Add product quality guardrail
Browse files
skills/gr-product-dev-ops/SKILL.md
ADDED
|
@@ -0,0 +1,484 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
---
|
| 2 |
+
name: gr-product-dev-ops
|
| 3 |
+
description: |
|
| 4 |
+
🇺🇸 Your dev team ships features nobody asked for while user-reported bugs pile up for months. Operations blames engineering for ignoring users; engineering blames operations for not understanding technical constraints. This gives you the complete Product × Engineering × Operations alignment SOP — from unified backlog to 10-day sprint cadence to veto power rules.
|
| 5 |
+
|
| 6 |
+
What's inside:
|
| 7 |
+
• Dual-layer Kanban system (master backlog + sprint board with unified tagging)
|
| 8 |
+
• 10-day sprint standard process (Day 1 dev → Day 6 testable build → Day 10 ship)
|
| 9 |
+
• Issue template with reproducibility requirements (3x reported = auto-severe)
|
| 10 |
+
• Tri-party alignment meetings (daily standup / sprint planning / sprint review)
|
| 11 |
+
• Operations veto power on releases (P0 bug = block shipping)
|
| 12 |
+
• User feedback → product iteration closed loop (beta testing + interview SOP)
|
| 13 |
+
• Core metrics framework (acquisition → activation → retention → monetization → referral)
|
| 14 |
+
• Technical debt management (20-30% sprint capacity reserved)
|
| 15 |
+
• Ready-to-use templates: Bug Report, Sprint Planning, Responsibility Matrix
|
| 16 |
+
|
| 17 |
+
Built from: Real product strategy meetings + beta testing frameworks. References Supabase sprint model, Manus/DeepSeek commercialization alignment. By @WeiYipei.
|
| 18 |
+
|
| 19 |
+
🇨🇳 你的研发团队在做没人要的新功能,用户反馈的 Bug 堆了三个月没人动。运营觉得研发不听用户,研发觉得运营不懂技术。这份 SOP 给你从统一看板到 10 天迭代节奏到一票否决权的完整产研运协同框架。
|
| 20 |
+
|
| 21 |
+
🇯🇵 開発チームは誰も求めていない機能を作り、ユーザーから報告されたバグは何ヶ月も放置。このSOPは、統一バックログから10日スプリント、リリース拒否権まで、プロダクト×エンジニアリング×オペレーションの完全な連携フレームワークを提供します。
|
| 22 |
+
|
| 23 |
+
🇰🇷 개발팀은 아무도 요청하지 않은 기능을 만들고, 사용자가 보고한 버그는 몇 달째 방치됩니다. 이 SOP는 통합 백로그부터 10일 스프린트, 릴리스 거부권까지 제품×개발×운영 완전 협업 프레임워크를 제공합니다.
|
| 24 |
+
|
| 25 |
+
Triggers: "product ops" | "engineering operations" | "product development SOP" | "sprint planning" | "iteration management" | "cross-functional alignment" | "product engineering ops" | "dev ops collaboration" | "产研运协同" | "迭代管理" | "产品研发运营" | "プロダクト開発運営" | "제품개발운영"
|
| 26 |
+
tags:
|
| 27 |
+
- product-management
|
| 28 |
+
- engineering-operations
|
| 29 |
+
- sprint-planning
|
| 30 |
+
- iteration-management
|
| 31 |
+
- cross-functional
|
| 32 |
+
- product-ops
|
| 33 |
+
- agile
|
| 34 |
+
- kanban
|
| 35 |
+
- bug-tracking
|
| 36 |
+
- user-feedback
|
| 37 |
+
- technical-debt
|
| 38 |
+
- release-management
|
| 39 |
+
- startup-operations
|
| 40 |
+
- team-alignment
|
| 41 |
+
- commercialization
|
| 42 |
+
source: https://github.com/Gingiris-1031/gingiris-skills/tree/main/skills/gr-product-dev-ops
|
| 43 |
+
---
|
| 44 |
+
|
| 45 |
+
> 🌍 **Language / 语言**: [中文](#中文版) | [English](references/en/README.md) | [日本語](references/ja/README.md) | [한국어](references/ko/README.md)
|
| 46 |
+
|
| 47 |
+
## 📦 Install
|
| 48 |
+
|
| 49 |
+
```bash
|
| 50 |
+
clawhub install product-dev-ops-playbook
|
| 51 |
+
```
|
| 52 |
+
|
| 53 |
+
**What you get after installing:**
|
| 54 |
+
- Complete 10-day sprint cadence with tri-party alignment checkpoints
|
| 55 |
+
- Issue template + severity auto-escalation rules (3x reported = must-fix)
|
| 56 |
+
- Ready-to-use meeting templates for sprint planning, review, and daily standups
|
| 57 |
+
|
| 58 |
+
---
|
| 59 |
+
|
| 60 |
+
# 产品研发 × 运营协同 SOP
|
| 61 |
+
|
| 62 |
+
## 证据补充:避免“40 分功能”陷阱
|
| 63 |
+
|
| 64 |
+
本地播客逐字稿中的 AFFiNE 复盘指出:方案被想出来时,产品工作才刚开始。若团队不断追逐新点子,会留下大量只做到 40–60 分、没有验证激活和留存的功能。每次迭代规划必须回答:本期把哪个已有能力从“能用”磨到“可靠”,完成阈值是什么,以及为此明确停止什么。
