U27-05/few_sheet/01.png", "page_02_file_name": "images/MS-U27-05/few_sheet/02.png", "page_03_file_name": "images/MS-U27-05/few_sheet/03.png", "page_04_file_name": "images/MS-U27-05/few_sheet/04.png", "page_05_file_name": "images/MS-U27-05/few_sheet/05.png", "page_06_file_name": "images/MS-U27-05/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U27-05", "set": "U27", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "东、西两座景观天桥各自的中跨内,位于北、南两处斜腿与主梁交汇处之间(不含交汇处那两道)的全部主梁横隔板,钢材重量合计是多少(kg)?", "options": [{"key": "A", "text": "965.8", "correct": false}, {"key": "B", "text": "1013.4", "correct": false}, {"key": "C", "text": "2826.4", "correct": false}, {"key": "D", "text": "927.0", "correct": false}, {"key": "E", "text": "2029.0", "correct": false}, {"key": "F", "text": "1940.4", "correct": true}], "answer": ["F"], "few_sheet_pages": [14, 16, 8, 15, 6, 7], "evidence_pages": [6, 7, 15, 16], "full_set_page_count": 20, "sub_questions": [{"id": "MS-U27-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“工程材料汇总表”(适用于西侧景观天桥)中,钢梁横隔板 GA5、GA6、GA2 的单件净重各是多少?按字段 GA5、GA6、GA2 返回,每个字段为数值和单位(kg)。", "answer": "{\"GA5\": {\"value\": 154.0, \"unit\": \"kg\"}, \"GA6\": {\"value\": 103.2, \"unit\": \"kg\"}, \"GA2\": {\"value\": 88.6, \"unit\": \"kg\"}}"}, {"id": "MS-U27-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“工程材料汇总表”(适用于西侧景观天桥)中,钢梁横隔板 GA7、GA8 的单件净重各是多少?按字段 GA7、GA8 返回,每个字段为数值和单位(kg)。", "answer": "{\"GA7\": {\"value\": 94.4, \"unit\": \"kg\"}, \"GA8\": {\"value\": 132.4, \"unit\": \"kg\"}}"}, {"id": "MS-U27-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“工程材料汇总表”(适用于东侧景观天桥)中,钢梁横隔板 GA7、GA8、GA4 的单件净重各是多少?按字段 GA7、GA8、GA4 返回,每个字段为数值和单位(kg)。", "answer": "{\"GA7\": {\"value\": 153.5, \"unit\": \"kg\"}, \"GA8\": {\"value\": 103.1, \"unit\": \"kg\"}, \"GA4\": {\"value\": 88.6, \"unit\": \"kg\"}}"}, {"id": "MS-U27-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“工程材料汇总表”(适用于东侧景观天桥)中,钢梁横隔板 GA9、GA10 的单件净重各是多少?按字段 GA9、GA10 返回,每个字段为数值和单位(kg)。", "answer": "{\"GA9\": {\"value\": 94.0, \"unit\": \"kg\"}, \"GA10\": {\"value\": 131.2, \"unit\": \"kg\"}}"}, {"id": "MS-U27-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“钢梁立面”(适用于西侧景观天桥的景观天桥钢箱梁一般构造图)上 GA6 与 GA7 之间画了几道 GA2,“钢梁立面”(适用于东侧景观天桥的景观天桥钢箱梁一般构造图)上 GA8 与 GA9 之间画了几道 GA4?按字段 西侧GA2、东侧GA4 返回,每个字段为数值和单位(单位一律写“块”)。", "answer": "{\"西侧GA2\": {\"value\": 5, \"unit\": \"块\"}, \"东侧GA4\": {\"value\": 6, \"unit\": \"块\"}}"}, {"id": "MS-U27-05-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“工程材料汇总表”(适用于西侧景观天桥)中 GA2 的件数和“工程材料汇总表”(适用于东侧景观天桥)中 GA4 的件数各是多少?按字段 西侧GA2件数、东侧GA4件数 返回,每个字段为数值和单位(单位一律写“块”)。", "answer": "{\"西侧GA2件数\": {\"value\": 11, \"unit\": \"块\"}, \"东侧GA4件数\": {\"value\": 10, \"unit\": \"块\"}}"}, {"id": "MS-U27-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "西侧景观天桥上,北侧斜腿与主梁交汇处那道横隔板往南紧接的一道主梁横隔板,单件钢材重量是多少?返回数值和单位(kg)。", "answer": "{\"value\": 154.0, \"unit\": \"kg\"}"}]} {"page_01_file_name": "images/MS-U27-06/few_sheet/01.png", "page_02_file_name": "images/MS-U27-06/few_sheet/02.png", "page_03_file_name": "images/MS-U27-06/few_sheet/03.png", "page_04_file_name": "images/MS-U27-06/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U27-06", "set": "U27", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "关于东侧景观天桥钢箱梁的顶板纵肋和挑梁底板,下列说法哪些正确?", "options": [{"key": "A", "text": "位于东侧翼缘下方的顶板纵肋,最短一根长 38829 mm", "correct": false}, {"key": "B", "text": "东侧翼缘下方的 4 根顶板纵肋,合计净重 1148.6 kg", "correct": true}, {"key": "C", "text": "东侧翼缘下方的挑梁底板,单件净重为 5782.2 kg", "correct": true}, {"key": "D", "text": "箱内顶板纵肋最长一根,比东侧翼缘下方最长一根长 1547 mm", "correct": true}, {"key": "E", "text": "位于东侧翼缘下方的顶板纵肋,最短一根长 37399 mm", "correct": false}, {"key": "F", "text": "位于东侧翼缘下方的顶板纵肋,最长一根长 36940 mm", "correct": true}], "answer": ["B", "C", "D", "F"], "few_sheet_pages": [15, 8, 9, 16], "evidence_pages": [9, 15, 16], "full_set_page_count": 20, "sub_questions": [{"id": "MS-U27-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥钢箱梁截面上,标'东'一侧翼缘下方的顶板纵肋编号范围是什么?按图中编号原样返回起止两个编号(形如 TL2-1)。", "answer": "[\"TL1-5\", \"TL1-8\"]"}, {"id": "MS-U27-06-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥钢箱梁截面上,标'西'一侧翼缘下方的顶板纵肋编号范围是什么?按图中编号原样返回起止两个编号(形如 TL2-1)。", "answer": "[\"TL1-1\", \"TL1-4\"]"}, {"id": "MS-U27-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥工程材料汇总表中,TL1-5 的长度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 36940, \"unit\": \"mm\"}"}, {"id": "MS-U27-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥工程材料汇总表中,TL1-6 的长度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 36698, \"unit\": \"mm\"}"}, {"id": "MS-U27-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥工程材料汇总表中,TL1-7 的长度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 36457, \"unit\": \"mm\"}"}, {"id": "MS-U27-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥工程材料汇总表中,TL1-8 的长度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 36216, \"unit\": \"mm\"}"}, {"id": "MS-U27-06-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥工程材料汇总表中,TL1-1 的长度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 39552, \"unit\": \"mm\"}"}, {"id": "MS-U27-06-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥工程材料汇总表中,TL2-1 的长度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 38487, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U27-07/few_sheet/01.png", "page_02_file_name": "images/MS-U27-07/few_sheet/02.png", "page_03_file_name": "images/MS-U27-07/few_sheet/03.png", "page_04_file_name": "images/MS-U27-07/few_sheet/04.png", "page_05_file_name": "images/MS-U27-07/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U27-07", "set": "U27", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "东侧景观天桥北端承台下的两根钻孔灌注桩,关于它们及该端的布置,下列说法哪些正确?", "options": [{"key": "A", "text": "该端桩的暂定桩底标高为 −12.4 m", "correct": true}, {"key": "B", "text": "这两根桩的桩径均为 1.2 m", "correct": false}, {"key": "C", "text": "西侧景观天桥北端承台下确有两根桩(NA-1、NA-2)", "correct": true}, {"key": "D", "text": "该端的桩编号为 NB-2、NB-3", "correct": false}, {"key": "E", "text": "东侧天桥北端承台下只有一根桩(NB-1),并不存在两根", "correct": true}, {"key": "F", "text": "两座天桥北端的桩顶标高相同", "correct": false}], "answer": ["A", "C", "E"], "few_sheet_pages": [2, 1, 4, 3, 5], "evidence_pages": [5, 3, 2], "full_set_page_count": 20, "sub_questions": [{"id": "MS-U27-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桩位坐标表”中,NB-1 的 X 坐标、NB-2 的 X 坐标、NB-3 的 X 坐标各是多少?按字段 NB-1、NB-2、NB-3 返回,每个字段为数值和单位(m)。", "answer": "{\"NB-1\": {\"value\": 226569.738, \"unit\": \"m\"}, \"NB-2\": {\"value\": 226543.997, \"unit\": \"m\"}, \"NB-3\": {\"value\": 226541.943, \"unit\": \"m\"}}"}, {"id": "MS-U27-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁立面图”(适用于东侧景观天桥,图签“景观天桥桥型布置图”)上,北端(图左“北⇦”一侧)桩的桩径、桩顶标高和暂定桩底标高各是多少?按字段 桩径、桩顶标高、桩底标高 返回,桩径为数值和单位(mm),标高为数值和单位(m)。", "answer": "{\"桩径\": {\"value\": 1600, \"unit\": \"mm\"}, \"桩顶标高\": {\"value\": 2.6, \"unit\": \"m\"}, \"桩底标高\": {\"value\": -12.4, \"unit\": \"m\"}}"}, {"id": "MS-U27-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁立面图”(适用于东侧景观天桥,图签“景观天桥桥型布置图”)上,南端(图右“南⇨”一侧)桩的桩径是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1200, \"unit\": \"mm\"}"}, {"id": "MS-U27-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桩位坐标表”中,NA-1 的 X 坐标、NA-2 的 X 坐标、NA-3 的 X 坐标、NA-4 的 X 坐标各是多少?按字段 NA-1、NA-2、NA-3、NA-4 返回,每个字段为数值和单位(m)。", "answer": "{\"NA-1\": {\"value\": 226575.463, \"unit\": \"m\"}, \"NA-2\": {\"value\": 226572.941, \"unit\": \"m\"}, \"NA-3\": {\"value\": 226554.487, \"unit\": \"m\"}, \"NA-4\": {\"value\": 226552.491, \"unit\": \"m\"}}"}, {"id": "MS-U27-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁立面图”(适用于西侧景观天桥,图签“景观天桥桥型布置图”)上,北端(图左“北⇦”一侧)桩的桩顶标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 3.1, \"unit\": \"m\"}"}, {"id": "MS-U27-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥上桩径为 1.6 m 的钻孔灌注桩,编号是什么?按“桩位坐标表”的编号原样返回(形如 NA-1)。", "answer": "\"NB-1\""}]} {"page_01_file_name": "images/MS-U27-08/few_sheet/01.png", "page_02_file_name": "images/MS-U27-08/few_sheet/02.png", "page_03_file_name": "images/MS-U27-08/few_sheet/03.png", "page_04_file_name": "images/MS-U27-08/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U27-08", "set": "U27", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "西侧景观天桥钢梁立面上,位于 17500 mm 中跨右端尺寸界线处的那道钢梁横隔板,下列说法哪些正确?", "options": [{"key": "A", "text": "板件竖向总高为 1196 mm", "correct": false}, {"key": "B", "text": "板件竖向总高为 1354 mm", "correct": false}, {"key": "C", "text": "单件净重为 277.8 kg", "correct": true}, {"key": "D", "text": "隔板参数 H 为 1196 mm", "correct": true}, {"key": "E", "text": "板件竖向尺寸中间一段为 536 mm", "correct": true}, {"key": "F", "text": "单件净重为 325.3 kg", "correct": false}], "answer": ["C", "D", "E"], "few_sheet_pages": [13, 6, 14, 15], "evidence_pages": [6, 13, 15], "full_set_page_count": 20, "sub_questions": [{"id": "MS-U27-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "西侧景观天桥钢梁立面中,17500 mm 中跨右端尺寸界线处的钢梁横隔板编号是什么?按图中编号原样返回(形如 GA1)。", "answer": "\"GA9\""}, {"id": "MS-U27-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "西侧景观天桥钢梁立面中,17500 mm 中跨左端尺寸界线处的钢梁横隔板编号是什么?按图中编号原样返回(形如 GA1)。", "answer": "\"GA4\""}, {"id": "MS-U27-08-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "西侧景观天桥通用隔板 GA 大样注明不适用于哪两个编号?按图中编号原样返回两个编号(形如 GA1)。", "answer": "[\"GA4\", \"GA9\"]"}, {"id": "MS-U27-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "西侧景观天桥隔板 GA9 大样图中,板件左侧标注的竖向总尺寸是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1167, \"unit\": \"mm\"}"}, {"id": "MS-U27-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "西侧景观天桥隔板 GA4 大样图中,板件左侧标注的竖向总尺寸是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1354, \"unit\": \"mm\"}"}, {"id": "MS-U27-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "西侧景观天桥隔板参数表中,GA9 的 H 是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1196, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U27-09/few_sheet/01.png", "page_02_file_name": "images/MS-U27-09/few_sheet/02.png", "page_03_file_name": "images/MS-U27-09/few_sheet/03.png", "page_04_file_name": "images/MS-U27-09/few_sheet/04.png", "page_05_file_name": "images/MS-U27-09/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U27-09", "set": "U27", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "西侧景观天桥北端承台下的两根钻孔灌注桩,关于它们及该端的布置,下列说法哪些正确?", "options": [{"key": "A", "text": "西侧天桥北端承台下只有一根桩,并不存在两根", "correct": false}, {"key": "B", "text": "两根中编号为 NA-1 的那根桩底更深,为 −17.9 m", "correct": true}, {"key": "C", "text": "这两根桩的编号是 NA-3、NA-4", "correct": false}, {"key": "D", "text": "这两根桩的桩径均为 1.2 m", "correct": true}, {"key": "E", "text": "该端桩顶标高为 2.6 m", "correct": false}, {"key": "F", "text": "东侧景观天桥北端承台下同样有两根桩", "correct": false}], "answer": ["B", "D"], "few_sheet_pages": [2, 5, 1, 3, 4], "evidence_pages": [5, 2, 3], "full_set_page_count": 20, "sub_questions": [{"id": "MS-U27-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桩位坐标表”中,NA-1 的 X 坐标、NA-2 的 X 坐标、NA-3 的 X 坐标、NA-4 的 X 坐标各是多少?按字段 NA-1、NA-2、NA-3、NA-4 返回,每个字段为数值和单位(m)。", "answer": "{\"NA-1\": {\"value\": 226575.463, \"unit\": \"m\"}, \"NA-2\": {\"value\": 226572.941, \"unit\": \"m\"}, \"NA-3\": {\"value\": 226554.487, \"unit\": \"m\"}, \"NA-4\": {\"value\": 226552.491, \"unit\": \"m\"}}"}, {"id": "MS-U27-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁立面图”(适用于西侧景观天桥,图签“景观天桥桥型布置图”)上,北端(图左“北⇦”一侧)两根桩中靠左那根和靠右那根的桩径、该端桩顶标高、靠左那根的桩底标高各是多少?按字段 左桩桩径、右桩桩径、桩顶标高、左桩桩底 返回,桩径为数值和单位(mm),标高为数值和单位(m)。", "answer": "{\"左桩桩径\": {\"value\": 1200, \"unit\": \"mm\"}, \"右桩桩径\": {\"value\": 1200, \"unit\": \"mm\"}, \"桩顶标高\": {\"value\": 3.1, \"unit\": \"m\"}, \"左桩桩底\": {\"value\": -17.9, \"unit\": \"m\"}}"}, {"id": "MS-U27-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁立面图”(适用于西侧景观天桥,图签“景观天桥桥型布置图”)上,北端(图左“北⇦”一侧)两根桩中靠右那根的桩底标高是多少?返回数值和单位(m)。", "answer": "{\"value\": -16.1, \"unit\": \"m\"}"}, {"id": "MS-U27-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁立面图”(适用于东侧景观天桥,图签“景观天桥桥型布置图”)上,北端(图左“北⇦”一侧)桩的桩顶标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 2.6, \"unit\": \"m\"}"}, {"id": "MS-U27-09-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桩位坐标表”中,NB-1 的 X 坐标、NB-2 的 X 坐标、NB-3 的 X 坐标各是多少?按字段 NB-1、NB-2、NB-3 返回,每个字段为数值和单位(m)。", "answer": "{\"NB-1\": {\"value\": 226569.738, \"unit\": \"m\"}, \"NB-2\": {\"value\": 226543.997, \"unit\": \"m\"}, \"NB-3\": {\"value\": 226541.943, \"unit\": \"m\"}}"}, {"id": "MS-U27-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "编号为 NA-1 的钻孔灌注桩,桩底标高是多少?返回数值和单位(m)。", "answer": "{\"value\": -17.9, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U27-10/few_sheet/01.png", "page_02_file_name": "images/MS-U27-10/few_sheet/02.png", "page_03_file_name": "images/MS-U27-10/few_sheet/03.png", "page_04_file_name": "images/MS-U27-10/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U27-10", "set": "U27", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "东侧景观天桥钢梁立面上,19500 mm 中跨内 7×2000 mm 等间距段左端尺寸界线处的那道钢梁横隔板,下列说法哪些正确?", "options": [{"key": "A", "text": "其隔板参数 H 为 786 mm", "correct": false}, {"key": "B", "text": "单件净重为 103.1 kg", "correct": true}, {"key": "C", "text": "板件竖向总高为 596 mm", "correct": true}, {"key": "D", "text": "其隔板参数 H 为 900 mm", "correct": false}, {"key": "E", "text": "单件净重为 153.5 kg", "correct": false}, {"key": "F", "text": "板件竖向总高为 628 mm", "correct": false}], "answer": ["B", "C"], "few_sheet_pages": [14, 7, 15, 16], "evidence_pages": [7, 14, 15, 16], "full_set_page_count": 20, "sub_questions": [{"id": "MS-U27-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥钢梁立面中,19500 mm 中跨内 7×2000 mm 等间距段左端尺寸界线处的钢梁横隔板编号是什么?按图中编号原样返回(形如 GA1)。", "answer": "\"GA8\""}, {"id": "MS-U27-10-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥钢梁立面中,19500 mm 中跨内左侧两段 1375 mm 相接处的钢梁横隔板编号是什么?按图中编号原样返回(形如 GA1)。", "answer": "\"GA7\""}, {"id": "MS-U27-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥隔板参数表中,GA8 的 H 是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 628, \"unit\": \"mm\"}"}, {"id": "MS-U27-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥隔板GA大样图中,板件竖向总尺寸标注为 H 减去多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 32, \"unit\": \"mm\"}"}, {"id": "MS-U27-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥隔板参数表中,GA7 的 H 是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 900, \"unit\": \"mm\"}"}, {"id": "MS-U27-10-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥隔板GA大样图标题下注明不适用于哪两个编号?按图中编号原样返回两个编号(形如 GA1)。", "answer": "[\"GA6\", \"GA11\"]"}]} {"page_01_file_name": "images/MS-U27-11/few_sheet/01.png", "page_02_file_name": "images/MS-U27-11/few_sheet/02.png", "page_03_file_name": "images/MS-U27-11/few_sheet/03.png", "page_04_file_name": "images/MS-U27-11/few_sheet/04.png", "page_05_file_name": "images/MS-U27-11/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U27-11", "set": "U27", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于两座景观天桥的平面走向和桩位布置,下列说法哪些正确?", "options": [{"key": "A", "text": "东侧天桥南端的 NB-2、NB-3 两根桩沿桥轴线一前一后布置,而不是横桥向并排", "correct": true}, {"key": "B", "text": "西侧天桥北端的桩比其南端的桩离东侧天桥更近(两桥向南张开)", "correct": true}, {"key": "C", "text": "由北端走向南端,西侧天桥大致朝东南方向延伸", "correct": false}, {"key": "D", "text": "西侧天桥南端两根桩中,NA-4 比 NA-3 更靠近跨中", "correct": false}, {"key": "E", "text": "由北端走向南端,东侧天桥大致朝南偏东方向延伸", "correct": true}, {"key": "F", "text": "NB-1 位于东侧天桥北端,桩径 1.6 m", "correct": true}], "answer": ["A", "B", "E", "F"], "few_sheet_pages": [5, 3, 2, 4, 1], "evidence_pages": [5, 3, 1], "full_set_page_count": 20, "sub_questions": [{"id": "MS-U27-11-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桩位坐标表”中,NA-1 和 NA-4 的 X、Y 坐标各是多少?按字段 NA-1_X、NA-1_Y、NA-4_X、NA-4_Y 返回,每个字段为数值和单位(m)。", "answer": "{\"NA-1_X\": {\"value\": 226575.463, \"unit\": \"m\"}, \"NA-1_Y\": {\"value\": 43620.574, \"unit\": \"m\"}, \"NA-4_X\": {\"value\": 226552.491, \"unit\": \"m\"}, \"NA-4_Y\": {\"value\": 43593.441, \"unit\": \"m\"}}"}, {"id": "MS-U27-11-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桩位坐标表”中,NB-1 和 NB-3 的 X、Y 坐标各是多少?按字段 NB-1_X、NB-1_Y、NB-3_X、NB-3_Y 返回,每个字段为数值和单位(m)。", "answer": "{\"NB-1_X\": {\"value\": 226569.738, \"unit\": \"m\"}, \"NB-1_Y\": {\"value\": 43670.593, \"unit\": \"m\"}, \"NB-3_X\": {\"value\": 226541.943, \"unit\": \"m\"}, \"NB-3_Y\": {\"value\": 43687.417, \"unit\": \"m\"}}"}, {"id": "MS-U27-11-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桩位坐标表”中,NA-3 的 X 坐标、NB-2 的 X 和 Y 坐标各是多少?按字段 NA-3_X、NB-2_X、NB-2_Y 返回,每个字段为数值和单位(m)。", "answer": "{\"NA-3_X\": {\"value\": 226554.487, \"unit\": \"m\"}, \"NB-2_X\": {\"value\": 226543.997, \"unit\": \"m\"}, \"NB-2_Y\": {\"value\": 43686.174, \"unit\": \"m\"}}"}, {"id": "MS-U27-11-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥梁立面图”(适用于东侧景观天桥,图签“景观天桥桥型布置图”)上,北端(图左“北⇦”一侧)桩的桩径是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1600, \"unit\": \"mm\"}"}, {"id": "MS-U27-11-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥上桩径为 1.6 m 的钻孔灌注桩,编号是什么?按“桩位坐标表”的编号原样返回(形如 NA-1)。", "answer": "\"NB-1\""}]} {"page_01_file_name": "images/MS-U27-12/few_sheet/01.png", "page_02_file_name": "images/MS-U27-12/few_sheet/02.png", "page_03_file_name": "images/MS-U27-12/few_sheet/03.png", "page_04_file_name": "images/MS-U27-12/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U27-12", "set": "U27", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "两座景观天桥中,中跨跨径较小的那一座,关于其钢箱梁的顶板、底板和腹板,下列说法哪些正确?", "options": [{"key": "A", "text": "底板 DB1 的单件净重为 2677.5 kg", "correct": false}, {"key": "B", "text": "底板 DB2 的单件净重为 5194.7 kg", "correct": true}, {"key": "C", "text": "底板 DB1 的长度 L 为 9978 mm", "correct": true}, {"key": "D", "text": "腹板 FB2 的合重为 172.3 kg", "correct": true}, {"key": "E", "text": "底板 DB3 的长度 L 为 9097 mm", "correct": true}, {"key": "F", "text": "顶板 TB 的单件净重为 21430.2 kg", "correct": false}], "answer": ["B", "C", "D", "E"], "few_sheet_pages": [16, 15, 10, 2], "evidence_pages": [2, 15, 10], "full_set_page_count": 20, "sub_questions": [{"id": "MS-U27-12-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥钢箱梁一般构造图中,\"工程材料汇总表(适用于西侧景观天桥)\"里,顶板 TB、底板 DB1、底板 DB2 的单件净重各是多少?以 JSON 返回三个字段 TB、DB1、DB2,每个字段为数值和单位(kg)。", "answer": "{\"TB\": {\"value\": 21154.0, \"unit\": \"kg\"}, \"DB1\": {\"value\": 2171.0, \"unit\": \"kg\"}, \"DB2\": {\"value\": 5194.7, \"unit\": \"kg\"}}"}, {"id": "MS-U27-12-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥钢箱梁一般构造图中,\"工程材料汇总表(适用于西侧景观天桥)\"里,腹板 FB2 的合重是多少?返回数值和单位(kg)。", "answer": "{\"value\": 172.3, \"unit\": \"kg\"}"}, {"id": "MS-U27-12-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥钢箱梁一般构造图中(附注写明适用于西侧景观天桥的那张),\"底板DB立面示意图\"上 DB1、DB3 的长度 L 各是多少?以 JSON 返回两个字段 DB1、DB3,每个字段为数值和单位(mm)。", "answer": "{\"DB1\": {\"value\": 9978, \"unit\": \"mm\"}, \"DB3\": {\"value\": 9097, \"unit\": \"mm\"}}"}, {"id": "MS-U27-12-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥钢箱梁一般构造图中,\"工程材料汇总表(适用于东侧景观天桥)\"里,顶板 TB、底板 DB1 的单件净重各是多少?以 JSON 返回两个字段 TB、DB1,每个字段为数值和单位(kg)。", "answer": "{\"TB\": {\"value\": 21430.2, \"unit\": \"kg\"}, \"DB1\": {\"value\": 2677.5, \"unit\": \"kg\"}}"}, {"id": "MS-U27-12-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥桥型布置图附注 4 中,西侧、东侧景观天桥的中跨跨径各是多少?以 JSON 返回两个字段 西侧、东侧,每个字段为数值和单位(m)。", "answer": "{\"西侧\": {\"value\": 17.5, \"unit\": \"m\"}, \"东侧\": {\"value\": 19.5, \"unit\": \"m\"}}"}, {"id": "MS-U27-12-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "中跨跨径为 17.5 m 的那座景观天桥,其钢箱梁工程材料汇总表中顶板 TB、底板 DB1、底板 DB2 的单件净重各是多少?以 JSON 返回三个字段 TB、DB1、DB2,每个字段为数值和单位(kg)。", "answer": "{\"TB\": {\"value\": 21154.0, \"unit\": \"kg\"}, \"DB1\": {\"value\": 2171.0, \"unit\": \"kg\"}, \"DB2\": {\"value\": 5194.7, \"unit\": \"kg\"}}"}]} {"page_01_file_name": "images/MS-U28-01/few_sheet/01.png", "page_02_file_name": "images/MS-U28-01/few_sheet/02.png", "page_03_file_name": "images/MS-U28-01/few_sheet/03.png", "page_04_file_name": "images/MS-U28-01/few_sheet/04.png", "page_05_file_name": "images/MS-U28-01/few_sheet/05.png", "page_06_file_name": "images/MS-U28-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U28-01", "set": "U28", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "北锚碇隧道锚沿主缆方向由明洞、前锚室、锚塞体、后锚室等洞段组成。下列洞段中,哪些在初期支护以内还设有二次衬砌?", "options": [{"key": "A", "text": "锚塞体后端洞段(紧邻后锚室处)", "correct": false}, {"key": "B", "text": "前锚室洞段", "correct": true}, {"key": "C", "text": "锚塞体中部洞段", "correct": false}, {"key": "D", "text": "后锚室洞段", "correct": true}, {"key": "E", "text": "明洞洞口端墙段(设门洞和缆索过孔处)", "correct": false}, {"key": "F", "text": "明洞拱圈段", "correct": false}], "answer": ["B", "D"], "few_sheet_pages": [9, 13, 12, 20, 6, 11], "evidence_pages": [9, 11, 12, 13], "full_set_page_count": 23, "sub_questions": [{"id": "MS-U28-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北锚碇一般构造图(隧道锚方案)中,画有人洞、竖向总高标注 1500 的 B—B 断面,边墙处由外向内依次是 C25 喷射混凝土、一道间隔层、C35 钢筋防水混凝土二次衬砌。这三层的厚度各是多少?按字段 喷射混凝土、间隔层、二次衬砌 返回,每个字段为数值和单位(cm)。", "answer": "{\"喷射混凝土\": {\"value\": 25, \"unit\": \"cm\"}, \"间隔层\": {\"value\": 8, \"unit\": \"cm\"}, \"二次衬砌\": {\"value\": 60, \"unit\": \"cm\"}}"}, {"id": "MS-U28-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北锚碇一般构造图(隧道锚方案)中,画有人洞的 E—E 断面,边墙处由外向内依次是 C25 喷射混凝土、一道间隔层、C35 钢筋防水混凝土二次衬砌。这三层的厚度各是多少?按字段 喷射混凝土、间隔层、二次衬砌 返回,每个字段为数值和单位(cm)。", "answer": "{\"喷射混凝土\": {\"value\": 27, \"unit\": \"cm\"}, \"间隔层\": {\"value\": 10, \"unit\": \"cm\"}, \"二次衬砌\": {\"value\": 70, \"unit\": \"cm\"}}"}, {"id": "MS-U28-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北锚碇一般构造图(隧道锚方案)中,画有人洞、宽度标注为\"1380/2~1700/2\"的 C—C 断面,边墙处从外轮廓到净空的单侧总厚度是多少?其中 C25 喷射混凝土层的厚度又是多少?按字段 单侧总厚、喷射混凝土 返回,每个字段为数值和单位(cm)。", "answer": "{\"单侧总厚\": {\"value\": 27, \"unit\": \"cm\"}, \"喷射混凝土\": {\"value\": 27, \"unit\": \"cm\"}}"}, {"id": "MS-U28-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北锚碇一般构造图(隧道锚方案)中,画有人洞的 D—D 断面,边墙处从外轮廓到净空的单侧总厚度是多少?其中 C25 喷射混凝土层的厚度又是多少?按字段 单侧总厚、喷射混凝土 返回,每个字段为数值和单位(cm)。", "answer": "{\"单侧总厚\": {\"value\": 27, \"unit\": \"cm\"}, \"喷射混凝土\": {\"value\": 27, \"unit\": \"cm\"}}"}, {"id": "MS-U28-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北锚碇一般构造图(隧道锚方案)中,北锚明洞立面图对应的 B—B 断面(明洞断面),拱圈的厚度是多少?返回数值和单位(cm)。", "answer": "{\"value\": 93, \"unit\": \"cm\"}"}, {"id": "MS-U28-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚碇隧道锚沿主缆方向的立面上标有剖切符号 B 和 E。这两处剖切所剖示的断面各属于哪个洞段?从 {明洞, 前锚室, 锚塞体, 后锚室} 中选,按字段 B、E 返回。", "answer": "{\"B\": \"前锚室\", \"E\": \"后锚室\"}"}, {"id": "MS-U28-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚碇隧道锚沿主缆方向的立面上标有剖切符号 C 和 D。这两处剖切所剖示的断面各属于哪个洞段?从 {明洞, 前锚室, 锚塞体, 后锚室} 中选,按字段 C、D 返回。", "answer": "{\"C\": \"锚塞体\", \"D\": \"锚塞体\"}"}]} {"page_01_file_name": "images/MS-U28-02/few_sheet/01.png", "page_02_file_name": "images/MS-U28-02/few_sheet/02.png", "page_03_file_name": "images/MS-U28-02/few_sheet/03.png", "page_04_file_name": "images/MS-U28-02/few_sheet/04.png", "page_05_file_name": "images/MS-U28-02/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U28-02", "set": "U28", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "北锚碇右幅鞍座基础下的桩基采用多大桩径、多长?下列说法哪些正确?", "options": [{"key": "A", "text": "桩基采用水下 C35 混凝土", "correct": true}, {"key": "B", "text": "桩径 250 cm、桩长 1400 cm,桩底高程 225.211 m", "correct": true}, {"key": "C", "text": "桩基与鞍座基础同为 C40 混凝土", "correct": false}, {"key": "D", "text": "桩基横桥向中心距 500 cm、顺桥向中心距 600 cm", "correct": false}, {"key": "E", "text": "右幅鞍座基础下并没有桩基", "correct": false}, {"key": "F", "text": "共 12 根,横桥向 4 根、顺桥向 3 排", "correct": true}], "answer": ["A", "B", "F"], "few_sheet_pages": [9, 15, 10, 14, 16], "evidence_pages": [9, 14, 16], "full_set_page_count": 23, "sub_questions": [{"id": "MS-U28-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”第 9 页:“北锚右幅鞍座基础立面”上垫层以下画出几根桩?同页“A—A”剖面上垫层以下画出几根桩?返回 JSON 对象,字段名固定为 立面、剖面(剖面指 A—A),每个字段为数值和单位(根)。", "answer": "{\"立面\": {\"value\": 3, \"unit\": \"根\"}, \"剖面\": {\"value\": 4, \"unit\": \"根\"}}"}, {"id": "MS-U28-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”第 4 页的“北锚立面布置图(右幅)”上,鞍座基础下的桩标注的桩径、桩长各是多少?桩底标注的高程是多少?返回 JSON 对象,字段名固定为 桩径、桩长、桩底高程;桩径、桩长为数值和单位(cm),桩底高程为数值和单位(m)。", "answer": "{\"桩径\": {\"value\": 250, \"unit\": \"cm\"}, \"桩长\": {\"value\": 1400, \"unit\": \"cm\"}, \"桩底高程\": {\"value\": 225.211, \"unit\": \"m\"}}"}, {"id": "MS-U28-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”第 9 页的“北锚右幅鞍座基础平面”上,桩位的中心距标注:沿基础宽 2400 cm 方向(即 A—A 剖面方向,横桥向)相邻桩中心距是多少?沿另一方向(即立面方向,顺桥向)相邻桩中心距是多少?返回 JSON 对象,字段名固定为 横桥向、顺桥向,每个字段为数值和单位(cm)。", "answer": "{\"横桥向\": {\"value\": 600, \"unit\": \"cm\"}, \"顺桥向\": {\"value\": 500, \"unit\": \"cm\"}}"}, {"id": "MS-U28-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”第 11 页“主要工程数量表”的“桩基”一栏中,“水下C35混凝土”一行和“C40混凝土”一行各填了多少?空白格记 0。返回 JSON 对象,字段名固定为 水下C35、C40,每个字段为数值和单位(m³)。", "answer": "{\"水下C35\": {\"value\": 824.67, \"unit\": \"m³\"}, \"C40\": {\"value\": 0, \"unit\": \"m³\"}}"}, {"id": "MS-U28-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”中的“北锚左幅鞍座基础立面”上,基础底面(垫层)以下共画出几根桩?没有画桩则答 0。返回数值和单位(根)。", "answer": "{\"value\": 0, \"unit\": \"根\"}"}, {"id": "MS-U28-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚碇右幅鞍座基础下的桩,桩底高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 225.211, \"unit\": \"m\"}"}, {"id": "MS-U28-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚碇右幅鞍座基础下的桩,横桥向相邻桩的中心距是多少?