| U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD | |
| INVESTIGATION REPORT | |
| Final Report | |
| E.I. DUPONT DE NEMOURS & CO., INC. | |
| BELLE, WEST VIRGINIA | |
| METHYL CHLORIDE RELEASE | |
| JANUARY 22, 2010 | |
| OLEUM RELEASE | |
| JANUARY 23, 2010 | |
| PHOSGENE RELEASE | |
| JANUARY 23, 2010 | |
| One Fatality | |
| One Confirmed Exposure | |
| One Possible Exposure | |
| KEY ISSUES: | |
| • MECHANICAL INTEGRITY | |
| • ALARM MANAGEMENT | |
| • OPERATING PROCEDURES | |
| • COMPANY EMERGENCY RESPONSE & NOTIFICATION | |
| REPORT NO. 2010-6-I-WV | |
| SEPTEMBER 2011 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| CONTENTS | |
| 1.0 | |
| 1.1 | |
| 1.2 | |
| 1.3 | |
| 1.4 | |
| 2.0 | |
| 2.1 | |
| INTRODUCTION ......................................................................................................................... 13 | |
| Background .................................................................................................................................... 13 | |
| Investigative Process ...................................................................................................................... 14 | |
| E.I. DuPont de Nemours & Co., Inc. ............................................................................................. 16 | |
| 1.3.1 Company History .............................................................................................................. 16 | |
| 1.3.2 DuPont Business Areas and Corporate Management ....................................................... 16 | |
| 1.3.3 Safety at DuPont ............................................................................................................... 17 | |
| DuPont Belle Plant ......................................................................................................................... 20 | |
| METHYL CHLORIDE RELEASE (JANUARY 22, 2010) .......................................................... 22 | |
| Background .................................................................................................................................... 22 | |
| 2.1.1 Methyl Chloride ................................................................................................................ 23 | |
| 2.2 | |
| Incident Description ....................................................................................................................... 24 | |
| 2.2.1 ECF Sensor Alarm ............................................................................................................ 25 | |
| 2.2.2 Odor Detection Considerations ......................................................................................... 25 | |
| 2.2.3 | |
| Incident Response ............................................................................................................. 26 | |
| 2.2.4 Community Impact ........................................................................................................... 29 | |
| 2.3 | |
| Incident Analysis ........................................................................................................................... 29 | |
| 2.3.1 Mechanical Integrity ......................................................................................................... 29 | |
| 2.3.2 Design and Maintenance of Rupture Discs ....................................................................... 31 | |
| 2.3.3 Previous Incidents of Rupture Discs Bursting .................................................................. 32 | |
| 2.3.4 Management of Change--Technology and Subtle Change ............................................... 34 | |
| 2.3.5 F3455 Unit Turnaround .................................................................................................... 35 | |
| 2.3.6 Second-Party Process Safety Management Audit ............................................................. 38 | |
| Key Findings .................................................................................................................................. 39 | |
| Root Causes ................................................................................................................................... 39 | |
| OLEUM RELEASE (JANUARY 23, 2010) .................................................................................. 40 | |
| Background .................................................................................................................................... 40 | |
| Incident Description ....................................................................................................................... 40 | |
| 3.2.1 | |
| Incident Response ............................................................................................................. 42 | |
| 2.4 | |
| 2.5 | |
| 3.0 | |
| 3.1 | |
| 3.2 | |
| 3.3 | |
| Incident Analysis ........................................................................................................................... 42 | |
| ii | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 3.3.1 Reconstructive Analysis ................................................................................................... 42 | |
| 3.3.2 Pipe Testing and Analysis ................................................................................................. 45 | |
| 3.3.3 Previous Incident Investigation ......................................................................................... 46 | |
| 3.3.4 PM Program Recommendation from 2009 Incident ......................................................... 47 | |
| 3.3.5 Mechanical Integrity ......................................................................................................... 47 | |
| 3.3.6 Heat Tracing Design ......................................................................................................... 48 | |
| Key Findings .................................................................................................................................. 48 | |
| Root Causes ................................................................................................................................... 49 | |
| PHOSGENE RELEASE (JANUARY 23, 2010) ........................................................................... 49 | |
| Background .................................................................................................................................... 49 | |
| 4.1.1 Phosgene ........................................................................................................................... 49 | |
| 4.1.2 Phosgene Stainless Steel Hose Transfer Operation .......................................................... 50 | |
| 4.1.3 Phosgene Highly Toxic Material Guardian Committee .................................................... 56 | |
| 3.4 | |
| 3.5 | |
| 4.0 | |
| 4.1 | |
| 4.2 | |
| Incident Description ....................................................................................................................... 57 | |
| 4.2.1 Community Impact ........................................................................................................... 61 | |
| 4.3 | |
| Incident Analysis ........................................................................................................................... 61 | |
| 4.3.1 Hose Failure Analysis ....................................................................................................... 61 | |
| 4.3.2 Effect of Plastic Adhesive Tape ........................................................................................ 62 | |
| 4.3.3 Hose Degradation Issues ................................................................................................... 64 | |
| 4.3.4 Hose Change-out Frequency ............................................................................................. 64 | |
| 4.3.5 SAP Work Process ............................................................................................................ 66 | |
| 4.3.6 Near-Miss Phosgene Incident ........................................................................................... 67 | |
| 4.3.7 Mechanical Integrity ......................................................................................................... 68 | |
| 4.3.8 Flex Hose Materials of Construction ................................................................................ 70 | |
| 4.3.8 Non-routine Job Planning ................................................................................................. 72 | |
| Process Hazard Analysis ................................................................................................................ 73 | |
| Audits ............................................................................................................................................. 75 | |
| 4.5.1 Unit Second-Party PSM Audit .......................................................................................... 75 | |
| 4.5.2 | |
| 2006 Phosgene Committee Audit ..................................................................................... 79 | |
| Standards and Guidelines ............................................................................................................... 80 | |
| Key Findings .................................................................................................................................. 86 | |
| Root Causes ................................................................................................................................... 87 | |
| 4.4 | |
| 4.5 | |
| 4.6 | |
| 4.7 | |
| 4.8 | |
| iii | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 5.0 | |
| THREE INCIDENTS IN 33 HOURS ............................................................................................ 88 | |
| 5.0.1 Additional DuPont Incidents ............................................................................................. 90 | |
| 5.1 | |
| Management Systems .................................................................................................................... 91 | |
| 5.1.1 Knowledge Management .................................................................................................. 91 | |
| 5.1.2 Hierarchy of Controls ....................................................................................................... 93 | |
| REGULATORY ANALYSIS ........................................................................................................ 97 | |
| Occupational Safety and Health Administration (OSHA) ............................................................. 97 | |
| 6.1.1 Process Safety Management Program .............................................................................. 97 | |
| 6.1.2 Compressed Gases ............................................................................................................ 99 | |
| 6.1.3 | |
| Inspection History ........................................................................................................... 100 | |
| Environmental Protection Agency ............................................................................................... 101 | |
| State Hazardous Chemical Release Prevention Program ............................................................. 103 | |
| RECOMMENDATIONS ............................................................................................................. 105 | |
| 6.0 | |
| 6.1 | |
| 6.2 | |
| 6.3 | |
| 7.0 | |
| REFERENCES ......................................................................................................................................... 112 | |
| APPENDIX A: THREE EVENT LOGIC TREE ...................................................................................... 114 | |
| APPENDIX B: HISTORICAL AND EVENT TIMELINE ...................................................................... 119 | |
| APPENDIX C: SAP PROGRAM ............................................................................................................. 120 | |
| APPENDIX D: PHOSGENE RELEASE CALCULATIONS .................................................................. 123 | |
| APPENDIX E: HAZARD ANALYSIS FOR PHOSGENE USE AT BELLE ......................................... 130 | |
| APPENDIX F: HARD PIPE TO FLEXIBLE HOSE TRANSITION CORRESPONDENCE ................. 130 | |
| APPENDIX G: PHA RECOMMENDATION DELAY LETTER ........................................................... 165 | |
| iv | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| List of Figures | |
| Figure 1. DuPont Belle, WV, facility on the Kanawha River (EPA, 1973) | |
| ................................................ 20 | |
| Figure 2. Simplified thermal oxidizer and rupture disc block flow diagram | |
| .............................................. 23 | |
| Figure 3. 0.5-inch NPS vent/drain pipe and rupture disc | |
| ............................................................................ 25 | |
| Figure 4. Rupture disc piping and vent pipeline to atmosphere on roof | |
| ..................................................... 28 | |
| Figure 5. Rupture disc burst sensor post-incident | |
| ....................................................................................... 30 | |
| Figure 6. New rupture disc | |
| .......................................................................................................................... 32 | |
| Figure 7. Process data showing sudden pressure decrease when rupture disc burst | |
| ................................... 37 | |
| Figure 8. Photo of the position of the 1-inch sample line, which had not yet been replaced | |
| ...................... 41 | |
| Figure 9. The pitting phenomena observed in the small initial hole of the oleum sample line wall | |
| ........... 43 | |
| Figure 10. The large hole eroded from the outside-in on the oleum sample line | |
| ........................................ 44 | |
| Figure 11. Photo showing the orientation of the small hole to the main hole | |
| ............................................. 45 | |
| Figure 12. Phosgene shed and full (F) and empty (MT) cylinder locations on day of incident | |
| (not to scale) | |
| ........................................................................................................................................ 51 | |
| Figure 13. SafeAir Phosgene Dosimeter Badge | |
| .......................................................................................... 55 | |
| Figure 14. The distinct effect of the white plastic adhesive tag on the corrosion of the stainless steel | |
| overbraid | |
| ............................................................................................................................................. 63 | |
| Figure 15. Damaged hillside phosgene hose removed from phosgene cylinder. The plastic adhesive tag | |
| that covered the damaged section fell off during the hose decontamination procedure. | |
| .................... 67 | |
| Figure 16. Flex hose comparison photographs: (top to bottom) ruptured riverside hose, flow restricted | |
| hillside hose, a new hose with attached ID tag | |
| ................................................................................... 72 | |
| Figure 17. Hierarchy of Controls | |
| ................................................................................................................ 93 | |
| Figure 18. The hose and piping system that supplied phosgene for the release | |
| ....................................... 123 | |
| Figure 19. ALOHA estimate of phosgene concentrations with MARPLOT GIS overlay | |
| ........................ 128 | |
| List of Tables | |
| Table 1. Previous rupture disc events in the F3455 unit | |
| ............................................................................. 34 | |
| Table 2. Phosgene hose change-out frequency | |
| ........................................................................................... 65 | |
| Table 3. Flexible hoses for phosgene service as listed in the DuPont P3H Standard: Flexible Chemical | |
| Hose for Highly Toxic Services | |
| .......................................................................................................... 69 | |
| Table 4. Preliminary Risk Assessment by DuPont Engineering, 1988 (Appendix E) | |
| ................................ 76 | |
| Table 5. PHA enclosure recommendation delays timeline | |
| ......................................................................... 78 | |
| v | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Table 6. Sum of Belle plant retirements and new hires from 2005 to 2009 | |
| ................................................ 92 | |
| Table 7. DuPont Belle RMP-covered chemicals and threshold quantities | |
| ............................................... 102 | |
| vi | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| List of Acronyms and Abbreviations | |
| ACC | |
| American Chemistry Council | |
| ACGIH | |
| American Conference of Governmental Industrial Hygienists | |
| AIHA | |
| American Industrial Hygiene Association | |
| ALOHA | |
| Area Locations of Hazardous Atmospheres | |
| CERCLA | |
| Comprehensive Environmental Response, Compensation, and Liability Act | |
| CFR | |
| Cl2 | |
| Code of Federal Regulations | |
| chlorine | |
| CMMS | |
| Computerized Maintenance Management System | |
| CO | |
| CSB | |
| DCS | |
| DMA | |
| DMS | |
| ECF | |
| EMS | |
| FRC | |
| EPA | |
| GIS | |
| HCl | |
| HTM | |
| IDLH | |
| carbon monoxide | |
| U.S. Chemical Safety and Hazard Investigation Board | |
| distributed control system | |
| dimethylamine | |
| dimethylsulfate | |
| ethyl chloroformate | |
| emergency medical services | |
| flame-resistant clothing | |
| U.S. Environmental Protection Agency | |
| Graphical Information System | |
| hydrochloric acid | |
| Highly Toxic Materials | |
| immediately dangerous to life and health | |
| KCEAA | |
| Kanawha County Emergency Ambulance Authority | |
| KPEPC | |
| LDAR | |
| MIC | |
| MM | |
| MOC | |
| NDE | |
| NIMS | |
| NIOSH | |
| NOAA | |
| NPS | |
| Kanawha-Putnam County Emergency Planning Committee | |
| Leak Detection and Repair | |
| methyl isocyanate | |
| million (old notation style) | |
| Management of Change | |
| non-destructive examination | |
| National Incident Management System | |
| National Institute for Occupational Safety and Health | |
| National Oceanic and Atmospheric Administration | |
| nominal pipe size | |
| vii | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| OSHA | |
| U.S. Department of Labor, Occupational Safety and Health Administration | |
| OTPT | |
| Oleum Tower Pump Tank | |
| PEL | |
| PHA | |
| PM | |
| ppm | |
| psig | |
| PSSR | |
| PSM | |
| PTFE | |
| Permissible Exposure Limit | |
| Process Hazard Analysis | |
| Preventive Maintenance | |
| parts per million | |
| pound-force per square inch gauge | |
| pre-startup safety review | |
| OSHA Process Safety Management Standard (29 CFR 1910.119) | |
| polytetrafluoroethylene | |
| RCRA | |
| Resource Conservation and Recovery Act | |
| RMP | |
| RQ | |
| SAP | |
| SAR | |
| Risk Management Plan | |
| reportable quantity | |
| System Application & Products | |
| Spent Acid Recovery Unit | |
| SCBA | |
| self-contained breathing apparatus | |
| SLM | |
| SOPs | |
| TQ | |
| TWA | |
| VOC | |
| Small Lots Manufacturing Unit | |
| Standard Operating Procedures | |
| threshold quantity | |
| time-weighted average | |
| volatile organic compounds | |
| viii | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Executive Summary | |
| On January 22 and 23, 2010, three separate incidents at the DuPont plant in Belle, WV, involving releases | |
| of methyl chloride, oleum, and phosgene, triggered notification of outside emergency response agencies. | |
| The incident involving the release of phosgene gas led to the fatal exposure of a worker performing | |
| routine duties in an area where phosgene cylinders were stored and used. | |
| Operators discovered the first incident, the release of methyl chloride, the morning of January 22, 2010, | |
| when an alarm sounded on the plant’s distributed control system monitor. They confirmed that a release | |
| had occurred and that methyl chloride was venting to the atmosphere. Managers assessing the release | |
| estimated that more than 2,000 pounds of methyl chloride may have been released over the preceding 5 | |
| days. | |
| The oleum release, the second incident, occurred the morning of January 23, 2010. Workers discovered a | |
| leak in an overhead oleum sample pipe that was allowing a fuming cloud of oleum to escape to the | |
| atmosphere. The plant fire brigade, after donning the appropriate personal protective equipment, closed a | |
| valve that stopped the leak about an hour after it was discovered. No injuries occurred, but the plant called | |
| the Belle Volunteer Fire Department to assist. | |
| The third incident, a phosgene release, occurred later that same day when a hose used to transfer | |
| phosgene from a 1-ton cylinder to a process catastrophically failed and sprayed a worker in the face while | |
| he was checking the weight of the cylinder. The employee, who was alone when exposed, was assisted by | |
| co-workers who immediately responded to his call for help. Initial assessments by the plant’s | |
| occupational health nurse indicated that the worker showed no symptoms of exposure prior to transport to | |
| the hospital for observation and treatment. A delayed onset of symptoms, consistent with information in | |
| phosgene exposure literature, occurred after he arrived at the hospital. His condition deteriorated over the | |
| next day and he died from his exposure the next night. | |
| 9 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| At the request of the Board, the U.S. Chemical Safety and Hazard Investigation Board (CSB) | |
| investigation team examined all three incidents at Belle due to the severity and potential for even greater | |
| consequences and to understand how and why they could occur at a DuPont facility. DuPont is regarded | |
| as an industry leader in the advancement of health and safety practices and develops sound, respected, and | |
| widely used safe practice guidance. With such a reputation, the CSB was interested in examining the | |
| conditions at the Belle facility that led to a decline in adherence to the higher standard of performance that | |
| the corporation historically held. | |
| The CSB incident investigation determined root and contributing causes for each of the three incidents. | |
| An overall analysis revealed common deficiencies in the following management systems: | |
| • Maintenance and inspections | |
| • Alarm recognition and management | |
| • | |
| Incident investigation | |
| • Emergency response and communications | |
| • Hazard recognition | |
| The CSB found that each incident was preceded by an event or multiple events that triggered internal | |
| incident investigations by DuPont, which investigated all of these precursor events and issued | |
| recommendations and corrective actions. Despite investigating these preceding events, the | |
| recommendations and corrective actions did not prevent the occurrence of similar events. | |
| Because of recent changes to the Kanawha County Metro 9-1-1 response policies and procedures that | |
| could lead to delays in treatment for future incidents, the CSB investigators also examined concerns | |
| raised by the emergency response organizations. These concerns included the timeliness and quality of | |
| 10 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| information provided to dispatchers and EMS personnel who responded to two of the incidents and which | |
| mirrors issues identified in the CSB Bayer CropScience August 2008 incident investigation. 1 | |
| The CSB identified the following root causes: | |
| Methyl Chloride Incident (January 22, 2010, 5:02 a.m.) | |
| • DuPont management, following their Management of Change process, approved a design for the | |
| rupture disc alarm system that lacked sufficient reliability to advise operators of a flammable | |
| methyl chloride release. | |
| Oleum Release Incident (January 23, 2010, 7:40 a.m.) | |
| • Corrosion under the insulation caused a small leak in the oleum pipe. | |
| Phosgene Incident (January 23, 2010, 1:45 p.m.) | |
| • DuPont’s phosgene hazard awareness program was deficient in ensuring that operating personnel | |
| were aware of the hazards associated with trapped liquid phosgene in transfer hoses. | |
| • DuPont relied on a maintenance software program that was subject to changes without | |
| authorization or review, did not automatically initiate a change-out of phosgene hoses at the | |
| prescribed interval, and did not provide a back-up process to ensure timely change-out of hoses. | |
| • DuPont Belle’s near-miss reporting process was not rigorous enough to ensure that the near | |
| failure of a similar phosgene transfer hose, just hours prior to the exposure incident, would be | |
| immediately brought to the attention of plant supervisors and managers. | |
| • DuPont lacked a dedicated radio/telephone system and emergency notification process to convey | |
| the nature of an emergency at the Belle plant, thereby restricting the ability of personnel to | |
| provide timely and quality information to emergency responders. | |
| 1 CSB-2008-I-WV (Bayer CropScience). | |
| 11 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| The CSB makes recommendations to | |
| • Occupational Safety and Health Administration (OSHA) | |
| • DuPont Belle, WV, plant | |
| • E.I. DuPont de Nemours & Co., Inc. | |
| • Compressed Gas Association of America (CGA) | |
| • American Chemistry Council (ACC) Phosgene Panel | |
| 12 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 1.0 | |
| Introduction | |
| 1.1 Background | |
| At 5:02 a.m. on Friday, January 22, 2010, a release of methyl chloride activated an alarm in the F3455 | |
| unit control room, signaling the first of three incidents that would occur over the next 33 hours at the | |
| DuPont Belle, WV, facility. No injuries were associated with this incident, but the release went | |
| undetected for as long as 5 days. DuPont estimates that more than 2,000 pounds of methyl chloride | |
| released to the atmosphere. | |
| At 7:40 a.m. on Saturday, January 23, 2010, a contractor reported seeing a fuming plume on a 1-inch | |
| diameter sample pipe in the Spent Acid Recovery (SAR) unit. Operations personnel confirmed that oleum | |
| was leaking; thus, a fume alert was activated for the entire Belle plant. Plant fire brigade members | |
| responded to the release and closed valves that stopped the leak at about 8:09 a.m., after which the “all | |
| clear” was sounded. | |
| The third incident occurred just 6 hours later. At approximately 1:45 p.m., an operator walked into the | |
| phosgene cylinder storage area in the Small Lots Manufacturing (SLM) unit and was sprayed in the face | |
| and upper torso with phosgene when a flexible hose suddenly ruptured. The worker called for assistance | |
| and coworkers immediately went to his aid. His personal dosimeter indicated that he had been exposed to | |
| a significant dose of phosgene; however, he did not exhibit immediate signs of breathing problems. About | |
| 3 hours after arriving at the hospital his condition deteriorated, and he died the following night. | |
| No injuries occurred as a result of the first two releases, but communication to Metro 9-1-1 dispatchers | |