|
| 65 |
+
|
| 66 |
+
> 本 SOP 整合一场真实产品战略会议纪要、用户反馈录入模板、内测用户访谈体系,提炼出一套**产品、研发、运营三方协同**的通用工作框架。
|
| 67 |
+
>
|
| 68 |
+
> **核心原则:** 一切面向商业化服务。一切为赚钱服务。
|
| 69 |
+
>
|
| 70 |
+
> **使用说明:** 本文档为通用模板,将所有 `[产品名称]` / `[项目代号]` / `[系统名称]` 替换为对应信息即可直接使用。
|
| 71 |
+
|
| 72 |
+
---
|
| 73 |
+
|
| 74 |
+
## 一、核心问题诊断:为什么产研运总是协同不好?
|
| 75 |
+
|
| 76 |
+
### 1.1 几乎所有成长期产品都会遇到的三个矛盾
|
| 77 |
+
|
| 78 |
+
| 矛盾 | 表现 | 本质原因 |
|
| 79 |
+
|------|------|----------|
|
| 80 |
+
| **新功能 vs 用户反馈** | 开发团队总在追新功能,用户反馈的小 Bug 被无限搁置 | 没有统一的优先级决策机制 |
|
| 81 |
+
| **研发想做什么 vs 运营要什么** | 研发觉得运营不懂技术,运营觉得研发不听用户 | 缺少共同目标 |
|
| 82 |
+
| **快 vs 稳** | 产品形态还没稳定就急着增长,技术债越积越多 | 没有明确的产品阶段判断 |
|
| 83 |
+
|
| 84 |
+
### 1.2 解决思路
|
| 85 |
+
|
| 86 |
+
> **来��真实会议洞察:** 商业化变现做得好的公司(如 Manus、DeepSeek),COO 或运营负责人直接为商业化服务,产研运三方高度协同。
|
| 87 |
+
|
| 88 |
+
**四大核心机制:**
|
| 89 |
+
|
| 90 |
+
| # | 机制 | 说明 |
|
| 91 |
+
|---|------|------|
|
| 92 |
+
| 1 | **统一看板** | 用户反馈和产品需求进同一个池子,用同一套标签体系 |
|
| 93 |
+
| 2 | **共同目标** | 每次迭代有明确的商业化指标(如"注册→付费转化率从 4.5% → 7%") |
|
| 94 |
+
| 3 | **运营有一票否决权** | 直接伤害用户体验或付费转化的问题,运营可以直接提议推迟发版 |
|
| 95 |
+
| 4 | **每个迭代前三方对齐** | 产研运负责人共同决定做什么、哪些先做、哪些放下一期 |
|
| 96 |
+
|
| 97 |
+
---
|
| 98 |
+
|
| 99 |
+
## 二、统一协作载体:看板体系设计
|
| 100 |
+
|
| 101 |
+
### 2.1 两层看板结构
|
| 102 |
+
|
| 103 |
+
> **来自真实经验:** 不要只有每个迭代的小看板,一定要有总看板。所有原始 Issue 先进总池子,再流向下游各个迭代。
|
| 104 |
+
|
| 105 |
+
| 层级 | 名称 | 内容 | 负责人 |
|
| 106 |
+
|------|------|------|--------|
|
| 107 |
+
| **第一层:总需求池** | `[产品名称] 总 backlog` | 所有来源的原始 Issue(用户反馈/竞品分析/战略需求) | 产品负责人 |
|
| 108 |
+
| **第二层:迭代看板** | `[版本号] - [目标描述]` | 本次迭代确认要做的需求 + 必须修的 Bug | 迭代 owner |
|
| 109 |
+
|
| 110 |
+
**流向逻辑:**
|
| 111 |
+
|
| 112 |
+
```
|
| 113 |
+
总需求池(所有来源的 Issue)
|
| 114 |
+
↓ 经过评审,认为可以形成方案
|
| 115 |
+
形成方案的需求
|
| 116 |
+
↓ 经过排期会议决策
|
| 117 |
+
进入某个迭代的项目
|
| 118 |
+
↓ 迭代内开发
|
| 119 |
+
发布上线 / 回滚到需求池 / 延到下一期
|
| 120 |
+
```
|
| 121 |
+
|
| 122 |
+
### 2.2 Issue 录入模板(通用格式)
|
| 123 |
+
|
| 124 |
+
> **关键原则:** 运营提的每个 Issue 必须包含可复现信息,否则研发无法 fix。
|
| 125 |
+
|
| 126 |
+
| 字段 | 说明 | 示例 |
|
| 127 |
+
|------|------|------|
|
| 128 |
+
| **Issue 标题** | 简明描述问题 | "iOS 版本排盘结果与 Android 不一致" |
|
| 129 |
+
| **来源渠道** | 用户反馈 / 竞品 / 战略 | 用户反馈 |
|
| 130 |
+
| **反馈次数** | 同一问题被反馈几次 | 3次以上 → 打严重标签 |
|
| 131 |
+
| **系统/平台** | Web / iOS / Android / Self-host | iOS |
|
| 132 |
+
| **版本号** | 具体版本 | v2.3.1 |
|
| 133 |
+
| **复现步骤** | 能复现才能修 | 1. 打开合盘 2. 选择XX 3. 查看结果 |
|
| 134 |
+
| **预期行为** | 用户期望是什么 | 两版排盘结果应一致 |
|
| 135 |
+
| **实际行为** | 当前实际表现 | iOS 显示顺序与 Android 相反 |
|
| 136 |
+
| **截图/录屏** | 附上证据 | [附件] |
|
| 137 |
+
| **影响评估** | 对体验/付费的影响 | 导致1名用户申请退款 |
|
| 138 |
+
| **标签** | Bug / Feature Request / UX优化 | Bug |
