ClarusC64's picture
Create data/train.csv
bc07ab0 verified
Raw
History Blame Contribute Delete
2.7 kB
scenario_id,scenario_text,claim,label
train_001,"Orders arrive faster than they can be packed because only one packing station exists.","The system contains a structural bottleneck.",1
train_002,"Orders are distributed across multiple packing stations with spare capacity.","The system contains a structural bottleneck.",0
train_003,"A clinic has adequate doctors but only one triage nurse processes all arrivals.","The clinic contains a structural bottleneck.",1
train_004,"A clinic distributes triage across multiple staff members.","The clinic contains a structural bottleneck.",0
train_005,"A database cluster has many replicas but all writes pass through one overloaded node.","The database contains a structural bottleneck.",1
train_006,"Database writes are distributed across multiple scalable resources.","The database contains a structural bottleneck.",0
train_007,"A project depends on one specialist to approve every design decision.","The project contains a structural bottleneck.",1
train_008,"Design approval authority is distributed across qualified team members.","The project contains a structural bottleneck.",0
train_009,"A supply chain depends on one port for all international shipments.","The supply chain contains a structural bottleneck.",1
train_010,"The supply chain uses multiple ports and routing options.","The supply chain contains a structural bottleneck.",0
train_011,"A machine line processes materials through one slow inspection station.","The production system contains a structural bottleneck.",1
train_012,"Inspection capacity scales with production volume.","The production system contains a structural bottleneck.",0
train_013,"A support organization routes all escalations through one manager.","The support system contains a structural bottleneck.",1
train_014,"Escalations are distributed across several managers.","The support system contains a structural bottleneck.",0
train_015,"A bridge network relies on one crossing point for all traffic.","The transport system contains a structural bottleneck.",1
train_016,"Traffic can flow through multiple independent crossings.","The transport system contains a structural bottleneck.",0
train_017,"All financial approvals require one executive signature.","The organization contains a structural bottleneck.",1
train_018,"Financial approvals can be completed through multiple authorized pathways.","The organization contains a structural bottleneck.",0
train_019,"A model-serving platform routes all requests through one inference gateway.","The platform contains a structural bottleneck.",1
train_020,"Model requests are balanced across multiple gateways.","The platform contains a structural bottleneck.",0