| regarding the nature of each release on Saturday became an issue post-incident. The CSB investigators | |
| examined how information related to the incidents was conveyed to Metro 9-1-1 dispatchers. The CSB | |
| also interviewed Kanawha County Ambulance Authority (KCEAA), Kanawha-Putnam Emergency | |
| Planning Committee (KPEPC), and Metro 9-1-1 representatives to assess each incident and determine if | |
| 13 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| actions could be taken to improve communication methods to prevent recurrence of the issues brought to | |
| the attention of county officials. During the Saturday afternoon call for assistance from DuPont, Metro 9- | |
| 1-1 dispatchers were not provided with sufficient information regarding the nature of the emergency and | |
| the chemicals involved to adequately inform responding EMS personnel. Many of those interviewed were | |
| familiar with the role of the CSB, having participated in conferences and interviews as part of the CSB | |
| investigation of the August 2008 Bayer CropScience incident. | |
| Due to recurring communication problems associated with emergency responses to chemical plants in the | |
| Kanawha Valley, responding medical units established a practice of waiting before going onto a property | |
| that called for assistance. EMS personnel respond to a staging area as far as a mile away where they | |
| remain until they receive more detailed information about the material involved and whether the victim | |
| has been, or will need to be, decontaminated prior to transport to a hospital. Emergency response | |
| organizations developed this practice as EMS personnel were receiving information that was sometimes | |
| so imprecise that they could not ensure that they or their equipment would not be contaminated by a | |
| hazardous chemical as a result of transporting an exposed victim. | |
| In examining the activities of employees involved in the response, the CSB learned that two other DuPont | |
| employees were also possibly exposed to phosgene. One worker, after he transported the victim part of | |
| the way to the plant medical center in a company truck, noticed that his dosimeter was discolored, | |
| indicating exposure. The second exposure occurred when a worker, unaware of the phosgene release, | |
| went into the area of the phosgene shed and noticed an odor that he had never smelled before. Unsure of | |
| what the odor was, he left the area and joined his co-workers in the control room. | |
| 1.2 | |
| Investigative Process | |
| Via the media and the National Response Center (NRC), the CSB monitored and tracked information | |
| related to the chemical release incidents at the DuPont Belle, WV, facility throughout the weekend of | |
| January 22 and 23, 2010. On January 25, 2010, the CSB Board deployed an investigation team. Because | |
| 14 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| of the number and potential for more severe consequences at the DuPont Belle plant over this 2-day | |
| period, the CSB launched an investigation to determine the root and contributing causes, which it would | |
| use to issue recommendations to help prevent similar occurrences. Although the consequences of the first | |
| two incidents were not as severe as the third, the CSB decided that since the three incidents occurred in | |
| less than 2 days, including one that led to a fatality, all three would be investigated to determine any | |
| common causes. | |
| The investigative team arrived at the Belle Plant on January 26, 2010, and met with Occupational Safety | |
| and Health Administration (OSHA) inspectors; U.S. Environmental Protection Agency (EPA) officials; | |
| and DuPont representatives to explain the CSB’s authority and purpose for conducting the investigation. | |
| The CSB investigation team remained onsite for 2 weeks and subsequently visited Belle to conduct | |
| independent investigations of each of the three DuPont Belle, WV, facility incidents. During its | |
| investigations, CSB investigators | |
| • | |
| • | |
| • | |
| • | |
| interviewed plant personnel, emergency responders, plant supervisors and managers, and | |
| corporate personnel; | |
| coordinated the examination, removal, and storage of physical evidence; | |
| requested and reviewed relevant documentation; | |
| reviewed technical and industry guidance, standards, and regulations; | |
| • discussed emergency response issues with the KPEPC, KCEAA, and Metro 9-1-1 dispatch center | |
| officials; | |
| • | |
| entered into joint testing protocol agreements with DuPont, OSHA, and the EPA; | |
| • observed metallurgical testing of the oleum sample line and the phosgene stainless steel overbraid | |
| hose; and | |
| • observed analytical testing and analysis of the polytetrafluoroethylene (PTFE) transfer hoses | |
| involved in the phosgene release. | |
| 15 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 1.3 E.I. DuPont de Nemours & Co., Inc. | |
| 1.3.1 | |
| Company History | |
| E.I. DuPont de Nemours and Co, named after its French founder, Eleuthère Irénée du Pont, was | |
| established in 1802 as a gunpowder manufacturing company on the Brandywine River in Wilmington, | |
| DE. DuPont grew as a manufacturer of gunpowder and explosives in the United States and in 1902 | |
| transitioned into a science-based chemical company. DuPont established Experimental Station, the first | |
| industrial laboratory where researchers and scientists began work on nitrocellulose chemistry and | |
| smokeless powders to improve military rifles for the World War I effort. By the 1920s, DuPont purchased | |
| several chemical companies and focused on polymers, which led to the discovery of neoprene (synthetic | |
| rubbers), polyester, and nylon by 1935. Many of these products were in demand during the Second World | |
| War. Further work with plastics and fibers led to the development of Teflon™, Lucite™, Nomex™, and | |
| Mylar™ in the 1950s. DuPont also introduced a number of inorganic insecticides and fungicides such as | |
| Lannate® (methomyl) and Telvar®, which eventually led to the establishment of its agricultural products | |
| business. By the mid-1980s, DuPont had grown to almost 100 major businesses selling a wide range of | |
| materials such as textiles, agricultural chemicals, petroleum, and biomedical products. | |
| 1.3.2 | |
| DuPont Business Areas and Corporate Management | |
| DuPont, headquartered in Wilmington, DE, has 58,000 employees in more than 80 countries. The | |
| company offers a broad range of products for industry and consumer use, including pesticides, | |
| electronics, apparel, and biomedical supplies. Five business platforms comprise the DuPont organization: | |
| Agriculture and Nutrition, Coatings and Color Technologies, Performance Materials, Electronics and | |
| 16 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Communications, and Safety and Protection. Within each business platform are strategic business areas2 | |
| focusing on the production, sale, and distribution of products and services related to each marketing area. | |
| The Crop Protection business area, a segment of the Agriculture and Nutrition platform, is responsible for | |
| the development, manufacture, and sale of fungicides, herbicides, insecticides, and seed treatments | |
| globally. The agriculture industry uses DuPont Crop Protection products on a variety of crops worldwide | |
| including cotton, soybeans, fruits, and vegetables. The F3455 and SLM units at the Belle Plant | |
| manufacture intermediate chemicals for their Crop Protection products. In 2009, the Agriculture and | |
| Nutrition platform had the most sales of any business area at $8.3 billion. | |
| A 13-member Board of Directors, including the chairperson and CEO, manage DuPont. Executive | |
| committees made up of board members and representatives from DuPont businesses oversee areas such as | |
| environmental policy, corporate governance, strategic direction, and auditing. In 2010, DuPont had global | |
| sales of $31.5 billion and ranked as the third-largest chemical company in profits and second in revenues | |
| in the world. | |
| 1.3.3 | |
| Safety at DuPont | |
| Concern for safety and health at DuPont became a part of the company’s structure in 1805 due to the | |
| hazards of producing gunpowder and explosives. The early corporate safety program was rooted in | |
| process safety concepts more than a century before governing safety regulations existed. Practices such as | |
| safe siting of buildings, explosion venting concepts, incident investigation processes, and emergency | |
| response were implemented in the DuPont gunpowder mills throughout the 19th century. | |
| 2 Pioneer Hy-bred, Crop Protection, Nutrition and Health, Electronics and Communications, Performance Coatings, | |
| Performance Polymers, Protection Technologies, Building Innovations, Sustainable Solutions, Chemicals and | |
| Fluoroproducts, Titanium Technologies, and Applied Biosciences. | |
| 17 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| The company continued to focus on health and safety to improve safety performance and in 1915 created | |
| its first corporate safety division, which was responsible for technical training, safety inspections, project | |
| design reviews, and the purchase of safety equipment. According to DuPont incident records, the safety | |
| division participation in facility operations decreased incident rates throughout the company. As a result, | |
| individual sites established site-specific safety groups in the mid-1930s. Hazard elimination was | |
| recognized as a priority above education and personal protection (Klein, 2009). | |
| 1.3.3.1 Early Process Safety Program | |
| The release of highly toxic methyl isocyanate (MIC) at the Union Carbide Corp. in Bhopal, India, resulted | |
| in nearly 3,800 immediate deaths, and 16,000 are estimated to have since died as a result of exposure, | |
| while more than 100,000 still report associated illnesses. In response to the Union Carbide incident, | |
| chemical companies, industry associations, and government agencies directed efforts to decrease process | |
| safety risks, which eventually led to the establishment of the OSHA Process Safety Management (PSM) | |
| Standard (29 CFR 1910.119), EPA Chemical Accident Prevention Program, and the creation of the CSB | |
| as part of the Clean Air Act amendment of 1990. | |
| Prior to establishing the OSHA PSM Standard, DuPont was practicing many process safety concepts at its | |
| facilities as part of the DuPont Process Hazards Management (PHM) Program. After a 1965 incident in | |
| Louisville, KY, killed 12, the company directed all sites to perform hazard reviews to evaluate the safety | |
| of site processes, which eventually became a corporate Process Hazards Review (PHR) program. The | |
| PHR was intended to prevent serious process-related incidents, and each site handling hazardous | |
| substances had to have a PHM program. | |
| The Bhopal incident contributed to an increase in DuPont’s focus on PHM, particularly in the | |
| manufacture of MIC. DuPont developed an inherently safer method of manufacturing and handling MIC | |
| that eliminated MIC bulk storage, as it relied on producing and directly consuming MIC. The company | |
| also created the Highly Toxic Materials (HTM) Subcommittee to review the global management of toxic | |
| 18 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| chemicals. In 1985, HTM became a corporate guideline, and a separate subcommittee was established to | |
| focus on each of the 15 highly hazardous materials identified within the company. DuPont continued to | |
| refine its PHM program, eventually developing professional guidance for process safety and OSHA PSM | |
| rulemaking (Mottle et al., 1995). | |
| 1.3.3.2 | |
| “Zero Incidents” Goal | |
| DuPont introduced the “zero incidents” goal in the early 1900s as a management directive to drive injury | |
| rates down to zero through continuous improvement of safety practices. The “zero” concept became a | |
| core strategy as the company grew and embraced the philosophy that all injuries, occupational illnesses, | |
| and environmental incidents are preventable and that the goal for all is zero. | |
| DuPont became recognized throughout industry as a safety innovator and leader. The company offers | |
| services as a safety resource for other corporations to evaluate and improve workplace safety, which | |
| include methodologies and technical training to manage and improve employee and contractor health and | |
| safety performance as well as process safety improvements. | |
| 19 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 1.4 DuPont Belle Plant | |
| Figure 1. DuPont Belle, WV, facility on the Kanawha River (EPA, 1973) | |
| The DuPont Belle plant is located in Belle, WV, about 8 miles east of Charleston, the state capital . The | |
| plant occupies about 723 acres along the Kanawha River and sits in an industrial, commercial, and | |
| residential use area. The plant was established in the West Virginia coal country as part of a post-World | |
| War I effort to produce ammonia. In the early 1920s DuPont spent $27 million3 | |
| on a highly complex | |
| production facility with atmospheric compressors capable of producing 25 tons of ammonia per day. | |
| Belle’s high-pressure ammonia technology yielded a host of collateral benefits. Methanol was initially | |
| manufactured on a small scale and then rapidly expanded to 1 million gallons a year. By 1935, Belle had | |
| 3 Equivalent to $332 million in 2010, according to the Bureau of Labor Statistics Inflation Calculator. | |
| 20 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| become DuPont's largest facility with more than 80 different chemical products, which included the first | |
| synthetic urea used in fertilizers and plastics. In 1939, DuPont began producing nylon chemical | |
| intermediates at Belle, and by 1944 the plant was producing 30 million pounds of synthetic polymers per | |
| year. Expansion of nitrogen and nylon intermediate production at Belle continued after the war, and | |
| product lines were introduced regularly. In 1969 Belle began producing the fungicide Benlate®. Currently, | |
| the DuPont Belle plant produces a variety of organic chemicals and agricultural intermediates and | |
| products. According to company documents, the plant had the best safety record of any DuPont | |
| production facility prior to the incidents of January 22 and 23.4 | |
| In January 2010, the DuPont Belle plant employed approximately 440 and had seven primary operating | |
| divisions occupying a 105-acre manufacturing area nearly 1 mile long. The DuPont-operated SAR unit | |
| was owned by Lucite International and operated by DuPont employees. The Belle facility is also the site | |
| of the newly constructed Kureha unit, owned by the Kureha Corp. of Japan, which is operated by Kureha | |
| employees on DuPont’s Belle site. The Kureha production unit uses glycolic acid produced by DuPont as | |
| a feedstock for polyglycolic acid, a specialty plastic. | |
| The DuPont Belle plant holds a Resource Conservation and Recovery Act (RCRA) Part B Treatment and | |
| Storage Permit for onsite handling of waste materials, in addition to a RCRA-permitted drum storage | |
| facility onsite. The Belle plant participates in a Community Action Council (CAC), comprised of citizens | |
| from neighboring communities and representatives from the industrial facilities in the region,5 | |
| that aims | |
| to address citizen concerns regarding site safety, health, and environmental performance. | |
| 4 www.2.dupont.com/heritage. | |
| 5 DuPont Belle Plant Information Sheet. | |
| 21 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 2.0 Methyl Chloride Release (January 22, 2010) | |
| 2.1 Background | |
| The Belle plant’s F3455 unit manufactures the intermediate F3455, a chemical that is shipped to another | |
| DuPont facility to make the herbicide Velpar®. Due to the exothermic reaction in the first reactor, | |
| dissolved methyl chloride vaporizes and normally exits through the reactor vent line along with carbon | |
| dioxide, nitrogen, and trace amounts of dimethylamine (DMA) vapor through a process scrubber and then | |
| to a thermal oxidizer for emission control. To avoid damage to the scrubber6 | |
| if excessive pressures occur, | |
| a piping connection upstream of the vent line is routed to a rupture disc that will burst and allow venting | |
| outside on the roof of the building which contains two reactors ( | |
| Figure 2 | |
| ). However, due to a lack of | |
| safety considerations during installation, a 0.5-inch weep hole7 | |
| was placed on the vent line inside the | |
| building; consequently, dangerous chemicals vent inside the building if the rupture disk bursts. | |
| Unaware that the rupture disc had blown during a nitrogen purge activity before the reactor startup, plant | |
| personnel proceeded with the normal production run. For nearly 5 days, methyl chloride vapor passed | |
| through the blown rupture disc and escaped into the operation building and outside atmosphere. On the | |
| fifth day, the methyl chloride vapors interfered with the chemical sensor configured to detect ethyl | |
| chloroformate (ECF), which alerted the workers. | |
| 6 A thermal oxidizer is a process unit for air pollution control in many chemical plants that decomposes hazardous | |
| gases at a high temperature and releases them into the atmosphere. | |
| 7 In process vent lines that lead to the atmosphere, protection must be installed to prevent ambient moisture -- from | |
| rain or other elements -- from collecting within the vent line. One such protection is a “weep hole,” a small hole | |
| drilled into a vent line that allows drainage. | |
| 22 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Figure 2. Simplified thermal oxidizer and rupture disc block flow diagram | |
| 2.1.1 Methyl Chloride | |
| Methyl chloride, also called chloromethane or monochloromethane, is a colorless gas with a faint sweet | |
| odor at low concentrations.8 The odor may not be noticeable and cannot be relied upon as warning of | |
| concentrations that are dangerous to health.9 | |
| Methyl chloride is extremely flammable; has a potent | |
| 8 The odor threshold, or concentration, of methyl chloride detectible by most humans varies between 10 and 250 | |
| ppm. | |
| 9http://www.oxy.com/Our_Businesses/chemicals/Documents/methyl_chloride/Methyl%20Chloride%20Handbook | |
| .pdf.(11/2009) | |
| 23 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| narcotic effect similar to trichloromethane, also known as chloroform; and is listed as a Group 3 | |
| carcinogen10 | |
| by the International Agency for Research on Cancer (IARC). The OSHA 8-hour time- | |
| weighted average (TWA) concentration is 100 ppm and the National Institute of Occupational Safety and | |
| Health (NIOSH)-designated Immediately Dangerous to Life and Health (IDLH) concentration is 2,000 | |
| ppm. | |
| Symptoms of methyl chloride exposure include dizziness, confusion, and nausea, and at higher | |
| concentrations, extreme nervousness, trembling, and possible loss of consciousness. High concentrations | |
| or long exposure can be fatal. The gas is also heavier than air and therefore settles close to the ground. | |
| 2.2 | |
| Incident Description | |
| The F3455 process was in the first series of batch runs following an extended maintenance outage from | |
| September 12, 2009, through January 17, 2010. The release is thought to have initiated on January 17 | |
| during the first batch run in the unit and continued until discovered on January 22; the release rate may | |
| have been sporadic throughout this period. | |
| On January 22, 2010, an air monitor alarm on the process control monitor alerted plant operating | |
| personnel of a chemical release while they were adding DMA11 | |
| to the reactor. The sensor for this alarm, | |
| located on the third floor of the F3455 building, is calibrated to activate when it detects ECF at 0.5 ppm. | |
| The methyl chloride vapors interfered with the ECF sensors on the third floor and activated the alarm. | |
| The distributed control system (DCS) recorded the alarm at 5:02 a.m., and responding operators saw a | |
| diffused fog and a liquid puddle near a 0.5-inch nominal pipe size (NPS) vent/drain pipe referred to as a | |
| 10 Substances the IARC lists as Group 3 carcinogens are mixtures or agents for which evidence of carcinogenicity in | |
| humans is inadequate and limited in experimental animals. | |
| 11 DMA is a toxic and extremely flammable, colorless product with a fishy or ammonia-like odor. DMA attacks the | |
| respiratory system and irritates eyes and skin and at higher concentrations can cause pulmonary edema. The | |
| OSHA 8-hour TWA is 10 ppm and the NIOSH IDLH is 500 ppm. Humans can detect DMA odors at 0.34 ppm | |
| (Sittig, 2008). DMA is a heavier than air vapor and settles close the ground | |
| 24 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| weep hole (Figure 3). This connection was associated with a thermal oxidizer “vent stack,” that vents to | |
| the atmosphere on the roof of the building during a process upset. Operators notified the board operator at | |
| 5:19 a.m. when they found the source of the release. | |
| Figure 3. 0.5-inch NPS vent/drain pipe and rupture disc | |
| 2.2.1 | |
| ECF Sensor Alarm | |
| The ECF sensor was detecting chlorine, not ECF. The ECF sensor is responsive to chemicals composed | |
| of chlorine (i.e. ethyl-chloroformate [ECF] and methyl-chloride); consequently, on the fifth day, the | |
| chlorides in the release were of sufficient concentration near the ECF sensor to activate the alarm. | |
| 2.2.2 | |
| Odor Detection Considerations | |
| The methyl chloride, DMA, and hydrochloric acid (HCl) mixture is extremely odorous; however, due to | |
| the nature of the F3455 process, operating personnel would have had to be in the area of the 0.5-inch | |
| weep hole at the time of the release to see or smell the leak. | |
| Methyl chloride liberated during this phase of the reaction would have likely taken the normal route to the | |
| thermal oxidizer piping, where it would have been consumed and vented to the atmosphere unnoticed. | |
| 25 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| The vent releases products of the reaction into the room if a rupture disc is blown and if the pressure | |
| inside the pipe is greater than the pressure in the room. | |
| The rupture disc piping was routed to the atmosphere above the roof of the building, which would have | |
| provided an outlet path for the methyl chloride vapor where it would have dissipated and dispersed | |
| without notice. | |
| The day before the leak was discovered, a crew performed a leak detection and repair (LDAR)12 | |
| inspection on the third floor of the building near the location of the release. The volatile organic | |
| compounds (VOC) electronic monitor was calibrated to detect methyl chloride, ECF, DMA, and | |
| methanol. Although an area within 12 inches of the weep hole was checked for leaks with the monitor, it | |
| did not detect any VOCs. | |
| 2.2.3 | |
| Incident Response | |
| In response to the ECF alarm, operators using a VOC analyzer to search for the source of the vapor | |
| immediately smelled an offensive odor on the third floor. They saw steam-like fumes near the vent pipe | |
| and dripping liquid puddling on the floor, both clear indications that the rupture disc had burst (Figure 4). | |
| They left the process area, closed all valves leading to the vent line, and cooled the reactors to stop the | |
| process. At about 9:30 a.m., maintenance mechanics replaced the rupture disc and burst sensor. | |
| After receiving confirmation of the release, the board operator notified the process supervisor who then | |
| calculated the estimated duration and magnitude of the release. After performing these calculations, the | |
| supervisor notified the plant manager, the Safety Health and Environmental (SHE) manager, the area | |
| manager, and the unit technology leader and told them that the release may have been ongoing for the | |
| 12 The Clean Air Act requires refineries and chemical plants to develop and implement an LDAR program to control | |
| fugitive emissions, which occur from leaks in valves, pumps, compressors, pressure relief valves, flanges, | |
| connectors, and other piping components. | |
| 26 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| entire run of nine batches, which occurred over 5 days. DuPont estimated that approximately 2,00013 | |
| pounds of methyl chloride were likely released to the atmosphere. | |
| During the initial phases of the DuPont incident investigation, employees discovered that the burst sensor | |
| on the rupture disc had started alarming 5 days prior to the incident. Due to its history of unreliability, | |
| operators likely became desensitized to this alarm. The burst sensor was the first in this sequence of | |
| incidents that led to a safety pause | |
| 14 | |
| at the plant. | |
| 13 DuPont, in its final investigation report, determined that 2,045 pounds of methyl chloride and 25 pounds of HCl | |
| released to the atmosphere as a result of this incident. | |
| 14 A safety pause is a structured work stoppage that the plant manager initiates to engage the entire workforce with | |
| the objectives of increasing awareness of hazards, providing safety education, and addressing past incidents. A | |
| safety pause was initiated at the Belle facility on Saturday, January 23, 2010, because of the incidents at the | |
| F3455 and SAR units. | |
| 27 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Figure 4. Rupture disc piping and vent pipeline to atmosphere on roof | |
| 28 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Once DuPont determined that the release quantity exceeded the Comprehensive Environmental Response, | |
| Compensation and Liability Act (CERCLA) reportable quantity (RQ) of 100 pounds,15 | |
| in compliance | |
| with CERCLA of 1980 it reported the release of methyl chloride to the NRC and to the West Virginia | |
| State Department of Homeland Security Emergency Operations Center, which notified the U.S. Coast | |
| Guard. Kanawha County Metro 9-1-1 was not informed of the release until 2:00 p.m. on January 22, | |
| 2010, 9 hours after discovery. | |
| 2.2.4 | |
| Community Impact | |
| DuPont estimated that between January 17 and 22, 2010, 2,045 pounds of methyl chloride; 25 pounds of | |
| hydrogen chloride; and trace amounts of DMA released to the atmosphere through a vent line on the roof | |
| of the F3455 building. No monitoring information was available to determine the concentrations of | |
| chemicals released to the atmosphere through the vent line. If monitoring information had been | |
| recorded, a more accurate estimate of chemical concentration would have provided data about when the | |
| release started and the potential for offsite impact. No workers at the facility reported symptoms from | |
| methyl chloride or any of the other toxic chemicals either during or after the release. DuPont did not | |
| receive any odor complaints from the community. | |
| 2.3 | |
| Incident Analysis | |
| 2.3.1 Mechanical Integrity | |
| Rupture discs are overpressure protection devices used in processes operating above ambient pressure and | |
| are intended to prevent equipment damage, including catastrophic failure. Without them, a process upset | |
