_id
stringlengths
30
67
title
stringclasses
196 values
text
stringlengths
31
8.3k
metadata
dict
image
null
ECSS-P-00C(22March2013)-page=1
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 ECSS Standardization objectives, policies and organization ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 1 }
null
ECSS-P-00C(22March2013)-page=2
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 2 Foreword This document (ECSS-P-00C) presents the objectives, policy and organization of ECSS together with its architecture and documents. This Standard has been prepared by the ECSS Technical Authority and approved by the ECSS Steering Board. Published by: ESA Requirements and Standards Division ESTEC, P.O. Box 299, 2200 AG Noordwijk The Netherlands Copyright: 2013© by the European Space Agency for the members of ECSS
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 2 }
null
ECSS-P-00C(22March2013)-page=3
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 3 Change log ECSS-P-00A 4 April 2000 First issue ECSS-P-00B Never published ECSS-P-00C 22 March 2013 Second issue - ECSS objectives and policies updated, in particular the following was added: o Concepts of Handbook, Technical Memorandum and Adoption Notice o Policy for establishing ECSS documents o Policy for certification, training and promotion o Policy for cooperation with other SDOs o Policy for application of the ECSS system o Policy for the maintenance of the ECSS system o Policy for the translation and use of the ECSS System by non-ECSS members - Roles of the different types of ECSS participants and process for accessing and changing status clarified - ECSS Structure updated to reflect actual structure - ECSS decision making process defined - ECSS documentation structure clarified, including addition of the new branch “Space sustainability” to the ECSS system
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 3 }
null
ECSS-P-00C(22March2013)-page=4
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 4 Table of contents Change log ................................................................................................................. 3 Introduction ................................................................................................................ 6 1 Scope ....................................................................................................................... 7 1.1 General ..................................................................................................................... 7 1.2 Applicability............................................................................................................... 7 2 Normative References ............................................................................................ 7 3 Terms, definitions and abbreviated terms ............................................................ 8 3.1 Terms and definitions from other documents ............................................................ 8 3.2 Terms specific to the present document ................................................................... 8 3.3 Abbreviated terms..................................................................................................... 9 4 ECSS objectives ................................................................................................... 10 5 ECSS policies ....................................................................................................... 11 5.1 General ................................................................................................................... 11 5.2 Policy for establishing ECSS System ...................................................................... 12 5.2.1 General ..................................................................................................... 12 5.2.2 Policy for establishing ECSS documents ................................................... 12 5.2.3 Policy for cooperation with other SDOs ..................................................... 13 5.3 Policy for application of the ECSS System .............................................................. 14 5.4 Policy for maintenance and configuration management of the ECSS System ......... 14 5.5 Policy for certification and training .......................................................................... 15 5.6 Policy for promoting the ECSS system ................................................................... 15 5.7 Policy for translation of ECSS documents by ECSS members ................................ 15 5.8 Policy for use of ECSS System by non-ECSS members ......................................... 16 6 ECSS organization ............................................................................................... 17 6.1 Participation ............................................................................................................ 17 6.1.1 General ..................................................................................................... 17 6.1.2 Full members ............................................................................................ 17
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 4 }
null
ECSS-P-00C(22March2013)-page=5
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 5 6.1.3 Associates ................................................................................................ 17 6.1.4 Observers ................................................................................................. 18 6.1.5 Accession by new participating organizations ........................................... 18 6.1.6 Termination of participation ....................................................................... 18 6.1.7 Change of status ....................................................................................... 19 6.2 ECSS Developer Structure ..................................................................................... 19 6.2.1 Overview ................................................................................................... 19 6.2.2 Mission statements of the ECSS bodies .................................................... 20 6.3 ECSS decision making process .............................................................................. 21 7 ECSS Documentation ........................................................................................... 23 7.1 Overview ................................................................................................................ 23 7.2 Documentation for developers ................................................................................ 23 7.3 Documentation for users (ECSS System) ............................................................... 24 Bibliography ............................................................................................................. 26 Figures Figure 6-1: ECSS developer structure .................................................................................. 20 Figure 7-1: Architecture of ECSS documentation for developers .......................................... 23 Figure 7-2: General Architecture of ECSS documentation for users ..................................... 25
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 5 }
null
ECSS-P-00C(22March2013)-page=6
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 6 Introduction Standardization is an important tool to reduce risks, cost and improve both quality and communication between parties during the preparation and execution of programmes. European Space Agencies and industry have in the past individually developed standards and applied them to their projects. The European Cooperation for Space Standardization ECSS) was initiated to harmonize the requirements from existing Standards for space projects, and to provide a single, coherent set of standards for use in all European space systems development and operation. The goal of the ECSS Standardization System is to develop a common set of consistent standards for hardware, software, information and activities to be applied in space projects, so that life cycle cost are minimized, while continually improving the quality, functional integrity, reliability and compatibility of all elements of the project.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 6 }
null
ECSS-P-00C(22March2013)-page=7
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 7 1 Scope 1.1 General This document states the objectives, policies and organisational structure for establishing, implementing, and maintaining a coherent set of standards for space systems development and operation, created through the European Cooperation for Space Standardization. ECSS documents are prepared for space projects and applications addressing aspects of: • Project management, • Engineering • Product Assurance, and • Space sustainability NOTE For space sustainability definition, see 3.2.3. ECSS documents include standards and supporting documents (handbooks, technical memoranda, general support documents such as glossary), together referred to as the ECSS system. 1.2 Applicability This document, being the top level ECSS document, applies to all ECSS activities and products. 2 Normative References None.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 7 }
null
ECSS-P-00C(22March2013)-page=8
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 8 3 Terms, definitions and abbreviated terms 3.1 Terms and definitions from other documents Standardized definition of terms for the ECSS Standards are defined in ECSS-S-ST-00-01 “ECSS system - Glossary of terms”. For example, the following terms, defined in ECSS-S-ST-00-01, apply to this document: • Standard • Handbook, and • Technical memorandum 3.2 Terms specific to the present document 3.2.1 European Cooperation on Space Standardization (ECSS) co-operative arrangement comprising nominated representatives of European space agencies and industries set up to achieve the objective of developing a comprehensive and coherent set of space standards for direct use in the implementation of space programmes/projects and the development of space products 3.2.2 ECSS developer organisational structure of ECSS set up to develop and maintain the ECSS system 3.2.3 ECSS system set of standards, handbooks and technical memoranda for ECSS users, organised in the following branches, for direct use in the implementation of space programmes and projects: • Space project management • Space product assurance • Space engineering • Space sustainability, which encompasses all standards and handbooks for the development of space products, contributing to the long term sustainability of space activities, including orbital debris mitigation, space situation awareness, and planetary protection. Space sustainability refers to the ability for all countries to continue to use space for peaceful purpose and socio-economic or scientific benefit over the long term.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 8 }
null
ECSS-P-00C(22March2013)-page=9
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 9 3.2.4 ECSS developer documents set of internal ECSS documents defining the organisational structures, roles and responsibilities, processes and rules required to define and implement the ECSS policy and to develop, publish and maintain the documents that make up the ECSS system 3.2.5 standards development organization (SDO) organisation establishing and/or publishing standards (national, regional, international, sectorial …) which are also available to users outside the standards developing organisation itself 3.3 Abbreviated terms The following abbreviated terms are used in this document: Abbreviation Meaning CEN European Committee for Standardization CENELEC European Committee for Electrotechnical Standardization ECSS European Cooperation for Space Standardization EN European standard ES Executive Secretariat ETSI European Telecommunications Standards Institute HB Handbook ISO International Organization for Standardization SB Steering Board SDO standards development organization ST Standard TA Technical Authority TM Technical Memorandum WG Working group
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 9 }
null
ECSS-P-00C(22March2013)-page=10
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 10 4 ECSS objectives European Cooperation for Space Standardization (ECSS) goal is to provide a set of documents, which have the overall objectives to: • be recognized and accepted by the European space community for use in space programmes/projects; • achieve more cost effective space programmes and projects in Europe in terms of technical performance, life cycle cost-effectiveness and on-time deliveries; • improve the competitiveness of European space sector; • improve the quality and safety of space projects and products; • reduce risk and guarantee interoperability and interface compatibility by applying proved and recognized requirements and methods; • facilitate clear and unambiguous communication between all parties involved in space systems development and operation, in a form suitable for inclusion in legally binding documents; • reflect user needs and feedback of experience from programmes, projects and other appropriate sources to improve ECSS Standards, while preserving internal coherency of ECSS system; • account for new practices, products, technology and missions.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 10 }
null
ECSS-P-00C(22March2013)-page=11
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 11 5 ECSS policies 5.1 General In order to meet the objectives stated in clause 4, the ECSS policy is to: • produce an integrated and coherent set of management, engineering, product assurance and space sustainability standards  covering all activities, phases and levels for the development and operation of a space system, and  based on consensus amongst the ECSS members; • ensure that these standards are structured in such a way that they:  are directly applicable in business agreements;  take into account continual improvement of methods, techniques and technologies;  define requirements in such a way that they bear on the need to be fulfilled rather than on the means to be used to fulfil that particular need, whenever possible;  are based on proven and validated approaches, methods and solutions;  avoid duplication with other standards by incorporating into the ECSS system where appropriate, available documents from other sources;  take into account all valid sources of information, expertise and feedback in the preparation and maintenance of ECSS documents;  make the best use of all available research, including the technology programmes of European space agencies and industry;  take into account in the course of their development, the potential negative impact of space systems, during their complete life cycle, on human life, the environment, public and private property, space and ground investments; • evaluate the benefits resulting from the use of a standard prior to its initiation; • promote the wider usage of ECSS standards. Therefore, ECSS published documents are made freely available worldwide. ECSS does not provide any warranty nor accept any liability with respect to the use of its documents.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 11 }
null
ECSS-P-00C(22March2013)-page=12
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 12 5.2 Policy for establishing ECSS System 5.2.1 General The core of the ECSS System is the complete set of ECSS standards. Standards can be developed entirely within ECSS or in cooperation with other SDOs. ECSS standards can be supported/complemented by HBs and TMs. 5.2.2 Policy for establishing ECSS documents 5.2.2.1 Policy for establishing ECSS standards ECSS policy is to ensure that ECSS Standards: • respond to a need clearly expressed by the space community, taking full account of the state of the art; • are designed for ease of application by their users and in particular, they shall be as complete as necessary, concise, consistent, accurate and unambiguous; • are comprehensible to qualified persons who have not participated in their preparation and be structured in a way that facilitates essential tailoring for application to specific projects; • contain requirements which benefit the whole space community, which are specific, achievable, relevant, uniquely identified and verifiable, and which do not give exclusive advantage to any individual European organisation; • are not to be considered as stand-alone documents but rather as part of a complete set of normative and reference documents; • avoid duplication of requirements inside and amongst documents; • are developed taking into account contributions from all relevant sources; • are subjected to public review open to all interested parties, before they can be approved; • are structured in such a way that they:  can directly support the formal customer-supplier interfaces and relationships, and address all the levels of the customer-supplier chain;  can be tailored to the technical, cost, schedule, programmatic and economic characteristics of individual space programmes and projects;  address all phases and activities from start to finish of a project; • are drafted, approved and published in English. In order to ensure uniformity of structure, style and terminology within the full ECSS system, ECSS has established and applies processes and drafting rules (see ECSS-D-00). In addition, in establishing the ECSS glossary, internationally agreed terms and definitions are used, where appropriate.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 12 }
null
ECSS-P-00C(22March2013)-page=13
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 13 5.2.2.2 Policy for establishing ECSS handbooks ECSS policy is to ensure that ECSS Handbooks: • are developed when need exists to support the application of ECSS standard(s); • describe solution that comply with existing ECSS requirement(s). 5.2.2.3 Policy for using documents developed by other SDOs When an already approved and published non-ECSS document (e.g. ISO IS, EN) exists, and is considered useable to fulfil an ECSS objective, this document is either: • copied in whole or in part, with permission, in an ECSS document; • in case of standard, directly called up as normative reference, by ECSS standard(s) and therefore made applicable by the ECSS system; • adopted through an adoption notice in the case where modification, addition, and/or deletion of part of the adopted document is necessary to ensure proper integration of that non-ECSS standard in the ECSS system. Non-ECSS documents can be adopted as standards or handbooks. The adoption notices follow the same approval process as ECSS standards. 5.2.3 Policy for cooperation with other SDOs The ECSS policy is to establish co-operation with other SDOs consistent with ECSS objectives, in order to: • achieve international consensus and recognition where essential to allow global interoperability, mission success, safety, protection of the earth, space and their environments, or common policies or treaties; • influence, as early as possible, documents from other SDOs, which could impact ECSS or which are intended to be adopted by ECSS; • maximize cost effectiveness and technical validity for ECSS by incorporating output or expertise from other SDO. Co-operation between ECSS and other SDOs may fall into one of three categories, as follows: • formal cooperation: cooperation with another organisation conducted under the control of a formal agreement, approved by both parties; • ad-hoc cooperation: activities to interface or cooperate with another SDO or organisation, as a result of a specific SB decision and associated mandate; • liaison: relation with another organisation, typically SDOs, to provide mutual visibility of the activities of ECSS and another organisation. In the frame of liaison level agreements collaborative activities are not necessarily conducted.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 13 }
null
ECSS-P-00C(22March2013)-page=14