返回数值和单位(cm)。", "answer": "{\"value\": 600, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U28-03/few_sheet/01.png", "page_02_file_name": "images/MS-U28-03/few_sheet/02.png", "page_03_file_name": "images/MS-U28-03/few_sheet/03.png", "page_04_file_name": "images/MS-U28-03/few_sheet/04.png", "page_05_file_name": "images/MS-U28-03/few_sheet/05.png", "page_06_file_name": "images/MS-U28-03/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U28-03", "set": "U28", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于北锚碇两幅锚体在平面上的方位,下列说法哪些正确?", "options": [{"key": "A", "text": "设有桩基的右幅锚碇位于左幅锚碇的西南侧(偏西)", "correct": true}, {"key": "B", "text": "设有桩基的鞍座基础位于图面上方(偏东北)的那一幅", "correct": false}, {"key": "C", "text": "后锚室位于前锚室的南偏东方向,比前锚室更靠近长江", "correct": false}, {"key": "D", "text": "由锚碇沿主缆往桥跨方向,大致朝南偏东", "correct": true}, {"key": "E", "text": "设有桩基的右幅锚碇位于左幅锚碇的东北侧", "correct": false}, {"key": "F", "text": "由锚碇沿主缆往桥跨方向,大致朝北偏西", "correct": false}], "answer": ["A", "D"], "few_sheet_pages": [6, 14, 2, 4, 3, 1], "evidence_pages": [1, 2, 3, 14], "full_set_page_count": 23, "sub_questions": [{"id": "MS-U28-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇结构布置总图(隧道锚方案)”第 1 页的平面图上有一个指北针。指北针箭头大致指向图面的哪个方向?从 上、下、左、右、左上、右上、左下、右下 八个词中选一个返回。", "answer": "\"左上\""}, {"id": "MS-U28-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇结构布置总图(隧道锚方案)”第 1 页的平面图上,沿任一幅的主缆中心线看,鞍座基础(矩形块)相对于锚体圆弧形的后端位于图面的哪个方向?从 上、下、左、右、左上、右上、左下、右下 八个词中选一个返回。", "answer": "\"右\""}, {"id": "MS-U28-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇结构布置总图(隧道锚方案)”第 2 页(附“北锚碇定位点坐标表”)的平面图上,两幅锚碇中画有桩位点 P1-1~P4-3 的那一幅,位于另一幅的图面哪个方向?从 上、下、左、右、左上、右上、左下、右下 八个词中选一个返回。", "answer": "\"下\""}, {"id": "MS-U28-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”中的“北锚右幅鞍座基础平面”上共画出几个桩位圆?返回数值和单位(根)。", "answer": "{\"value\": 12, \"unit\": \"根\"}"}, {"id": "MS-U28-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚碇右幅鞍座基础下共设几根桩?返回数值和单位(根)。", "answer": "{\"value\": 12, \"unit\": \"根\"}"}]} {"page_01_file_name": "images/MS-U28-04/few_sheet/01.png", "page_02_file_name": "images/MS-U28-04/few_sheet/02.png", "page_03_file_name": "images/MS-U28-04/few_sheet/03.png", "page_04_file_name": "images/MS-U28-04/few_sheet/04.png", "page_05_file_name": "images/MS-U28-04/few_sheet/05.png", "page_06_file_name": "images/MS-U28-04/few_sheet/06.png", "page_07_file_name": "images/MS-U28-04/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U28-04", "set": "U28", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "北锚碇左幅鞍座基础下的桩基采用多大桩径、多长?下列说法哪些正确?", "options": [{"key": "A", "text": "桩基采用水下 C35 混凝土", "correct": false}, {"key": "B", "text": "共 12 根,横桥向 4 根、顺桥向 3 排", "correct": false}, {"key": "C", "text": "左幅鞍座基础顺桥向全长 2149.5 cm,比右幅长 300.0 cm", "correct": true}, {"key": "D", "text": "左幅鞍座基础分 6 层浇筑", "correct": false}, {"key": "E", "text": "左幅鞍座基础下并没有桩基", "correct": true}, {"key": "F", "text": "桩径 250 cm、桩长 1400 cm", "correct": false}], "answer": ["C", "E"], "few_sheet_pages": [14, 10, 3, 15, 9, 16, 18], "evidence_pages": [15, 10, 14, 18, 16], "full_set_page_count": 23, "sub_questions": [{"id": "MS-U28-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”中的“北锚左幅鞍座基础立面”上,基础底面(垫层)以下共画出几根桩?没有画桩则答 0。返回数值和单位(根)。", "answer": "{\"value\": 0, \"unit\": \"根\"}"}, {"id": "MS-U28-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”中的“北锚左幅鞍座基础立面”上,基础顶部标注的水平总长是多少?返回数值和单位(cm)。", "answer": "{\"value\": 2149.5, \"unit\": \"cm\"}"}, {"id": "MS-U28-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”中的“北锚右幅鞍座基础立面”上,基础顶部标注的水平总长是多少?返回数值和单位(cm)。", "answer": "{\"value\": 1849.5, \"unit\": \"cm\"}"}, {"id": "MS-U28-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇冷却管布置图(隧道锚方案)”第 2 页的“左幅鞍座基础分层示意图”给浇筑层标了层号。最上面一层的层号是多少?只返回层号(阿拉伯数字)。", "answer": "\"7\""}, {"id": "MS-U28-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”第 9 页:“北锚右幅鞍座基础立面”上画的桩,桩径和桩长各标多少?同页“北锚右幅鞍座基础平面”上共画出几根桩?返回 JSON 对象,字段名固定为 桩径、桩长、根数;桩径和桩长为数值和单位(cm),根数为数值和单位(根)。", "answer": "{\"桩径\": {\"value\": 250, \"unit\": \"cm\"}, \"桩长\": {\"value\": 1400, \"unit\": \"cm\"}, \"根数\": {\"value\": 12, \"unit\": \"根\"}}"}, {"id": "MS-U28-04-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”第 11 页“主要工程数量表”中,“水下C35混凝土”一行在“桩基”一栏的数量是多少?返回数值和单位(m³)。", "answer": "{\"value\": 824.67, \"unit\": \"m³\"}"}, {"id": "MS-U28-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚碇左幅鞍座基础的顺桥向全长是多少?返回数值和单位(cm)。", "answer": "{\"value\": 2149.5, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U28-05/few_sheet/01.png", "page_02_file_name": "images/MS-U28-05/few_sheet/02.png", "page_03_file_name": "images/MS-U28-05/few_sheet/03.png", "page_04_file_name": "images/MS-U28-05/few_sheet/04.png", "page_05_file_name": "images/MS-U28-05/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U28-05", "set": "U28", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "检修人员从鞍座基础顶面出发,沿前锚室内的检修通道一路下到前锚面,再沿前锚面上行检查。下列\"前一段 → 紧接的下一段\"中,哪些与图纸一致?", "options": [{"key": "A", "text": "T2(混凝土楼梯)→ T5(竖直钢爬梯,宽 70 cm)", "correct": true}, {"key": "B", "text": "T2(混凝土楼梯)→ T3(前锚室混凝土楼梯)", "correct": false}, {"key": "C", "text": "T3(前锚室混凝土楼梯)→ T5(竖直钢爬梯)", "correct": false}, {"key": "D", "text": "T1(混凝土楼梯,宽 80 cm)→ T2(混凝土楼梯,宽 80 cm)", "correct": true}, {"key": "E", "text": "T3(前锚室混凝土楼梯)→ T4(前锚面钢爬梯,宽 70 cm)", "correct": false}, {"key": "F", "text": "T5(竖直钢爬梯)→ T3(前锚室混凝土楼梯)", "correct": true}], "answer": ["A", "D", "F"], "few_sheet_pages": [20, 21, 19, 16, 22], "evidence_pages": [19, 20, 22], "full_set_page_count": 23, "sub_questions": [{"id": "MS-U28-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇检修通道总体布置图(隧道锚方案)”的“北锚碇前锚室检修楼梯立面布置图”中,编号 T5 的那段梯子,上端连着哪一段、下端连着哪一段?按图上编号原样返回(形如 Tn)。返回 JSON 对象,字段名固定为 上端、下端。", "answer": "{\"上端\": \"T2\", \"下端\": \"T3\"}"}, {"id": "MS-U28-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇检修通道总体布置图(隧道锚方案)”的“北锚碇前锚室检修楼梯立面布置图”中,编号 T1 那段楼梯的下端连着哪一段?编号 T3 那段楼梯的下端连着哪一段?按图上编号原样返回(形如 Tn)。返回 JSON 对象,字段名固定为 T1下端、T3下端。", "answer": "{\"T1下端\": \"T2\", \"T3下端\": \"T4\"}"}, {"id": "MS-U28-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇检修通道总体布置图(隧道锚方案)”的材料数量估算表中,T1、T2、T5 三段的楼梯宽各是多少?返回 JSON 对象,字段名固定为 T1、T2、T5,每个字段为数值和单位(cm)。", "answer": "{\"T1\": {\"value\": 80, \"unit\": \"cm\"}, \"T2\": {\"value\": 80, \"unit\": \"cm\"}, \"T5\": {\"value\": 70, \"unit\": \"cm\"}}"}, {"id": "MS-U28-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇检修通道总体布置图(隧道锚方案)”的材料数量估算表中,T4 的楼梯宽是多少?T3 的楼梯类型是什么?返回 JSON 对象,字段名固定为 T4宽、T3类型;T4宽为数值和单位(cm),T3类型按表中文字原样返回。", "answer": "{\"T4宽\": {\"value\": 30, \"unit\": \"cm\"}, \"T3类型\": \"混凝土\"}"}, {"id": "MS-U28-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚碇前锚室检修通道中,有一段宽 70 cm 的钢结构爬梯。它在图上的编号是什么?按图上编号原样返回(形如 Tn)。", "answer": "\"T5\""}, {"id": "MS-U28-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚碇前锚室检修通道中,贴着前锚面布置的那段钢爬梯,宽多少?返回数值和单位(cm)。", "answer": "{\"value\": 30, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U28-06/few_sheet/01.png", "page_02_file_name": "images/MS-U28-06/few_sheet/02.png", "page_03_file_name": "images/MS-U28-06/few_sheet/03.png", "page_04_file_name": "images/MS-U28-06/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U28-06", "set": "U28", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "北锚左幅鞍座基础及其下方的 C20 垫层混凝土,下列说法哪些正确?", "options": [{"key": "A", "text": "垫层底面标高为 239.011 m", "correct": false}, {"key": "B", "text": "最下一层冷却管比垫层底面高 0.70 m", "correct": false}, {"key": "C", "text": "分层浇筑时,第 2 层混凝土的顶面标高为 251.211 m", "correct": false}, {"key": "D", "text": "最下一层冷却管的标高为 239.711 m", "correct": true}, {"key": "E", "text": "垫层底面标高为 238.911 m", "correct": true}, {"key": "F", "text": "最下一层冷却管比垫层底面高 0.50 m", "correct": false}], "answer": ["D", "E"], "few_sheet_pages": [15, 4, 18, 14], "evidence_pages": [4, 14, 15, 18], "full_set_page_count": 23, "sub_questions": [{"id": "MS-U28-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚左幅鞍座基础底面的标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 239.211, \"unit\": \"m\"}"}, {"id": "MS-U28-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北锚左幅鞍座基础立面中,C20 垫层混凝土的厚度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 30, \"unit\": \"cm\"}"}, {"id": "MS-U28-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北锚右幅鞍座基础立面中,C20 垫层混凝土的文字标注厚度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 20, \"unit\": \"cm\"}"}, {"id": "MS-U28-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北锚左幅鞍座基础立面底部,1410 右侧那一段水平尺寸是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 300, \"unit\": \"cm\"}"}, {"id": "MS-U28-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "竖向尺寸依次标 740、700、600 的那张北锚碇立面布置图中,700 这道竖向尺寸的上端对应的标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 252.211, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U28-07/few_sheet/01.png", "page_02_file_name": "images/MS-U28-07/few_sheet/02.png", "page_03_file_name": "images/MS-U28-07/few_sheet/03.png", "page_04_file_name": "images/MS-U28-07/few_sheet/04.png", "page_05_file_name": "images/MS-U28-07/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U28-07", "set": "U28", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "北锚碇左右两幅的锚塞体和鞍座基础都分层浇筑混凝土。全锚碇(两幅合计)锚塞体与鞍座基础一共分多少个浇筑层?", "options": [{"key": "A", "text": "60", "correct": false}, {"key": "B", "text": "31", "correct": false}, {"key": "C", "text": "62", "correct": true}, {"key": "D", "text": "58", "correct": false}, {"key": "E", "text": "48", "correct": false}, {"key": "F", "text": "55", "correct": false}], "answer": ["C"], "few_sheet_pages": [17, 6, 23, 18, 20], "evidence_pages": [17, 18, 6], "full_set_page_count": 23, "sub_questions": [{"id": "MS-U28-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇冷却管布置图(隧道锚方案)”中的“锚塞体分层示意图”,给各浇筑层标了层号。最上面一层的层号是多少?只返回层号(阿拉伯数字)。", "answer": "\"24\""}, {"id": "MS-U28-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇冷却管布置图(隧道锚方案)”第 2 页有“左幅鞍座基础分层示意图”和“右幅鞍座基础分层示意图”两张图,都给浇筑层标了层号。两张图里最上面一层的层号各是多少?返回 JSON 对象,字段名固定为 左幅、右幅,每个字段为层号(阿拉伯数字)。", "answer": "{\"左幅\": \"7\", \"右幅\": \"7\"}"}, {"id": "MS-U28-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇冷却管布置图(隧道锚方案)”中“锚塞体分层示意图”右侧的竖向尺寸标注里,中间等距的一段写成“n×200=4400”的形式。这里的 n 是多少?只返回这个数(阿拉伯数字)。", "answer": "\"22\""}, {"id": "MS-U28-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇冷却管布置图(隧道锚方案)”第 2 页“左幅鞍座基础分层示意图”右侧的竖向尺寸标注里,等距的一段写成“n×200=1200”的形式。这里的 n 是多少?只返回这个数(阿拉伯数字)。", "answer": "\"6\""}, {"id": "MS-U28-07-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”第 1 页的“北锚碇三维示意图”上,标注为“锚塞体”的构件和标注为“鞍座基础”的构件各有几处?返回 JSON 对象,字段名固定为 锚塞体、鞍座基础,每个字段为数值和单位(个)。", "answer": "{\"锚塞体\": {\"value\": 2, \"unit\": \"个\"}, \"鞍座基础\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U28-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚碇锚塞体分层浇筑混凝土,各浇筑层编有层号。锚塞体最上面一层的层号是多少?只返回层号(阿拉伯数字)。", "answer": "\"24\""}, {"id": "MS-U28-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚碇右幅鞍座基础分层浇筑混凝土,各浇筑层编有层号。右幅鞍座基础最上面一层的层号是多少?只返回层号(阿拉伯数字)。", "answer": "\"7\""}]} {"page_01_file_name": "images/MS-U28-08/few_sheet/01.png", "page_02_file_name": "images/MS-U28-08/few_sheet/02.png", "page_03_file_name": "images/MS-U28-08/few_sheet/03.png", "page_04_file_name": "images/MS-U28-08/few_sheet/04.png", "page_05_file_name": "images/MS-U28-08/few_sheet/05.png", "page_06_file_name": "images/MS-U28-08/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U28-08", "set": "U28", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "沿主缆中心线由桥跨侧进入山体,北锚碇隧道锚的洞身断面依次变化。关于其空间形态,下列说法哪些正确?", "options": [{"key": "A", "text": "主缆中心线由前锚面向后锚面向下倾斜,后锚面低于前锚面", "correct": true}, {"key": "B", "text": "前锚室开挖断面高 1900 cm,与后锚室相同", "correct": false}, {"key": "C", "text": "锚塞体洞段的开挖断面由前向后逐渐扩大,后端宽 1700 cm、高 1900 cm", "correct": true}, {"key": "D", "text": "后锚室净宽(1486 cm)大于前锚室净宽(1194 cm)", "correct": true}, {"key": "E", "text": "明洞拱圈外半径与前锚室开挖外轮廓拱部半径相同,均为 690 cm", "correct": true}, {"key": "F", "text": "锚塞体洞段的断面前大后小,向后收窄到宽 1380 cm", "correct": false}], "answer": ["A", "C", "D", "E"], "few_sheet_pages": [12, 11, 13, 20, 9, 6], "evidence_pages": [9, 11, 12, 13], "full_set_page_count": 23, "sub_questions": [{"id": "MS-U28-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”第 6 页(与 C—C 断面同页)的 B—B 断面上,二次衬砌内的净宽、断面总高、最外一圈拱部半径各标多少?返回 JSON 对象,字段名固定为 净宽、总高、外半径,每个字段为数值和单位(cm)。", "answer": "{\"净宽\": {\"value\": 1194, \"unit\": \"cm\"}, \"总高\": {\"value\": 1500, \"unit\": \"cm\"}, \"外半径\": {\"value\": 690, \"unit\": \"cm\"}}"}, {"id": "MS-U28-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”第 6 页的 C—C 断面上,底部最外一道总宽标注写成“a/2~b/2”的形式。a 和 b 各是多少?返回 JSON 对象,字段名固定为 a、b,每个字段为数值和单位(cm)。", "answer": "{\"a\": {\"value\": 1380, \"unit\": \"cm\"}, \"b\": {\"value\": 1700, \"unit\": \"cm\"}}"}, {"id": "MS-U28-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”第 7 页有 D—D、E—E 两个断面。D—D 断面的总宽、总高各标多少?E—E 断面二次衬砌内的净宽标多少?返回 JSON 对象,字段名固定为 D总宽、D总高、E净宽(分别指 D—D 总宽、D—D 总高、E—E 净宽),每个字段为数值和单位(cm)。", "answer": "{\"D总宽\": {\"value\": 1700, \"unit\": \"cm\"}, \"D总高\": {\"value\": 1900, \"unit\": \"cm\"}, \"E净宽\": {\"value\": 1486, \"unit\": \"cm\"}}"}, {"id": "MS-U28-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”第 8 页,与“北锚明洞立面图”同页的 B—B 断面上,明洞拱圈外缘半径标多少?返回数值和单位(cm)。", "answer": "{\"value\": 690, \"unit\": \"cm\"}"}, {"id": "MS-U28-08-R5", "role": "read", "tiers": ["full_set"], "question": "“北锚碇结构布置总图(隧道锚方案)”中的“北锚碇右洞立面布置图”上,主缆中心线穿过锚塞体处画有两个小圆,一个在锚塞体前端(靠鞍座基础一侧),一个在锚塞体后端。按图左侧的高程标尺估读,两个小圆中心的高程各约多少米?返回 JSON 对象,字段名固定为 前端、后端,每个字段为数值和单位(m)。", "answer": "{\"前端\": {\"value\": 235, \"unit\": \"m\"}, \"后端\": {\"value\": 199, \"unit\": \"m\"}}"}, {"id": "MS-U28-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚碇后锚室洞身断面,二次衬砌内的净宽是多少?返回数值和单位(cm)。", "answer": "{\"value\": 1486, \"unit\": \"cm\"}"}, {"id": "MS-U28-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚碇前锚室洞身开挖断面的总高是多少?返回数值和单位(cm)。", "answer": "{\"value\": 1500, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U28-09/few_sheet/01.png", "page_02_file_name": "images/MS-U28-09/few_sheet/02.png", "page_03_file_name": "images/MS-U28-09/few_sheet/03.png", "page_04_file_name": "images/MS-U28-09/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U28-09", "set": "U28", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "北锚碇前锚室洞段(锚塞体前锚面与鞍座之间)的隧道横断面,下列说法哪些正确?", "options": [{"key": "A", "text": "二次衬砌内轮廓净宽 1486 cm", "correct": false}, {"key": "B", "text": "C35 钢筋防水混凝土二次衬砌厚 60 cm", "correct": true}, {"key": "C", "text": "外层 C25 喷射混凝土厚 27 cm", "correct": false}, {"key": "D", "text": "二次衬砌拱部外缘半径为 690 cm", "correct": false}, {"key": "E", "text": "衬砌为单层拱圈、厚 93 cm,不设喷射混凝土层", "correct": false}, {"key": "F", "text": "二次衬砌内轮廓底角倒角为 50×50", "correct": false}], "answer": ["B"], "few_sheet_pages": [11, 13, 12, 9], "evidence_pages": [9, 11, 12, 13], "full_set_page_count": 23, "sub_questions": [{"id": "MS-U28-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "北锚右幅中,穿过前锚室洞段的剖切符号是哪个字母?只返回一个大写字母(形如 X)。", "answer": "\"B\""}, {"id": "MS-U28-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "隧道锚断面图 B—B 中,C35 钢筋防水混凝土二次衬砌的厚度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 60, \"unit\": \"cm\"}"}, {"id": "MS-U28-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "隧道锚断面图 E—E 中,C35 钢筋防水混凝土二次衬砌的厚度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 70, \"unit\": \"cm\"}"}, {"id": "MS-U28-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "隧道锚断面图 B—B 中,C25 喷射混凝土的厚度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 25, \"unit\": \"cm\"}"}, {"id": "MS-U28-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "北锚明洞立面图下方的 B—B 断面中,拱圈厚度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 93, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U28-10/few_sheet/01.png", "page_02_file_name": "images/MS-U28-10/few_sheet/02.png", "page_03_file_name": "images/MS-U28-10/few_sheet/03.png", "page_04_file_name": "images/MS-U28-10/few_sheet/04.png", "page_05_file_name": "images/MS-U28-10/few_sheet/05.png", "page_06_file_name": "images/MS-U28-10/few_sheet/06.png", "page_07_file_name": "images/MS-U28-10/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U28-10", "set": "U28", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "前锚室内的检修通道贴着结构表面布置。关于各段楼梯、爬梯在立面上的走向,下列说法哪些正确?", "options": [{"key": "A", "text": "后锚室施工楼梯 T6 与 T3 平行,也沿主缆方向布置", "correct": false}, {"key": "B", "text": "T3 楼梯铺在前锚室底板上,与主缆中心线平行", "correct": true}, {"key": "C", "text": "T2 是三段混凝土楼梯(T1、T2、T3)中坡度最缓的一段", "correct": false}, {"key": "D", "text": "T1 楼梯铺在鞍座基础顶部的缓坡面上,其水平投影和高度与该坡面的 684.5 cm × 386.2 cm 一致", "correct": true}, {"key": "E", "text": "T4 爬梯贴着前锚面布置,与主缆中心线垂直", "correct": true}, {"key": "F", "text": "T5 是倾斜钢梯,坡度与 T4 相同", "correct": false}], "answer": ["B", "D", "E"], "few_sheet_pages": [16, 20, 14, 13, 22, 21, 19], "evidence_pages": [19, 21, 14, 20, 22], "full_set_page_count": 23, "sub_questions": [{"id": "MS-U28-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇检修通道总体布置图(隧道锚方案)”中的“北锚碇前锚室检修楼梯立面布置图”上,T3 楼梯的水平总长和竖向总高各标多少?返回 JSON 对象,字段名固定为 水平、竖向,每个字段为数值和单位(cm)。", "answer": "{\"水平\": {\"value\": 1410, \"unit\": \"cm\"}, \"竖向\": {\"value\": 1183.1, \"unit\": \"cm\"}}"}, {"id": "MS-U28-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇检修通道总体布置图(隧道锚方案)”中的“北锚碇前锚室检修楼梯立面布置图”上,T4 爬梯的水平总长和竖向总高各标多少?返回 JSON 对象,字段名固定为 水平、竖向,每个字段为数值和单位(cm)。", "answer": "{\"水平\": {\"value\": 755.2, \"unit\": \"cm\"}, \"竖向\": {\"value\": 900, \"unit\": \"cm\"}}"}, {"id": "MS-U28-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇检修通道构造图(隧道锚方案)”中的“T1侧立面”上,T1 楼梯的水平总长和竖向总高各标多少?返回 JSON 对象,字段名固定为 水平、竖向,每个字段为数值和单位(cm)。", "answer": "{\"水平\": {\"value\": 684.5, \"unit\": \"cm\"}, \"竖向\": {\"value\": 386.2, \"unit\": \"cm\"}}"}, {"id": "MS-U28-10-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇一般构造图(隧道锚方案)”第 11 页的“集水井大样”中,集水井所在斜向底板旁画有一个坡度三角形,一条直角边标 1,另一条直角边标多少?只返回这个数。", "answer": "\"0.8391\""}, {"id": "MS-U28-10-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇检修通道总体布置图(隧道锚方案)”第 2 页的“北锚碇后锚室施工楼梯立面图”上,T6 楼梯的水平总长和竖向总高各标多少?返回 JSON 对象,字段名固定为 水平、竖向,每个字段为数值和单位(cm)。", "answer": "{\"水平\": {\"value\": 1057.3, \"unit\": \"cm\"}, \"竖向\": {\"value\": 1260, \"unit\": \"cm\"}}"}, {"id": "MS-U28-10-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“北锚碇检修通道构造图(隧道锚方案)”第 2 页的“T5楼梯侧立面”上,T5 梯身与水平面的夹角是多少度?只返回角度数值(阿拉伯数字,单位为度,不写单位)。", "answer": "\"90\""}, {"id": "MS-U28-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "前锚室检修通道中 T2 楼梯的水平总长和竖向总高各是多少?返回 JSON 对象,字段名固定为 水平、竖向,每个字段为数值和单位(cm)。", "answer": "{\"水平\": {\"value\": 276.3, \"unit\": \"cm\"}, \"竖向\": {\"value\": 390.1, \"unit\": \"cm\"}}"}]} {"page_01_file_name": "images/MS-U29-01/few_sheet/01.png", "page_02_file_name": "images/MS-U29-01/few_sheet/02.png", "page_03_file_name": "images/MS-U29-01/few_sheet/03.png", "page_04_file_name": "images/MS-U29-01/few_sheet/04.png", "page_05_file_name": "images/MS-U29-01/few_sheet/05.png", "page_06_file_name": "images/MS-U29-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U29-01", "set": "U29", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "沿桩号增大方向,下列\"前一段纵坡 → 紧接的下一段纵坡\"中,哪些在某一条还建道路的纵断面上真实相邻?", "options": [{"key": "A", "text": "+2.8% → +0.3%", "correct": false}, {"key": "B", "text": "+3.9% → +10%", "correct": false}, {"key": "C", "text": "+2.8% → −0.5%", "correct": true}, {"key": "D", "text": "−7.5% → +2.8%", "correct": false}, {"key": "E", "text": "−4.8% → −2%", "correct": false}, {"key": "F", "text": "−1.5% → +10%", "correct": true}], "answer": ["C", "F"], "few_sheet_pages": [2, 4, 1, 5, 9, 3], "evidence_pages": [2, 1, 3, 5], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U29-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路三纵断面图”的坡度/坡长栏中,沿桩号增大方向依次有几段纵坡、各是多少?以 JSON 返回:n(只写阿拉伯数字,字符串)以及 i1、i2……(i1 为起点端第一段;坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))。", "answer": "{\"n\": \"4\", \"i1\": \"-7.5%\", \"i2\": \"1.5%\", \"i3\": \"2.8%\", \"i4\": \"-0.5%\"}"}, {"id": "MS-U29-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路二纵断面图”的坡度/坡长栏中,沿桩号增大方向依次有几段纵坡、各是多少?以 JSON 返回:n(只写阿拉伯数字,字符串)以及 i1、i2……(i1 为起点端第一段;坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))。", "answer": "{\"n\": \"3\", \"i1\": \"2.8%\", \"i2\": \"6%\", \"i3\": \"0.3%\"}"}, {"id": "MS-U29-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路四纵断面图”的坡度/坡长栏中,沿桩号增大方向依次有几段纵坡、各是多少?以 JSON 返回:n(只写阿拉伯数字,字符串)以及 i1、i2……(i1 为起点端第一段;坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))。", "answer": "{\"n\": \"3\", \"i1\": \"-1.5%\", \"i2\": \"10%\", \"i3\": \"3.9%\"}"}, {"id": "MS-U29-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路一纵断面图”的坡度/坡长栏中,沿桩号增大方向依次有几段纵坡、各是多少?以 JSON 返回:n(只写阿拉伯数字,字符串)以及 i1、i2……(i1 为起点端第一段;坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))。", "answer": "{\"n\": \"3\", \"i1\": \"-2%\", \"i2\": \"-4.8%\", \"i3\": \"-2.5%\"}"}, {"id": "MS-U29-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "还建道路中坡长为 164.506 m 的那段纵坡,沿桩号增大方向紧接在它后面的一段纵坡是多少?坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\")。按图中记号或文字原样返回一个字符串。", "answer": "\"-0.5%\""}, {"id": "MS-U29-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "还建道路中坡长为 20 m 的那段纵坡,沿桩号增大方向紧接在它后面的一段纵坡是多少?坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\")。按图中记号或文字原样返回一个字符串。", "answer": "\"6%\""}]} {"page_01_file_name": "images/MS-U29-02/few_sheet/01.png", "page_02_file_name": "images/MS-U29-02/few_sheet/02.png", "page_03_file_name": "images/MS-U29-02/few_sheet/03.png", "page_04_file_name": "images/MS-U29-02/few_sheet/04.png", "page_05_file_name": "images/MS-U29-02/few_sheet/05.png", "page_06_file_name": "images/MS-U29-02/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U29-02", "set": "U29", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "五条还建道路的纵断面上共设有十余处竖曲线,各处半径互不相同。下列竖曲线(以半径区分)中,哪些是凹形竖曲线?", "options": [{"key": "A", "text": "R = 5000 m", "correct": true}, {"key": "B", "text": "R = 7500 m", "correct": false}, {"key": "C", "text": "R = 275 m", "correct": true}, {"key": "D", "text": "R = 2000 m", "correct": false}, {"key": "E", "text": "R = 550 m", "correct": false}, {"key": "F", "text": "R = 2200 m", "correct": true}], "answer": ["A", "C", "F"], "few_sheet_pages": [2, 9, 3, 5, 1, 4], "evidence_pages": [5, 2, 1, 3], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U29-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路一纵断面图”上,坡度/坡长栏沿桩号增大方向依次列出的各段纵坡是多少,两处竖曲线(SJD1、SJD2)的半径 R 各是多少?以 JSON 返回五个字段:i1、i2、i3(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、R_sjd1、R_sjd2(数值和单位 m)。", "answer": "{\"i1\": \"-2%\", \"i2\": \"-4.8%\", \"i3\": \"-2.5%\", \"R_sjd1\": {\"value\": 2000, \"unit\": \"m\"}, \"R_sjd2\": {\"value\": 2200, \"unit\": \"m\"}}"}, {"id": "MS-U29-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路三纵断面图”上,坡度/坡长栏沿桩号增大方向依次列出的各段纵坡是多少,SJD2、SJD3 两处竖曲线的半径 R 各是多少?以 JSON 返回六个字段:i1~i4(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、R_sjd2、R_sjd3(数值和单位 m)。", "answer": "{\"i1\": \"-7.5%\", \"i2\": \"1.5%\", \"i3\": \"2.8%\", \"i4\": \"-0.5%\", \"R_sjd2\": {\"value\": 5000, \"unit\": \"m\"}, \"R_sjd3\": {\"value\": 7500, \"unit\": \"m\"}}"}, {"id": "MS-U29-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路二纵断面图”上,坡度/坡长栏沿桩号增大方向依次列出的各段纵坡是多少,SJD2 处竖曲线的半径 R 是多少?以 JSON 返回四个字段:i1~i3(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、R_sjd2(数值和单位 m)。", "answer": "{\"i1\": \"2.8%\", \"i2\": \"6%\", \"i3\": \"0.3%\", \"R_sjd2\": {\"value\": 550, \"unit\": \"m\"}}"}, {"id": "MS-U29-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路四纵断面图”上,坡度/坡长栏沿桩号增大方向的前两段纵坡是多少,SJD1 处竖曲线的半径 R 是多少?以 JSON 返回三个字段:i1、i2(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、R_sjd1(数值和单位 m)。", "answer": "{\"i1\": \"-1.5%\", \"i2\": \"10%\", \"R_sjd1\": {\"value\": 275, \"unit\": \"m\"}}"}, {"id": "MS-U29-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "五条还建道路中,竖曲线半径为 2200 m 的那处变坡点:以 JSON 返回三个字段 road(所在道路,只能从 还建道路一、还建道路二、还建道路三、还建道路四、还建道路五 中选一个原样返回)、i_before、i_after(该变坡点前、后紧邻两段纵坡,沿桩号增大方向;坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))。", "answer": "{\"road\": \"还建道路一\", \"i_before\": \"-4.8%\", \"i_after\": \"-2.5%\"}"}, {"id": "MS-U29-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "五条还建道路中,竖曲线半径为 550 m 的那处变坡点:以 JSON 返回三个字段 road(所在道路,只能从 还建道路一、还建道路二、还建道路三、还建道路四、还建道路五 中选一个原样返回)、i_before、i_after(该变坡点前、后紧邻两段纵坡,沿桩号增大方向;坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))。", "answer": "{\"road\": \"还建道路二\", \"i_before\": \"6%\", \"i_after\": \"0.3%\"}"}]} {"page_01_file_name": "images/MS-U29-03/few_sheet/01.png", "page_02_file_name": "images/MS-U29-03/few_sheet/02.png", "page_03_file_name": "images/MS-U29-03/few_sheet/03.png", "page_04_file_name": "images/MS-U29-03/few_sheet/04.png", "page_05_file_name": "images/MS-U29-03/few_sheet/05.png", "page_06_file_name": "images/MS-U29-03/few_sheet/06.png", "page_07_file_name": "images/MS-U29-03/few_sheet/07.png", "page_08_file_name": "images/MS-U29-03/few_sheet/08.png", "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U29-03", "set": "U29", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "沿线采用的各型波形梁护栏和防护隔离网中,哪些的立柱中心间距为 2 m?", "options": [{"key": "A", "text": "Gr-A-2C 型波形梁护栏", "correct": true}, {"key": "B", "text": "Gr-SS-2E 型波形梁护栏", "correct": true}, {"key": "C", "text": "Gr-A-2E 型波形梁护栏", "correct": true}, {"key": "D", "text": "防护隔离网(浸塑网)", "correct": false}, {"key": "E", "text": "Gr-SA-3E 型波形梁护栏", "correct": false}, {"key": "F", "text": "Gr-SAm-3E 型波形梁护栏", "correct": false}], "answer": ["A", "B", "C"], "few_sheet_pages": [22, 20, 16, 15, 23, 24, 25, 27], "evidence_pages": [20, 22, 23, 25, 27, 15], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U29-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“波形护栏大样图(一)”的 Gr-SAm-3E 立面图上,相邻两根立柱中心之间的间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 3000, \"unit\": \"mm\"}"}, {"id": "MS-U29-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“波形护栏大样图(三)”的 Gr-SA-3E 立面图上,相邻两根立柱中心之间的间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 3000, \"unit\": \"mm\"}"}, {"id": "MS-U29-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“波形护栏大样图(四)”的 Gr-SS-2E 主立面图上,相邻两根立柱中心之间的间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2000, \"unit\": \"mm\"}"}, {"id": "MS-U29-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“波形护栏大样图(六)”的 Gr-A-2E 标准段立面图和“波形护栏大样图(八)”的 Gr-A-2C 标准段立面图上,相邻两根立柱中心之间的间距各是多少?