| can cause unsafe pressure levels and an overpressure incident. Since these devices activate only when a | |
| system has had an overpressure event, it is imperative that their activation be discovered. In this | |
| 15 Under CERCLA, operators of facilities and vessels are required to immediately report releases to the NRC above | |
| the EPA RQ. | |
| 29 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| application, the rupture disc releases hazardous chemicals to the atmosphere. One approach to help with | |
| early detection is to evaluate the alarm management process and, where appropriate, adjust process | |
| parameters so that an alarm will activate prior to the disc actually bursting. Another is to evaluate the | |
| process and eliminate the conditions that increase the pressure that cause the disc to burst. Regardless, | |
| once systems have been selected, the configuration should be reviewed by a team, including process | |
| engineers, control engineers, and operations managers (Lees, 2005). | |
| Figure 5. Rupture disc burst sensor post-incident | |
| DuPont Belle used a “burst sensor” intended to notify the board operator that the rupture disk (Figure 5) | |
| activated. A burst sensor is a thin plastic membrane with embedded wires installed on top of the rupture | |
| disc. Small electrical current passes through the wires. When the rupture disc activates, the membrane and | |
| embedded wires break, triggering the alarm. | |
| The CSB learned that the rupture discs and sensors associated with this system were historically | |
| problematic. The burst sensor involved in the January 22, 2010, incident had been replaced many times | |
| 30 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| because it was unreliable. Initially the sensor was battery-operated, sending signals to a remote receiver in | |
| the control room rather than to the process control monitor. However, the battery life was short; | |
| consequently, operators received frequent false, or “nuisance,” alarms. According to Management of | |
| Change (MOC) documentation, “the burst sensor [was] in and out of alarm every 3 minutes” and required | |
| replacements almost monthly. When its batteries failed, the transmitter sent an alarm to the remote | |
| receiver to notify the operators. The receiver displayed the same alarm text as when the sensor detected a | |
| burst rupture disc. Because the batteries needed frequent replacing and because the operators had to wait | |
| for an electrician to change the batteries, the false alarms became a nuisance. | |
| Battery life, however, was not the only reported shortcoming of burst sensors. Operators told the CSB | |
| investigators that burst sensors were so delicate that they could sometimes tear during installation and that | |
| liquid condensation on top of the sensors sometimes caused them to fail and trigger a false alarm. | |
| An improved burst sensor was installed on the DCS while the unit was down for maintenance just before | |
| the incident. Operators indicated they were not retrained to respond to the more reliable burst sensor | |
| alarm and still considered it a nuisance. | |
| 2.3.2 | |
| Design and Maintenance of Rupture Discs | |
| The rupture disc involved in the incident was a 4-inch diameter graphite rupture disc, designed to rupture | |
| at 15 psig, and mounted in neoprene casing (Figure 6). While the rupture disc is on a preventive | |
| maintenance (PM) schedule, the annual inspection was so infrequent that the disc is replaced only when it | |
| has activated or is removed for certain processes. Operators told the CSB investigators that once removed, | |
| the rupture discs, intact or compromised, are discarded and replaced with new ones. Even without a burst | |
| 31 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| sensor, all overpressure protection devices, including rupture discs, should be routinely checked on an | |
| effective PM schedule as a layer of protection.16 | |
| Figure 6. New rupture disc | |
| 2.3.3 | |
| Previous Incidents of Rupture Discs Bursting | |
| From 2005 to 2010, the rupture disc on the F3455 unit vent line experienced nine recorded activations | |
| (Table 1). On April 11, 2006, the rupture disc activated three times. DuPont determined that the disc was | |
| most likely experiencing thermal or hydraulic shock. Thermal shock would occur from boiling reactor | |
| 16 BS&B Safety Systems, Inc, Special Applications and Preventive Maintenance, Catalog 77-1007, Section B. | |
| 32 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| vapor mixing with cool liquid on the disc due to its close proximity to the reactor; hydraulic shock would | |
| occur from any “sloshing” in the line upstream of the disc. This recurring problem was remedied by | |
| moving the rupture disc farther away from these units and eventually to the third floor toward the extreme | |
| end of the vent line. | |
| On May 6, 2006, a rupture disc activation at the same facility went unnoticed for 48 hours, which | |
| illustrates how the January 22, 2010, release could have gone undetected for 5 days. In the May incident, | |
| although operators complained about strong odors in the F3455 building, the rupture disc was never | |
| considered as the source; indeed, operators and supervisory staff identified multiple locations where | |
| fugitive emissions could have produced the offensive smell. Eventually, when a new batch of F3455 was | |
| started, an operator near the vent line saw the rupture disc fuming, indicating that it was the odor source. | |
| At the Belle facility, pipe blockage at the unit was the most commonly reported cause of premature | |
| rupture disc activation (Table 1). The F3455 process creates various solids in the vent and process lines, | |
| which eventually block flow, increasing the pressure in the system. Once the blockage is melted by the | |
| process temperature or forced through the line due to the increased pressure, the resulting pressure spike | |
| activates the rupture disc. | |
| 33 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Previous Rupture Disc Incidents | |
| Date | |
| Cause | |
| 05/20/05 Unknown | |
| 05/31/05 Pressure Control Issues | |
| 04/11/06 Hydraulic/Thermal Shock17 | |
| 05/06/06 | |
| 06/16/06 | |
| 05/30/07 Ruptured during Water Cleaning | |
| 06/12/07 Blockage | |
| 04/15/08 Blockage | |
| 02/24/09 Blockage | |
| Blockage18 | |
| Unknown | |
| Table 1. Previous rupture disc events in the F3455 unit | |
| 2.3.4 Management of Change--Technology and Subtle Change | |
| Within DuPont, MOC procedures are defined at a corporate level and adopted according to each site’s | |
| procedures. At the corporate level, the PSM Standard defines two types of MOC: technology (MOC-T) | |
| and subtle changes. MOC-T is defined as “a change in hazards of materials (including the introduction of | |
| chemicals), a change in equipment design basis, or a change to the process design basis.” Subtle changes | |
| are defined as “any change within the documented [process technology] that is not a replacement in | |
| kind.”19 | |
| Regarding high-hazard processes, such as the F3455 and SLM units at Belle, the corporate PSM | |
| Standard states, “[S]ubtle changes in the field can (and have) led to catastrophic events.” However, even | |
| with this knowledge the MOC team at Belle incorrectly categorized the burst sensor installation as a | |
| subtle change. | |
| 17 This incident was actually three incidents over a short period. The rupture disc was discovered ruptured and | |
| replaced three times before the unit was shut down for further investigation. | |
| 18 This incident went undiscovered for 48 hours. | |
| 19 The corporate DuPont PSM Standard defines “replacement in kind” as the “replacement of an instrument or | |
| electrical, piping, or other process equipment component with an identical part or an approved equivalent part that | |
| is specified by the applicable DuPont Engineering standard.” | |
| 34 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| At the Belle site the standard operating procedures (SOPs) do not distinguish between MOC subtle | |
| changes and MOC-T. The MOC package documentation, however, shows that subtle, often referred to as | |
| “minor,” changes are not subjected to the same in-depth review as a MOC-T. When the MOC is marked | |
| as “subtle,” the level of safety review is at the discretion of the MOC team leader. | |
| The MOC package that first installed the rupture disc burst sensor was marked as a subtle change and | |
| included a “What If” review that stated, “What if you get a false positive indication (indicating failed | |
| disc, but not actually failed)? Not a safety issue. Shut down and investigate.” | |
| This type of review did not go deep enough to confirm that false-positives could lead to nuisance alarms, | |
| which can create risk by desensitizing operators to a hazard and be more detrimental than the absence of | |
| the alarm. In the MOC section marked “Reason for this Type of Safety Review,” the response by the | |
| MOC team leader was “Minor Change.” | |
| The MOC package that converted the burst sensor from battery-powered to a supplied power device was | |
| also marked as a subtle change. Again, the MOC team leader recorded in the documentation that “a ‘What | |
| If’ review [was] appropriate for the afore-mentioned [sic] change.” The MOC did not address the | |
| operators’ non-battery related concerns for the burst sensor or how to re-train the board operator to no | |
| longer treat the burst sensor alarm as a false-positive. | |
| Because MOC packages deemed “subtle” are not given the same level of review as MOC-T packages, the | |
| subtle change MOC packages did not identify or prevent the potential causes of this incident. | |
| 2.3.5 | |
| F3455 Unit Turnaround | |
| On June 6, 2009, nearly 2 years after installing the battery-operated transmitter, DuPont attempted to | |
| eliminate the false alarms caused by low batteries by wiring the transmitter to a standard electrical circuit. | |
| During a unit shutdown that lasted from September 12, 2009, through January 17, 2010, there was | |
| significant maintenance activity, including work that, by its nature triggered alarms; however, these | |
| 35 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| alarms did not require response from the operators because there were no “live” process streams that | |
| would initiate an actual alarm. | |
| DCS data recorded during the shutdown indicated that the pressure in the reactor system increased slowly | |
| from December 18, 2009, to December 20, 2009, when it exceeded the rupture disc rating (Figure 7). The | |
| source of the pressure was a nitrogen valve on a level indicator that slowly leaked nitrogen into the | |
| system.20 | |
| The rupture disc burst, triggering an alarm, as it should have. Under normal, live operating | |
| conditions, the operators would have investigated to understand, acknowledge, and correct the alarm | |
| condition. However, extensive maintenance work was still underway in the unit; thus, the operators did | |
| not address the alarm as they would have under normal operation. | |
| 20 The level instrument measures the difference between the pressure in the vapor space inside the top of the reactor | |
| and the pressure under the liquid at the bottom of the reactor. Based on the pressure difference, the control | |
| computer calculates the amount of liquid in the reactor. The nitrogen provides a chemical barrier between the | |
| reactor liquid and the level instrument. | |
| 36 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 18 | |
| 16 | |
| 14 | |
| 12 | |
| 10 | |
| 8 | |
| 6 | |
| 4 | |
| 2 | |
| 0 | |
| e | |
| r | |
| u | |
| s | |
| s | |
| e | |
| r | |
| P | |
| 12/18/09 12:00 | |
| AM | |
| 12/18/09 12:00 | |
| PM | |
| 12/19/09 12:00 | |
| AM | |
| 12/19/09 12:00 | |
| PM | |
| 12/20/09 12:00 | |
| AM | |
| 12/20/09 12:00 | |
| PM | |
| 12/21/09 12:00 | |
| AM | |
| 12/21/09 12:00 | |
| PM | |
| Time | |
| Figure 7. Process data showing sudden pressure decrease when rupture disc burst | |
| The operators did not address the alarm when it triggered in December because they knew that work in | |
| the area was causing nuisance alarms; however, when the ECF alarm activated on January 22, 2010, | |
| operators responded. The board operator in the F3455 control room investigated and observed that the | |
| original alarm from December 21, 2009, was still displayed; the first item on the alarm screen had not | |
| been acknowledged because they had become accustomed to nuisance alarm conditions. 21 | |
| 21 Under normal operating conditions, when an alarm point activates it will remain in an activated state until the | |
| alarm condition is cleared and acknowledged. | |
| 37 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 2.3.6 | |
| Second-Party Process Safety Management Audit | |
| In 2007, an audit team of engineers and safety and health experts from other DuPont facilities conducted a | |
| 4-day second-party audit22 | |
| of the Crop Protection business at Belle, which included the F3455 and SLM | |
| units. The four-member team audited the units against PSM focus areas such as MOC-subtle change, pre- | |
| startup safety reviews (PSSRs), training, PHA, mechanical integrity, and process technology. While | |
| auditing the F3455 unit and during a review of site and area management practices, the team noted the | |
| many active alarms in the unit control room: “[The] control system is not engineered to eliminate alarms | |
| from idled and secure process equipment [and as a result] the contribution to ‘nuisance’ alarms is | |
| unknown.” The audit team recommended that Belle evaluate the control system and develop an | |
| engineered solution to reduce the number of active alarms and establish a policy reflective of | |
| improvements to safely manage operations with active alarms. | |
| During another review of SOPs and worksite practices, the team noted that the Crop Protection procedure | |
| for operating with active alarms did not effectively address alarm activations from idle equipment: “The | |
| current situation can lead to human factors errors such as failing to recognize an alarm and misidentifying | |
| an alarm.” The team recommended that Belle conduct an engineering evaluation to determine changes | |
| that could separate alarms on active processes from those associated with shutdown equipment so that | |
| operators could readily identify abnormal process conditions. | |
| Both recommendations, added to a corrective action tracking plan, were completed in fourth quarter 2008, | |
| months beyond the original target completion dates. Despite these recommendations, F3455 unit | |
| personnel continued to restart the unit while the alarm was activated, failing to recognize the impact of the | |
| burst sensor alarm. | |
| 22 A second-party audit is an independent assessment of PSM systems performed against the requirements of the | |
| DuPont corporate PSM standard. | |
| 38 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 2.4 Key Findings | |
| 1. The rupture disc alarm system being monitored by a battery-powered transmitter, with batteries | |
| requiring almost monthly replacement, was designated as PSM-critical23 | |
| equipment by DuPont. | |
| 2. DuPont ran the equipment with an unreliable battery-powered transmitter for 18 months before | |
| executing a MOC package to convert to a wired power supply. | |
| 3. Operators expected maintenance work to trigger alarms, but planning and communication were | |
| insufficient to distinguish which alarms needed immediate attention during the turnaround and | |
| after work was completed. | |
| 4. Despite repeated incidents of rupture discs bursting, DuPont did not adequately address the cause | |
| to prevent recurrence. | |
| 5. The alarm from the transmitter did not distinguish between a condition that required immediate | |
| attention (ruptured disc burst) and a lower priority condition such as failed batteries. | |
| 6. Operators became desensitized to the rupture disc burst alarm. | |
| 2.5 Root Causes | |
| 1. DuPont’s MOC process approved a design for the rupture disc alarm system that lacked sufficient | |
| reliability for minimizing the release of methyl chloride. | |
| 2. DuPont did not resolve the “nuisance alarm” condition in a timely manner despite various safety | |
| reviews. | |
| 23 PSM-critical is defined in DuPont SHE Standards S21A and S24 A as components, equipment, or systems whose | |
| failure could cause, allow, or contribute to process incidents that result in death or serious injuries, significant | |
| property damage, or significant environmental impact. | |
| 39 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 3.0 Oleum Release (January 23, 2010) | |
| 3.1 Background | |
| Lucite International owned the sulfuric acid recovery (SAR) unit on DuPont’s Belle plant property and | |
| DuPont employees operated the equipment. The SAR unit produced oleum, which is a solution of sulfur | |
| trioxide dissolved in sulfuric acid. As the sulfuric acid is consumed, the sulfur trioxide converts to | |
| sulfuric acid. | |
| The process unit adjacent to the SAR unit used the oleum to produce methacrylic acid, an ingredient for | |
| acrylic polymers, and then returned the spent oleum to the SAR unit. The SAR unit burned off the | |
| impurities from the spent oleum and used the remaining sulfur compounds to produce clean oleum. | |
| As a result of an unrelated, earlier inspection, the EPA ordered the Belle facility to upgrade emissions | |
| monitoring equipment or improve abatement capacity in the SAR unit. As part of a consent decree with | |
| the EPA issued on April 24, 2009, Lucite International chose to permanently shut down the plant. The | |
| complete and final shutdown of the SAR was concluded in March 2010. | |
| 3.2 | |
| Incident Description | |
| On January 23, 2010, at about 7:40 a.m., contract personnel working near the SAR unit saw an unusual | |
| cloud near the oleum tower and reported a fume release to the board operator. The contractors estimated | |
| the release to be about midway along the length of a1-inch diameter insulated pipe between the Oleum | |
| Tower Pump Tank (OTPT) and a sample station (Figure 8). The board operator asked the plant operator | |
| to go to the area of the reported leak to determine the nature of the release. The plant operator confirmed | |
| that a leak had developed on the sample piping between the OTPT and the sample station and alerted | |
| other workers in the vicinity to move to a safe area. Based on the information the plant operator provided, | |
| 40 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| at about 7:45 a.m. the board operator notified the main gate guard, who then activated a “fume alert” 24 to | |
| notify the facility of the release. | |
| Figure 8. Photo of the position of the 1-inch sample line, which had not yet been replaced | |
| 24 Each plant in the facility has a pre-determined unique number of rings that identify it in case of a release or | |
| emergency. | |
| 41 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| A cloud of steam and sulfuric acid mist from this release is reported to have traveled west and dissipated | |
| in an adjacent operating unit. A concrete dike surrounding the OTPT contained liquid from the leak. | |
| There were no reports of exposure to any DuPont or contract employees or the public. | |
| 3.2.1 | |
| Incident Response | |
| When the plant activates a fume alert, a klaxon bell notifies plant personnel of the location of the incident. | |
| This action also initiates a response by plant fire brigade personnel who go to the facility’s fire station to | |
| obtain the plant fire engine and personal protective equipment (PPE) necessary to respond to the incident. | |
| At about the same time the fume alert was sounded, the gate guard called Metro 9-1-1. The shift | |
| supervisor radioed the gate guard to notify the Belle Volunteer Fire Department, which then dispatched | |
| three engines to the plant. Two of the engines staged outside the plant’s gate while the third went into the | |
| plant to stand by. | |
| DuPont fire brigade members arrived at the site of the release and set up a water fog spray from the | |
| DuPont fire engine and an oscillating water spray from a nearby hydrant for about an hour. After donning | |
| an acid suit and self-contained breathing apparatus (SCBA), one responder entered the area and closed a | |
| valve, which stopped the release at about 8:09 a.m. The gate guard sounded the “all clear” at about 8:27 | |
| a.m. Calculations estimate that 22 pounds of 20 percent oleum was released during the incident.25 | |
| 3.3 | |
| Incident Analysis | |
| 3.3.1 | |
| Reconstructive Analysis | |
| The CSB investigators documented the analysis of the oleum sample line, which was conducted by an | |
| independent metallurgical lab, to determine the incident cause. | |
| 25 20 percent oleum has an acid content that is 20 percent greater than pure sulfuric acid. | |
| 42 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Caused by an unknown defect, oleum corroded through a small section of the pipe involved in the release | |
| on January 23, 2010. Starting as a pitting phenomena and finishing slightly larger than a pin hole, the | |
| corrosion penetrated the insulated stainless steel sample pipe (Figure 9). | |
| Figure 9. The pitting phenomena in the small initial hole of the oleum sample line wall | |
| Once oleum was present on the exterior of the oleum pipe, it readily corroded the insulation and steam | |
| tracing line and then created a leak in the steam tracing, causing the steam and oleum to mix. This | |
| reaction created a strong solution of sulfuric acid that rapidly and effectively corroded the stainless steel | |
| sample line exterior, until a second larger hole developed at a location near the original small leak. The | |
| second hole clearly shows corrosion occurring from the outside-in (Figure 10). | |
| 43 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Figure 10. The larger hole eroded from the outside-in on the oleum sample line26 | |
| When DuPont removed the oleum-soaked insulation and cover, a larger hole was visible; the acid had | |
| also corroded a large amount of the steam tracing. When the sample line was properly cleaned, inspection | |
| revealed that the smaller hole was only a few inches away from the larger hole, and after thorough | |
| examination, metallurgists concluded that the small hole in the sample line initiated the oleum release | |
| ( | |
| Figure 11). | |
| 26 Because the oleum pipe was held as evidence, its decontamination was delayed; the size of the holes may have | |
| marginally increased from continued corrosion prior to examination. | |
| 44 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Figure 11. Photo showing the orientation of the small hole to the main hole | |
| 3.3.2 | |
| Pipe Testing and Analysis | |
| The oleum sample line was tested using gamma ray radiography, ultrasonic thickness (UT), and | |
| metallographic analysis. The metallographic analysis confirmed that the sample line was fabricated from | |
| 304L stainless steel, one of the few metals approved by the DuPont Piping Standard for this oleum | |
| service. | |
| The radiographic and UT testing showed that the pipe wall had suffered general thinning from corrosion, | |
| which is expected in most piping applications involving corrosive materials. The thinning rate can predict | |
| the service life of the pipe, and in the case of pipes routing corrosive materials, the expectation is that | |
| 45 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| roughly 1 to 2 mils27 | |
| will corrode per year. UT testing and radiography revealed that general wall | |
| thinning of the sample line was much less than the predicted 1 to 2 mils per year and showed much less | |
| thinning than expected for its lifetime. This sample line had been in place for 19 years, which is not | |
| unusual for this type of service. | |
| Only one anomaly, later deemed the initiator of this incident, was found during the testing. During visual | |
| inspection a small hole was discovered 90o off and a few inches from the larger hole. Under microscopic | |
| examination, the small hole corrosion phenomenon could clearly be seen; however, its exact cause is | |
| unknown. One theory is that this small hole may have originated from some sort of manufacturing defect, | |
| but the size and shape of the pitting phenomenon suggest that if this were a manufacturing defect, the | |
| pitting would have occurred around the circumference of the pipe or along the longitudinal axis. This | |
| particular phenomenon does not fall into any easily defined defects. Due to the small size of this pitting, it | |
| is unlikely that routine non-destruction examination (NDE) techniques would have identified this defect. | |
| 3.3.3 | |
| Previous Incident Investigation | |
| On January 27, 2009, almost a year to the day prior to the incident, a leak developed in the Oleum Tower | |
| circulation piping. Although the amount estimated to have been released was greater than the January 23, | |
| 2010, release (40 pounds vs. 22 pounds), supervisors deemed the situation unnecessary for an emergency | |
| shutdown and activation of a fume alert. | |
| The emergency response for the 2009 incident was inconsistent with that taken in 2010. Unlike in 2010, | |
| in 2009 a “hot line”28 | |
| announcement informed plant personnel of the incident. In the incident | |
| 27 A mil is a unit of measure equal to one-thousandth of an inch (i.e., 1/1000 in). | |
| 28 A “hot line” announcement involves notification to a pre-determined list of operating and supervisory personnel | |
| who are all informed of an incident at the facility with one call. | |
| 46 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| investigation report for the 2010 incident, no criteria is discussed that would provide guidance for the | |
| appropriate response or what distinguished the two events. | |
| 3.3.4 | |
| PM Program Recommendation from 2009 Incident | |
| The internal DuPont investigation identified the following key factor in the 2009 incident: “Pipe in acid | |
| service tends to have very localized areas of erosion/corrosion that can be easily missed while performing | |
| thickness checks. These areas are often the result of welds, the heat affected area of welds, and, | |
| disruptions or turbulence in the acid flow.” | |
| Although DuPont realized that certain wall thinning in acid service could go undetected, one | |
| recommendation from this investigation was to incorporate all piping in oleum service into a PM | |
| schedule; however, this recommendation was not completed prior to the January 2010 incident. | |
| Moreover, the sample line involved in the January 2010 incident was not included in the PM schedule. An | |
| interview with one of the engineers responsible for arranging for this equipment to be included in the PM | |
| schedule revealed that the oversight occurred due to poor communication between DuPont and the | |
| contractors hired to perform the PM inspections. | |
| 3.3.5 Mechanical Integrity | |
| The piping material, 304L stainless steel, is acceptable to carry this concentration of oleum. The expected | |