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 14 5.3 Policy for application of the ECSS System ECSS documents are made applicable to a project only through a legal document such as business agreement (e.g. contract) and/or internal directives. When made applicable: • it is the responsibility of the party imposing a particular standard to tailor it to ensure that it meets the intended need. • all parties using a standard are advised to acquaint themselves with the intended scope and applicability of the standard to prevent inappropriate usage. • the party imposing the use of an ECSS document, or a part thereof, is responsible for monitoring and assuring its correct application. • all users of ECSS documents are encouraged to inform the ECSS Secretariat about experience gained from application of ECSS Standards, so that inadequacies in the documents can be corrected and improvements made. Details concerning application of the ECSS system are provided in ECSS-S-ST-00. 5.4 Policy for maintenance and configuration management of the ECSS System ECSS implements a maintenance policy which includes: • a fully documented and recorded baseline for the ECSS system and its individual documents. • A change system based on the use of traceable change requests, change request dispositions and their implementation. • a 5 year maintenance cycle at the end of which all standards of the ECSS system shall be re-assessed with respect to the need for updating and reissuing them with a common incremented issue index. During that period, only modifications (technical or editorial) which are strictly needed to guarantee correct application of the standard or to adapt to new factors shall be implemented. • a process to collect feedback and lessons learned from users and developers as a prime source for maintenance of the ECSS system. • a systematic checking of compatibility of modifications introduced in new revisions or issues of documents with already published requirements to maintain internal coherency of the ECSS system. • a configuration management system for ECSS documentation in line with the following principles:  Establish and maintain a Configuration Management index containing current issue and revision status of all ECSS documents and make this available to all interested parties.  apply the configuration management procedure, as defined in ECSS-D-00.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 14 }
null
ECSS-P-00C(22March2013)-page=15
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 15 • Nomination of Document and Discipline Focal Points to support the Technical Authority for correct understanding and application of the standards and assessment of feedback and Change Requests. 5.5 Policy for certification and training 5.5.1.1 Certification ECSS neither provides nor recognizes any certification process of supplier or of product according to ECSS requirements, by any party. 5.5.1.2 Training and users information ECSS promotes usage of ECSS system in European space projects and beyond through information and, as far as practical, through training of potential users. In addition, ECSS does not endorse the development of third party training courses related to ECSS system. 5.6 Policy for promoting the ECSS system ECSS will promote worldwide usage of ECSS system through all appropriate means: e.g. conference papers, organization of users’ day, dedicated presentations to space related projects or organizations, liaisons with standards development organizations. In particular, ECSS has developed and maintains a user friendly website enabling both ECSS standards developers and users to get fully up-to-date information. 5.7 Policy for translation of ECSS documents by ECSS members ECSS documents are written and published in English language only. Any ECSS member wishing to translate, at its own expense, an ECSS document into another language may do so, provided that such intent is made known to the ECSS Secretariat and this ECSS member remains the sole responsible for the coherence between the English version and the translated one. Such translated documents are not part of the ECSS system. They shall bear a different identification number than the original ECSS document and shall separately identify which ECSS Standard has been used. In no way shall approval of the ECSS Steering Board, nor any duty of distribution by the ECSS Secretariat, be stated or implied for such translations, nor may such documents be sold. ECSS does not recognize nor maintain translated version of the ECSS original documents in English.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 15 }
null
ECSS-P-00C(22March2013)-page=16
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 16 5.8 Policy for use of ECSS System by non-ECSS members The European Space Agency, on behalf of the participating members, holds copyright for all ECSS documents. No ECSS document may be reproduced in any form without the explicit consent of ESA. However, this consent is granted to ECSS members for their own use, for their contractors and subcontractors. In case of request by non-ESA members or non-ECSS members for using ECSS documents in whole or in part in their own documentation, the following policy shall be applied: • direct use of ECSS standards themselves should be made rather than rewriting using quotation of ECSS standards. This could avoid incoherencies with ECSS system due to partial imports of ECSS requirements, modified quotations or quotation of obsolete versions. • ECSS members are informed of requests addressed to the ES. Final version of the proposed agreement to grant use and/or translation should be submitted to SB approval and, when approved, signed by the SB chairman on behalf of ECSS members (Copyright on ECSS standards being held by ESA on behalf of ECSS members, final agreement are also to be signed by ESA appropriate official). • when ECSS documents text is used, ECSS copyright is acknowledged, quotations clearly identified in the document together with exact reference/version and potential modifications of ECSS standards used as source. This applies also to any derived document. • when translation of ECSS standard(s) is performed by the beneficiary, this translation should be made available to ECSS members.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 16 }
null
ECSS-P-00C(22March2013)-page=17
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 17 6 ECSS organization 6.1 Participation 6.1.1 General ECSS is open to participation from all European space sector and associated organizations. Participating entities in ECSS can have a role of Members, Associates or Observers. Agreement to work in the interest of ECSS, to pursue the ECSS objectives and policies and to follow rules as set out in the ECSS Operating Documents (ECSS- P-00 and ECSS-D-00) is required from all participating organizations. 6.1.2 Full members ECSS Full members are European space sector stakeholders that indicate their intention to actively participate in ECSS document production, maintenance, use and the associated feedback. They commit to: • provide an adequate level of support for all these activities, • ensure the implementation of ECSS system in their respective projects when applicable. Any member from the European space industry will participate through Eurospace. Only Full members take part in the consensus process within ECSS, as specified in 6.3a. At the time of the approval of this issue of ECSS-P-00, the following organisations were Full members: Agenzia Spaziale Italiana, Centre National d’Etudes Spatiales, Deutsches Zentrum für Luft- und Raumfahrt e.V., European Space Agency, Eurospace, Netherlands Space Office, Norwegian Space Centre, UK Space Agency. 6.1.3 Associates ECSS Associates are those European space sector stakeholders that indicate a desire to participate in ECSS document production but at a reduced level of effort or limited to some specific aspects/disciplines, and that commit to
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 17 }
null
ECSS-P-00C(22March2013)-page=18
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 18 implement ECSS system in their respective projects when applicable for those documents whose preparation they were involved in. Associates are encouraged to provide feedback on their use of the ECSS standards by CR’s or other means. Associates will be given access to specific ECSS body as per ECSS Technical Authority proposal and when approval is given by the ECSS Steering Board. At the time of the approval of this issue of ECSS-P-00, the following organisations were Associates: Canadian Space Agency. 6.1.4 Observers Observers are those European space sector stakeholders desiring a formal tie with the ECSS through which they can observe the development process of technical documentation and through which they can contribute to the ECSS system (e.g. need for new standards, return of experience related to ECSS system application in projects). Their participation to the production, review of documents is not envisaged but not excluded. Observers will be given access to specific ECSS body as per ECSS Technical Authority proposal and when approval is given by the ECSS Steering Board. At the time of the approval of this issue of ECSS-P-00, the following organisations were observers: EUMETSAT, European Defence Agency, CEN/CENELEC. 6.1.5 Accession by new participating organizations Request for participation or change of status shall be sent in writing to the ECSS Secretariat, stating the formal acceptance of the conditions laid out in the relevant clauses 6.1.1 to 6.1.4. The Steering Board decides on such requests by consensus of its members. Accession or change of status takes place on the date of notification by the ECSS Secretariat that the Steering Board has approved their participation. 6.1.6 Termination of participation A participating organization may terminate its participation in ECSS by written notification to ECSS Secretariat, who informs the ECSS Steering Board. The termination becomes effective three months after receipt of the notification in the ECSS Secretariat. Such participating organization shall endeavour to minimize the effects of the termination on ECSS. If, in the opinion of two thirds of all members, a participant no longer complies with relevant clauses 6.1.1 to 6.1.4, its participation is terminated with immediate effect.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 18 }
null
ECSS-P-00C(22March2013)-page=19
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 19 6.1.7 Change of status A participating organization may change its status according to the following rules: a. For changing status from Observer to either Associate or Full Member or from Associate to Full Member, the principles laid down in 6.1.5 shall be followed. b. For changing status from Full Member to either Associate or Observer or from Associate to Observer, the principles laid down in 6.1.6 shall be followed. 6.2 ECSS Developer Structure 6.2.1 Overview The ECSS activities are organized through a number of bodies, collectively known as the ECSS Developer, whose main functions are as follows: • Steering Board (SB): Define ECSS objectives, policy and strategy and endorse the work plan • Technical Authority (TA): Implement the objectives, policy and strategy defined by the SB; setup, approve, implement and monitor the Work- plan endorsed by the SB • Executive Secretariat (ES): Support the TA and WGs, enforces drafting rules, provide administrative support to the TA and SB, and ensure promotion of ECSS and interface with other SDOs. • Working Group (WG): Convened as necessary by TA and in charge of producing/modifying the standards as required by the endorsed Work- plan. • Network of Expert (NoE): Document and Discipline Focal Points that, with the addition of ad hoc experts, support TA and ES in specific tasks. Figure 6-1 presents the ECSS developer structure. In addition to the above and in line with the bodies responsibilities, task forces may be created by the SB or TA, to assist in executing their responsibilities, and are normally used to investigate and make recommendations on a particular aspect or issue related to ECSS activities. Their mandate is usually of limited duration. The organisation of ECSS bodies, together with ECSS developer responsibilities, documentation and processes is addressed in ECSS-D-00.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 19 }
null
ECSS-P-00C(22March2013)-page=20
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 20 Steering Board (SB) Technical Authority (TA) Executive Secretariat (ES) Network of Experts (NoE) Steering Board (SB) Executive Secretariat (ES) Technical Authority (TA) Network of Experts (NoE) Working Group W G W G Working Group Working Group Working Group Figure 6-1: ECSS developer structure 6.2.2 Mission statements of the ECSS bodies 6.2.2.1 Steering Board (SB) The SB is mandated by the participating member organizations to define the objectives, policy and strategy for the ECSS system and for providing overall leadership of the ECSS bodies. The SB decides whether ECSS shall cooperate with other SDOs, which type of cooperation, and endorses the cooperation agreement prepared by the TA. 6.2.2.2 Technical Authority (TA) The activity of the TA is guided and monitored by the SB. The TA is the technical approval authority for the initiation and release of new ECSS documents as well as for all changes to existing ECSS documents. It is in charge to setup and implement the Work-plan with the support of the ES. Furthermore, TA proposes the Work-plan to SB for endorsement. Following interest expressed by any ECSS partner or other SDO for a co- operative agreement, the TA: • assesses the impact of formal cooperation, and submit recommendation to the SB, including the proposed methodology and process for implementation; • if endorsed by the SB, set-up cooperation agreement, liaising with the other parties as necessary.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 20 }
null
ECSS-P-00C(22March2013)-page=21
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 21 6.2.2.3 Executive Secretariat (ES) The mission of the ES is composed of four items: • Programme function in support to TA to:  build the Work-plan to be endorsed by the SB (e.g. programmatic, resources);  monitor and support the implementation of the Work-plan including finalization and notification of the publication of ECSS documents/events;  ensure implementation and perform monitoring of the ECSS processes (including those to gather feedback from users and lessons learned). • Support WGs and enforce drafting rules. • Custodian and configuration control of the ECSS documents; • Ensure the promotion of ECSS and interface with other SDOs; • Provide administrative support to SB and TA. 6.2.2.4 Working Group (WG) The mission of an ECSS Working Group is to carry out the tasks necessary to draft or update an ECSS Document in line with its Terms of Reference, against an agreed planning and schedule. They are built on a case by case basis, managed by the TA through a limited duration mandate. 6.2.2.5 Network of experts (NoE) The network of experts is a pool of experts appointed by the TA and supported by the ECSS organizations nominating them. They act for specific mission/action through the sponsorship of the TA members or their nominating organization. The NoE is composed by the Document and Discipline Focal Points and ad hoc experts, providing support in specific tasks. The NoE are not an advisory body intended for the general public. Their support is restricted to the SB, TA and ES. 6.3 ECSS decision making process In this document consensus is defined as not only a way to seek the agreement of most participants, but also to resolve or mitigate the objections of the minority to achieve the most acceptable general agreement. As a consequence, minority views are considered to a greater degree than where a majority can take a decision and enforce it without any further consideration of the minority views. a. The ECSS governing bodies (i.e. the ECSS SB and TA) make decisions on the following basis: 1. After having considered the position of all Full members, associated and observers, the governing body works on the basis
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 21 }
null
ECSS-P-00C(22March2013)-page=22
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 22 of achieving consensus of the voting members (i.e. full members). 2. If consensus as stated in a.1 above cannot be achieved, decisions are made by the vote of the full members, with a simple majority subject that a quorum of 50% of the voting rights is reached. Votes are weighted in accordance with the following principles: (a) One (1) vote for each ECSS full member National Space Agency. (b) Four (4) votes for the European Industry, represented by Eurospace. NOTE Eurospace can decide to appoint four Eurospace voting representatives, with one voting right each, or to concentrate the four votes with a voting representative, or any intermediate solution. b. ECSS WGs make all decisions on the following basis: 1. by achieving consensus of all the WG members officially approved by the ECSS TA. 2. If consensus, cannot be achieved on a particular issue, the matter is escalated to the TA for resolution. Implementation details of these principles can be found in Chapter 4 of ECSS- D-00 “ECSS organization and processes”.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 22 }
null
ECSS-P-00C(22March2013)-page=23
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 23 7 ECSS Documentation 7.1 Overview ECSS documentation is divided into 2 categories: • Documents for developers of standards specifying objectives, policies, processes, rules, standard forms; • Documents for users, composed of standards and supporting documents, which collectively form the ECSS System, addressing the aspects of:  ECSS system description and implementation,  Space project management,  Space product assurance  Space engineering, and  Space sustainability. NOTE For space sustainability definition, see 3.2.3. 7.2 Documentation for developers Architecture of ECSS documentation for developers of standards is depicted in Figure 7-1: Figure 7-1: Architecture of ECSS documentation for developers ECSS standardization policies (ECSS-P-00) ECSS processes (ECSS-D-00) ECSS configuration management ECSS-SDO cooperation agreements (e.g. CEN, CCSDS) ECSS drafting rules and template for ECSS standards
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 23 }
null
ECSS-P-00C(22March2013)-page=24
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 24 The present document (ECSS-P-00: Standardization policy) is the highest level document providing objectives and policies applicable to the development, maintenance and deployment of standards, handbooks and technical memoranda, and defining the ECSS structure. The cooperation agreements between SDOs and ECSS are kept/archived by ES and constitute essential elements for the implementation of the actual ECSS policy. All the ECSS internal processes are specified in ECSS-D-00. This document also identifies all the items which are under configuration control by ECSS, together with the stage at which they have to be put under configuration control. The ECSS drafting rules and template for ECSS standards and for handbooks are specified in ECSS-D-00-01 and ECSS-D-00-02 respectively. They specify all the editorial rules necessary to guarantee high quality and maintainability of the ECSS system. An ECSS configuration management document specifies the configuration control system and processes for the ECSS system. In order to keep consistency between the two documentation sets, the document for users: “ECSS Glossary of terms” described in 7.3 is also applicable to developers. 7.3 Documentation for users (ECSS System) The architecture of the ECSS system, shown in Figure 7-2, is composed of: • A System description and implementation standard (ECSS-S-ST-00) which specifies how to use the ECSS system in a given project; • A Glossary of terms (ECSS-S-ST-00-01) which provides definition of terms common to several ECSS standards (terms specific to a standard are defined locally in that standard); • Standards (ST), Handbooks (HB) and Technical Memoranda (TM) organized to cover: space project management, space product assurance, space engineering and space sustainability. Inside each branch, the three types of documents are classified in disciplines. For each discipline, a top level standard provides all the general requirements related to that discipline, while other documents cover specific aspects, processes, products within a given discipline. Detailed descriptions of the architecture, content and ECSS disciplines are provided in clause 5.3 of ECSS-S-ST-00.