|
| 139 |
+
| **优先级建议** | 运营侧判断(高/中/低) | 高 |
|
| 140 |
+
|
| 141 |
+
> **运营侧特殊规则:** 同一 Issue 被反馈 **3 次以上**,自动打 `severe` 标签,必须在最近一个迭代中解决。
|
| 142 |
+
|
| 143 |
+
### 2.3 Bug 与 Feature Request 分流处理
|
| 144 |
+
|
| 145 |
+
| 类型 | 定义 | 处理方式 |
|
| 146 |
+
|------|------|----------|
|
| 147 |
+
| **Bug** | 现有功能行为与预期不符 | 直接进入 Bug 看板,研发评估工时后修复 |
|
| 148 |
+
| **Feature Request** | 用户需要新功能 | 进入总需求池,产品出方案后才能进入迭代 |
|
| 149 |
+
| **UX优化** | 不影响核心功能,但影响体验 | 与 Bug 同级,运营可以推动优先级 |
|
| 150 |
+
|
| 151 |
+
---
|
| 152 |
+
|
| 153 |
+
## 三、迭代节奏设计
|
| 154 |
+
|
| 155 |
+
### 3.1 迭代周期选择
|
| 156 |
+
|
| 157 |
+
| 产品阶段 | 推荐迭代周期 | 说明 |
|
| 158 |
+
|----------|-------------|------|
|
| 159 |
+
| **早期 PMF 验证** | 1-2 周 | 快节奏,快速试错 |
|
| 160 |
+
| **增长期** | 3-4 周 | 平衡速度与稳定性 |
|
| 161 |
+
| **稳定期** | 6-8 周 | 稳定性优先,可以做大版本 |
|
| 162 |
+
|
| 163 |
+
> ⚠️ **提醒:** 现代 Web 开发节奏下建议压缩到 **10 天~2 周**。过长的迭代周期会导致团队失去紧迫感。
|
| 164 |
+
|
| 165 |
+
### 3.2 10 天迭代标准流程
|
| 166 |
+
|
| 167 |
+
| 天次 | 研发动作 | 运营动作 | 产出物 |
|
| 168 |
+
|------|----------|----------|--------|
|
| 169 |
+
| **第 1 天** | 开始开发 | — | — |
|
| 170 |
+
| **第 6 天** | 提交**可测试版本** | 领取测试版本,**半天内测完** | 测试报告(Bug 列表 + 优先级) |
|
| 171 |
+
| **第 7 天** | 根据优先级修复 P0/P1 | 运营×研发**对齐会**(20-30 分钟) | 本迭代范围确认 |
|
| 172 |
+
| **第 8 天** | 继续修复 + 出第二测试版 | 第二轮测试(如有必要) | — |
|
| 173 |
+
| **第 9 天** | 最终修复 | 准备**发布物料**(截图/官网/社媒) | 物料就绪 |
|
| 174 |
+
| **第 10 天** | **发布上线** | 同步发布内容到各渠道 | 发布完成 |
|
| 175 |
+
|
| 176 |
+
### 3.3 发布节奏红线
|
| 177 |
+
|
| 178 |
+
> **来自真实教训:** 绝对不要在周五或周末发版。
|
| 179 |
+
|
| 180 |
+
---
|
| 181 |
+
|
| 182 |
+
## 四、三方对齐会议机制
|
| 183 |
+
|
| 184 |
+
### 4.1 日常站会(每日,15 分钟)
|
| 185 |
+
|
| 186 |
+
**参与人:** 产品 / 研发 / 运营全体
|
| 187 |
+
|
| 188 |
+
- 站着开,限时 15 分钟以内
|
| 189 |
+
- 每人只说三件事:①昨天做了什么 ②今天在做什么 ③有没有 blocker
|
| 190 |
+
- **运营侧必须通报**:昨日用户投诉热点、新发现的高频 Bug
|
| 191 |
+
- **超过 1 小时的会一定有人摸鱼**
|
| 192 |
+
|
| 193 |
+
### 4.2 迭代规划会(每迭代开始,30-60 分钟)
|
| 194 |
+
|
| 195 |
+
**参与人:** 产研运三方负责人
|
| 196 |
+
|
| 197 |
+
```
|
| 198 |
+
议题1:复盘上一迭代(20分钟��
|
| 199 |
+
- 核心指标完成情况(对比目标)
|
| 200 |
+
- 有哪些没做完?为什么?
|
| 201 |
+
- 用户反馈集中在哪里?
|
| 202 |
+
|
| 203 |
+
议题2:本迭代目标设定(20分钟)
|
| 204 |
+
- 运营侧:本迭代最需要解决的问题(关联商业化目标)
|
| 205 |
+
- 产品侧:本迭代主推的新功能/优化
|
| 206 |
+
- 研发侧:技术债/重构需求
|
| 207 |
+
- 共同决策:本迭代的 Top 3 目标
|
| 208 |
+
|
| 209 |
+
议题3:资源与排期确认(20分钟)
|
| 210 |
+
- 各方投入多少人天?
|
| 211 |
+
- 哪些功能确定进迭代?哪些 hold?
|
| 212 |
+
- 是否有模块需要重构?
|
| 213 |
+
```
|
| 214 |
+
|
| 215 |
+
### 4.3 迭代验收会(每迭代结束,30 分钟)
|
| 216 |
+
|
| 217 |
+
**核心问题:**
|
| 218 |
+
1. 本迭代的**目标指标**达成情况?
|
| 219 |
+
2. 有哪些 P0 Bug 没修完?是否影响发版?
|
| 220 |
+
3. 哪些功能决定**推迟到下个迭代**?
|
| 221 |
+
4. 下个迭代的运营重点是什么?