| rate of wall thinning would project the lifetime of the pipe to be approximately 40 years, and this pipe had | |
| been in service for only 19. While the oleum sample line was within the design specifications, DuPont did | |
| not address the corrosion issues associated with acid service. | |
| 47 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 3.3.6 | |
| Heat Tracing Design | |
| The oleum sample line was heat-traced29 | |
| with a steam tracing line comprised of ¼-inch copper tubing | |
| strapped to the outside of the sample line. The steam in the copper tracing line heats the sample line to | |
| prevent the oleum inside from freezing. Steam tracing, however, can create hot spots and often does not | |
| distribute heat evenly throughout its length. A preferred method is electric tracing, which can be easily | |
| controlled and prevents hot spots through even heat distribution (Dillon, 1997). | |
| As described in the Analysis Section, steam tracing played a significant role in the failure of the sample | |
| piping. Once the oleum escaped containment, the copper tracing corroded away. The oleum and steam | |
| then mixed, and the resulting extremely corrosive sulfuric acid created the larger hole. If an electric | |
| tracing line had been used, as DuPont suggests for these conditions, the larger hole would not have | |
| formed, reducing the magnitude of this incident. | |
| 3.4 Key Findings | |
| 1. An internal DuPont investigation report from a prior oleum leak recommended including all | |
| piping in a PM thickness monitoring program. The CSB found no evidence that the piping in the | |
| January 23, 2010, incident was included in the program. | |
| 2. The general wall thinning rate estimate for the oleum service was conservative. However, highly | |
| localized corrosion attack cannot be predicted by this method. | |
| 3. Corrosion caused a small leak in the oleum pipe under the insulation. | |
| 29 The protection of a liquid-filled pipe against freezing by installing heat tubing or heating cable around or along the | |
| pipe | |
| 48 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 3.5 Root Causes | |
| 1. DuPont did not adhere to industry recommended practices to use electrical tracing instead of | |
| steam tracing. | |
| 2. A defect in the piping, undetectable by routine NDE techniques, allowed for a loss of | |
| containment. | |
| 4.0 Phosgene Release (January 23, 2010) | |
| 4.1 Background | |
| 4.1.1 | |
| Phosgene | |
| Phosgene, in liquid and gaseous forms, is colorless and highly toxic and has a characteristic odor of | |
| freshly cut hay or grass, with a boiling point of 8° C (47° F), and is liquid in cold weather, gas in warmer | |
| weather. At room temperature phosgene is a dense gas that is heavier than air. Phosgene is manufactured | |
| through the reaction of carbon monoxide and chlorine and is used widely in industry as a chemical | |
| intermediate for isocyanate-based insecticides, polymers, and pharmaceuticals. | |
| Inhalation is the primary route of exposure to phosgene. The OSHA 8-hour TWA PEL for phosgene is 0.1 | |
| ppm30; the NIOSH IDLH concentration is 2 ppm. The odor threshold31 | |
| ranges between 0.4 and 1.0 ppm, | |
| which is higher than the OSHA PEL; therefore, odor is not a reliable detection method for phosgene, as | |
| injury may occur before the odor becomes prominent. Phosgene gas may irritate skin and eyes upon | |
| contact at lower concentrations. Liquid phosgene contact with skin can also cause severe chemical burns | |
| at higher doses. | |
| 30 The NIOSH- and ACGIH-recommended TWA concentrations are also 0.1 ppm for phosgene. | |
| 31 An odor threshold is the lowest airborne concentration that can be detected by a population of individuals. The | |
| range of detection varies among individuals. | |
| 49 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Phosgene inhalation can result in two mechanisms of injury to the respiratory tract, both of which can | |
| result in pulmonary edema32 | |
| at high concentrations. Inhaled phosgene slowly undergoes hydrolysis and | |
| forms HCl, which results in upper respiratory irritation and burning sensations, cough, and chest | |
| oppressions. Symptoms may not appear until several hours after exposure. Phosgene also reacts with | |
| proteins in the pulmonary bronchioles and alveoli, disrupting the blood-air barrier in the lungs and | |
| resulting in increased lung fluid. Pulmonary edema can be present in victims as long as 40 hours after | |
| exposure and may last days depending on the concentration and duration of the exposure. | |
| 4.1.2 | |
| Phosgene Stainless Steel Hose Transfer Operation | |
| The SLM unit runs on a campaign33 | |
| basis and is divided into two processes: the “front end” and “back | |
| end.” The front end process makes five isocyanate intermediate products. Phosgene used to produce the | |
| five intermediate products is fed to a process from 1-ton cylinders stored in the phosgene shed at the SLM | |
| unit. The phosgene cylinder storage shed is a covered, partially walled structure where the phosgene | |
| transfer and storage operations occur ( | |
| Figure 12 | |
| ). All equipment used for these purposes is in or around | |
| the shed. The shed contains no mechanical ventilation or exhaust systems to control phosgene leaks, only | |
| natural ventilation flowing through the shed wall opening from the atmosphere. | |
| 32 Pulmonary edema, which occurs when fluid accumulates in the lungs, leads to impaired gas exchange and may | |
| cause respiratory failure. It is due to either failure of the heart to remove fluid from the lung circulation | |
| ("cardiogenic pulmonary edema") or direct injury to the lung parenchyma ("noncardiogenic pulmonary edema"). | |
| 33 The front end of the SLM unit manufactures several types of isocyanate intermediates on a demand-based | |
| schedule. | |
| 50 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Figure 12. Phosgene shed and full (F) and empty (MT) cylinder locations on day of incident (not to scale) | |
| During normal operation, two cylinders are staged on weigh scales and each is connected to the process | |
| with two 0.25-inch diameter by 48-inch long PTFE-lined, 304 stainless steel overbraid hoses. One hose | |
| transfers liquid phosgene to a steam vaporizer and one provides 70-psig nitrogen to the cylinder. The | |
| scales record the weight of the in-service cylinder and when the container is nearly empty, an alarm | |
| notifies the board operator, who then directs operators to switch to a full cylinder. This switch is | |
| completed by opening valves to the full cylinder and closing valves to the empty cylinder. The hoses | |
| remain coupled in this operation, and plant SOPs do not require enhanced PPE such as a fully | |
| encapsulated suit and breathing air. Under normal operating conditions, the process consumes two to | |
| three cylinders of phosgene per day. | |
| 51 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| The SOPs do require operators to don a fully-encapsulated suit with supplied breathing air when they | |
| replace an empty cylinder with a full cylinder. After clearing all phosgene from the stainless steel hose | |
| with a nitrogen purge under vacuum to a scrubber, the hose is isolated from the vent piping and | |
| disconnected from the empty cylinder. Operators then replace the empty cylinder on the scale with a full | |
| cylinder and connect the stainless steel hose to the new cylinder. | |
| Maintenance mechanics replace stainless steel hoses in phosgene service when a work order is generated | |
| to change-out the hoses. The DuPont SOPs for the change-out frequency of the nitrogen and phosgene | |
| hoses directs replacement every 30 days.34 | |
| A number of manufacturers fabricate hose assemblies to DuPont’s specifications for phosgene and | |
| nitrogen hoses, which arrive pre-assembled and are stored in plastic bags in the maintenance shop. Prior | |
| to connecting the hoses to the phosgene cylinders, the maintenance mechanics install valves on either end | |
| of the hose. Hoses removed from service are decontaminated in a water bath and then disposed. | |
| 4.1.2.1 VanDeMark Chemical, Inc. | |
| VanDeMark Chemical supplies phosgene to the Belle plant in 1-ton cylinders. VanDeMark, located in | |
| Lockport, NY, is the only North American company that both produces and distributes phosgene. It | |
| distributes phosgene and phosgene derivatives in 1-ton cylinders. Each VanDeMark cylinder is 87 percent | |
| full and contains 2,000 pounds of phosgene. Each U.S. Department of Transportation-regulated cylinder | |
| has two valves with a seal plug screwed in the outlet covered by a flanged and gasketed bonnet to protect | |
| the valves and prevent leaks during transport. The Belle plant receives phosgene cylinders via truck that | |
| are unloaded at the phosgene shed; empty cylinders are loaded onto the truck and returned to | |
| VanDeMark. | |
| 34 DuPont’s former maintenance management process directed that hoses be changed every 2 months. | |
| 52 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 4.1.2.2 Use of Personal Protective Equipment (PPE) | |
| DuPont safety procedures include two levels of PPE required for work in the phosgene cylinder shed on | |
| the SLM unit, based on the connection status of the phosgene cylinders. When the phosgene cylinders are | |
| connected to the process and no breaks in the phosgene lines are occurring, the standard required PPE for | |
| the SLM unit is a hard hat, steel-toed safety shoes, safety glasses, flame resistant clothing (FRC), and a | |
| phosgene indicator badge. Work with this level of protection includes | |
| • | |
| entering the phosgene shed to check cylinder scale weights, | |
| • opening and closing valves to switch from one cylinder to another, and | |
| • operating the crane when loading and unloading full or empty cylinders in the phosgene shed | |
| The Belle Plant SOPs for disconnecting a phosgene cylinder require operators to wear a chemical suit | |
| (gloves, boots, and hood) with supplied breathing air in addition to the PPE listed above while performing | |
| the work. During all phosgene cylinder line break operations, another operator, wearing standard PPE, | |
| stands outside the shed to monitor the breathing air supply of the operator performing the work. | |
| At the time of the incident, the employee fatally exposed to phosgene was wearing the standard PPE. This | |
| met DuPont operating standards for the task he was performing, because he was likely checking cylinder | |
| weights in preparation for switching to the partially filled riverside cylinder. The Belle Plant PPE | |
| requirements and SLM unit procedures did not require him to don a chemical suit, with supplied air, | |
| during this activity. | |
| 4.1.2.3 Phosgene Indicator Badge | |
| Belle Plant safety procedures require all personnel (operators, contractors, managers) and visitors in the | |
| SLM unit to sign a log sheet and obtain a phosgene indicator badge from the SLM control room prior to | |
| entry and to wear a phosgene indicator badge in their breathing zone (Figure 13). Phosgene indicator | |
| 53 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| badges change color when exposed to phosgene, and the color indicates the concentration 1 minute after | |
| exposure. After 2 consecutive days of use, personnel using badges must discard and replace their | |
| indicator badge to ensure accurate sensitivity.35 | |
| Two types of phosgene indicator badges are available for use in the SLM unit. For work tasks not | |
| involving supplied air, personnel clip SafeAir® System phosgene badges (Morphix Technologies) to the | |
| collar or pocket of FRC near the breathing zone. The badges change from white to pink or red to indicate | |
| dose, concentration, or duration of exposure. In addition to badges, the SafeAir system uses a color | |
| comparator wheel to detect exposure dose and the presence of phosgene between 0.9 and 100 ppm-min. | |
| 36 | |
| 35 The manufacturing specifications state that the maximum recommended sampling time for each badge is 3 days. | |
| The Belle plant requires phosgene badges to be replaced after 2 days to ensure accurate detection and avoid | |
| discoloration or interference with other chemicals. | |
| 36 Parts per million-minute (ppm-min) is the concentration of a contaminant in air related to the exposure time | |
| through inhalation; 48 ppm-min = 480 minutes of exposure at 0.1 ppm concentration. | |
| 54 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Figure 13. SafeAir Phosgene Dosimeter Badge37 | |
| For work tasks in the SLM unit requiring supplied air, all personnel must wear a CheckAir® phosgene | |
| badge inside the mask of their supplied air respirator. The CheckAir detector (Morphix Technologies) | |
| detects exposure dose concentrations between 0.9 and 100 ppm-min. The color comparator wheel for | |
| detecting exposure concentrations of the CheckAir detectors differs from that of the SafeAir badges. | |
| 4.1.2.4 Alarms | |
| The SLM unit has 12 phosgene sensors placed in and around it to continuously sample and record | |
| phosgene concentrations every 30 seconds; concentrations of phosgene are detected via an | |
| electrochemical diffusion sensor within a range of 0.05 to 1 ppm. One phosgene sensor is located in the | |
| phosgene shed, six are in the SLM building, and two are located outside the building. Three sensors are | |
| 37 The badge in Figure12 has a range of 0.5 to 450 ppm-min. The SafeAir badge worn by the exposed employee had | |
| a range of 0.9 to 100 ppm-min. | |
| 55 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| on the fence line of the facility along the Kanawha River, approximately 120 feet from the phosgene | |
| storage shed. | |
| The analyzer readings are monitored by the DCS in the SLM control room, and concentrations in excess | |
| of 0.05 set off audible and visual alarms at the board operator’s work stations. Concentrations equal to or | |
| greater than 0.05 ppm set off a medium-high alarm and concentrations at or above 0.1 ppm set off a high- | |
| high alarm. The CSB could find no evidence that audible or visual alarms were in service in the phosgene | |
| shed when the release occurred. | |
| On the day of the incident, the phosgene release activated alarms in the control room for four of the 12 | |
| analyzers in and around the SLM unit. The phosgene analyzer in the shed recorded concentrations ranging | |
| from 0.04 to 1.0 ppm for approximately 50 minutes following the initial release. Two of the three fence | |
| line monitors triggered alarms, with the maximum recorded concentration of 0.27 ppm on a monitor | |
| located approximately 120 feet from the phosgene shed along the river. Another monitor, located on a | |
| spill tank outside the SLM unit building, also recorded a concentration of 0.04 around the time of the | |
| release. | |
| All 12 phosgene analyzers have a maximum detectable concentration of 1 ppm. The analyzers do not | |
| record actual values for concentrations in excess of 1 ppm; therefore, if phosgene concentrations exceed | |
| the detection range at the analyzer sample point, the values are recorded only as 1 ppm. | |
| 4.1.3 | |
| Phosgene Highly Toxic Material Guardian Committee | |
| DuPont’s Phosgene Highly Toxic Material Guardian Committee focuses on the safe management of | |
| phosgene at applicable DuPont facilities. DuPont has several guardian committees for highly toxic | |
| materials (HTMs) used within the company. The committee is comprised of representatives, known as | |
| phosgene guardians, from all DuPont sites that produce or consume phosgene. Managers from affected | |
| processes, corporate health and safety representatives, engineers, and industrial hygiene specialists also | |
| 56 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| participate. The Phosgene Guardian Committee holds meetings twice a year to share learnings and discuss | |
| phosgene handling issues. | |
| DuPont has an HTM manual for phosgene, a company protocol that includes requirements and guidelines | |
| for the safe design and operation of processes that generate or use phosgene. The primary purpose of the | |
| manual is to reduce the likelihood of phosgene harming employees or the public. The requirements of the | |
| manual are mandatory for all DuPont facilities with enough phosgene to impose a significant offsite | |
| hazard as determined by a chemical consequence analysis of offsite exposure. The Phosgene Committee | |
| conducts a second-party audit of all facilities using phosgene against the requirements and guidelines set | |
| forth in the phosgene HTM manual approximately every 3 years. The Phosgene HTM Committee audited | |
| the SLM unit at the Belle Plant in September 2006; the next audit was scheduled for January 25, 2010, | |
| just two days after the phosgene release incident. | |
| 4.2 | |
| Incident Description | |
| The third incident occurred on January 23, 2010, between 1:45 and 2:00 p.m. A stainless steel braided | |
| transfer hose connected to a partially filled, but not in service 1-ton phosgene cylinder failed | |
| catastrophically in the SLM unit phosgene shed. This incident occurred in the phosgene shed. When the | |
| release occurred, an operator was in the phosgene shed inspecting the status of the riverside38 | |
| phosgene | |
| cylinder as he anticipated that the active cylinder was nearly empty and would need to be switched. He | |
| was sprayed across the chest and face with liquid phosgene remaining in the riverside hose from a | |
| previous transfer operation. | |
| 38 The cylinders are commonly referred to as “hillside” or “riverside” based on their orientation in the phosgene shed | |
| relative to the hills north of the building and the Kanawha River to the south. | |
| 57 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| DuPont estimates that about 2 pounds of phosgene were released to the atmosphere when the hose failed. | |
| The CSB concurs with this estimate and further calculated that the operator would have received a lethal | |
| dose of phosgene in less than one-tenth of a second (Appendix D). | |
| Immediately after the operator was sprayed, he called for assistance on the SLM unit public address | |
| phone in the phosgene shed. A coworker who responded to the call noticed that the victim’s phosgene | |
| dosimeter badge (Figure 13) was discolored, indicating an exposure. The coworker directed the exposed | |
| worker to a plant truck to transport him to the plant’s medical center for assessment and treatment. As | |
| they drove to the medical center, the two workers were met by the Shift Supervisor and the exposed | |
| worker was transferred to the shift supervisor’s vehicle to complete the trip. While en route to the plant’s | |
| medical center, the front gate guard was radioed and advised to call Metro 9-1-1 and request that an | |
| ambulance respond for a medical emergency. The exposed worker, while at the medical center waiting for | |
| the ambulance, chose to wash his face and hands, but there is no evidence or record that he was placed in | |
| a safety shower to wash off, as instructed by the emergency procedures, or that any decontamination | |
| activity took place beyond the hand and face washing. He was given a change of coveralls to put on in | |
| exchange for the work clothes he was wearing. The gate guard called Metro 9-1-1 at 1:59 p.m., requesting | |
| transport for a medical emergency patient to the hospital. The 9-1-1 dispatcher asked if there was a | |
| chemical release; however, the gate guard, who was unaware of the situation, responded that there was no | |
| release and that the response was for a medical emergency. As part of the Metro 9-1-1 emergency | |
| response protocol, the dispatcher asks for specific information to ensure that responders are as informed | |
| as possible prior to arrival at the scene. At 2:03 p.m., an ambulance was dispatched from the KCEAA. | |
| At 2:08 p.m., responding EMTs asked Metro dispatchers if more information was available about the | |
| victim. When Metro called DuPont to get more information, the line was busy. EMTs also wanted to | |
| know if there was a chemical exposure, but Metro 9-1-1 could not get that information from DuPont. Six | |
| minutes later, the EMTs arrived at the DuPont gates. | |
| 58 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| EMTs were directed to the DuPont medical center to meet the exposed worker. As the EMTs gathered the | |
| worker for transport, they were given a written phosgene treatment protocol intended to be used at the | |
| hospital to provide treatment. While the worker was being transferred to their care, DuPont employees | |
| told the EMTs that the victim had been exposed to liquid phosgene. | |
| The EMTs left the facility with the victim at 2:26 p.m., or 27 minutes after the first call to Metro 9-1-1. | |
| During transit and after arrival at the hospital at 2:34 p.m., the victim was lucid, conscious, and talking | |
| clearly to the emergency responders and attending physician. Until the attending ER physician consulted | |
| the company-provided phosgene treatment protocol, which advised 48-hour monitoring for suspected | |
| phosgene exposures, he considered sending the victim home based on his condition shortly after arriving | |
| at the hospital. A baseline X-ray revealed no congestion in the victim’s lungs. At about 5:30 p.m., or | |
| almost 4 hours after exposure, the operator’s condition began to rapidly deteriorate. Over the next 29 | |
| hours, the victim received treatment from a variety of physicians, but his condition failed to improve and | |
| he died at 9:27 p.m. on Sunday, January 24, 2010. | |
| Post-incident, KCEAA staff voiced concerns regarding the quality and timeliness of information DuPont | |
| provided to Metro 9-1-1 dispatchers and responding EMTs. The concerns raised address the need to | |
| ensure that emergency responders and their equipment are not exposed to contaminants and that the | |
| victims they are assisting receive optimum care in transit for medical treatment. A review of comparable | |
| responses by KCEAA EMTs in the region reveal that the response time to DuPont and from there to the | |
| hospital was not unduly delayed by the lack of information. A sampling of similar emergency responses | |
| reveal an average response time from the initial call to Metro 9-1-1 until arrival at the hospital to be about | |
| 36 minutes. Total elapsed time for the response time on the day of the exposure was 35 minutes. | |
| Although the emergency response and transport of the victim was not delayed during this incident or the | |
| oleum release, because of a lack of clear, accurate information regarding the material involved, response | |
| procedures have since been modified by Metro 9-1-1 administrators. These modifications mandate that | |
| 59 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| EMS units not report directly to the site of an incident until clear information has been provided such that | |
| EMS personnel will not be at risk of unknown contaminants/threats. This change in response protocol | |
| was incorporated after several incidents in the Kanawha Valley. The CSB considers the change in | |
| response protocol significant enough to define the cause and effect of the communication gap as a “near- | |
| miss.” Several key factors that contributed to poor communication, including the absence of a process | |
| knowledgeable person assigned to convey information to the dispatchers and the lack of a direct line to | |
| the Metro 9-1-1 emergency operations center, must be recognized and addressed. | |
| One confirmed and one possible phosgene exposure to workers occurred after the initial release. The first | |
| was when a coworker responded to the call for assistance immediately after the phosgene hose ruptured. | |
| As he drove the victim to the facility’s medical building, the coworker’s dosimeter badge became slightly | |
| discolored, indicating phosgene exposure. | |
| A possible source of this exposure was phosgene vapor in the atmosphere as recorded on one of three | |
| fence line monitors about 120 feet from the shed along the river. Another possible source was the victim’s | |
| clothing, which may have been saturated with phosgene immediately after the release. When interviewed, | |
| this employee said that pulmonary function tests performed afterward showed no signs of adverse effects. | |
| A second possible exposure occurred when an employee working in the SLM unit went toward the | |
| phosgene shed shortly after the release. He reported in an interview that as he got closer, he noticed a | |
| smell that he had not encountered before or since. He recalled that the odor was not strong or offensive as | |
| would be expected with ammonia or chlorine, but noticeably different from any odors he had smelled in | |
| the past. Being unfamiliar with the characteristic fresh mown hay odor associated with phosgene, he left | |
| the area. | |
| Although the phosgene shed area has flashing lights to alert against entry into the area during cylinder | |
| changes, there is no evidence that a fume, medical, or plant radio alert sounded at any time during this | |
| release episode to warn operators and maintenance personnel to avoid coming near the phosgene shed. | |
| 60 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 4.2.1 | |
| Community Impact | |
| Two of the three fence line analyzers recorded a maximum concentration of 0.15 and 0.27 ppm39 | |
| phosgene, indicating that phosgene concentrations had traveled offsite toward the Kanawha River. | |
| However, no member of the public reported phosgene exposure symptoms the day of the incident nor did | |
| the U.S. Coast Guard restrict river traffic or conduct air monitoring as it had a day prior as a result of the | |
| methyl chloride release. | |
| 4.3 | |
| Incident Analysis | |
| 4.3.1 | |
| Hose Failure Analysis | |
| Post-incident inspections of the stainless steel hoses used for the two phosgene cylinders connected to the | |
| process identified comparable degradation patterns. Their failure was associated with corrosion that | |
| developed in approximately the same location on hoses used to transfer phosgene from the riverside and | |
| hillside cylinders. | |
| Investigators found that while the majority of tags attached to the hoses to indicate the intended service | |
| were secured in place with plastic ties and metal clamps—as was normal—one manufacturer’s tag was | |
| secured with white plastic adhesive tape (this tag applied by the manufacturer also provided identification | |
| information). The corrosion identified on the two hoses associated with the hillside and riverside | |
| cylinders was localized under the area covered by the white plastic adhesive tape securing the tag.40 | |
| The | |
| characteristics of the transfer hose, consisting of a core constructed of permeable PTFE and braided 304- | |
| 39 ERPG-2 value for phosgene is 0.20 ppm and at this concentration “all could be exposed for up to one hour | |
| without experiencing or developing irreversible or other serious health effects or symptoms that could impair their | |
| abilities to take protective action” (AIHA, 2008). | |
| 40 Witnesses could not provide an exact date that the hoses came into the facility with the tags affixed with adhesive | |
| tape. | |