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 24 }
null
ECSS-P-00C(22March2013)-page=25
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 25 ECSS-S-ST-00 ECSS System – Description, implementation and general requirements ECSS-ST-00-01 ECSS System – Glossary of terms ECSS M Standards, HBs and TMs External standards or handbooks “adopted” or called up by ECSS documents ECSS U Standards, HBs and TMs ECSS E Standards, HBs and TMs ECSS Q Standards, HBs and TMs Figure 7-2: General Architecture of ECSS documentation for users
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 25 }
null
ECSS-P-00C(22March2013)-page=26
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 26 Bibliography ECSS-D-00 ECSS – ECSS processes ECSS-D-00-01 ECSS - Drafting rules and template for ECSS Standards ECSS-D-00-02 ECSS - Drafting rules and template for ECSS Handbooks ECSS-S-ST-00 ECSS system - Description, implementation and general requirements ECSS-S-ST-00-01 ECSS system – Glossary of terms
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 26 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=1
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Space product assurance Crimping of high-reliability electrical connections ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Corrigendum 1 The following editorial errors were identified in the published version of this document and corrected: • Requirement 5.1.2.1h (page 16) • Requirement 5.3.2a.1 (page 27) • Requirement 5.4.3.2c (page 30) • Annex A.1 (page 46) ECSS Executive Secretariat, 1 June 2017
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 1 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=2
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Foreword This Standard is one of the series of ECSS Standards intended to be applied together for the management, engineering and product assurance in space projects and applications. ECSS is a cooperative effort of the European Space Agency, national space agencies and European industry associations for the purpose of developing and maintaining common standards. Requirements in this Standard are defined in terms of what shall be accomplished, rather than in terms of how to organize and perform the necessary work. This allows existing organizational structures and methods to be applied where they are effective, and for the structures and methods to evolve as necessary without rewriting the standards. This Standard has been prepared by the ECSS Executive Secretariat, endorsed by the Document and Discipline Focal points, and approved by the ECSS Technical Authority. Disclaimer ECSS does not provide any warranty whatsoever, whether expressed, implied, or statutory, including, but not limited to, any warranty of merchantability or fitness for a particular purpose or any warranty that the contents of the item are error-free. In no respect shall ECSS incur any liability for any damages, including, but not limited to, direct, indirect, special, or consequential damages arising out of, resulting from, or in any way connected to the use of this Standard, whether or not based upon warranty, business agreement, tort, or otherwise; whether or not injury was sustained by persons or property or otherwise; and whether or not loss was sustained from, or arose out of, the results of, the item, or any services that may be provided by ECSS. Published by: ESA Requirements and Standards Division ESTEC, P.O. Box 299, 2200 AG Noordwijk The Netherlands Copyright: 2017 © by the European Space Agency for the members of ECSS 2
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 2 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=3
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Change log ECSS-Q-70-26A 13 February 2001 First issue Transforming ESA PSS-01-726 into an ECSS Standard ECSS-Q-70-26B Never issued ECSS-Q-ST-70-26C 31 July 2008 Second issue Changes to ECSS-Q-70-26A are: • Redrafting of ECSS-Q-70-26A in conformance with ECSS drafting rules and new template. • The requirements of the original clauses 4, 5, 6, 7, and 8 were moved to the clause 5. • New clause 5.6 “Document requirements“. • Informative material moved to clause 4 and informative Annex A “Crimp configurations and tools”. ECSS-Q-ST-70-26C Rev.1 15 March 2017 Second issue, Revision 1 Changes with respect to the previous version are identified with revision tracking. Main changes are:: • Implementation of Change requests • Several Figures replaced by new ones • Clause 3 "Terms, definitions and abbreviated terms" updated • Nomenclature added as clause 3.4 • Titles of clauses 5.1.2.3, 5.2, 5.2.4, 5.2.5, 5.3, 5.3.2, 5.4.3.2, 5.4.3.3 changed • Several changes in the Clause 5.3 “Requirements for crimp configuration qualification” • Several changes in clause 5.4 “Test methods” • Clause 5.5.2 “Personnel training and certification” updated • Clause 5.5.4 “Visual inspection “updated • Several changes in clause 5.5.5 “Shift performance inspection and test for harness manufacturing” • Clause 5.5.9 "Special crimping activities at spacecraft level, modifications and repairs” added • All Figures from Issue C replaced • Annex A "Crimp configurations and tools" updated • Annex B "Examples of typical ultimate axial strength" added 3
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 3 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=4
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Added requirements: 5.1.2.1i; 5.1.2.2f; 5.2.1k; 5.2.4g-h; 5.2.5g-i; 5.2.6d-f (where f was moved from 5.2.6c); 5.2.7i-j; 5.3.1d-g; 5.3.2d-e; 5.3.4.1a; 5.3.4.2a-c; 5.4.3.1e; 5.4.3.2c-e; 5.4.3.3b; 5.4.3.4a-e; 5.4.3.5a-c; 5.4.4j; 5.5.2.2e; 5.5.4.3a-c; 5.5.5k-o; 5.5.9a-l. Modified requirements: 5.1.1.2a-c and e; 5.1.1.4b and c; 5.1.2.1a-d and f-g; Figure 5-1 called from added Note in 5.1.2.1a added; 5.1.2.2b; 5.1.2.3b and e; 5.1.2.4a; Table 5-1; 5.2.1a-c, e and h; 5.2.2a-b, d-g; 5.2.3a-c; 5.2.4a, c-f; 5.2.5a; 5.2.5c Note deleted; 5.2.5d Note modified; 5.2.5e-f; 5.2.6a-b; 5.2.7a,b, d-f, h (Note modified); 5.3.1a-b; 5.3.2a-c; 5.4.1a; 5.4.3.1d; 5.4.3.2a; 5.4.3.3a; 5.4.4a and i; 5.5.2.1a; 5.5.3d; 5.5.4.1a and d; 5.5.4.2a-c; 5.5.6.1a; 5.5.6.2c and d; 5.5.6.3c; 5.5.7c; 5.5.8a; 5.6a. Deleted requirements: 5.1.2.3d; 5.2.1j; 5.2.6c (moved to 5.2.6f); 5.2.7g; 5.3.1c; 5.4.2a-c; 5.4.3.2b; 5.2.2a; 5.5.5a-j. Corrigendum 1 of Second issue Revision 1: • 5.1.2.1h: text reworded to remove second "shall be" • 5.3.2a.1: reference to Table A-1 to Table A-6 put into a new NOTE • 5.4.3.2c: text reworded to remove second "shall" • Annex A.1: Text of first paragraph reworded from "(in conformance with Table A-1 to Table A-6) " to "Typical settings for the crimping tool are given in A.2." This corrigendum was approved by the ECSS Technical Authority at TA#58 (1 June 2017). 4
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 4 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=5
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Table of contents Change log ................................................................................................................. 3 1 Scope ....................................................................................................................... 8 2 Normative references ........................................................................................... 10 3 Terms, definitions and abbreviated terms .......................................................... 11 3.1 Terms defined in other standards ........................................................................... 11 3.2 Terms specific to the present standard ................................................................... 11 3.3 Abbreviated terms................................................................................................... 12 3.4 Nomenclature ......................................................................................................... 13 4 Principles .............................................................................................................. 14 5 Requirements ........................................................................................................ 15 5.1 Preparatory conditions ............................................................................................ 15 5.1.1 Facilities .................................................................................................... 15 5.1.2 Tools and equipment ................................................................................. 16 5.2 Crimping operations for different types of interconnections ..................................... 18 5.2.1 General ..................................................................................................... 18 5.2.2 Material selection ...................................................................................... 19 5.2.3 Process review and documentation ........................................................... 20 5.2.4 Contact barrel and single wire crimping ..................................................... 20 5.2.5 Contact barrel and multiple wire crimping .................................................. 21 5.2.6 Ferrule shield crimping .............................................................................. 23 5.2.7 Lug and splice wire crimping ..................................................................... 23 5.3 Requirements for crimp configuration qualification .................................................. 26 5.3.1 General ..................................................................................................... 26 5.3.2 Qualification process test procedure ......................................................... 27 5.3.3 Sealing and marking ................................................................................. 29 5.3.4 Batch to batch variation ............................................................................. 29 5.4 Test methods .......................................................................................................... 29 5.4.1 General ..................................................................................................... 29 5
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 5 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=6
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.4.2 <<deleted>> .............................................................................................. 29 5.4.3 Tensile strength ........................................................................................ 30 5.4.4 Metallography ........................................................................................... 31 5.5 Quality assurance ................................................................................................... 32 5.5.1 General ..................................................................................................... 32 5.5.2 Personnel training and certification ........................................................... 32 5.5.3 Workmanship ............................................................................................ 35 5.5.4 Visual inspection ....................................................................................... 37 5.5.5 Shift performance inspection and test for harness manufacturing ............. 39 5.5.6 Calibration of crimping tools ...................................................................... 40 5.5.7 Records .................................................................................................... 41 5.5.8 Nonconformance ....................................................................................... 42 5.5.9 Special crimping activities at spacecraft level, modifications and repairs ....................................................................................................... 42 5.6 Document requirements.......................................................................................... 45 Annex A (informative) Crimp configurations and tools ....................................... 46 Annex B (informative) Examples of typical ultimate axial strength .................... 53 Bibliography ............................................................................................................. 55 Figures Figure 1-1: Example of interconnections described in this Standard ....................................... 9 Figure 5-1: Example of crimping tools .................................................................................. 17 Figure 5-2: Example of a typical connector barrel and single wire crimping .......................... 21 Figure 5-3: Example of a typical connector barrel and multi-wire crimping............................ 22 Figure 5-4: Example of a typical ferrule shield crimping ........................................................ 23 Figure 5-5: Examples of typical lug and splice wire crimping (1 of 2) .................................... 25 Figure 5-6: Examples of typical lug and splice wire crimping (2 of 2) .................................... 26 Figure 5-7: Qualification process test procedure flow chart .................................................. 28 Figure 5-8: Quality control during crimping operation ........................................................... 34 Figure 5-9: Visible workmanship standards .......................................................................... 36 Figure 5-10: Workmanship examples and crimp micro-sections ........................................... 37 Figure 5-11: Shift performance test flowchart ....................................................................... 44 Figure A-1 : Confined irregular-octagon crimp (compactive) ................................................. 47 Figure A-2 : Dimpled confined octagon crimp (compactive) .................................................. 47 Figure A-3 : Regular-hexagon crimp (compactive) ................................................................ 47 Figure A-4 : Semicircular one- or two-indent crimp (dispersive) ............................................ 47 6
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 6 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=7
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Figure A-5 : Four-indent crimp (dispersive) ........................................................................... 47 Figure A-6 : Typical test fixture for testing lug and splice crimps ........................................... 52 Tables Table 5-1: Equipment for verification process ....................................................................... 18 Table A-1 : Guideline for selector setting - Four-indent crimp (dispersive) - Single wire ........ 48 Table A-2 : Guideline for selector setting - Four-indent crimp (dispersive) - Two wires ......... 49 Table A-3 : Guideline for selector setting – Four-indent crimp (dispersive) – Two different wires ..................................................................................................... 50 Table A-4 : Guideline for selector setting – Four-indent crimp (dispersive) – Single wire ...... 50 Table A-5 : Guideline for selector setting – Four-indent crimp (dispersive) – Two identical wires .................................................................................................... 50 Table A-6 : Guideline for die selection – Regular hexagon (compactive ) – Ferrule coaxial shield crimp ............................................................................................ 51 Table B-1 : Typical ultimate axial strength for compactive and dispersive crimped joints manufactured using qualified ESCC wires .......................................................... 53 7
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 7 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=8
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 1 Scope This Standard specifies: • Requirements for the following crimping wire connections intended for high reliability electrical connections for use on spacecraft and associated equipment operating under high vacuum, thermal cycling and launch vibration:  removable contacts, single wire  removable contacts, multiple wires  coaxial contacts, ferrules  lugs and splices. NOTE These are the most commonly used crimping wire connections and are represented in Figure 1-1. • The general conditions to be met for the approval of connections other than the above mentioned ones. NOTE Additional forms of crimps, not covered in this standard, are listed (not exhaustively) in the informative Annex A. • Product assurance provisions for both the specific and the generic connections mentioned above. • Training and certification requirements for operators and inspectors (clause 5.5.2), additional to those specified in ECSS-Q-ST-20. This standard may be tailored for the specific characteristics and constraints of a space project, in conformance with ECSS-S-ST-00. 8
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 8 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=9
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Normal socket Normal male Enlarged socket Enlarged male MDM socket MDM male Coax socket Coax male Power socket Power male Butt splice Parallel splice Lug Figure 1-1: Example of interconnections described in this Standard 9
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 9 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=10
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 2 Normative references The following normative documents contain provisions which, through reference in this text, constitute provisions of this ECSS Standard. For dated references, subsequent amendments to, or revisions of any of these publications do not apply. However, parties to agreements based on this ECSS Standard are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references the latest edition of the publication referred to applies. ECSS-S-ST-00-01 ECSS system - Glossary of terms ECSS-Q-ST-10-09 Space product assurance - Nonconformance control system ECSS-Q-ST-20 Space product assurance - Quality assurance ECSS-Q-ST-60 Space product assurance - Electrical, electronic and electromechanical (EEE) components ECSS-Q-ST-60-05 Space product assurance – General requirements for hybrids ECSS-Q-ST-70 Space product assurance - Materials, mechanical parts and processes ECSS-Q-ST-70-08 Space product assurance - Manual soldering of high- reliability electrical connections ECSS-Q-ST-70-38 Space product assurance - High-reliability soldering for surface-mount and mixed technology ECSS-Q-ST-70-71 Space product assurance - Data for selection of space materials and processes SAE-AS-22520, 24 October 2011 Crimping tools, , wire termination, General specification for SAE-AS-7928B 10 March 2011 Terminals, lugs, splices, conductor, crimp style, copper, general specification for ISO 7500-1:2004 Metallic materials - Verification of static uniaxial testing machines - Part 1: tension/compression testing machines - Verification and calibration of the force-measuring system ESCC 3901, Issue 2 May 2013 ESCC generic specification No. 3901 Wires and cables, electrical, 600V, low frequency 10