|
| 222 |
+
|
| 223 |
+
### 4.4 会议频率总览
|
| 224 |
+
|
| 225 |
+
| 会议 | 频率 | 时长 | 目的 |
|
| 226 |
+
|------|------|------|------|
|
| 227 |
+
| **每日站会** | 每天 | 15 分钟 | 同步进度,发现 blocker |
|
| 228 |
+
| **迭代规划会** | 每迭代开始 | 30-60 分钟 | 决定这个迭代做什么 |
|
| 229 |
+
| **迭代验收会** | 每迭代结束 | 30 分钟 | 复盘 + 为下个迭代做准备 |
|
| 230 |
+
| **月度 Review** | 每月 | 60-90 分钟 | 核心指标复盘 + 方向调整 |
|
| 231 |
+
|
| 232 |
+
---
|
| 233 |
+
|
| 234 |
+
## 五、运营侧在协同中的角色
|
| 235 |
+
|
| 236 |
+
### 5.1 运营是用户和研发之间的"翻译官"
|
| 237 |
+
|
| 238 |
+
| 职责 | 具体动作 | 频率 |
|
| 239 |
+
|------|----------|------|
|
| 240 |
+
| **用户声音收集** | 整理用户反馈,提炼高频问题,归类 Bug / Feature | 每日 |
|
| 241 |
+
| **Bug 初筛** | 确认每个 Issue 可复现,补充复现步骤 | 每日 |
|
| 242 |
+
| **优先级建议** | 站在用户体验和商业化角度打优先级 | 每迭代 |
|
| 243 |
+
| **版本验收测试** | 第 6 天开始,**半天内测完**并出报告 | 每迭代 |
|
| 244 |
+
| **发布物料准备** | App Store 更新、官网更新、社媒发布内容 | 每迭代 |
|
| 245 |
+
|
| 246 |
+
### 5.2 运营对发版的一票否决权
|
| 247 |
+
|
| 248 |
+
> **触发条件:** 如果上线前发现**影响用户体验或付费转化**的 P0 Bug 未修复,运营可以提议**推迟发版**。
|
| 249 |
+
|
| 250 |
+
**P0 Bug 标准(运营侧判断):**
|
| 251 |
+
|
| 252 |
+
| Bug 类型 | 例子 | 是否 P0 |
|
| 253 |
+
|----------|------|---------|
|
| 254 |
+
| 付费相关 | 支付失败、重复扣款 | ✅ P0 |
|
| 255 |
+
| 核心功能不可用 | 无法注册、无法生成结果 | ✅ P0 |
|
| 256 |
+
| 数据错误 | 排盘结果与其他平台不一致 | ✅ P0 |
|
| 257 |
+
| 界面错乱但功能可用 | 按钮位置偏移 | ⚠️ P1 |
|
| 258 |
+
| 文案/翻译错误 | 英文拼写错误 | ❌ P2 |
|
| 259 |
+
|
| 260 |
+
---
|
| 261 |
+
|
| 262 |
+
## 六、用户反馈驱动产品迭代
|
| 263 |
+
|
| 264 |
+
### 6.1 反馈→优化闭环
|
| 265 |
+
|
| 266 |
+
```
|
| 267 |
+
用户使用产品 → 产生问题/建议
|
| 268 |
+
↓
|
| 269 |
+
运营收集(整理/分类/初筛)
|
| 270 |
+
↓
|
| 271 |
+
录入 Issue 到总看板(附复现步骤)
|
| 272 |
+
↓
|
| 273 |
+
同一问题被反馈3次以上 → 打 severe 标签
|
| 274 |
+
↓
|
| 275 |
+
每迭代规划会重点讨论 severe 项
|
| 276 |
+
↓
|
| 277 |
+
进入迭代开发
|
| 278 |
+
↓
|
| 279 |
+
上线后运营验证问题是否解决
|
| 280 |
+
↓
|
| 281 |
+
通知用户问题已修复(增强被重视感)
|
| 282 |
+
```
|
| 283 |
+
|
| 284 |
+
### 6.2 内测用户访谈机制
|
| 285 |
+
|
| 286 |
+
| 阶段 | 时间 | 动作 | 负责人 |
|
| 287 |
+
|------|------|------|--------|
|
| 288 |
+
| **用户筛选** | 内测前 1 周 | 从活跃用户中筛选 10-15 人 | 运营 |
|
| 289 |
+
| **测试账号发放** | 内测前 3 天 | 发放测试账号 + 积分 | 运营 |
|
| 290 |
+
| **用户自测** | 内测期间 | 基于真实需求使用产品 | 用户 |
|
| 291 |
+
| **深度访谈** | 内测期间 | 30-40 分钟/场 | 运营 |
|
| 292 |
+
| **每日汇总** | 每日结束后 | 整理高频 Bug + 核心需求 | 运营 |
|
| 293 |
+
| **周维度 Review** | 每周 | 判断是否适合发布 | 产研运共同 |
|
| 294 |
+
|
| 295 |
+
**访谈结构(30-40 分钟):**
|
| 296 |
+
|
| 297 |
+
| 时间 | 模块 | 核心问题 |
|
| 298 |
+
|------|------|----------|
|
| 299 |
+
| 5 分钟 | 用户背景 | 当前做什么?用什么工具?最大问题? |
|
| 300 |
+
| 20 分钟 | 产品测试复盘 | 哪步最顺?哪步最卡?有没有 Bug? |
|
| 301 |
+
| 10 分钟 | 优化建议 | 最希望优先优化什么? |
|
| 302 |
+
| 5 分钟 | 收尾确认 | 是否愿意继续参与?愿意推荐吗? |
|
| 303 |
+
|
| 304 |
+
> **核心原则:** 不讨论抽象感受,只讨论真实使用过程。
|
| 305 |
+
|
| 306 |
+
---
|
| 307 |
+
|
| 308 |
+
## 七、核心指标体系
|
| 309 |
+
|
| 310 |
+
### 7.1 每个迭代的目标指标模板
|
| 311 |
+
|
| 312 |
+
```
|
| 313 |
+
本迭代目标:[具体描述]
|
| 314 |
+
- 起始值:XX%
|
| 315 |
+
- 目标值:XX%
|
| 316 |
+
- 验证方式:[数据来源/查询方式]
|
| 317 |
+
- 负责人:产品/运营/研发
|
| 318 |
+
```
|
| 319 |
+
|
| 320 |
+
### 7.2 商业化核心链路指标
|
| 321 |
+
|
| 322 |
+
| 阶段 | 指标 | 说明 |
|
| 323 |
+
|------|------|------|
|
| 324 |
+
| **获取** | 新增注册用户数 | 按渠道拆分(自然/社媒/投放/KOL) |
|
| 325 |
+
| **激活** | Onboarding 完成率 | 分模块看:信息输入/功能体验/得到结果 |
|
| 326 |
+
| **留存** | 次日/7日/30日留存率 | 按用户来源拆分 |
|
| 327 |
+
| **付费** | 注册→付费转化率 | 按渠道/用户属性拆分 |
