Winter 2026 (Dec 2025–Feb 2026)
Conceptual Design & Feasibility
Scope includes conceptual design of the pumptrack, bike trails, and supporting bike infrastructure, including preliminary layouts, feature concepts, and feasibility review.
Spring–Summer 2026 (March–August 2026)
Pre-Construction Planning & Engineering
Ongoing Operations & Maintenance
Development of engineered pre-construction plans including pumptrack square footage, trail corridors, drainage design, and specifications for metal and wood features.
Construction Phase 1 (Paved Pumptrack)
Construction of the paved pumptrack including earthwork, drainage installation, asphalt surfacing, and associated bike infrastructure.
Routine inspections, maintenance, and seasonal repairs begin upon completion of each construction
phase, coordinated per governing agreements.
Construction Phase 2 (Flow Trails)
Construction of flow-style bike trails including corridor clearing, trail shaping, drainage features, and surface finishing.
Construction – Phase 3 (Dirt Jump Park & Dual Slalom)
Construction of dirt jump lines and a dual slalom track including earthwork, drainage, feature installation, and final commissioning.