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 10 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=11
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 3 Terms, definitions and abbreviated terms 3.1 Terms defined in other standards a. For the purpose of this Standard, the terms and definitions from ECSS-S-ST-00-01 apply, in particular for the following terms: 1. acceptance 2. analysis 3. batch 4. component 5. conformance 6. contaminant b. For the purpose of this Standard, the terms and definitions from ECSS- Q-ST-60-05 apply, in particular for the following terms: 1. process identification document (PID) c. For the purpose of this Standard, the terms and definitions from ECSS-Q- ST-70-08 apply, in particular for the following terms: 1. electrical connection 3.2 Terms specific to the present standard 3.2.1 adjustable indenter tool crimping ratcheting tool which has an adjustable part (setting variable) that indents or compresses the conductor barrel or ferrule 3.2.2 crimping configuration combination of crimping tool, crimp item and number and type of wires defined by the procurement specification NOTE 1 Example of crimp item include lug, splice and contact, ferrule. NOTE 2 Type of wires include material, size, finish and batch if not ESCC qualified wire. 11
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 11 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=12
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 NOTE 3 Crimping tool based on the combination of tool reference, setting and locator (when necessary). 3.2.3 crimping tool mechanical ratcheting tool used for permanently attaching a wire connection device to a conductor by pressure deformation or by reshaping the barrel around the conductor to establish good electrical and mechanical contact 3.2.4 ferrule short metal tube used to make crimp connections to the outer conductor of shielded or coaxial cables 3.2.5 intrinsic wire strength tensile strength of a wire used in a crimped assembly, determined by a specific pull test 3.2.6 lug metallic tube with drilled flange projection for fixing to a connection point 3.2.7 splice metallic tube for joining two or more conductors to each other 3.2.8 terminal metallic device that is used to make an electrical connection 3.3 Abbreviated terms For the purpose of this Standard, the abbreviated terms from ECSS-S-ST-00-01 and the following apply: Abbreviation Meaning AWG American wire gauge DRD document requirement definition IPA iso-propyl alcohol KIP key inspection point MIP mandatory inspection point NCR nonconformance report PID process identification document QA quality assurance RFA request for approval RFW request for waiver RH relative humidity 12
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 12 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=13
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 3.4 Nomenclature The following nomenclature applies throughout this document: a. The word “shall” is used in this Standard to express requirements. All the requirements are expressed with the word “shall”. b. The word “should” is used in this Standard to express recommendations. All the recommendations are expressed with the word “should”. NOTE It is expected that, during tailoring, recommendations in this document are either converted into requirements or tailored out. c. The words “may” and “need not” are used in this Standard to express positive and negative permissions, respectively. All the positive permissions are expressed with the word “may”. All the negative permissions are expressed with the words “need not”. d. The word “can” is used in this Standard to express capabilities or possibilities, and therefore, if not accompanied by one of the previous words, it implies descriptive text. NOTE In ECSS “may” and “can” have completely different meanings: “may” is normative (permission), and “can” is descriptive. e. The present and past tenses are used in this Standard to express statements of fact, and therefore they imply descriptive text. 13
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 13 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=14
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 4 Principles This Standard is structured such that the necessary level of quality is achieved, consistently maintained and high reliability of the end product assured. The following principles are covered: • Preparatory conditions to determine the availability of facilities, tools and equipment, along with obligatory hazard and health precautions. • Specific interconnections, as identified in the Scope above, are then covered in detail including  Material selection,  Process identification and documentation. • New crimp combinations beyond those identified in the Scope. • Test methods and acceptance criteria for both specific and generic types of interconnections are specified. • Quality assurance measures for both the operator and the inspector are prescribed:  Training and certification of personnel,  Calibration of tools and equipment,  Workmanship standards and acceptance criteria,  Inspection criteria and sequence,  Records from material incoming inspection through delivery of the end product, including KIP, MIP, travellers, follow-up sheets, log books, traceability samples and the handling of deviations by RFA or NCR. It is important to perform the work taking into account health and safety regulations, and in particular the national standards on this subject. 14
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 14 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=15
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5 Requirements 5.1 Preparatory conditions 5.1.1 Facilities 5.1.1.1 Overview The requirements in this clause can generally be met by using cleanrooms. It is not, however, mandatory to use a cleanroom. NOTE Depending on supplier and customer business agreement. 5.1.1.2 Facility cleanliness a. The supplier shall provide cleaning services for production facilities where high reliability crimping is performed. b. Production facilities where high reliability crimping is performed shall be maintained in a clean and tidy condition. c. Loose material that can cause contamination of the crimped connection shall be removed. NOTE For example: Dirt, dust, oils and cut wire strands. d. Furniture shall be kept to a minimum in the work areas and be arranged to allow easy and thorough cleaning of the floor. e. Working surfaces shall be covered with an easily cleaned hard top, antistatic mat or have a replaceable surface of clean, non-contaminating silicone-free paper. 5.1.1.3 Environmental conditions a. The crimping area shall have a controlled environment, which limits entry of contamination. b. The area shall be continuously controlled as follows: 1. room temperature: (22 ± 3) °C; 2. relative humidity: (55 ± 10) %. 15
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 15 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=16
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 c. The workstations shall not be exposed to draughts. d. Fresh air shall be supplied to the room through a filtering system with positive pressure difference with regard to adjacent rooms. e. The exhaust air shall be suitably restricted. 5.1.1.4 Lighting requirements a. The supplier shall ensure adequate illumination conditions of the crimp workstations. b. The minimum light intensity shall be 1 080 lux on the work surface. c. A minimum of 90 % of the work area shall be shadow-less and without severe reflections. 5.1.2 Tools and equipment 5.1.2.1 Crimping tools a. The supplier shall provide the tooling necessary for continued high quality crimping. NOTE Examples of crimping tools are shown in Figure 5-1. b. Tools used shall employ an integral ratcheting mechanism, which controls the crimping operation in conformance to SAE-AS-22520. NOTE The mechanism ensures that, once the operation is started, the tool cannot be opened until the crimping cycle is complete. c. Tools shall be sealed on one setting value in case of variable settings tools. d. Tool calibration shall be verified in conformance with the clause 5.5.6 requirements. e. Proper operation of the integral ratcheting mechanism or the positive stops on pneumatic tools shall be verified as defined in clause 5.5.6. f. Before starting a crimping process on a new terminal size and wire type, the tool used for crimping of the previous wire type shall be returned to the tool storage. g. If the tool settings seals are found removed or broken, the tool shall be removed from the work place and returned immediately for recalibration. h. Tools used in the crimping operation shall be clean and excess lubricant removed before crimping starts. i. Tools shall be individually labelled. NOTE This identification is recorded in the manufacturing connector follow up sheet. 16
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 16 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=17
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Contact crimping tool Splice-lug crimping tool Figure 5-1: Example of crimping tools 5.1.2.2 Insulation strippers a. The supplier shall provide the tooling necessary to avoid damage to the conductor. b. The selection of thermal or precision cutting devices, manual or automatic power-driven, shall ensure integrity of the conductor strands. c. Wire stretching by use of mechanical strippers shall be avoided. d. The conductor shall not be twisted, ringed, nicked, cut or scored by stripping operation. e. Both thermal and mechanical stripping tools shall be calibrated periodically on sample evaluation during a production run. f. For coated wires the exposure of underlined base metal shall be a cause for rejection. 17
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 17 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=18
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.1.2.3 Cutting pliers a. The supplier shall provide the tooling necessary for precision wire trimming and cutting. b. The cutter used for trimming conductor wire shall shear sharply and consistently to produce a clean, flat, smooth-cut surface along the entire cut edge. c. Twisting action during cutting operation shall be avoided. d. <<deleted>> e. The cutting edges shall be regularly checked for damage and maintained in a sharp condition. 5.1.2.4 Test and monitoring equipment a. The supplier shall provide the equipment specified in Table 5-1 necessary for verification activities specified in clause 5.4.3. Table 5-1: Equipment for verification process Performance tests activity Equipment characteristic <<deleted>> <<deleted>> Tensile strength (in conformance with clause 5.4.3 requirements) Tensile testing machine conforming to ISO 7500 class 1 or better. Axial load applied at a rate of (20 – 40) mm/min ±2 mm/min Visual inspection Magnification ×7 to ×40 Monitoring requirements of the process Temperature 15 °C to 30 °C, accurate to ±1 °C Relative humidity (RH) 40 % to 70 %, accurate to ±1 % 5.2 Crimping operations for different types of interconnections 5.2.1 General a. The supplier shall visually examine wires, terminals and connector contacts for cleanliness, absence of oil films and freedom from tarnish or corrosion before assembly. b. The supplier shall perform cleaning of the work pieces using IPA. c. Further cleaning or other treatment shall not be carried out except the case when validation and qualification of a cleaning product was performed on all used materials. d. The supplier shall handle work pieces with clean lint free gloves or finger cots. e. Before a crimping activity, tools at the operator’s station shall be verified to conform to those selected in accordance with the applicable PID or procedures. 18
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 18 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=19
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 f. All conductor strands shall be inserted cleanly into the barrel without any buckling. g. Strands shall not be left outside or cut back to reduce the conductor diameter to fit an undersized barrel. h. The supplier shall use tools as specified in SAE-AS-22520 for the crimp contact configuration. NOTE Examples of crimping parameters are given in Table A-1 to Table A-6 i. The supplier shall take provisions to avoid degradation of the silver plated wire caused by tarnish during storage. j. <<deleted>> k. The crimping of single solid wires shall not be used. 5.2.2 Material selection a. The supplier shall use silver plated copper multi stranded wire and braided shield cable procured in conformance with the requirements from ESCC generic specification 3901. b. In cases where other types of wire and wire finishes are used a request for approval (RFA) in conformance with DRD from Annex D from ECSS- Q-ST-70 shall be provided to the customer for approval. NOTE Examples of wire and wire finishes needing RFA include nickel- or fused tin-plated wires, stainless steel, phosphor bronze, copper, constantan, and nickel alloys. c. The supplier shall use high strength copper alloy wire for 24 AWG, 26 AWG and 28 AWG crimped joints. NOTE Soft or annealed copper wire are not acceptable for crimped joints of 24 AWG, 26 AWG and 28 AWG size. d. The supplier shall use space-qualified components having gold plated finishes in conformance with ECSS-Q-ST-60. e. Specific items such as ferrules, splices, contacts and lugs shall be purchased to SAE-AS-7928 specification. f. When gold plating is not available the finish shall be in conformance with ECSS-Q-ST-70-71. NOTE Ferrules, splice, contacts and lugs supporting an external nickel layer can be used in case there is no alternative finish, although tool wear is accelerated. g. Cadmium, chromate-coated cadmium, tin-lead and non-fused tin-plating shall not be used. NOTE Tin-lead finish is not acceptable for crimp connection due to creep. 19
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 19 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=20
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.2.3 Process review and documentation a. The supplier shall perform a review of all the materials, tools and techniques planned to be used to ensure conformance to requirements of this standard and as a means of identifying potential problems. NOTE Type of wire includes base material, number of strands, plating metal, type and thickness of insulation. b. Dies, setting of controls for the length of strip in automatic stripping machines and the selection of specific locators or positioners for crimping tools, shall be selected to meet process requirements. NOTE The requirement is valid for power driven and manual crimping processes as well as for size and tolerance for crimping tools. c. The results of the review shall be documented in a specific internal procedure. 5.2.4 Contact barrel and single wire crimping a. The supplier shall give preference to the selection of single multistranded wire interconnections. b. The supplier shall not use strands of wire doubled backed to increase the conductor diameter. c. The supplier shall use a specific contact to be compatible with the cross- sectional area of the wire. NOTE Examples of a specific contact include reduced, normal or enlarged barrel. d. For 28 AWG up to 16 AWG wire sizes, the insulation clearance shall be maintained between 0,3 mm and 1,0 mm. e. For wire size bigger than 16 AWG the insulation clearance shall be maintained between 0,3 mm and 2 mm. f. On D-sub contacts, a transparent shrink fit insulation sleeve shall be applied over the rear of the contact and the wire insulation both to cover the insulation clearance and to prevent any risk of a short circuit. NOTE Examples of crimping parameters are given in Table A-1. An example of a typical contact barrel and an example of single wire crimping is shown in Figure 5-2. g. Multistranded type of wire shall be used in case the filler wire is used to increase the conductors diameter. h. The use of potting, to ensure insulation at the rear of connectors with removable contacts, shall not be used except when authorized by the customer through RFA. NOTE The use of potting on these types of connectors can violate specification from manufacturer and can invalidate the qualification status of the connector itself. 20
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 20 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=21
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Figure 5-2: Example of a typical connector barrel and single wire crimping 5.2.5 Contact barrel and multiple wire crimping a. Requirements of this clause shall be applied when single multistranded wire crimping cannot be used. b. The maximum number of wires in one crimp barrel shall be two. c. The sum of the two nominal conductor sections shall be compatible with the crimp barrel used d. Both conductors shall be of the same material and support the same plating finish. NOTE 1 For example: both are silver plated and not a combination of silver and nickel plated, both are high-strength copper alloy and not a combination of pure copper and high-strength copper alloy. NOTE 2 Strand wires or conductors can be inserted straight into the barrel or twisted together to obtain a “single” conductor. e. Axial strength measurements shall be performed in compliance with requirements in clause 5.4.3.2. NOTE Examples of crimping parameters are given in Table A-2 and an example of a typical contact 21
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 21 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=22