以 JSON 返回两个字段 sheet6、sheet8,每个为数值和单位(mm)。", "answer": "{\"sheet6\": {\"value\": 2000, \"unit\": \"mm\"}, \"sheet8\": {\"value\": 2000, \"unit\": \"mm\"}}"}, {"id": "MS-U29-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“防护网大样图”的立面图上,相邻两根立柱之间的间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 2500, \"unit\": \"mm\"}"}, {"id": "MS-U29-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "用于道路主线中央分隔带处的那型波形梁护栏,相邻立柱中心间距是多少?返回数值和单位(mm)。", "answer": "{\"value\": 3000, \"unit\": \"mm\"}"}, {"id": "MS-U29-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "用于主线路侧、可采用打入法施工路段的 SA 级波形梁护栏,其材料数量表按每 90 m 计列的立柱数量是多少?返回数值和单位(根)。", "answer": "{\"value\": 30, \"unit\": \"根\"}"}]} {"page_01_file_name": "images/MS-U29-04/few_sheet/01.png", "page_02_file_name": "images/MS-U29-04/few_sheet/02.png", "page_03_file_name": "images/MS-U29-04/few_sheet/03.png", "page_04_file_name": "images/MS-U29-04/few_sheet/04.png", "page_05_file_name": "images/MS-U29-04/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U29-04", "set": "U29", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "主线有一张挖方典型横断面和一张填方典型横断面。关于两张断面上边坡及沿线设施的相对位置,下列说法哪些正确?", "options": [{"key": "A", "text": "填方断面上,48 班小学位于填方边坡较矮的一侧", "correct": false}, {"key": "B", "text": "挖方断面上,防护网设在截水沟靠路基的一侧(内侧)", "correct": false}, {"key": "C", "text": "填方断面上,较高一侧的填方边坡分两级,下一级比上一级缓", "correct": true}, {"key": "D", "text": "挖方断面上,坡顶截水沟设在地面较高的一侧", "correct": true}, {"key": "E", "text": "挖方断面上较高一侧挖方边坡的总高度,小于填方断面上较高一侧填方边坡的总高度", "correct": false}, {"key": "F", "text": "按路基设计图对检修道栏杆的设置要求,填方断面上只有靠小学一侧需要设置检修道栏杆", "correct": false}], "answer": ["C", "D"], "few_sheet_pages": [7, 6, 8, 11, 19], "evidence_pages": [8, 7, 11], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U29-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "在“道路典型横断面图(一)”上,把图面按图中文字正读方向放置时,左侧挖方边坡自上而下各级的坡高标注分别是多少?返回 upper、middle、lower 三个字段,每个字段为 {value, unit},单位 m。", "answer": "{\"upper\": {\"value\": 2.78, \"unit\": \"m\"}, \"middle\": {\"value\": 8, \"unit\": \"m\"}, \"lower\": {\"value\": 8, \"unit\": \"m\"}}"}, {"id": "MS-U29-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "在“道路典型横断面图(一)”上,把图面按图中文字正读方向放置时,右侧挖方边坡自上而下各级的坡高标注分别是多少?返回 upper、lower 两个字段,每个字段为 {value, unit},单位 m。", "answer": "{\"upper\": {\"value\": 4.24, \"unit\": \"m\"}, \"lower\": {\"value\": 8, \"unit\": \"m\"}}"}, {"id": "MS-U29-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "在“道路典型横断面图(二)”上,把图面按图中文字正读方向放置时:左侧填方边坡上一级的坡高、左侧填方边坡下一级的坡高、右侧填方边坡的坡高标注各是多少?返回 left_upper、left_lower、right 三个字段,每个字段为 {value, unit},单位 m。", "answer": "{\"left_upper\": {\"value\": 8, \"unit\": \"m\"}, \"left_lower\": {\"value\": 6, \"unit\": \"m\"}, \"right\": {\"value\": 3.05, \"unit\": \"m\"}}"}, {"id": "MS-U29-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“路基设计图”的说明中,填方边坡需要设置检修道栏杆的填方高度界限是多少?返回数值和单位(m)。", "answer": "{\"value\": 3, \"unit\": \"m\"}"}, {"id": "MS-U29-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线挖方典型横断面上,坡顶外设有截水沟的那一侧,挖方边坡最上一级的坡高是多少?返回数值和单位(m)。", "answer": "{\"value\": 2.78, \"unit\": \"m\"}"}, {"id": "MS-U29-04-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线挖方典型横断面上,防护网靠路基一侧紧邻的是什么?从以下四项中选一项,按所列文字原样返回:截水沟、挖方坡口、边坡平台、检修道。", "answer": "\"截水沟\""}, {"id": "MS-U29-04-B3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "主线填方典型横断面上,48 班小学所在一侧的填方边坡,最上一级和最下一级的坡率各是多少?返回 top、bottom 两个字段,每个字段按 1:n 形式写(如 1:2,冒号前后不留空格);只有一级时两个字段填同一个值。", "answer": "{\"top\": \"1:1.5\", \"bottom\": \"1:1.75\"}"}]} {"page_01_file_name": "images/MS-U29-05/few_sheet/01.png", "page_02_file_name": "images/MS-U29-05/few_sheet/02.png", "page_03_file_name": "images/MS-U29-05/few_sheet/03.png", "page_04_file_name": "images/MS-U29-05/few_sheet/04.png", "page_05_file_name": "images/MS-U29-05/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U29-05", "set": "U29", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "还建道路一、二、三中有一段纵坡大于 8% 的坡段。关于这段坡和三条道路的纵坡,下列说法哪些正确?", "options": [{"key": "A", "text": "还建道路一的最大纵坡为 4.8%,出现在下坡段", "correct": true}, {"key": "B", "text": "还建道路二的最大纵坡为 6%", "correct": true}, {"key": "C", "text": "还建道路一、二、三中并没有纵坡大于 8% 的坡段", "correct": true}, {"key": "D", "text": "这段坡是还建道路三起点处的 −7.5% 下坡,坡长 56.667 m", "correct": false}, {"key": "E", "text": "这段坡的坡度为 10%,坡长 95.813 m", "correct": false}, {"key": "F", "text": "三条道路中最陡的坡段是还建道路三起点处的 −7.5% 下坡", "correct": true}], "answer": ["A", "B", "C", "F"], "few_sheet_pages": [5, 4, 1, 2, 3], "evidence_pages": [5, 1, 2], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U29-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路一纵断面图”的坡度/坡长栏中,坡度绝对值最大的那一段纵坡,坡度和坡长各是多少?以 JSON 返回两个字段:grade(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、length(数值和单位 m)。", "answer": "{\"grade\": \"-4.8%\", \"length\": {\"value\": 135.704, \"unit\": \"m\"}}"}, {"id": "MS-U29-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路二纵断面图”的坡度/坡长栏中,坡度绝对值最大的那一段纵坡,坡度和坡长各是多少?以 JSON 返回两个字段:grade(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、length(数值和单位 m)。", "answer": "{\"grade\": \"6%\", \"length\": {\"value\": 103.695, \"unit\": \"m\"}}"}, {"id": "MS-U29-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路三纵断面图”的坡度/坡长栏中,坡度绝对值最大的那一段纵坡,坡度和坡长各是多少?以 JSON 返回两个字段:grade(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、length(数值和单位 m)。", "answer": "{\"grade\": \"-7.5%\", \"length\": {\"value\": 56.667, \"unit\": \"m\"}}"}, {"id": "MS-U29-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路四纵断面图”的坡度/坡长栏中,坡度绝对值最大的那一段纵坡,坡度和坡长各是多少?以 JSON 返回两个字段:grade(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、length(数值和单位 m)。", "answer": "{\"grade\": \"10%\", \"length\": {\"value\": 95.813, \"unit\": \"m\"}}"}, {"id": "MS-U29-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "还建道路一、二、三中坡度绝对值最大的那段纵坡:以 JSON 返回两个字段 road(所在道路,只能从 还建道路一、还建道路二、还建道路三、还建道路四、还建道路五 中选一个原样返回)、grade(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))。", "answer": "{\"road\": \"还建道路三\", \"grade\": \"-7.5%\"}"}, {"id": "MS-U29-05-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "五条还建道路中,坡度为 10% 的那段纵坡在哪条道路上?只能从 还建道路一、还建道路二、还建道路三、还建道路四、还建道路五 中选一个原样返回。", "answer": "\"还建道路四\""}]} {"page_01_file_name": "images/MS-U29-06/few_sheet/01.png", "page_02_file_name": "images/MS-U29-06/few_sheet/02.png", "page_03_file_name": "images/MS-U29-06/few_sheet/03.png", "page_04_file_name": "images/MS-U29-06/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U29-06", "set": "U29", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "主线典型横断面 K0+040 与 K2+020 的断面形式若各自沿线延续 100 m,关于两段边坡上马道的 C20 素混凝土封底数量,下列说法哪些正确?", "options": [{"key": "A", "text": "K2+020 段靠 48 班小学一侧边坡马道的封底为 40 m³", "correct": false}, {"key": "B", "text": "K2+020 段远离 48 班小学一侧边坡马道的封底为 20 m³", "correct": false}, {"key": "C", "text": "K0+040 段两侧挖方边坡马道的封底合计 60 m³", "correct": true}, {"key": "D", "text": "K0+040 段两侧挖方边坡马道的封底合计 120 m³", "correct": false}, {"key": "E", "text": "K2+020 段两侧边坡马道的封底合计 40 m³", "correct": false}, {"key": "F", "text": "K0+040 段挖方较高一侧边坡马道的封底为 20 m³", "correct": false}], "answer": ["C"], "few_sheet_pages": [19, 7, 11, 8], "evidence_pages": [7, 8, 11, 19], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U29-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "挖方平台马道 C20 素混凝土封底的工程数量是按多长的马道计列的?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 100, \"unit\": \"m\"}"}, {"id": "MS-U29-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主线典型横断面 K0+040 画面左侧挖方边坡上,宽度标注为 2 的平台有几处?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 2, \"unit\": \"处\"}"}, {"id": "MS-U29-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主线典型横断面 K0+040 画面右侧挖方边坡上,宽度标注为 2 的平台有几处?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1, \"unit\": \"处\"}"}, {"id": "MS-U29-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "马道设计大样图的工程数量表中,挖方平台马道的 C20 素混凝土封底数量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 20, \"unit\": \"m³\"}"}, {"id": "MS-U29-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "路基设计图'挖方路基'断面中,宽度标注为 2000 的平台有几处?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1, \"unit\": \"处\"}"}]} {"page_01_file_name": "images/MS-U29-07/few_sheet/01.png", "page_02_file_name": "images/MS-U29-07/few_sheet/02.png", "page_03_file_name": "images/MS-U29-07/few_sheet/03.png", "page_04_file_name": "images/MS-U29-07/few_sheet/04.png", "page_05_file_name": "images/MS-U29-07/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U29-07", "set": "U29", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "还建道路三、四、五中有一段纵坡大于 8% 的坡段。关于这段坡和三条道路的纵坡,下列说法哪些正确?", "options": [{"key": "A", "text": "还建道路三、四、五中并没有纵坡大于 8% 的坡段", "correct": false}, {"key": "B", "text": "这段坡所在道路的设计终点高程是三条道路中最高的", "correct": true}, {"key": "C", "text": "这段坡为上坡,坡长 95.813 m", "correct": true}, {"key": "D", "text": "三条道路中纵坡绝对值超过 5% 的坡段只有这一段", "correct": false}, {"key": "E", "text": "这段坡是还建道路三起点处的 −7.5% 下坡", "correct": false}, {"key": "F", "text": "三条道路中纵坡绝对值第二大的坡段在还建道路五", "correct": false}], "answer": ["B", "C"], "few_sheet_pages": [3, 1, 4, 2, 5], "evidence_pages": [3, 2, 4], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U29-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路四纵断面图”的坡度/坡长栏中,坡度绝对值最大的那一段纵坡,坡度和坡长各是多少?以 JSON 返回两个字段:grade(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、length(数值和单位 m)。", "answer": "{\"grade\": \"10%\", \"length\": {\"value\": 95.813, \"unit\": \"m\"}}"}, {"id": "MS-U29-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路三纵断面图”的坡度/坡长栏中,坡度绝对值最大的那一段纵坡,坡度和坡长各是多少?以 JSON 返回两个字段:grade(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、length(数值和单位 m)。", "answer": "{\"grade\": \"-7.5%\", \"length\": {\"value\": 56.667, \"unit\": \"m\"}}"}, {"id": "MS-U29-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路五(G348)纵断面图”的坡度/坡长栏中,坡度绝对值最大的那一段纵坡,坡度和坡长各是多少?以 JSON 返回两个字段:grade(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、length(数值和单位 m)。", "answer": "{\"grade\": \"3.8%\", \"length\": {\"value\": 130.634, \"unit\": \"m\"}}"}, {"id": "MS-U29-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路三纵断面图”“还建道路四纵断面图”“还建道路五(G348)纵断面图”上,各条道路的设计终点高程(图中“H设=”)各是多少?以 JSON 返回三个字段 road3、road4、road5,每个为数值和单位(m)。", "answer": "{\"road3\": {\"value\": 250.492, \"unit\": \"m\"}, \"road4\": {\"value\": 256.36, \"unit\": \"m\"}, \"road5\": {\"value\": 247.863, \"unit\": \"m\"}}"}, {"id": "MS-U29-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "还建道路三、四、五中,含有纵坡大于 8% 坡段的那条道路,设计终点高程是多少?返回数值和单位(m)。", "answer": "{\"value\": 256.36, \"unit\": \"m\"}"}, {"id": "MS-U29-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "还建道路三、四、五的全部坡段中,坡度绝对值第二大的那段纵坡:以 JSON 返回两个字段 road(所在道路,只能从 还建道路一、还建道路二、还建道路三、还建道路四、还建道路五 中选一个原样返回)、grade(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))。", "answer": "{\"road\": \"还建道路三\", \"grade\": \"-7.5%\"}"}]} {"page_01_file_name": "images/MS-U29-08/few_sheet/01.png", "page_02_file_name": "images/MS-U29-08/few_sheet/02.png", "page_03_file_name": "images/MS-U29-08/few_sheet/03.png", "page_04_file_name": "images/MS-U29-08/few_sheet/04.png", "page_05_file_name": "images/MS-U29-08/few_sheet/05.png", "page_06_file_name": "images/MS-U29-08/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U29-08", "set": "U29", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "还建道路一至四(不含还建道路五)的纵断面上,纵坡绝对值大于 5% 的各坡段,坡长合计为多少(m)?", "options": [{"key": "A", "text": "256.175", "correct": true}, {"key": "B", "text": "160.362", "correct": false}, {"key": "C", "text": "391.879", "correct": false}, {"key": "D", "text": "277.175", "correct": false}, {"key": "E", "text": "199.508", "correct": false}, {"key": "F", "text": "152.480", "correct": false}], "answer": ["A"], "few_sheet_pages": [3, 1, 9, 5, 2, 4], "evidence_pages": [5, 1, 2, 3], "full_set_page_count": 28, "sub_questions": [{"id": "MS-U29-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路二纵断面图”的坡度/坡长栏中,坡度绝对值最大的那一段纵坡,坡度和坡长各是多少?以 JSON 返回两个字段:grade(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、length(数值和单位 m)。", "answer": "{\"grade\": \"6%\", \"length\": {\"value\": 103.695, \"unit\": \"m\"}}"}, {"id": "MS-U29-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路三纵断面图”的坡度/坡长栏中,坡度绝对值最大的那一段纵坡,坡度和坡长各是多少?以 JSON 返回两个字段:grade(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、length(数值和单位 m)。", "answer": "{\"grade\": \"-7.5%\", \"length\": {\"value\": 56.667, \"unit\": \"m\"}}"}, {"id": "MS-U29-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路四纵断面图”的坡度/坡长栏中,坡度绝对值最大的那一段纵坡,坡度和坡长各是多少?以 JSON 返回两个字段:grade(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、length(数值和单位 m)。", "answer": "{\"grade\": \"10%\", \"length\": {\"value\": 95.813, \"unit\": \"m\"}}"}, {"id": "MS-U29-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路一纵断面图”的坡度/坡长栏中,坡度绝对值最大的那一段纵坡,坡度和坡长各是多少?以 JSON 返回两个字段:grade(坡度按图中坡度/坡长栏原样写成字符串:下坡带负号(如 \"-2%\"),上坡不加正号(如 \"3%\"))、length(数值和单位 m)。", "answer": "{\"grade\": \"-4.8%\", \"length\": {\"value\": 135.704, \"unit\": \"m\"}}"}, {"id": "MS-U29-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“还建道路四纵断面图”上,坡度/坡长栏中坡度最大那一段的终点(变坡点)桩号是多少?返回形如 K0+100.000 的桩号。", "answer": "\"K0+116.813\""}, {"id": "MS-U29-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "还建道路一至四中,坡度绝对值大于 5% 的下坡段,坡长是多少?返回数值和单位(m)。", "answer": "{\"value\": 56.667, \"unit\": \"m\"}"}, {"id": "MS-U29-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "还建道路一至四中坡度最大的上坡段,坡长是多少?返回数值和单位(m)。", "answer": "{\"value\": 95.813, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U30-01/few_sheet/01.png", "page_02_file_name": "images/MS-U30-01/few_sheet/02.png", "page_03_file_name": "images/MS-U30-01/few_sheet/03.png", "page_04_file_name": "images/MS-U30-01/few_sheet/04.png", "page_05_file_name": "images/MS-U30-01/few_sheet/05.png", "page_06_file_name": "images/MS-U30-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U30-01", "set": "U30", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于不刁桥在地面上的方位、与河流的关系以及墩台朝向,下列说法哪些正确?", "options": [{"key": "A", "text": "由朝韦村往登山村行驶时,河水从行车方向的右侧流向左侧", "correct": false}, {"key": "B", "text": "2号桥台位于0号桥台的东侧(登山村一端)", "correct": true}, {"key": "C", "text": "河道护岸墙只设在0号桥台一端的上、下游两侧", "correct": false}, {"key": "D", "text": "1号墩顶标为\"前侧\"的一排支座位于靠朝韦村的一侧", "correct": true}, {"key": "E", "text": "河水大致由北向南从桥下流过", "correct": true}, {"key": "F", "text": "河道护岸墙的墙顶低于50年一遇洪水位", "correct": false}], "answer": ["B", "D", "E"], "few_sheet_pages": [10, 6, 4, 34, 35, 5], "evidence_pages": [5, 35, 10, 4], "full_set_page_count": 35, "sub_questions": [{"id": "MS-U30-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桩位坐标图”的“桩位坐标表”中,0a 和 2a 两根桩“位置 0”的 Y 坐标各是多少?按字段 0a、2a 返回,每个字段为数值和单位(m)。", "answer": "{\"0a\": {\"value\": 582572.392, \"unit\": \"m\"}, \"2a\": {\"value\": 582607.189, \"unit\": \"m\"}}"}, {"id": "MS-U30-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桩位坐标图”的“桩位坐标表”中,0a 桩“位置 0”和“位置 1”的 X 坐标各是多少?按字段 位置0、位置1 返回,每个字段为数值和单位(m)。", "answer": "{\"位置0\": {\"value\": 2589766.536, \"unit\": \"m\"}, \"位置1\": {\"value\": 2589756.968, \"unit\": \"m\"}}"}, {"id": "MS-U30-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“河道护岸墙构造图”的“河道护岸墙设置平面图”上,按图面方位,登山村箭头指向哪一侧、水流箭头指向哪一侧?每个字段从 {上, 下, 左, 右} 中选一个,按字段 登山村、水流 返回。", "answer": "{\"登山村\": \"上\", \"水流\": \"右\"}"}, {"id": "MS-U30-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩一般构造图”的侧面图上,标为“Z前”和“Z后”的支座分别在朝哪个村的一侧?每个字段从 {朝韦村, 登山村} 中选一个,按字段 Z前、Z后 返回。", "answer": "{\"Z前\": \"朝韦村\", \"Z后\": \"登山村\"}"}, {"id": "MS-U30-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“河道护岸墙构造图”中,0 号桥台一端和 2 号桥台一端各画了几段护岸墙,护岸墙断面图上的墙顶高程是多少?按字段 0号桥台一端、2号桥台一端、墙顶高程 返回;段数为数值和单位(单位写“个”),高程为数值和单位(m)。", "answer": "{\"0号桥台一端\": {\"value\": 2, \"unit\": \"个\"}, \"2号桥台一端\": {\"value\": 2, \"unit\": \"个\"}, \"墙顶高程\": {\"value\": 65.2, \"unit\": \"m\"}}"}, {"id": "MS-U30-01-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥型布置图”的立面上,标注的 50 年一遇洪水位是多少?返回数值和单位(m)。", "answer": "{\"value\": 64.96, \"unit\": \"m\"}"}, {"id": "MS-U30-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "靠登山村一端那个桥台,其 a 号桩“位置 0”的 Y 坐标是多少?返回数值和单位(m)。", "answer": "{\"value\": 582607.189, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U30-02/few_sheet/01.png", "page_02_file_name": "images/MS-U30-02/few_sheet/02.png", "page_03_file_name": "images/MS-U30-02/few_sheet/03.png", "page_04_file_name": "images/MS-U30-02/few_sheet/04.png", "page_05_file_name": "images/MS-U30-02/few_sheet/05.png", "page_06_file_name": "images/MS-U30-02/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U30-02", "set": "U30", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "不刁桥在2号桥台处设有一道伸缩缝。关于这道伸缩缝及全桥的伸缩、连续构造,下列说法哪些正确?", "options": [{"key": "A", "text": "2号桥台处并没有伸缩缝,该处为桥面连续", "correct": false}, {"key": "B", "text": "墙式护栏在该处断开", "correct": true}, {"key": "C", "text": "1号墩顶也设有同型伸缩缝", "correct": false}, {"key": "D", "text": "该处伸缩缝的预留槽内用 C50 混凝土填充", "correct": false}, {"key": "E", "text": "该处伸缩缝为 E-40 型,伸缩缝间歇量 b 为 14~54 mm", "correct": true}, {"key": "F", "text": "全桥伸缩缝处护栏钢遮板合计 107.2 kg", "correct": true}], "answer": ["B", "E", "F"], "few_sheet_pages": [31, 32, 27, 26, 33, 30], "evidence_pages": [30, 31, 32, 33], "full_set_page_count": 35, "sub_questions": [{"id": "MS-U30-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝构造图”的附注中,伸缩缝设在哪几个墩台处?按墩台编号的阿拉伯数字返回两个,不分先后,以 JSON 数组返回(形如 [\"3\", \"4\"])。", "answer": "[\"0\", \"2\"]"}, {"id": "MS-U30-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝构造图”的“GQF-E型伸缩装置设置参数表”中,E-40 的伸缩缝间歇量 b 最小值和最大值各是多少?按字段 bmin、bmax 返回,每个字段为数值和单位(mm)。", "answer": "{\"bmin\": {\"value\": 14, \"unit\": \"mm\"}, \"bmax\": {\"value\": 54, \"unit\": \"mm\"}}"}, {"id": "MS-U30-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“防撞护栏一般构造图”的“全桥伸缩缝处钢遮板数量表”中,钢遮板的全桥数量是多少?返回数值和单位(kg)。", "answer": "{\"value\": 107.2, \"unit\": \"kg\"}"}, {"id": "MS-U30-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“防撞护栏钢筋构造图”的附注中,墙式护栏在哪几个墩台的伸缩缝处断开?按墩台编号的阿拉伯数字返回两个,不分先后,以 JSON 数组返回(形如 [\"3\", \"4\"])。", "answer": "[\"0\", \"2\"]"}, {"id": "MS-U30-02-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝构造图”的附注中,伸缩缝预留槽内填充的混凝土强度等级是多少?只返回强度等级,形如 C30。", "answer": "\"C40\""}, {"id": "MS-U30-02-R6", "role": "read", "tiers": ["full_set"], "question": "“箱梁一般构造图”的“箱梁混凝土数量表”中,预制箱梁混凝土的强度等级是多少?只返回强度等级,形如 C30。", "answer": "\"C50\""}, {"id": "MS-U30-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "2 号桥台处伸缩缝的型号是什么,伸缩缝间歇量 b 的最小值和最大值各是多少?按字段 型号、bmin、bmax 返回;型号按图中写法返回(形如 E-80),bmin、bmax 为数值和单位(mm)。", "answer": "{\"型号\": \"E-40\", \"bmin\": {\"value\": 14, \"unit\": \"mm\"}, \"bmax\": {\"value\": 54, \"unit\": \"mm\"}}"}]} {"page_01_file_name": "images/MS-U30-03/few_sheet/01.png", "page_02_file_name": "images/MS-U30-03/few_sheet/02.png", "page_03_file_name": "images/MS-U30-03/few_sheet/03.png", "page_04_file_name": "images/MS-U30-03/few_sheet/04.png", "page_05_file_name": "images/MS-U30-03/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U30-03", "set": "U30", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "同一孔中,一片预制边梁与一片预制中梁相比,下列钢筋中哪些在根数或单根长度上不同?", "options": [{"key": "A", "text": "N2 纵向钢筋", "correct": true}, {"key": "B", "text": "N6' 钢筋", "correct": true}, {"key": "C", "text": "N7 钢筋", "correct": false}, {"key": "D", "text": "封锚及锚下钢筋", "correct": false}, {"key": "E", "text": "N3 纵向钢筋", "correct": true}, {"key": "F", "text": "N6 钢筋", "correct": true}], "answer": ["A", "B", "E", "F"], "few_sheet_pages": [18, 23, 19, 20, 21], "evidence_pages": [19, 21, 23], "full_set_page_count": 35, "sub_questions": [{"id": "MS-U30-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“箱梁普通钢筋构造图(二)”的“一片中梁材料数量表”中,N2 的根数、N3 的根数、N6 的每根长各是多少?按字段 N2根数、N3根数、N6每根长 返回,根数的单位写“根”,长度为数值和单位(cm)。", "answer": "{\"N2根数\": {\"value\": 12, \"unit\": \"根\"}, \"N3根数\": {\"value\": 11, \"unit\": \"根\"}, \"N6每根长\": {\"value\": 374.2, \"unit\": \"cm\"}}"}, {"id": "MS-U30-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“箱梁普通钢筋构造图(四)”的“一片边梁材料数量表”中,N2 的根数、N3 的根数、N6 的每根长各是多少?按字段 N2根数、N3根数、N6每根长 返回,根数的单位写“根”,长度为数值和单位(cm)。", "answer": "{\"N2根数\": {\"value\": 14, \"unit\": \"根\"}, \"N3根数\": {\"value\": 13, \"unit\": \"根\"}, \"N6每根长\": {\"value\": 386.6, \"unit\": \"cm\"}}"}, {"id": "MS-U30-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“箱梁普通钢筋构造图(二)”的“一片中梁材料数量表”中,N6' 的根数、N7 的每根长、N7 的根数各是多少?按字段 N6'根数、N7每根长、N7根数 返回,根数的单位写“根”,长度为数值和单位(cm)。", "answer": "{\"N6'根数\": {\"value\": 44, \"unit\": \"根\"}, \"N7每根长\": {\"value\": 211.6, \"unit\": \"cm\"}, \"N7根数\": {\"value\": 200, \"unit\": \"根\"}}"}, {"id": "MS-U30-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“箱梁普通钢筋构造图(四)”的“一片边梁材料数量表”中,N6' 的根数、N7 的每根长、N7 的根数各是多少?按字段 N6'根数、N7每根长、N7根数 返回,根数的单位写“根”,长度为数值和单位(cm)。", "answer": "{\"N6'根数\": {\"value\": 22, \"unit\": \"根\"}, \"N7每根长\": {\"value\": 211.6, \"unit\": \"cm\"}, \"N7根数\": {\"value\": 200, \"unit\": \"根\"}}"}, {"id": "MS-U30-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“封锚端及锚下钢筋构造图”的“封锚及锚下钢筋明细表”中,边梁和中梁的小计各是多少?按字段 边梁、中梁 返回,每个字段为数值和单位(kg)。", "answer": "{\"边梁\": {\"value\": 95.0, \"unit\": \"kg\"}, \"中梁\": {\"value\": 95.0, \"unit\": \"kg\"}}"}, {"id": "MS-U30-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "一片预制边梁中,N2、N3 纵向钢筋各有多少根,N6 钢筋的每根长是多少?按字段 N2根数、N3根数、N6每根长 返回,根数的单位写“根”,长度为数值和单位(cm)。", "answer": "{\"N2根数\": {\"value\": 14, \"unit\": \"根\"}, \"N3根数\": {\"value\": 13, \"unit\": \"根\"}, \"N6每根长\": {\"value\": 386.6, \"unit\": \"cm\"}}"}]} {"page_01_file_name": "images/MS-U30-04/few_sheet/01.png", "page_02_file_name": "images/MS-U30-04/few_sheet/02.png", "page_03_file_name": "images/MS-U30-04/few_sheet/03.png", "page_04_file_name": "images/MS-U30-04/few_sheet/04.png", "page_05_file_name": "images/MS-U30-04/few_sheet/05.png", "page_06_file_name": "images/MS-U30-04/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U30-04", "set": "U30", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "关于不刁桥各支点处支座的位置和布置方向,下列说法哪些正确?", "options": [{"key": "A", "text": "每片箱梁在每个支承端下设两个支座,两者沿横桥向相距 40 cm", "correct": true}, {"key": "B", "text": "支座中心线距箱梁梁端 33 cm", "correct": true}, {"key": "C", "text": "1号墩的支座垫石顶面比0号桥台的支座垫石顶面高", "correct": false}, {"key": "D", "text": "1号墩顶两排支座的中心线分别距桥墩中心线 34.7 cm", "correct": true}, {"key": "E", "text": "桥台上同一片梁下的两个支座沿顺桥向一前一后布置", "correct": false}, {"key": "F", "text": "0、2号桥台的支座位于背墙的靠河一侧,背墙在支座后方(靠路堤一侧)", "correct": true}], "answer": ["A", "B", "D", "F"], "few_sheet_pages": [10, 16, 17, 14, 8, 6], "evidence_pages": [6, 10, 16, 17], "full_set_page_count": 35, "sub_questions": [{"id": "MS-U30-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“上部构造标准横断面”的支点横断面上,一片箱梁下两个支座中心之间的距离是多少?返回数值和单位(cm)。", "answer": "{\"value\": 40, \"unit\": \"cm\"}"}, {"id": "MS-U30-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“箱梁一般构造图”的“1/2中梁立面”上,支座中心线距梁端的距离是多少?返回数值和单位(cm)。", "answer": "{\"value\": 33, \"unit\": \"cm\"}"}, {"id": "MS-U30-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩一般构造图”的侧面图上,“Z前”“Z后”两排支座的中心线各距桥墩中心线多少?按字段 Z前、Z后 返回,每个字段为数值和单位(cm)。", "answer": "{\"Z前\": {\"value\": 34.7, \"unit\": \"cm\"}, \"Z后\": {\"value\": 34.7, \"unit\": \"cm\"}}"}, {"id": "MS-U30-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥台一般构造图”的“垫石标高表”中,0 号桥台 Za1 的垫石标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 65.411, \"unit\": \"m\"}"}, {"id": "MS-U30-04-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩一般构造图”的“垫石标高表”中,Za1 前侧的垫石标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 65.411, \"unit\": \"m\"}"}, {"id": "MS-U30-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "1 号桥墩顶和 0 号桥台顶的支座垫石,顶面标高各是多少?按字段 1号墩、0号台 返回,每个字段为数值和单位(m)。", "answer": "{\"1号墩\": {\"value\": 65.411, \"unit\": \"m\"}, \"0号台\": {\"value\": 65.411, \"unit\": \"m\"}}"}]} {"page_01_file_name": "images/MS-U30-05/few_sheet/01.png", "page_02_file_name": "images/MS-U30-05/few_sheet/02.png", "page_03_file_name": "images/MS-U30-05/few_sheet/03.png", "page_04_file_name": "images/MS-U30-05/few_sheet/04.png", "page_05_file_name": "images/MS-U30-05/few_sheet/05.png", "page_06_file_name": "images/MS-U30-05/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U30-05", "set": "U30", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "不刁桥在1号桥墩顶设有一道伸缩缝。关于这道伸缩缝及全桥的伸缩、连续构造,下列说法哪些正确?", "options": [{"key": "A", "text": "该处伸缩缝为 E-40 型,伸缩缝间歇量 b 为 14~54 mm", "correct": false}, {"key": "B", "text": "该处伸缩缝的预留槽内用含 6% 钢纤维的 C40 混凝土填充", "correct": false}, {"key": "C", "text": "1号墩顶并没有伸缩缝,该处为桥面连续,在桥墩中心线处设 3 mm 宽、60 mm 高的通长切缝", "correct": true}, {"key": "D", "text": "全桥伸缩缝处护栏钢遮板合计 107.2 kg", "correct": true}, {"key": "E", "text": "墙式护栏在该处断开", "correct": false}, {"key": "F", "text": "全桥伸缩缝处护栏钢遮板共 6 处,其中 2 处在1号墩", "correct": false}], "answer": ["C", "D"], "few_sheet_pages": [29, 31, 32, 26, 33, 30], "evidence_pages": [30, 31, 32, 33], "full_set_page_count": 35, "sub_questions": [{"id": "MS-U30-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥面连续钢筋构造图”的立面上,通长切缝的宽度和高度各是多少?