| 61 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| stainless steel, provided a suitable environment under the adhesive tape for stress corrosion cracking | |
| (SCC41 | |
| ) to occur. | |
| To provide comparative data, hoses from the hillside, riverside, and exemplars of similar age and new | |
| assembly were sent to an analytical lab for testing and analysis. The tests established that all of the hoses | |
| were constructed with 304-stainless steel and the construction material for the inner core of the hoses was | |
| PTFE, as expected. | |
| 4.3.2 | |
| Effect of Plastic Adhesive Tape | |
| The PTFE, 304 stainless steel, and white plastic adhesive tape contributed to the incident. The PTFE inner | |
| core was permeable and susceptible to phosgene vapor diffusing through the hose. The adhesive tape used | |
| to secure the tag contributed to the retention of phosgene gas on the exterior of the stainless steel | |
| overbraid. The phosgene gas converted to HCl, and 304-stainless steel overbraid is subject to corrosive | |
| attack by HCl. Since the white plastic adhesive tag trapped the phosgene permeating through the PTFE | |
| inner core, the resulting concentration of HCl was much higher under the tag than elsewhere on the hose | |
| (Figure 14). | |
| 41 Stress corrosion cracking is the formation of brittle cracks in a normally sound material through the simultaneous | |
| action of a tensile stress and a corrosive environment. | |
| 62 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Figure 14. The distinct effect of the white plastic adhesive tag on the corrosion of the stainless steel | |
| overbraid | |
| Additionally, at the time of the incident, the isolation valves on the phosgene hose on the riverside | |
| cylinder were closed, which retained liquid phosgene in the hose and pipe between the valves that isolated | |
| the cylinder from the process. The heavy corrosion of the stainless steel overbraid, coupled with the time | |
| the hose had been in service and thermal expansion42 | |
| of the isolated liquid phosgene, caused the hose to | |
| fail catastrophically. When this failure occurred, the worker was exposed as he walked nearby to check on | |
| the status of the adjacent in-service cylinder. | |
| 42 Tendency for solids, liquids and gases to change in volume in response to a change in temperature. | |
| 63 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 4.3.3 | |
| Hose Degradation Issues | |
| Although the maintenance plan for the hillside and riverside hoses prescribed a regular change-out | |
| schedule of 30 days, work orders show that change-out frequency was neither systematic nor predictable. | |
| At least three times from 2006 to 2010, phosgene hoses were left in service from 4 to 7 months. | |
| 4.3.4 | |
| Hose Change-out Frequency | |
| Several times each year, the phosgene process is halted so the plant can produce a material requiring the | |
| physical removal of phosgene, including all full or empty 1-ton cylinders, from the phosgene shed. | |
| Table 2 shows the change-out frequency of the phosgene hoses in the SLM unit and the periods when | |
| SLM did not run processes using phosgene. The most recent recorded instance where phosgene was not | |
| used in the process was between September and November 2009, 2 months prior to the incident. Work | |
| orders for changing-out the phosgene hoses indicate that the stainless steel transfer hoses connected at the | |
| time of the incident had been in service for more than 6 months. This included a removal of the phosgene | |
| system change-out in September 2009 when the hoses could have been changed-out. | |
| 64 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Hose Change-out Frequency | |
| Month/Year Phosgene Hoses Phosgene Used | |
| Jul-05 | |
| Aug-05 | |
| Sep-05 | |
| Oct-05 | |
| Nov-05 | |
| Dec-05 | |
| Jan-06 | |
| Feb-06 | |
| Mar-06 | |
| Apr-06 | |
| May-06 | |
| Jun-06 | |
| Jul-06 | |
| Aug-06 | |
| Sep-06 | |
| Oct-06 | |
| Nov-06 | |
| Dec-06 | |
| Jan-07 | |
| Feb-07 | |
| Mar-07 | |
| Apr-07 | |
| May-07 | |
| Jun-07 | |
| Jul-07 | |
| Aug-07 | |
| Sep-07 | |
| Oct-07 | |
| Nov-07 | |
| Dec-07 | |
| Jan-08 | |
| Feb-08 | |
| Mar-08 | |
| Apr-08 | |
| May-08 | |
| Jun-08 | |
| Jul-08 | |
| Aug-08 | |
| Sep-08 | |
| Oct-08 | |
| Nov-08 | |
| Dec-08 | |
| Jan-09 | |
| Feb-09 | |
| Mar-09 | |
| Apr-09 | |
| May-09 | |
| Jun-09 | |
| Jul-09 | |
| Aug-09 | |
| Sep-09 | |
| Oct-09 | |
| Nov-09 | |
| Dec-09 | |
| Jan-10 | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Changed | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Phosgene Used | |
| Table 2. Phosgene hose change-out frequency | |
| 65 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| The CSB found that change-out frequency was intended to be governed automatically by the Belle | |
| facility’s SAP maintenance program. Some supervisors also relied on the maintenance coordinator | |
| remembering to initiate the change-out. | |
| 4.3.5 | |
| SAP Work Process | |
| DuPont uses the plant maintenance module of SAP enterprise resource planning software43 | |
| to schedule | |
| the change-out of phosgene hoses at pre-determined 30 day intervals. The SAP system is programmed to | |
| issue the work orders for hose replacement to prevent the release of phosgene; thus, maintaining accurate | |
| data in the SAP database is crucial to protect against phosgene exposure (Appendix C). | |
| In late 2006, SAP data managing the change-out frequency of the phosgene hoses at the Belle facility | |
| were changed; consequently, SAP stopped automatically issuing work orders to change the hoses, but | |
| plant personnel were unaware that SAP no longer automatically issued the work orders. The CSB | |
| requested additional information regarding the change; however, DuPont could not determine who | |
| changed the SAP data, why it was changed, or when the change was executed. No back-up layer of | |
| protection, such as a weekly critical equipment maintenance check sheet or an inspection tag, ensured that | |
| the hoses were changed at the pre-determined frequency. With SAP no longer automatically issuing work | |
| orders to change the hoses, the system did not trigger maintenance notifications to change-out the hoses at | |
| assigned intervals. | |
| 43 Enterprise resource planning software is a type of database that allows data related to flows of money and other | |
| resources in areas such as accounting, supply chain management, sales and marketing, manufacturing, | |
| maintenance, and project management to be recorded and accessed. | |
| 66 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 4.3.6 | |
| Near-Miss Phosgene Incident | |
| On the morning of the phosgene incident, operators asked maintenance personnel to replace the phosgene | |
| hose on the hillside cylinder because of a suspected flow restriction. Although the cylinder was still about | |
| half full, it was removed from service and replaced with the full riverside cylinder. | |
| The hillside phosgene supply hose and valve assembly were removed and decontaminated in a water bath. | |
| When the hose was removed from the water, the white adhesive ID tag had fallen off, revealing a broken | |
| stainless steel braid and collapsed PTFE liner, a possible cause of the flow restriction (Figure 15). | |
| Figure 15. Damaged hillside phosgene hose removed from phosgene cylinder. The plastic adhesive tag | |
| that covered the damaged section fell off during the hose decontamination procedure. | |
| An operator stated during an interview that when he saw the physically defective section of the frayed | |
| hose, he told his coworkers, stressing that the hose was close to rupturing and that they were lucky to | |
| have found it and changed-out the hose in time. Unfortunately, this discovery was not captured as a near- | |
| miss, since supervisors were not made aware of the issue. | |
| 67 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Operators told the CSB investigators that they had never seen a phosgene stainless steel hose braid | |
| corroded to the point of separation. Although they were surprised and concerned about their finding, and | |
| since supervisory staff does not work on weekends, they planned to tell the supervisors about the | |
| discovery on Monday morning, about 48 hours later. Operators said that they expected that the | |
| supervisors would conduct a full investigation; however, since the incident occurred on a Saturday, it was | |
| not investigated. Had there been a system in place for operators to report near-miss incidents on | |
| weekends, the near-miss investigation may have been properly initiated prior to the fatal release. | |
| 4.3.7 Mechanical Integrity | |
| The DuPont P3H Standard lists acceptable construction materials for flexible hoses used in HTM service | |
| and recommends three different hoses acceptable for use with phosgene: H2, H7, and H9 (Table 3). | |
| 68 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Name | |
| H2 | |
| DuPont P3H Standard Hoses for Phosgene Service | |
| Specifications | |
| Inner core material: | |
| Reinforcement material: | |
| End fitting material: | |
| Core/fitting connection method: Welded, full penetration | |
| Monel® 400, corrugated | |
| Monel® 400 overbraid | |
| Monel® 400 SCH. 80 | |
| H7 | |
| Inner core material: | |
| Reinforcement material: | |
| End fitting material: | |
| Core/fitting connection method: Welded, full penetration | |
| Hastelloy® C276, corrugated | |
| Monel® 400 or Hastelloy® C276 overbraid | |
| Hastelloy® C276 stub ends | |
| H9 | |
| Inner core material: | |
| Reinforcement material: | |
| PTFE, helical, corrugated, taped or extruded | |
| Teflon®44 | |
| construction, unpigmented or conductive | |
| PVDF (Kynar®) double overbraid | |
| Monel® 400, Hastelloy® C276, or Teflon® encapsulated | |
| SS | |
| End fitting material: | |
| Core/fitting connection method: Crimped (or swaged) | |
| Table 3. Flexible hoses for phosgene service as listed in the DuPont P3H Standard: Flexible Chemical | |
| Hose for Highly Toxic Services | |
| The Belle facility did not use any of the P3H specified hoses and configurations; instead, it used a flexible | |
| hose made of a Teflon® PTFE inner core and a braided stainless steel reinforcement material, even though | |
| stainless steel is not recommended for phosgene service, as it is susceptible to SCC from chlorides. | |
| Phosgene, which can readily react with air to produce chlorides, can permeate PTFE, directly exposing | |
| the stainless steel braid to chloride attack. | |
| 44 Teflon is the DuPont-registered trademark for PTFE. | |
| 69 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 4.3.8 | |
| Flex Hose Materials of Construction | |
| The Belle facility referred to corporate experts and the La Porte45 | |
| facility, where flexible hoses were | |
| being used for phosgene service. | |
| The discussions between the two plants and corporate experts about flexible hoses began in 1987, when | |
| corporate experts suggested the use of Monel metal for both the hose core and hose overbraid, since it | |
| resists chloride SCC. However, the La Porte plant asserted that its history with Monel metal was less than | |
| desirable; one correspondent noted, “The La Porte plant was considering testing Kynar overbraid- | |
| 46 | |
| covered Teflon hose because of discoloration and gradual deterioration of the Monel.” | |
| An expert from DuPont corporate told Belle that the discoloration was not a problem: | |
| Reports from La Porte that Monel braided hoses were corroding in phosgene | |
| service are not exactly true. The hoses at that time were Teflon lined, with a | |
| Monel outer overbraid. Due to permeation of phosgene through Teflon, the | |
| Monel was slightly attacked, forming a green surface film known as a ‘patina’47 | |
| which is common to all copper-based alloys. | |
| A Belle representative sent a questionnaire to La Porte in August 1987 to evaluate its hose program. The | |
| questionnaire revealed that La Porte had been using PTFE-lined stainless steel hoses for the previous 3 to | |
| 4 years and that they were replaced every 3 months. It reported that the majority of the hose failures were | |
| due to fatigue, and that the facility was using stainless steel because it is not as susceptible to failure from | |
| 45 DuPont uses phosgene at four of its facilities. DuPont no longer uses phosgene in La Porte, TX. | |
| 46 The Kynar hose was also not pursued due to pre-conceived flexibility limitations. | |
| 47 Patina, most easily observed on old pennies, is a green film formed naturally on the surface of copper and copper- | |
| based metals. | |
| 70 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| fatigue and bending stresses as are Monel and Kynar hoses. After reading the questionnaire, the corporate | |
| DuPont expert wrote, | |
| I still believe that Monel is the best choice for material of construction for | |
| phosgene unloading hoses (and definitely for the fittings). I am surprised that La | |
| Porte is using Teflon-lined hose with stainless overbraid since Teflon is known to | |
| be permeable and the phosgene is known to attack the stainless. | |
| The DuPont expert further stated, | |
| Admittedly, the Monel hose will cost more than its stainless counterpart. | |
| However, with proper construction, and design so that stresses are | |
| minimized…useful life should be much greater than 3 months. Costs will be less | |
| in the long run and safety will also be improved. | |
| Correspondence or other records that would explain why the expert’s recommendation went unheeded at | |
| La Porte and why the Belle staff decided to follow the La Porte approach was not discovered during the | |
| CSB investigation. However, Belle decided to follow La Porte’s example, and adopted a hose design not | |
| recommended by its P3H Standard or by a DuPont corporate expert. | |
| The phosgene hose replacement frequency at Belle is defined in DuPont’s Phosgene Hose Assembly | |
| Procedure: “Due to the extremely hazardous nature of phosgene the hose assemblies are replaced every 2 | |
| months.” | |
| However, the PM schedule in SAP is actually set to a replacement frequency of 30 days. This procedure | |
| does not effectively communicate why the hoses must be replaced so frequently: if left on too long, the | |
| accepted corrosion condition poses a serious risk to the facility and the community. | |
| 71 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Figure 16. Flex hose comparison photographs: (top to bottom) ruptured riverside hose, flow restricted | |
| hillside hose, a new hose with attached ID tag | |
| 4.3.8 | |
| Non-routine Job Planning | |
| Operators told the CSB investigators about the difficulty maintaining the required flow of phosgene from | |
| one of the two cylinders on the weigh scales the day prior to the exposure incident. The phosgene flow | |
| from the cylinder to the process was inadequate; thus, they performed a non-routine operation to establish | |
| a steady flow of phosgene because they suspected a plugged hose or a malfunctioning automatic feed | |
| control valve. Non-routine operations are characterized by infrequent practice, can be both planned and | |
| scheduled, or can occur without scheduling | |
| To minimize disruption of the phosgene flow to the process, operators switched to the riverside cylinder, | |
| which operated as expected and supplied the normal flow rate. Continuing throughout the day and into the | |
| next, operators repeated switching to the riverside cylinder as the flow from the hillside cylinder became | |
| low enough to begin to affect the process. When valves for each of the respective transfer hoses were | |
| 72 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| closed, liquid phosgene was not evacuated as required by the SOP for switching from one cylinder to | |
| another. Since the operators were not fully aware of the hazards of thermal expansion, liquid phosgene | |
| remained in the hoses as the cylinders were switched. | |
| The CSB investigators reviewed DCS flow and weight data and saw a distinct difference in the ability of | |
| the riverside cylinder to provide the needed flow rate of phosgene compared to the hillside cylinder in this | |
| operation. All DCS information the operators received as a result of the non-routine cylinder switching | |
| indicated that their actions were successfully maintaining the smooth operation of the unit. | |
| The operators, however, were involved in non-routine operations by attempting to maintain steady-state | |
| operations, as the SOPs did not address handling flow restriction. In addition, they were unaware of the | |
| threat of liquid thermal expansion developing as a result of switching the cylinders and not evacuating the | |
| hoses after each switch-out operation. | |
| 4.4 Process Hazard Analysis | |
| PHAs were conducted on the phosgene cylinder feed system and vaporizer as part of the Front End SLM | |
| Unit assessment in 1994, 1999, 2004, and 2009. The 2009 PHA team, all DuPont employees, included a | |
| senior process engineer, two technical resources, a mechanic, and a front end operator; reviewed subtle | |
| changes to the process and associated MOC documentation since the last PHA in 2004 and previous | |
| phosgene release incidents, and recommended corrective actions. The PHA for the phosgene system | |
| included the 1-ton cylinders, nitrogen pressuring system, the vaporizer, and all associated piping and | |
| controls. The team used a Hazard and Operability48 (HAZOP) and “What If49 | |
| ” methodologies to review | |
| process hazards and deviations. | |
| 48 A systematic method in which process hazards and potential operating problems are identified using a series of | |
| guidewords to investigate process deviations (CCPS, 2008). | |
| 73 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| The team recognized and assessed the potential for a phosgene release from the cylinder transfer hoses | |
| but only if the hoses were incorrectly connected or inadvertently disconnected while the cylinder feed | |
| valve remained open. They did not assess the potential for the hose to rupture due to thermal expansion of | |
| liquid phosgene even though the potential for liquid phosgene thermal expansion was evaluated in other | |
| process equipment during the 2009 PHA. | |
| None of the consequence scenarios the PHA team assessed involved failure of the phosgene transfer hose | |
| or the nitrogen flex hose. When the team evaluated the phosgene vaporizer, it considered corrosion | |
| potential when stainless steel is exposed to phosgene and water, but did not apply those factors to the | |
| cylinder transfer hoses. For the vaporizer, the probability value assigned to the phosgene leak scenario | |
| was decreased by reliance on the PM program to detect corrosion. The PHA team also noted that the | |
| slowly developing corrosion would decrease the probability of a leak because the corrosion would be | |
| noticeable during visual inspections. If the PHA team had assessed the thermal expansion and corrosion | |
| issues for the phosgene transfer hoses and had applied the same conditions to decrease the probability as | |
| used for the vaporizer corrosion scenario, the incident may still have occurred due to the team’s reliance | |
| on the PM program to reduce the hazard. Unfortunately, the slowly developing corrosion on the hose was | |
| not visible due to the location of the white plastic adhesive tape, and the PM program was not configured | |
| to ensure that the hoses were changed at the appropriate frequency. | |
| Phosgene permeation through PTFE had resulted in leaks at Belle in the past; however, the PHA team did | |
| not consider this hazard for the phosgene cylinder hoses. The CSB received documentation of all SLM | |
| PHA audits dating back to 1994. The 1999 PHA included two incidents in which phosgene likely | |
| permeated through PTFE-lined conveyance equipment in other parts of the phosgene process. Even with | |
| 49 A technique in which a team with process knowledge and experience examines possible process deviations or | |
| combinations of deviations than can result in an undesired consequence (CCPS, 2008). | |
| 74 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| these previous incidents considered, the PHA team still did not account for the potential of the phosgene | |
| cylinder hoses to result in a release under similar conditions. | |
| 4.5 Audits | |
| 4.5.1 | |
| Unit Second-Party PSM Audit | |
| In August 2007, a second-party audit team of engineers and health and safety experts from other DuPont | |
| facilities audited the SLM unit against regulatory and company PSM requirements. As in the F3455 unit | |
| audit, the team focused on MOC-subtle change, pre-startup safety reviews (PSSRs), training, PHAs, | |
| mechanical integrity, and process technology. The audit contained 64 findings—27 observations, 35 | |
| policy, and two regulatory issues—within the F3455 and SLM units at Belle. | |
| One regulatory issue noted for the SLM and F3455 units was timely initiation of accident investigations. | |
| Auditors noted several instances where incident investigations were not started and communicated within | |
| the Belle plant 24- or the 48-hour OSHA requirements. The audit team recommended revising the Belle | |
| Plant Incident Investigation procedure and area practices to ensure that plant personnel initiate | |
| investigations within 24, and no later than 48, hours following an incident. According to the audit | |
| tracking plan the CSB investigators reviewed, an assigned DuPont employee completed and closed the | |
| recommendation as of June 2009. | |
| However, in the case of the hillside hose near-miss prior to the phosgene exposure (Section 4.3.3), | |
| operators told the CSB investigators that they planned to communicate the near-miss to supervisors for | |
| investigation the following Monday; however, this would not have been within the Belle Plant required | |
| 24-hour period. The OSHA PSM Standard requires the employer to “investigate each incident which | |
| resulted in, or could reasonably have resulted in, a catastrophic release of highly hazardous chemical in | |
| the workplace” (1910.119(m)(1)) and that an incident investigation “shall be initiated as promptly as | |
| possible” (1910.119(m)(2)). The EPA Risk Management Program also requires an investigation of an | |
| incident involving a regulated substance, such as phosgene, be initiated within 48 hours (40 CFR part | |
| 75 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 68.81(b)). Though supervisors are not typically at the facility on weekends, management and safety and | |
| health experts, including the SLM Area Manager, were at the Belle Plant the morning of Saturday, | |
| January 23, 2010, attending the safety pause meeting. Had the incident been reported in a timely manner, | |
| management onsite could have immediately initiated an investigation. | |
| 4.5.2 | |
| Onsite Phosgene Generation | |
| In 1988, DuPont engineers considered two options for using phosgene at the Belle facility: in cylinders | |
| from an offsite provider or constructing a phosgene generation plant to make phosgene onsite. To better | |
| understand the hazards involved in each design, DuPont engineers conducted a risk assessment in which | |
| four cases were considered (Table 4): | |
| Case 1. Operating with a liquid phosgene feed from cylinders | |
| Case 2. Vaporizing the feed from the cylinders | |
| Case 3. Installing a plant to make phosgene from CO and Cl2 | |
| Case 4. Enclosing the phosgene plant (in a fully contained building with an air scrubber) | |
| After evaluating each case, they estimated the risk of fatality as follows: | |
| Case 1 | |
| Case 2 | |
| Case 3 | |
| Case 4 | |
| Onsite Fatalities per 10,000 years | |
| 244 | |
| 154 | |
| 16.7 | |
| 2.3 | |
| Offsite Fatalities per 10,000 years | |
| 10.5 | |
| 0.22 | |
| 0.007 | |
| 0.006 | |
| Table 4. Preliminary risk assessment by DuPont Engineering, 1988 (Appendix E) | |
| While Case 4 was estimated to have the least amount of risk, the assessment concluded, | |
| Spending $2 MM for an enclosure to get from Case 3 to Case 4 saves 14.4 lives | |
| per 10,000 years. (Almost all the improvement is in on-site risk. Off-site risk | |
| improvement is not significant.) This sets a value of life plus public outrage at | |
| $143 MM. It may be that in the present circumstances the business can afford $2 | |
| MM for an enclosure; however, in the long run can we afford to take such action | |
| 76 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| which has such a small impact on safety and yet sets a precedent for all highly | |
| toxic material activities [?]. | |
| After the analysis, construction on Case 3, the open-to-atmosphere phosgene generation plant, began. | |
| However, the phosgene generation plant was abandoned mid-construction, and Case 2 is the current | |
| configuration at the Belle facility. | |
| Documentation to support why the phosgene generation plant was abandoned was not provided, although | |
| the CSB obtained a proposal by a third-party contractor to build the plant. The proposal for a plant, as | |
| presented in Case 3, estimated a cost of $830,000 and stressed the contractor’s history of building | |
| successful phosgene generation units. DuPont did not act on this proposal; anecdotal evidence from | |
| interviews suggests that corporate engineers decided to use DuPont resources to construct the plant. | |
| However, once the project was partially complete, the effort was abandoned as it was determined that the | |
| DuPont-designed system would not work. | |
| DuPont cancelled plans for the enclosed phosgene generation unit, but the potential for offsite impact still | |
| remained a concern and was identified in SLM unit PHAs years later. In 2004, a PHA on the SLM unit | |
| by Belle Plant personnel identified the need for a shed enclosure with a scrubber to mitigate or prevent the | |
| release of phosgene offsite. The recommendation resulted from a “What if” analysis during the PHA. | |
| The PHA team listed two separate scenarios that could result in a plant-wide or offsite consequence, both | |
| recommending a shed enclosure. The original due date for the shed enclosure was scheduled for | |
| December 2005 but extended to December 2006; three subsequent extensions on the enclosure | |
| recommendation remained incomplete the day of the fatal phosgene release (Table 5). | |
| 77 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| PHA Enclosure Recommendation Delays | |
| 2004 | |
| Original Recommendation created in SLM 2004 PHA | |
| "Provide appropriate mitigation to prevent multiple fatalities from the | |
| release of a 2000 lb phosgene cylinder." | |
| Due Date: Dec-05 | |
| Dec-04 | |
| 2005 | |
| First Extension | |
| "A COC12 generation system is currently being | |
| evaluated, and if this was installed the shed enclosure may be | |
| designed differently to handle the appropriate chemicals." | |
| New Due Date: Dec-06 | |
| 2006 | |
| Second Extension | |
| "Work to define the scope on this item is progressing but not yet | |
| complete. We are evaluating potential lower cost alternatives to total | |
| shed enclosure." | |
| New Due Date: Dec-08 | |
| 2008 | |
| Third Extension | |
| "...the schedule indicates completion by August 2009." | |