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 barrel and multi-wire crimping is shown in Figure 5-3. f. For separate conductors introduced straight into the barrel the following shall apply: 1. the actual strength measurement is performed on one of the wires (the smaller, if two different sizes are used); 2. the axial strength requirement is determined as specified in requirements of clause 5.4.3.2 for the actual size of wire pulled, assuming a barrel size equal to that wire’s gauge. NOTE Examples of crimping parameters are given in Table A-3 and an example of a typical connector barrel and multi-wire crimping is shown in Figure 5-3. g. The conductor diameter shall not be increased by the use of individual strands of wire or double back wire. h. Multistranded type of wire shall be used in case the filler wire is used to increase the conductors diameter. i. For 28 AWG up to 16 AWG wire sizes the maximum insulation clearance shall be maintained between 0,3 mm and 1,0 mm. Figure 5-3: Example of a typical connector barrel and multi-wire crimping 22
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 22 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=23
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.2.6 Ferrule shield crimping a. The shielding on coaxial cables shall be ensured by braided strands. b. Axial strength measurements shall be performed in compliance with requirements from clause 5.4.3.3. c. <<deleted, moved to 5.2.6f>> d. Only one braided shield shall be crimped in one ferrule connection. e. The braid end shall only be located at the ferrule crimp level in order to prevent any risk of short circuit between central pin and braid strands. f. Following crimping, the assembly shall be protected by shrink tubing. NOTE Examples of crimping parameters are given in Table A-6 and an example of a typical ferrule shield crimping is shown in Figure 5-4. Figure 5-4: Example of a typical ferrule shield crimping 5.2.7 Lug and splice wire crimping a. Only tools specified by the manufacturer of the terminals shall be used. b. The maximum number of wires shall be ten on the same assembly. c. Seven wires maximum shall be on the same side. d. All conductors shall be of the same material and within a size range of 4 wire gauges including odd and even AWG sizes on the same side. e. If the number of conductors on the same side is more than two all conductors shall be positioned parallel in the terminal barrel before crimping. 23
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 23 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=24
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 f. Axial strength measurements shall be performed in compliance with requirements from clause 5.4.3.3. g. <<deleted>> h. Figure A-6Following crimping, the assembly shall be protected by shrink tubing. NOTE Examples of typical lug and splice wire crimpings are shown in Figure 5-5 and Figure 5-6. i. In case the number of conductors on the same side is limited to two then the conductors may be twisted together to form a single conductor. j. For 28 AWG up to 16 AWG wire sizes the maximum insulation clearance shall be maintained between 0,3 mm and 1,0 mm. 24
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 24 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=25
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Butt splice crimping Two sided parallel splice crimping One side parallel splice crimping Figure 5-5: Examples of typical lug and splice wire crimping (1 of 2) 25
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 25 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=26
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Crimping of lug Crimping of lug with filler wire Microgaph of crimping of lug with filler wire Figure 5-6: Examples of typical lug and splice wire crimping (2 of 2) 5.3 Requirements for crimp configuration qualification 5.3.1 General a. All crimp configurations shall be qualified in compliance with requirements from clause 5.3.2. b. The supplier shall document the data of successful process qualification in a specific internal procedure to ensure continued high quality of production performance. c. <<deleted>> d. Any change to an element of the qualified crimp configuration specified in requirement 5.3.1a shall be qualified. 26
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 26 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=27
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 e. The supplier shall ensure that the selected materials are qualified for the mission environment. f. In case the mission environment exceeds the temperature range for which the materials are qualified, a qualification shall be performed and agreed with the customer NOTE Examples of materials include cables and crimp items. g. In case qualification is needed, the supplier shall issue an RFA. 5.3.2 Qualification process test procedure a. The supplier shall perform tensile strength tests on samples prepared at a number of tool settings, in conformance with the requirements specified in clause 5.4 and in conformance with the following process: 1. Ten samples prepared at the point specified by the crimping tool manufacturer as a starting point for calibrating tools. 2. For connector contacts the tool indenter opening is then adjusted in convenient increments above and below this point, and ten samples pulled at each increment. 3. For lugs, splices and ferrules, ten samples are prepared at each setting of the crimping tool and pulled. 4. A plot is made with increments being close enough together to obtain a smooth curve. 5. The maximum in tensile strength is then determined and evaluated. 6. The optimum tool setting lies approximately in the middle of the flat top portion of the tensile-strength plot. 7. In case of very close average tensile strength values, the microsectioning of the samples relevant to the concerned settings is performed to identify the best setting. NOTE Typical settings of crimping tool are given in Annex A.2. b. The supplier shall validate satisfactory results achieved from the final tool setting at the operating point on a minimum of ten samples in conformance with the methods defined in clause 5.4 and according to the following process: 1. Tensile strength tests are performed on five samples corresponding to the operating point. 2. <<deleted>> 3. Metallographic tests are performed on a minimum of three samples corresponding to the operating point. 4. Not tested samples are retained for reference. c. Test data shall be recorded in a qualification report. d. The qualification report shall include the results of the search for the optimum tool setting specified in requirement 5.3.2a. 27
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 27 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=28
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 NOTE Figure 5-7 presents a flow chart of the Qualification process test procedure of clause 5.3.2. Wire / braid under ESCC specification? Wire / braid intrinsic tensile strength already characterized? Wire / braid intrinsic tensile strength already characterized? YES NO Ensure the intrinsic wire / braid tensile strenth characterization (clause 5.4.3.5) [Average values on 10 samples] Wire / braid batch is the same than the already used on a previous qualified crimping configuartion? YES NO NO NO Choice of the crimp item: Crimp item barrel section > wire /braid section to be crimped into Optimum setting search (clause 5.3.2) Optimum setting research: For connector contacts: - Average tensile strength values on 10 samples of the chosen setting - Average tensile strength values on 10 samples of the just above setting Optimum setting qualification Optimum setting research: - 10 samples with the chosen setting, - 5 samples for tensile strenght tests YES YES Figure 5-7: Qualification process test procedure flow chart 28
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 28 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=29
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.3.3 Sealing and marking a. The supplier shall seal and mark calibrated tools in conformance with clause 5.5.6.3 requirements. 5.3.4 Batch to batch variation 5.3.4.1 Wires qualified by ESCC a. For wires qualified by ESCC the qualified tool set-up may be used without additional validation when different batches of wires are used. 5.3.4.2 Wires not qualified by ESCC a. For wires not qualified by ESCC the qualified optimum set-up shall be confirmed for each new batch of wire in conformance with the following qualification process: 1. tensile strength tests are performed on five samples corresponding to the operating point, 2. a further five samples are produced at tool settings above and below the operating point and tensile tested. b. The average tensile strength at the operating point, as per 5.3.4.2a.1, shall be higher or equal to the result obtained in 5.3.4.2a.2 and in compliance with 5.4.3. c. In case the average result at the operating point is lower than the result obtained in 5.3.4.2a.2 the qualification process specified in the requirements from clause 5.3.2 shall be repeated. 5.4 Test methods 5.4.1 General a. The supplier shall submit samples to the tests specified in clauses 5.4.3 and 5.4.4. NOTE The number of samples is dependent on the specific process requirement (in conformance with clauses 5.3.2 ,5.3.4, 5.5.5 and 5.5.6.2 requirements). b. Test samples shall meet the requirements of clause 5.5.4.1. c. Records of all results shall be tabulated in conformance with 5.5.7. 5.4.2 <<deleted>> a. <<deleted>> b. <<deleted>> c. <<deleted>> 29
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 29 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=30
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.4.3 Tensile strength 5.4.3.1 General a. The supplier shall use a tensile testing device with characteristics in conformance with Table 5-1. b. The connections shall be loaded until failure occurs. c. The value at failure shall be recorded, together with the information as to whether the failure was “pull-out”, “break in crimp” or “break in wire”. d. The required ultimate axial strengths for compactive and dispersive crimped joints shall be determined as specified in clauses 5.4.3.2 and 5.4.3.3. NOTE A typical test fixture for testing ferrule lug, splice and contact crimps is shown in Figure A- 6. e. The clamping of the free bare ends of wire or metallic braided shield directly in the clamping fixtures of the tensile machine shall not be used. 5.4.3.2 Contact barrel wire crimping a. The required axial strength of the crimped assembly shall be 75 % of the intrinsic wire strength as specified in clause 5.4.3.5. NOTE Examples of typical values of intrinsic wire strength of ESCC qualified wires and the 75% requirement are detailed in Table B-1. b. <<deleted>> c. In case of two crimped wires the axial strength the measurement shall be performed on one of the two inserted wires and be at least 75 % of the intrinsic strength of the wire. d. If two different wire gauges are used then the test specified in 5.4.3.2c shall be performed on the smaller of the two. e. Only one tensile test per sample is performed and the test shall be continued until failure occurs. 5.4.3.3 Ferrule a. The required axial strength of the crimped assembly shall be 75 % of the intrinsic wire or braid strength as specified in clause 5.4.3.5. b. Axial strength measurements shall be performed only on the shield after removal of the core dielectric. 5.4.3.4 Lug and splice a. The required axial strength of the crimped assembly shall be 75 % of the intrinsic wire or braid strength as specified in clause 5.4.3.5. b. In the case of several equal wire sizes crimped into the same barrel axial strength measurements shall be performed on only one wire per sample. 30
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 30 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=31
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 c. In the case of different wire sizes crimped into the same barrel axial strength measurements shall be performed on only one wire per sample from the smallest gauge d. In the case where opposed wires are tested a specifically designed test fixture shall be used. NOTE A typical test fixture is shown in Figure A-6 e. Only one tensile test per sample is performed and the test shall be continued until failure occurs. 5.4.3.5 Characterisation of intrinsic wire / braid strength a. Intrinsic strength of wire or metallic braided shields shall be determined as follows: 1. A minimum of ten samples of 200 mm length from the wire batch to be used for the crimped assembly are prepared for testing by first stripping the insulation from both ends of the wire, 2. For metallic braided shield axial strength measurements are performed only on the shield after removal of the core dielectric, 3. To avoid wire or metallic braided shield strands damage in the clamping area, suitable end tabs, such as soldered splice are used, 4. The samples are tested to failure at a rate of (20 – 50) mm/min, 5. The maximum load achieved is recorded, 6. In case of failure in the clamps the result is discarded, 7. Intrinsic wire strength is calculated by averaging a minimum of ten valid tests. b. The intrinsic wire strength characterization shall be performed once for each batch of wire. c. For ESCC wires, the intrinsic wire strength characterization value obtained on a batch of wire to other batches of the same type and size of wire from the same manufacturer, may be applied. 5.4.4 Metallography a. The supplier shall employ a certified laboratory to perform the metallographic tests specified in the requirements 5.4.4c to 5.4.4i. b. The customer shall approve the certification status of the laboratory. c. The joint to be sectioned shall be mounted in a low exotherm resin capable of being moulded without the application of external pressure. d. The joint shall be oriented that the wire is perpendicular to the polishing surface. e. The specimen shall be ground with the aid of appropriate grades of silicon carbide papers, in order to expose the mid-section of the joint. 31
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 31 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=32
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 f. This section shall then be polished with successively finer grades of diamond paste down to 1 µm. g. To aid microscopic examination, the polished section shall be very lightly etched with an accepted chemical reagent specific to the composition of the materials being crimped. h. The section shall be examined in both as-polished and etched states using a metallographic microscope at a magnification up to ×400. i. The following acceptance criteria shall be met: 1. Each micro section is free from contamination; 2. The crimp barrel is evenly deformed; 3. Voids occupy less than 10 % of the cross sectioned area of the wire volume; 4. The wires and barrel appear as a gas-tight joint and conform to the workmanship sample prepared during qualification; 5. All strands are deformed from their circular cross section; 6. There are no indentations or fracturing of the deformed receptacle barrel or its plated finish. NOTE For ferrule shield crimping the requirements of 5.4.4i.3. and 5. are not applicable. j. The laboratory for the metallographic tests should be certified with ISO 17025. 5.5 Quality assurance 5.5.1 General a. The supplier shall install a Quality Assurance (QA) function in conformance with the requirements as defined in ECSS-Q-ST-20. b. The quality control process shall be as specified in Figure 5-8. 5.5.2 Personnel training and certification 5.5.2.1 Training program a. The supplier shall employ trained and certified personnel for all stripping and crimping operations implementing and maintaining a skill matrix. b. The supplier shall develop, maintain and implement a training programme, in conformance with ECSS-Q-ST-20. NOTE The aim of the training programme is to provide for excellence of workmanship and personnel skills, careful and safe operations, and improvement of the quality of crimped joints. 32
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 32 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=33
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.5.2.2 Certification a. <<deleted>> b. The certification of personnel shall be based upon objective evidence of crimp quality, resulting from test and inspection of the crimped joints. c. Operators or inspectors shall be re-certified in cases of repeatedly unacceptable quality levels and changes in crimping techniques, parameters or required skills. d. The supplier shall perform training and certification at a school authorized by the customer. e. Certification shall be valid for a period of two years. 5.5.2.3 Documentation a. The supplier shall maintain records of the training and certification status of crimping operators and inspection personnel. 33
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 33 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=34
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Figure 5-8: Quality control during crimping operation Personnel trained and certified (in conformance with clause 5.5.2) Control of compatibility of parts, crimping and stripping tools (in conformance with clauses 5.1.2.1 and 5.1.2.2) Crimp configuration qualified (in conformance with clause 5.3.1 Crimping tool calibrated using go/no-go gauges and sample crimps (in conformance with subclause 5.5.6.2 Definition of tool setting parameters (in conformance with clauses 5.5.6.2b) Pre-crimp production inspection of wires and barrels (in conformance with clause 5.5.4.1) Remove stripping tool from the area and repair/recalibrate or reject as necessary nonconformance Performance inspection and test of crimping operations (in conformance with subclause 5.5.5 or 5.5.9) All crimping production performed with the crimp tool concerned since its last acceptable sampling shall be rejected nonconformance Crimping operation Post-crimp production inspection (in conformance with clause 5.5.4.2 REJECT ACCEPT nonconformance 34
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 34 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=35
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.5.3 Workmanship a. The supplier shall prepare standards consisting of satisfactory work samples (in conformance with the Figure 5-9 and Figure 5-10) b. The supplier shall have readily available visual aids, which clearly illustrate the quality characteristics of all crimped connections utilized. c. Defects such as those listed in clause 5.5.4.2 and shown in Figure 5-9 shall be included as examples. d. The operator shall discard production crimps which are defective. e. Defective test samples shall not be discarded. 35
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 35 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=36