按字段 宽、高 返回,每个字段为数值和单位(mm)。", "answer": "{\"宽\": {\"value\": 3, \"unit\": \"mm\"}, \"高\": {\"value\": 60, \"unit\": \"mm\"}}"}, {"id": "MS-U30-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝构造图”的附注中,伸缩缝设在哪几个墩台处?按墩台编号的阿拉伯数字返回两个,不分先后,以 JSON 数组返回(形如 [\"3\", \"4\"])。", "answer": "[\"0\", \"2\"]"}, {"id": "MS-U30-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝构造图”的“GQF-E型伸缩装置设置参数表”中,E-40 的伸缩缝间歇量 b 最小值和最大值各是多少?按字段 bmin、bmax 返回,每个字段为数值和单位(mm)。", "answer": "{\"bmin\": {\"value\": 14, \"unit\": \"mm\"}, \"bmax\": {\"value\": 54, \"unit\": \"mm\"}}"}, {"id": "MS-U30-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“防撞护栏一般构造图”的“全桥伸缩缝处钢遮板数量表”中,钢遮板一处的数量和全桥数量各是多少?按字段 一处、全桥 返回,每个字段为数值和单位(kg)。", "answer": "{\"一处\": {\"value\": 26.8, \"unit\": \"kg\"}, \"全桥\": {\"value\": 107.2, \"unit\": \"kg\"}}"}, {"id": "MS-U30-05-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“防撞护栏钢筋构造图”的附注中,墙式护栏在哪几个墩台的伸缩缝处断开?按墩台编号的阿拉伯数字返回两个,不分先后,以 JSON 数组返回(形如 [\"3\", \"4\"])。", "answer": "[\"0\", \"2\"]"}, {"id": "MS-U30-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥面连续构造中的通长切缝,位于哪个墩台的中心线上?只返回墩台编号的阿拉伯数字。", "answer": "\"1\""}]} {"page_01_file_name": "images/MS-U30-06/few_sheet/01.png", "page_02_file_name": "images/MS-U30-06/few_sheet/02.png", "page_03_file_name": "images/MS-U30-06/few_sheet/03.png", "page_04_file_name": "images/MS-U30-06/few_sheet/04.png", "page_05_file_name": "images/MS-U30-06/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U30-06", "set": "U30", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "在1号桥墩处,把桥墩图中标注的各控制高程(自支座垫石顶面至扩大基础底面)与设计洪水位、测时水位放在一起,自上而下排列。下列\"上方一项 → 紧接其下的一项\"中,哪些正确?", "options": [{"key": "A", "text": "支座垫石顶面 → 设计洪水位", "correct": false}, {"key": "B", "text": "墩柱顶面 → 扩大基础顶面", "correct": false}, {"key": "C", "text": "设计洪水位 → 测时水位", "correct": false}, {"key": "D", "text": "扩大基础顶面 → 测时水位", "correct": false}, {"key": "E", "text": "设计洪水位 → 墩柱顶面", "correct": true}, {"key": "F", "text": "盖梁顶面 → 设计洪水位", "correct": true}], "answer": ["E", "F"], "few_sheet_pages": [10, 6, 35, 4, 14], "evidence_pages": [10, 4, 35], "full_set_page_count": 35, "sub_questions": [{"id": "MS-U30-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩一般构造图”中,1 号桥墩的盖梁顶面(H1)、墩柱顶面(H3)、扩大基础顶面(H5)高程各是多少?按字段 盖梁顶面、墩柱顶面、扩大基础顶面 返回,每个字段为数值和单位(m)。", "answer": "{\"盖梁顶面\": {\"value\": 65.26, \"unit\": \"m\"}, \"墩柱顶面\": {\"value\": 63.96, \"unit\": \"m\"}, \"扩大基础顶面\": {\"value\": 61.9, \"unit\": \"m\"}}"}, {"id": "MS-U30-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩一般构造图”的“垫石标高表”中,Za1 前侧的垫石标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 65.411, \"unit\": \"m\"}"}, {"id": "MS-U30-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥型布置图”的立面上,标注的 50 年一遇洪水位和测时水位各是多少?按字段 洪水位、测时水位 返回,每个字段为数值和单位(m)。", "answer": "{\"洪水位\": {\"value\": 64.96, \"unit\": \"m\"}, \"测时水位\": {\"value\": 63.21, \"unit\": \"m\"}}"}, {"id": "MS-U30-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "1 号桥墩的盖梁顶面、墩柱顶面、扩大基础顶面,高程各是多少?按字段 盖梁顶面、墩柱顶面、扩大基础顶面 返回,每个字段为数值和单位(m)。", "answer": "{\"盖梁顶面\": {\"value\": 65.26, \"unit\": \"m\"}, \"墩柱顶面\": {\"value\": 63.96, \"unit\": \"m\"}, \"扩大基础顶面\": {\"value\": 61.9, \"unit\": \"m\"}}"}]} {"page_01_file_name": "images/MS-U30-07/few_sheet/01.png", "page_02_file_name": "images/MS-U30-07/few_sheet/02.png", "page_03_file_name": "images/MS-U30-07/few_sheet/03.png", "page_04_file_name": "images/MS-U30-07/few_sheet/04.png", "page_05_file_name": "images/MS-U30-07/few_sheet/05.png", "page_06_file_name": "images/MS-U30-07/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U30-07", "set": "U30", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "按图中各处\"一片梁\"的数量计,一片预制边梁共用 HRB400 Φ12 钢筋多少 kg(不含现浇湿接缝和桥面铺装)?", "options": [{"key": "A", "text": "895.5", "correct": false}, {"key": "B", "text": "970.5", "correct": true}, {"key": "C", "text": "921.9", "correct": false}, {"key": "D", "text": "997.4", "correct": false}, {"key": "E", "text": "868.6", "correct": false}, {"key": "F", "text": "943.6", "correct": false}], "answer": ["B"], "few_sheet_pages": [24, 19, 29, 22, 20, 21], "evidence_pages": [19, 21, 22, 24], "full_set_page_count": 35, "sub_questions": [{"id": "MS-U30-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“箱梁普通钢筋构造图(四)”的“一片边梁材料数量表”中,钢筋合计栏里 Φ12 的重量是多少?返回数值和单位(kg)。", "answer": "{\"value\": 868.6, \"unit\": \"kg\"}"}, {"id": "MS-U30-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“箱梁普通钢筋构造图(二)”的“一片中梁材料数量表”中,钢筋合计栏里 Φ12 的重量是多少?返回数值和单位(kg)。", "answer": "{\"value\": 820.0, \"unit\": \"kg\"}"}, {"id": "MS-U30-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“底板钝角加强钢筋构造图”的“钝角加强钢筋明细表”中,一片梁数量的合计是多少?返回数值和单位(kg)。", "answer": "{\"value\": 26.9, \"unit\": \"kg\"}"}, {"id": "MS-U30-07-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“预应力钢束构造图”的“一片预制箱梁预应力材料数量表”中,定位钢筋的重量是多少?返回数值和单位(kg)。", "answer": "{\"value\": 75, \"unit\": \"kg\"}"}, {"id": "MS-U30-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "预制箱梁的钢束定位钢筋,直径是多少?返回数值和单位(mm)。", "answer": "{\"value\": 12, \"unit\": \"mm\"}"}, {"id": "MS-U30-07-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "一片预制边梁的普通钢筋中,Φ12 钢筋共重多少?返回数值和单位(kg)。", "answer": "{\"value\": 868.6, \"unit\": \"kg\"}"}]} {"page_01_file_name": "images/MS-U30-08/few_sheet/01.png", "page_02_file_name": "images/MS-U30-08/few_sheet/02.png", "page_03_file_name": "images/MS-U30-08/few_sheet/03.png", "page_04_file_name": "images/MS-U30-08/few_sheet/04.png", "page_05_file_name": "images/MS-U30-08/few_sheet/05.png", "page_06_file_name": "images/MS-U30-08/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U30-08", "set": "U30", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "全桥所有墩台上的支座垫石和挡块,钢筋用量合计是多少(kg)?", "options": [{"key": "A", "text": "544.71", "correct": false}, {"key": "B", "text": "736.61", "correct": true}, {"key": "C", "text": "568.81", "correct": false}, {"key": "D", "text": "916.62", "correct": false}, {"key": "E", "text": "542.21", "correct": false}, {"key": "F", "text": "388.80", "correct": false}], "answer": ["B"], "few_sheet_pages": [7, 15, 13, 9, 14, 8], "evidence_pages": [8, 9, 14, 15], "full_set_page_count": 35, "sub_questions": [{"id": "MS-U30-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥台支座垫石钢筋构造图”的“一个桥台支座垫石材料数量表”中,总重是多少?返回数值和单位(kg)。", "answer": "{\"value\": 86.4, \"unit\": \"kg\"}"}, {"id": "MS-U30-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥台挡块钢筋构造图”的“一个挡块材料数量表”中,总重是多少?返回数值和单位(kg)。", "answer": "{\"value\": 54.0, \"unit\": \"kg\"}"}, {"id": "MS-U30-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩支座垫石钢筋构造图”的“一个桥墩支座垫石材料数量表”中,总重是多少?返回数值和单位(kg)。", "answer": "{\"value\": 180.01, \"unit\": \"kg\"}"}, {"id": "MS-U30-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥墩挡块钢筋构造图”的“一个挡块材料数量表”中,总重是多少?返回数值和单位(kg)。", "answer": "{\"value\": 83.9, \"unit\": \"kg\"}"}, {"id": "MS-U30-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "每个桥台的台帽上、以及 1 号桥墩的盖梁上,各设有几个挡块?按字段 每个桥台、1号墩 返回,每个字段为数值和单位(单位写“个”)。", "answer": "{\"每个桥台\": {\"value\": 2, \"unit\": \"个\"}, \"1号墩\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U30-08-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥台支座垫石和桥台挡块的钢筋用量,适用于哪几个墩台?按墩台编号的阿拉伯数字返回两个,不分先后,以 JSON 数组返回(形如 [\"3\", \"4\"])。", "answer": "[\"0\", \"2\"]"}]} {"page_01_file_name": "images/MS-U30-09/few_sheet/01.png", "page_02_file_name": "images/MS-U30-09/few_sheet/02.png", "page_03_file_name": "images/MS-U30-09/few_sheet/03.png", "page_04_file_name": "images/MS-U30-09/few_sheet/04.png", "page_05_file_name": "images/MS-U30-09/few_sheet/05.png", "page_06_file_name": "images/MS-U30-09/few_sheet/06.png", "page_07_file_name": "images/MS-U30-09/few_sheet/07.png", "page_08_file_name": "images/MS-U30-09/few_sheet/08.png", "page_09_file_name": "images/MS-U30-09/few_sheet/09.png", "page_10_file_name": null, "id": "MS-U30-09", "set": "U30", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "下列构件(或构造)中,哪些在全桥恰好有 4 个(片、处、段)?", "options": [{"key": "A", "text": "现浇湿接缝", "correct": false}, {"key": "B", "text": "墩台挡块", "correct": false}, {"key": "C", "text": "预制边梁", "correct": true}, {"key": "D", "text": "河道护岸墙", "correct": true}, {"key": "E", "text": "伸缩缝", "correct": false}, {"key": "F", "text": "伸缩缝处的护栏钢遮板", "correct": true}], "answer": ["C", "D", "F"], "few_sheet_pages": [34, 31, 9, 4, 32, 8, 16, 35, 15], "evidence_pages": [4, 9, 15, 16, 31, 32, 35], "full_set_page_count": 35, "sub_questions": [{"id": "MS-U30-09-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“上部构造标准横断面”的支点横断面上,一孔中边缘的预制箱梁(宽 147)有几片、相邻箱梁之间的现浇湿接缝有几道?按字段 边梁、湿接缝 返回,每个字段为数值和单位(单位一律写“个”)。", "answer": "{\"边梁\": {\"value\": 2, \"unit\": \"个\"}, \"湿接缝\": {\"value\": 4, \"unit\": \"个\"}}"}, {"id": "MS-U30-09-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥型布置图”的立面上,全桥共分几孔?返回数值和单位(单位写“个”)。", "answer": "{\"value\": 2, \"unit\": \"个\"}"}, {"id": "MS-U30-09-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“防撞护栏一般构造图”的“全桥伸缩缝处钢遮板数量表”中,钢遮板一处的数量和全桥数量各是多少?按字段 一处、全桥 返回,每个字段为数值和单位(kg)。", "answer": "{\"一处\": {\"value\": 26.8, \"unit\": \"kg\"}, \"全桥\": {\"value\": 107.2, \"unit\": \"kg\"}}"}, {"id": "MS-U30-09-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“河道护岸墙构造图”的“河道护岸墙设置平面图”上,0 号桥台一端和 2 号桥台一端各画了几段浆砌片石砼护岸墙?按字段 0号桥台一端、2号桥台一端 返回,每个字段为数值和单位(单位写“个”)。", "answer": "{\"0号桥台一端\": {\"value\": 2, \"unit\": \"个\"}, \"2号桥台一端\": {\"value\": 2, \"unit\": \"个\"}}"}, {"id": "MS-U30-09-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥台挡块钢筋构造图”的立面上,一个桥台台帽上画了几个挡块?返回数值和单位(单位写“个”)。", "answer": "{\"value\": 2, \"unit\": \"个\"}"}, {"id": "MS-U30-09-R6", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“伸缩缝构造图”的附注中,伸缩缝设在哪几个墩台处?按墩台编号的阿拉伯数字返回两个,不分先后,以 JSON 数组返回(形如 [\"3\", \"4\"])。", "answer": "[\"0\", \"2\"]"}, {"id": "MS-U30-09-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "1 号桥墩的盖梁上设有几个挡块?返回数值和单位(单位写“个”)。", "answer": "{\"value\": 2, \"unit\": \"个\"}"}]} {"page_01_file_name": "images/MS-U30-10/few_sheet/01.png", "page_02_file_name": "images/MS-U30-10/few_sheet/02.png", "page_03_file_name": "images/MS-U30-10/few_sheet/03.png", "page_04_file_name": "images/MS-U30-10/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U30-10", "set": "U30", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "关于一片预制中梁所含的钢筋(箱梁普通钢筋以及封锚端和锚下钢筋),下列说法哪些正确?", "options": [{"key": "A", "text": "直径 12 mm 的普通钢筋共 868.6 kg", "correct": false}, {"key": "B", "text": "普通钢筋与封锚及锚下钢筋合计 1933.21 kg", "correct": false}, {"key": "C", "text": "普通钢筋与封锚及锚下钢筋合计 2020.1 kg", "correct": false}, {"key": "D", "text": "一片中梁的普通钢筋合计比一片边梁少 67.9 kg", "correct": true}, {"key": "E", "text": "直径 10 mm 钢筋(普通钢筋加封锚及锚下钢筋)共 800.5 kg", "correct": true}, {"key": "F", "text": "直径 10 mm 钢筋(普通钢筋加封锚及锚下钢筋)共 781.5 kg", "correct": false}], "answer": ["D", "E"], "few_sheet_pages": [21, 19, 22, 23], "evidence_pages": [19, 21, 23], "full_set_page_count": 35, "sub_questions": [{"id": "MS-U30-10-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "中梁封锚及锚下钢筋的小计重量涵盖哪些编号的钢筋?返回起止两个编号,只写数字(如 2 号至 4 号返回 2 和 4)。", "answer": "[\"1\", \"6\"]"}, {"id": "MS-U30-10-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "一片中梁材料数量表的'钢筋合计'栏中,直径 10 mm 钢筋的合计重量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 705.5, \"unit\": \"kg\"}"}, {"id": "MS-U30-10-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "封锚及锚下钢筋明细表中,中梁一块的 Φ10 小计重量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 95.0, \"unit\": \"kg\"}"}, {"id": "MS-U30-10-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "一片边梁材料数量表的'钢筋合计'栏中,直径 10 mm 钢筋的合计重量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 724.8, \"unit\": \"kg\"}"}, {"id": "MS-U30-10-R4", "role": "read", "tiers": ["full_set"], "question": "桥梁工程数量表中,预制箱梁钢筋 HRB400 Φ10 的数量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 8082.2, \"unit\": \"kg\"}"}]} {"page_01_file_name": "images/MS-U30-11/few_sheet/01.png", "page_02_file_name": "images/MS-U30-11/few_sheet/02.png", "page_03_file_name": "images/MS-U30-11/few_sheet/03.png", "page_04_file_name": "images/MS-U30-11/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U30-11", "set": "U30", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "关于不刁桥 1 号墩与 0 号台的支座垫石(各按一个墩台计),下列说法哪些正确?", "options": [{"key": "A", "text": "1 号墩的支座垫石 C30 混凝土比 0 号台的多 0.51 m³", "correct": false}, {"key": "B", "text": "0 号台与 1 号墩的支座垫石 C30 混凝土合计 1.18 m³", "correct": true}, {"key": "C", "text": "0 号台的支座垫石 C30 混凝土为 0.7 m³", "correct": false}, {"key": "D", "text": "1 号墩的支座垫石钢筋总重比 0 号台的多 93.61 kg", "correct": true}, {"key": "E", "text": "0 号台支座垫石所用钢筋为 Φ16", "correct": false}, {"key": "F", "text": "1 号墩支座垫石的 C30 混凝土未计入该墩工程数量表的 C30 合计,连同垫石该墩 C30 共 69.4 m³", "correct": true}], "answer": ["B", "D", "F"], "few_sheet_pages": [14, 9, 10, 8], "evidence_pages": [8, 9, 10, 14], "full_set_page_count": 35, "sub_questions": [{"id": "MS-U30-11-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "本桥哪几个墩台设桥台支座垫石?只返回墩台编号数字(如 5 号台返回 5)。", "answer": "[\"0\", \"2\"]"}, {"id": "MS-U30-11-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥台支座垫石钢筋构造图的'一个桥台支座垫石材料数量表'中,C30 混凝土是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 0.48, \"unit\": \"m³\"}"}, {"id": "MS-U30-11-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥墩支座垫石钢筋构造图的'一个桥墩支座垫石材料数量表'中,C30 混凝土是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 0.7, \"unit\": \"m³\"}"}, {"id": "MS-U30-11-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥台挡块钢筋构造图的'一个挡块材料数量表'中,C30 混凝土是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 0.19, \"unit\": \"m³\"}"}, {"id": "MS-U30-11-R4", "role": "read", "tiers": ["full_set"], "question": "桥梁工程数量表中,U 型桥台'垫石、挡块'一栏的现浇 C30 砼数量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1.7, \"unit\": \"m³\"}"}, {"id": "MS-U30-11-R5", "role": "read", "tiers": ["full_set"], "question": "桥梁工程数量表中,桥墩'挡块、垫石'一栏的现浇 C30 砼数量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1.3, \"unit\": \"m³\"}"}, {"id": "MS-U30-11-R6", "role": "read", "tiers": ["full_set"], "question": "桥墩挡块钢筋构造图的'一个挡块材料数量表'中,C30 混凝土是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 0.28, \"unit\": \"m³\"}"}]} {"page_01_file_name": "images/MS-U31-01/few_sheet/01.png", "page_02_file_name": "images/MS-U31-01/few_sheet/02.png", "page_03_file_name": "images/MS-U31-01/few_sheet/03.png", "page_04_file_name": "images/MS-U31-01/few_sheet/04.png", "page_05_file_name": "images/MS-U31-01/few_sheet/05.png", "page_06_file_name": "images/MS-U31-01/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U31-01", "set": "U31", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "北岸 P7 桥塔承台施工时设置了双壁钢围堰。这个围堰的顶面比设防水位高出多少?下列说法哪些正确?", "options": [{"key": "A", "text": "高出 2.5 m", "correct": false}, {"key": "B", "text": "第一阶段赶在枯水期施工的钢围堰包括 P7、P8 两座桥塔的", "correct": false}, {"key": "C", "text": "P8 钢围堰顶面低于设防水位", "correct": false}, {"key": "D", "text": "P7 墩并没有设置双壁钢围堰", "correct": true}, {"key": "E", "text": "高出 0.5 m", "correct": false}, {"key": "F", "text": "P8 墩只设一个双壁钢围堰", "correct": false}], "answer": ["D"], "few_sheet_pages": [3, 9, 11, 1, 7, 4], "evidence_pages": [1, 4, 7, 11], "full_set_page_count": 12, "sub_questions": [{"id": "MS-U31-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔基础围堰及防汛措施布置图”A-A 剖面上,围堰顶标高和围堰设防水位各是多少?以 JSON 返回 top、design_wl 两个字段,每个为数值和单位(m)。", "answer": "{\"top\": {\"value\": 193.81, \"unit\": \"m\"}, \"design_wl\": {\"value\": 193.31, \"unit\": \"m\"}}"}, {"id": "MS-U31-01-R2", "role": "read", "tiers": ["full_set"], "question": "“滑移支架布置图(四)”的说明中,滑移支架的轨顶标高和设防水位各是多少?以 JSON 返回 rail、design_wl 两个字段,每个为数值和单位(m)。", "answer": "{\"rail\": {\"value\": 195.81, \"unit\": \"m\"}, \"design_wl\": {\"value\": 193.31, \"unit\": \"m\"}}"}, {"id": "MS-U31-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔基础围堰及防汛措施布置图”的说明中,P8 墩共设几个围堰?返回数值和单位(个)。", "answer": "{\"value\": 2, \"unit\": \"个\"}"}, {"id": "MS-U31-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“施工措施平面布置图”上,标注为“双壁钢围堰”的围堰分别设在哪几个墩?按墩号从小到大,以 JSON 返回 first、second、third 三个字段,按图中墩号原样写(形如 P3)。", "answer": "{\"first\": \"P8\", \"second\": \"P9\", \"third\": \"P10\"}"}, {"id": "MS-U31-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“全桥施工流程图”(共 2 张)第 1 张最上一栏的主要工序说明中,赶在枯水期施工钢围堰的是哪座桥塔?按图中墩号原样返回(形如 P3)。", "answer": "\"P8\""}, {"id": "MS-U31-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "P8 墩承台施工一共设置了几个双壁钢围堰?返回数值和单位(个)。", "answer": "{\"value\": 2, \"unit\": \"个\"}"}]} {"page_01_file_name": "images/MS-U31-02/few_sheet/01.png", "page_02_file_name": "images/MS-U31-02/few_sheet/02.png", "page_03_file_name": "images/MS-U31-02/few_sheet/03.png", "page_04_file_name": "images/MS-U31-02/few_sheet/04.png", "page_05_file_name": "images/MS-U31-02/few_sheet/05.png", "page_06_file_name": "images/MS-U31-02/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U31-02", "set": "U31", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "spatial", "question": "沿桥轴线方向看,两岸滑移支架与南岸施工栈桥的支墩编号和端部布置如何?下列说法哪些正确?", "options": [{"key": "A", "text": "南岸滑移支架那一跨 9 m 的非标准跨在靠主跨跨中的一端", "correct": false}, {"key": "B", "text": "南岸滑移支架的 Z1 紧靠 P8 桥塔,编号向主跨跨中方向增大", "correct": true}, {"key": "C", "text": "南岸施工栈桥的编号自岸侧桥台 Z0 起向 P8 方向增大", "correct": true}, {"key": "D", "text": "北岸滑移支架的 Z1 紧靠 P7 桥塔,伸向主跨的最外端支墩为 Z8", "correct": true}, {"key": "E", "text": "两岸滑移支架的 3 m 端部悬出段都在靠主跨跨中的一端", "correct": true}, {"key": "F", "text": "南岸施工栈桥的 Z1 紧靠 P8 墩施工平台", "correct": false}], "answer": ["B", "C", "D", "E"], "few_sheet_pages": [9, 7, 5, 8, 10, 6], "evidence_pages": [5, 7, 8, 9], "full_set_page_count": 12, "sub_questions": [{"id": "MS-U31-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“滑移支架布置图(二)”和“滑移支架布置图(三)”的南岸滑移支架立面上,紧靠 P8 桥塔的支墩编号是什么?离 P8 最远的支墩编号是什么?以 JSON 返回 at_tower、farthest 两个字段,按图中编号原样写(形如 Z5)。", "answer": "{\"at_tower\": \"Z1\", \"farthest\": \"Z23\"}"}, {"id": "MS-U31-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“滑移支架布置图(一)”的北岸滑移支架立面上,紧靠 P7 桥塔的支墩编号是什么?离 P7 最远的支墩编号是什么?以 JSON 返回 at_tower、farthest 两个字段,按图中编号原样写(形如 Z5)。", "answer": "{\"at_tower\": \"Z1\", \"farthest\": \"Z8\"}"}, {"id": "MS-U31-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“南岸栈桥布置图(一)”1-1 立面上,紧靠 P8 墩施工平台的栈桥支墩编号是什么?栈桥最靠岸一端的支墩编号是什么?以 JSON 返回 at_platform、shore_end 两个字段,按图中编号原样写(形如 Z5)。", "answer": "{\"at_platform\": \"Z17\", \"shore_end\": \"Z0\"}"}, {"id": "MS-U31-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "两岸钢箱梁滑移支架的端部各有一段 3 m 的悬出段。北岸、南岸的悬出段各自紧接在哪个支墩之外?以 JSON 返回 north、south 两个字段,按图中编号原样写(形如 Z5)。", "answer": "{\"north\": \"Z8\", \"south\": \"Z23\"}"}, {"id": "MS-U31-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "南岸钢箱梁滑移支架上,跨径为 9 m 的那一跨位于哪两个支墩之间?以 JSON 返回 from(编号较小者)、to 两个字段,按图中编号原样写(形如 Z5)。", "answer": "{\"from\": \"Z1\", \"to\": \"Z2\"}"}]} {"page_01_file_name": "images/MS-U31-03/few_sheet/01.png", "page_02_file_name": "images/MS-U31-03/few_sheet/02.png", "page_03_file_name": "images/MS-U31-03/few_sheet/03.png", "page_04_file_name": "images/MS-U31-03/few_sheet/04.png", "page_05_file_name": "images/MS-U31-03/few_sheet/05.png", "page_06_file_name": "images/MS-U31-03/few_sheet/06.png", "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U31-03", "set": "U31", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "sequence", "question": "把选项中出现的各个标高(临时结构的顶面、底面和水位)合在一起,从高到低排成一列。下列\"较高的一项 → 紧接其下的一项\"中,哪些正确?", "options": [{"key": "A", "text": "P8 钢围堰顶 → 施工期间常水位", "correct": false}, {"key": "B", "text": "栈桥及施工平台顶面 → P8 钢围堰顶", "correct": true}, {"key": "C", "text": "滑移支架轨顶 → 栈桥及施工平台顶面", "correct": true}, {"key": "D", "text": "施工期间常水位 → P8 钢围堰底", "correct": false}, {"key": "E", "text": "设防水位 → P8 承台底面", "correct": false}, {"key": "F", "text": "栈桥及施工平台顶面 → 滑移支架轨顶", "correct": false}], "answer": ["B", "C"], "few_sheet_pages": [1, 6, 5, 10, 11, 12], "evidence_pages": [1, 5, 10, 11], "full_set_page_count": 12, "sub_questions": [{"id": "MS-U31-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“滑移支架布置图(四)”的说明中,滑移支架的轨顶标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 195.81, \"unit\": \"m\"}"}, {"id": "MS-U31-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“南岸栈桥布置图(一)”1-1 立面上,栈桥及施工平台顶面的标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 195.31, \"unit\": \"m\"}"}, {"id": "MS-U31-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔基础围堰及防汛措施布置图”A-A 剖面上,围堰顶标高和围堰设防水位各是多少?以 JSON 返回 top、design_wl 两个字段,每个为数值和单位(m)。", "answer": "{\"top\": {\"value\": 193.81, \"unit\": \"m\"}, \"design_wl\": {\"value\": 193.31, \"unit\": \"m\"}}"}, {"id": "MS-U31-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔基础围堰及防汛措施布置图”A-A 剖面上,承台底面标高和围堰底标高各是多少?以 JSON 返回 cap_bottom、weir_bottom 两个字段,每个为数值和单位(m)。", "answer": "{\"cap_bottom\": {\"value\": 172.293, \"unit\": \"m\"}, \"weir_bottom\": {\"value\": 169.793, \"unit\": \"m\"}}"}, {"id": "MS-U31-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“全桥施工流程图”的主要施工流程示意图上,标注的施工期间常水位是多少?返回数值和单位(m)。", "answer": "{\"value\": 175.0, \"unit\": \"m\"}"}, {"id": "MS-U31-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "P8 桥塔双壁钢围堰内,C30 封底混凝土顶面的标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 172.293, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U31-04/few_sheet/01.png", "page_02_file_name": "images/MS-U31-04/few_sheet/02.png", "page_03_file_name": "images/MS-U31-04/few_sheet/03.png", "page_04_file_name": "images/MS-U31-04/few_sheet/04.png", "page_05_file_name": "images/MS-U31-04/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U31-04", "set": "U31", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "enumerate", "question": "本桥施工用了三类临时钢结构:南岸施工栈桥(含各墩施工平台)、两岸钢箱梁滑移支架、P8 桥塔双壁钢围堰。下列钢材规格中,哪些只在其中一类结构里使用?", "options": [{"key": "A", "text": "321 型贝雷梁", "correct": false}, {"key": "B", "text": "Φ820×12 钢管", "correct": false}, {"key": "C", "text": "Φ1020×12 钢管", "correct": true}, {"key": "D", "text": "Φ630×8 钢管", "correct": true}, {"key": "E", "text": "Φ425×8 钢管", "correct": true}, {"key": "F", "text": "45b 工字钢", "correct": false}], "answer": ["C", "D", "E"], "few_sheet_pages": [11, 5, 10, 6, 12], "evidence_pages": [6, 10, 11], "full_set_page_count": 12, "sub_questions": [{"id": "MS-U31-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“南岸栈桥布置图(二)”上的“南岸栈桥材料数量表”中,立柱钢管桩和连接系钢管的外径各是多少?“桩顶分配梁1”所用工字钢是什么型号?以 JSON 返回三个字段:pile_D、brace_D(各为数值和单位,mm),beam(只写工字钢型号的数字和字母,形如 32a)。", "answer": "{\"pile_D\": {\"value\": 820, \"unit\": \"mm\"}, \"brace_D\": {\"value\": 425, \"unit\": \"mm\"}, \"beam\": \"45b\"}"}, {"id": "MS-U31-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“滑移支架布置图(四)”上的“南岸钢梁滑移平台材料数量表”中,立柱钢管桩和连接系钢管的外径各是多少?以 JSON 返回 pile_D、brace_D 两个字段,每个为数值和单位(mm)。", "answer": "{\"pile_D\": {\"value\": 1020, \"unit\": \"mm\"}, \"brace_D\": {\"value\": 630, \"unit\": \"mm\"}}"}, {"id": "MS-U31-04-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔基础围堰及防汛措施布置图”的说明中,双壁钢围堰内支撑所用钢管的外径是多少?支撑与围堰壁板间圈梁所用工字钢是什么型号?以 JSON 返回 strut_D(数值和单位,mm)、ring(只写工字钢型号的数字和字母,形如 32a)两个字段。", "answer": "{\"strut_D\": {\"value\": 820, \"unit\": \"mm\"}, \"ring\": \"45b\"}"}, {"id": "MS-U31-04-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“南岸栈桥布置图(二)”上的“南岸栈桥材料数量表”和“滑移支架布置图(四)”上的“南岸钢梁滑移平台材料数量表”中,贝雷梁一行的数量各是多少?以 JSON 返回 trestle、slide 两个字段,每个为数值和单位(个)。", "answer": "{\"trestle\": {\"value\": 544, \"unit\": \"个\"}, \"slide\": {\"value\": 1308, \"unit\": \"个\"}}"}, {"id": "MS-U31-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "本桥三类临时钢结构(南岸施工栈桥及各墩施工平台、两岸钢箱梁滑移支架、P8 桥塔双壁钢围堰)中,有一类结构的连接系采用外径 630 mm 的钢管。这类结构的立柱钢管外径是多少?返回数值和单位(mm)。", "answer": "{\"value\": 1020, \"unit\": \"mm\"}"}, {"id": "MS-U31-04-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "本桥三类临时钢结构中,有一类结构的立柱采用外径 820 mm 的钢管桩。这类结构的连接系钢管外径是多少?返回数值和单位(mm)。", "answer": "{\"value\": 425, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U31-05/few_sheet/01.png", "page_02_file_name": "images/MS-U31-05/few_sheet/02.png", "page_03_file_name": "images/MS-U31-05/few_sheet/03.png", "page_04_file_name": "images/MS-U31-05/few_sheet/04.png", "page_05_file_name": "images/MS-U31-05/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U31-05", "set": "U31", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "南岸施工栈桥在 P11 墩处设有施工平台。这个平台的平面尺寸是多少?下列说法哪些正确?", "options": [{"key": "A", "text": "栈桥上并没有 P11 墩施工平台", "correct": true}, {"key": "B", "text": "栈桥在 P10 墩与岸侧桥台之间设有一处制动墩", "correct": false}, {"key": "C", "text": "栈桥靠岸一端止于 Z0 处的桥台,P11 墩位于桥台之外", "correct": true}, {"key": "D", "text": "顺桥向 20 m、横桥向 81 m", "correct": false}, {"key": "E", "text": "栈桥标准截面的桥面宽 15 m", "correct": false}, {"key": "F", "text": "顺桥向 15 m、横桥向 39 m", "correct": false}], "answer": ["A", "C"], "few_sheet_pages": [10, 4, 6, 11, 5], "evidence_pages": [4, 5, 6], "full_set_page_count": 12, "sub_questions": [{"id": "MS-U31-05-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“施工措施平面布置图”上,P9 墩施工平台的顺桥向尺寸和横桥向尺寸各是多少?以 JSON 返回 along、across 两个字段,每个为数值和单位(cm)。", "answer": "{\"along\": {\"value\": 1500, \"unit\": \"cm\"}, \"across\": {\"value\": 3900, \"unit\": \"cm\"}}"}, {"id": "MS-U31-05-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“施工措施平面布置图”上,P8 墩施工平台的顺桥向尺寸和横桥向尺寸各是多少?以 JSON 返回 along、across 两个字段,每个为数值和单位(cm)。", "answer": "{\"along\": {\"value\": 2000, \"unit\": \"cm\"}, \"across\": {\"value\": 8100, \"unit\": \"cm\"}}"}, {"id": "MS-U31-05-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“南岸栈桥布置图(一)”1-1 立面上:栈桥最靠岸一端的支墩编号是什么?