|
| 328 |
+
| **推荐** | K 因子(NPS/推荐意愿) | 邀请机制参与率 |
|
| 329 |
+
|
| 330 |
+
### 7.3 迭代健康度自检
|
| 331 |
+
|
| 332 |
+
| 检查项 | 健康值 | 预警信号 |
|
| 333 |
+
|--------|--------|----------|
|
| 334 |
+
| P0 Bug 平均修复时长 | ≤2 天 | > 3 天 |
|
| 335 |
+
| 功能按时上线率 | ≥80% | <60% |
|
| 336 |
+
| 用户反馈平均响应时长 | ≤24 小时 | > 48 小时 |
|
| 337 |
+
| 同一 Bug 重复反馈次数 | ≤2 次 | ≥3 次 |
|
| 338 |
+
| 测试报告提交及时率 | 100% 在 Day 6.5 前 | 超过半天 |
|
| 339 |
+
|
| 340 |
+
---
|
| 341 |
+
|
| 342 |
+
## 八、技术债与产品重构管理
|
| 343 |
+
|
| 344 |
+
### 8.1 触发重构的信号
|
| 345 |
+
|
| 346 |
+
| 信号 | 说明 |
|
| 347 |
+
|------|------|
|
| 348 |
+
| 同一模块 Bug 反复出现(≥5 个相关 Issue) | 模块设计有根本性问题 |
|
| 349 |
+
| 新功能开发成本越来越高 | 底层架构限制了扩展性 |
|
| 350 |
+
| 多端数据不一致 | 实体抽象不统一 |
|
| 351 |
+
| 技术选型已过时 | 需要升级技术栈 |
|
| 352 |
+
|
| 353 |
+
### 8.2 资源分配建议
|
| 354 |
+
|
| 355 |
+
| 类型 | 建议占比 | 说明 |
|
| 356 |
+
|------|----------|------|
|
| 357 |
+
| **新功能开发** | 50-60% | 直接服务商业化目标 |
|
| 358 |
+
| **Bug 修复** | 20-30% | 保障基础体验 |
|
| 359 |
+
| **技术债/重构** | 20-30% | 保障长期可持续性 |
|
| 360 |
+
|
| 361 |
+
### 8.3 重构类需求处理
|
| 362 |
+
|
| 363 |
+
- 重构类需求**单独建 Project**,周期 1-3 个月
|
| 364 |
+
- 重构期间**不影响正常迭代发版**(两套体系并行)
|
| 365 |
+
- 重构完成后需要**完整的回归测试**(建议 3-5 名核心用户参与)
|
| 366 |
+
|
| 367 |
+
---
|
| 368 |
+
|
| 369 |
+
## 九、阶段性重点
|
| 370 |
+
|
| 371 |
+
| 阶段 | 重点 | 说明 |
|
| 372 |
+
|------|------|------|
|
| 373 |
+
| **冷启动期(<PMF)** | 跑通协同流程 | 2-3 个迭代把流程跑通,深度访谈 20-30 名用户 |
|
| 374 |
+
| **增长前期** | 明确核心指标 | Onboarding 完成率 / 转化率 / 留存曲线 |
|
| 375 |
+
| **快速增长期** | 提升研发效率 | 压缩迭代到 10 天,建立 in-house 增长团队 |
|
| 376 |
+
|
| 377 |
+
---
|
| 378 |
+
|
| 379 |
+
## 十、工具推荐
|
| 380 |
+
|
| 381 |
+
| 用途 | 工具 | 说明 |
|
| 382 |
+
|------|------|------|
|
| 383 |
+
| 项目管理 | **Linear** / Jira / 飞书多维表格 | 所有 Issue 统一入口 |
|
| 384 |
+
| 数据分析 | **PostHog** / Amplitude / Mixpanel | 核心链路埋点 + 漏斗分析 |
|
| 385 |
+
| 用户反馈收集 | GitHub Issue / Linear / 飞书多维表格 | 用户可直接提交 |
|
| 386 |
+
| 会议纪要 | 飞书智能纪要 | 访谈记录自动整理 |
|
| 387 |
+
| 内部沟通 | 飞书 / Slack | 按项目建频道 |
|
| 388 |
+
| 内容管理 | Notion / 飞书云文档 | SOP、模板、知识库 |
|
| 389 |
+
|
| 390 |
+
---
|
| 391 |
+
|
| 392 |
+
## 附录一:Bug Report 模板
|
| 393 |
+
|
| 394 |
+
```markdown
|
| 395 |
+
## Issue 标题
|
| 396 |
+
[简明描述问题]
|
| 397 |
+
|
| 398 |
+
## 基本信息
|
| 399 |
+
- **来源渠道**:[用户反馈 / 客服 / 社媒 / 内测]
|
| 400 |
+
- **反馈次数**:[N] 次(≥3次请标注 severe)
|
| 401 |
+
- **系统/平台**:[Web / iOS / Android / Self-host]
|
| 402 |
+
- **版本号**:[如 v2.3.1]
|
| 403 |
+
|
| 404 |
+
## 复现步骤
|
| 405 |
+
1. [步骤1]
|
| 406 |
+
2. [步骤2]
|
| 407 |
+
3. [步骤3]
|
| 408 |
+
|
| 409 |
+
## 预期行为
|
| 410 |
+
[用户期望应该是什么样的]
|
| 411 |
+
|
| 412 |
+
## 实际行为
|
| 413 |
+
[当前实际发生的情况]
|
| 414 |
+
|
| 415 |
+
## 证据
|
| 416 |
+
[截图 / 录屏链接]
|
| 417 |
+
|
| 418 |
+
## 影响评估
|
| 419 |
+
[对用户体验/付费转化/留存的影响]
|
| 420 |
+
|
| 421 |
+
## 标签
|
| 422 |
+
[Bug / Feature Request / UX优化]
|
| 423 |
+
|
| 424 |
+
## 优先级建议(运营侧)
|
| 425 |
+
[P0(立即修)/ P1(本迭代修)/ P2(下个迭代修)]
|
| 426 |
+
```
|
| 427 |
+
|
| 428 |
+
---
|
| 429 |
+
|
| 430 |
+
## 附录二:迭代规划会模板
|
| 431 |
+
|
| 432 |
+
```markdown
|
| 433 |
+
# [迭代名称] 规划会议纪要
|
| 434 |
+
**日期:**
|
| 435 |
+
**参与人:**
|
| 436 |
+
|
| 437 |
+
## 一、上迭代复盘
|
| 438 |
+
| 目标指标 | 起始值 | 结果值 | 完成情况 |
|
| 439 |
+
|---------|-------|-------|---------|
|
| 440 |
+
| | | | |
|
| 441 |
+
|
| 442 |
+
**未完成项:**
|
| 443 |
+
1.