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Figure 5-9: Visible workmanship standards 36
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 36 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=37
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Unacceptable: undercrimp Limit of acceptability: void 10 % Acceptable: preferred Not acceptable: overcrimp A Figure 5-10: Workmanship examples and crimp micro-sections 5.5.4 Visual inspection 5.5.4.1 Pre-crimp inspection (performed by the operator) a. The wire shall be examined for no evidence of nicks, rings, broken strands, untwisted lay or not-removed insulation in the area of the crimp before the stripped wire is inserted into the crimped item barrel. b. Damaged wires where the base material is exposed shall not be used. c. Contacts and terminal barrels that show evidence of the presence of tarnish, corrosion or physical damage, including bent contacts, shall not be used. d. Inspection shall check that the combination of wire size and type and crimp item are in accordance with the drawing or control document. 37
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 37 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=38
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.5.4.2 Post-crimp inspection (performed by quality assurance) a. The QA inspector shall carry out inspection with the use of a binocular microscope having a minimum linear magnification of ×7. NOTE Further examination of surface characteristics can be performed at higher magnifications. b. The inspector shall not physically disturb parts and conductor leads to help inspection. c. The following acceptance criteria shall be met; 1. Wire insulation is not damaged by the crimping operation; 2. The conductor is visible in the inspection hole when an inspection hole is provided; in the case of lugs and splices the free end of the conductor is visible at the exit point; 3. The crimp barrel has no unintentional sharp edges, peeled metal, burrs, cracked platings or cuts after crimping; 4. All functional parts, including all retention clips or locking devices, are operational after the crimp has been made; 5. No tarnished or corroded crimped item are present; 6. No misplaced crimps, as determined by marks found on areas not designed to take crimping, are present 7. No undercrimps or overcrimps are present; 8. The detection of an under crimp or over crimp shall cause the stop of manufacturing as follows: (a) operations at that work place , (b) rejection of all production crimps made since the last verification or pull test, (c) investigation of tools, wire and crimp item to determine the cause of failure. 9. No bent contacts are present. 10. Wire strands are not damaged as a result of the crimping operation. 11. The insulation clearance complies with the requirements 5.2.4d and 5.2.4e. d. Failure to meet the acceptance criteria of 5.5.4.2c shall be cause for rejection. 5.5.4.3 General a. 100 % visual inspection shall be performed by independent inspector. b. The independent inspector should be from Quality Assurance. c. Pre-crimp inspection may be performed by an operator who has successfully followed and passed an internal training scheme which has been implemented by QA as specified in 5.5.2. 38
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 38 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=39
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.5.5 Shift performance inspection and test for harness manufacturing a. <<deleted>> b. <<deleted>> c. <<deleted>> d. <<deleted>> e. <<deleted>> f. <<deleted>> g. <<deleted>> h. <<deleted>> i. <<deleted>> j. <<deleted>> k. Prior to the start of a new harness manufacturing the following shall be done: 1. The tool settings are determined for each crimp combinations, wire and crimp item, that are planned to be used during the project, 2. Crimping tools are dedicated to one crimping combination, wire and contact, and have individual identification, 3. Crimping tools are validated at start of manufacture and traceability noted in its correspondent log book, 4. Crimp configuration settings are locked on each contact crimping tool. NOTE 1 Ideally, crimping tools are dedicated to one project. NOTE 2 Shift performance test for crimping operation with small number of crimps as integration and repairs, are detailed in clause 5.5.9. l. At the start of harness manufacturing the following shall be done: 1. Four samples of each of the different configurations are produced at the optimum setting for connector and ferrules, 2. Four samples of the configuration with the minimum number of wires into the barrel and four samples of the configuration with maximum number of wires for lugs and splices, 3. Three of the samples of each type from the four samples specified in the requirements 5.5.5l.1 and 5.5.5l.2 are pull tested, 4. The fourth sample is retained as traceability witness, 5. All results are recorded in the dedicated project logbook. m. Intermediate tool inspections of a harness manufacturing shall be done as follows: 39
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 39 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=40
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 1. At the start of each new shift cleanliness control of the active part of the tool and “go/no-go” checks are performed, 2. Crimping tools which are used for less than 500 crimps per week shall be revalidated after each 500 crimp operations or 2 months whichever is earlier in conformance with requirements from the clause 5.5.6.2 3. The results are recorded in the dedicated tool logbook in accordance with 5.5.6.2c. n. For manufacturing runs of more than 500 crimps per week with the same crimping tool the following shall be done: 1. Cleanliness control of the active part of the tool and “go/no-go” checks are performed, 2. Tensile test on not less than four samples each 500 crimp operations are performed, 3. Revalidation of the tools is performed each 1500 crimp operations or 2 months, whichever is earlier in conformance with requirements from the clause 5.5.6.2, 4. The results are recorded in the dedicated tool logbook in accordance with 5.5.6.2c. o. At the end of the harness manufacturing the following shall be done: 1. Four samples of each of the different configurations are produced at the optimum setting for connector contacts and ferrules, 2. Four samples of the configuration with the minimum number of wires into the barrel and four samples of the configuration with maximum number of wires for lugs and splices, 3. Three samples from four samples specified in the requirements 5.5.5o.1 and 5.5.5o.2 are pull tested, 4. The fourth sample is retained as traceability witness, 5. All results are recorded in the dedicated project logbook. 5.5.6 Calibration of crimping tools 5.5.6.1 General a. The QA organization of the supplier shall ensure that each crimping tool and measuring equipment is calibrated as indicated in the subsequent sub clauses. b. The QA organization of the supplier shall record any suspected and actual equipment failure as a project nonconformance report NOTE Based on past nonconformance reports previous results can be examined to ascertain whether or not re-inspection or retesting is required. 40
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 40 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=41
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 c. The QA organization of the supplier shall notify the customer of the nonconformance details. d. The supplier’s calibration procedure shall include the requirements specified in this clause for tool calibration. 5.5.6.2 Validation a. The QA organization of the supplier shall ensure that crimping tools, both manual and powered, are calibrated when initially set up for each specific wire size, connection size and type prior to first use. b. Calibration shall be verified in conformance with the following check-list: 1. cleanliness control of the active part of the tool (e.g. indenters); 2. set up with the aid of the “go/no-go” gauge in conformance with specified conditions; 3. tests in conformance with the clause 5.4 requirements on not less than four samples. c. After satisfactory verification of calibration the tool status shall be documented in a “tool calibration sheet” to ensure tool traceability. d. This traceability shall be established by periodic analysis of the corresponding data from the performance inspection and tests (in conformance with clause 5.5.5 requirements), e. A significant drift in test results shall result in tool rejection. NOTE Such a tool is generally labelled "out-of- calibration tool" (in conformance with clause 5.5.6.4 requirements). 5.5.6.3 Sealing and marking a. The supplier shall provide sealing for calibrated crimping tools to ensure against unauthorized alteration of adjustment settings. b. A wire and lead seal method shall be used if the tool has provisions for it; c. In case requirement 5.5.6.3b cannot be implemented, the tool shall be sealed by a non-reusable decal seal, which, if the calibrated setting is altered, is visibly damaged. d. Seals shall be placed on all external adjustment points of the tool. 5.5.6.4 Out-of-calibration tools a. Tools that are out of calibration shall be returned to the tool facility for readjustment and calibration. b. Tools that are worn or damaged shall be identified as rejected and removed from the fabrication area. 5.5.7 Records a. The supplier shall maintain traceability throughout the process from incoming inspection to final test, including details of test equipment, tools and personnel employed in performing the task. b. Quality records and logbooks shall be retained for at least ten years 41
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 41 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=42
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 c. Quality records and logbooks shall contain the following information: 1. the as-built and test configuration list (waiver and deviation summary); 2. nonconformance reports and corrective actions; 3. copy of the visual inspection and performance test results with reference to the relevant procedure, personnel and tools used; 4. records of the training, testing and certification status of crimping operators in conformance with clause 5.5.3 requirements. 5.5.8 Nonconformance a. The QA organization of the supplier shall disposition any nonconformance which is observed in respect of the process in conformance with the quality assurance requirements, in conformance with ECSS-Q-ST-10-09. b. Failure of a crimping tool to pass any requirement specified in clause 5.1.2.1 shall require rejection of all crimps made by that tool since it was last tested successfully for acceptance. 5.5.9 Special crimping activities at spacecraft level, modifications and repairs a. Crimping tools shall have individual identification. b. Crimping tools shall be validated every 12 months or every 1500 crimps whichever is earlier in compliance with requirements from clause 5.5.6.2. c. Results of validation specified in the requirement 5.5.9b shall be recorded in its dedicated logbook. d. The supplier shall keep a logbook for each tool. e. The logbook shall show the quantity of parts crimped since each calibration and since each “go/no-go” operation. f. The in-process controls shall be in compliance with requirements 5.5.9g or 5.5.9h. g. After every 250 crimping operations four samples shall be crimped of which: 1. three samples are submitted to the tensile strength test as specified in the requirements from the clause 5.4.3, 2. the fourth sample is retained for reference and traceability purposes in conformance with requirements from clause 5.5.6.2, and 3. a “go/no-go” check of the tool is performed at the beginning of each shift and recorded in the logbook. h. In case the supplier does not maintain a logbook of the crimping operation, detailed in 5.5.9g, the following shall be performed by each operator: 42
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 42 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=43
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 1. prepare four samples at the beginning of a shift or before a series of crimping operations of which: (a) three samples are submitted to the tensile strength test as specified in the requirements from the clause 5.4.3, and (b) the fourth sample is retained for reference and traceability purposes in conformance with requirements from clause 5.5.6.2. 2. at the end of the shift or after 250 crimping operations, whichever is reached first, four samples are crimped of which: (a) three samples are submitted to the tensile strength test as specified in the requirements from the clause 5.4.3, and (b) the fourth sample is retained for reference and traceability purposes in conformance with requirements from clause 5.5.6.2. i. A crimping tool shall be changed whenever a wire size or contact size is changed. j. After a change of a crimping tool, as specified in the requirement 5.5.9i, the operator shall, unless the tool has a current validation, prepare four samples at the start of the operation, of which: 1. three samples are submitted to the tensile strength test as specified in the requirements from the clause 5.4.3, and 2. the fourth sample is retained for reference and traceability purposes in conformance with requirements from clause 5.5.6.2. k. The supplier shall perform an analysis of shift performance test results, in comparison with initial tool calibration results, to determine any drift in tool performance. NOTE Figure 5-11 illustrates the shift performance test flow. 43
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 43 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=44
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Tools preparation per 5.5.5k Preparation and test of 4 samples per tool in compliance with 5.5.5l at beginning of the manufacturing of a new harness. “Go/no-go” check is done at beginning of each shift per 5.5.5m.1 Are more than 500 crimps performed with the tool in a week? Perform the intermediate checks as per 5.5.5m “Go/no-go” check is done at beginning of each shift per 5.5.5m.1 NO YES At the end of the harness manufacturing perform the testing on four samples per tool as per 5.5.5o Tool preparation as per 5.5.9b and 5.5.9c Supplier maintains logbook for crimping tool Preparation and test of 4 samples per tool in compliance with 5.5.9g “Go/no-go” check is done at beginning of each shift per 5.5.9g.3 Preparation and test of 4 samples per tool in compliance with 5.5.9g After 250 crimping operations At the beginning of the shift Preparation and test of 4 samples per tool in compliance with 5.5.9h.1 At the end of the shift or after 250 crimping operation whichever is reached first: Preparation and test of 4 samples per tool in compliance with 5.5.9h.2 Every 1500 crimps of 12 months whichever is reached first the crimp is validated as per 5.5.9b YES NO Harness manufacturing according to clause 5.5.5 Integration activities at PCB / unit / spacecraft level according to clause 5.5.9 Figure 5-11: Shift performance test flowchart 44
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 44 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=45
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.6 Document requirements a. The supplier shall produce documentation for: 1. Process identification, in a PID or a specific internal procedure and RFA, 2. Inspection, 3. Traceability, 4. Testing, both procedures and records, 5. Logbooks, and 6. Calibration. b. The format of the documents shall be in accordance with the deliverables item list defined in the business agreement. NOTE No specific DRD requirements emerge from this Standard. 45
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 45 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=46
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Annex A (informative) Crimp configurations and tools A.1 Overview of crimp configurations Many crimp interconnection technologies are currently available for space applications. Confined or compactive crimps are made by a tool, which exerts an even pressure around the receptacle barrel circumference such that even deformation is applied on all sides; the only means of stress relief is by elongation of the barrel and wire. Typical settings for the crimping tool are given in A.2. Non-confined or dispersive crimps result from compression of the receptacle barrel with an indenter die having one or two indents or, alternatively, by two or four radially opposed indenter dies (in conformance with Figure A-4 and Figure A-5). The achievement of an acceptable crimped joint is controlled by the tools and materials used, but workmanship - the manner in which they are employed - is also important. Items that constitute workmanship are those under the control of the operator. They include careful butting of the wire against the stop in the stripping operation to ensure correct insulation gap, loading of a connector pin in the positioner to the full distance, inserting the stripped wire into the connector pin barrel or terminal until it shows in the inspection hole or through the contact in the case of crimp lugs and re-twisting the strands not more than the natural lay, if disturbed during the stripping operation. 46
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 46 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=47
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Figure A-1: Confined irregular-octagon crimp (compactive) Figure A-2: Dimpled confined octagon crimp (compactive) Figure A-3: Regular-hexagon crimp (compactive) Figure A-4: Semicircular one- or two-indent crimp (dispersive) Figure A-5: Four-indent crimp (dispersive) 47
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 47 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=48
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 A.2 Typical settings of crimping tools For the type of crimping covered in this Standard typical tool selector settings are applicable. Those are, however, only indicative and require effective calibration or validation before use for production of high-reliability crimps, in conformance with clause 5.5.6 Tables for the different types of crimp configuration are shown below. They include reference to the tooling and selector settings by wire and barrel sizes. For the specific case of lug and splice configurations where opposed wires are tested (in conformance with clause 5.4.3 requirements) a typical test fixture is shown in Figure A-6. Table A-1: Guideline for selector setting - Four-indent crimp (dispersive) - Single wire Connector Wire gauge (AWG) Wire barrel contact size Crimping tool / Selector setting M22520/2-01 M22520/1/01 M300-BT D * SUB 3401-002 connector family 8 8 - 8 - - 6 10 8 - 10 - - 5 12 8 - 14/12 - - 2 16 20 - 18 7 - 18 20 - 18 6 - - - - 20 20 - 20 7 - - 22 20 - 20 6 - - 24 20 - 20 5 - - 26 20 - 26 6 - - 28 20 - 26 6 - - 22 22 - 22 4 - - 24 22 - 22 3 - - 26 22 – 22 2 - - 28 22 – 22 1 - - MIL-C 38999 3401-044;3401-052 and 3401-056 connector family 12 12 - 12 - 8 - 14 12 - 12 - - - 16 12 - 12 - 7 - 16 16 - 16 - 6 - 18 16 - 16 - 5 - 20 16 - 16 - 4 - 20 20 - 20 7 3 - 22 20 - 20 6 2 - 24 20 - 20 5 1 - 22 22 - 22 4 - - 24 22 - 22 3 - - 48