紧邻其外侧(远离江心一侧)画出的桥墩编号是什么?标“制动墩”的两个栈桥支墩编号是什么?距 P10 墩中心线最近的栈桥支墩编号是什么?以 JSON 返回 shore_end、beyond、brake(两个编号用“/”隔开,编号小的在前,形如 Z2/Z9)、near_P10 四个字段,均按图中编号原样写。", "answer": "{\"shore_end\": \"Z0\", \"beyond\": \"P11\", \"brake\": \"Z7/Z13\", \"near_P10\": \"Z5\"}"}, {"id": "MS-U31-05-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“南岸栈桥布置图(二)”上,“栈桥标准截面图”的栈桥全宽和“5—5(6—6)”断面的全宽各是多少?以 JSON 返回 std、sec5 两个字段,每个为数值和单位(cm)。", "answer": "{\"std\": {\"value\": 800, \"unit\": \"cm\"}, \"sec5\": {\"value\": 1500, \"unit\": \"cm\"}}"}, {"id": "MS-U31-05-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "南岸施工栈桥上设置的各墩施工平台中,最靠岸的那一处是为哪个墩设置的?按图中墩号原样返回(形如 P3)。", "answer": "\"P10\""}]} {"page_01_file_name": "images/MS-U31-06/few_sheet/01.png", "page_02_file_name": "images/MS-U31-06/few_sheet/02.png", "page_03_file_name": "images/MS-U31-06/few_sheet/03.png", "page_04_file_name": "images/MS-U31-06/few_sheet/04.png", "page_05_file_name": "images/MS-U31-06/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U31-06", "set": "U31", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "aggregate", "question": "把南、北两岸的钢箱梁滑移支架合起来统计,下列合计哪些正确?", "options": [{"key": "A", "text": "标准跨以外的部分合计长 12 m", "correct": false}, {"key": "B", "text": "15 m 标准跨共 21 跨", "correct": false}, {"key": "C", "text": "15 m 标准跨共 28 跨", "correct": true}, {"key": "D", "text": "Z 编号支墩共 31 个", "correct": true}, {"key": "E", "text": "Z 编号支墩共 29 个", "correct": false}, {"key": "F", "text": "标准跨以外的部分合计长 15 m", "correct": true}], "answer": ["C", "D", "F"], "few_sheet_pages": [10, 8, 9, 7, 5], "evidence_pages": [7, 8, 9], "full_set_page_count": 12, "sub_questions": [{"id": "MS-U31-06-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“滑移支架布置图(一)”的北岸滑移支架立面上:15 m 标准跨有几跨?标准跨以外的端部悬出段长多少?Z 编号支墩共有几个?以 JSON 返回 std_spans(数值和单位,个)、overhang(数值和单位,cm)、piers(数值和单位,个)三个字段。", "answer": "{\"std_spans\": {\"value\": 7, \"unit\": \"个\"}, \"overhang\": {\"value\": 300, \"unit\": \"cm\"}, \"piers\": {\"value\": 8, \"unit\": \"个\"}}"}, {"id": "MS-U31-06-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“滑移支架布置图(二)”的南岸滑移支架立面上,15 m 标准跨有几跨?江侧端部的悬出段长多少?以 JSON 返回 std_spans(数值和单位,个)、overhang(数值和单位,cm)两个字段。", "answer": "{\"std_spans\": {\"value\": 21, \"unit\": \"个\"}, \"overhang\": {\"value\": 300, \"unit\": \"cm\"}}"}, {"id": "MS-U31-06-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“滑移支架布置图(三)”的南岸滑移支架立面上,紧靠 P8 桥塔的那一跨跨径是多少?返回数值和单位(cm)。", "answer": "{\"value\": 900, \"unit\": \"cm\"}"}, {"id": "MS-U31-06-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“滑移支架布置图(二)”和“滑移支架布置图(三)”合起来,南岸滑移支架的 Z 编号支墩共有几个?返回数值和单位(个)。", "answer": "{\"value\": 23, \"unit\": \"个\"}"}, {"id": "MS-U31-06-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "南岸钢箱梁滑移支架上,跨径为 9 m 的那一跨位于哪两个支墩之间?以 JSON 返回 from(编号较小者)、to 两个字段,按图中编号原样写(形如 Z5)。", "answer": "{\"from\": \"Z1\", \"to\": \"Z2\"}"}]} {"page_01_file_name": "images/MS-U31-07/few_sheet/01.png", "page_02_file_name": "images/MS-U31-07/few_sheet/02.png", "page_03_file_name": "images/MS-U31-07/few_sheet/03.png", "page_04_file_name": "images/MS-U31-07/few_sheet/04.png", "page_05_file_name": "images/MS-U31-07/few_sheet/05.png", "page_06_file_name": "images/MS-U31-07/few_sheet/06.png", "page_07_file_name": "images/MS-U31-07/few_sheet/07.png", "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U31-07", "set": "U31", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "南岸 P8 桥塔承台施工时设置了双壁钢围堰。这个围堰的顶面比设防水位高出多少?下列说法哪些正确?", "options": [{"key": "A", "text": "围堰顶比 P8 施工平台顶面低 1.5 m", "correct": true}, {"key": "B", "text": "围堰在加劲梁吊装的同一施工阶段、于枯水期拆除", "correct": true}, {"key": "C", "text": "P8 墩并没有设置双壁钢围堰", "correct": false}, {"key": "D", "text": "围堰在主缆架设完成之前就已拆除", "correct": false}, {"key": "E", "text": "高出 0.5 m", "correct": true}, {"key": "F", "text": "围堰顶与滑移支架轨顶齐平", "correct": false}], "answer": ["A", "B", "E"], "few_sheet_pages": [12, 2, 10, 5, 11, 1, 3], "evidence_pages": [1, 2, 5, 10, 11], "full_set_page_count": 12, "sub_questions": [{"id": "MS-U31-07-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“桥塔基础围堰及防汛措施布置图”A-A 剖面上,围堰顶标高和围堰设防水位各是多少?以 JSON 返回 top、design_wl 两个字段,每个为数值和单位(m)。", "answer": "{\"top\": {\"value\": 193.81, \"unit\": \"m\"}, \"design_wl\": {\"value\": 193.31, \"unit\": \"m\"}}"}, {"id": "MS-U31-07-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“滑移支架布置图(四)”的说明中,滑移支架的轨顶标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 195.81, \"unit\": \"m\"}"}, {"id": "MS-U31-07-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "把“全桥施工流程图”两张图上的各栏自上而下、先第 1 张后第 2 张依次编为第 1 至第 6 阶段。“架设主缆”“加劲梁逐段吊装”“拆除 P8 桥塔围堰”这三项工序分别在第几阶段?以 JSON 返回 cable、girder、cofferdam 三个字段,每个只写阿拉伯数字(例如第二阶段写 \"2\")。", "answer": "{\"cable\": \"3\", \"girder\": \"4\", \"cofferdam\": \"4\"}"}, {"id": "MS-U31-07-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "南岸 P8 墩施工平台顶面的标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 195.31, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U31-08/few_sheet/01.png", "page_02_file_name": "images/MS-U31-08/few_sheet/02.png", "page_03_file_name": "images/MS-U31-08/few_sheet/03.png", "page_04_file_name": "images/MS-U31-08/few_sheet/04.png", "page_05_file_name": "images/MS-U31-08/few_sheet/05.png", "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U31-08", "set": "U31", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "false_premise", "question": "南岸施工栈桥在 P9 墩处设有施工平台。这个平台的平面尺寸是多少?下列说法哪些正确?", "options": [{"key": "A", "text": "顺桥向 15 m、横桥向 39 m", "correct": true}, {"key": "B", "text": "P9 处的栈桥墩(Z13)是制动墩", "correct": true}, {"key": "C", "text": "栈桥上并没有 P9 墩施工平台", "correct": false}, {"key": "D", "text": "平台立柱为 Φ1020×12 钢管桩", "correct": false}, {"key": "E", "text": "横桥向 39 m 由 3 跨 12 m 贝雷梁再加 3 m 组成", "correct": true}, {"key": "F", "text": "平台顶面比栈桥桥面高 0.5 m", "correct": false}], "answer": ["A", "B", "E"], "few_sheet_pages": [4, 6, 10, 12, 5], "evidence_pages": [4, 5, 6], "full_set_page_count": 12, "sub_questions": [{"id": "MS-U31-08-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“施工措施平面布置图”上,P9 墩施工平台的顺桥向尺寸和横桥向尺寸各是多少?以 JSON 返回 along、across 两个字段,每个为数值和单位(cm)。", "answer": "{\"along\": {\"value\": 1500, \"unit\": \"cm\"}, \"across\": {\"value\": 3900, \"unit\": \"cm\"}}"}, {"id": "MS-U31-08-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“南岸栈桥布置图(二)”的“3—3(4—4)”断面上,施工平台横向尺寸 3900 被分成的各段中,重复出现的那一段长度是多少、最后一段长度是多少?平台立柱钢管桩的外径是多少?以 JSON 返回 seg(cm)、last(cm)、pile_D(mm)三个字段,每个为数值和单位。", "answer": "{\"seg\": {\"value\": 1200, \"unit\": \"cm\"}, \"last\": {\"value\": 300, \"unit\": \"cm\"}, \"pile_D\": {\"value\": 820, \"unit\": \"mm\"}}"}, {"id": "MS-U31-08-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“南岸栈桥布置图(一)”1-1 立面上,栈桥及施工平台顶面的标高是多少?返回数值和单位(m)。", "answer": "{\"value\": 195.31, \"unit\": \"m\"}"}, {"id": "MS-U31-08-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“滑移支架布置图(四)”上:说明中滑移支架的轨顶标高是多少?“南岸钢梁滑移平台材料数量表”中立柱钢管桩的外径是多少?以 JSON 返回 rail(m)、pile_D(mm)两个字段,每个为数值和单位。", "answer": "{\"rail\": {\"value\": 195.81, \"unit\": \"m\"}, \"pile_D\": {\"value\": 1020, \"unit\": \"mm\"}}"}, {"id": "MS-U31-08-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "“南岸栈桥布置图(一)”1-1 立面上,标“制动墩”的两个栈桥支墩编号是什么?以 JSON 返回 first(编号小者)、second 两个字段,按图中编号原样写(形如 Z2)。", "answer": "{\"first\": \"Z7\", \"second\": \"Z13\"}"}, {"id": "MS-U31-08-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "南岸施工栈桥上,位于 P9 墩处(与 P9 承台相交)的那个栈桥支墩编号是什么?按图中编号原样返回(形如 Z2)。", "answer": "\"Z13\""}]} {"page_01_file_name": "images/MS-U32-01/few_sheet/01.png", "page_02_file_name": "images/MS-U32-01/few_sheet/02.png", "page_03_file_name": "images/MS-U32-01/few_sheet/03.png", "page_04_file_name": "images/MS-U32-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U32-01", "set": "U32", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "双龙河桥紧邻路线长链断链点的那一端,下列说法哪些正确?桥长以本册主要技术经济指标表所列为准。", "options": [{"key": "A", "text": "该端桥台扩大基础底面标高为 104.78 m", "correct": false}, {"key": "B", "text": "该端的桥梁端点桩号为 K1+073.46", "correct": false}, {"key": "C", "text": "该端的桥梁端点桩号为 K1+073.48", "correct": true}, {"key": "D", "text": "该端桥台为 0 号桥台", "correct": true}, {"key": "E", "text": "该端桥台扩大基础底面标高为 103.28 m", "correct": false}, {"key": "F", "text": "该端桥台扩大基础顶面标高为 105.55 m", "correct": true}], "answer": ["C", "D", "F"], "few_sheet_pages": [4, 14, 9, 13], "evidence_pages": [9, 13, 14], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U32-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "指向'1-20m T梁 双龙河桥'的那一处桩号标注是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K1+086.5\""}, {"id": "MS-U32-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "拟建桥梁桥型布置图立面中,⓪号桥台一侧标注的桥梁端点桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K1+073.46\""}, {"id": "MS-U32-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主要技术经济指标表中,'桥梁'一行所列的桥长是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 26.04, \"unit\": \"m\"}"}, {"id": "MS-U32-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "路线平、纵面缩图平面部分的长链断链标注中,等号右侧的桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K1+064.976\""}, {"id": "MS-U32-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "拟建桥梁桥型布置图立面中,全桥总长的尺寸标注是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 26080, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U32-02/few_sheet/01.png", "page_02_file_name": "images/MS-U32-02/few_sheet/02.png", "page_03_file_name": "images/MS-U32-02/few_sheet/03.png", "page_04_file_name": "images/MS-U32-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U32-02", "set": "U32", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "关于吕亭镇施工范围内的路线,下列说法哪些正确?", "options": [{"key": "A", "text": "该范围内 −6.26% 坡段的实际长度为 585 m", "correct": true}, {"key": "B", "text": "该范围内共含 2 个变坡点", "correct": false}, {"key": "C", "text": "该范围末端 −4.0% 坡段的实际长度为 60.682 m", "correct": false}, {"key": "D", "text": "该范围的起点落在 −3.00% 的坡段上", "correct": false}, {"key": "E", "text": "该范围内路线的实际长度为 657.581 m", "correct": true}, {"key": "F", "text": "该范围内路线的实际长度为 645.682 m", "correct": false}], "answer": ["A", "E"], "few_sheet_pages": [11, 18, 13, 20], "evidence_pages": [13, 20], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U32-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "青色'乡镇分界线'所在位置对应的桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K0+460\""}, {"id": "MS-U32-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "公路平面总体设计图(2/4)中,青色'吕亭镇施工范围'标注的终点桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K1+105.682\""}, {"id": "MS-U32-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "路线平、纵面缩图平面部分的断链标注中,长链长度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 11.899, \"unit\": \"m\"}"}, {"id": "MS-U32-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "路线平、纵面缩图平面部分的长链断链标注中,等号右侧的桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K1+064.976\""}, {"id": "MS-U32-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "公路平面总体设计图(2/4)中,图幅所注本张桩号范围的起点是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K0+350\""}]} {"page_01_file_name": "images/MS-U33-01/few_sheet/01.png", "page_02_file_name": "images/MS-U33-01/few_sheet/02.png", "page_03_file_name": "images/MS-U33-01/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U33-01", "set": "U33", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "全线纵坡(按绝对值)达到全线最大纵坡的那些坡段,下列说法哪些正确?", "options": [{"key": "A", "text": "其中最长的一段坡长为 212.0 m", "correct": true}, {"key": "B", "text": "这些坡段的坡长合计为 663.0 m", "correct": false}, {"key": "C", "text": "其中有一段起于 K0+557", "correct": true}, {"key": "D", "text": "这些坡段都位于 K1+000 之前", "correct": true}, {"key": "E", "text": "这些坡段的坡长合计为 366.0 m", "correct": false}, {"key": "F", "text": "其中最短的一段坡长为 77.0 m", "correct": true}], "answer": ["A", "C", "D", "F"], "few_sheet_pages": [13, 5, 12], "evidence_pages": [5, 12], "full_set_page_count": 32, "sub_questions": [{"id": "MS-U33-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "路线设计说明的\"纵面主要技术指标表\"中,\"最大坡长\"一项的技术指标是多少?返回数值和单位(m)。", "answer": "{\"value\": 663.0, \"unit\": \"m\"}"}, {"id": "MS-U33-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "路线平、纵面缩图(K0+000~K3+450)纵断面\"坡度/坡长\"栏中,变坡点 K0+557 至 K0+634 之间那一坡段的坡度和坡长各是多少?以 JSON 返回两个字段:坡度(按图上数字原样写成字符串,不带 %,形如 \"4.5\")、坡长(数值和单位,m)。", "answer": "{\"坡度\": \"9.0\", \"坡长\": {\"value\": 77.0, \"unit\": \"m\"}}"}, {"id": "MS-U33-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "路线平、纵面缩图(K0+000~K3+450)纵断面\"坡度/坡长\"栏中,变坡点 K0+220 至 K0+374、K0+750 至 K0+962 两个坡段的坡长各是多少?以 JSON 返回两个字段 前段、后段,每个字段为数值和单位(m)。", "answer": "{\"前段\": {\"value\": 154.0, \"unit\": \"m\"}, \"后段\": {\"value\": 212.0, \"unit\": \"m\"}}"}, {"id": "MS-U33-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "全线纵坡(按绝对值)等于全线最大纵坡的各个坡段,起点桩号各是多少?按里程从小到大以 JSON 返回三个字段 第1段、第2段、第3段,每个字段为桩号字符串(形如 K1+234,不带小数)。", "answer": "{\"第1段\": \"K0+220\", \"第2段\": \"K0+557\", \"第3段\": \"K0+750\"}"}, {"id": "MS-U33-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "全线纵坡(按绝对值)等于全线最大纵坡的各个坡段,坡长各是多少?按里程从小到大以 JSON 返回三个字段 第1段、第2段、第3段,每个字段为数值和单位(m)。", "answer": "{\"第1段\": {\"value\": 154.0, \"unit\": \"m\"}, \"第2段\": {\"value\": 77.0, \"unit\": \"m\"}, \"第3段\": {\"value\": 212.0, \"unit\": \"m\"}}"}]} {"page_01_file_name": "images/MS-U33-02/few_sheet/01.png", "page_02_file_name": "images/MS-U33-02/few_sheet/02.png", "page_03_file_name": "images/MS-U33-02/few_sheet/03.png", "page_04_file_name": "images/MS-U33-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U33-02", "set": "U33", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "按施工图设计评审会专家组意见执行后,第 5 条意见所调整的那一层路面结构,以及第 6 条意见要求补充材料要求的那种挡墙,下列说法哪些正确?", "options": [{"key": "A", "text": "该路面结构层的全线数量为 20289.6 m²", "correct": false}, {"key": "B", "text": "该路面结构层材料的抗压回弹模量(弯沉计算用)为 250 MPa", "correct": false}, {"key": "C", "text": "该路面结构层材料的抗压回弹模量(弯沉计算用)为 3600 MPa", "correct": false}, {"key": "D", "text": "该路面结构层的全线数量为 23278.6 m²", "correct": true}, {"key": "E", "text": "该挡墙的全线数量为 88.5 m³", "correct": false}, {"key": "F", "text": "该路面结构层的厚度为 20 cm", "correct": false}], "answer": ["D"], "few_sheet_pages": [7, 10, 14, 19], "evidence_pages": [7, 10, 14], "full_set_page_count": 32, "sub_questions": [{"id": "MS-U33-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "专家组意见第 5 条落实后,写明调整后的厚度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 18, \"unit\": \"cm\"}"}, {"id": "MS-U33-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "专家组意见第 6 条要求明确材料要求的那种挡墙,其混凝土强度等级是什么?按原文返回(形如 C30)。", "answer": "\"C25\""}, {"id": "MS-U33-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主要技术经济指标表中,'18cm水泥稳定碎石'一行的数量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 23278.6, \"unit\": \"m²\"}"}, {"id": "MS-U33-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主要技术经济指标表中,'20cm水泥混凝土'一行的数量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 20289.6, \"unit\": \"m²\"}"}, {"id": "MS-U33-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主要技术经济指标表中,'C25片石砼挡土墙'一行的数量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 5400, \"unit\": \"m³\"}"}, {"id": "MS-U33-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "主要技术经济指标表中,'挡墙基底换填(砂砾石)'一行的数量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 88.5, \"unit\": \"m³\"}"}]} {"page_01_file_name": "images/MS-U33-03/few_sheet/01.png", "page_02_file_name": "images/MS-U33-03/few_sheet/02.png", "page_03_file_name": "images/MS-U33-03/few_sheet/03.png", "page_04_file_name": "images/MS-U33-03/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U33-03", "set": "U33", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "沿路线中线按实际长度量取(起点为路线起点 K0+000),下列说法哪些正确?", "options": [{"key": "A", "text": "路线终点距起点 3962 m", "correct": false}, {"key": "B", "text": "全线唯一一道盖板涵之后的第一道涵洞,其中心距起点 1501 m", "correct": true}, {"key": "C", "text": "全线唯一一道盖板涵的中心距起点 1199 m", "correct": false}, {"key": "D", "text": "全线唯一一道盖板涵之后的第一道涵洞,其中心距起点 1451 m", "correct": false}, {"key": "E", "text": "全线唯一一道盖板涵的中心距起点 1139 m", "correct": false}, {"key": "F", "text": "起点附近第一道涵洞的中心与全线唯一一道盖板涵的中心相距 1245 m", "correct": true}], "answer": ["B", "F"], "few_sheet_pages": [23, 21, 24, 14], "evidence_pages": [14, 21, 24], "full_set_page_count": 32, "sub_questions": [{"id": "MS-U33-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "全线标注为盖板涵的那道涵洞,桩号是多少?按图中桩号形式返回(形如 K1+234)。", "answer": "\"K1+199\""}, {"id": "MS-U33-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "路线断链标注中,等号右侧(断链后接续)的桩号是多少?按图中桩号形式返回(形如 K1+234)。", "answer": "\"K0+120\""}, {"id": "MS-U33-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "公路平面总体设计图(1/12)的断链标注中,长链长度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 50.0, \"unit\": \"m\"}"}, {"id": "MS-U33-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "公路平面总体设计图(4/12)中,1-φ1.0 圆管涵的桩号是多少?按图中桩号形式返回(形如 K1+234)。", "answer": "\"K1+089\""}]} {"page_01_file_name": "images/MS-U34-01/few_sheet/01.png", "page_02_file_name": "images/MS-U34-01/few_sheet/02.png", "page_03_file_name": "images/MS-U34-01/few_sheet/03.png", "page_04_file_name": "images/MS-U34-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U34-01", "set": "U34", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "灵川大桥中幅 0 号桥台,下列说法哪些正确?", "options": [{"key": "A", "text": "盖梁底(桩顶)比测时水位高 2.396 m", "correct": true}, {"key": "B", "text": "相邻两桩外缘之间的净距为 460 cm", "correct": true}, {"key": "C", "text": "盖梁底比桥梁起点处路基设计高程低 3.649 m", "correct": true}, {"key": "D", "text": "盖梁下共 4 根桩,均为利用的原桩基,桩径 140 cm", "correct": true}, {"key": "E", "text": "盖梁底比 5% 设计水位高 0.294 m", "correct": false}, {"key": "F", "text": "相邻两桩中心距为 590 cm", "correct": false}], "answer": ["A", "B", "C", "D"], "few_sheet_pages": [11, 5, 17, 3], "evidence_pages": [3, 11], "full_set_page_count": 20, "sub_questions": [{"id": "MS-U34-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "引注'利用原0#桥台桩基'所指的那根桩,标注的桩径是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 140, \"unit\": \"cm\"}"}, {"id": "MS-U34-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥台一般构造图(1/2)立面中,盖梁底面(桩顶)标注的标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 161.016, \"unit\": \"m\"}"}, {"id": "MS-U34-01-R2", "role": "read", "tiers": ["full_set"], "question": "新建桥台一般构造图(2/2)立面中,盖梁底面(桩顶)标注的标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 162.219, \"unit\": \"m\"}"}, {"id": "MS-U34-01-R3", "role": "read", "tiers": ["full_set"], "question": "新建桥台一般构造图(2/2)侧面中,桩径是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 150, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U35-01/few_sheet/01.png", "page_02_file_name": "images/MS-U35-01/few_sheet/02.png", "page_03_file_name": "images/MS-U35-01/few_sheet/03.png", "page_04_file_name": "images/MS-U35-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U35-01", "set": "U35", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "关于本桥桥墩上的支座垫石,下列说法哪些正确?", "options": [{"key": "A", "text": "2 号桥墩右幅固定支座垫石的顶面标高为 39.256 m", "correct": false}, {"key": "B", "text": "全桥桥墩支座垫石的 C40 小石子砼合计 2.64 m³", "correct": false}, {"key": "C", "text": "全桥桥墩支座垫石的钢筋合计 2016.0 kg", "correct": true}, {"key": "D", "text": "每块桥墩支座垫石的钢筋重 102.8 kg", "correct": false}, {"key": "E", "text": "桥墩固定支座本身的高度为 32 cm", "correct": false}, {"key": "F", "text": "2 号桥墩左幅固定支座垫石的顶面标高为 39.287 m", "correct": true}], "answer": ["C", "F"], "few_sheet_pages": [24, 3, 8, 17], "evidence_pages": [8, 24], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U35-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥墩支座垫石的尺寸(钢筋直径除外)以什么单位计?只返回 mm、cm 或 m 之一。", "answer": "\"cm\""}, {"id": "MS-U35-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥墩垫石、防落梁挡块钢筋构造图(1/2)中,固定支座垫石的竖向总高度标注是多少?按图注单位返回。", "answer": "{\"value\": 15, \"unit\": \"cm\"}"}, {"id": "MS-U35-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥墩垫石、防落梁挡块钢筋构造图(1/2)中,活动支座垫石的竖向总高度标注是多少?按图注单位返回。", "answer": "{\"value\": 13, \"unit\": \"cm\"}"}, {"id": "MS-U35-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥墩一般构造图的桥墩各部参数表中,2#桥墩左幅的 H1 是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 39.137, \"unit\": \"m\"}"}, {"id": "MS-U35-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥墩一般构造图的桥墩各部参数表中,2#桥墩左幅垫石顶标高 Z1 是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 39.267, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U35-02/few_sheet/01.png", "page_02_file_name": "images/MS-U35-02/few_sheet/02.png", "page_03_file_name": "images/MS-U35-02/few_sheet/03.png", "page_04_file_name": "images/MS-U35-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U35-02", "set": "U35", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "3 号桥台桩位'位置 0'的那根桩,下列说法哪些正确?", "options": [{"key": "A", "text": "该桩桩径为 180 cm", "correct": false}, {"key": "B", "text": "与它在路线前进方向同一侧的三块支座垫石,顶面标高为 41.301 m", "correct": true}, {"key": "C", "text": "背墙在该桩所在一端的端部顶面标高为 43.311 m", "correct": false}, {"key": "D", "text": "背墙在该桩所在一端的端部顶面标高为 43.713 m", "correct": false}, {"key": "E", "text": "与它在路线前进方向同一侧的三块支座垫石,顶面标高为 41.290 m", "correct": false}, {"key": "F", "text": "该桩与位置 1 桩沿桩位连线的中心距为 505.3 cm", "correct": false}], "answer": ["B"], "few_sheet_pages": [4, 7, 3, 6], "evidence_pages": [3, 4, 6, 7], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U35-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "3 号台桩位'位置 0'的那根桩,位于路线前进方向(起点→终点)的哪一侧?只返回'左'或'右'。", "answer": "\"左\""}, {"id": "MS-U35-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "3 号桥台上,离注有'左侧'的那一端最近的垫石,编号是什么?按图中编号原样返回(形如 Z9)。", "answer": "\"Z1\""}, {"id": "MS-U35-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥台一般构造图(2/2)的桥台各部参数表中,3 号桥台垫石顶标高 Z1 是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 41.301, \"unit\": \"m\"}"}, {"id": "MS-U35-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥台一般构造图(2/2)的桥台各部参数表中,3 号桥台垫石顶标高 Z4 是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 41.29, \"unit\": \"m\"}"}, {"id": "MS-U35-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥台一般构造图(1/2)的桥台各部参数表中,0 号桥台垫石顶标高 Z1 是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 41.676, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U35-03/few_sheet/01.png", "page_02_file_name": "images/MS-U35-03/few_sheet/02.png", "page_03_file_name": "images/MS-U35-03/few_sheet/03.png", "page_04_file_name": "images/MS-U35-03/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U35-03", "set": "U35", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "3 号桥台的全部桩基与全部支座垫石,按本册钢筋构造图所列材料数量,下列说法哪些正确?", "options": [{"key": "A", "text": "桩基水下 C30 混凝土共 415.6 m³", "correct": false}, {"key": "B", "text": "桩基 Φ25 钢筋共重 33173.9 kg", "correct": false}, {"key": "C", "text": "桩基 Φ10 钢筋共重 4380.3 kg", "correct": false}, {"key": "D", "text": "支座垫石钢筋共重 102.8 kg", "correct": false}, {"key": "E", "text": "桩基水下 C30 混凝土共 207.81 m³", "correct": true}, {"key": "F", "text": "支座垫石钢筋共重 1233.6 kg", "correct": false}], "answer": ["E"], "few_sheet_pages": [17, 7, 27, 19], "evidence_pages": [7, 17, 19, 27], "full_set_page_count": 27, "sub_questions": [{"id": "MS-U35-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "3 号桥台下共有多少根桩?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 9, \"unit\": \"根\"}"}, {"id": "MS-U35-03-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "3 号桥台台帽上共有多少块支座垫石?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 6, \"unit\": \"块\"}"}, {"id": "MS-U35-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥台桩基钢筋构造图的桥台桩基材料数量表中,水下 C30 混凝土是多少 m³?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 415.6, \"unit\": \"m³\"}"}, {"id": "MS-U35-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥台桩基钢筋构造图的桩基钢筋明细表中,水下 C30 混凝土是多少 m³?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 23.09, \"unit\": \"m³\"}"}, {"id": "MS-U35-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥台垫石钢筋构造图的一个垫石钢筋明细及材料数量表中,钢筋小计是多少 kg?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 102.8, \"unit\": \"kg\"}"}, {"id": "MS-U35-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥台一般构造图(3 号桥台)附注中,盆式橡胶支座共计多少块?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 12, \"unit\": \"块\"}"}, {"id": "MS-U35-03-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥台桩基钢筋构造图的桥台桩基材料数量表,表名旁注明的桩数是多少根?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 18, \"unit\": \"根\"}"}]} {"page_01_file_name": "images/MS-U36-01/few_sheet/01.png", "page_02_file_name": "images/MS-U36-01/few_sheet/02.png", "page_03_file_name": "images/MS-U36-01/few_sheet/03.png", "page_04_file_name": "images/MS-U36-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U36-01", "set": "U36", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "坐标为 X=2516356.860、Y=440927.056 的那根桩,下列说法哪些正确?", "options": [{"key": "A", "text": "桩底标高为 58.000 m", "correct": true}, {"key": "B", "text": "桩长为 23.0 m", "correct": false}, {"key": "C", "text": "所在桥墩的中心桩号为 K0+377.660", "correct": true}, {"key": "D", "text": "桩底标高为 58.500 m", "correct": false}, {"key": "E", "text": "所在桥墩的中心桩号为 K0+322.660", "correct": false}, {"key": "F", "text": "桩长为 24.0 m", "correct": false}], "answer": ["A", "C"], "few_sheet_pages": [7, 5, 4, 6], "evidence_pages": [4, 5, 7], "full_set_page_count": 23, "sub_questions": [{"id": "MS-U36-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "坐标为 X=2516356.860、Y=440927.056 的桩,属于哪一幅的几号墩台?按'左幅0'这样的格式返回(幅名加墩台序号数字)。", "answer": "\"右幅3\""}, {"id": "MS-U36-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "右幅各墩中,桩底标高注为 57.500 的是几号墩?