{ "invoiceNumber": "10001", "materials": [ { "description": "Marking of foundation layout at site", "quantity": 5.0, "rate": 200.0, "total": 1000.0 }, { "description": "Earth excavation up to the required depth by machine", "quantity": 4.0, "rate": 150.0, "total": 600.0 }, { "description": "Earth excavation and levelling of soil by hand- operated tools", "quantity": 2.0, "rate": 125.0, "total": 250.0 }, { "description": "Placing of PCC", "quantity": 15.0, "rate": 78.0, "total": 1170.0 }, { "description": "Placement of reinforcement steel", "quantity": 30.0, "rate": 165.0, "total": 4950.0 }, { "description": "Erection of concrete formworks for footings", "quantity": 34.0, "rate": 230.0, "total": 7820.0 } ], "labor": [ { "description": "Marking of foundation layout at site", "hours": 30.0, "rate": 60.0, "amount": 1800.0 }, { "description": "Earth excavation up to the required depth by machine", "hours": 23.0, "rate": 60.0, "amount": 1380.0 }, { "description": "Earth excavation and levelling of soil by hand- operated tools", "hours": 19.0, "rate": 60.0, "amount": 1140.0 }, { "description": "Placing of PCC", "hours": 35.0, "rate": 60.0, "amount": 2100.0 }, { "description": "Placement of reinforcement steel", "hours": 76.0, "rate": 60.0, "amount": 4560.0 }, { "description": "Erection of concrete formworks for footings", "hours": 53.0, "rate": 60.0, "amount": 3180.0 } ], "miscellaneousCharges": [ { "description": "Transportation of materials", "amount": 430.0 }, { "description": "Consultations with architect", "amount": 760.0 } ], "totals": { "totalMaterials": 15790.0, "totalLabor": 14160.0, "totalMiscellaneous": 1190.0, "subtotal": 31140.0, "taxRate": 3.8, "totalTax": 1183.32, "total": 32323.32 } }