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 48 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=49
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 26 22 - 22 2 - - 28 22 - 22 1 - - DBAS 3401-008 connector family 12 12 - 12 - 8 - 14 12 - 12 - 7 - 16 16 - 16 - 6 - 18 16 - 16 - 5 - 20 16 - 16 4 - 20 20 - 20 7 - - 22 20 - 20 6 - - 24 20 - 20 5 - - 26 20 - 26 6 - - 28 20 - 26 5 - - HE801 3401-016 connector family 22 22 - 22 5 24 22 - 22 4 26 22 - 22 4 Table A-2: Guideline for selector setting - Four-indent crimp (dispersive) - Two wires Connector Wire gauge (AWG) Wire barrel contact size Crimping tool / Selector setting M22520/2-01 M22520/1/01 M300-BT D*SUB 3401-002 connector family 12 + 12 8 - 8 - - 6 - 8 - 10 - - - 16 + 16 8 - 14/12 - - 3 20 + 20 20 - 18 7 - - 22 + 22 20 - 18 6 - - 24 + 24 20 - 20 6 - - 26 + 26 20 - 20 5 - - 28 + 28 20 - 20 4 - - DBAS 3401-008 connector family - 12 - 12 - - - 20 + 20 16 - 16 - 6 - 24 + 24 20 -20 6 - - 26 + 26 20 - 20 5 - - 28 + 28 20 - 20 4 - - 49
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 49 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=50
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Table A-3: Guideline for selector setting – Four-indent crimp (dispersive) – Two different wires Connector Wire gauge (AWG) Wire barrel contact size Crimping tool / Selector setting M22520/2-01 M22520/1/01 M300-BT D*SUB 3401-002 connector family - 8 - 8 - - - 12 + 16 8 - 10 - - 5 - 8 – 14/12 - - - 20 + 22 20 - 18 6 - - 22 + 24 20 - 20 8 - - 22 + 26 20 - 20 7 - - 24 + 26 20 - 20 6 - - 26 + 28 20 - 20 4 - - 26 + 28 22 - 22 4 DBAS 3401-008 connector family - 12 - 12 - - - - 16 - 16 - - - 26 + 28 20 -20 5 - - Table A-4: Guideline for selector setting – Four-indent crimp (dispersive) – Single wire Connector Wire gauge (AWG) Wire barrel contact size Crimping tool / Selector setting M22520/2-01 MDMA 3401-077 connector family 24 24 – 24 3 26 24 – 26 2 28 24 - 26 2 Table A-5: Guideline for selector setting – Four-indent crimp (dispersive) – Two identical wires Connector Wire gauge (AWG) Wire barrel contact size Crimping tool / Selector setting M22520/2-01 MDMA 3401-077 connector family 28 + 28 24 -24 3 50
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 50 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=51
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Table A-6: Guideline for die selection – Regular hexagon (compactive ) – Ferrule coaxial shield crimp Coaxial sort Coaxial cable reference M22520/5-01 Crimping tool Die / Slot selection M22520/10-01 Crimping tool Die / Slot selection D*SUB 3401-002 connector family RG 178 BU M22520/5-03 B M22520/10-05 B RG 196 AU M22520/5-03 B M22520/10-05 B RGL-196 #28 M22520/5-03 B M22520/10-05 B 50 CIS M22520/5-03 A M22520/10-05 A 50 CIS BLG M22520/5-03 A M22520/10-05 A SMA 3402-001 connector family 50 CIS M22520/5-03 A M22520/10-05 A 50 CIS BLG M22520/5-03 A M22520/10-05 A 50 CIS DTR M22520/5-03 A M22520/10-05 A A.3 Typical test fixture for pull tests For the specific case of lug and splice configurations where opposed wires are tested, see clause 5.4.3, a typical test fixture is shown in Figure A-6. 51
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 51 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=52
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Figure A-6: Typical test fixture for testing lug and splice crimps 52
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 52 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=53
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Annex B (informative) Examples of typical ultimate axial strength Examples of typical values of intrinsic wire strength of ESCC qualified wires and presented in the Table B-1. Table B-1: Typical ultimate axial strength for compactive and dispersive crimped joints manufactured using qualified ESCC wires AWG Number and size of strands (∅ in mm) Conductor section in mm2 Minimum tensile resistance for crimps with the following composition Kapton Tefzel Teflon/Kapton Silver-plated pure copper Silver-plated copper alloy 3901/001-002 3901/012 3901/019 28 19 x 0,08 7 x 0,12 7 x 0,127 0,095 - 35 N 26 19 x 0,10 19 x 0,10 19 x 0,10 0,15 - 45 N 24 19 x 0,12 19 x 0,12 19 x 0,12 0,22 - 60 N 22 19 x 0,16 19 x 0,15 19 x 0,15 0,38 65 N - 20 19 x 0,20 19 x 0,20 19 x 0,20 0,6 110 N - 18 19 x 0,25 19 x 0,25 - 0,93 170 N - 16 19 x 0,30 19 x 0,30 19 x 0,30 1,34 250 N - 14 27 x 0,30 37 x 0,25 - 1,91 330 N - 12 45 x 0,30 37 x 0,32 37 x 0,32 3,18 550 N - 53
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 53 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=54
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 AWG Number and size of strands (∅ in mm) Conductor section in mm2 Minimum tensile resistance for crimps with the following composition Kapton Tefzel Teflon/Kapton Silver-plated Silver-plated 10 - - - 5,30 850 N - 8 - - - 8,98 1500 N - 6 - - - 13,4 2300 N - 4 - - - 21,8 3750 N - 2 - - - 33,5 - - 1 - - - 41,8 - - 0 - - - 53 - - 54
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 54 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=55
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Bibliography ECSS-S-ST-00 ECSS system — Description and implementation and general requirements 55
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 55 }
null
ECSS-E-ST-10-09C(31July2008)-page=1
ECSS-E-ST-10-09C(31July2008)
ECSS-E-ST-10-09C 31 July 2008 Space engineering Reference coordinate system   ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 1 }
null
ECSS-E-ST-10-09C(31July2008)-page=2
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  Foreword This  Standard  is  one  of  the  series  of  ECSS  Standards  intended  to  be  applied  together  for  the  management,  engineering  and  product  assurance  in  space  projects  and  applications.  ECSS  is  a  cooperative  effort  of  the  European  Space  Agency,  national  space  agencies  and  European  industry  associations for the purpose of developing and maintaining common standards. Requirements in this  Standard are defined in terms of what shall be accomplished, rather than in terms of how to organize  and  perform  the  necessary  work.  This allows  existing  organizational  structures  and  methods  to  be  applied where they are effective, and for the structures and methods to evolve as necessary without  rewriting the standards.  This  Standard  has  been  prepared  by  the  ECSS‐E‐10‐09C  Working  Group,  reviewed  by  the  ECSS  Executive Secretariat and approved by the ECSS Technical Authority.  Disclaimer ECSS does not provide any warranty whatsoever, whether expressed, implied, or statutory, including,  but not limited to, any warranty of merchantability or fitness for a particular purpose or any warranty  that  the  contents  of  the  item  are  error‐free.  In  no  respect  shall  ECSS  incur  any  liability  for  any  damages, including, but not limited to, direct, indirect, special, or consequential damages arising out  of, resulting from, or in any way connected to the use of this Standard, whether or not based upon  warranty, business agreement, tort, or otherwise; whether or not injury was sustained by persons or  property or otherwise; and whether or not loss was sustained from, or arose out of, the results of, the  item, or any services that may be provided by ECSS.  Published by:   ESA Requirements and Standards Division  ESTEC, P.O. Box 299, 2200 AG Noordwijk The Netherlands Copyright: 2008 © by the European Space Agency for the members of ECSS  2
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 2 }
null
ECSS-E-ST-10-09C(31July2008)-page=3
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  Change log ECSS‐E‐ST‐10‐09A  Never issued  ECSS‐E‐ST‐10‐09B  Never issued  ECSS‐E‐ST‐10‐09C  31 July 2008  First issue  3
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 3 }
null
ECSS-E-ST-10-09C(31July2008)-page=4
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  Table of contents Change log.................................................................................................................3 Introduction................................................................................................................7 1 Scope.......................................................................................................................8 2 Normative references.............................................................................................9 3 Terms, definitions and abbreviated terms..........................................................10 3.1 Terms from other standards .....................................................................................10 3.2 Terms specific to the present standard ....................................................................10 3.3 Abbreviated terms ....................................................................................................11 4 Objectives, process and principles ....................................................................13 4.1 General.....................................................................................................................13 4.2 Concepts and processes..........................................................................................13 4.2.1 Process.......................................................................................................13 4.2.2 Documentation ...........................................................................................13 4.2.3 Coordinate system chain analysis..............................................................13 4.2.4 Notation ......................................................................................................14 4.3 Technical issues.......................................................................................................14 4.3.1 Frame and coordinate system....................................................................14 4.3.2 Transformation between coordinate systems.............................................14 4.3.3 IERS definition of a transformation.............................................................15 4.3.4 Time............................................................................................................15 5 Requirements........................................................................................................16 5.1 Overview ..................................................................................................................16 5.2 Process requirements ..............................................................................................16 5.2.1 Responsibility .............................................................................................16 5.2.2 Documentation ...........................................................................................16 5.2.3 Analysis ......................................................................................................17 5.3 General requirements...............................................................................................17 5.3.1 Applicability.................................................................................................17 4
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 4 }
null
ECSS-E-ST-10-09C(31July2008)-page=5
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  5.3.2 Notation ......................................................................................................18 5.3.3 Figures........................................................................................................18 5.4 Technical requirements ............................................................................................19 5.4.1 Frame .........................................................................................................19 5.4.2 Coordinate system......................................................................................19 5.4.3 Unit .............................................................................................................19 5.4.4 Time............................................................................................................19 5.4.5 Mechanical frames .....................................................................................20 5.4.6 Planet coordinates......................................................................................20 5.4.7 Coordinate system parameterisation..........................................................20 5.4.8 Transformation decomposition and parameterisation ................................20 5.4.9 Transformation definition............................................................................21 Annex A (normative) Coordinate Systems Document (CSD) - DRD....................23 Annex B (informative) Transformation tree analysis ...........................................26 B.1 General.....................................................................................................................26 B.2 Transformation examples.........................................................................................26 B.3 Tree analysis ............................................................................................................26 B.4 Franck diagrams.......................................................................................................26 Annex C (informative) International standards authorities..................................33 C.1 Standards .................................................................................................................33 C.2 Time .........................................................................................................................33 C.2.1 United States Naval Observatory (USNO) .................................................33 C.2.2 Bureau International des Poids et Mesures (BIPM) ...................................33 C.3 Ephemerides ............................................................................................................33 C.3.1 Institut de Mécanique Céleste et de Calcul des Ephémérides (IMCCE)......................................................................................................33 C.3.2 Jet Propulsion Laboratory (JPL) ephemerides ...........................................34 C.4 Reference systems...................................................................................................34 C.4.1 International Earth Rotation and Reference Systems Service (IERS)........34 C.4.2 International Astronomical Union (IAU) ......................................................34 C.4.3 United States naval observatory (USNO)...................................................34 C.4.4 National Imagery and Mapping Agency (NIMA) .........................................35 C.5 Consultative Committee for Space Data Systems (CCSDS)....................................35 C.5.1 Navigation...................................................................................................35 C.5.2 Orbit............................................................................................................35 C.5.3 Attitude .......................................................................................................35 5
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 5 }
null
ECSS-E-ST-10-09C(31July2008)-page=6
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  C.6 IAU/IAG Working Group on Cartographic Coordinates and Rotational Elements (WGCCRE)...............................................................................................36 References ...............................................................................................................37 Bibliography.............................................................................................................38 Figures Figure B-1 : General tree structure illustrating a product tree ................................................29 Figure B-2 : Transformation chain decomposition for coordinate systems ............................30 Figure B-3 : Example of Franck diagram for a spacecraft......................................................31 Figure B-4 : Example of Franck diagram for a star tracker ....................................................32 Tables Table B-1 : Example of mechanical body frame.....................................................................27 Table B-2 : Example of orbital coordinate system..................................................................28   6
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 6 }
null
ECSS-E-ST-10-09C(31July2008)-page=7
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  Introduction Clear  definition  of  reference  directions,  coordinate  systems  and  their  inter‐ relationships  is  part  of  the  System  Engineering  process.  Problems  caused  by  inadequate  early  definition,  often  pass  unnoticed  during  the  exchange  of  technical information.  This Standard addresses this by separating the technical aspects from the issues  connected with process, maintenance and transfer of such information. Clause 4  provides  some  explanation  and  justification,  applicable  to  all  types  of  space  systems,  missions  and  phases.  Clause  5  contains  the  requirements  and  recommendations.  Helpful  and  informative  material  is  provided  in  the  Annexes.  7
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 7 }
null
ECSS-E-ST-10-09C(31July2008)-page=8