只返回数字。", "answer": "\"1\""}, {"id": "MS-U36-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥型布置图(2/3)立面中,3 号墩的桩底标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 58.0, \"unit\": \"m\"}"}, {"id": "MS-U36-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥型布置图(1/3)立面中,3 号墩的桩底标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 58.5, \"unit\": \"m\"}"}, {"id": "MS-U36-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥型布置图(2/3)立面中,1 号墩的桩底标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 57.5, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U37-01/few_sheet/01.png", "page_02_file_name": "images/MS-U37-01/few_sheet/02.png", "page_03_file_name": "images/MS-U37-01/few_sheet/03.png", "page_04_file_name": "images/MS-U37-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U37-01", "set": "U37", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "沿桥梁中心线,关于两座桥台各部位的桩号,下列说法哪些正确?", "options": [{"key": "A", "text": "1 号桥台扩大基础前缘位于 K109+782.692", "correct": true}, {"key": "B", "text": "0 号桥台台帽前缘位于 K109+768.904", "correct": true}, {"key": "C", "text": "1 号桥台台身前缘位于 K109+783.096", "correct": false}, {"key": "D", "text": "0 号桥台台帽前缘位于 K109+766.924", "correct": false}, {"key": "E", "text": "两座桥台扩大基础前缘相距 13.26 m", "correct": false}, {"key": "F", "text": "0 号桥台扩大基础前缘位于 K109+769.370", "correct": false}], "answer": ["A", "B"], "few_sheet_pages": [30, 26, 4, 23], "evidence_pages": [4, 23], "full_set_page_count": 37, "sub_questions": [{"id": "MS-U37-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "沿桥梁中心线方向,桥台顶部 600 这道尺寸远离跨中的一端所对应的竖线,与扩大基础后端边缘之间的水平距离是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 46.2, \"unit\": \"cm\"}"}, {"id": "MS-U37-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "0号桥台一侧标注 600 的那道纵向水平尺寸,其远离跨中一端所在竖线的桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K109+761.98\""}, {"id": "MS-U37-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥型布置图立面中,0号桥台扩大基础沿纵桥向标注的长度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 7.79, \"unit\": \"m\"}"}, {"id": "MS-U37-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥型布置图立面下方数据栏'里程桩号'一行最左一格的桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K109+760.00\""}, {"id": "MS-U37-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥台一般构造图 V-V 剖面中,扩大基础左侧超出台身的宽度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 40, \"unit\": \"cm\"}"}]} {"page_01_file_name": "images/MS-U38-01/few_sheet/01.png", "page_02_file_name": "images/MS-U38-01/few_sheet/02.png", "page_03_file_name": "images/MS-U38-01/few_sheet/03.png", "page_04_file_name": "images/MS-U38-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U38-01", "set": "U38", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "关于本桥桩基钢筋与钢护筒的重量,下列说法哪些正确?", "options": [{"key": "A", "text": "4 号桥台两根桩基的钢筋与 4 号桥台的钢护筒,重量合计 10694.2 kg", "correct": false}, {"key": "B", "text": "4 号桥台两根桩基中直径 10 mm 的钢筋重 1028.4 kg", "correct": false}, {"key": "C", "text": "4 号桥台两根桩基的钢筋与 4 号桥台的钢护筒,重量合计 9985.2 kg", "correct": true}, {"key": "D", "text": "4 号桥台两根桩基的钢筋合计 9168.2 kg", "correct": false}, {"key": "E", "text": "全桥(两座桥台与三座桥墩)的钢护筒合计 3052 kg", "correct": false}, {"key": "F", "text": "全桥(两座桥台与三座桥墩)的钢护筒合计 9156 kg", "correct": false}], "answer": ["C"], "few_sheet_pages": [15, 8, 10, 9], "evidence_pages": [8, 10, 15], "full_set_page_count": 22, "sub_questions": [{"id": "MS-U38-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "4 号台钢护筒的数量是多少?换算成 kg 返回。", "answer": "{\"value\": 1526, \"unit\": \"kg\"}"}, {"id": "MS-U38-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "4 号桥台桩基工程数量表(共 2 根)中,钢筋重量的合计是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 8459.2, \"unit\": \"kg\"}"}, {"id": "MS-U38-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "0 号桥台桩基工程数量表(共 2 根)中,钢筋重量的合计是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 9168.2, \"unit\": \"kg\"}"}]} {"page_01_file_name": "images/MS-U39-01/few_sheet/01.png", "page_02_file_name": "images/MS-U39-01/few_sheet/02.png", "page_03_file_name": "images/MS-U39-01/few_sheet/03.png", "page_04_file_name": "images/MS-U39-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U39-01", "set": "U39", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "Y280 线 K3+800~K4+060 范围内,右侧 W2 首次为 4.50 m 的桩号处的横断面,关于其右侧的标注,下列说法哪些正确?", "options": [{"key": "A", "text": "右端竖排标注的高程点比该断面右侧路基边缘低 1.87 m", "correct": false}, {"key": "B", "text": "右端竖排标注(距离与高程两项)中的高程为 323.80", "correct": false}, {"key": "C", "text": "右端竖排标注中的距离为 2.52 m", "correct": false}, {"key": "D", "text": "该断面右侧为坡率 1:1.50 的填方边坡", "correct": true}, {"key": "E", "text": "右端竖排标注的高程点比该断面右侧路基边缘高 0.03 m", "correct": false}, {"key": "F", "text": "右端竖排标注中的距离为 7.69 m", "correct": true}], "answer": ["D", "F"], "few_sheet_pages": [15, 5, 4, 14], "evidence_pages": [5, 14, 15], "full_set_page_count": 24, "sub_questions": [{"id": "MS-U39-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "K3+800 至 K4+060 之间,右侧 W2 为 4.50 m 的第一个桩号是哪一个?按 K1+234 形式返回。", "answer": "\"K3+900\""}, {"id": "MS-U39-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "横断面设计图 K3+900 断面,右端竖排标注(距离与高程两项)中的高程是多少?返回 {value, unit}。", "answer": "{\"value\": 324.31, \"unit\": \"m\"}"}, {"id": "MS-U39-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "横断面设计图 K3+900 断面,右侧路基边缘标注的高程是多少?返回 {value, unit}。", "answer": "{\"value\": 326.1, \"unit\": \"m\"}"}, {"id": "MS-U39-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "横断面设计图 K3+900 断面,中桩处标注的高程是多少?返回 {value, unit}。", "answer": "{\"value\": 326.18, \"unit\": \"m\"}"}, {"id": "MS-U39-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "横断面设计图 K3+880 断面,右端竖排标注(距离与高程两项)中的高程是多少?返回 {value, unit}。", "answer": "{\"value\": 328.86, \"unit\": \"m\"}"}, {"id": "MS-U39-01-R5", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "横断面设计图 K3+880 断面,右侧路基边缘标注的高程是多少?返回 {value, unit}。", "answer": "{\"value\": 328.83, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U40-01/few_sheet/01.png", "page_02_file_name": "images/MS-U40-01/few_sheet/02.png", "page_03_file_name": "images/MS-U40-01/few_sheet/03.png", "page_04_file_name": "images/MS-U40-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U40-01", "set": "U40", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "双龙河桥靠叶湾一端的桥台,下列说法哪些正确?", "options": [{"key": "A", "text": "该桥台自基础顶面至背墙顶面的总高为 4299 mm", "correct": false}, {"key": "B", "text": "该桥台台帽及背墙的 C30 混凝土为 12.80 m³", "correct": true}, {"key": "C", "text": "该桥台台身(台帽以下部分)高 3000 mm", "correct": false}, {"key": "D", "text": "该桥台基础的 C25 混凝土为 69.70 m³", "correct": false}, {"key": "E", "text": "该桥台背墙(台帽顶面以上部分)高 4267 mm", "correct": false}, {"key": "F", "text": "该桥台台身及侧墙下部的 C25 混凝土为 56.60 m³", "correct": false}], "answer": ["B"], "few_sheet_pages": [28, 3, 24, 25], "evidence_pages": [3, 24, 25], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U40-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "路线箭头标注'叶湾'的那一端,桥台编号是几?只返回数字(形如 7)。", "answer": "\"1\""}, {"id": "MS-U40-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "路线箭头标注'倪家新屋'的那一端,桥台编号是几?只返回数字(形如 7)。", "answer": "\"0\""}, {"id": "MS-U40-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "1号桥台一般构造图 I-I 断面中,自基础顶面至背墙顶面的总高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 4267, \"unit\": \"mm\"}"}, {"id": "MS-U40-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "0号桥台一般构造图 I-I 断面中,自基础顶面至背墙顶面的总高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 4299, \"unit\": \"mm\"}"}, {"id": "MS-U40-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "1号桥台一般构造图 I-I 断面中,背墙(台帽顶面以上部分)的高度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1267, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U40-02/few_sheet/01.png", "page_02_file_name": "images/MS-U40-02/few_sheet/02.png", "page_03_file_name": "images/MS-U40-02/few_sheet/03.png", "page_04_file_name": "images/MS-U40-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U40-02", "set": "U40", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "双龙河桥 0号桥台在桥梁中心线处的竖向位置,下列说法哪些正确?", "options": [{"key": "A", "text": "台身顶面高出设计水位 0.38 m", "correct": false}, {"key": "B", "text": "台帽顶面标高为 109.05 m", "correct": false}, {"key": "C", "text": "台帽顶面标高为 107.78 m", "correct": false}, {"key": "D", "text": "台身顶面高出设计水位 1.15 m", "correct": false}, {"key": "E", "text": "台身顶面标高为 108.05 m", "correct": true}, {"key": "F", "text": "台身顶面标高为 107.28 m", "correct": false}], "answer": ["E"], "few_sheet_pages": [24, 23, 3, 1], "evidence_pages": [3, 24], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U40-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "⓪ 号桥台旁竖向尺寸 3000 的下端对应的标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 105.55, \"unit\": \"m\"}"}, {"id": "MS-U40-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "0号桥台一般构造图 I-I 断面中,台身的高度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 2500, \"unit\": \"mm\"}"}, {"id": "MS-U40-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥梁总体布置图立面中,① 号桥台的基础顶面标高是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 104.78, \"unit\": \"m\"}"}, {"id": "MS-U40-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "0号桥台一般构造图 I-I 断面中,台帽的高度是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 500, \"unit\": \"mm\"}"}]} {"page_01_file_name": "images/MS-U40-03/few_sheet/01.png", "page_02_file_name": "images/MS-U40-03/few_sheet/02.png", "page_03_file_name": "images/MS-U40-03/few_sheet/03.png", "page_04_file_name": "images/MS-U40-03/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U40-03", "set": "U40", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "双龙河桥设伸缩缝的那一端,下列关于里程桩号的说法哪些正确?", "options": [{"key": "A", "text": "该端支座中心线的桩号为 K1+076.900", "correct": false}, {"key": "B", "text": "该端支座中心线的桩号为 K1+076.920", "correct": true}, {"key": "C", "text": "伸缩缝中心线的桩号为 K1+096.500", "correct": false}, {"key": "D", "text": "伸缩缝中心线的桩号为 K1+076.500", "correct": true}, {"key": "E", "text": "该端 T 梁梁端的桩号为 K1+096.480", "correct": false}, {"key": "F", "text": "该端 T 梁梁端的桩号为 K1+076.480", "correct": false}], "answer": ["B", "D"], "few_sheet_pages": [22, 5, 17, 3], "evidence_pages": [3, 17, 22], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U40-03-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "伸缩缝设在几号桥台的背墙处?只返回数字(形如 7)。", "answer": "\"0\""}, {"id": "MS-U40-03-B2", "role": "bind", "tiers": ["full_set"], "question": "桥面连续设在几号桥台的背墙处?只返回数字(形如 7)。", "answer": "\"1\""}, {"id": "MS-U40-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥梁总体布置图立面中,⓪ 号桥台一端标注的桥梁桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K1+073.48\""}, {"id": "MS-U40-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥梁总体布置图立面中,桥梁两端各有一道自桥梁桩号线量到梁端缝的水平尺寸,它是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 3000, \"unit\": \"mm\"}"}, {"id": "MS-U40-03-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥梁总体布置图立面中,3000 与 19960 两道尺寸之间的缝宽是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 40, \"unit\": \"mm\"}"}, {"id": "MS-U40-03-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥梁总体布置图立面中,① 号桥台一端标注的桥梁桩号是多少?以桩号字符串返回(形如 K12+345.678),保留图示精度。", "answer": "\"K1+099.52\""}]} {"page_01_file_name": "images/MS-U40-04/few_sheet/01.png", "page_02_file_name": "images/MS-U40-04/few_sheet/02.png", "page_03_file_name": "images/MS-U40-04/few_sheet/03.png", "page_04_file_name": "images/MS-U40-04/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U40-04", "set": "U40", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "双龙河桥两座桥台上的支座,下列说法哪些正确?", "options": [{"key": "A", "text": "1号桥台上全部支座配用的钢板共重 271.32 kg", "correct": true}, {"key": "B", "text": "1号桥台上全部支座配用的钢板共重 542.64 kg", "correct": false}, {"key": "C", "text": "0号桥台上每个支座配用的钢板重 45.22 kg", "correct": false}, {"key": "D", "text": "1号桥台上的支座型号为 GBZJ250×250×52(CR)", "correct": true}, {"key": "E", "text": "1号桥台上每个支座配用的钢板重 87.47 kg", "correct": false}, {"key": "F", "text": "0号桥台上的支座型号为 GBZJH250×250×54(CR)", "correct": true}], "answer": ["A", "D", "F"], "few_sheet_pages": [22, 23, 17, 16], "evidence_pages": [16, 17, 22, 23], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U40-04-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "1 号桥台背墙处设置的是伸缩缝还是桥面连续?返回'伸缩缝'或'桥面连续'。", "answer": "\"桥面连续\""}, {"id": "MS-U40-04-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥面连续处采用哪一种支座?按图中名称返回'滑板橡胶支座'或'普通板式橡胶支座'。", "answer": "\"普通板式橡胶支座\""}, {"id": "MS-U40-04-D1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支座及预埋钢板构造图'一块支座材料数量表'中,滑板橡胶支座一块配用的 □460×390×15 钢板,数量栏所列重量是多少 kg?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 42.25, \"unit\": \"kg\"}"}, {"id": "MS-U40-04-D2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支座垫石及内侧挡块布置图附注中,全桥共有多少个支座垫石?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 12, \"unit\": \"个\"}"}, {"id": "MS-U40-04-D3", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "0 号桥台背墙处设置的是伸缩缝还是桥面连续?返回'伸缩缝'或'桥面连续'。", "answer": "\"伸缩缝\""}, {"id": "MS-U40-04-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支座及预埋钢板构造图'一块支座材料数量表'中,普通板式橡胶支座一块配用的 □480×400×30 钢板重多少 kg?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 45.22, \"unit\": \"kg\"}"}, {"id": "MS-U40-04-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "支座垫石及内侧挡块布置图'桥台处支座垫石布置图'中,一个桥台上画出多少个支座垫石?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 6, \"unit\": \"个\"}"}]} {"page_01_file_name": "images/MS-U41-01/few_sheet/01.png", "page_02_file_name": "images/MS-U41-01/few_sheet/02.png", "page_03_file_name": "images/MS-U41-01/few_sheet/03.png", "page_04_file_name": "images/MS-U41-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U41-01", "set": "U41", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "松柏路桥按设计为位于河堤上的 1、2 号桥墩建议的挡水做法计入相应的围堰工程后,关于全桥的工程数量,下列说法哪些正确?", "options": [{"key": "A", "text": "计入围堰工程后,全桥土方开挖数量与不计围堰时相同", "correct": false}, {"key": "B", "text": "全桥土方开挖共 7784.8 m³", "correct": true}, {"key": "C", "text": "全桥基坑回填共 2645.0 m³", "correct": false}, {"key": "D", "text": "全桥土方开挖共 4700.8 m³", "correct": false}, {"key": "E", "text": "全桥基坑回填共 1910.0 m³", "correct": false}, {"key": "F", "text": "计入围堰工程后,全桥土方开挖比不计围堰时增加 1872.0 m³", "correct": false}], "answer": ["B"], "few_sheet_pages": [10, 16, 18, 17], "evidence_pages": [10, 17], "full_set_page_count": 18, "sub_questions": [{"id": "MS-U41-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "对位于河堤上的 1、2 号桥墩,设计建议采用哪种围堰挡水?按原文返回(形如 XX围堰)。", "answer": "\"土袋围堰\""}, {"id": "MS-U41-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "列有全桥'土方开挖'数量的那张表中,'合计'一栏表头括号里注明的口径是什么?按原文返回括号内文字。", "answer": "\"不含围堰\""}, {"id": "MS-U41-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "工程数量表中,'土方开挖'一行在'合计(不含围堰)'栏的数量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 2828.8, \"unit\": \"m³\"}"}, {"id": "MS-U41-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "工程数量表中,'土方开挖'一行在'围堰方案一(土袋围堰)'栏的数量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 4956.0, \"unit\": \"m³\"}"}, {"id": "MS-U41-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "工程数量表中,'土方开挖'一行在'围堰方案二(钢板桩围堰)'栏的数量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1872.0, \"unit\": \"m³\"}"}]} {"page_01_file_name": "images/MS-U41-02/few_sheet/01.png", "page_02_file_name": "images/MS-U41-02/few_sheet/02.png", "page_03_file_name": "images/MS-U41-02/few_sheet/03.png", "page_04_file_name": "images/MS-U41-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U41-02", "set": "U41", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "把设计说明中各类墩台的桩基直径对应到工程数量表下部结构的桥墩、桥台各栏,下列说法哪些正确?", "options": [{"key": "A", "text": "桩基直径为 1.8 m 的那类墩台,数量表中其桩基所列 C30 水下混凝土为 488.6 m³", "correct": true}, {"key": "B", "text": "桩基直径为 1.4 m 的那类墩台,数量表中其桩基所列 Φ57(外)×3 声测管为 4001.6 m", "correct": false}, {"key": "C", "text": "桩基直径为 1.4 m 的那类墩台,数量表中其桩基所列 Φ57(外)×3 声测管为 7382.0 m", "correct": false}, {"key": "D", "text": "桩基直径为 1.8 m 的那类墩台,数量表中其桩基所列 HRB400Φ25 钢筋为 33173.9 kg", "correct": false}, {"key": "E", "text": "桩基直径为 1.8 m 的那类墩台,数量表中其桩基所列 C30 水下混凝土为 415.6 m³", "correct": false}, {"key": "F", "text": "桩基直径为 1.4 m 的那类墩台,数量表中其桩基所列钢筋小计为 39845.7 kg", "correct": true}], "answer": ["A", "F"], "few_sheet_pages": [5, 10, 18, 17], "evidence_pages": [5, 17], "full_set_page_count": 18, "sub_questions": [{"id": "MS-U41-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "松柏路桥中,桩基直径为 1.8 m 的那类墩台采用什么形式?按说明原文返回形式名称(形如'双柱墩')。", "answer": "\"花瓶墩\""}, {"id": "MS-U41-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "松柏路桥共有几座桥墩(同一编号的左右幅算一座)?只返回阿拉伯数字(形如 7)。", "answer": "\"2\""}, {"id": "MS-U41-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "工程数量表(QL-02)中,'下部结构—桥墩—桩基础'一栏'C30水下'混凝土的数量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 488.6, \"unit\": \"m³\"}"}, {"id": "MS-U41-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "工程数量表(QL-02)中,'下部结构—桥台—桩基'一栏'C30水下'混凝土的数量是多少?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 415.6, \"unit\": \"m³\"}"}, {"id": "MS-U41-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "桥梁施工图设计说明'八、桥梁构造及抗震设计'的'下部结构设计'中,桥台的桩基直径是多少 m?以 {value, unit} 返回:value 为数值,unit 为图中所用单位。", "answer": "{\"value\": 1.4, \"unit\": \"m\"}"}]} {"page_01_file_name": "images/MS-U42-01/few_sheet/01.png", "page_02_file_name": "images/MS-U42-01/few_sheet/02.png", "page_03_file_name": "images/MS-U42-01/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U42-01", "set": "U42", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "该桥全部桥台的钻孔灌注桩,下列说法哪些正确?", "options": [{"key": "A", "text": "5 号 Φ10 螺旋筋单根长 4167 cm", "correct": false}, {"key": "B", "text": "全桥桩基 Φ22 钢筋合计 3169.35 kg", "correct": false}, {"key": "C", "text": "桩长 26.18 m", "correct": false}, {"key": "D", "text": "全桥桩基 Φ22 钢筋合计 6338.7 kg", "correct": true}, {"key": "E", "text": "全桥桩基 Φ10 钢筋合计 1477.8 kg", "correct": true}, {"key": "F", "text": "每根桩的 1 号主筋为 22 根", "correct": false}], "answer": ["D", "E"], "few_sheet_pages": [22, 10, 23], "evidence_pages": [10, 23], "full_set_page_count": 33, "sub_questions": [{"id": "MS-U42-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "小杜南桥桥台桩基钢筋构造图的\"一个桥台桩基材料数量表\"中,Φ22 钢筋和 Φ10 钢筋的总重各是多少?以 JSON 返回两个字段 Φ22、Φ10,每个字段为数值和单位(kg)。", "answer": "{\"Φ22\": {\"value\": 3169.35, \"unit\": \"kg\"}, \"Φ10\": {\"value\": 738.9, \"unit\": \"kg\"}}"}, {"id": "MS-U42-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "小杜南桥桥台桩基钢筋构造图的\"一个桥台桩基材料数量表\"中,1 号钢筋的根数、5 号钢筋的单根长度各是多少?以 JSON 返回两个字段 1号根数(根)、5号单根长度(cm),每个字段为数值和单位。", "answer": "{\"1号根数\": {\"value\": 22, \"unit\": \"根\"}, \"5号单根长度\": {\"value\": 55712, \"unit\": \"cm\"}}"}, {"id": "MS-U42-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "小杜南桥桥型总体布置图的立面上,桥台下钻孔灌注桩的桩长标注是多少?返回数值和单位(cm)。", "answer": "{\"value\": 2800, \"unit\": \"cm\"}"}, {"id": "MS-U42-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "小杜南桥桥台桩基钢筋构造图的\"一个桥台桩基材料数量表\"中,1 号、4 号钢筋的单根长度各是多少?以 JSON 返回两个字段 1号、4号,每个字段为数值和单位(cm)。", "answer": "{\"1号\": {\"value\": 2618, \"unit\": \"cm\"}, \"4号\": {\"value\": 4167, \"unit\": \"cm\"}}"}, {"id": "MS-U42-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "小杜南桥每一座桥台下设几根钻孔灌注桩?返回数值和单位(根)。", "answer": "{\"value\": 2, \"unit\": \"根\"}"}, {"id": "MS-U42-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "小杜南桥全部桥台下的钻孔灌注桩合计几根?返回数值和单位(根)。", "answer": "{\"value\": 4, \"unit\": \"根\"}"}]} {"page_01_file_name": "images/MS-U43-01/few_sheet/01.png", "page_02_file_name": "images/MS-U43-01/few_sheet/02.png", "page_03_file_name": "images/MS-U43-01/few_sheet/03.png", "page_04_file_name": "images/MS-U43-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U43-01", "set": "U43", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "侧面图上桩位尺寸依次为 1500、2400、1100 的那座桥台,其台帽与背墙,下列说法哪些正确?", "options": [{"key": "A", "text": "台帽 N1 Φ28 钢筋 40 根", "correct": false}, {"key": "B", "text": "台帽 3D 号钢筋单根长 1261 mm", "correct": false}, {"key": "C", "text": "台帽 C35 混凝土 12.6 m³", "correct": true}, {"key": "D", "text": "台帽另设 4 根 Φ28 的 N6 钢筋", "correct": true}, {"key": "E", "text": "背墙 5 号钢筋重 5.7 kg", "correct": false}, {"key": "F", "text": "背墙 2 号钢筋 22 根", "correct": true}], "answer": ["C", "D", "F"], "few_sheet_pages": [7, 4, 12, 8], "evidence_pages": [4, 8, 12], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U43-01-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥桥台台帽钢筋构造图(图号 GZT-S-QL-08-4/4)的\"工程数量汇总表\"中,1 号钢筋的数目、3D 号钢筋的尺寸、C35 混凝土方量各是多少?以 JSON 返回三个字段 1号数目(根)、3D尺寸(mm)、C35(m³),每个字段为数值和单位。", "answer": "{\"1号数目\": {\"value\": 37, \"unit\": \"根\"}, \"3D尺寸\": {\"value\": 1469, \"unit\": \"mm\"}, \"C35\": {\"value\": 12.6, \"unit\": \"m³\"}}"}, {"id": "MS-U43-01-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥桥台台帽钢筋构造图(图号 GZT-S-QL-08-4/4)的\"工程数量汇总表\"中,6 号钢筋的直径和数目各是多少?以 JSON 返回两个字段 直径(mm)、数目(根),每个字段为数值和单位。", "answer": "{\"直径\": {\"value\": 28, \"unit\": \"mm\"}, \"数目\": {\"value\": 4, \"unit\": \"根\"}}"}, {"id": "MS-U43-01-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥桥台背墙钢筋构造图(图号 GZT-S-QL-09-4/4)的\"工程数量汇总表\"中,2 号钢筋的数目,5 号钢筋的总长和总重各是多少?以 JSON 返回三个字段 2号数目(根)、5号总长(m)、5号总重(kg),每个字段为数值和单位。", "answer": "{\"2号数目\": {\"value\": 22, \"unit\": \"根\"}, \"5号总长\": {\"value\": 5.7, \"unit\": \"m\"}, \"5号总重\": {\"value\": 9.1, \"unit\": \"kg\"}}"}, {"id": "MS-U43-01-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥桥台台帽钢筋构造图(图号 GZT-S-QL-08-3/4)的\"工程数量汇总表\"中,1 号钢筋的数目、3D 号钢筋的尺寸各是多少?以 JSON 返回两个字段 1号数目(根)、3D尺寸(mm),每个字段为数值和单位。", "answer": "{\"1号数目\": {\"value\": 40, \"unit\": \"根\"}, \"3D尺寸\": {\"value\": 1261, \"unit\": \"mm\"}}"}, {"id": "MS-U43-01-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "侧面图上桩位尺寸依次为 1500、2400、1100 的那座桥台,其台帽钢筋工程数量汇总表中 1 号钢筋的数目是多少?返回数值和单位(根)。", "answer": "{\"value\": 37, \"unit\": \"根\"}"}, {"id": "MS-U43-01-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "侧面图上桩位尺寸依次为 1500、2400、1100 的那座桥台,其背墙钢筋工程数量汇总表中 2 号钢筋的数目是多少?返回数值和单位(根)。", "answer": "{\"value\": 22, \"unit\": \"根\"}"}]} {"page_01_file_name": "images/MS-U43-02/few_sheet/01.png", "page_02_file_name": "images/MS-U43-02/few_sheet/02.png", "page_03_file_name": "images/MS-U43-02/few_sheet/03.png", "page_04_file_name": "images/MS-U43-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U43-02", "set": "U43", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "桥面顶标高为 7.95 m 的各座桥台,其桥头搭板,下列说法哪些正确?", "options": [{"key": "A", "text": "搭板 N3 Φ16 钢筋单根长 3310 mm", "correct": true}, {"key": "B", "text": "这几座桥台的搭板 Φ22 钢筋合计 558.2 kg", "correct": true}, {"key": "C", "text": "这几座桥台的搭板 C30 混凝土合计 4.2 m³", "correct": false}, {"key": "D", "text": "搭板另设 5、6、7 号 Φ16 附加钢筋", "correct": false}, {"key": "E", "text": "这几座桥台的搭板 Φ12 钢筋合计 150.1 kg", "correct": false}, {"key": "F", "text": "搭板 N4 Φ12 钢筋单根长 600 mm,每座 134 根", "correct": true}], "answer": ["A", "B", "F"], "few_sheet_pages": [25, 4, 2, 27], "evidence_pages": [2, 4, 25], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U43-02-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥桥台搭板钢筋构造图(图号 GZT-S-QL-13-1/3)的\"4m搭板工程数量表(单个桥台)\"中,3 号钢筋的单根长、4 号钢筋的单根长和根数各是多少?以 JSON 返回三个字段 3号单根长(mm)、4号单根长(mm)、4号根数(根),每个字段为数值和单位。", "answer": "{\"3号单根长\": {\"value\": 3310, \"unit\": \"mm\"}, \"4号单根长\": {\"value\": 600, \"unit\": \"mm\"}, \"4号根数\": {\"value\": 134, \"unit\": \"根\"}}"}, {"id": "MS-U43-02-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥桥台搭板钢筋构造图(图号 GZT-S-QL-13-1/3)的\"4m搭板工程数量表(单个桥台)\"中,\"合计\"栏的 Φ22、Φ12 重量和 C30 混凝土方量各是多少?以 JSON 返回三个字段 Φ22(kg)、Φ12(kg)、C30(m³),每个字段为数值和单位。", "answer": "{\"Φ22\": {\"value\": 279.1, \"unit\": \"kg\"}, \"Φ12\": {\"value\": 150.1, \"unit\": \"kg\"}, \"C30\": {\"value\": 4.2, \"unit\": \"m³\"}}"}, {"id": "MS-U43-02-R3", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥桥台搭板钢筋构造图(图号 GZT-S-QL-13-1/3)的\"4m搭板工程数量表(单个桥台)\"中,共列出几个钢筋编号?返回数值和单位(个)。", "answer": "{\"value\": 4, \"unit\": \"个\"}"}, {"id": "MS-U43-02-R4", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥桥台搭板钢筋构造图(图号 GZT-S-QL-13-3/3)的\"4m搭板工程数量表(单个桥台)\"中,共列出几个钢筋编号、\"合计\"栏的 Φ22 重量是多少?以 JSON 返回两个字段 编号个数(个)、Φ22(kg),每个字段为数值和单位。", "answer": "{\"编号个数\": {\"value\": 7, \"unit\": \"个\"}, \"Φ22\": {\"value\": 276.7, \"unit\": \"kg\"}}"}, {"id": "MS-U43-02-B1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "景观天桥的各座桥台中,桥面顶标高为 7.95 m 的共有几座?返回数值和单位(个)。", "answer": "{\"value\": 2, \"unit\": \"个\"}"}, {"id": "MS-U43-02-B2", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "桥面顶标高为 7.95 m 的那几座桥台,按其适用的搭板钢筋构造图,每座桥台搭板的 Φ22 钢筋重量是多少?返回数值和单位(kg)。", "answer": "{\"value\": 279.1, \"unit\": \"kg\"}"}]} {"page_01_file_name": "images/MS-U43-03/few_sheet/01.png", "page_02_file_name": "images/MS-U43-03/few_sheet/02.png", "page_03_file_name": "images/MS-U43-03/few_sheet/03.png", "page_04_file_name": "images/MS-U43-03/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U43-03", "set": "U43", "tiers": ["few_sheet", "full_set"], "question_type": "multiple_select", "question_style": "claim", "question": "关于广州塔南广场东、西两座景观天桥各桥台耳墙与背墙的钢筋和混凝土数量,下列说法哪些正确?", "options": [{"key": "A", "text": "东侧景观天桥南部桥台的耳墙与背墙,C35 混凝土合计 5.4 m³", "correct": false}, {"key": "B", "text": "东侧景观天桥南部桥台耳墙的 HRB400 钢筋,比西侧景观天桥南部桥台耳墙多 8.0 kg", "correct": true}, {"key": "C", "text": "东侧景观天桥南部桥台耳墙的 HRB400 钢筋,比西侧景观天桥南部桥台耳墙少 211.4 kg", "correct": false}, {"key": "D", "text": "东侧景观天桥南部桥台的耳墙与背墙,HRB400 钢筋合计 989.1 kg", "correct": false}, {"key": "E", "text": "东侧景观天桥南部桥台的耳墙与背墙,HRB400 钢筋合计 1024.6 kg", "correct": true}, {"key": "F", "text": "东侧景观天桥南部桥台的耳墙与背墙,C35 混凝土合计 5.5 m³", "correct": false}], "answer": ["B", "E"], "few_sheet_pages": [14, 13, 9, 12], "evidence_pages": [12, 13, 14], "full_set_page_count": 34, "sub_questions": [{"id": "MS-U43-03-B1", "role": "bind", "tiers": ["full_set"], "question": "西侧景观天桥南端的桥台设有几道耳墙?