VSP / blocks /task5 /example /level3 /question2.txt
AnonyCAD's picture
Upload folder using huggingface_hub
45f037d verified
Please generate the moving plan. The beginning state is:
- Stack with orange block
- Stack with green block
- Stack with red block
- Stack with blue block
- Stack with purple block
The end state is:
- Stack with green block, purple block, from bottom to top
- Stack with orange block, red block, blue block, from bottom to top