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  1 Scope The objective of the Coordinate Systems Standard is to define the requirements  related to the various coordinate systems, as well as their related mutual inter‐ relationships  and  transformations,  which  are  used  for  mission  definition,  engineering,  verification,  operations  and  output  data  processing  of  a  space  system and its elements.  This Standard aims at providing a practical, space‐focused implementation of  Coordinate  Systems,  developing  a  set  of  definitions  and  requirements.  These  constitute a common reference or “checklist” of maximum utility for organising  and conducting the system engineering activities of a space system project or  for participating as customer or supplier at any level of system decomposition.  This standard may be tailored for the specific characteristics and constraints of a  space project in conformance with ECSS‐S‐ST‐00.  8
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 8 }
null
ECSS-E-ST-10-09C(31July2008)-page=9
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  2 Normative references The  following  normative  documents  contain  provisions  which,  through  reference  in  this  text,  constitute  provisions  of  this  ECSS  Standard.  For  dated  references,  subsequent  amendments  to,  or  revisions  of  any  of  these  publications, do not apply. However, parties to agreements based on this ECSS  Standard  are  encouraged  to  investigate  the  possibility  of  applying  the  most  recent  editions  of  the  normative  documents  indicated  below.  For  undated  references the latest edition of the publication referred to applies.    ECSS‐S‐ST‐00‐01  ECSS system– Glossary of terms  ECSS‐M‐ST‐10  Space project management – Project planning and  implementation  9
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 9 }
null
ECSS-E-ST-10-09C(31July2008)-page=10
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  3 Terms, definitions and abbreviated terms 3.1 Terms from other standards For  the  purpose  of  this  Standard,  the  terms  and  definitions  from  ECSS‐S‐ST‐00‐01 apply.  NOTE 1  Some  terms  are  taken  from  other  documents,  referenced in square brackets in the References.  NOTE 2  There  is  no  agreed  convention  for  usage  of  combinations of the words “reference, coordinate,  frame  and  system”.  These  terms  are  often  used  interchangeably  in  practice.  In  1989,  Wilkins’  [1]  made a proposal. This Standard adopts a simpler  terminology, which is more in line with everyday  practice.  3.2 Terms specific to the present standard 3.2.1 coordinate system method  of  specifying  the  position  of  a  point  or  a  direction  with  respect  to  a  specified frame  NOTE  E.g. Cartesian or rectangular coordinates, spherical  coordinates and geodetic coordinates.   3.2.2 frame triad of axes, together with an origin  3.2.3 inertial frame non‐rotating frame  NOTE 1  Inertial reference directions are fixed at an epoch.  NOTE 2  The centre of the Earth can be considered as non‐ accelerating  for  selecting  the  origin,  in  some  applications.  3.2.4 J2000.0 astronomical standard epoch 2000 January 1.5 (TT)  NOTE  equivalent to JD2451545.0 (TT).  10
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 10 }
null
ECSS-E-ST-10-09C(31July2008)-page=11
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  3.3 Abbreviated terms  For the purpose of this Standard, the abbreviated terms from ECSS‐S‐ST‐00‐01  and the following apply:  Abbreviation  Meaning  AIT  assembly integration and test  AIV  assembly integration and verification  BCRS  barycentric celestial reference system  BIPM  Bureau International des Poids et Mesures –  international bureau of weights and measures  CAD  computer aided design  CCSDS  Consultative Committee for Space Data Systems   CoM  centre of mass  CSD  coordinate systems document  DoF  degree of freedom  DRD  document requirements definition  GCRS  geocentric celestial reference system  IAG  International Association of Geodesy  IAU  International Astronomical Union  ICD  interface control document  ICRF  international celestial reference frame  ICRS  international celestial reference system  IERS  international Earth rotation and reference service  IMCCE  Institut de Mécanique Céleste et de Calcul des  Ephémérides  ISO  International Organization for Standardization  ITRF  international terrestrial reference frame  ITRS  international terrestrial reference system  IUGG  International Union of Geodesy and Geophysics  J2000.0  epoch 2000 January 1.5 (TT)  JPL DExxx  Jet Propulsion Laboratory development ephemeris,  number xxx  L/V  launch vehicle  MICD  mechanical interface control document  RCS  reaction control system  SEP  system engineering plan  SI  système international  STR  star tracker  TAI  temps atomique international – international atomic  time  ToD  true of date  11
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 11 }
null
ECSS-E-ST-10-09C(31July2008)-page=12
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  TT  terrestrial time  UTC  coordinated universal time ‐temps universel coordonné  WGCCRE  Working Group on Cartographic Coordinates and  Rotational Elements  w.r.t.  with respect to  12
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 12 }
null
ECSS-E-ST-10-09C(31July2008)-page=13
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  4 Objectives, process and principles 4.1 General This  Clause  provides  the  background  to  the  requirements  and  recommendations stated in Clause 5, from the conceptual, process and technical  points of view.  4.2 Concepts and processes 4.2.1 Process The coordinate systems used within a project are identified early in the lifecycle  of  a  project.  These  coordinate  systems  are  then  related  via  a  chain  of  transformations to allow the transformation of coordinates, directions and other  geometric parameters into any coordinate system used within the project at any  time in the project life.   4.2.2 Documentation Besides  the  ICDs,  CAD  drawings  and  SRD,  a  specific  document  for  all  coordinate  systems  and  their  inter‐relationships,  throughout  the  product  tree  and  the  project  life,  are  created,  maintained  and  configured.  The  Coordinate  System Document (CSD) takes shape before the end of phase‐A.  4.2.3 Coordinate system chain analysis A chain of transformations is constructed using chain elements or links. A link  is  composed  of  two  coordinate  systems  together  with  the  transformation  between them. The product tree can be mapped into a set of connected chains.   For any analysis, the appropriate connected chain is used, even if other paths  within the tree are later found to be useful for satellite integration, operations or  processing.  For subsystem or unit analysis, any link may be decomposed into a  sub‐chain  containing  intermediate  coordinate  systems.  The  relationship  between  two  coordinate  systems  can  involve  kinematics,  dynamics,  measurement or constraints. See Annex B for some examples.  13
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 13 }
null
ECSS-E-ST-10-09C(31July2008)-page=14
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  The  main  mission  chain  typically  includes  inertial,  rotating  planet‐centred  orbital,  spacecraft  mechanical,  instrument  and  product  (i.e.  post‐processing  related) coordinate systems.”  4.2.4 Notation Experts  working  together  within  a  project  need  to  have  a  common  understanding of the parameters and variables. Specific coordinate systems are  used  to  obtain  a  convenient  formulation  of  the  kinematic  and  dynamic  equations involved. A shared understanding of all the coordinate systems and  their parameterisations is therefore paramount. This necessitates the definition  of a notational convention for naming variables, coordinate systems and their  inter‐relationships.  4.3 Technical issues 4.3.1 Frame and coordinate system Transformations between frames, having orthogonal axes, the same handedness  (right or left) and unit vectors along each axis, enjoy the properties of unitary  matrices,  which  facilitate  the  calculation  of  inverse  transformations  between  these frames.   The method for constructing a triad of orthogonal axes needs to be agreed and  specified.  The  definition  requires  at  least  two  non‐parallel  directions,  which  may  be  derived  from  physical  elements,  theoretical  considerations  or  mathematical definitions. In general, a set of (physical) directions is not likely to  be orthogonal.  By definition of a coordinate system, the position of a point can be expressed by  a  set  of  coordinates  with  respect  to  its  frame.  The  concept  of  coordinates  requires  a  unit  and  an  origin  in  addition  to  the  directions  as  defined  by  the  selected frame.  Several mathematical representations exist to describe a position or direction,  each with their own advantages. The Cartesian vector representation, being a  common representation, is selected for this standard. Other parameterisations  (e.g.  geodetic  coordinates  and  topocentric  direction)  can  be  also  used  to  describe a position or direction.  Formal  parameterisation  is  specified  in  vector  notation  using  an  explicit  mathematical relationship.  4.3.2 Transformation between coordinate systems Accurate  verbal,  graphical  and  mathematical  description  of  a  transformation  between two coordinate systems is essential for its correct interpretation.   In general, each transformation consists of a translation, a rotation and possibly  a  scale  factor  operation.  The  specification  of  the  order  of  operations  is  14
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 14 }
null
ECSS-E-ST-10-09C(31July2008)-page=15
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  important, even when the nominal translation is assumed to be the null vector.  A theoretically null translation can later, in the project life or in more precise  calculations, become non‐null.  Quaternions,  Euler  angles,  mechanical  and  other  parameters  can  be  used  to  describe transformations between coordinate systems.  In this standard, matrix  representation  is  selected  for  the  mathematical  definition  of  a  rotational  transformation.   4.3.3 IERS definition of a transformation The general transformation of the Cartesian coordinates of a point from frame 1  to frame 2 is given by the following equation, see Reference [2], page 21 from  Bibliography.  → → → × × + = ) 1 ( 2 ,1 2 ,1 2 ,1 ) 2 ( X R T X λ   where:   → 2,1 T   is the translation vector,   2,1 λ   is the scale factor, and   2,1 R   is the rotation matrix.  This relates two Cartesian coordinate systems, by defining the coordinates of  the origin and the three unit vectors of one of them in the other one.  4.3.4 Time Certain coordinate systems are time dependent. A unique specification of the  time  standard  is  necessary.  Such  a  definition  includes  the  mathematical  relationship between each of the time standards used within the project.    15
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 15 }
null
ECSS-E-ST-10-09C(31July2008)-page=16
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  5 Requirements 5.1 Overview This  clause  contains  process  requirements,  covering  the  management  and  utilisation  of  coordinate  systems  throughout  the  life  cycle  of  space  missions;  general requirements, covering applicability, terminology, notation, figures and  illustrations; and technical requirements, covering the definition of coordinate  systems  and  their  parameterisation,  and  of  the  transformations  between  coordinate systems.   5.2 Process requirements 5.2.1 Responsibility a. The responsibility for the task of system‐level definition of the coordinate  systems  and  their  inter‐relationships,  applicable  to  the  whole  product  tree and to be used throughout the lifetime a project, shall be identified.  NOTE 1  See  ECSS‐M‐ST‐10,  subclause  4.3.4  and  5.3  and  Annex  B  of  this  document  for  product  tree.  See  also ECSS‐S‐ST‐00‐01 for the definition of product  tree.  NOTE 2  The  product  tree  includes  the  space  segment,  the  launcher,  the  ground  segment  and  associated  processors,  the  user  segment,  operations,  and  the  engineering  tools  and  models  such  as simulators,  emulators and test benches.  5.2.2 Documentation a. The  Coordinate  Systems  Document  (CSD)  shall  be  produced  in  conformance with Annex A.  NOTE  The CSD is intended for reviews.  b. The CSD shall identify the specified coordinate systems and time scales  used  throughout  the  project,  by  two  or  more  subsystems  or  organisations,  together  with  their  inter‐relationships  (in  a  parametric  form).  16
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 16 }
null
ECSS-E-ST-10-09C(31July2008)-page=17
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  NOTE  Subsystems  (or  organisations)  are  free  to  make  specifications within their area of responsibility, so  long as the specific (internal) coordinate system or  time  scale  is  not  used  by  another  subsystem  (or  organisation).  c. For  a  spacecraft  project,  a  preliminary  version  of  the  CSD  shall  be  produced before the end of phase A.  d. The CSD (and related database) shall be put under configuration control  at the beginning of phase B.  e. At  each  phase  of  the  project,  the  coordinate  systems  and  their  inter‐ relationships shall be re‐examined.  f. The CSD shall include the new coordinate systems and transformations  following the progress of the project development.  NOTE  During  the  project,  new  details  and  elements  are  defined (e.g. equipment, methods and algorithms).  5.2.3 Analysis a. The elements, which need coordinate systems, shall be identified.  NOTE  This  involves  iterative  analysis  of  the  functional  and product trees as well as the interfaces, at each  phase.   b. Each identified element of the system shall have its coordinate systems  defined.  c. A transformation chain structure shall be built to link coordinate systems  used by two or more subsystems   NOTE  See Annex B for guidelines and examples.  d. The nominal value, in numeric or parametric form, of the transformation  between two coordinate systems shall be specified.  5.3 General requirements 5.3.1 Applicability a. Applicable parts of the international standards and conventions listed in  Annex C shall be selected and specified in the CSD.  NOTE  Such  organisations  maintain,  for  example,  definitions of certain reference coordinate systems,  and of time.   b. Applicable  non  compliant  external  conventions  shall  be  converted  into  the project’s convention.  c. The conversion of 5.3.1b shall be specified.  17
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 17 }
null
ECSS-E-ST-10-09C(31July2008)-page=18
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  5.3.2 Notation a. A coordinate system shall be identified by a unique descriptive name.  b. Recognised international names should not be used if the exact definition  is not followed.  NOTE  E.g. the name “Pseudo True of Date” can be used if  the  conventional  definition  of  ToD  is  not  strictly  followed.  c. A unique mnemonic shall be derived from the descriptive name of the  coordinate system.  d. The  transformation  from  one  coordinate  system  to  another  shall  be  identified  by  a  unique  name,  which  also  indicates  the  direction  of  the  transformation.  e. The convention for naming coordinate systems and transformations shall  be specified.  f. The notation convention shall be specified.  g. Sign conventions shall be identified and defined.  NOTE  E.g. rotation around an axis.  5.3.3 Figures a. A  figure  shall  show  the  relationship  of  a  coordinate  system  with  equipment, spacecraft or mission.  b. The origin and axes of a coordinate frame shall be identified in figures  using the reference mnemonic as indicated in 5.3.2c.  c. A figure should show the relationship of a coordinate system to at least  one  other  already  defined  coordinate  system,  once  the  first  has  been  defined.  d. If two or more rotations are used in a transformation between coordinate  systems,  they  should  be  indicated  on  the  figure  with  intermediate  rotation axes.  e. Symbols used within illustrations, figures and supporting diagrams shall  be defined.  f. In  an  engineering  drawing,  the  applicable  projection  system  shall  be  indicated.  NOTE  The  projection  system  is  generally  European  or  American.  g. In  a  3D  figure,  the  axes  above,  within  and  below  a  plane  shall  be  differentiated.  NOTE 1  An axis pointing out of the plane of the paper can  be  depicted  by  a  circle  with  a  dot  in  it;  an  axis  pointing into the paper by a circle with a cross.  NOTE 2  Shadowing  and  dotted  lines  can  be  used  in  3D  figures.  18
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 18 }
null
ECSS-E-ST-10-09C(31July2008)-page=19
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  5.4 Technical requirements 5.4.1 Frame a. The origin of the frame shall be specified.  b. The  derivation  of  the  origin  of  a  frame  from  reference  points  shall  be  defined.  c. The derivation of the axes of a frame from reference directions shall be  defined.  d. The axes of a frame shall be orthogonal.  e. The orientation of the axes of a frame shall be defined according to the  right hand rule.  NOTE 1  Sometimes left handed frames cannot be avoided,  because of imported off‐the‐shelf equipment.    NOTE 2  E.g.  raw  measurements  or  actuator  commands  may be given in a left handed frame.  f. Any imported left handed frame shall be specified.  g. Any left handed frame shall be associated with a system reference right  handed frame with the related transformation, for project development  use.  NOTE  This  avoids  a  “change  of  sign”  in  the  software  without a change of variable.  h. The epoch of an inertial frame shall be defined.  5.4.2 Coordinate system a. If  a  coordinate  system  is  time  dependent,  then  its  time  scale  shall  be  defined.  b. The  position  of  a  point  shall  be  definable  by  a  set  of  coordinates  with  respect to a selected frame.  5.4.3 Unit a. Dimensionless quantities shall be explicitly denoted as such.  b. The  units  or  physical  dimensions  of  all  non‐dimensionless  parameters,  including angles, shall be defined.  NOTE  E.g. Units for angles include radians and degrees.  5.4.4 Time a. The unit of time shall be defined.  b. The relationship between all time scales used shall be defined.  NOTE  E.g.  The  relationship  between  local  clocks  on  a  group of spacecraft and UTC on Earth.  19
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 19 }
null