以 {value, unit} 返回,unit 用'处'。", "answer": "{\"value\": 1, \"unit\": \"处\"}"}, {"id": "MS-U43-03-B2", "role": "bind", "tiers": ["full_set"], "question": "东侧景观天桥南端的桥台设有几道耳墙?以 {value, unit} 返回,unit 用'处'。", "answer": "{\"value\": 1, \"unit\": \"处\"}"}, {"id": "MS-U43-03-B3", "role": "bind", "tiers": ["full_set"], "question": "两座景观天桥北端的两座桥台,合计设有几道耳墙?以 {value, unit} 返回,unit 用'处'。", "answer": "{\"value\": 0, \"unit\": \"处\"}"}, {"id": "MS-U43-03-B4", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "东侧景观天桥南端桥台的耳墙中,1 号钢筋(Φ16)的单根长度是多少?以 {value, unit} 返回,unit 用'mm'。", "answer": "{\"value\": 6530, \"unit\": \"mm\"}"}, {"id": "MS-U43-03-D1", "role": "bind", "tiers": ["few_sheet", "full_set"], "question": "西侧景观天桥南端桥台的耳墙中,1 号钢筋(Φ16)的单根长度是多少?以 {value, unit} 返回,unit 用'mm'。", "answer": "{\"value\": 6371, \"unit\": \"mm\"}"}, {"id": "MS-U43-03-R1", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥桥台耳墙钢筋构造图(1/2)工程数量汇总表中,HRB400 钢筋的总重是多少?以 {value, unit} 返回,unit 用'kg'。", "answer": "{\"value\": 614.0, \"unit\": \"kg\"}"}, {"id": "MS-U43-03-R2", "role": "read", "tiers": ["few_sheet", "full_set"], "question": "景观天桥桥台耳墙钢筋构造图(2/2)工程数量汇总表中,HRB400 钢筋的总重是多少?以 {value, unit} 返回,unit 用'kg'。", "answer": "{\"value\": 622.0, \"unit\": \"kg\"}"}]} {"page_01_file_name": "images/MS-U44-01/few_sheet/01.png", "page_02_file_name": "images/MS-U44-01/few_sheet/02.png", "page_03_file_name": "images/MS-U44-01/few_sheet/03.png", "page_04_file_name": "images/MS-U44-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U44-01", "set": "U44", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "位于被交路弯道处、要对靠山体一侧局部挖除以改善视野的那处平面交叉,下列说法哪些正确?", "options": [{"key": "A", "text": "两条加铺转角曲线的半径为 12 m 和 20 m", "correct": true}, {"key": "B", "text": "被交路路面宽 5.0 m", "correct": false}, {"key": "C", "text": "两条加铺转角曲线的半径为 5 m 和 15 m", "correct": false}, {"key": "D", "text": "横向施工缝传力杆 Φ28 共 72.45 kg", "correct": false}, {"key": "E", "text": "异形板角隅钢筋 Φ14 共 34.85 kg", "correct": false}, {"key": "F", "text": "20 cm C35 水泥混凝土面层 21.01 m²", "correct": false}], "answer": ["A"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [3, 2, 1], "full_set_page_count": null, "sub_questions": [{"id": "MS-U44-01-R1", "role": "read", "tiers": ["few_sheet"], "question": "K3+962平面交叉布置图的\"平面交叉曲线要素表\"中,路线 01、02 的半径 R 各是多少?以 JSON 返回两个字段 01、02,每个字段为数值和单位(m)。", "answer": "{\"01\": {\"value\": 12, \"unit\": \"m\"}, \"02\": {\"value\": 20, \"unit\": \"m\"}}"}, {"id": "MS-U44-01-R2", "role": "read", "tiers": ["few_sheet"], "question": "平面交叉工程数量表中,交叉桩号 K3+962 那一行的\"20cmC35水泥砼面层\"、\"传力杆Φ28\"、\"角隅钢筋Φ14\"各是多少?以 JSON 返回三个字段 面层(m²)、传力杆(kg)、角隅钢筋(kg),每个字段为数值和单位。", "answer": "{\"面层\": {\"value\": 100.56, \"unit\": \"m²\"}, \"传力杆\": {\"value\": 108.68, \"unit\": \"kg\"}, \"角隅钢筋\": {\"value\": 23.23, \"unit\": \"kg\"}}"}, {"id": "MS-U44-01-R3", "role": "read", "tiers": ["few_sheet"], "question": "平面交叉设计说明中,K3+962 处平面交叉的被交路路基宽和路面宽各是多少?以 JSON 返回两个字段 路基宽、路面宽,每个字段为数值和单位(m)。", "answer": "{\"路基宽\": {\"value\": 5.0, \"unit\": \"m\"}, \"路面宽\": {\"value\": 4.0, \"unit\": \"m\"}}"}, {"id": "MS-U44-01-R4", "role": "read", "tiers": ["few_sheet"], "question": "平面交叉工程数量表中,交叉桩号 K0+000 那一行的\"20cmC35水泥砼面层\"、\"传力杆Φ28\",以及\"合计\"行的\"角隅钢筋Φ14\"各是多少?以 JSON 返回三个字段 K0面层(m²)、K0传力杆(kg)、合计角隅钢筋(kg),每个字段为数值和单位。", "answer": "{\"K0面层\": {\"value\": 21.01, \"unit\": \"m²\"}, \"K0传力杆\": {\"value\": 72.45, \"unit\": \"kg\"}, \"合计角隅钢筋\": {\"value\": 34.85, \"unit\": \"kg\"}}"}, {"id": "MS-U44-01-R5", "role": "read", "tiers": ["few_sheet"], "question": "K0+000平面交叉布置图的\"平面交叉曲线要素表\"中,路线 01、02 的半径 R 各是多少?以 JSON 返回两个字段 01、02,每个字段为数值和单位(m)。", "answer": "{\"01\": {\"value\": 5, \"unit\": \"m\"}, \"02\": {\"value\": 15, \"unit\": \"m\"}}"}, {"id": "MS-U44-01-B1", "role": "bind", "tiers": ["few_sheet"], "question": "位于被交路弯道处、要对靠山体一侧局部挖除以改善视野的那处平面交叉,交叉桩号是多少?返回桩号字符串(形如 K1+234)。", "answer": "\"K3+962\""}, {"id": "MS-U44-01-B2", "role": "bind", "tiers": ["few_sheet"], "question": "位于被交路弯道处、要对靠山体一侧局部挖除以改善视野的那处平面交叉,其布置图曲线要素表中路线 01、02 的半径 R 各是多少?以 JSON 返回两个字段 01、02,每个字段为数值和单位(m)。", "answer": "{\"01\": {\"value\": 12, \"unit\": \"m\"}, \"02\": {\"value\": 20, \"unit\": \"m\"}}"}]} {"page_01_file_name": "images/MS-U45-01/few_sheet/01.png", "page_02_file_name": "images/MS-U45-01/few_sheet/02.png", "page_03_file_name": "images/MS-U45-01/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U45-01", "set": "U45", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "这座石拱桥改造时在原防撞护栏顶部补设的钢扶手,下列说法哪些正确?", "options": [{"key": "A", "text": "扶手立柱钢板沿桥每 2 m 设一块", "correct": true}, {"key": "B", "text": "扶手钢管外径 100 mm、壁厚 5 mm", "correct": true}, {"key": "C", "text": "每延米用 M20 螺栓 2 个", "correct": true}, {"key": "D", "text": "扶手由三根不锈钢管组成,最上一根为 φ89×1.5", "correct": false}, {"key": "E", "text": "扶手立柱底座钢板规格为 200×250×8", "correct": false}, {"key": "F", "text": "每延米的扶手立柱底座钢板重 2.813 kg", "correct": false}], "answer": ["A", "B", "C"], "few_sheet_pages": [1, 2, 3], "evidence_pages": [1, 2], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U46-01/few_sheet/01.png", "page_02_file_name": "images/MS-U46-01/few_sheet/02.png", "page_03_file_name": "images/MS-U46-01/few_sheet/03.png", "page_04_file_name": "images/MS-U46-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U46-01", "set": "U46", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "本桥两座中间桥墩中,靠大桩号一侧那座墩顶所设的盆式支座,下列说法哪些正确?", "options": [{"key": "A", "text": "设有固定支座,其上部尺寸 A×B 为 1360 mm × 1360 mm", "correct": true}, {"key": "B", "text": "单向活动支座的高度 H 为 270 mm", "correct": true}, {"key": "C", "text": "单向活动支座的上部尺寸 A×B 为 690 mm × 710 mm", "correct": false}, {"key": "D", "text": "固定支座的高度 H 为 270 mm", "correct": false}, {"key": "E", "text": "单向活动支座的下部尺寸 C×D 为 1370 mm × 1370 mm", "correct": true}, {"key": "F", "text": "单向活动支座的上部尺寸 A×B 为 1360 mm × 1340 mm", "correct": false}], "answer": ["A", "B", "E"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [2, 4, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U46-02/few_sheet/01.png", "page_02_file_name": "images/MS-U46-02/few_sheet/02.png", "page_03_file_name": "images/MS-U46-02/few_sheet/03.png", "page_04_file_name": "images/MS-U46-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U46-02", "set": "U46", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "桥头搭板中,紧贴中央分隔带两侧的那两块搭板,关于其单块的钢筋与混凝土数量,下列说法哪些正确?", "options": [{"key": "A", "text": "1700 机动车道一侧的那块:Φ16 钢筋合计 640.8 kg", "correct": false}, {"key": "B", "text": "1500 机动车道一侧的那块:N1(Φ20)每根长 393.6 cm", "correct": false}, {"key": "C", "text": "1700 机动车道一侧的那块:N1(Φ20)每根长 418.9 cm", "correct": true}, {"key": "D", "text": "1500 机动车道一侧的那块:Φ20 钢筋合计 835.2 kg", "correct": false}, {"key": "E", "text": "1700 机动车道一侧的那块:N3(Φ20)共 24 根", "correct": false}, {"key": "F", "text": "1500 机动车道一侧的那块:一块的 C35 混凝土为 8.4 m³", "correct": true}], "answer": ["C", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [3, 4, 2], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U46-03/few_sheet/01.png", "page_02_file_name": "images/MS-U46-03/few_sheet/02.png", "page_03_file_name": "images/MS-U46-03/few_sheet/03.png", "page_04_file_name": "images/MS-U46-03/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U46-03", "set": "U46", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "所设盆式支座全部为 5.0 级(而非 25 级)的那几个支点处的横梁,关于其中一道横梁的钢筋,下列说法哪些正确?", "options": [{"key": "A", "text": "Φ28 钢筋合计 1801.8 kg", "correct": true}, {"key": "B", "text": "顶层 N1 为 Φ25 钢筋,每根长 2190 cm,共 21 根", "correct": true}, {"key": "C", "text": "Φ25 钢筋合计 5391.51 kg", "correct": false}, {"key": "D", "text": "Φ16 钢筋合计 5681.0 kg", "correct": true}, {"key": "E", "text": "Φ12 钢筋合计 317.3 kg", "correct": true}, {"key": "F", "text": "Φ25 钢筋合计 19143.6 kg", "correct": false}], "answer": ["A", "B", "D", "E"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [1, 4, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U46-04/few_sheet/01.png", "page_02_file_name": "images/MS-U46-04/few_sheet/02.png", "page_03_file_name": "images/MS-U46-04/few_sheet/03.png", "page_04_file_name": "images/MS-U46-04/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U46-04", "set": "U46", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "设有盆式固定支座的那个支点处的横梁,关于其中一道横梁的钢筋,下列说法哪些正确?", "options": [{"key": "A", "text": "N4 为 Φ25 钢筋,平均长 1485.4 cm,共 36 根", "correct": false}, {"key": "B", "text": "N2 为 Φ28 钢筋,每根长 1866.7 cm", "correct": false}, {"key": "C", "text": "Φ16 钢筋合计 12478.6 kg", "correct": true}, {"key": "D", "text": "顶层 N1 为 Φ32 钢筋,每根长 2190 cm,共 30 根", "correct": true}, {"key": "E", "text": "Φ12 钢筋合计 6935.2 kg", "correct": false}, {"key": "F", "text": "Φ32 钢筋合计 29197.64 kg", "correct": false}], "answer": ["C", "D"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [2, 3, 1], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U47-01/few_sheet/01.png", "page_02_file_name": "images/MS-U47-01/few_sheet/02.png", "page_03_file_name": "images/MS-U47-01/few_sheet/03.png", "page_04_file_name": "images/MS-U47-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U47-01", "set": "U47", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "中幅第 3 跨墩顶负弯矩钢束中,每束 5 根钢绞线的那种钢束所锚固的齿板,下列说法哪些正确?", "options": [{"key": "A", "text": "一个齿板内编号 6 钢筋每根长 151.1 cm", "correct": false}, {"key": "B", "text": "第 3 跨一孔主梁这种齿板 Φ12 钢筋合计 432.8 kg", "correct": false}, {"key": "C", "text": "第 3 跨一孔主梁这种齿板 Φ12 钢筋合计 1295.7 kg", "correct": false}, {"key": "D", "text": "第 3 跨一孔主梁这种齿板共 5 个", "correct": false}, {"key": "E", "text": "一个齿板内编号 2 钢筋(长 201.9 cm)共 11 根", "correct": false}, {"key": "F", "text": "一个齿板内编号 1 钢筋(长 202.0 cm)共 7 根", "correct": true}], "answer": ["F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [1, 2, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U47-02/few_sheet/01.png", "page_02_file_name": "images/MS-U47-02/few_sheet/02.png", "page_03_file_name": "images/MS-U47-02/few_sheet/03.png", "page_04_file_name": "images/MS-U47-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U47-02", "set": "U47", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "两幅旧桥中 5# 墩盖梁有剥落、露筋病害的那一幅,关于其病害处治,下列说法哪些正确?", "options": [{"key": "A", "text": "人行道铺装横向裂缝 64 条,低压灌浆修补 140.8 m", "correct": true}, {"key": "B", "text": "下部结构墩台冲蚀环氧砂浆修补 144.15 m²", "correct": false}, {"key": "C", "text": "人行道铺装构件分离环氧砂浆修补 3.921 m²", "correct": false}, {"key": "D", "text": "上构小箱梁剥落、露筋环氧砂浆修补 11.73 m²", "correct": true}, {"key": "E", "text": "上构小箱梁底面缝宽小于 0.15 mm 的纵向裂缝表面封闭 212.3 m", "correct": true}, {"key": "F", "text": "防撞墙病害环氧砂浆修补 0.42 m²", "correct": false}], "answer": ["A", "D", "E"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [1, 2, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U47-03/few_sheet/01.png", "page_02_file_name": "images/MS-U47-03/few_sheet/02.png", "page_03_file_name": "images/MS-U47-03/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U47-03", "set": "U47", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "中幅第 4 跨一孔 20 m 主梁的堵头板与墩顶短束齿板,下列说法哪些正确?", "options": [{"key": "A", "text": "一孔堵头板 C50 混凝土 0.30 m³", "correct": false}, {"key": "B", "text": "一孔短束齿板 Φ12 钢筋合计 647.9 kg", "correct": false}, {"key": "C", "text": "一个堵头板中编号 6 钢筋共重 3.00 kg", "correct": false}, {"key": "D", "text": "一孔堵头板 Φ10 钢筋合计 48.9 kg", "correct": false}, {"key": "E", "text": "一孔短束齿板共 5 个", "correct": false}, {"key": "F", "text": "一孔堵头板共 10 个", "correct": true}], "answer": ["F"], "few_sheet_pages": [1, 2, 3], "evidence_pages": [2, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U47-04/few_sheet/01.png", "page_02_file_name": "images/MS-U47-04/few_sheet/02.png", "page_03_file_name": "images/MS-U47-04/few_sheet/03.png", "page_04_file_name": "images/MS-U47-04/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U47-04", "set": "U47", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "中幅第 3 跨与第 4 跨相接处墩顶两侧的 20 m 预制箱梁梁端,下列说法哪些正确?", "options": [{"key": "A", "text": "梁端封锚 B 锚块钢筋合计 12.1 kg", "correct": false}, {"key": "B", "text": "梁端设封锚,单幅 A 锚块 10 个", "correct": false}, {"key": "C", "text": "墩顶永久支座为 GBZY550×90(CR)", "correct": true}, {"key": "D", "text": "梁底预埋钢板每块重 53.8 kg", "correct": false}, {"key": "E", "text": "该处墩顶负弯矩钢束在施工第三步张拉", "correct": false}, {"key": "F", "text": "两侧梁端设四氟滑板支座", "correct": false}], "answer": ["C"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [4, 3, 1], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U47-05/few_sheet/01.png", "page_02_file_name": "images/MS-U47-05/few_sheet/02.png", "page_03_file_name": "images/MS-U47-05/few_sheet/03.png", "page_04_file_name": "images/MS-U47-05/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U47-05", "set": "U47", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "中幅最后一跨一孔上部构造的混凝土与钢材用量,下列说法哪些正确?", "options": [{"key": "A", "text": "M15-3 型锚具 36 套", "correct": true}, {"key": "B", "text": "一片边梁预制 C50 混凝土 8.49 m³", "correct": true}, {"key": "C", "text": "现浇部分 C50 混凝土 22.1 m³", "correct": false}, {"key": "D", "text": "一片中梁预制 C50 混凝土 8.49 m³", "correct": false}, {"key": "E", "text": "预制箱梁 C50 混凝土 73.4 m³", "correct": true}, {"key": "F", "text": "Q235NH 钢板 1276.5 kg", "correct": false}], "answer": ["A", "B", "E"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [2, 3, 4], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U48-01/few_sheet/01.png", "page_02_file_name": "images/MS-U48-01/few_sheet/02.png", "page_03_file_name": "images/MS-U48-01/few_sheet/03.png", "page_04_file_name": "images/MS-U48-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U48-01", "set": "U48", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "路线左侧 K0+134~K0+158 段的波形钢护栏,下列说法哪些正确?", "options": [{"key": "A", "text": "K0+146~K0+158 段的端头设加强钢板 7 块", "correct": false}, {"key": "B", "text": "K0+146~K0+158 段的端头设 G-Z-01 立柱 7 根", "correct": false}, {"key": "C", "text": "K0+134~K0+146 段设 G-Z-01 立柱 4 根", "correct": false}, {"key": "D", "text": "K0+146~K0+158 段的端头设 G-Z-02 立柱 3 根", "correct": true}, {"key": "E", "text": "K0+134~K0+146 段设 R-160 端头 1 个", "correct": false}, {"key": "F", "text": "K0+134~K0+146 段设膨胀螺栓 4 套", "correct": true}], "answer": ["D", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [2, 3, 4], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U48-02/few_sheet/01.png", "page_02_file_name": "images/MS-U48-02/few_sheet/02.png", "page_03_file_name": "images/MS-U48-02/few_sheet/03.png", "page_04_file_name": "images/MS-U48-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U48-02", "set": "U48", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "路线右侧 K0+146~K0+158 段的护栏端头,关于其材料,下列说法哪些正确?", "options": [{"key": "A", "text": "所用型式的砼基础按Ⅱ型砼基础设置", "correct": true}, {"key": "B", "text": "同型式两处端头的 C25 砼基础合计 1.20 m³", "correct": false}, {"key": "C", "text": "加强钢板共重 68.18 kg", "correct": false}, {"key": "D", "text": "设加强钢板 7 块", "correct": true}, {"key": "E", "text": "设 G-Z-01 立柱 7 根", "correct": true}, {"key": "F", "text": "G-Z-01 立柱共重 94.772 kg", "correct": false}], "answer": ["A", "D", "E"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [4, 2, 1], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U49-01/few_sheet/01.png", "page_02_file_name": "images/MS-U49-01/few_sheet/02.png", "page_03_file_name": "images/MS-U49-01/few_sheet/03.png", "page_04_file_name": "images/MS-U49-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U49-01", "set": "U49", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "路线左侧 K0+120~K0+148 段的波形钢护栏(端头及其后的标准段),下列说法哪些正确?", "options": [{"key": "A", "text": "K0+120~K0+132 段端头设加强钢板 4 块", "correct": false}, {"key": "B", "text": "K0+120~K0+132 段端头设 G-Z-01 立柱 7 根", "correct": true}, {"key": "C", "text": "K0+132~K0+148 段每延公里设钢管立柱 250 根", "correct": true}, {"key": "D", "text": "K0+132~K0+148 段每延公里设连接螺栓 JⅡ-1 1000 套", "correct": false}, {"key": "E", "text": "K0+132~K0+148 段每延公里设托架 500 个", "correct": false}, {"key": "F", "text": "K0+132~K0+148 段采用 DB02 波形梁板", "correct": false}], "answer": ["B", "C"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [2, 1, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U50-01/few_sheet/01.png", "page_02_file_name": "images/MS-U50-01/few_sheet/02.png", "page_03_file_name": "images/MS-U50-01/few_sheet/03.png", "page_04_file_name": "images/MS-U50-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U50-01", "set": "U50", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "左幅桥三个桥墩中最靠近六阴一侧的那一个,其靠路线中心线一侧的立柱及其下桩基,下列说法哪些正确?", "options": [{"key": "A", "text": "盖梁顶面在靠路线中心线一端的标高为 90.255 m", "correct": true}, {"key": "B", "text": "桩底标高为 58.000 m", "correct": false}, {"key": "C", "text": "桩底标高为 58.500 m", "correct": false}, {"key": "D", "text": "立柱高度为 6.017 m", "correct": false}, {"key": "E", "text": "桩长为 17.0 m", "correct": true}, {"key": "F", "text": "立柱顶面(盖梁底)标高为 88.607 m", "correct": true}], "answer": ["A", "E", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [1, 2, 4], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U50-02/few_sheet/01.png", "page_02_file_name": "images/MS-U50-02/few_sheet/02.png", "page_03_file_name": "images/MS-U50-02/few_sheet/03.png", "page_04_file_name": "images/MS-U50-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U50-02", "set": "U50", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "右幅 2 号墩中远离路线中心线的那根桩柱,关于其桩柱材料数量,下列说法哪些正确?", "options": [{"key": "A", "text": "桩基 C30 混凝土 54.7 m³", "correct": false}, {"key": "B", "text": "墩柱 C35 混凝土 15.3 m³", "correct": true}, {"key": "C", "text": "Φ28 钢筋总重 6519.3 kg", "correct": false}, {"key": "D", "text": "一根桩柱钢筋合计 7393.7 kg", "correct": false}, {"key": "E", "text": "墩柱螺旋箍筋(N7,Φ10)每根长 31078.2 cm", "correct": false}, {"key": "F", "text": "墩柱主筋(N1,Φ28)每根长 1043.2 cm", "correct": true}], "answer": ["B", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [2, 3, 4], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U51-01/few_sheet/01.png", "page_02_file_name": "images/MS-U51-01/few_sheet/02.png", "page_03_file_name": "images/MS-U51-01/few_sheet/03.png", "page_04_file_name": "images/MS-U51-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U51-01", "set": "U51", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "桥梁大桩号端 K0+125~K0+149 段路侧所设的标准段波形梁护栏,关于其材料,下列说法哪些正确?", "options": [{"key": "A", "text": "本桥该段两侧该型护栏合计设立柱 24 根", "correct": false}, {"key": "B", "text": "每延公里用钢管立柱 250 根,合计 3645.0 kg", "correct": true}, {"key": "C", "text": "每延公里混凝土基础共 75 m³", "correct": false}, {"key": "D", "text": "柱帽为 □114 方形柱帽", "correct": false}, {"key": "E", "text": "立柱为 □114×1950×4.5 方钢管", "correct": false}, {"key": "F", "text": "每延公里托架 T(300×57×4.5)共 500 个", "correct": false}], "answer": ["B"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [4, 1], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U51-02/few_sheet/01.png", "page_02_file_name": "images/MS-U51-02/few_sheet/02.png", "page_03_file_name": "images/MS-U51-02/few_sheet/03.png", "page_04_file_name": "images/MS-U51-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U51-02", "set": "U51", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "路线左侧 K0+024~K0+036 段所设的波形梁护栏端头,关于其材料数量,下列说法哪些正确?", "options": [{"key": "A", "text": "G-Z-01 立柱 7 根,合计 165.851 kg", "correct": true}, {"key": "B", "text": "该端头长 24 m", "correct": false}, {"key": "C", "text": "立柱合计重 331.70 kg", "correct": false}, {"key": "D", "text": "R-160(D-Ⅰ)端头共 2 个,合计 28.8 kg", "correct": false}, {"key": "E", "text": "连接螺栓 A 共 7 套", "correct": false}, {"key": "F", "text": "加强钢板合计 34.09 kg", "correct": true}], "answer": ["A", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [2, 1], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U52-01/few_sheet/01.png", "page_02_file_name": "images/MS-U52-01/few_sheet/02.png", "page_03_file_name": "images/MS-U52-01/few_sheet/03.png", "page_04_file_name": "images/MS-U52-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U52-01", "set": "U52", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "傍山临崖路段外侧的危险路段,路侧为土方且不属小半径路段时,所设波形梁护栏每百延米标准段的材料,下列说法哪些正确?", "options": [{"key": "A", "text": "防盗螺母 550 件", "correct": true}, {"key": "B", "text": "拼接螺栓 200 件", "correct": false}, {"key": "C", "text": "波形梁板规格为 2320×310×85×3", "correct": true}, {"key": "D", "text": "立柱 50 根", "correct": true}, {"key": "E", "text": "托架总重 88.0 kg", "correct": false}, {"key": "F", "text": "柱帽总重 15.0 kg", "correct": true}], "answer": ["A", "C", "D", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [3, 1, 4], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U53-01/few_sheet/01.png", "page_02_file_name": "images/MS-U53-01/few_sheet/02.png", "page_03_file_name": "images/MS-U53-01/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U53-01", "set": "U53", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "两座景观天桥中桥面面积较小的那一座,关于其钢桥外包 UHPC 板材的分格,下列说法哪些正确?", "options": [{"key": "A", "text": "赤岗塔站方向一端立面的板材竖向分格为 600×8", "correct": false}, {"key": "B", "text": "立面跨中拱腹顶点标高为 4.200 m", "correct": false}, {"key": "C", "text": "平面上每端直线段的板材分格宽度为 1000 mm", "correct": false}, {"key": "D", "text": "中心方向一端立面顶标高为 7.950 m", "correct": false}, {"key": "E", "text": "中跨段板材分格长度为 19500 mm", "correct": false}, {"key": "F", "text": "平面上每端直线段的板材分格宽度为 1200 mm", "correct": true}], "answer": ["F"], "few_sheet_pages": [1, 2, 3], "evidence_pages": [1, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U54-01/few_sheet/01.png", "page_02_file_name": "images/MS-U54-01/few_sheet/02.png", "page_03_file_name": "images/MS-U54-01/few_sheet/03.png", "page_04_file_name": "images/MS-U54-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U54-01", "set": "U54", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "set", "question": "下列交点中,哪些交点的交点桩号落在路线左侧某一段衡重式路肩墙的起讫桩号范围内?", "options": [{"key": "A", "text": "JD129", "correct": true}, {"key": "B", "text": "JD109", "correct": true}, {"key": "C", "text": "JD108", "correct": false}, {"key": "D", "text": "JD121", "correct": true}, {"key": "E", "text": "JD140", "correct": false}, {"key": "F", "text": "JD114", "correct": false}], "answer": ["A", "B", "D"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [1, 3, 4], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U54-02/few_sheet/01.png", "page_02_file_name": "images/MS-U54-02/few_sheet/02.png", "page_03_file_name": "images/MS-U54-02/few_sheet/03.png", "page_04_file_name": "images/MS-U54-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U54-02", "set": "U54", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "set", "question": "下列交点中,哪些交点的交点桩号落在路线左侧某一段挂网喷混防护的起讫桩号范围内?", "options": [{"key": "A", "text": "JD166", "correct": false}, {"key": "B", "text": "JD189", "correct": false}, {"key": "C", "text": "JD175", "correct": false}, {"key": "D", "text": "JD164", "correct": false}, {"key": "E", "text": "JD165", "correct": true}, {"key": "F", "text": "JD126", "correct": true}], "answer": ["E", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [2, 1, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U55-01/few_sheet/01.png", "page_02_file_name": "images/MS-U55-01/few_sheet/02.png", "page_03_file_name": "images/MS-U55-01/few_sheet/03.png", "page_04_file_name": "images/MS-U55-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U55-01", "set": "U55", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "本项目场地清理按沿线树木、灌木与清表的调查数量组价,下列说法哪些正确?", "options": [{"key": "A", "text": "清理现场分项的计价面积 19277.49 m² 即为清表面积", "correct": false}, {"key": "B", "text": "砍伐树木分项的棵数取自沿线赔偿树木的茶树株数", "correct": false}, {"key": "C", "text": "直径 0.1 m 以上树木中“困难”的 30 棵,单独套用困难条件的伐树定额", "correct": false}, {"key": "D", "text": "推土机清除表土子目的工程数量 44.485(100 m³),即清表面积按 30 cm 厚折算的体积", "correct": true}, {"key": "E", "text": "砍伐树木分项计 178 棵,为直径 0.1 m 以上“一般”与“困难”两栏棵数之和", "correct": true}, {"key": "F", "text": "砍挖灌木林子目按“密”灌木林定额计", "correct": false}], "answer": ["D", "E"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [4, 3, 1], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U55-02/few_sheet/01.png", "page_02_file_name": "images/MS-U55-02/few_sheet/02.png", "page_03_file_name": "images/MS-U55-02/few_sheet/03.png", "page_04_file_name": "images/MS-U55-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U55-02", "set": "U55", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "本项目盖板涵的洞口混凝土墙身、洞口铺砌及截水墙(均为 C20 混凝土),关于这两个分项的工料机消耗,下列说法哪些正确?", "options": [{"key": "A", "text": "洞口铺砌及截水墙分项,人工合计 2.862 工日", "correct": true}, {"key": "B", "text": "洞口墙身分项,25t 以内汽车式起重机合计 0.162 台班", "correct": true}, {"key": "C", "text": "洞口墙身分项,32.5 级水泥合计 1.097 t", "correct": true}, {"key": "D", "text": "洞口墙身分项,碎石(4cm)合计 1.363 m³", "correct": false}, {"key": "E", "text": "洞口铺砌及截水墙分项,碎石(4cm)合计 3.094 m³", "correct": false}, {"key": "F", "text": "洞口墙身分项,人工合计 2.724 工日", "correct": false}], "answer": ["A", "B", "C"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [4, 2, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U55-03/few_sheet/01.png", "page_02_file_name": "images/MS-U55-03/few_sheet/02.png", "page_03_file_name": "images/MS-U55-03/few_sheet/03.png", "page_04_file_name": "images/MS-U55-03/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U55-03", "set": "U55", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "本项目修补路面(旧路面破除重建)的混凝土面层和新建基层,关于其分项工程预算,下列说法哪些正确?", "options": [{"key": "A", "text": "面层分项 