|
| 444 |
+
2.
|
| 445 |
+
|
| 446 |
+
## 二、本迭代目标
|
| 447 |
+
| # | 目标 | 对应商业化价值 | 负责人 |
|
| 448 |
+
|---|-----|------------|-------|
|
| 449 |
+
| 1 | | | |
|
| 450 |
+
| 2 | | | |
|
| 451 |
+
| 3 | | | |
|
| 452 |
+
|
| 453 |
+
## 三、运营侧需求
|
| 454 |
+
| 需求 | 背景/用户反馈来源 | 建议优先级 |
|
| 455 |
+
|-----|----------------|----------|
|
| 456 |
+
| | | |
|
| 457 |
+
|
| 458 |
+
## 四、研发侧评估
|
| 459 |
+
| 需求 | 技术方案 | 工时估计 | 本迭代可完成? |
|
| 460 |
+
|-----|---------|--------|-------------|
|
| 461 |
+
| | | | |
|
| 462 |
+
|
| 463 |
+
## 五、最终确认范围
|
| 464 |
+
**进入迭代:**
|
| 465 |
+
**延到下期:**
|
| 466 |
+
**技术债安排:**
|
| 467 |
+
```
|
| 468 |
+
|
| 469 |
+
---
|
| 470 |
+
|
| 471 |
+
## 附录三:产研运职责边界
|
| 472 |
+
|
| 473 |
+
| 事项 | 决策方 | 建议方 | 执行方 |
|
| 474 |
+
|------|--------|--------|--------|
|
| 475 |
+
| 功能要不要做 | 产品 + 运营 | 运营(需求)、研发(可行性) | 研发 |
|
| 476 |
+
| Bug 修不修 | 产品 + 运营 | 运营(反馈集中度) | 研发 |
|
| 477 |
+
| 发版时间 | 产研运三方共同 | — | — |
|
| 478 |
+
| 用户访谈发现的优先级 | 运营 | — | 产品 + 研发 |
|
| 479 |
+
| 增长策略 | 运营 + 产品 | 研发(数据支持) | 运营 |
|
| 480 |
+
| 技术架构/重构 | 研发 + 产品 | 运营(体验影响) | 研发 |
|
| 481 |
+
|
| 482 |
+
---
|
| 483 |
+
|
| 484 |
+
*本 SOP 整合自真实产品战略会议纪要、用户反馈录入模板、内测用户访谈体系。适用于所有需要在产品、研发、运营三方之间建立协同机制的产品团队。*
|
skills/gr-product-dev-ops/references/en/README.md
ADDED
|
@@ -0,0 +1,54 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# Product × Engineering × Operations Alignment SOP
|
| 2 |
+
|
| 3 |
+
Everything serves commercialization. From unified backlog to 10-day sprint cadence to release veto power.
|
| 4 |
+
|
| 5 |
+
## Why the Three Teams Misalign
|
| 6 |
+
|
| 7 |
+
- **New features vs. user feedback**: dev chases new features while reported bugs sit for months — no unified priority mechanism
|
| 8 |
+
- **What eng wants vs. what ops needs**: eng thinks ops doesn't get tech, ops thinks eng ignores users — no shared goal
|
| 9 |
+
- **Fast vs. stable**: growing before the product form stabilizes piles up tech debt — no clear product-stage judgment
|
| 10 |
+
|
| 11 |
+
Four fixes: one unified board, a commercial metric per sprint (e.g., signup→paid 4.5% → 7%), ops veto on releases, tri-party alignment before every sprint.
|
| 12 |
+
|
| 13 |
+
## Dual-Layer Kanban
|
| 14 |
+
|
| 15 |
+
- **Master backlog**: every raw issue (user feedback / competitor / strategy) enters one pool first
|
| 16 |
+
- **Sprint board**: only reviewed, scheduled items flow downstream into it
|
| 17 |
+
- **Issue discipline**: every ops-filed issue must include reproduction steps — unreproducible means unfixable
|
| 18 |
+
- **Auto-escalation**: same issue reported 3+ times → `severe` tag, must be fixed in the next sprint
|
| 19 |
+
- **Triage**: Bugs go straight to the bug board; feature requests need a product spec before entering a sprint
|
| 20 |
+
|
| 21 |
+
## 10-Day Sprint Cadence
|
| 22 |
+
|
| 23 |
+
- Day 1 dev starts → Day 6 testable build (ops finishes testing within half a day) → Day 7 alignment meeting (20-30 min) → Day 9 launch assets ready → Day 10 ship
|
| 24 |
+
- Cycle by stage: PMF validation 1-2 weeks, growth 3-4 weeks, mature 6-8 weeks — modern web teams should compress to 10 days-2 weeks
|
| 25 |
+
- **Red line**: never ship on a Friday or weekend
|
| 26 |
+
|
| 27 |
+
## Meeting Rhythm
|
| 28 |
+
|
| 29 |
+
- **Daily standup**: 15 min, standing; each person covers yesterday / today / blockers; ops reports complaint hotspots
|
| 30 |
+
- **Sprint planning** (30-60 min): last-sprint retro → Top-3 goals tied to commercial value → scope confirmation
|
| 31 |
+
- **Sprint review** (30 min) + **monthly review** (60-90 min); any meeting over an hour means someone is coasting
|
| 32 |
+
|
| 33 |
+
## Ops Veto Power
|
| 34 |
+
|
| 35 |
+
If a P0 bug that hurts UX or paid conversion is unfixed before release, ops can propose delaying the ship. P0 = payment failures, core function down, data errors. Layout glitches are P1; copy typos are P2.