| "The holds on the capital project were due to uncertainty of the | |
| future of the facility and due to the cost of the project." | |
| New Due Date: Nov-09 | |
| 2009 | |
| Fourth Extension | |
| "… project to install a phosgene scrubber to address these | |
| recommendations, an error in basic data was discovered. This | |
| invalidated the original design basis for the scrubbing system, and | |
| required a halt to the project activity." | |
| New Due Date: Nov-10 | |
| SLM 2009 PHA Completed | |
| 32 Recommendations are made, none of which capture the | |
| outstanding recommendation from the SLM 2004 PHA | |
| Fatal Phosgene Incident Occurs | |
| 2010 | |
| May-05 | |
| Dec-06 | |
| Dec-08 | |
| Nov-09 | |
| Dec-09 | |
| Jan-10 | |
| Table 5.Delay for Completing the PHA Recommendation for Enclosing the Shed | |
| 78 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Following the phosgene release incident, DuPont announced that it would idle the storage and use of | |
| phosgene at the Belle site for 2011 and later told the CSB that the site has permenantly discontinued all | |
| onsite phosgene operations. The CSB requested documentation from DuPont that defines the status of the | |
| PHA recommendation for the shed enclosure as of the date of this report. DuPont extended the PHA | |
| recommendation for the shed enclosure until November 2010; however, the work was not completed and | |
| was extended again until the end of 2011. | |
| 4.5.3 | |
| 2006 Phosgene Committee Audit | |
| In 2006, the Phosgene Guardian Committee audited against the DuPont Phosgene Highly Toxic Materials | |
| (HTM) Manual, which included a review of the phosgene cylinder storage shed, the SLM production area, | |
| and other areas of the Belle plant. Three audit team members from other DuPont sites visited the Belle | |
| facility to conduct field walkthroughs and hold discussions with process unit personnel. The audit team | |
| divided the findings and recommendations from the audit into two categories: policies and observations. | |
| The policies were related to the requirements of the HTM manual and the observations were suggestions | |
| or preferred, but not mandatory, practices. | |
| The team found no regulatory compliance deficiencies in the audit, but did issue five policy | |
| recommendations and eight observations. The policy recommendations applied to equipment downstream | |
| of the phosgene cylinder feed system, including a recommendation to add inspection plans for corrosion | |
| detection of the Teflon-lined reactor piping. The team found, and noted as an observation, that the hoses | |
| used on the phosgene feed system were not one of the three types recommended for phosgene service by | |
| the DuPont P3H Standard, but did not require the Belle facility to use the appropriate hoses. | |
| The team also observed that liquid phosgene lines in the shed had moderate external corrosion and that | |
| significant moisture in the shed should be addressed to eliminate future corrosion potential. Because these | |
| items were observations, the HTM manual did not require that DuPont develop an action plan to resolve | |
| 79 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| them. Consequently, the Belle plant continued to use a hose for phosgene service that the company | |
| standard did not recommend. | |
| SLM unit equipment selection practices did not align with the requirements and recommendations in the | |
| phosgene HTM manual. The manual states, “Materials of construction must be selected properly to | |
| handle phosgene safely” but only recommends against the use of nonmetals for piping, valves, and | |
| process equipment containing phosgene. It further states, “Where small amounts of phosgene are present, | |
| stainless steel lined with Teflon is commonly used” without specifically quantifying an amount of | |
| phosgene where Teflon is acceptable. In the SLM phosgene transfer system, phosgene was continuously | |
| present in the PTFE-lined hoses while the connected cylinder was feeding the process. | |
| The HTM manual’s design information section requires that special attention be given to the “prevention | |
| of over pressuring those lines and vessels where liquid phosgene can be trapped between two isolation | |
| valves.” In the course of switching between cylinders on the morning of the phosgene incident, SLM | |
| operators “blocked in” (i.e., closed the valve on each end of the hose), which trapped liquid phosgene | |
| between the partially filled riverside cylinder and the valve to the process. The liquid phosgene trapped in | |
| the hose underwent thermal expansion, rupturing the hose due to the overpressure of the line that was | |
| facilitated by the weakened and corroded stainless steel overbraid. None of the SOPs for the SLM unit | |
| warned against blocking in liquid phosgene to prevent hose ruptures, making operators less aware of the | |
| thermal expansion hazards of phosgene. | |
| 4.6 Standards and Guidelines | |
| 4.6.1 | |
| DuPont Highly Toxic Materials Phosgene Manual | |
| The DuPont HTM manual includes mandatory criteria for the storage, handling, maintenance, and | |
| management of phosgene in quantities with the potential to cause offsite impact if released. The 86-page | |
| manual also includes non-mandatory practices for new and existing units or facilities handling phosgene, | |
| and company requirements and procedures related to first aid and medical treatment, MOC, design | |
| 80 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| information for new and existing phosgene equipment, and PSM principles. The Phosgene Guardian | |
| Committee reviews and revises the manual and the committee chairperson and SHE leader authorize the | |
| revisions. The Responsible Care Core Team reviews and approves all changes to mandatory requirements | |
| before issuing the revised manual. The Plant or Unit Manager must authorize any deviation from the | |
| manual requirements before using an alternative practice. The HTM Committee conducts a safety analysis | |
| to ensure that the alternate practice is acceptable before implementation. | |
| 4.6.2 | |
| American Chemistry Council (ACC) Phosgene Safe Practice Guidelines | |
| Manufacturers and users of phosgene formed the Phosgene Panel in 1972 to share information about | |
| practices to safely produce, handle, and use phosgene throughout industry. The Phosgene Panel is part of | |
| the Chemical Products and Technology Division of the ACC, an industry trade association for chemical | |
| companies; its Chemical Products and Technology Division supports companies through continuous | |
| evaluation and communication improvements related to the safe use of hazardous chemicals. Engineers, | |
| health and safety experts, and occupational health physicians from member companies participate on the | |
| panel,50 | |
| which meets twice a year to share information and experiences related to handling phosgene. The | |
| panel sponsors engineering studies and research to prevent phosgene-related incidents and has prepared | |
| manuals for phosgene safe practices and medical treatment information as a resource for ACC member | |
| companies. | |
| The ACC Phosgene Panel compiles information from member companies into the Phosgene Safe Practice | |
| Guidelines Manual to provide general information to those that manufacture or handle phosgene. The | |
| manual contains nine sections of phosgene safety information such as phosgene properties, design | |
| 50 In 2010, all U.S. phosgene manufacturers participated in the panel: BASF Corp.; Bayer Corp.; Chemtura; Dow | |
| Chemical; DuPont; Huntsman; SABIC Innovative Plastics; and VanDeMark Chemicals, Inc. | |
| 81 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| information for phosgene process facilities, transportation, emergency planning, first aid and medical | |
| treatment, and training. | |
| Phosgene panel members draft summaries of industry practices that they submit for review and approval | |
| by all members of the ACC Phosgene Panel prior to inclusion in the manual. The panel periodically | |
| updates the manual and adds new and relevant practices identified by industry. The ACC does not intend | |
| for the manual to be a training tool or be adopted as procedure; it is to be referenced for general | |
| information regarding safe practices for phosgene storage and use. | |
| The “Design of Facilities” section of the manual has several subsections pertaining to construction | |
| materials and layout of phosgene process equipment and facilities. This section includes leak prevention | |
| information such as equipment inspections, monitoring, and alarms, and describes the use of engineering | |
| controls and multiple layers of protection or barriers between phosgene exposure hazards and personnel. | |
| This section includes precautions with regards to piping and valves in phosgene service. The manual | |
| states that users should pay particular attention to | |
| • protecting piping from over-pressurization due to liquid phosgene trapped between closed valves; | |
| • protecting dry51 | |
| phosgene systems from the intrusion of moisture, which can react with phosgene | |
| and cause severe corrosion and failure; and, | |
| • | |
| inspecting and testing where stainless steel materials are used to detect the presence of stress | |
| corrosion cracking caused by exposure to chlorides. | |
| The section also states that the use of metallic and non-metallic hoses for permanent or temporary piping | |
| systems may increase the opportunity for phosgene leakage and advises users to give due consideration to | |
| 51 Phosgene in the absence of water or moisture, sometimes referred to as “anhydrous.” | |
| 82 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| the design, fabrication, and testing of all components. The manual also notes the potential permeability | |
| issue with PTFE liners, stating that these liners are typically used for phosgene service in well-ventilated | |
| areas; however, it does not specifically describe acceptable methods of ventilation. | |
| 4.6.3 | |
| National Fire Protection Association (NFPA) | |
| NFPA 55: Compressed Gases and Cryogenic Fluids Code provides fundamental safeguards to users, | |
| producers, distributors, and others who handle compressed gas cylinders and includes general | |
| requirements for storage, occupancy, and emergency response and provisions for specific chemicals or | |
| hazard classes as defined by the NFPA. The current version of the CGA P-1 Standard references NFPA | |
| 55 in the “Ventilation, Storage, and Site Criteria” section for toxic and corrosive gases. | |
| DuPont Belle’s programs and practices related to the storage and handling of phosgene cylinders does not | |
| align with the provisions set forth in NFPA 55. NFPA 55 defines phosgene as a highly toxic gas because | |
| it contains a lethal concentration (LC50) equal to or less than 200 ppm in air when administered via | |
| inhalation for 1 hour.52 | |
| The LC50 for phosgene is 5 ppm for 1 hour of exposure (CGA P-20, 1995). NFPA | |
| 55 includes guidelines for controls in buildings that store compressed gas cylinders, and classifies the | |
| phosgene shed structure as an indoor storage area because the walls comprise more than 25 percent of the | |
| shed perimeter ( | |
| Figure 12 | |
| ). Indoor storage for highly toxic gases must include a gas cabinet, exhausted | |
| enclosure, or a gas room, according to NFPA 55. Exhausted enclosures, gas cabinets, or gas rooms fully | |
| enclose cylinders and associated process equipment and are equipped with ventilation systems to capture | |
| and treat hazardous vapors. The phosgene shed at Belle, though considered indoor storage by NFPA, does | |
| not contain a ventilation system; instead, DuPont relies on natural ventilation from the outside to decrease | |
| concentrations of phosgene, which allows phosgene vapors to travel downwind, potentially exposing | |
| 52 LC50 is the lethal concentration for 50 percent of the exposed population. | |
| 83 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| other employees working outside. Without exhausted enclosures, no barriers were present to prevent | |
| phosgene from exposing operators or traveling offsite. | |
| The standard also includes guidance for alarms to warn personnel of potential releases from compressed | |
| gas cylinders and associated equipment. The SLM unit at the Belle plant had alarms for phosgene releases | |
| that were activated manually by the control board operator upon notification from outside personnel or if | |
| a phosgene analyzer activated an alarm at the control board. NFPA 55 guidance states that manual | |
| emergency alarms should be provided in the buildings that enclose cylinders and, when activated, sound | |
| local alarms to alert occupants in the surrounding area. The phosgene shed at Belle contains no alarms | |
| that can be activated locally. Operators suspecting a release are expected to communicate verbally with | |
| the control operator who then sounds an alarm. In the absence of automatic alarm notifications, personnel | |
| in the surrounding area risk exposure, as was the case on the day of the incident. | |
| For gas detection systems, the NFPA states that alarms should activate a local alarm that is both audible | |
| and visual. In the phosgene shed, the SLM building area, and on the Belle Plant fence line, the gas | |
| detection systems activate alarms only in the SLM control room if concentrations exceed the alarm set | |
| points. The gas detectors do not locally sound or visually indicate the detection of a hazardous | |
| concentration to alert surrounding personnel. | |
| 4.6.4 | |
| Compressed Gas Association (CGA) Standards for the Safe Handling of | |
| Cylinders | |
| The industry association CGA represents manufacturers, distributors, suppliers, and transporters of gases | |
| and cryogenic liquids. It develops and promotes standards and practices for the industrial and medical gas | |
| industry, with input from over 125 member companies. Standards include technical specifications, health | |
| and safety practices, and training and educational materials. | |
| The VanDeMark phosgene bulletin references the current CGA Standard, Safe Handling of Compressed | |
| Gases in Containers (P-1), for the training and proper handling of phosgene cylinders. The 2008 P-1 | |
| Standard includes safe practices related to the transportation, identification, and storage of compressed | |
| 84 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| gases and specific safe handling and storage rules for chemicals defined by hazard classes. Each | |
| chemical has an assigned hazard class based on its physical properties: flammable, asphyxiant, oxidizer, | |
| toxic, corrosive, or extreme cold. The CGA lists phosgene as a primary toxic and secondary corrosive. | |
| The toxic and corrosive gas section includes requirements for cylinder storage and ventilation, emergency | |
| response, and training. OSHA adopted the 1965 version of the CGA P-1 Standard under the requirements | |
| of the Compressed Gas Standard (29 CFR 1910.101). Under the OSHA Standard, the in-plant handling | |
| and storage of compressed gas cylinders will be in accordance with CGA P-1 (1965). | |
| The current version of the CGA P-1 Standard includes a specific reference to Chapter 7 of NFPA 55 for | |
| the storage and handling of compressed gas cylinders with flammables, but contains only basic | |
| requirements for the storage and handling of corrosives and toxics. In CGA P-1 Section 6.2.6 of | |
| Flammable Gases, the standard includes NFPA 55 requirements such as separation distances, flammable | |
| storage quantities, and fire barriers. However for toxics, the P-1 Standard states, “Storage of corrosive | |
| and toxic gases shall be in accordance with local and/or provincial/territorial building and fire prevention | |
| codes.” The standard also states that toxics “shall be filled and used only in adequately ventilated areas or | |
| preferably outdoors or in exhausted enclosures,” but does not contain any specific provisions to achieve | |
| adequately ventilated areas such as the requirements set forth in NFPA Section 7.9. | |
| 4.6.5 | |
| CGA Standards for PTFE-lined Hoses | |
| On January 29, 2010, CGA published the fourth edition of Standard E-9, Standard for Flexible, PTFE- | |
| lined Pigtails53 | |
| for Compressed Gas Service. Section 1 of E-9 states that the standard applies to hoses | |
| with a diameter of 0.25 inches or smaller and with a maximum allowable working pressure (MAWP) of at | |
| least 3,000 psi, such as those used at DuPont. Section 2 of E-9 states, “PTFE-lined pigtails are not | |
| suitable for use with… poisonous, toxic, or pyrophoric gases because permeation of gas through the | |
| 53 “Pigtails” are hoses or flexible tubing used to transfer material from a compressed gas cylinder. | |
| 85 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| PTFE wall creates a potential hazard.” Since phosgene is toxic, this standard rules out using PTFE-lined | |
| hoses for phosgene. | |
| Additionally, Section 5 of Standard E-9 defines how to label hoses: rather than allow tags with adhesive | |
| or heat-shrink wrap, as was the case with the DuPont hoses, it states, “The markings shall be made on the | |
| end fitting, collar, separate band, or other permanent location.” The hose supplier’s practice of affixing | |
| adhesive tape on the hose itself did not align with the requirements in CGA E-9 and enhanced the | |
| corrosion of the metal braid on the PTFE-lined hoses at Belle. | |
| The CGA 2008 P-1 Standard does not specifically reference prior revisions of the E-9 standard. Section | |
| 5.9 of P-1 includes general requirements for container connections and states that “[p]iping, regulators, | |
| and other apparatus should be kept air tight to prevent leakage...” The P-1 Standard does not address | |
| materials of construction or permeability for cylinder discharge hoses in its general or safe handling | |
| requirements by corrosive and toxic hazard class. | |
| 4.7 Key Findings | |
| 1. An out-of-service phosgene transfer hose failed, exposing a worker to a lethal dose of | |
| phosgene. | |
| 2. DuPont did not follow its own standards for the change-out of phosgene transfer hoses. | |
| 3. DuPont engineers voiced concern regarding the materials of construction for phosgene hoses | |
| that were not addressed. | |
| 4. Liquid phosgene was not evacuated from the riverside hose, as the SOPs indicate, between | |
| transfers to the process from the 1-ton cylinders. | |
| 5. A similar hose failure almost occurred a few hours before the exposure of the worker; | |
| however, this near-miss did not prompt an investigation when operators observed the near | |
| failure of the hose on the morning of the fatal release. | |
| 86 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 6. The SAP maintenance program was altered so that a work order to change-out the phosgene | |
| transfer hoses was no longer generated automatically (Appendix C). | |
| 7. One worker was confirmed to have been exposed to phosgene after the initial exposure while | |
| a second is thought to have been possibly exposed. | |
| 8. Emergency responders did not receive timely and detailed information on how to adequately | |
| prepare to respond to the incident. | |
| 9. No audible or visual phosgene alarm indication in or around the phosgene shed. | |
| 10. The 2009 PHA did not address thermal expansion and corrosion potential for phosgene | |
| transfer hoses. | |
| 11. Operators were unaware of the hazards of liquid phosgene thermal expansion (training and | |
| procedures). | |
| 12. No plant-wide notification occurred in response to the exposure. | |
| 4.8 Root Causes | |
| 1. DuPont relied on a maintenance software program to initiate the automatic change-out of | |
| phosgene hoses at the prescribed interval. | |
| 2. DuPont did not provide a back-up method to ensure timely change-out of the hoses. | |
| 3. A maintenance software program change was not documented or reviewed in accordance | |
| with the MOC process. | |
| 4. No person with process knowledge was in place and assigned to convey timely and useful | |
| information to Metro 9-1-1. This responsibility was consigned to the gate guard. | |
| 87 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 5. The Belle Plant did not use the construction materials recommended by a corporate expert, | |
| the P3H standard, CGA, or the HTM manual for phosgene hoses, even though the 2006 | |
| second-party HTM audit recorded it as an observation. | |
| 5.0 Three Incidents in 33 Hours | |
| Because two incidents occurred in a relatively short period, on Saturday, January 23, 2010, after the | |
| oleum release had been secured, the Plant Manager convened a meeting of supervisors and roughly 10 | |
| managers and supervisors assigned to the Belle Plant Crisis Committee to discuss and initiate a safety | |
| pause, the intent of which was to evaluate what the managers had seen and “take appropriate steps to | |
| ensure safe operation.” Approximately 10 managers are part of the Crisis Committee and, after a | |
| debriefing, other supervisors and managers were advised that a safety pause would be conducted. Where | |
| possible, processes would be shut down to allow the discussion, and in those plants that could not be shut | |
| down, employees were expected to participate as best they could. | |
| The Plant Manager assigned the Area Manager for the SLM and F3455 units (who was part of the Belle | |
| Plant Crisis Committee) to contact supervisors and managers and ask that they come to the plant to | |
| participate in planning a plant-wide safety pause. These calls went out at about 11:00 a.m., and | |
| supervisors and managers started arriving at the plant at about noon. At about 2:00 p.m., shortly after the | |
| planning for the safety pause began, the group heard a radio call advising the plant of a medical | |
| emergency. In response to the Plant Manager’s inquiry, it was learned a worker had been exposed to | |
| phosgene in the SLM unit, making it the third incident in about 33 hours at the facility. | |
| In a striking similarity of events and activities, after two release incidents at the Honeywell Baton Rouge | |
| facility in July 2003, upper management ordered the entire plant to shut down and review all facility | |
| 88 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| operations prior to re-start. During this safety stand-down, a third incident occurred where an employee | |
| was exposed to hydrofluoric acid during cleanup of an area in the plant.54 | |
| The objective of both shutdowns was to get the attention of the workforce, acknowledge that the | |
| occurrence of incidents was unacceptable, and recommit to the two companies’ core values of adhering to | |
| health and safety guidance. One common element was that both companies initiated safety stand-down | |
| activities after the string of incidents started in their respective plants. Another common theme was the | |
| precursor or near-miss events preceding actual incidents. Despite these efforts to address the cause of the | |
| string of incidents at the Belle plant, a fatal incident occurred. At the Belle plant, although investigations | |
| were conducted, near-miss investigations were not immediately responded to on weekends, including the | |
| near catastrophic failure of a separate phosgene transfer hose only hours earlier. Management at all levels | |
| is responsible for fostering an atmosphere of trust and openness and for encouraging the reporting of near- | |
| misses and incidents, as failure to do so could result in non-reporting of near-miss events (CCPS, 1992). | |
| Despite these efforts to address the cause of the string of incidents at the Belle plants, a fatal incident | |
| occurred. | |
| As part of another investigation of the BP Texas City incident in 2005,55 the CSB examined corporate | |
| oversight of safety management systems and corporate safety culture. As a result of an urgent | |
| recommendation from that same investigation, The Report of the BP U.S. Refineries Independent Safety | |
| Review Panel, The examination of corporate oversight of safety management systems and corporate | |
| safety culture has been conducted as part of another CSB investigation of the BP Texas City incident in | |
| 200556 | |
| , and a blue ribbon panel of experts chaired by former Secretary of State James A. Baker was | |
| 54 CSB-2003-13-I-LA (Honeywell). | |
| 55 CSB 2005-04-I-TX, 2007. | |
| 56 CSB 2005-04-I-TX, 2007 | |
| 89 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| convened. as the result of an urgent recommendation from that same investigation, The Report of the BP | |
| U.S. Refineries Independent Safety Review Panel. While not indicating that the work/safety culture was | |
| irretrievably broken at the Belle facility—and perhaps within the DuPont Corp.—the events before and | |
| after the string of incidents in late January 2010 suggest that the safety culture has “shifted”; is not | |
| operating as it has historically; and could benefit from an extensive examination of all facets of the safety | |
| culture, both within the facility and throughout the corporation. | |
| 5.0.1 Additional DuPont Incidents | |
| About 8 months after the series of incidents at the Belle plant triggered this investigation, another | |
| significant release occurred. At about 4:00 p.m. on September 21, 2010, DuPont Belle plant personnel | |
| discovered a methanol leak in a heat exchanger in the methylamines production unit while conducting | |
| regular sampling of the plant's water effluent stream. More than 160,000 pounds of methanol were | |
| estimated to have been released into the Kanawha River over a 24-hour period. This incident occurred | |
| when pressure on the process side of a heat exchanger was increased to a pressure greater than the steam | |
| condensate side of the process. After troubleshooting, operators suspected a leak on the process side of | |
| the heat exchanger and increased steam pressure until samples of the effluent stream confirmed that the | |
| leak had stopped. No employee or community injuries were recorded as a result of this release. | |
| Almost 3 months after the methanol release, on December 3, 2010, at about 2:23 a.m., a fume alert was | |
| sounded in the amines unit at the DuPont Belle, WV, facility announcing a release of monomethylamine | |
| (MMA). The release occurred while two operators—one senior operator with 34 years of experience at | |
| DuPont and a junior operator with a little over a year—were sampling MMA from a rail car. One | |
| operator received first- and second-degree chemical burns to his face, while the other inhaled some of the | |
| escaping MMA and received first-degree chemical burns to his face. Both were transported to Charleston | |
| Area Medical Center for 24-hour treatment and observation and released the following day. | |
| 90 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| The CSB investigators returned to the Belle facility to assess the MMA release incident. In examining the | |
| equipment, one area of concern was the design of the valves used to isolate the sampling apparatus. As | |
| configured during the sampling operation, only a single block valve isolated the process from the sample | |
