DocuBench / labels /ZXlksSpk.json
urimer's picture
Initial upload: 50 documents, schemas, hand-verified labels, scorer, baseline results
ca66b51 verified
Raw
History Blame Contribute Delete
2.81 kB
{
"projectName": "Plot 6",
"bills": [
{
"billNumber": 1.0,
"billName": "Preliminaries",
"amount": 352.0
},
{
"billNumber": 2.0,
"billName": "Excavating & filling",
"amount": 5158.95
},
{
"billNumber": 3.0,
"billName": "Insitu concrete works",
"amount": 2487.79
},
{
"billNumber": 4.0,
"billName": "Composite precast concrete",
"amount": 3315.56
},
{
"billNumber": 5.0,
"billName": "Precast concrete",
"amount": 70.67
},
{
"billNumber": 6.0,
"billName": "Masonry",
"amount": 31566.68
},
{
"billNumber": 7.0,
"billName": "Carpentry",
"amount": 10281.72
},
{
"billNumber": 8.0,
"billName": "Sheet roof coverings",
"amount": 599.79
},
{
"billNumber": 9.0,
"billName": "Tile and slate roof and wall coverings",
"amount": 15427.2
},
{
"billNumber": 10.0,
"billName": "General joinery",
"amount": 1545.26
},
{
"billNumber": 11.0,
"billName": "Windows, screens and lights",
"amount": 17675.61
},
{
"billNumber": 12.0,
"billName": "Doors, shutters and hatches",
"amount": 4090.66
},
{
"billNumber": 13.0,
"billName": "Stairs, walkways and balustrades",
"amount": 1838.42
},
{
"billNumber": 14.0,
"billName": "Floor, wall, ceiling and roof finishings",
"amount": 9648.06
},
{
"billNumber": 15.0,
"billName": "Decoration",
"amount": 4411.85
},
{
"billNumber": 16.0,
"billName": "Insulation, fire stopping & fire protection",
"amount": 4465.35
},
{
"billNumber": 17.0,
"billName": "Furniture, fittings and equipment",
"amount": 3057.88
},
{
"billNumber": 18.0,
"billName": "Drainage above ground",
"amount": 2151.63
},
{
"billNumber": 19.0,
"billName": "Drainage below ground",
"amount": 4245.46
},
{
"billNumber": 20.0,
"billName": "Site works",
"amount": 3620.52
},
{
"billNumber": 21.0,
"billName": "Soft landscaping",
"amount": 1685.66
},
{
"billNumber": 22.0,
"billName": "Mechanical services",
"amount": 779.93
},
{
"billNumber": 23.0,
"billName": "Electrical services",
"amount": 227.25
},
{
"billNumber": 24.0,
"billName": "Builder's work in connection with mechanical, electrical & transportation installations",
"amount": 66.02
},
{
"billNumber": 25.0,
"billName": "Main contractor's overheads and profit",
"amount": 51508.49
}
],
"grandTotal": 180278.41
}