|
| 36 |
+
|
| 37 |
+
## Resources & Tech Debt
|
| 38 |
+
|
| 39 |
+
- Split: 50-60% new features / 20-30% bug fixes / 20-30% tech debt
|
| 40 |
+
- Refactors get a separate project (1-3 months), run parallel to normal releases, and end with full regression testing (3-5 core users)
|
| 41 |
+
|
| 42 |
+
## Sprint Health Benchmarks
|
| 43 |
+
|
| 44 |
+
| Check | Healthy | Warning |
|
| 45 |
+
|-------|---------|---------|
|
| 46 |
+
| Avg P0 fix time | ≤2 days | >3 days |
|
| 47 |
+
| Features shipped on time | ≥80% | <60% |
|
| 48 |
+
| Avg feedback response time | ≤24 h | >48 h |
|
| 49 |
+
| Same bug re-reported | ≤2 times | ≥3 times |
|
| 50 |
+
| Test report submitted | 100% by Day 6.5 | over half a day late |
|
| 51 |
+
|
| 52 |
+
## Related Gingiris Skills
|
| 53 |
+
- User interview SOP: https://github.com/Gingiris-1031/gingiris-skills/tree/main/skills/gingiris-user-interview
|
| 54 |
+
- All skills: https://clawhub.ai/gingiris-1031
|
skills/gr-product-dev-ops/references/ja/README.md
ADDED
|
@@ -0,0 +1,54 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# プロダクト × 開発 × 運営 連携 SOP
|
| 2 |
+
|
| 3 |
+
すべては商業化のために。統一バックログから 10 日スプリント、リリース拒否権までの完全な三者連携フレームワーク。
|
| 4 |
+
|
| 5 |
+
## なぜ三者連携はうまくいかないのか
|
| 6 |
+
|
| 7 |
+
- **新機能 vs ユーザーフィードバック**:開発は新機能を追いかけ、報告されたバグは何ヶ月も放置——統一された優先度決定メカニズムがない
|
| 8 |
+
- **開発がやりたいこと vs 運営が求めること**:開発は「運営は技術を分かっていない」、運営は「開発はユーザーの声を聞かない」——共通の目標がない
|
| 9 |
+
- **スピード vs 安定**:プロダクトの形が固まる前に成長を急ぎ、技術的負債が積み上がる——プロダクト段階の判断基準がない
|
| 10 |
+
|
| 11 |
+
解決の 4 つの仕組み:統一カンバン、スプリントごとの商業指標(例:登録→課金転換率 4.5% → 7%)、運営のリリース拒否権、毎スプリント前の三者アラインメント。
|
| 12 |
+
|
| 13 |
+
## 二層カンバン体系
|
| 14 |
+
|
| 15 |
+
- **総バックログ**:すべての生 Issue(ユーザーフィードバック/競合分析/戦略要件)はまず一つのプールへ
|
| 16 |
+
- **スプリントボード**:レビューを経てスケジュールされた項目だけが流れ込む
|
| 17 |
+
- **Issue の規律**:運営が起票する Issue には必ず再現手順を付ける——再現できないものは直せない
|
| 18 |
+
- **自動エスカレーション**:同一 Issue が 3 回以上報告されたら `severe` タグを付け、直近のスプリントで必ず解決
|
| 19 |
+
- **振り分け**:Bug は直接 Bug ボードへ、Feature Request はプロダクト側が方案を出してからスプリントへ
|
| 20 |
+
|
| 21 |
+
## 10 日スプリントの標準リズム
|
| 22 |
+
|
| 23 |
+
- Day 1 開発開始 → Day 6 テスト可能ビルド提出(運営は半日以内にテスト完了)→ Day 7 アラインメント会議(20-30 分)→ Day 9 リリース素材準備 → Day 10 リリース
|
| 24 |
+
- 段階別の周期:PMF 検証期 1-2 週、成長期 3-4 週、安定期 6-8 週——現代の Web 開発では 10 日〜2 週間への圧縮を推奨
|
| 25 |
+
- **レッドライン**:金曜・週末のリリースは絶対にしない
|
| 26 |
+
|
| 27 |
+
## 会議のリズム
|
| 28 |
+
|
| 29 |
+
- **デイリースタンドアップ**:15 分、立ったまま。昨日/今日/ブロッカーの 3 点のみ。運営は前日のユーザークレームのホットスポットを必ず共有
|
| 30 |
+
- **スプリント計画会**(30-60 分):前スプリントの振り返り → 商業価値に紐づく Top 3 目標 → スコープ確定
|
| 31 |
+
- **スプリント検収会**(30 分)+ **月次レビュー**(60-90 分)。1 時間を超える会議には必ずサボる人が出る
|
| 32 |
+
|
| 33 |
+
## 運営の拒否権
|
| 34 |
+
|
| 35 |
+
UX や課金転換を直接損なう P0 バグが未修正のままなら、運営はリリース延期を提案できる。P0 = 決済失敗・コア機能の停止・データ誤り。レイアウト崩れは P1、文言ミスは P2。
|
| 36 |
+
|
| 37 |
+
## リソース配分と技術的負債
|
| 38 |
+
|
| 39 |
+
- 配分目安:新機能 50-60% / バグ修正 20-30% / 技術的負債 20-30%
|
| 40 |
+
- リファクタリングは別プロジェクト化(1-3 ヶ月)、通常リリースと並行運用し、完了後はコアユーザー 3-5 名での完全回帰テスト
|
| 41 |
+
|
| 42 |
+
## スプリント健全性ベンチマーク
|
| 43 |
+
|
| 44 |
+
| チェック項目 | 健全値 | 警告シグナル |
|
| 45 |
+
|------------|--------|------------|
|
| 46 |
+
| P0 バグ平均修復時間 | ≤2 日 | >3 日 |
|
| 47 |
+
| 機能の予定通りリリース率 | ≥80% | <60% |
|
| 48 |
+
| フィードバック平均応答時間 | ≤24 時間 | >48 時間 |
|
| 49 |
+
| 同一バグの再報告回数 | ≤2 回 | ≥3 回 |
|
| 50 |
+
| テストレポート提出 | Day 6.5 までに 100% | 半日以上の遅延 |
|
| 51 |
+
|
| 52 |
+
## 関連 Gingiris スキル
|
| 53 |
+
- ユーザーインタビュー SOP: https://github.com/Gingiris-1031/gingiris-skills/tree/main/skills/gingiris-user-interview
|
| 54 |
+
- 全スキル: https://clawhub.ai/gingiris-1031
|
skills/gr-product-dev-ops/references/ko/README.md
ADDED
|
@@ -0,0 +1,54 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# 제품 × 개발 × 운영 협업 SOP
|
| 2 |
+
|
| 3 |
+
모든 것은 수익화를 위해. 통합 백로그부터 10일 스프린트 리듬, 릴리스 거부권까지 완전한 3자 협업 프레임워크.