| container. This contrasts with industry standards, which suggest the use of double block valves and bleed | |
| vents to assure that the sample piping is clear of hazardous material prior to disconnecting. About 10 | |
| pounds of MMA are estimated to have been released during this incident; no employee or community | |
| injuries were recorded as a result of this release. | |
| At DuPont’s Yerkes facility in Tonawanda, NY, the CSB assessed a hot work incident that killed a welder | |
| and injured his supervisor on November 9, 2010. This incident was under investigation as this report | |
| went to publication, but preliminary assessments indicate that pre-hot work inspections were less than | |
| adequate, including a failure to check the atmosphere in a tank that normally processes non-flammable | |
| material, but that had inter-connecting piping that could route flammable vinyl fluoride into the tank. The | |
| workers were assigned to repair the tank; however, prior to beginning work, there is no record of DuPont | |
| using a portable gas detector to ensure that the tank being worked on was free of flammable material. | |
| 5.1 Management Systems | |
| 5.1.1 | |
| Knowledge Management | |
| DuPont employees told the CSB investigators that many “very knowledgeable” Belle plant operations and | |
| maintenance workers had recently retired or are approaching retirement age. From 2005 to the end of | |
| 2009, 82 Belle Plant employees retired and 14 resigned. The total number of employees at the Belle plant | |
| has dropped 13 percent (55 people) over the last 5 years. A loss of plant-specific knowledge, or | |
| “corporate memory fade,” has contributed several incidents in industry (CCPS, 1995), as new hires | |
| cannot replace years of experience; thus, companies must train and supervise new staff until they acquire | |
| job competencies to work safely. | |
| 91 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Experienced maintenance mechanics and technicians have valuable hands-on experience and knowledge | |
| of equipment essential to the safe operation of plant processes. A worker in the Belle maintenance | |
| department told the CSB investigators that the maintenance staff reported to four different maintenance | |
| site leaders over the last 5 years prior to the January 2010 incidents. Other employees expressed concern | |
| that new hires spent too little time learning from veteran employees. | |
| The CSB investigators reviewed and compiled workforce data from DuPont Belle organization | |
| announcements between January 2005 and June 2010, which listed all new hires, transfers, resignations, | |
| and retirements that affected the Belle workforce. Over the 4 years, there were 85 retirements totaling | |
| 2,572 years of experience with an average 30 years of service per employee. Among the 85, 20 were from | |
| the maintenance department, contributing to a loss of 713 total years of knowledge and experience (Table | |
| 6). | |
| DuPont Belle Workforce 2005 to 2009 | |
| Retirements | |
| Years Experience at Belle | |
| Maintenance | |
| Total | |
| 20 | |
| 85 | |
| 713 | |
| 2,572 | |
| New hires | |
| Years Experience at Belle | |
| Maintenance | |
| Total | |
| 10 | |
| 101 | |
| 0 | |
| 0 | |
| Table 6. Sum of Belle plant retirements and new hires from 2005 to 200957 | |
| In addition to the 85 retirements, there were 14 resignations and 14 transfers to other sites. The Belle plant | |
| hired 101 employees over the 4 years and 8 DuPont employees transferred to Belle from other sites. | |
| Though the overall proportion of new to departing employees has remained consistent, a significant | |
| 57 This does not include interns, co-ops, special assignments, or leaves of absence. | |
| 92 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| reduction of employees with an average of 30 years of experience working on the Belle site contributes to | |
| a loss of institutional and plant-specific knowledge. | |
| In the case of Belle, a significant population of employees is retiring, with a great deal of process | |
| knowledge that is lost if not properly maintained. This is an issue for industry in general as an entire | |
| generation of baby boomers approaches retirement. In January, 2011, DuPont announced plans to hire | |
| 150 employees at Belle over the next few years to compensate for the number of retiring workers. | |
| 5.1.2 | |
| Hierarchy of Controls | |
| The Hierarchy of Controls is a method generally recognized and used by health and safety professionals | |
| to control workplace hazards. The National Safety Council (NSC) developed the Hierarchy of Controls in | |
| the 1950s and Congress later adopted and enacted it into the Occupational Safety and Health Act of 1970. | |
| The Hierarchy of Controls (Figure 17) demands the use of higher-level engineering and administrative | |
| controls to eliminate hazards. When those operations are not feasible, a PPE program must be | |
| implemented. | |
| Figure 17. Hierarchy of Controls | |
| 93 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| In the early 1900s, DuPont recognized that eliminating hazards is preferred beyond education and | |
| protection. However, SOPs for the SLM phosgene cylinder feed system relied primarily on work practices | |
| and PPE to protect operators from the exposure hazards. Other facilities within DuPont and in the | |
| chemical industry have engineering controls in place for similar phosgene cylinder operations. | |
| 5.1.2.1 Design and Engineering Controls for Phosgene Cylinders | |
| In 1984, Ciba-Geigy Corp. employees published a technical paper about the safe handling of phosgene in | |
| chemical processing specific to the operation of 1-ton phosgene cylinders (Alspach et al., 1984). Ciba- | |
| Geigy, now part of BASF, had a facility in Toms River, NJ, where two 1-ton cylinders of phosgene fed a | |
| chemical process. Similar to DuPont, the cylinders connected to the process through PTFE-lined hoses | |
| with a stainless steel overbraid induced with nitrogen to drive liquid from the cylinders. At the Ciba- | |
| Geigy plant, a transparent isolation chamber enclosed the cylinder valve connections, and operators | |
| opened and closed valves while standing outside the enclosure, extending their arms though rubber arms | |
| and gloves that were part of enclosure. The enclosure continuously vented to a caustic scrubber and acted | |
| as a barrier between the operator and any potential phosgene vapors near the cylinders. | |
| The phosgene area had phosgene analyzers to continuously monitor and alarm if concentrations exceeded | |
| a defined set point. At high concentrations, flashing lights and audible warnings automatically alerted the | |
| production building, plant guards, and adjacent roadways and buildings. At the Belle facility, phosgene | |
| readings on the analyzers activate alarms in the control room, but DuPont relies on the board operator to | |
| notify personnel in the unit and the rest of the plant. By automating the phosgene analyzer alarm system | |
| to activate notifications plant-wide, Ciba-Geigy eliminated reliance on administrative controls to notify | |
| and protect personnel. | |
| 5.1.2.2 Phosgene Handling at the DuPont Mobile, AL Plant | |
| The DuPont Mobile plant in Mobile, AL, uses the same 1-ton phosgene cylinders as Belle for its | |
| agricultural chemicals’ process. The Mobile process has three cylinders on weigh scales, transferred to the | |
| 94 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| process through similar PTFE-lined flexible hoses with a stainless steel overbraid made by a different | |
| manufacturer. The Mobile hoses are 18 inches shorter and have a greater maximum operating temperature | |
| and pressure than those used at Belle. A hose distributor supplies both hoses from the manufacturer to | |
| each site. | |
| The phosgene cylinders and weigh scales at the Mobile plant are housed in the cylinder room, an enclosed | |
| room that vents to an emergency scrubber that pulls a slight negative pressure on the room and scrubs air | |
| before venting to the atmosphere. The scrubber is designed to capture vapors from a release of an entire | |
| cylinder. Operators at the Mobile plant enter the phosgene cylinder area under the same PPE requirements | |
| as Belle for isolating and changing cylinders (hard hat, steel-toed shoes, safety glasses, and phosgene | |
| dosimeter). However, at Mobile, to capture and scrub phosgene vapors in the event of a release, the | |
| operator turns on the emergency scrubber and pump before entering the enclosure. | |
| Like Belle, Mobile has phosgene analyzers located in and around the unit to continuously monitor | |
| concentrations. At Mobile, alarms in the cylinder enclosure activate local audible alarms inside the | |
| enclosure and a flashing light outside to alert employees. If no operators are present in the enclosure when | |
| the alarm activates, the emergency vent scrubber automatically starts. The Belle plant analyzer in the | |
| phosgene shed has no audible alarm to alert personnel in the area; instead, Belle plant procedures require | |
| the board operator to notify personnel of the release and only operators at the phosgene shed can activate | |
| the switch for the warning light. | |
| The emergency scrub system and automated alarms at Mobile are examples of higher-level controls that | |
| protect workers. Mobile has automated alarms where Belle relies on operator action to initiate alarms to | |
| warn personnel of a suspected or actual release. Mobile implemented the scrubber system, an example of | |
| an engineering control, to manage the concentrations of phosgene in the cylinder enclosure in the event of | |
| a release. The Belle plant phosgene shed design allows only for natural ventilation to carry unwashed | |
| 95 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| phosgene gases that can potentially harm personnel in or around the shed and possibly enter the | |
| community. | |
| 5.1.2.3 Safety in Design Issues | |
| Safety considerations in the equipment design stage eliminate the need for companies to retrofit existing | |
| process equipment or implement administrative or PPE programs to protect workers and the environment. | |
| In addition to the SLM unit, the CSB also identified a lack of safety and health considerations during the | |
| design and construction phases of the F3455 and SAR units. In the F3455 unit, engineers did not design | |
| the control system alarms so that operators could distinguish between a failed battery and activation of a | |
| rupture disc burst sensor, which resulted in nuisance alarms for the rupture disc on the methyl chloride | |
| vent line. Instead of addressing the reliability issues associated with the frequently failing sensor, | |
| management wired the burst sensor to electric power so that low batteries were no longer causing frequent | |
| and false alarms. However, since operators were not retrained to respond to the alarm, they ignored the | |
| alarm during the F3455 unit maintenance activity; consequently, the unit restarted with a failed rupture | |
| disc. | |
| The CSB investigators also noted safety in design issues with the presence of the weep hole on the methyl | |
| chloride vent line upstream of the rupture disc assembly. DuPont engineering standards require that | |
| drainage holes be placed downstream of the relief devices on vent lines to allow for drainage and prevent | |
| liquid from lodging in the discharge side of the rupture disc. However, the location of the weep hole | |
| allowed toxic vapors from the methyl chloride vent line to enter the F3455 building where concentrations | |
| could accumulate to dangerous levels. DuPont could have designed the vent line so that the weep hole | |
| would drain to the exterior of the facility where vapors would dissipate into the atmosphere if a rupture | |
| disc burst. | |
| In the SAR unit, DuPont chose copper steam tracing to prevent the oleum sample line and other process | |
| lines from freezing, even though steam tracing is not the preferred method for oleum service (Dillon, | |
| 96 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 1997). Steam tracing can create hot spots that result in an uneven heat distribution in the oleum sample | |
| line, which can accelerate corrosion. Steam tracing in the SAR unit exacerbated the corrosion incident in | |
| the oleum sample line, resulting in a significant release of oleum. Had the SAR unit design engineers | |
| called for electric tracing or replaced the steam tracing, the larger hole in the sample line might not have | |
| formed. | |
| 6.0 Regulatory Analysis | |
| 6.1 Occupational Safety and Health Administration (OSHA) | |
| 6.1.1 | |
| Process Safety Management Program | |
| The OSHA PSM Standard (29 CFR 1910.119) requires employers to minimize or prevent the | |
| consequence of catastrophic incidents involving highly hazardous chemicals by applying elements of the | |
| PSM regulation to covered processes. PSM applies to processes using or producing any of the 137 listed | |
| toxic chemicals at or above threshold quantities and processes with flammable liquids or gases onsite in | |
| quantities of 10,000 pounds or more in one location. The PSM Standard applies to the SLM and F3455 | |
| units because they contain listed toxic chemicals in excess of the threshold quantities (TQ) specified in | |
| the regulation. | |
| A PHA is one of the 14 elements in the PSM Standard requiring the employer to assess all PSM-covered | |
| processes to identify, evaluate, and control hazards by using one or a combination of several | |
| methodologies listed in the regulation. Furthermore, the standard requires the PHA to address58 | |
| • | |
| the hazards of the process | |
| 58 29 CFR 1910.119(e)(3). | |
| 97 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| • | |
| • | |
| engineering and administrative controls applicable to the hazards and their interrelationships such | |
| as appropriate application of detection methodologies to provide early warning of releases | |
| consequences of failure of engineering and administrative controls | |
| In the 2009 PHA for the SLM unit, the team did not assess the potential for a phosgene release from a | |
| failed transfer hose due to corrosion or thermal expansion but did consider these issues in process | |
| equipment downstream of the hoses. The team identified that engineering and administrative controls, | |
| such as the PM system and adherence to SOPs, would reduce the likelihood of a phosgene release from | |
| this equipment. However, the team did not assess the consequences caused by the PM system failing to | |
| initiate hose replacements at the proper frequency. In its 2009 PHA for the SLM unit, an audit team did | |
| not address phosgene thermal expansion in the liquid transfer hose; subsequently, in July 2010, OSHA | |
| issued a serious violation to DuPont. | |
| The PSM Standard also requires employers to conduct an MOC for all modifications to process | |
| chemicals, technology, equipment, and procedures; and changes to facilities that affect a PSM-covered | |
| process. The procedures are meant to address the following prior to the change59 | |
| : | |
| • The technical basis for the proposed change | |
| • | |
| Impact of change on safety and health | |
| • Modifications to operating procedures | |
| • Necessary time for the change | |
| • Authorization requirements for the proposed change | |
| The MOC also requires that the employees in operations and maintenance affected by the change be | |
| informed of the change and trained prior to the start-up of that process. | |
| 59 29 CFR 1910.119(l). | |
| 98 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Investigators found MOC program deficiencies for modifications made to critical equipment on both the | |
| F3455 and SLM units. On the F3455 unit, DuPont’s MOC process approved a design for the rupture disc | |
| alarm system that lacked sufficient reliability to minimize the release of flammable methyl chloride. The | |
| unit changed the rupture disc burst sensor on the methyl chloride vent line from battery power to electric | |
| to eliminate battery failure, but failed to assess the reliability of the burst sensors individually. The MOC | |
| process did not evaluate the basis of the modification to verify that it met the intended purpose of | |
| eliminating nuisance alarms caused by battery failure. | |
| DuPont did not perform an MOC review for the changes to the maintenance system that handled the | |
| phosgene hose replacements on the SLM unit. The modification made to the phosgene hose replacement | |
| work orders kept the system from generating a new work order, thus extending phosgene hose use beyond | |
| its planned service life. DuPont stated that knowledge of the change was limited to only a few key SAP | |
| users, but these users lacked training necessary to recognize its impact on hose replacement frequency. | |
| 6.1.2 Compressed Gases | |
| The OSHA Standard for Compressed Gases (29 CFR 1910.101) applies to employers that handle, store, | |
| and use compressed gases in cylinders, portable tanks, or tank cars. The standard includes requirements | |
| for cylinder inspections, safety relief devices, and storage and handling of compressed gas cylinders, and | |
| requires employers to handle and store cylinders in accordance with CGA pamphlet P-1 1965, “Safe | |
| Handling of Compressed Gases in Containers.” | |
| In the 41 years since OSHA adopted the reference standard as part of the Compressed Gas Regulation, | |
| CGA P-1 has been revised 10 times. The current 2008 version is more comprehensive than the OSHA- | |
| adopted 1965 version, which does not list chemicals by hazard class and contains specific safety | |
| information only for flammable and poisonous gases. The current version lists 82 chemicals that fall into | |
| 99 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| the primary toxics category, while the 1965 version lists only 13 poisonous gases as defined by the | |
| Interstate Commerce Commission (ICC).60 | |
| The 1965 standard contains the same general information as | |
| the current version, but lacks detailed guidance for facility siting, emergency response, and safety | |
| information specific to various types of chemicals stored in compressed gas cylinders. The 1965 version | |
| includes obsolete and outdated references and lacks references to applicable OSHA regulations, as it was | |
| published prior to the establishment of OSHA. With respect to the issues identified in the phosgene | |
| release investigation, had OSHA adopted the 2008 version of the CGA P-1 Standard, DuPont would have | |
| been accountable for more phosgene storage engineering controls via the incorporation of NFPA 55 and | |
| other consensus standards referenced in the standard. | |
| 6.1.3 | |
| Inspection History | |
| OSHA is authorized under the Occupational Safety and Health Act of 1970 to inspect workplaces to | |
| ensure that employers are providing a safe and healthy work environment by complying with OSHA | |
| standards. A range of inspection categories establish a system of priorities: | |
| • | |
| Imminent danger | |
| • Catastrophes and fatal accidents | |
| • Complaints and referrals | |
| • Programmed inspections | |
| • Follow-up inspections | |
| 60 A regulatory body abolished in 1995, some of whose responsibilities were transferred to the Surface | |
| Transportation Board, an agency within the U.S. Department of Transportation. | |
| 100 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| A review of OSHA’s inspection history reveals that three planned inspections were conducted at the Belle | |
| facility in 1982, 1984, and 1993, in addition to one unprogrammed-related61 | |
| inspection in 1981. Although | |
| no planned inspections occurred from 1993 through 2010, two inspections, one in 1995 and one in 2004, | |
| were the result of complaints; both were closed. | |
| In a series of post-incident inspections, OSHA cited DuPont for a serious violation of Section 5(a)(1) of | |
| the Occupational Safety and Health Act, alleging that inspections were not conducted for all sections of | |
| oleum piping based on prior leak incidents at the SAR unit. Citations for numerous violations of the | |
| 62 | |
| PSM | |
| Standard were also issued. OSHA cited DuPont for serious violations, including the company's | |
| failure to properly inspect piping used to transfer phosgene, perform a thorough PHA for its phosgene | |
| operation, and train workers on hazards associated with phosgene. Proposed penalties for all violations | |
| totaled $43,000.The OSHA PSM Standard (29 CFR 1910.119) requires employers to prevent or minimize | |
| the consequences of a catastrophic release of highly hazardous chemicals and of flammable liquids and | |
| gases. Phosgene and methyl chloride are listed chemicals, and the SLM and F3455 units processed more | |
| than the TQ, thus the PSM Standard applied. | |
| 6.2 Environmental Protection Agency | |
| The EPA Risk Management Program (RMP) regulation (40 CFR 68), mandated by Section 112(r) of the | |
| Clean Air Act Amendments of 1990, regulates the use of highly hazardous chemicals at fixed facilities. | |
| Its purpose is to prevent accidental offsite releases of listed substances and ensure that a company and the | |
| 61 An unprogrammed-related inspection can occur at a multi-employer worksite when an employer is being | |
| inspected because of a complaint, accident, or referral. Any other employer with staff on the worksite is subject to | |
| inspection. | |
| 62 PSM is a regulation promulgated by OSHA. A process is any activity or combination of activities including any | |
| use, storage, manufacturing, handling, or the onsite movement of HHCs as defined by OSHA and the EPA. | |
| 101 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| community are able to respond effectively in the event of a release. The regulation applies to facilities | |
| using or storing regulated substances exceeding the TQ specified in the EPA regulations. | |
| Each covered process is required to be designated as one of three “prevention program” levels based on | |
| offsite consequence analyses, incident history, and PSM program applicability. Program 1 is the lowest, | |
| simplest management program; Program 2 is an intermediate management-level program with added | |
| program elements and basic documentation requirements (PSM-covered processes cannot be designated | |
| Program 2); Program 3 is the highest-level management program. Most PSM-covered processes are | |
| Program 3, which requires a rigorous management program with detailed record retention criteria and all | |
| PSM program elements. All PSM program activities and records are directly applicable to Program 3 | |
| regulatory activities, and all RMP covered chemicals at the DuPont Belle plant fall into Program 3 | |
| requirements (Table 7). | |
| Toxics | |
| Anhydrous Ammonia | |
| Phosgene | |
| Sulfur Trioxide | |
| Formaldehyde | |
| Oleum | |
| Methyl Chloroformate | |
| Flammables | |
| Dimethylamine | |
| Methylamine | |
| Methyl Ether | |
| Ethylamine (70% aqueous) | |
| RMP TQ (lbs) | |
| 10,000 | |
| 500 | |
| 10,000 | |
| 15,000 | |
| 10,000 | |
| 5,000 | |
| 10,000 | |
| 10,000 | |
| 10,000 | |
| 10,000 | |
| Table 7. DuPont Belle RMP-covered chemicals and threshold quantities | |
| Each covered process must undergo a hazard assessment (40 CFR 68, Subpart B) in which the owner is | |
| required to prepare a “worst case release scenario” and an “alternative release scenario” for each covered | |
| process. Different analysis criteria apply based on whether the covered chemical is toxic or flammable. | |
| The hazard assessment also requires inclusion of the “five year accident history.” The results of the | |
| hazard assessment, along with other pertinent information for each covered process, must be submitted to | |
| 102 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| the EPA. The RMP (40 CFR 68, Subpart G) is submitted electronically and must be periodically updated. | |
| The DuPont RMP submission for 2010 had no accident history to report. | |
| In November 2003, the EPA Region III Chemical Accident Prevention Program audited the Belle facility | |
| to ensure compliance with the EPA RMP, and covered all RMP elements and emergency response and | |
| site security. The EPA audited the 2-million gallon ammonia storage tank against the RMP requirements | |
| for Program 3 management programs and the RMP documentation DuPont submitted. The EPA audit | |
| report submitted to DuPont in December 2003 contained no deficiencies or recommendations for | |
| improvement. The November 2003 RMP audit is the only one conducted at the Belle Plant prior to the | |
| January 2010 incidents. | |
| 6.3 State Hazardous Chemical Release Prevention Program | |
| On January 20, 2011, the CSB Bayer CropScience investigation resulted in a recommendation being | |
| issued to the Kanawha-Charleston Health Department to establish a Hazardous Chemical Release | |
| Prevention Program, whose objective is to enhance the prevention of accidental releases of highly | |
| hazardous chemicals and optimize responses if they occur. In light of its proximity in the Kanawha | |
| Valley, the series of incidents at the DuPont Belle, WV, facility support the plant’s inclusion in such a | |
| program. | |
| The implementation of the new program would incorporate several key guidelines applicable to chemical | |
| plants operating in the Kanawha County. The Belle facility is one of 13 in the county that report EPA | |
| RMP-covered chemicals assigned as Program level 3 that could fall under the auspices of the new | |
| program. The recommendation to the Kanawha-Charleston Health Department stated: | |
| Specifically, the Bayer report recommends that the Director of the Kanawha-Charleston | |
| Health Department establish a Hazardous Chemical Release Prevention Program to | |
| enhance the prevention of accidental releases of highly hazardous chemicals, and | |
| optimize responses in the event of their occurrence. In establishing the program, study | |
| 103 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| and evaluate the possible applicability of the experience of similar programs in the | |
| country, such as those summarized in Section 5.3 of this report. At a minimum: | |
| a. | |
| Ensure that the new program: | |
| 1. Implements an effective system of independent oversight and other services to | |
| enhance the prevention of accidental releases of highly hazardous chemicals | |
| 2. Facilitates the collaboration of multiple stakeholders in achieving common goals | |
| of chemical safety; and, | |
| 3. Increases the confidence of the community, the workforce, and the local | |
| authorities in the ability of the facility owners to prevent and respond to | |
| accidental releases of highly hazardous chemicals | |
| b. | |
| Define the characteristics of chemical facilities that would be covered by the | |
| new Program, such as the hazards and potential risks of their chemicals and | |
| processes, their quantities, and similar relevant factors; | |
| c. | |
| Ensure that covered facilities develop, implement, and submit for review and | |
| approval: | |
| 1. Applicable hazard and process information and evaluations. | |
| 2. Written safety plans with appropriate descriptions of hazard controls, safety | |