42.5 级水泥合计 7.171 t", "correct": true}, {"key": "B", "text": "面层铺筑定额的人工消耗为 62.5 工日/1000 m²", "correct": false}, {"key": "C", "text": "面层分项中(粗)砂合计 8.868 m³", "correct": true}, {"key": "D", "text": "新建基层分项 32.5 级水泥合计 4.788 t", "correct": true}, {"key": "E", "text": "面层按人工铺筑混凝土路面(厚 18 cm)定额计价", "correct": true}, {"key": "F", "text": "面层铺筑定额的 10000L 以内洒水汽车消耗为 1.480 台班/1000 m²", "correct": false}], "answer": ["A", "C", "D", "E"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [1, 2, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U56-01/few_sheet/01.png", "page_02_file_name": "images/MS-U56-01/few_sheet/02.png", "page_03_file_name": "images/MS-U56-01/few_sheet/03.png", "page_04_file_name": "images/MS-U56-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U56-01", "set": "U56", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "挖除旧路面 150 mm 厚稳定土基层时所用的挖掘机,按其台班单价组成,下列说法哪些正确?", "options": [{"key": "A", "text": "机型为 WY200A 液压", "correct": true}, {"key": "B", "text": "每台班柴油消耗 91.93 kg", "correct": true}, {"key": "C", "text": "每台班柴油费 521.37 元", "correct": false}, {"key": "D", "text": "台班不变费用 604.71 元", "correct": true}, {"key": "E", "text": "每台班可变费用合计 897.99 元", "correct": true}, {"key": "F", "text": "每台班人工费 129.08 元", "correct": false}], "answer": ["A", "B", "D", "E"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [1, 4, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U56-02/few_sheet/01.png", "page_02_file_name": "images/MS-U56-02/few_sheet/02.png", "page_03_file_name": "images/MS-U56-02/few_sheet/03.png", "page_04_file_name": "images/MS-U56-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U56-02", "set": "U56", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "水泥稳定碎石基层施工所用的几种压路机中,台班数最多的那一种,下列说法哪些正确?", "options": [{"key": "A", "text": "每台班柴油费 278.40 元", "correct": false}, {"key": "B", "text": "台班不变费用 206.20 元", "correct": true}, {"key": "C", "text": "台班单价 590.69 元", "correct": false}, {"key": "D", "text": "规格型号 3Y-18/21", "correct": true}, {"key": "E", "text": "每台班人工 2.00 工日", "correct": false}, {"key": "F", "text": "每台班可变费用合计 541.11 元", "correct": true}], "answer": ["B", "D", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [3, 1, 2], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U56-03/few_sheet/01.png", "page_02_file_name": "images/MS-U56-03/few_sheet/02.png", "page_03_file_name": "images/MS-U56-03/few_sheet/03.png", "page_04_file_name": "images/MS-U56-03/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U56-03", "set": "U56", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "平面交叉处新做的 150 mm 混凝土基层,按预算所列工料机消耗,下列说法哪些正确?", "options": [{"key": "A", "text": "32.5 级水泥合计 6.755 t", "correct": true}, {"key": "B", "text": "6m3 以内混凝土搅拌运输车合计 0.245 台班", "correct": true}, {"key": "C", "text": "人工合计 242.438 工日", "correct": false}, {"key": "D", "text": "250L 以内强制式混凝土搅拌机合计 0.270 台班", "correct": false}, {"key": "E", "text": "碎石(4cm)合计 303.808 m3", "correct": false}, {"key": "F", "text": "中(粗)砂合计 11.101 m3", "correct": true}], "answer": ["A", "B", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [4, 3, 2], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U57-01/few_sheet/01.png", "page_02_file_name": "images/MS-U57-01/few_sheet/02.png", "page_03_file_name": "images/MS-U57-01/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U57-01", "set": "U57", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "全线下坡由缓变陡的那个变坡点,其所在桩号的路基横断面,下列说法哪些正确?", "options": [{"key": "A", "text": "中桩挖方高度为 10.36 m", "correct": false}, {"key": "B", "text": "中桩设计高程为 150.83 m", "correct": false}, {"key": "C", "text": "左侧路基边缘设计高程为 150.76 m", "correct": false}, {"key": "D", "text": "右侧坡口点距中线 6.84 m", "correct": false}, {"key": "E", "text": "左侧坡口点距中线 7.05 m", "correct": false}, {"key": "F", "text": "挖方面积为 110.52 m²", "correct": true}], "answer": ["F"], "few_sheet_pages": [1, 2, 3], "evidence_pages": [2, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U58-01/few_sheet/01.png", "page_02_file_name": "images/MS-U58-01/few_sheet/02.png", "page_03_file_name": "images/MS-U58-01/few_sheet/03.png", "page_04_file_name": "images/MS-U58-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U58-01", "set": "U58", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "K0+180 处设置的那一组标志,关于其支撑结构与基础,下列说法哪些正确?", "options": [{"key": "A", "text": "基础定位尺寸 d 为 233 mm", "correct": false}, {"key": "B", "text": "基础定位尺寸 c 为 200 mm", "correct": true}, {"key": "C", "text": "基础 C25 混凝土 1.20 m³", "correct": true}, {"key": "D", "text": "基础 HPB300 Φ8 钢筋每根长 3170 mm", "correct": false}, {"key": "E", "text": "基础 HRB400 Φ14 钢筋共 8 根", "correct": false}, {"key": "F", "text": "立柱规格为 φ121×6", "correct": false}], "answer": ["B", "C"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [3, 1, 2], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U59-01/few_sheet/01.png", "page_02_file_name": "images/MS-U59-01/few_sheet/02.png", "page_03_file_name": "images/MS-U59-01/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U59-01", "set": "U59", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "set", "question": "以平曲线的起点至终点为范围,下列交点中,哪些交点的平曲线与路肩墙段有重叠?", "options": [{"key": "A", "text": "JD11", "correct": true}, {"key": "B", "text": "JD19", "correct": false}, {"key": "C", "text": "JD20", "correct": true}, {"key": "D", "text": "JD12", "correct": false}, {"key": "E", "text": "JD18", "correct": true}, {"key": "F", "text": "JD16", "correct": true}], "answer": ["A", "C", "E", "F"], "few_sheet_pages": [1, 2, 3], "evidence_pages": [3, 2], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U59-02/few_sheet/01.png", "page_02_file_name": "images/MS-U59-02/few_sheet/02.png", "page_03_file_name": "images/MS-U59-02/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U59-02", "set": "U59", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "沿桩号增大方向,老路利用改造段之后的第一段路肩墙。关于该墙段在纵断面上的情况,下列说法哪些正确?", "options": [{"key": "A", "text": "墙段范围内各整 20 m 桩的挖方深度均不超过 0.5 m", "correct": false}, {"key": "B", "text": "墙段起点处的地面高程为 1664.26 m", "correct": false}, {"key": "C", "text": "墙段起点处的设计高程为 1665.99 m", "correct": true}, {"key": "D", "text": "墙段起点处为填方", "correct": false}, {"key": "E", "text": "墙段起点所在坡段的纵坡为 1.86%", "correct": false}, {"key": "F", "text": "墙段终点桩号为 K0+605", "correct": false}], "answer": ["C"], "few_sheet_pages": [1, 2, 3], "evidence_pages": [3, 1], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U59-03/few_sheet/01.png", "page_02_file_name": "images/MS-U59-03/few_sheet/02.png", "page_03_file_name": "images/MS-U59-03/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U59-03", "set": "U59", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "桩号 K2+000 处的圆管涵位于一段路肩墙范围内,该墙段内完整包含一段平曲线。关于这段平曲线,下列说法哪些正确?", "options": [{"key": "A", "text": "该平曲线的切线长为 28.747 m", "correct": true}, {"key": "B", "text": "该平曲线曲中点(QZ)的桩号为 K1+920.625", "correct": false}, {"key": "C", "text": "该平曲线的曲线长为 55.693 m", "correct": true}, {"key": "D", "text": "该平曲线的缓和曲线长度为 13 m", "correct": false}, {"key": "E", "text": "该平曲线的外距为 1.097 m", "correct": false}, {"key": "F", "text": "该平曲线交点的 X(N) 坐标为 3490471.800", "correct": false}], "answer": ["A", "C"], "few_sheet_pages": [1, 2, 3], "evidence_pages": [2, 1], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U59-04/few_sheet/01.png", "page_02_file_name": "images/MS-U59-04/few_sheet/02.png", "page_03_file_name": "images/MS-U59-04/few_sheet/03.png", "page_04_file_name": "images/MS-U59-04/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U59-04", "set": "U59", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "set", "question": "以变坡点桩号为准,下列竖曲线中,哪些竖曲线的变坡点位于路肩墙段范围内?", "options": [{"key": "A", "text": "半径 1000 m、切线长 40.71 m 的竖曲线", "correct": true}, {"key": "B", "text": "半径 500 m、切线长 15 m 的竖曲线", "correct": false}, {"key": "C", "text": "半径 1000 m、切线长 32.5 m 的竖曲线", "correct": false}, {"key": "D", "text": "半径 460 m、切线长 14.95 m 的竖曲线", "correct": false}, {"key": "E", "text": "半径 1150 m、切线长 20.12 m 的竖曲线", "correct": true}, {"key": "F", "text": "半径 500 m、切线长 21.61 m 的竖曲线", "correct": true}], "answer": ["A", "E", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [1, 4, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U59-05/few_sheet/01.png", "page_02_file_name": "images/MS-U59-05/few_sheet/02.png", "page_03_file_name": "images/MS-U59-05/few_sheet/03.png", "page_04_file_name": "images/MS-U59-05/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U59-05", "set": "U59", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "set", "question": "以平曲线的起点至终点为范围,下列交点中,哪些交点的平曲线与路肩墙段有重叠?", "options": [{"key": "A", "text": "JD28", "correct": false}, {"key": "B", "text": "JD25", "correct": true}, {"key": "C", "text": "JD29", "correct": true}, {"key": "D", "text": "JD27", "correct": true}, {"key": "E", "text": "JD31", "correct": true}, {"key": "F", "text": "JD32", "correct": false}], "answer": ["B", "C", "D", "E"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [4, 2], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U59-06/few_sheet/01.png", "page_02_file_name": "images/MS-U59-06/few_sheet/02.png", "page_03_file_name": "images/MS-U59-06/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U59-06", "set": "U59", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "交点 JD21 的平曲线范围内设有一段路肩墙。关于该墙段在纵断面上的情况,下列说法哪些正确?", "options": [{"key": "A", "text": "墙段起点处的设计高程为 1733.12 m", "correct": false}, {"key": "B", "text": "墙段范围内设有竖曲线", "correct": false}, {"key": "C", "text": "该墙段长 55 m", "correct": false}, {"key": "D", "text": "墙段起点处的地面高程为 1735.52 m", "correct": false}, {"key": "E", "text": "该墙段所在坡段的纵坡为 12.00%", "correct": true}, {"key": "F", "text": "墙段终点处为填方", "correct": false}], "answer": ["E"], "few_sheet_pages": [1, 2, 3], "evidence_pages": [1, 2], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U59-07/few_sheet/01.png", "page_02_file_name": "images/MS-U59-07/few_sheet/02.png", "page_03_file_name": "images/MS-U59-07/few_sheet/03.png", "page_04_file_name": "images/MS-U59-07/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U59-07", "set": "U59", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "set", "question": "下列变坡点(以纵断面上标注的变坡点设计高程区分)中,哪些变坡点位于路肩墙段范围内?", "options": [{"key": "A", "text": "设计高程为 1724.72 m 的变坡点", "correct": true}, {"key": "B", "text": "设计高程为 1757.19 m 的变坡点", "correct": true}, {"key": "C", "text": "设计高程为 1764.19 m 的变坡点", "correct": false}, {"key": "D", "text": "设计高程为 1745.72 m 的变坡点", "correct": false}, {"key": "E", "text": "设计高程为 1778.69 m 的变坡点", "correct": false}, {"key": "F", "text": "设计高程为 1774.49 m 的变坡点", "correct": true}], "answer": ["A", "B", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [4, 1, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U60-01/few_sheet/01.png", "page_02_file_name": "images/MS-U60-01/few_sheet/02.png", "page_03_file_name": "images/MS-U60-01/few_sheet/03.png", "page_04_file_name": "images/MS-U60-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U60-01", "set": "U60", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "K20+809 处路左侧所设的那块交通标志,关于其版面与支撑结构,下列说法哪些正确?", "options": [{"key": "A", "text": "版面外径 700 mm", "correct": false}, {"key": "B", "text": "滑动槽钢为 100×30×4×189 和 100×30×4×427 各 1 根", "correct": false}, {"key": "C", "text": "标志板单件重 1.782 kg", "correct": false}, {"key": "D", "text": "反光膜用量为 0.339 m²", "correct": false}, {"key": "E", "text": "立柱为 Φ76×4.5×2500 热轧无缝钢管", "correct": true}, {"key": "F", "text": "版面边框宽 50 mm", "correct": false}], "answer": ["E"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [4, 3, 1], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U60-02/few_sheet/01.png", "page_02_file_name": "images/MS-U60-02/few_sheet/02.png", "page_03_file_name": "images/MS-U60-02/few_sheet/03.png", "page_04_file_name": "images/MS-U60-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U60-02", "set": "U60", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "关于全线凸面镜的数量与材料,下列说法哪些正确?", "options": [{"key": "A", "text": "全线凸面镜法兰盘合计 778.72 kg", "correct": false}, {"key": "B", "text": "全线凸面镜的 C30 砼基础合计 17.98 m³", "correct": true}, {"key": "C", "text": "道路右侧共设凸面镜 16 套", "correct": true}, {"key": "D", "text": "凸面镜钢管立柱规格为 ø89×4.5×2500", "correct": false}, {"key": "E", "text": "全线凸面镜钢管立柱合计 787.8 kg", "correct": false}, {"key": "F", "text": "全线凸面镜地脚螺栓共 124 根", "correct": true}], "answer": ["B", "C", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [1, 3, 2], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U60-03/few_sheet/01.png", "page_02_file_name": "images/MS-U60-03/few_sheet/02.png", "page_03_file_name": "images/MS-U60-03/few_sheet/03.png", "page_04_file_name": "images/MS-U60-03/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U60-03", "set": "U60", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "K0+050~K0+210 段左侧的波形梁护栏,下列说法哪些正确?", "options": [{"key": "A", "text": "立柱总长 2100 mm", "correct": true}, {"key": "B", "text": "共设立柱 80 根", "correct": false}, {"key": "C", "text": "共设端头 2 个", "correct": false}, {"key": "D", "text": "端头梁单件重 49.16 kg", "correct": false}, {"key": "E", "text": "立柱单根重 14.58 kg", "correct": false}, {"key": "F", "text": "拼接螺栓 A1 的规格为 M16×45", "correct": false}], "answer": ["A"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [4, 2, 1], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U61-01/few_sheet/01.png", "page_02_file_name": "images/MS-U61-01/few_sheet/02.png", "page_03_file_name": "images/MS-U61-01/few_sheet/03.png", "page_04_file_name": "images/MS-U61-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U61-01", "set": "U61", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "set", "question": "下列中桩中,哪些位于半径为 120 m 的平曲线范围内?", "options": [{"key": "A", "text": "K0+460", "correct": false}, {"key": "B", "text": "K0+240", "correct": true}, {"key": "C", "text": "K0+453.750", "correct": false}, {"key": "D", "text": "K0+391.101", "correct": false}, {"key": "E", "text": "K0+204.904", "correct": false}, {"key": "F", "text": "K0+440", "correct": false}], "answer": ["B"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [1, 4, 2], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U61-02/few_sheet/01.png", "page_02_file_name": "images/MS-U61-02/few_sheet/02.png", "page_03_file_name": "images/MS-U61-02/few_sheet/03.png", "page_04_file_name": "images/MS-U61-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U61-02", "set": "U61", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "set", "question": "下列中桩中,哪些位于半径为 65 m 的平曲线范围内?", "options": [{"key": "A", "text": "K8+176.216", "correct": false}, {"key": "B", "text": "K8+220", "correct": false}, {"key": "C", "text": "K8+124.520", "correct": false}, {"key": "D", "text": "K8+221.668", "correct": false}, {"key": "E", "text": "K7+940", "correct": false}, {"key": "F", "text": "K8+040", "correct": true}], "answer": ["F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [3, 2, 1], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U61-03/few_sheet/01.png", "page_02_file_name": "images/MS-U61-03/few_sheet/02.png", "page_03_file_name": "images/MS-U61-03/few_sheet/03.png", "page_04_file_name": "images/MS-U61-03/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U61-03", "set": "U61", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "K2+690 至 K2+740 之间有一段凹型竖曲线。关于它起点、变坡点、终点处的路基横断面,下列说法哪些正确?", "options": [{"key": "A", "text": "终点处中桩挖方高度为 1.93 m", "correct": false}, {"key": "B", "text": "变坡点处横断面挖方面积为 1.71 m²", "correct": true}, {"key": "C", "text": "终点处横断面挖方面积为 13.21 m²", "correct": true}, {"key": "D", "text": "起点处横断面填方面积为 41.97 m²", "correct": true}, {"key": "E", "text": "起点处横断面挖方面积为 1.91 m²", "correct": false}, {"key": "F", "text": "变坡点处横断面填方面积为 121.66 m²", "correct": false}], "answer": ["B", "C", "D"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [1, 2, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U61-04/few_sheet/01.png", "page_02_file_name": "images/MS-U61-04/few_sheet/02.png", "page_03_file_name": "images/MS-U61-04/few_sheet/03.png", "page_04_file_name": "images/MS-U61-04/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U61-04", "set": "U61", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "set", "question": "下列中桩中,哪些位于半径为 60 m 的平曲线范围内?", "options": [{"key": "A", "text": "K3+752.500", "correct": true}, {"key": "B", "text": "K3+960", "correct": false}, {"key": "C", "text": "K3+903.607", "correct": false}, {"key": "D", "text": "K3+699.365", "correct": false}, {"key": "E", "text": "K3+840.803", "correct": false}, {"key": "F", "text": "K3+956.031", "correct": false}], "answer": ["A"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [2, 4, 1], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U61-05/few_sheet/01.png", "page_02_file_name": "images/MS-U61-05/few_sheet/02.png", "page_03_file_name": "images/MS-U61-05/few_sheet/03.png", "page_04_file_name": "images/MS-U61-05/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U61-05", "set": "U61", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "set", "question": "在交点 JD78 平曲线的圆曲线段内(从缓和曲线终点到圆曲线终点,含两端),下列哪些中桩的横断面挖方面积超过 24 m²?", "options": [{"key": "A", "text": "K5+100", "correct": false}, {"key": "B", "text": "K5+160", "correct": false}, {"key": "C", "text": "K5+183.288", "correct": false}, {"key": "D", "text": "K5+180", "correct": true}, {"key": "E", "text": "K5+168.229", "correct": true}, {"key": "F", "text": "K5+175.758", "correct": true}], "answer": ["D", "E", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [2, 4, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U61-06/few_sheet/01.png", "page_02_file_name": "images/MS-U61-06/few_sheet/02.png", "page_03_file_name": "images/MS-U61-06/few_sheet/03.png", "page_04_file_name": "images/MS-U61-06/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U61-06", "set": "U61", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "K18+200~K18+280 一段路基设有挡土墙。关于这一段内各断面的挡墙尺寸与断面填挖面积,下列说法哪些正确?", "options": [{"key": "A", "text": "K18+211.836 断面:挡墙基底宽 1.24 m,断面填方面积 2.05 m²", "correct": true}, {"key": "B", "text": "K18+240 断面:挡墙基底宽 1.21 m,断面挖方面积 15.24 m²", "correct": true}, {"key": "C", "text": "K18+220 断面:挡墙墙顶宽 0.64 m,断面挖方面积 13.24 m²", "correct": true}, {"key": "D", "text": "K18+201.063 断面:挡墙基底宽 1.18 m,断面挖方面积 36.97 m²", "correct": false}, {"key": "E", "text": "K18+201.063 断面:挡墙墙顶宽 0.55 m,断面填方面积 0.01 m²", "correct": true}, {"key": "F", "text": "K18+280 断面:挡墙墙顶宽 0.57 m,断面挖方面积 37.04 m²", "correct": false}], "answer": ["A", "B", "C", "E"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [4, 2, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U62-01/few_sheet/01.png", "page_02_file_name": "images/MS-U62-01/few_sheet/02.png", "page_03_file_name": "images/MS-U62-01/few_sheet/03.png", "page_04_file_name": "images/MS-U62-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U62-01", "set": "U62", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "关于本路线各处新增标志的单柱支撑构造与材料,下列说法哪些正确?", "options": [{"key": "A", "text": "K2+520 左侧的标志,IV 类反光膜合计 0.678 平方米", "correct": true}, {"key": "B", "text": "K3+940 右侧的标志,抱箍规格为 60×6×283.301,共 4 件", "correct": true}, {"key": "C", "text": "K1+580 左侧的标志,立柱为 Φ76×4.5×3410 热轧无缝钢管", "correct": false}, {"key": "D", "text": "K3+100 右侧的标志,抱箍规格为 60×6×262.881,共 4 件", "correct": false}, {"key": "E", "text": "K1+840 右侧的标志,立柱为 Φ76×4.5×3410 热轧无缝钢管", "correct": true}, {"key": "F", "text": "K3+680 左侧的标志,滑动槽铝规格为 100×30×4×600,共 2 件", "correct": false}], "answer": ["A", "B", "E"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [4, 2, 3], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U62-02/few_sheet/01.png", "page_02_file_name": "images/MS-U62-02/few_sheet/02.png", "page_03_file_name": "images/MS-U62-02/few_sheet/03.png", "page_04_file_name": "images/MS-U62-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U62-02", "set": "U62", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "关于本路线新增的限制速度标志及单块三角形警告标志,下列说法哪些正确?", "options": [{"key": "A", "text": "限制速度标志的铝合金标志板单件重 1.782 kg", "correct": false}, {"key": "B", "text": "两块限制速度标志的版面限速值均为 15 km/h", "correct": true}, {"key": "C", "text": "限制速度标志的立柱为 Φ76×4.5×2670 热轧无缝钢管", "correct": true}, {"key": "D", "text": "每块限制速度标志的 IV 类反光膜为 0.452 平方米", "correct": true}, {"key": "E", "text": "连续上坡标志的滑动槽铝为 100×30×4×366,共 2 件", "correct": false}, {"key": "F", "text": "连续下坡标志的立柱为 Φ76×4.5×2670 热轧无缝钢管", "correct": false}], "answer": ["B", "C", "D"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [3, 4, 2], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U63-01/few_sheet/01.png", "page_02_file_name": "images/MS-U63-01/few_sheet/02.png", "page_03_file_name": "images/MS-U63-01/few_sheet/03.png", "page_04_file_name": "images/MS-U63-01/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U63-01", "set": "U63", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "关于本线设置路肩挡土墙的段落,下列说法哪些正确?", "options": [{"key": "A", "text": "其中一处挡墙的起讫段落与路面挖除重建段落有重叠", "correct": false}, {"key": "B", "text": "按其平均墙高查尺寸表,墙底宽 Bd 为 159 cm", "correct": false}, {"key": "C", "text": "按其平均墙高查尺寸表,墙身台阶宽 bj 为 24 cm", "correct": false}, {"key": "D", "text": "挡墙所在段落的路面加宽在挡墙同一侧,C35 混凝土面层加宽宽度为 1.50 m", "correct": true}, {"key": "E", "text": "挡墙所在段落的 5% 水泥稳定碎石基层加宽宽度为 3.00 m", "correct": false}, {"key": "F", "text": "按其平均墙高查尺寸表,墙顶宽 b 为 79 cm", "correct": true}], "answer": ["D", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [1, 4, 2], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U63-02/few_sheet/01.png", "page_02_file_name": "images/MS-U63-02/few_sheet/02.png", "page_03_file_name": "images/MS-U63-02/few_sheet/03.png", "page_04_file_name": "images/MS-U63-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U63-02", "set": "U63", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "路线终点前最后一段不做路面加宽的路段,下列说法哪些正确?", "options": [{"key": "A", "text": "该段内路面挖除重建的段落共有 2 段", "correct": false}, {"key": "B", "text": "该段内设有一处交叉口的道口标柱", "correct": false}, {"key": "C", "text": "该段内设有横向振动标线", "correct": false}, {"key": "D", "text": "该段两侧施划路线边线", "correct": true}, {"key": "E", "text": "该段内路面挖除重建的修补长度为 10 m", "correct": true}, {"key": "F", "text": "该段不施划路中线", "correct": true}], "answer": ["D", "E", "F"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [4, 2, 1], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U63-03/few_sheet/01.png", "page_02_file_name": "images/MS-U63-03/few_sheet/02.png", "page_03_file_name": "images/MS-U63-03/few_sheet/03.png", "page_04_file_name": "images/MS-U63-03/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U63-03", "set": "U63", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "路面加宽设在路线右侧的各段中,最长的那一段范围内,下列说法哪些正确?", "options": [{"key": "A", "text": "段内的加长利用圆管涵在路线右侧加长", "correct": true}, {"key": "B", "text": "段内设有 3 道横向振动标线", "correct": true}, {"key": "C", "text": "段内有 2 道加长利用的圆管涵", "correct": false}, {"key": "D", "text": "段内加长利用圆管涵的孔径为 0.50 m", "correct": false}, {"key": "E", "text": "段内不施划路中线", "correct": false}, {"key": "F", "text": "段内共有 3 道涵洞", "correct": false}], "answer": ["A", "B"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [3, 1, 4], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U64-01/few_sheet/01.png", "page_02_file_name": "images/MS-U64-01/few_sheet/02.png", "page_03_file_name": "images/MS-U64-01/few_sheet/03.png", "page_04_file_name": null, "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U64-01", "set": "U64", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "紧接在半径 100 m 平曲线之后的那处平曲线,关于其曲线中点和终点处的路基横断面,下列说法哪些正确?", "options": [{"key": "A", "text": "曲线终点处为挖方,挖深 0.05 m", "correct": false}, {"key": "B", "text": "曲线中点处挖方面积 19.36 m²", "correct": true}, {"key": "C", "text": "曲线终点处填方面积 48.93 m²", "correct": true}, {"key": "D", "text": "曲线中点处左侧路基宽 3.35 m", "correct": false}, {"key": "E", "text": "曲线终点处右侧路基宽 3.28 m", "correct": false}, {"key": "F", "text": "曲线中点处左侧超高 -0.08 m", "correct": false}], "answer": ["B", "C"], "few_sheet_pages": [1, 2, 3], "evidence_pages": [1, 2], "full_set_page_count": null, "sub_questions": []} {"page_01_file_name": "images/MS-U64-02/few_sheet/01.png", "page_02_file_name": "images/MS-U64-02/few_sheet/02.png", "page_03_file_name": "images/MS-U64-02/few_sheet/03.png", "page_04_file_name": "images/MS-U64-02/few_sheet/04.png", "page_05_file_name": null, "page_06_file_name": null, "page_07_file_name": null, "page_08_file_name": null, "page_09_file_name": null, "page_10_file_name": null, "id": "MS-U64-02", "set": "U64", "tiers": ["few_sheet"], "question_type": "multiple_select", "question_style": "claim", "question": "最低点高程 202 m 的那处弃土场,关于其前缘挡墙,下列说法哪些正确?", "options": [{"key": "A", "text": "每延米挖基 4.22 m³", "correct": false}, {"key": "B", "text": "按图示墙长计,墙身圬工合计约 257.8 m³", "correct": false}, {"key": "C", "text": "墙底宽 b2 为 2.34 m", "correct": false}, {"key": "D", "text": "每延米砂砾层 0.9 m³", "correct": true}, {"key": "E", "text": "每延米回填 1.90 m³", "correct": false}, {"key": "F", "text": "墙顶宽 b1 为 0.87 m", "correct": false}], "answer": ["D"], "few_sheet_pages": [1, 2, 3, 4], "evidence_pages": [1, 2], "full_set_page_count": null, "sub_questions": []}