|
| 4 |
+
|
| 5 |
+
## 왜 세 팀의 협업은 늘 어긋나는가
|
| 6 |
+
|
| 7 |
+
- **신기능 vs 사용자 피드백**: 개발팀은 신기능만 쫓고, 보고된 버그는 몇 달째 방치 — 통합된 우선순위 결정 메커니즘 부재
|
| 8 |
+
- **개발이 하고 싶은 것 vs 운영이 원하는 것**: 개발은 "운영이 기술을 모른다", 운영은 "개발이 사용자 말을 안 듣는다" — 공동 목표 부재
|
| 9 |
+
- **속도 vs 안정성**: 제품 형태가 안정되기 전에 성장을 서두르다 기술 부채만 쌓임 — 제품 단계 판단 기준 부재
|
| 10 |
+
|
| 11 |
+
해결의 4대 메커니즘: 통합 칸반, 스프린트마다 명확한 상업화 지표(예: 가입→결제 전환율 4.5% → 7%), 운영의 릴리스 거부권, 매 스프린트 전 3자 얼라인먼트.
|
| 12 |
+
|
| 13 |
+
## 2층 칸반 체계
|
| 14 |
+
|
| 15 |
+
- **총 백로그**: 모든 원시 이슈(사용자 피드백/경쟁사 분석/전략 요구)는 먼저 하나의 풀로
|
| 16 |
+
- **스프린트 보드**: 리뷰를 거쳐 일정이 확정된 항목만 하류로 유입
|
| 17 |
+
- **이슈 규율**: 운영이 등록하는 모든 이슈에는 재현 단계 필수 — 재현할 수 없으면 고칠 수 없음
|
| 18 |
+
- **자동 에스컬레이션**: 동일 이슈가 3회 이상 보고되면 `severe` 태그 부착, 가장 가까운 스프린트에서 반드시 해결
|
| 19 |
+
- **분류**: 버그는 버그 보드로 직행, 기능 요청은 제품 기획안이 나온 뒤에야 스프린트 진입
|
| 20 |
+
|
| 21 |
+
## 10일 스프린트 표준 리듬
|
| 22 |
+
|
| 23 |
+
- Day 1 개발 시작 → Day 6 테스트 가능 빌드 제출(운영은 반나절 내 테스트 완료) → Day 7 얼라인먼트 회의(20-30분) → Day 9 출시 자료 준비 → Day 10 릴리스
|
| 24 |
+
- 단계별 주기: PMF 검증기 1-2주, 성장기 3-4주, 안정기 6-8주 — 현대 웹 개발 리듬에서는 10일~2주로 압축 권장
|
| 25 |
+
- **레드라인**: 금요일이나 주말에는 절대 릴리스하지 않는다
|
| 26 |
+
|
| 27 |
+
## 회의 리듬
|
| 28 |
+
|
| 29 |
+
- **데일리 스탠드업**: 15분, 서서 진행. 어제/오늘/블로커 세 가지만. 운영은 전날 사용자 불만 핫스팟을 반드시 공유
|
| 30 |
+
- **스프린트 계획 회의**(30-60분): 지난 스프린트 회고 → 상업적 가치와 연결된 Top 3 목표 → 범위 확정
|
| 31 |
+
- **스프린트 검수 회의**(30분) + **월간 리뷰**(60-90분). 1시간 넘는 회의에는 반드시 딴짓하는 사람이 생긴다
|
| 32 |
+
|
| 33 |
+
## 운영의 거부권
|
| 34 |
+
|
| 35 |
+
UX나 결제 전환을 직접 해치는 P0 버그가 미해결이면 운영은 릴리스 연기를 제안할 수 있다. P0 = 결제 실패·핵심 기능 불능·데이터 오류. 레이아웃 깨짐은 P1, 문구 오타는 P2.
|
| 36 |
+
|
| 37 |
+
## 리소스 배분과 기술 부채
|
| 38 |
+
|
| 39 |
+
- 배분 기준: 신기능 50-60% / 버그 수정 20-30% / 기술 부채 20-30%
|
| 40 |
+
- 리팩토링은 별도 프로젝트로(1-3개월), 정상 릴리스와 병행 운영하며 완료 후 핵심 사용자 3-5명이 참여하는 완전 회귀 테스트 필수
|
| 41 |
+
|
| 42 |
+
## 스프린트 건강도 벤치마크
|
| 43 |
+
|
| 44 |
+
| 체크 항목 | 건강 기준 | 경고 신호 |
|
| 45 |
+
|----------|----------|----------|
|
| 46 |
+
| P0 버그 평균 수정 시간 | ≤2일 | >3일 |
|
| 47 |
+
| 기능 정시 출시율 | ≥80% | <60% |
|
| 48 |
+
| 피드백 평균 응답 시간 | ≤24시간 | >48시간 |
|
| 49 |
+
| 동일 버그 반복 보고 횟수 | ≤2회 | ≥3회 |
|
| 50 |
+
| 테스트 리포트 제출 | Day 6.5까지 100% | 반나절 이상 지연 |
|
| 51 |
+
|
| 52 |
+
## 관련 Gingiris 스킬
|
| 53 |
+
- 사용자 인터뷰 SOP: https://github.com/Gingiris-1031/gingiris-skills/tree/main/skills/gingiris-user-interview
|
| 54 |
+
- 전체 스킬: https://clawhub.ai/gingiris-1031
|