| culture and human factors programs with employee participation, and | |
| consideration of the adoption of inherently safer systems to reduce risks | |
| 3. Emergency response plans; and, | |
| 4. Performance indicators addressing the prevention of chemical incidents. | |
| d. | |
| Ensure that the program has the right to evaluate the documents submitted by | |
| the covered facilities, and to require modifications, as necessary | |
| e. | |
| Ensure that the program has right-of-entry to covered facilities, and access to | |
| requisite information to conduct periodic audits of safety systems and | |
| investigations of chemical releases; | |
| 104 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| f. | |
| Establish a system of fees assessed on covered facilities sufficient to cover the | |
| oversight and related services to be provided to the facilities including necessary | |
| technical and administrative personnel; and, | |
| g. | |
| Consistent with applicable law, ensure that the program provides reasonable | |
| public participation with the program staff in review of facility programs and | |
| access to: | |
| 1. The materials submitted by covered facilities (e.g., hazard evaluations, safety | |
| plans, emergency response plans); | |
| 2. The reviews conducted by program staff and the modifications triggered by | |
| those reviews; | |
| 3. Records of audits and incident investigations conducted by the program; | |
| 4. Performance indicator reports and data submitted by the facilities, and; | |
| 5. Other relevant information concerning the hazards and the control methods | |
| overseen by the program. | |
| Ensure that the program will require a periodic review of the designated agency activities and | |
| issue a periodic public report of its activities and recommended action items.63 | |
| 63 CSB-2008-I-WV (Bayer CropScience). | |
| 105 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 7.0 Recommendations | |
| The CSB makes recommendations based on the findings and conclusions of its investigations. | |
| Recommendations are made to parties that can effect change to prevent future incidents, which may | |
| include the companies involved; industry organizations responsible for developing good practice | |
| guidelines; regulatory bodies; and/or organizations that have the ability to broadly communicate lessons | |
| learned from the incident, such as trade associations and labor unions. | |
| Phosgene Exposure | |
| The Occupational Safety and Health Administration (OSHA) | |
| 2010-06-I-WV-R1 | |
| Revise OSHA 29 CFR 1910.101, General Industry Standard for Compressed Gases, to require | |
| facilities that handle toxic and highly toxic materials in compressed gas cylinders to incorporate | |
| provisions that are at least as effective as the 2010 edition of Section 7.9, Toxic and Highly Toxic | |
| Gases, in National Fire Protection Association (NFPA) 55, Compressed Gases and Cryogenic | |
| Fluids Code, including enclosures, ventilation and treatment systems, interlocked fail-safe | |
| shutdown valves, gas detection and alarm systems, piping system components, and similarly | |
| relevant layers of protection. | |
| 2010-06-I-WV-R2 | |
| Take sustained measures to minimize the exposure of hazards to workers handling highly toxic | |
| gases from cylinders and associated regulators, gages, hoses, and appliances. Ensure that OSHA | |
| managers, compliance officers, equivalent state OSHA plan personnel, and regulated parties | |
| conform, under the Process Safety Management Standard (29 CFR 1910.119) Recognized and | |
| Generally Accepted Good Engineering Practices (RAGAGEP) provisions, to industry practices at | |
| least as effective as the following: | |
| 106 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 1. | |
| NFPA 55 - Compressed Gases and Cryogenic Fluids Code (2010) | |
| 2. CGA P-1 Safe Handling of Compressed Gases in Containers (2008) | |
| 3. CGA E-9 Standard for Flexible, PTFE-lined Pigtails for Compressed Gas Service (2010) | |
| 4. ASME B31.3 Process Piping (2008) | |
| DuPont Belle Plant | |
| 2010-06-I-WV-R3 | |
| Improve the existing maintenance management by | |
| • Supplementing the computerized system with sufficient redundancy to ensure tracking | |
| and timely scheduling of preventive maintenance for all PSM-critical equipment. | |
| • Conducting Management-of-Change (MOC) reviews for all changes to preventive | |
| maintenance orders for all PSM-critical equipment in the computerized maintenance | |
| management system. | |
| 2010-06-I-WV-R4 | |
| Revise the facility emergency response protocol to require that a responsible and accountable | |
| DuPont employee always be available (all shifts, all days) to provide timely and accurate | |
| information to the Kanawha County Emergency Ambulance Authority (KCEAA) and Metro 9-1- | |
| 1 dispatchers. | |
| 2010-06-I-WV-R5 | |
| Revise the near-miss reporting and investigation policy and implement a program that includes | |
| the following at a minimum: | |
| • Ensures employee participation in reporting, investigating, analyzing, and recommending | |
| corrective actions as appropriate for all near-misses and disruptions of normal | |
| operations. | |
| 107 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| • Develops and encourages use of an anonymous electronic and/or hard copy near-miss | |
| reporting process for all DuPont Belle site employees. | |
| • Establishes roles and responsibilities for ownership, management, execution, and | |
| resolution of recommendations from incident or near-miss investigations at the DuPont | |
| Belle facility. | |
| • Ensures that the near-miss investigation program requires prompt investigations, as | |
| appropriate, and that results are promptly circulated to well-suited recipients throughout | |
| the DuPont Corp. | |
| • Ensures that this program is operational at all times (e.g. nights, weekends, and holiday | |
| shifts). | |
| E.I. DuPont de Nemours and Co., Inc. | |
| 2010-06-I-WV-R6 | |
| Revise safeguards for phosgene handling at all DuPont facilities by | |
| • Requiring that all indoor phosgene production and storage areas, as defined in NFPA 55, | |
| have secondary enclosures, mechanical ventilation systems, emergency phosgene scrubbers, | |
| and automated audible alarms, which are, at a minimum, consistent with the standards of | |
| NFPA 55 for highly toxic gases. | |
| • Prohibiting the use of hoses with permeable cores and materials susceptible to chlorides | |
| corrosion for phosgene transfer. | |
| • Conducting annual phosgene hazard awareness training for all employees who handle | |
| phosgene, including the hazards associated with thermal expansion of entrapped liquid | |
| phosgene in piping and equipment. | |
| 108 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 2010-06-I-WV-R7 | |
| Review all DuPont units that produce and handle phosgene that, at a minimum, observe and | |
| document site-specific practices for engineering controls, construction materials, PPE, | |
| procedures, maintenance, emergency response, and release detection and alarms, and use | |
| information from external sources to develop and implement consistent company-wide policies | |
| for the safe production and handling of phosgene. | |
| 2010-06-I-WV-R8 | |
| For each DuPont facility that uses, but does not manufacture, phosgene onsite | |
| • Conduct a risk assessment of manufacturing phosgene onsite against the current | |
| configuration. | |
| • Communicate the findings of each assessment to compile recommendations applicable to | |
| all DuPont phosgene delivery systems. | |
| • Implement these recommendations. | |
| Compressed Gas Association, Inc. | |
| 2010-06-I-WV-R9 | |
| Revise CGA P-1, Safe Handling of Compressed Gases in Containers, to include specific | |
| requirements for storing and handling highly toxic compressed gas, including enclosure | |
| ventilation and alarm requirements at least as protective as Section 7.9, Toxic and Highly Toxic | |
| Gases and NFPA 55, Compressed Gases and Cryogenics Fluids Code. | |
| 2010-06-I-WV-R10 | |
| Revise CGA P-1, Safe Handling of Compressed Gases in Containers, to incorporate by reference | |
| CGA E-9, Standard for Flexible, PTFE-lined Pigtails for Compressed Gas Service. | |
| 109 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| American Chemistry Council Phosgene Panel | |
| 2010-06-I-WV-R11 | |
| Revise the Phosgene Safe Practice Guidelines Manual to | |
| • Advise against the use of hoses for phosgene transfer that are constructed of | |
| permeable cores and materials subject to chlorides corrosion. | |
| • | |
| Include guidance for the immediate reporting and prompt investigation of all | |
| potential (near-miss) phosgene releases. | |
| Methyl Chloride Release | |
| E.I. DuPont de Nemours and Co., Inc. | |
| 2010-06-I-WV-R12 | |
| Commission an audit in consultation with operations personnel to establish and identify the | |
| conditions that cause nuisance alarms at all DuPont facilities. Establish and implement a | |
| corporate alarm management program as part of the DuPont PSM Program, including measures to | |
| prevent nuisance alarms and other malfunctions in those systems. Include initial and refresher | |
| training as an integral part of this effort. | |
| 2010-06-I-WV-R13 | |
| Revise the DuPont PSM standard to require confirmation that all safety alarms/interlocks are in | |
| proper working order (e.g., not in an active alarm state) prior to the start-up of all Higher-Hazard | |
| Process facilities. | |
| 2010-06-I-WV-R14 | |
| Reevaluate and clarify the DuPont corporate MOC policies to ensure that staff can properly | |
| identify and use the distinctions between subtle and full changes and train appropriate personnel | |
| how to properly apply the distinctions on any changes in the policy. | |
| 110 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| By the | |
| U.S. Chemical Safety and Hazard Investigation Board | |
| Dr. Rafael Moure-Eraso | |
| Chair | |
| John Bresland | |
| Member | |
| Mark Griffon | |
| Member | |
| William Wark | |
| Member | |
| William Wright | |
| Member | |
| Date of Board Approval | |
| September 20, 2011 | |
| 111 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| References | |
| Alspach, J.; Bianchi, R.J. Safe Handling of Phosgene in Chemical Processing. Plant/Operations Progress | |
| Jan. 1984; Vol. 3, No. 1. | |
| American Chemistry Council Phosgene Panel. Phosgene Safe Practice Guidelines Manual; American | |
| Chemistry Council: Washington, DC, 2006-2009. | |
| Center for Chemical Process Safety (CCPS). Guidelines for Hazard Evaluation Procedures; American | |
| Institute of Chemical Engineers Center for Chemical Process Safety: New York, NY, 1992. | |
| CCPS. Guidelines for Safe Process Operations and Maintenance; American Institute of Chemical | |
| Engineers Center for Chemical Process Safety: New York, NY, 1995. | |
| CCPS. Investigating Chemical Process Incidents; American Institute of Chemical Engineers Center for | |
| Chemical Process Safety: New York, NY, 1992. | |
| Collins, J.J., et al. Results From the US Industry-Wide Phosgene Surveillance: The Diller Registry; | |
| American College of Occupational and Environmental Medicine, Article: JOM201162, Jan. 2011. | |
| Compressed Gas Association, Inc. (CGA). Safe Handling of Compressed Gases in Containers; P-1 11th | |
| ed., Compressed Gas Association, Inc.: Chantilly, VA. | |
| CGA. Standard for Flexible, PTFE-Lined Pigtails for Compressed Gas Service, E-9; 4th ed.; Compressed | |
| Gas Association, Inc.: Chantilly, VA. | |
| Dillon, C.P. Materials Selector for Hazardous Chemicals. Concentrated Sulfuric Acid and Oleum; | |
| Materials Technology Institute of the Chemical Process Industries, Inc. (MTI): St. Louis, MO, | |
| 1997; Vol. 1. | |
| Klein, J.A. Two Centuries of Process Safety at DuPont. Process Safety Progress. American Institute of | |
| Chemical Engineers; Mar. 2009. pp 114-122. | |
| 112 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Lees, F.P. Loss Prevention in the Process Industries; 3rd ed., Elsevier Butterworth-Heinemann: | |
| Burlington, MA, 2005. | |
| Mottle, W.J.; Long J.F.; Morrison, D.E. Industrial Safety is Good Business; John Wiley and Sons: New | |
| York, NY, 1995. | |
| National Fire Protection Association. NFPA 55 – Compressed Gases and Cryogenic Fluids Code; | |
| National Fire Protection Association: Quincy, MA, 2010. | |
| PD-USGOV-EPA National Archives and Records Administration, Archival Research Catalog, ARC | |
| Identifier 5519.1 Series: DOCUMERICA: The Environmental Protection Agency's Program to | |
| Photographically Document Subjects of Environmental Concern, compiled 1972 - 1977. | |
| Sittig, M. Handbook of Toxic and Hazardous Chemicals and Carcinogens; 5th ed.; William Andrew | |
| Norwich: New York, NY, 2005. | |
| U.S. Chemical Safety and Hazard Investigation Board (CSB). Investigation Report, Chlorine Release, | |
| July 20, 2003, Contaminated Antimony Pentachloride Exposure, July 29, 2003, Hydrogen | |
| Fluoride Release, August 13, 2003, Honeywell International, Inc., No. 2003-13-I-LA, 2005. | |
| CSB. Investigation Report, Pesticide Chemical Runaway Reaction Pressure Vessel Explosion, Bayer | |
| CropScience, LP, August 28, 2008, No. 2008-08-I-WV, 2011. | |
| 113 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Appendix A: Three Event Logic Tree | |
| 114 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 115 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 116 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 117 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 118 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Appendix B: Historical and Event Timeline | |
| 119 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Appendix C: SAP Program | |
| The DuPont Belle plant uses the SAP R/3 Plant Maintenance module to schedule PM and repair work and | |
| track maintenance costs. Many companies use a Computerized Maintenance Management System | |
| (CMMS) such as SAP Plant Maintenance for this purpose. In particular, companies use the CMMS to | |
| schedule PM to ensure that PSM-critical equipment functions properly. This appendix gives additional | |
| detail on scheduling and completing PM jobs in SAP, and why SAP failed to issue work orders to change | |
| the hoses. | |
| PM keeps plant equipment functioning properly, and to minimize the likelihood of a phosgene hose | |
| corroding and rupturing, DuPont created a PM job in SAP to replace the hoses regularly. The SAP Plant | |
| Maintenance module automatically schedules the job at the frequency DuPont designates. | |
| In the SAP Plant Maintenance module, DuPont created a number for the physical equipment and an | |
| electronic document, or “maintenance plan,” to store all information about the job. The maintenance plan | |
| is a complex form with many fields. One field, “confirmation required,” can be clicked “on” or “off.” If | |
| this button is “off,” SAP schedules the first hose change job; waits the specified time indicated in the | |
| interval field, such as “30 days”; and then automatically schedules another hose change job. Thus, when | |
| the button is “off,” by default SAP schedules hose change-outs “every 30 days,” which, for critical | |
| equipment subject to intermittent operation, is usually the desired option (CCPS, 1995). If this button is | |
| “on,” SAP requires confirmation that the hoses have been changed. Thus, if the confirmation-required | |
| button is “on,” SAP schedules hose changes “30 days after the previous change,” but opens the possibility | |
| that no one will confirm the completion date in the system, creating a scenario where SAP will not | |
| schedule the hose change at the pre-determined interval. | |
| 120 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Despite the computer-based and administrative controls that SAP and DuPont provided, in late 2006 | |
| someone changed the confirmation-required field for the phosgene hoses from "off" to "on"—or requiring | |
| confirmation. These administrative controls highlight gaps that contributed to the fatality. | |
| When an SAP user account is created, access is provided according to the “work role” profile that DuPont | |
| establishes. Only certain users would have had access to change the data in the maintenance plan for the | |
| phosgene hoses. | |
| Programmers are “super users” who have higher level access than normal users and can write batch | |
| programs to change data, forms, and other SAP computer code that affects multiple pieces of equipment | |
| and multiple plant sites simultaneously. As an administrative control at DuPont, programmers write | |
| computer code in a “development box” to prevent creating problems in the SAP “production box” that | |
| normal users see. When the programmer completes the code or downloads it to the “sandbox,” the process | |
| owners test the change to see that it performs as requested or if it creates a problem. After the process | |
| owners approve the change, the programmer runs the code or downloads it to the “production box” and | |
| makes the actual change for regular users. These computer controls help ensure the integrity of the | |
| “production box” for regular users, but were not enough to prevent the Belle Plant fatality. | |
| The CSB discovered evidence relevant to the SAP change: | |
| • The SAP work role controls allow programmers, process owners, and specific Belle Plant | |
| employees to access the phosgene hose maintenance plan. | |
| • | |
| In 2005, the Belle Plant upgraded from SAP R/2 to the newer SAP R/3 partly because SAP R/3 | |
| included the new PM module. Converting from the previous CMMS to the SAP PM module was | |
| a large project that involved site personnel who verified the data in spreadsheets before contract | |
| SAP programmers uploaded the data into SAP. | |
| 121 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Based on this evidence, the most likely scenario is that a programmer accidentally changed the | |
| confirmation-required field for the phosgene hoses. The change may have been an unintended effect of a | |
| valid change that DuPont requested or may have been an accidental change that went undetected. | |
| 122 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Appendix D: Phosgene Release Calculations | |
| DuPont initially estimated that 0.7 pounds of phosgene released from the riverside cylinder hose and | |
| associated valving at the time of the rupture. After more detailed calculations, DuPont revised the | |
| estimated release quantity to 2.0 pounds of phosgene. The CSB performed calculations and modeled the | |
| release to verify the phosgene release quantity. | |
| Process Equipment | |
| Figure 18 shows the hose and piping dimensions and the maximum amount of phosgene present in the | |
| piping system associated with the hose failure. | |
| Figure 18. The hose and piping system that supplied phosgene for the release | |
| 1) Area of a circle: | |
| or | |
| = | |
| 2) Volume of a cylinder is equal to the area of the circle, multiplied by the length ( ): | |
| 123 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| = | |
| 3) To determine weight, multiply by the density ( ): | |
| = | |
| = lbs | |
| The density of phosgene, given that the ambient temperature was 8 °C: | |
| Phosgene contained in the 1-inch pipe: | |
| Thus, | |
| Phosgene contained in the 0.5-inch pipe: | |
| Thus, | |
| Phosgene contained in the 0.5-inch valve: | |
| (1/3 the full length of the valve, since it was closed) | |
| Thus, | |
| 124 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Phosgene contained in the 1-inch valve: | |
| (1/3 the full length of the valve, since it was closed) | |
| Thus, | |
| Phosgene contained in the quarter inch, four foot long hose: | |
| Thus, | |
| The sum of phosgene in the system: | |
| Phosgene Dose Calculation | |
| Using this phosgene release quantity (2.067 pounds), the CSB calculated the approximate concentration | |
| of phosgene the fatally injured operator was exposed to. Assuming the operator was 3 feet from the | |
| release and the phosgene instantly vaporized in a spherical fashion from the point of release, the operator | |
| would have received a lethal dose of phosgene in less than one-tenth of a second. This calculation | |
| assumes homogeneous concentration/mixing within the spherical phosgene gas cloud: | |
| 125 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 126 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Vapor Cloud Dispersion Modeling | |
| The CSB used the ALOHA® (Area Locations of Hazardous Atmospheres) 5.4.1 program to model the | |
| phosgene release based on the characteristics of the release and atmospheric conditions on the afternoon | |
| of January 23, 2010. The National Oceanic and Atmospheric Administration (NOAA) and the EPA | |
| developed ALOHA to estimate the threat zones associated with hazardous chemical releases from toxic | |
| plumes, fires, and explosions. The user inputs chemical property and weather information and the | |
| program generates a user-defined release scenario that shows the concentration of toxic gases within a | |
| radius of the release source. | |
| The following assumptions were used to model the phosgene release in ALOHA: | |
| Atmospheric and Environmental Conditions: | |
| Atmospheric temperature: 50 °F | |
| Wind speed: calm, 1.5 m/s | |
| Wind direction: from the north | |
| Humidity: 66% | |
| Cloud cover: scattered | |
| Surrounding terrain: urban | |
| Release conditions | |
| Chemical: Phosgene | |
| Amount released: 2 pounds | |
| Release type: instantaneous | |
| Height of release: 4 feet | |
| The ALOHA program generated a display of concentration “threat zones” over a distance downwind from | |
| the source of the release. Using the EPA MARPLOT program, threat zones are displayed over a satellite | |
| map of the area using a GIS interface (Figure 19). | |
| 127 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Figure 19. ALOHA estimate of phosgene concentrations with MARPLOT GIS overlay | |
| The ALOHA program estimated threat zones for three user selected phosgene concentrations: | |
| • 2 ppm (IDLH) 0.2 miles from release source | |
| • 0.5 ppm (odor threshold) 0.3 miles from release source | |
| • 0.2 ppm (ERPG-264 | |
| ) 0.4 miles from release source | |
| 64 ERPG-2 is the concentration to which all could be exposed for up to 1 hour without experiencing or developing | |
| irreversible or other serious health effects or symptoms that could impair their ability to take protective action | |
| (AIHA, 2008). | |
| 128 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| The release estimates from the ALOHA program are based on the weather conditions recorded at the | |
| Charleston Yeager Airport around the time of the January 23, 2010, phosgene release, but may not | |
| accurately represent atmospheric conditions at the plant. The ALOHA program also does not consider the | |
| topography or terrain surrounding the plant. The fence line monitors south and southwest of the phosgene | |
| shed recorded phosgene concentrations between 0 and 0.27 ppm, suggesting phosgene vapor may have | |
| traveled south of the DuPont Belle plant fence line toward the river. The ALOHA threat zone overlay in | |
| Figure 19 displays a model of the worst case release conditions indicating that IDLH concentrations of | |
| phosgene could have been present on the Kanawha River shortly after the release and lower | |
| concentrations could have traveled across the river. The community reported no odors or exposure | |
| symptoms the afternoon of the phosgene release incident. | |
| 129 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Appendix E: Hazard Analysis for Phosgene Use at Belle | |
| (Documents in this appendix are redacted for confidentiality) | |
| List of Acronyms, Abbreviations, and Terminology | |
| dia | |
| diameter | |
| flashing | |
| instantly vaporizing liquid | |
| IHI | |
| LD50 | |
| MM | |
| PHI | |
| ppm | |
| Individual Hazard Index | |
| 50% lethal dose | |
| million (old notation style) | |
| Process Hazard Index | |
| parts per million | |
| 130 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 131 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 132 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 133 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 134 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 135 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 136 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 137 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 138 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 139 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 140 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 141 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 142 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 143 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 144 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 145 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 146 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 147 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 148 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 149 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 150 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 151 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 152 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 153 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Appendix F: Hard Pipe to Flexible Hose Transition | |
| Correspondence | |
| (Documents in this appendix are redacted for confidentiality) | |
| List of Acronyms, Abbreviations, and Terminology | |
| AgProducts | |
| The Agricultural Products Department/Business of DuPont | |
| dry phosgene | |
| liquid phosgene without any water, also called "anhydrous" phosgene | |
| engg spec | |
| engineering specification | |
| ESD | |
| SS | |
| Engineering Services Division of DuPont | |
| stainless steel | |
| 154 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 155 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 156 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 157 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 158 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 159 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 160 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 161 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 162 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 163 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 164 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| Appendix G: PHA Recommendation Delay Letter | |
| (Documents in this appendix are redacted for confidentiality) | |
| List of Acronyms, Abbreviations, and Terminology | |
| COCL2 | |
| Phosgene | |
| FEL | |
| PM | |
| Rec | |
| Rx | |
| Front-end loading | |
| Preventive Maintenance | |
| Recommendation | |
| Reactor | |
| 165 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 166 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 167 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 168 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 169 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 170 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 171 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 172 | |
| E.I. DuPont de Nemours & Co. | |
| Final Report | |
| September 2011 | |
| 173 | |